ML16188A020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16188A020
| number = ML16188A020
| issue date = 07/05/2016
| issue date = 07/05/2016
| title = 06/08/2016 - Summary of Annual Assessment Meeting for Indian Point Units 2 and 3
| title = Summary of Annual Assessment Meeting for Indian Point Units 2 and 3
| author name = Dentel G T
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person = Dentel G T
| contact person = Dentel G
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 2
| page count = 2
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 5, 2016   MEETING SUMMARY LICENSEE: ENTERGY NUCLEAR NORTHEAST
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 5, 2016 MEETING  


FACILITY: INDIAN POINT UNITS 2 AND 3  
==SUMMARY==
 
LICENSEE:      ENTERGY NUCLEAR NORTHEAST FACILITY:       INDIAN POINT UNITS 2 AND 3


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015. The NRC discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period of January 1 through December 31, 2015. The NRC presented slides on two topics of public interest, which included the identification of degraded baffle-former bolts at Unit 2 and the plans for installation of a new natural gas pipeline that will cross a portion of the Indian Point plant property. Following the presentations, the NRC held a question and answer session, during which interested stakeholders were able to ask questions or make statements in a public forum.


Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC personnel were available to speak individually with stakeholders.  
==SUMMARY==
 
OF PUBLIC MEETING On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015.
The NRC's assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.  
The NRC discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period of January 1 through December 31, 2015. The NRC presented slides on two topics of public interest, which included the identification of degraded baffle-former bolts at Unit 2 and the plans for installation of a new natural gas pipeline that will cross a portion of the Indian Point plant property. Following the presentations, the NRC held a question and answer session, during which interested stakeholders were able to ask questions or make statements in a public forum.
        /RA/     Glenn T. Dentel, Chief Projects Branch 2 Division of Reactor Projects  
Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC personnel were available to speak individually with stakeholders.
The NRCs assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
                                                        /RA/
Glenn T. Dentel, Chief Projects Branch 2 Division of Reactor Projects


==Enclosures:==
==Enclosures:==
1. Speaker List (ML16182A062)  
: 1. Speaker List (ML16182A062)
: 2. NRC Staff Presentations (ML16182A067)  
: 2. NRC Staff Presentations (ML16182A067)
: 3. Presentations by Members of the Public (ML16182A102)  
: 3. Presentations by Members of the Public (ML16182A102)
: 4. Handouts Submitted by Individuals (ML16182A177)  
: 4. Handouts Submitted by Individuals (ML16182A177)


ML16188A020           SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE     RI/DRP RI/DRP   NA.M.E NFloyd/NF   GDentel/GTD   DATE 7/5/16 7/5/16    
ML16188A020 Non-Sensitive                             Publicly Available SUNSI Review Sensitive                                Non-Publicly Available OFFICE         RI/DRP                 RI/DRP NA.M.E         NFloyd/NF             GDentel/GTD DATE           7/5/16                 7/5/16}}
}}

Latest revision as of 15:25, 4 December 2019

Summary of Annual Assessment Meeting for Indian Point Units 2 and 3
ML16188A020
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 07/05/2016
From: Glenn Dentel
Reactor Projects Branch 2
To:
Entergy Nuclear Northeast
Dentel G
References
Download: ML16188A020 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 5, 2016 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR NORTHEAST FACILITY: INDIAN POINT UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015.

The NRC discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period of January 1 through December 31, 2015. The NRC presented slides on two topics of public interest, which included the identification of degraded baffle-former bolts at Unit 2 and the plans for installation of a new natural gas pipeline that will cross a portion of the Indian Point plant property. Following the presentations, the NRC held a question and answer session, during which interested stakeholders were able to ask questions or make statements in a public forum.

Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC personnel were available to speak individually with stakeholders.

The NRCs assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413.

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

/RA/

Glenn T. Dentel, Chief Projects Branch 2 Division of Reactor Projects

Enclosures:

1. Speaker List (ML16182A062)
2. NRC Staff Presentations (ML16182A067)
3. Presentations by Members of the Public (ML16182A102)
4. Handouts Submitted by Individuals (ML16182A177)

ML16188A020 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NA.M.E NFloyd/NF GDentel/GTD DATE 7/5/16 7/5/16