Line 3: |
Line 3: |
| | issue date = 08/25/2010 | | | issue date = 08/25/2010 |
| | title = Draft RAIs Re AST LAR | | | title = Draft RAIs Re AST LAR |
| | author name = Paige J C | | | author name = Paige J |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Franzone S, Tomonto B | | | addressee name = Franzone S, Tomonto B |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Paige, Jason Sent: Wednesday, August 25, 2010 3:25 PM To: Franzone, Steve; Tomonto, Bob | | {{#Wiki_filter:From: Paige, Jason Sent: Wednesday, August 25, 2010 3:25 PM To: Franzone, Steve; Tomonto, Bob |
|
| |
|
| ==Subject:== | | ==Subject:== |
| DRAFT RAIs RE AST LAR Steve, below are the draft RAIs that the containment ventilation branch (questions 1-8) and the mechanical engineering branch (question 9) generated from FPL's May 21, 2010 RAI responses. I suggest we have a call tomorrow, Thursday, August 26, 2010 to discuss. Also, we will discuss TSTF-448 during this call. Let me know if this works for you. | | DRAFT RAIs RE AST LAR Steve, below are the draft RAIs that the containment ventilation branch (questions 1-8) and the mechanical engineering branch (question 9) generated from FPLs May 21, 2010 RAI responses. I suggest we have a call tomorrow, Thursday, August 26, 2010 to discuss. Also, we will discuss TSTF-448 during this call. Let me know if this works for you. |
| Jason By letter dated May 21, 2010 Florida Power and Light (FPL), licensee of Turkey Point Units 3 and 4, responded to the NRC staff's request for additional information (RAI). In response to RAI #20 it states that modifications are proposed to the control room emergency ventilation system (CREVS) to install a compensatory filter unit that may be manually placed in service in the event that the installed filter train becomes inoperable--.The proposed location is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. It is also stated that the filtration unit design is currently planned to include a recirculation fan, charcoal and high efficiency particulate air filter (HEPA) and capable of being powered off of the swing bus from the emergency diesel generators (EDGs). The licensee's responses to the following RAIs will allow the staff to complete its review in a timely manner. | | Jason By letter dated May 21, 2010 Florida Power and Light (FPL), licensee of Turkey Point Units 3 and 4, responded to the NRC staffs request for additional information (RAI). In response to RAI |
| : 1. Will the stated post maintenance testing be conducted in accordance with an NRC accepted standard such as ASTM-E741? If not, what standard will be used? | | #20 it states that modifications are proposed to the control room emergency ventilation system (CREVS) to install a compensatory filter unit that may be manually placed in service in the event that the installed filter train becomes inoperable.The proposed location is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. It is also stated that the filtration unit design is currently planned to include a recirculation fan, charcoal and high efficiency particulate air filter (HEPA) and capable of being powered off of the swing bus from the emergency diesel generators (EDGs). The licensees responses to the following RAIs will allow the staff to complete its review in a timely manner. |
| : 2. In the May 21, 2010, letter you stated the proposed location of the compensatory filter unit is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. How will leak tightness be assured? | | : 1. Will the stated post maintenance testing be conducted in accordance with an NRC accepted standard such as ASTM-E741? If not, what standard will be used? |
| : 3. The proposed location of the compensatory filtration unit is outside the CRE and will be manually placed into service. How can this be accomplished without invalidating the results of the current ASTM E741 tracer gas test? | | : 2. In the May 21, 2010, letter you stated the proposed location of the compensatory filter unit is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. How will leak tightness be assured? |
| : 4. Will the surveillance requirements for technical specification (TS) 3/4.7.5 be updated to include the compensatory filtration unit? | | : 3. The proposed location of the compensatory filtration unit is outside the CRE and will be manually placed into service. How can this be accomplished without invalidating the results of the current ASTM E741 tracer gas test? |
| : 5. Will the charcoal in the compensatory filtration unit be tested in accordance with the testing methods and at the frequencies specified for the charcoal in the CREVS? | | : 4. Will the surveillance requirements for technical specification (TS) 3/4.7.5 be updated to include the compensatory filtration unit? |
| : 6. On page 6 of 24 under SURVEILLANCE REQUIREMENTS item c. states "At least once per 18 months or (1) after [[estimated NRC review hours::720 hours]] of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal absorber housing, or (3) following operational exposure of the filters to effluents from painting, fire or chemical releases in any ventilation zone communicating with the system, or (4) after complete or partial replacement of a filter bank by:--". In this context, what is the meaning of "operational"? This appears to be inconsistent with the NRC staff's intent when discussing ventilation zones communicating with systems (see Regulatory Guide 1.52 revision 3, June 2001, Regulatory Position C.6.3 foot note 8). | | : 5. Will the charcoal in the compensatory filtration unit be tested in accordance with the testing methods and at the frequencies specified for the charcoal in the CREVS? |
