ML060330578: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060330578
| number = ML060330578
| issue date = 02/22/2006
| issue date = 02/22/2006
| title = Oyster Creek Nuclear Generating Station, License Amendment, Deletion of Reporting Requirement in Facility Operating License (TAC MC6255)
| title = License Amendment, Deletion of Reporting Requirement in Facility Operating License
| author name = Miller G E
| author name = Miller G
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = AmerGen Energy Co, LLC
| addressee affiliation = AmerGen Energy Co, LLC
| docket = 05000219
| docket = 05000219
Line 14: Line 14:
| page count = 9
| page count = 9
| project = TAC:MC6255
| project = TAC:MC6255
| stage = Approval
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:February 22, 2006Mr. Christopher M. CranePresident and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:February 22, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF             AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)


==Dear Mr. Crane:==
==Dear Mr. Crane:==


The Commission has issued the enclosed Amendment No. 258 to Facility Operating LicenseNo. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your applicationdated February 25, 2005.The amendment deletes the reporting requirement in the Facility Operating License related toreporting violations of Section 2.C of the operating license.A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included inthe Commission's biweekly Federal Register notice. Sincerely,/RA/G. Edward Miller, Project M anagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219
The Commission has issued the enclosed Amendment No. 258 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your application dated February 25, 2005.
The amendment deletes the reporting requirement in the Facility Operating License related to reporting violations of Section 2.C of the operating license.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                            /RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 258 to DPR-16
: 1. Amendment No. 258 to DPR-16
: 2. Safety Evaluationcc w/encls: See next page February 22, 2006Mr. Christopher M. CranePresident and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
: 2. Safety Evaluation cc w/encls: See next page
 
February 22, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF             AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)
OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)


==Dear Mr. Crane:==
==Dear Mr. Crane:==


The Commission has issued the enclosed Amendment No. 258 to Facility Operating LicenseNo. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your applicationdated February 25, 2005.The amendment deletes the reporting requirement in the Facility Operating License related toreporting violations of Section 2.C of the operating license.A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included inthe Commission's biweekly Federal Register notice. Sincerely,/RA/G. Edward Miller, Project M anagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-219
The Commission has issued the enclosed Amendment No. 258 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your application dated February 25, 2005.
The amendment deletes the reporting requirement in the Facility Operating License related to reporting violations of Section 2.C of the operating license.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                              /RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 258 to DPR-16
: 1. Amendment No. 258 to DPR-16
: 2. Safety Evaluationcc w/encls: See next page DISTRIBUTION
: 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
:PUBLICRidsOgcRpRidsNrrDorl LPLI-2 R/FGHill (2)RidsNrrDorlLplb WBecknerRidsNrrPMGMillerRidsNrrLACRaynor RidsAcrsAcnwMailCenterRidsRgn1MailCenter Accession Number: ML060330578OFFICECLIIP LPMNRR/LPLI-2/PMNRR/LPLI-2/LANRR/LPLI-2/BCNAMEWReckleyGEMillerCRaynorDRobertsDATE1/24/062/06/062/17/062/21/06Official Record Copy AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219OYSTER CREEK NUCLEAR GENERATING STATIONAMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 258License No. DPR-161.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment by AmerGen Energy Company, LLC, et al., (thelicensee), dated February 25, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance: (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the Facility Operating License is amended by deletion of paragraph 2.E asindicated in the attachment to this license amendment.3.This license amendment is effective as of the date of its issuance and shall beimplemented within 60 days of the date of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Darrell J. Roberts, ChiefPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
PUBLIC                                RidsOgcRp                      RidsNrrDorl LPLI-2 R/F                            GHill (2)                     RidsNrrDorlLplb WBeckner                              RidsNrrPMGMiller              RidsNrrLACRaynor RidsAcrsAcnwMailCenter                RidsRgn1MailCenter Accession Number: ML060330578 OFFICE CLIIP LPM            NRR/LPLI-2/PM NRR/LPLI-2/LA NRR/LPLI-2/BC NAME      WReckley          GEMiller          CRaynor          DRoberts DATE      1/24/06          2/06/06            2/17/06          2/21/06 Official Record Copy
 
AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 258 License No. DPR-16
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by AmerGen Energy Company, LLC, et al., (the licensee), dated February 25, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the Facility Operating License is amended by deletion of paragraph 2.E as indicated in the attachment to this license amendment.
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
Darrell J. Roberts, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Facility Operating LicenseDate of Issuance:  February 22, 2006 ATTACHMENT TO LICENSE AMENDMENT NO. 258FACILITY OPERATING LICENSE NO. DPR-16DOCKET NO. 50-219Replace the following page of the Facility Operating License with the attached page. Therevised page is identified by amendment number and contains marginal lines indicating the areas of change. RemoveInsert    5    5 1The condition (2.E) in the Facility Operating License for Oyster Creek is similar to thestandard language.SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 258TO FACILITY OPERATING LICENSE NO. DPR-16AMERGEN ENERGY COMPANY, LCCOYSTER CREEK NUCLEAR GENERATING STATIONDOCKET NO. 50-21


==91.0INTRODUCTION==
Changes to the Facility Operating License Date of Issuance: February 22, 2006
By application dated February 25, 2005, AmerGen Energy Company, LLC, (AmerGen or thelicensee) requested changes to the Facility Operating License for the Oyster Creek NuclearGenerating Station (Oyster Creek) (Agencywide Documents Access and Management System(ADAMS) Accession No. ML050600047). The proposed amendment would delete Section 2.E of the Facility Operating License that requires reporting violations of the requirements inSection 2.C of the Facility Operating License. A notice announcing the availability of thisproposed change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on November 4, 2005 (70 FR 67202). The licensee's application wasused during the development of the CLIIP notice and is being evaluated using that processeven though the application predates the notice of availability.
 
ATTACHMENT TO LICENSE AMENDMENT NO. 258 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following page of the Facility Operating License with the attached page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove                                    Insert 5                                          5
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 258 TO FACILITY OPERATING LICENSE NO. DPR-16 AMERGEN ENERGY COMPANY, LCC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219
 
==1.0    INTRODUCTION==
 
By application dated February 25, 2005, AmerGen Energy Company, LLC, (AmerGen or the licensee) requested changes to the Facility Operating License for the Oyster Creek Nuclear Generating Station (Oyster Creek) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML050600047). The proposed amendment would delete Section 2.E of the Facility Operating License that requires reporting violations of the requirements in Section 2.C of the Facility Operating License. A notice announcing the availability of this proposed change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on November 4, 2005 (70 FR 67202). The licensees application was used during the development of the CLIIP notice and is being evaluated using that process even though the application predates the notice of availability.
 
==2.0    REGULATORY EVALUATION==
 
A section or condition was included in the facility operating licenses issued to some nuclear power plants requiring the licensee to make reports to the Nuclear Regulatory Commission (NRC or the Commission) regarding violations of other sections of the operating license (typically Section 2.C). A typical license condition reads as follows:1 Except as otherwise provided in this license and its appendices, the Licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner: initial notification shall be made within 24 hours to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in
[Title 10 of the Code of Federal Regulations] 10 CFR 50.73 (licensee event report system).
1 The condition (2.E) in the Facility Operating License for Oyster Creek is similar to the standard language.


==2.0REGULATORY EVALUATION==
In addition to the information provided to support licensing decisions, the NRC obtains information about plant operation, licensee programs, and other matters using a combination of inspections and reporting requirements. Routine or scheduled reports that are required to be submitted to the NRC are defined in the related regulations, specific license condition, technical specification, or an NRC-approved program document. The reporting of emergencies, unplanned events or conditions, and other special cases may also be addressed within such documents by the inclusion of reporting thresholds, and are also the focus of the reporting requirements in 10 CFR 50.72, ?Immediate notification requirements for operating nuclear power reactors, and 10 CFR 50.73, ?Licensee event report system. Changes to the reporting regulations in 10 CFR Sections 50.72 and 50.73 became effective in January 2001 (see Federal Register notice on October 25, 2000 (65 FR 63769)) and included extending the allowable reporting times for licensee event reports (LERs) from 30 days to 60 days.
A section or condition was included in the facility operating licenses issued to some nuclearpower plants requiring the licensee to make reports to the Nuclear Regulatory Commission (NRC or the Commission) regarding violations of other sections of the operating license(typically Section 2.C). A typical license condition reads as follows:
1Except as otherwise provided in this license and its appendices, the Licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner:  initial notification shall be made within 24 hours to the NRC Operations Center via the Emergency Notification System withwritten followup within thirty days in accordance with the procedures described in
[Title 10 of the Code of Federal Regulations] 10 CFR 50.73 (licensee eventreport system). In addition to the information provided to support licensing decisions, the NRC obtainsinformation about plant operation, licensee programs, and other matters using a combination of inspections and reporting requirements. Routine or scheduled reports that are required to be submitted to the NRC are defined in the related regulations, specific license condition, technicalspecification, or an NRC-approved program document. The reporting of emergencies,unplanned events or conditions, and other special cases may also be addressed within such documents by the inclusion of reporting thresholds, and are also the focus of the reporting requirements in 10 CFR 50.72, ?Immediate notification requirements for operating nuclearpower reactors," and 10 CFR 50.73, ?Licensee event report system.Changes to the reportingregulations in 10 CFR Sections 50.72 and 50.73 became effective in January 2001 (see Federal Register notice on October 25, 2000 (65 FR 63769)) and included extending theallowable reporting times for licensee event reports (LERs) from 30 days to 60 days.


