ML16264A363: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16264A363 | | number = ML16264A363 | ||
| issue date = 09/20/2016 | | issue date = 09/20/2016 | ||
| title = | | title = Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times | ||
| author name = | | author name = | ||
| author affiliation = South Texas Association for Responsible Energy | | author affiliation = South Texas Association for Responsible Energy | ||
Line 9: | Line 9: | ||
| docket = 05000489, 05000499 | | docket = 05000489, 05000499 | ||
| license number = NPF-076, NPF-080 | | license number = NPF-076, NPF-080 | ||
| contact person = Regner L | | contact person = Regner L | ||
| case reference number = CAC MF8280, CAC MF8281 | | case reference number = CAC MF8280, CAC MF8281 | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
| page count = 14 | | page count = 14 | ||
| project = CAC:MF8280, CAC:MF8281 | |||
| stage = Meeting | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016 | |||
===Introductions=== | |||
* Mike Murray- Regulatory Affairs Manager | |||
* Joe Enoch- Supervisor, Emergency Planning | |||
* Stephanie Rodgers- Staff, Emergency Planning | |||
* Kathleen Van Daalen- Staff, Licensing 2 | |||
Desired Outcomes | |||
* Communicate the content of the planned submittal | |||
* Provide a common understanding of the planned submittal 3 | |||
Proposed Changes | |||
* Increases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes. | |||
- Increases the required augmentation time for Emergency Response Organization members to respond to their facility | |||
- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth | |||
- Increases Emergency Response Facilities activation times | |||
* The proposed changes considered the guidance of RIS 2016-10 4 | |||
Regulatory Compliance Applicable Regulatory Referenced in LAR Documents Submittal | |||
* 10 CFR 50.47(b)(2) | |||
* Planning Standard (ERO) | |||
* 10 CFR 50.54(q) | |||
* Prior Approval (Example 1.219) | |||
* 10 CFR 50.90 | |||
* License Request (required) | |||
* NUREG-0654 | |||
* Guidance (Basis for Plan) | |||
* NUREG-0737 | |||
* STA (Engineering On-shift) | |||
* RG 1.219 | |||
* Guidance for Changes (50.54q) | |||
* RG 1.101 | |||
* Endorsement (NUREG-0654) | |||
* RIS 2016-10 | |||
* Expectation (Staff) 5 | |||
Comparison (RIS-STP LAR) | |||
RIS 2016-10 STP Submittal | |||
* Current License Basis | |||
* May 20, 1993 | |||
* Fukushima (FLEX) | |||
* No credit taken | |||
* NUREG-0654 Staffing | |||
* Staffing > NUREG-0654 | |||
- Major Functions - Identified | |||
- Technology - Described | |||
- Table B-1, 60-90 Minute - Defined | |||
* Offsite Agency Impact | |||
* State/County Concurrence 6 | |||
Comparison (RIS-STP LAR) | |||
RIS 2016-10 STP Submittal Major Functional Tasks Details | |||
* Notification and Communication | |||
* 2 Dedicated on-shift ( RO & NLO) | |||
* Emergency Director | |||
* 2 Augmented at 90-minutes | |||
* Off-site Surveys / On-site (out-of- | |||
* Describes personnel and plant) / In-Plant Surveys technology | |||
* Chemistry/Radio-chemistry | |||
* On-shift staffed | |||
* Technical Support | |||
* STA role and technology | |||
* Repair and Corrective Actions | |||
* Identified Staffing > NUREG-0654 | |||
* Radiation Protection | |||
* Staffing and technology | |||
* Dose Assessment | |||
* On-shift staffed 7 | |||
Site/Program Enhancements | |||
* Technology | |||
- Access/Dosimetry Controls | |||
- Area Radiation Monitors | |||
- Dose Assessment | |||
- Plant Computer (System status trees) | |||
- Auto Notifications Systems | |||
- Web EOC | |||
* Training | |||
- Licensed Operator Requalification and Simulator Modeling | |||
- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering) | |||
* Procedures | |||
- Symptom Based | |||
- Initiating Events (EALs NEI 99-01 Rev. 6) | |||
* Shift Complement 8 | |||
Staffing Changes | |||
* Increased in 1993 to staffing of 20 | |||
* Currently staffed at 25 | |||