| : 7. To facilitate a more clear understanding, the NRC staff is requesting that the first sentence (page 7 of 24 item a.5.) be revised as follows: "With the filter train inoperable, e.g., an inoperable filter, and/or two inoperable recirculation fans, and/or two inoperable recirculation dampers, immediately suspend all movement of irradiated fuel, and immediately initiate action to implement mitigating actions, and, within [[estimated NRC review hours::24 hours]], verify mitigating actions ensure control room occupant radiological exposures will not exceed limits and, within 7 days, restore the filter train to OPERABLE status." | | : 6. On page 6 of 24 under SURVEILLANCE REQUIREMENTS item c. states At least once per 18 months or (1) after 720 hours of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal absorber housing, or (3) following operational exposure of the filters to effluents from painting, fire or chemical releases in any ventilation zone communicating with the system, or (4) after complete or partial replacement of a filter bank by:. In this context, what is the meaning of operational? This appears to be inconsistent with the NRC staffs intent when discussing ventilation zones communicating with systems (see Regulatory Guide 1.52 revision 3, June 2001, Regulatory Position C.6.3 foot note 8). |
| : 8. In the BASES on page 23 of 24, the second paragraph states that a 24 hour allowed outage time (AOT) is reasonable based on the low probability of a---. This statement is not consistent with ACTION statement a.5 of TS 3/4.7.5, i.e., there is no 24 hour AOT. The NRC staff requests that FPL revise this paragraph in accordance with the TS action statement. | | : 7. To facilitate a more clear understanding, the NRC staff is requesting that the first sentence (page 7 of 24 item a.5.) be revised as follows: With the filter train inoperable, e.g., an inoperable filter, and/or two inoperable recirculation fans, and/or two inoperable recirculation dampers, immediately suspend all movement of irradiated fuel, and immediately initiate action to implement mitigating actions, and, within 24 hours, verify mitigating actions ensure control room occupant radiological exposures will not exceed limits and, within 7 days, restore the filter train to OPERABLE status. |
| : 9. In the attachment to the May 21, 2010, letter, page 4 of 24 indicates that the compensatory filtration unit will be designed as a safety-related, Seismic Class I backup to the installed system. a) Describe the methodology utilized to perform the seismic qualification of the compensatory filtration unit. Additionally, confirm that the methodology described is in accordance with the Turkey Point licensing basis. If the methodology is not in accordance with the Turkey Point licensing basis, provide justification for this deviation. | | : 8. In the BASES on page 23 of 24, the second paragraph states that a 24 hour allowed outage time (AOT) is reasonable based on the low probability of a. This statement is not consistent with ACTION statement a.5 of TS 3/4.7.5, i.e., there is no 24 hour AOT. The NRC staff requests that FPL revise this paragraph in accordance with the TS action statement. |
| | : 9. In the attachment to the May 21, 2010, letter, page 4 of 24 indicates that the compensatory filtration unit will be designed as a safety-related, Seismic Class I backup to the installed system. |
| | a) Describe the methodology utilized to perform the seismic qualification of the compensatory filtration unit. Additionally, confirm that the methodology described is in accordance with the Turkey Point licensing basis. If the methodology is not in accordance with the Turkey Point licensing basis, provide justification for this deviation. |
| b) Provide a summary of the results of the seismic qualification of the compensatory filtration unit demonstrating that this unit, including the individual filtration unit components and all connected components, meets the acceptance criteria for Seismic Class I structures, systems, and components at PTN. | | b) Provide a summary of the results of the seismic qualification of the compensatory filtration unit demonstrating that this unit, including the individual filtration unit components and all connected components, meets the acceptance criteria for Seismic Class I structures, systems, and components at PTN. |
| Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties () | | Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties () |
|
| |
|
| ==Subject:== | | ==Subject:== |
| DRAFT RAIs RE AST LAR Sent Date: 8/25/2010 2:01:37 PM Received Date: 8/25/2010 3:25:00 PM From: Paige, Jason | | DRAFT RAIs RE AST LAR Sent Date: 8/25/2010 2:01:37 PM Received Date: 8/25/2010 3:25:00 PM From: Paige, Jason Created By: Jason.Paige@nrc.gov Recipients: |
| | |
| Created By: Jason.Paige@nrc.gov | |
| | |
| Recipients: | |
| Steve.Franzone@fpl.com (Franzone, Steve) | | Steve.Franzone@fpl.com (Franzone, Steve) |
| Tracking Status: None Bob.Tomonto@fpl.com (Tomonto, Bob) | | Tracking Status: None Bob.Tomonto@fpl.com (Tomonto, Bob) |
| Tracking Status: None
| |
|
| |
| Post Office:
| |
|
| |
| Files Size Date & Time
| |
|
| |
| MESSAGE 12539 8/25/2010
| |
|
| |
| Options Expiration Date:
| |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False
| |
|
| |
|
| Sensitivity: olNormal Recipients received:}} | | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 12539 8/25/2010 Options Expiration Date: |
| | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
|
---|
Category:E-Mail
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 2024-09-06
[Table view] |
Text
From: Paige, Jason Sent: Wednesday, August 25, 2010 3:25 PM To: Franzone, Steve; Tomonto, Bob
Subject:
DRAFT RAIs RE AST LAR Steve, below are the draft RAIs that the containment ventilation branch (questions 1-8) and the mechanical engineering branch (question 9) generated from FPLs May 21, 2010 RAI responses. I suggest we have a call tomorrow, Thursday, August 26, 2010 to discuss. Also, we will discuss TSTF-448 during this call. Let me know if this works for you.
