ML082490766: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082490766
| number = ML082490766
| issue date = 06/12/2008
| issue date = 06/12/2008
| title = Oyster Creek Retake Exam Draft - Outlines (Folder 2)
| title = Retake Exam Draft - Outlines (Folder 2)
| author name =  
| author name =  
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OC NRC Re-Take Exam 2008 Scenario Outline Event No. Facility: Ovster Creek Scenario No.: NRC 1 Op Test No.: NRC 2008-1 Malf. No. Event TY Pe* Examiners: Operators:
{{#Wiki_filter:OC NRC Re-Take Exam 2008 Scenario Outline Facility: Ovster Creek                 Scenario No.: NRC 1           Op Test No.: NRC 2008-1 Examiners:                                             Operators:     S RO-Steve Johnston Initial Conditions:
S RO-Steve Johnston 1 Initial Conditions:
0   100% Power 0   RWCU Pump 9 00s 0   RWM is bypassed and 00s Turnover:
0 100% Power 0 RWCU Pump "9" 00s 0 RWM is bypassed and 00s Turnover:
0   Perform 602.4.004, Main Steam Isolation Valve 10% Closure Test.
0 Perform 602.4.004, Main Steam Isolation Valve 10% Closure Test. NIA N 2 I VLV-RPS004 TS 7 n MAL-EDS003B MAL-CFWO17 R /I 4 I MAL-NIS021F 8 9 1 1 %l05-22-15 1 MAL-SWSOOI B MAL-RCUO13 VLV-RCU001 M VLV-RCUOW MAL-CNS004A c or B or C or D SRO BOP SRO SRO BOP SRO RO SRO RO SRO BOP SRO RO ALL SRO BOP - Event Description Performs 602.4.004, Main Steam Isolation Valve 10% Closure Test.
Event      Malf. No.          Event                                Event No.                          TY Pe*                            Description SRO    Performs 602.4.004, Main Steam Isolation Valve 10%
MSlV NS04B sticks open during Closure Test TS 3.5.3. Respond to Loss of USS 1A2 480V bus. APRM 6 hop. Failure causes
1          NIA          N BOP    Closure Test.
% scram TS 3.7.B, ABN-45 "LOSS of USS 1A2" RAP-G2f Control Rod Drift Out ABN-6 "Control Rod Malfunctions" Respond to trip of Service Water Pump 1-2 ABN-18 "Service Water Failure Response Main Condenser Vacuum Leak Power Reduction required ABN-14 "Loss of Condenser Vacuum" 7. RWCU Leak in the Reactor Building RWCU fails to isolate Secondary Containment Control EOP Emergency Depressurization required A Containment Spray pump trips while in Torus Cooling (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 1 Page 1 of 27 OC NRC Retake Exam 2008 Scenario Outline MAL-CRD005 MAL-RPSOOG
I                                    MSlV NS04B sticks open during Closure Test n
2      VLV-RPS004      TS      SRO TS 3.5.3.
SRO    Respond to Loss of USS 1A2 480V bus.
MAL-EDS003B BOP    TS 3.7.B, ABN-45 LOSS of USS 1A2 I
11                    1          SRO    APRM 6 hop. Failure causes % scram 4      MAL-NIS021F
                          /  I      RO      RAP-G2f SRO    Control Rod Drift Out
          %l05-22-15                        ABN-6 Control Rod Malfunctions RO SRO    Respond to trip of Service Water Pump 1-2 MAL-SWSOOIB BOP    ABN-18 Service Water Failure Response Main Condenser Vacuum Leak 7      MAL-CFWO17        R      SRO    Power Reduction required RO ABN-14 Loss of Condenser Vacuum       7 .
RWCU Leak in the Reactor Building MAL-RCUO13 RWCU fails to isolate 8      VLV-RCU001        M      ALL VLV-RCUOW                          Secondary Containment Control EOP Emergency Depressurization required 9
MAL-CNS004A      c      SRO A Containment Spray pump trips while in Torus Cooling or B or C or D
                                  - BOP (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 1                                                                             Page 1 of 27


