| title = IR 05000317-08-006, and IR 05000318-08-006, on 05/19/2008 to 05/23/2008, Calvert Cliffs, Units 1 and 2, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies - Cover Letter O
| title = IR 05000317-08-006, and IR 05000318-08-006, on 05/19/2008 to 05/23/2008, Calvert Cliffs, Units 1 and 2, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies - Cover Letter O
| author name = Rogge J F
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Spina J A
| addressee name = Spina J
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc, Constellation Generation Group
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc, Constellation Generation Group
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:une 24, 2008
[[Issue date::June 24, 2008]]


Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc. Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
==SUBJECT:==
 
CALVERT CLIFFS NUCLEAR POWER PLANT - NRC TEAM INSPECTION REPORT 05000317/2008006 AND 05000318/2008006
SUBJECT: CALVERT CLIFFS NUCLEAR POWER PLANT - NRC TEAM INSPECTION REPORT 05000317/2008006 AND 05000318/2008006


==Dear Mr. Spina:==
==Dear Mr. Spina:==
On May 23, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2. The enclosed report documents the team's results, which were discussed on May 23, 2008, with you and other members of your staff.
On May 23, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2. The enclosed report documents the teams results, which were discussed on May 23, 2008, with you and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
 
This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Calvert Cliffs Nuclear Power Plant.


When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.


Sincerely,/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-317 and 50-318 License No. DPR-53, DPR-69
This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Calvert Cliffs Nuclear Power Plant.


===Enclosure:===
When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Inspection Report 05000317/2008006 and 05000318/2008006


===w/Attachment:===
Sincerely,
Supplemental Information
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-317 and 50-318 License No. DPR-53, DPR-69 Enclosure: Inspection Report 05000317/2008006 and 05000318/2008006 w/Attachment: Supplemental Information
}}
}}

Latest revision as of 16:34, 14 November 2019

IR 05000317-08-006, and IR 05000318-08-006, on 05/19/2008 to 05/23/2008, Calvert Cliffs, Units 1 and 2, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies - Cover Letter O
ML081760425
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/24/2008
From: Rogge J
Engineering Region 1 Branch 3
To: Spina J
Calvert Cliffs, Constellation Generation Group
References
IR-08-006
Download: ML081760425 (5)


Text

une 24, 2008

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT - NRC TEAM INSPECTION REPORT 05000317/2008006 AND 05000318/2008006

Dear Mr. Spina:

On May 23, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2. The enclosed report documents the teams results, which were discussed on May 23, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Calvert Cliffs Nuclear Power Plant.

When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-317 and 50-318 License No. DPR-53, DPR-69 Enclosure: Inspection Report 05000317/2008006 and 05000318/2008006 w/Attachment: Supplemental Information