==3.0TECHNICAL EVALUATION==
==3.0      TECHNICAL EVALUATION==
The specific section (2.E) in the Oyster Creek Facility Operating License requires the licenseeto report any violations of the requirements of Section 2.C of the Facility Operating License anddefines the method and allowable time periods for such reports. The reporting threshold (i.e., a violation) for some of the conditions included in Section 2.C of the Facility Operating Licensesduplicates those defined in 10 CFR 50.72 and 10 CFR 50.73. However, the requirements in theFacility Operating License may have different deadlines than those defined in the regulations(following a rule change in 2001). This difference in reporting requirements has led to variations in reporting since many Facility Operating Licenses do not contain the subjectcondition. For those licensees with a 30-day reporting requirement in the Facility OperatingLicense, the condition has decreased the benefits of the rulemaking. For those cases wherethe current Facility Operating License requirement to report violations is also reportable inaccordance with the regulations defined in 10 CFR 50.72 and 10 CFR 50.73, the NRC stafffinds that the regulations adequately address this issue and the elimination of the duplicativerequirement in the Oyster Creek Facility Operating License is acceptable.Some of the conditions addressed in Section 2.C of the Facility Operating License may addressthe maintenance of particular programs, administrative requirements, or other matters where a violation of the requirement would not result in a report to the NRC in accordance with10 CFR 50.72 or 10 CFR 50.73. In most cases, there are requirements for reports to the NRC related to these conditions in other regulations, the specific license condition or technical specification, or an NRC-approved program document. In other cases, there are reports toother agencies or news releases that would prompt a report to the NRC (in accordance with10 CFR 50.72(b)(2)(xi)). The NRC staff also assessed violations of administrative requirementsthat could be reportable under the current License Condition but that may not have a duplicativerequirement in a regulation or other regulatory requirement. The NRC staff finds that therequirements to report such problems within 24 hours with written reports to follow using the LER process is not needed. The NRC staff is confident that the information related to suchviolations that is actually important to the NRC's regulatory functions would come to light in atime frame comparable to the 60-day LER requirements. The information would become available to the appropriate NRC staff through the inspection program, updates to programdocuments, resultant licensing actions, public announcements, or some other reliable mechanism. The NRC staff finds that the elimination of Section 2.E in the Oyster Creek Facility Operating  License will not result in a loss of information to the NRC that would adversely affect either itsgoal to protect public health and safety, or its ability to carry out its various other regulatoryresponsibilities. 


==4.0STATE CONSULTATION==
The specific section (2.E) in the Oyster Creek Facility Operating License requires the licensee to report any violations of the requirements of Section 2.C of the Facility Operating License and defines the method and allowable time periods for such reports. The reporting threshold (i.e., a violation) for some of the conditions included in Section 2.C of the Facility Operating Licenses duplicates those defined in 10 CFR 50.72 and 10 CFR 50.73. However, the requirements in the Facility Operating License may have different deadlines than those defined in the regulations (following a rule change in 2001). This difference in reporting requirements has led to variations in reporting since many Facility Operating Licenses do not contain the subject condition. For those licensees with a 30-day reporting requirement in the Facility Operating License, the condition has decreased the benefits of the rulemaking. For those cases where the current Facility Operating License requirement to report violations is also reportable in accordance with the regulations defined in 10 CFR 50.72 and 10 CFR 50.73, the NRC staff finds that the regulations adequately address this issue and the elimination of the duplicative requirement in the Oyster Creek Facility Operating License is acceptable.
In accordance with the Commission's regulations, the Pennsylvania State official was notified ofthe proposed issuance of the amendments. The State official had no comments.
Some of the conditions addressed in Section 2.C of the Facility Operating License may address the maintenance of particular programs, administrative requirements, or other matters where a violation of the requirement would not result in a report to the NRC in accordance with 10 CFR 50.72 or 10 CFR 50.73. In most cases, there are requirements for reports to the NRC related to these conditions in other regulations, the specific license condition or technical specification, or an NRC-approved program document. In other cases, there are reports to other agencies or news releases that would prompt a report to the NRC (in accordance with 10 CFR 50.72(b)(2)(xi)). The NRC staff also assessed violations of administrative requirements that could be reportable under the current License Condition but that may not have a duplicative requirement in a regulation or other regulatory requirement. The NRC staff finds that the requirements to report such problems within 24 hours with written reports to follow using the LER process is not needed. The NRC staff is confident that the information related to such violations that is actually important to the NRCs regulatory functions would come to light in a time frame comparable to the 60-day LER requirements. The information would become available to the appropriate NRC staff through the inspection program, updates to program documents, resultant licensing actions, public announcements, or some other reliable mechanism.
The NRC staff finds that the elimination of Section 2.E in the Oyster Creek Facility Operating


==5.0ENVIRONMENTAL CONSIDERATION==
License will not result in a loss of information to the NRC that would adversely affect either its goal to protect public health and safety, or its ability to carry out its various other regulatory responsibilities.
The amendment changes recordkeeping, reporting, or administrative procedures orrequirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusionset forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


==6.0CONCLUSION==
==4.0    STATE CONSULTATION==
The Commission has concluded, based on the considerations discussed above, that:  (1) thereis reasonable assurance that the health and safety of the public will not be endangered byoperation in the proposed manner, (2) such activities will be conducted in compliance with theCommission's regulations, and (3) the issuance of the amendments will not be inimical to thecommon defense and security or to the health and safety of the public. Principal Contributor:  W. Reckley Date:  February 22, 2006 Oyster Creek Nuclear Generating StationSite Vice President - Oyster Creek  Nuclear Generating Station AmerGen Energy Company, LLC


P.O. Box 388 Forked River, NJ  08731Senior Vice President  of  Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC  20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ  08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ  08731Senior Resident InspectorU.S. Nuclear Regulatory Commission
In accordance with the Commissions regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments. The State official had no comments.


P.O. Box 445 Forked River, NJ  08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control
==5.0    ENVIRONMENTAL CONSIDERATION==


P.O. Box 160 Kennett Square, PA  19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control
The amendment changes recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


P.O. Box 160 Kennett Square, PA  19348Regulatory Assurance Manager  Oyster Creek AmerGen Energy Company, LLC
==6.0    CONCLUSION==


P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA  19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA  19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: W. Reckley Date: February 22, 2006


P.O. Box 388 Forked River, NJ 08731}}
Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek      Director - Licensing and Regulatory Affairs Nuclear Generating Station            AmerGen Energy Company, LLC AmerGen Energy Company, LLC            Correspondence Control P.O. Box 388                            P.O. Box 160 Forked River, NJ 08731                  Kennett Square, PA 19348 Senior Vice President of                Manager Licensing - Oyster Creek Operations                            Exelon Generation Company, LLC AmerGen Energy Company, LLC            Correspondence Control 200 Exelon Way, KSA 3-N                P.O. Box 160 Kennett Square, PA 19348                Kennett Square, PA 19348 Kathryn M. Sutton, Esquire              Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP            Oyster Creek 1111 Pennsylvania Avenue, NW            AmerGen Energy Company, LLC Washington, DC 20004                    P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of                Assistant General Counsel Environmental Protection              AmerGen Energy Company, LLC Bureau of Nuclear Engineering          200 Exelon Way CN 415                                  Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and          U.S. Nuclear Regulatory Commission Regulatory Affairs                    475 Allendale Road AmerGen Energy Company, LLC            King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555                  Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I        200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission      Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415          Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township                AmerGen Energy Company, LLC 818 West Lacey Road                    P.O. Box 388 Forked River, NJ 08731                  Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731}}

Latest revision as of 22:41, 23 November 2019

License Amendment, Deletion of Reporting Requirement in Facility Operating License
ML060330578
Person / Time
Site: Oyster Creek
Issue date: 02/22/2006
From: Geoffrey Miller
Plant Licensing Branch III-2
To: Crane C
AmerGen Energy Co
Miller G, NRR/DLPM, 415-2481
References
TAC MC6255
Download: ML060330578 (9)


Text

February 22, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)

Dear Mr. Crane:

The Commission has issued the enclosed Amendment No. 258 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your application dated February 25, 2005.

The amendment deletes the reporting requirement in the Facility Operating License related to reporting violations of Section 2.C of the operating license.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosures:

1. Amendment No. 258 to DPR-16
2. Safety Evaluation cc w/encls: See next page

February 22, 2006 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - ISSUANCE OF AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN FACILITY OPERATING LICENSE (TAC NO. MC6255)

Dear Mr. Crane:

The Commission has issued the enclosed Amendment No. 258 to Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station, in response to your application dated February 25, 2005.

The amendment deletes the reporting requirement in the Facility Operating License related to reporting violations of Section 2.C of the operating license.

A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosures:

1. Amendment No. 258 to DPR-16
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsOgcRp RidsNrrDorl LPLI-2 R/F GHill (2) RidsNrrDorlLplb WBeckner RidsNrrPMGMiller RidsNrrLACRaynor RidsAcrsAcnwMailCenter RidsRgn1MailCenter Accession Number: ML060330578 OFFICE CLIIP LPM NRR/LPLI-2/PM NRR/LPLI-2/LA NRR/LPLI-2/BC NAME WReckley GEMiller CRaynor DRoberts DATE 1/24/06 2/06/06 2/17/06 2/21/06 Official Record Copy

AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 258 License No. DPR-16

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by AmerGen Energy Company, LLC, et al., (the licensee), dated February 25, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2. Accordingly, the Facility Operating License is amended by deletion of paragraph 2.E as indicated in the attachment to this license amendment.
3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Darrell J. Roberts, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License Date of Issuance: February 22, 2006

ATTACHMENT TO LICENSE AMENDMENT NO. 258 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following page of the Facility Operating License with the attached page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Insert 5 5

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 258 TO FACILITY OPERATING LICENSE NO. DPR-16 AMERGEN ENERGY COMPANY, LCC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219

1.0 INTRODUCTION

By application dated February 25, 2005, AmerGen Energy Company, LLC, (AmerGen or the licensee) requested changes to the Facility Operating License for the Oyster Creek Nuclear Generating Station (Oyster Creek) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML050600047). The proposed amendment would delete Section 2.E of the Facility Operating License that requires reporting violations of the requirements in Section 2.C of the Facility Operating License. A notice announcing the availability of this proposed change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on November 4, 2005 (70 FR 67202). The licensees application was used during the development of the CLIIP notice and is being evaluated using that process even though the application predates the notice of availability.

2.0 REGULATORY EVALUATION

A section or condition was included in the facility operating licenses issued to some nuclear power plants requiring the licensee to make reports to the Nuclear Regulatory Commission (NRC or the Commission) regarding violations of other sections of the operating license (typically Section 2.C). A typical license condition reads as follows:1 Except as otherwise provided in this license and its appendices, the Licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in

[Title 10 of the Code of Federal Regulations] 10 CFR 50.73 (licensee event report system).

1 The condition (2.E) in the Facility Operating License for Oyster Creek is similar to the standard language.

In addition to the information provided to support licensing decisions, the NRC obtains information about plant operation, licensee programs, and other matters using a combination of inspections and reporting requirements. Routine or scheduled reports that are required to be submitted to the NRC are defined in the related regulations, specific license condition, technical specification, or an NRC-approved program document. The reporting of emergencies, unplanned events or conditions, and other special cases may also be addressed within such documents by the inclusion of reporting thresholds, and are also the focus of the reporting requirements in 10 CFR 50.72, ?Immediate notification requirements for operating nuclear power reactors, and 10 CFR 50.73, ?Licensee event report system. Changes to the reporting regulations in 10 CFR Sections 50.72 and 50.73 became effective in January 2001 (see Federal Register notice on October 25, 2000 (65 FR 63769)) and included extending the allowable reporting times for licensee event reports (LERs) from 30 days to 60 days.

3.0 TECHNICAL EVALUATION

The specific section (2.E) in the Oyster Creek Facility Operating License requires the licensee to report any violations of the requirements of Section 2.C of the Facility Operating License and defines the method and allowable time periods for such reports. The reporting threshold (i.e., a violation) for some of the conditions included in Section 2.C of the Facility Operating Licenses duplicates those defined in 10 CFR 50.72 and 10 CFR 50.73. However, the requirements in the Facility Operating License may have different deadlines than those defined in the regulations (following a rule change in 2001). This difference in reporting requirements has led to variations in reporting since many Facility Operating Licenses do not contain the subject condition. For those licensees with a 30-day reporting requirement in the Facility Operating License, the condition has decreased the benefits of the rulemaking. For those cases where the current Facility Operating License requirement to report violations is also reportable in accordance with the regulations defined in 10 CFR 50.72 and 10 CFR 50.73, the NRC staff finds that the regulations adequately address this issue and the elimination of the duplicative requirement in the Oyster Creek Facility Operating License is acceptable.

Some of the conditions addressed in Section 2.C of the Facility Operating License may address the maintenance of particular programs, administrative requirements, or other matters where a violation of the requirement would not result in a report to the NRC in accordance with 10 CFR 50.72 or 10 CFR 50.73. In most cases, there are requirements for reports to the NRC related to these conditions in other regulations, the specific license condition or technical specification, or an NRC-approved program document. In other cases, there are reports to other agencies or news releases that would prompt a report to the NRC (in accordance with 10 CFR 50.72(b)(2)(xi)). The NRC staff also assessed violations of administrative requirements that could be reportable under the current License Condition but that may not have a duplicative requirement in a regulation or other regulatory requirement. The NRC staff finds that the requirements to report such problems within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with written reports to follow using the LER process is not needed. The NRC staff is confident that the information related to such violations that is actually important to the NRCs regulatory functions would come to light in a time frame comparable to the 60-day LER requirements. The information would become available to the appropriate NRC staff through the inspection program, updates to program documents, resultant licensing actions, public announcements, or some other reliable mechanism.

The NRC staff finds that the elimination of Section 2.E in the Oyster Creek Facility Operating

License will not result in a loss of information to the NRC that would adversely affect either its goal to protect public health and safety, or its ability to carry out its various other regulatory responsibilities.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: W. Reckley Date: February 22, 2006

Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Director - Licensing and Regulatory Affairs Nuclear Generating Station AmerGen Energy Company, LLC AmerGen Energy Company, LLC Correspondence Control P.O. Box 388 P.O. Box 160 Forked River, NJ 08731 Kennett Square, PA 19348 Senior Vice President of Manager Licensing - Oyster Creek Operations Exelon Generation Company, LLC AmerGen Energy Company, LLC Correspondence Control 200 Exelon Way, KSA 3-N P.O. Box 160 Kennett Square, PA 19348 Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Regulatory Assurance Manager Morgan, Lewis, & Bockius LLP Oyster Creek 1111 Pennsylvania Avenue, NW AmerGen Energy Company, LLC Washington, DC 20004 P.O. Box 388 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Assistant General Counsel Environmental Protection AmerGen Energy Company, LLC Bureau of Nuclear Engineering 200 Exelon Way CN 415 Kennett Square, PA 19348 Trenton, NJ 08625 Ron Bellamy, Region I Vice President - Licensing and U.S. Nuclear Regulatory Commission Regulatory Affairs 475 Allendale Road AmerGen Energy Company, LLC King of Prussia, PA 19406-1415 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk AmerGen Energy Company, LLC Regional Administrator, Region I 200 Exelon Way, KSA 1--1 U.S. Nuclear Regulatory Commission Kennett Square, PA 19348 475 Allendale Road King of Prussia, PA 19406-1415 Oyster Creek Nuclear Generating Station Plant Manager Mayor of Lacey Township AmerGen Energy Company, LLC 818 West Lacey Road P.O. Box 388 Forked River, NJ 08731 Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731