- Will remain staffed at 25 | |||
* Operations Staff | |||
* 2-SMs (ED qualified) | |||
* 2-SROs | |||
* 4-ROs | |||
* 4-NLOs | |||
* 1-STA 9 | |||
Staffing Comparison Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Operations * | |||
: 1. Shift Sup/Manager 1. 1/0/0 1. 2/0/0 1. 2/0 | |||
: 2. Shift Foreman/US 2. 1/0/0 2. 2/0/0 2. 2/0 | |||
: 3. RO 3. 2/0/0 3. 4/0/0 3. 4/0 | |||
: 4. Plant Operators 4. 2/0/0 4. 4/0/0 4. 4/0 | |||
: 5. STA 5. 1**/0/0 (not counted in 5. 1**/0/0 (not counted in 5. 1**/0 (not counted in On-shift Total) On-shift Total) On-shift Total) | |||
: 6. Operations Discipline 6. None defined 6. 0/0/1# 6. 0/1# | |||
Lead Emergency Direction and Control*** 1**/0/0 (not counted in 2**/0/0 (not counted in 2**/0 (not counted in (STA, SS, or Facility On-shift Total) On-shift Total) On-shift Total) | |||
Director) | |||
Notification/ 1/1/2 2/0/2 2/2 Communication | |||
* Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO | |||
** May be provided by shift personnel assigned other functions | |||
*** Assumed by EOF Director when all facilities are manned | |||
# Filled by personnel with plant operations experience 10 | |||
Staffing Comparison (Continued) | |||
Major Functional Area NUREG-0654 NUREG-0654 Current STP Staffing Proposed STP Staffing On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Radiological Assessment Emergency Director 0/0/1 0/0/1 0/1 Senior HP Expertise 0/1/0 1/0/0 1/0 Offsite/Onsite surveys 0/3/3 2/3/4 2**/7 Chemistry/Radio-chem 2/1/2 1/0/1 1/1 Engineering, Repair and Corrective Actions | |||
: 1. Technical Support 1. 1. 1. | |||
STA 1/0/0 1/0/0 1/0 Core 0/1/0 0/1/0 0/1 Electrical 0/0/1 0/0/1 0/1 Mechanical 0/0/1 0/0/1 0/1 | |||
: 2. Repair and Corr. Actions | |||
: 2. 2. 2. | |||
2**/0/0 (not counted in 2**/0 (not counted in Rad Waste/ | |||
1**/0/2 (not counted On-shift Total) On-shift Total) | |||
Mechanical in On-shift total) 1**/0/1 1**/1 Electrical/I&C 1**/1/1 (not counted 1**and 1/0/1 1**and1/1 in On-shift Total) | |||
I&C 1/0/0 1/0 0/1/0 | |||
** May be provided by shift personnel assigned other functions 11 | |||
Staffing Comparison (Continued) | |||
Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Protective Actions (In Plant) Radiation 2**/2/2 (not counted in 2**/4/0 (not counted in 2**/4 (not counted in Protection HP On-shift Total) On-shift Total) On-shift Total) | |||
Technicians for: | |||
: a. Access Control | |||
: b. HP Coverage | |||
: c. Personnel monitor | |||
: d. Dosimetry Firefighting Per T/S / Local Support / Per T/S / Local Support Per T/S / Local Support 0 / Local Support Rescue First Aid 2**/ Local Support 2**/ Local Support / 2**/ Local Support (not counted in On-shift Total) Local Support Security Site Access Per Security Plan Per Security Plan Per Security Plan Control and Personnel Accountability Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46 | |||
** May be provided by shift personnel assigned other functions 12 | |||
Precedent | |||
* Point Beach | |||
* Prairie Island | |||
* RAIs Reviewed 13 | |||
Closing Remarks | |||
* Desired Outcome | |||
* Submittal Date | |||
* STP Point of Contact 14}} |
Latest revision as of 13:03, 4 December 2019
ML16264A363 | |
Person / Time | |
---|---|
Site: | South Texas, Perkins |
Issue date: | 09/20/2016 |
From: | South Texas Association for Responsible Energy |
To: | Division of Operating Reactor Licensing |
Regner L | |
References | |
CAC MF8280, CAC MF8281 | |
Download: ML16264A363 (14) | |
Text
Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016
Introductions
- Mike Murray- Regulatory Affairs Manager
- Joe Enoch- Supervisor, Emergency Planning
- Stephanie Rodgers- Staff, Emergency Planning
- Kathleen Van Daalen- Staff, Licensing 2
Desired Outcomes
- Communicate the content of the planned submittal
- Provide a common understanding of the planned submittal 3
Proposed Changes
- Increases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes.
- Increases the required augmentation time for Emergency Response Organization members to respond to their facility
- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth
- Increases Emergency Response Facilities activation times
- The proposed changes considered the guidance of RIS 2016-10 4
Regulatory Compliance Applicable Regulatory Referenced in LAR Documents Submittal
- Planning Standard (ERO)
- Prior Approval (Example 1.219)
- License Request (required)
- Guidance (Basis for Plan)
- STA (Engineering On-shift)
- Guidance for Changes (50.54q)
- Endorsement (NUREG-0654)
- Expectation (Staff) 5
Comparison (RIS-STP LAR)
RIS 2016-10 STP Submittal
- Current License Basis
- May 20, 1993
- Fukushima (FLEX)
- No credit taken
- NUREG-0654 Staffing
- Staffing > NUREG-0654
- Major Functions - Identified
- Technology - Described
- Table B-1, 60-90 Minute - Defined
- Offsite Agency Impact
- State/County Concurrence 6
Comparison (RIS-STP LAR)
RIS 2016-10 STP Submittal Major Functional Tasks Details
- Notification and Communication
- Emergency Director
- 2 Augmented at 90-minutes
- Off-site Surveys / On-site (out-of-
- Describes personnel and plant) / In-Plant Surveys technology
- Chemistry/Radio-chemistry
- On-shift staffed
- Technical Support
- STA role and technology
- Repair and Corrective Actions
- Identified Staffing > NUREG-0654
- Radiation Protection
- Staffing and technology
- Dose Assessment
- On-shift staffed 7
Site/Program Enhancements
- Technology
- Access/Dosimetry Controls
- Area Radiation Monitors
- Dose Assessment
- Plant Computer (System status trees)
- Auto Notifications Systems
- Web EOC
- Training
- Licensed Operator Requalification and Simulator Modeling
- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)
- Procedures
- Symptom Based
- Initiating Events (EALs NEI 99-01 Rev. 6)
- Shift Complement 8
Staffing Changes
- Increased in 1993 to staffing of 20
- Currently staffed at 25
- Will remain staffed at 25
- Operations Staff
- 2-SMs (ED qualified)
- 2-SROs
- 4-ROs
- 4-NLOs
- 1-STA 9
Staffing Comparison Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Operations *
- 1. Shift Sup/Manager 1. 1/0/0 1. 2/0/0 1. 2/0
- 2. Shift Foreman/US 2. 1/0/0 2. 2/0/0 2. 2/0
- 3. RO 3. 2/0/0 3. 4/0/0 3. 4/0
- 4. Plant Operators 4. 2/0/0 4. 4/0/0 4. 4/0
- 5. STA 5. 1**/0/0 (not counted in 5. 1**/0/0 (not counted in 5. 1**/0 (not counted in On-shift Total) On-shift Total) On-shift Total)
- 6. Operations Discipline 6. None defined 6. 0/0/1# 6. 0/1#
Lead Emergency Direction and Control*** 1**/0/0 (not counted in 2**/0/0 (not counted in 2**/0 (not counted in (STA, SS, or Facility On-shift Total) On-shift Total) On-shift Total)
Director)
Notification/ 1/1/2 2/0/2 2/2 Communication
- Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO
- May be provided by shift personnel assigned other functions
- Assumed by EOF Director when all facilities are manned
- Filled by personnel with plant operations experience 10
Staffing Comparison (Continued)
Major Functional Area NUREG-0654 NUREG-0654 Current STP Staffing Proposed STP Staffing On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Radiological Assessment Emergency Director 0/0/1 0/0/1 0/1 Senior HP Expertise 0/1/0 1/0/0 1/0 Offsite/Onsite surveys 0/3/3 2/3/4 2**/7 Chemistry/Radio-chem 2/1/2 1/0/1 1/1 Engineering, Repair and Corrective Actions
- 1. Technical Support 1. 1. 1.
STA 1/0/0 1/0/0 1/0 Core 0/1/0 0/1/0 0/1 Electrical 0/0/1 0/0/1 0/1 Mechanical 0/0/1 0/0/1 0/1
- 2. Repair and Corr. Actions
- 2. 2. 2.
2**/0/0 (not counted in 2**/0 (not counted in Rad Waste/
1**/0/2 (not counted On-shift Total) On-shift Total)
Mechanical in On-shift total) 1**/0/1 1**/1 Electrical/I&C 1**/1/1 (not counted 1**and 1/0/1 1**and1/1 in On-shift Total)
I&C 1/0/0 1/0 0/1/0
- May be provided by shift personnel assigned other functions 11
Staffing Comparison (Continued)
Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Protective Actions (In Plant) Radiation 2**/2/2 (not counted in 2**/4/0 (not counted in 2**/4 (not counted in Protection HP On-shift Total) On-shift Total) On-shift Total)
Technicians for:
- a. Access Control
- b. HP Coverage
- c. Personnel monitor
- d. Dosimetry Firefighting Per T/S / Local Support / Per T/S / Local Support Per T/S / Local Support 0 / Local Support Rescue First Aid 2**/ Local Support 2**/ Local Support / 2**/ Local Support (not counted in On-shift Total) Local Support Security Site Access Per Security Plan Per Security Plan Per Security Plan Control and Personnel Accountability Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46
- May be provided by shift personnel assigned other functions 12
Precedent
- Point Beach
- Prairie Island
- RAIs Reviewed 13
Closing Remarks
- Desired Outcome
- Submittal Date
- STP Point of Contact 14