SWI-RPS006 MAL-NSSOI 78 MAL-PCN001 N MAL-RPS007C VLV-CNS008 PMP-CNS008A Facility: Oyster Creek Scenario No.: NRC 2 Op Test No.: NRC 2008-1 Examiners:
OC NRC Retake Exam 2008 Scenario Outline Facility: Oyster Creek           Scenario No.: NRC 2                     Op Test No.: NRC 2008-1 Examiners:                                           Operators:         SRO- Steve Johnston initial Conditions:
Operators:
90% Power R W M is bypassed and 00s lsophase Bus Fan A is 00s 0   Main Generator voltage control is in manual Turnover:
SRO- Steve Johnston C M C initial Conditions:
Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 24KV Main Gen Electrical System IAW the ReMA I
90% Power RWM is bypassed and 00s lsophase Bus Fan "A" is 00s 0 Main Generator voltage control is in manual Turnover:
Event     Malf. No. I     Event                                       Event No.                            le*                                 Description
Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 "24KV Main Gen Electrical System" I Event No. I 2 Malf. No. I Event CRD008-34-11 x C SWI-ADS001C ANN-E6D ANN-E2D VLV-NSSOOG
                                            ~~
* (N)ormal, (R)eactivity, le* SRO ATC SRO BOP SRO ATC SRO BOP SRO BOP SRO ATC ALL SRO BOP IAW the ReMA Event Description  
Restore the amplidyne to service and transfer main SRO I                                        generator voltage control to automatic IAW 336.1 ATC 24KV Main Gen Electrical System SRO 2                                          Increase reactor power with control rods BOP x
~~ Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 "24KV Main Gen Electrical System" Increase reactor power with control rods Uncoupled Control Rod ABN-6 "Control Rod Malfunction" EMRV "A Inadvertently Opens ABN-40 "Stuck Open EMRV'; TS 3.4.8 ~~ ~ ~ ~ Respond to Reactor Recirc Pump "A' Alarms, Pump Discharge Valve fails to close ABN-2 "Recirculation System Failures" TS 3.3.F. Multiple control rod drifts, Manual scram required and fails, ARI required ABNB "Control Rod Malfunction" Steam leak in Primary Containment, DWiTorus Vacuum Breaker fails open Failure of RWCU to Auto isolate, Containment Spray System failures (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 2 Page 1 of 21 OC NRC Re-Take Exam 2008 Scenario Outline Event TY Pe* Facility:
CRD008-34-11 SWI-ADS001C C
Oyster Creek Scenario No.: NRC 3 Op Test No.: NRC 2008-1 Event Description Examiners: Operators:
SRO Uncoupled Control Rod ATC ABN-6 Control Rod Malfunction SRO EMRV A Inadvertently Opens BOP ABN-40 Stuck Open EMRV; TS 3.4.8
RO- Steve Johnston ATC ATC ATC ALL Initial Conditions:
                                          ~~                   ~     ~         ~
92%Power RWM bypassed and 00s TBCCW pump 2 00s Turnover: Increase reactor power to 100% IAW ReMA Increase Power with Rods  
ANN-E6D ANN-E2D Respond to Reactor Recirc Pump A       Alarms, Pump SRO        Discharge Valve fails to close VLV-NSSOOG BOP ABN-2 Recirculation System Failures TS 3.3.F.
& Recirc Flow to 100% Power Stuck Control Rod CRD Pump 1A Shaft Failure Condensate Pump B Motor Bearing Hi Temp requires power reduction with Recirculation Flow to approx. 65% power Small Steam leak in containment with Hydraulic ATWS Event Malf. No. No. 1 PMP- CRD002A 4 ICH-CW069A MAL- NSSOl7D CRD021A CRD021 B CRDOOI A MAL- MAL- MAL- ATC I CRD FIOW Control Valve fails to 0% i (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 3 Page 1 of 14}}
MAL-CRD005                          Multiple control rod drifts, Manual scram required and MAL-RPSOOG        C    SRO      fails, ARI required SWI-RPS006              ATC ABNB Control Rod Malfunction MAL-NSSOI78                          Steam leak in Primary Containment, DWiTorus MAL-PCN001N M    ALL      Vacuum Breaker fails open MAL-RPS007C SRO        Failure of RWCU to Auto isolate, Containment Spray VLV-CNS008        C PMP-CNS008A              BOP        System failures
*      (N)ormal,  (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient       (TS) Tech Spec NRC 2                                                                                 Page 1 of 21
 
OC NRC Re-Take Exam 2008 Scenario Outline Facility: Oyster Creek               Scenario No.: NRC 3           Op Test No.: NRC 2008-1 Examiners:                                         Operators:     RO- Steve Johnston Initial Conditions:
92%Power RWM bypassed and 00s TBCCW pump 2 00s Turnover:
Increase reactor power to 100% IAW ReMA Event No. 1    Malf. No.          Event TY Pe*
Event Description Increase Power with Rods & Recirc Flow to 100% Power ATC      Stuck Control Rod PMP-CRD002A                  ATC      CRD Pump 1A Shaft Failure Condensate Pump B Motor Bearing Hi Temp 4      ICH-CW069A                ATC      requires power reduction with Recirculation Flow to approx. 65% power MAL-NSSOl7D MAL-                              Small Steam leak in containment with Hydraulic CRD021A                  ALL      ATWS MAL-CRD021B MAL-CRDOOIA                  ATC     I CRD FIOW Control Valve fails to 0%
i       (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 3                                                                                       Page 1 of 14}}

Latest revision as of 13:13, 14 November 2019

Retake Exam Draft - Outlines (Folder 2)
ML082490766
Person / Time
Site: Oyster Creek
Issue date: 06/12/2008
From:
NRC Region 1
To:
Hansell S
Shared Package
ML081630455 List:
References
Download: ML082490766 (3)


Text

OC NRC Re-Take Exam 2008 Scenario Outline Facility: Ovster Creek Scenario No.: NRC 1 Op Test No.: NRC 2008-1 Examiners: Operators: S RO-Steve Johnston Initial Conditions:

0 100% Power 0 RWCU Pump 9 00s 0 RWM is bypassed and 00s Turnover:

0 Perform 602.4.004, Main Steam Isolation Valve 10% Closure Test.

Event Malf. No. Event Event No. TY Pe* Description SRO Performs 602.4.004, Main Steam Isolation Valve 10%

1 NIA N BOP Closure Test.

I MSlV NS04B sticks open during Closure Test n

2 VLV-RPS004 TS SRO TS 3.5.3.

SRO Respond to Loss of USS 1A2 480V bus.

MAL-EDS003B BOP TS 3.7.B, ABN-45 LOSS of USS 1A2 I

11 1 SRO APRM 6 hop. Failure causes % scram 4 MAL-NIS021F

/ I RO RAP-G2f SRO Control Rod Drift Out

%l05-22-15 ABN-6 Control Rod Malfunctions RO SRO Respond to trip of Service Water Pump 1-2 MAL-SWSOOIB BOP ABN-18 Service Water Failure Response Main Condenser Vacuum Leak 7 MAL-CFWO17 R SRO Power Reduction required RO ABN-14 Loss of Condenser Vacuum 7 .

RWCU Leak in the Reactor Building MAL-RCUO13 RWCU fails to isolate 8 VLV-RCU001 M ALL VLV-RCUOW Secondary Containment Control EOP Emergency Depressurization required 9

MAL-CNS004A c SRO A Containment Spray pump trips while in Torus Cooling or B or C or D

- BOP (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 1 Page 1 of 27

OC NRC Retake Exam 2008 Scenario Outline Facility: Oyster Creek Scenario No.: NRC 2 Op Test No.: NRC 2008-1 Examiners: Operators: SRO- Steve Johnston initial Conditions:

90% Power R W M is bypassed and 00s lsophase Bus Fan A is 00s 0 Main Generator voltage control is in manual Turnover:

Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 24KV Main Gen Electrical System IAW the ReMA I

Event Malf. No. I Event Event No. le* Description

~~

Restore the amplidyne to service and transfer main SRO I generator voltage control to automatic IAW 336.1 ATC 24KV Main Gen Electrical System SRO 2 Increase reactor power with control rods BOP x

CRD008-34-11 SWI-ADS001C C

SRO Uncoupled Control Rod ATC ABN-6 Control Rod Malfunction SRO EMRV A Inadvertently Opens BOP ABN-40 Stuck Open EMRV; TS 3.4.8

~~ ~ ~ ~

ANN-E6D ANN-E2D Respond to Reactor Recirc Pump A Alarms, Pump SRO Discharge Valve fails to close VLV-NSSOOG BOP ABN-2 Recirculation System Failures TS 3.3.F.

MAL-CRD005 Multiple control rod drifts, Manual scram required and MAL-RPSOOG C SRO fails, ARI required SWI-RPS006 ATC ABNB Control Rod Malfunction MAL-NSSOI78 Steam leak in Primary Containment, DWiTorus MAL-PCN001N M ALL Vacuum Breaker fails open MAL-RPS007C SRO Failure of RWCU to Auto isolate, Containment Spray VLV-CNS008 C PMP-CNS008A BOP System failures

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 2 Page 1 of 21

OC NRC Re-Take Exam 2008 Scenario Outline Facility: Oyster Creek Scenario No.: NRC 3 Op Test No.: NRC 2008-1 Examiners: Operators: RO- Steve Johnston Initial Conditions:

92%Power RWM bypassed and 00s TBCCW pump 2 00s Turnover:

Increase reactor power to 100% IAW ReMA Event No. 1 Malf. No. Event TY Pe*

Event Description Increase Power with Rods & Recirc Flow to 100% Power ATC Stuck Control Rod PMP-CRD002A ATC CRD Pump 1A Shaft Failure Condensate Pump B Motor Bearing Hi Temp 4 ICH-CW069A ATC requires power reduction with Recirculation Flow to approx. 65% power MAL-NSSOl7D MAL- Small Steam leak in containment with Hydraulic CRD021A ALL ATWS MAL-CRD021B MAL-CRDOOIA ATC I CRD FIOW Control Valve fails to 0%

i (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 3 Page 1 of 14