Jason By letter dated May 21, 2010 Florida Power and Light (FPL), licensee of Turkey Point Units 3 and 4, responded to the NRC staffs request for additional information (RAI). In response to RAI
- 20 it states that modifications are proposed to the control room emergency ventilation system (CREVS) to install a compensatory filter unit that may be manually placed in service in the event that the installed filter train becomes inoperable.The proposed location is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. It is also stated that the filtration unit design is currently planned to include a recirculation fan, charcoal and high efficiency particulate air filter (HEPA) and capable of being powered off of the swing bus from the emergency diesel generators (EDGs). The licensees responses to the following RAIs will allow the staff to complete its review in a timely manner.
- 1. Will the stated post maintenance testing be conducted in accordance with an NRC accepted standard such as ASTM-E741? If not, what standard will be used?
- 2. In the May 21, 2010, letter you stated the proposed location of the compensatory filter unit is currently outside of the control room envelope (CRE) and post maintenance testing will assure the leak tightness of the system. How will leak tightness be assured?
- 3. The proposed location of the compensatory filtration unit is outside the CRE and will be manually placed into service. How can this be accomplished without invalidating the results of the current ASTM E741 tracer gas test?
- 4. Will the surveillance requirements for technical specification (TS) 3/4.7.5 be updated to include the compensatory filtration unit?
- 5. Will the charcoal in the compensatory filtration unit be tested in accordance with the testing methods and at the frequencies specified for the charcoal in the CREVS?
- 6. On page 6 of 24 under SURVEILLANCE REQUIREMENTS item c. states At least once per 18 months or (1) after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal absorber housing, or (3) following operational exposure of the filters to effluents from painting, fire or chemical releases in any ventilation zone communicating with the system, or (4) after complete or partial replacement of a filter bank by:. In this context, what is the meaning of operational? This appears to be inconsistent with the NRC staffs intent when discussing ventilation zones communicating with systems (see Regulatory Guide 1.52 revision 3, June 2001, Regulatory Position C.6.3 foot note 8).
- 7. To facilitate a more clear understanding, the NRC staff is requesting that the first sentence (page 7 of 24 item a.5.) be revised as follows: With the filter train inoperable, e.g., an inoperable filter, and/or two inoperable recirculation fans, and/or two inoperable recirculation dampers, immediately suspend all movement of irradiated fuel, and immediately initiate action to implement mitigating actions, and, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify mitigating actions ensure control room occupant radiological exposures will not exceed limits and, within 7 days, restore the filter train to OPERABLE status.
- 8. In the BASES on page 23 of 24, the second paragraph states that a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed outage time (AOT) is reasonable based on the low probability of a. This statement is not consistent with ACTION statement a.5 of TS 3/4.7.5, i.e., there is no 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AOT. The NRC staff requests that FPL revise this paragraph in accordance with the TS action statement.
- 9. In the attachment to the May 21, 2010, letter, page 4 of 24 indicates that the compensatory filtration unit will be designed as a safety-related, Seismic Class I backup to the installed system.
a) Describe the methodology utilized to perform the seismic qualification of the compensatory filtration unit. Additionally, confirm that the methodology described is in accordance with the Turkey Point licensing basis. If the methodology is not in accordance with the Turkey Point licensing basis, provide justification for this deviation.
b) Provide a summary of the results of the seismic qualification of the compensatory filtration unit demonstrating that this unit, including the individual filtration unit components and all connected components, meets the acceptance criteria for Seismic Class I structures, systems, and components at PTN.
Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 E-mail Properties Mail Envelope Properties ()
Subject:
DRAFT RAIs RE AST LAR Sent Date: 8/25/2010 2:01:37 PM Received Date: 8/25/2010 3:25:00 PM From: Paige, Jason Created By: Jason.Paige@nrc.gov Recipients:
Steve.Franzone@fpl.com (Franzone, Steve)
Tracking Status: None Bob.Tomonto@fpl.com (Tomonto, Bob)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 12539 8/25/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: