ML14163A388

From kanterella
Jump to navigation Jump to search

Final Operating Exam (Sections a, B, and C) (Folder 3)
ML14163A388
Person / Time
Site: Oyster Creek
Issue date: 05/13/2014
From: Ridosh J
Exelon Nuclear Generation Corp
To: Todd Fish
Operations Branch I
Shared Package
ML13333A261 List:
References
TAC U01893
Download: ML14163A388 (310)


Text

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2230101504 Task

Title:

Determine Bulk Drywell Temperature lAW EMG-SP26 Job Performance Measure No.: NRC RO Admin ...-

IPM - - -

KIA

Reference:

_2_._1_.2_0__,.(4_._6.{_)_ _ _ _ _ __

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant was at rated power when an event occurred which required entry into the Primary Containment Control EOP
2. Computer point DWTEMP is questionable
3. Recorder IA55 has lost power
4. Recorder TR-100A is operable
5. EMG-SP26, Determining Bulk Drywell Temperature has been completed through step 3.1.2 Task Standard: Determines bulk Drywell temperature lAW Support Procedure 26, Determining Bulk Drywell Temperature Required Materials: Calculator General

References:

1. EMG-SP26, Determining Bulk Drywell Temperature, Rev 1 Initiating Cue: Determine bulk Drywell temperature lAW Support Procedure 26, Determining Bulk Drywell Temperature, starting at step 3.2 NRC RO Admin JPM 1 Page 1 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.

Validation Time: 10 Minutes NRC RO Admin JPM 1 Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark -I' Performance Step: 1 Procedure Step: Provides repeat bacl< of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Verifies Prerequisites Standard: There are no prerequisites to verify for this procedure Comment:

SAT/UNSAT NRC RO Admin JPM 1 Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 3.1.2 DETERMINE drywell bulk temperature by using the appropriate calculation and the following recorders:

  • Recorder TR-100A (RB 51' Elev.)
  • Recorder IA55 (Panel 8R)

Standard: From the initial conditions, determines TR-1 OOA is available and IA55 is NOT available. Directs an EO to obtain temperature readings on TR-100A using EMG-SP26 attachment EMG-SP26-1.

Cue: Provide a copy of the JPM Data Sheet with temperature values from TR-1 OOA.

NOTE: If this JPM is to be performed as a Group, DELETE this step and handout the Date Sheet at the start of the JPM.

Comment:

SAT/UNSAT NRC RO Admin JPM 1 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: 3.2.2.1 Using Attachment EMG-26-1, calculates T Avg Is Standard: Determines T Avg 18 is 204 oF Comment:

SAT/UNSAT Performance Step: 5 Procedure Step: 3.2.2.1 Using Attachment EMG-26-1, calculates T Avg II Standard: Determines T Avg II is 215°F Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 3.2.2.1 Using Attachment EMG-26-1, calculates T Avg Ill.

Standard: Determines T Avg Ill is 241°F Comment:

SAT/UNSAT NRC RO Admin JPM 1 Page 5 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 3.2.2.1 Using Attachment EMG-26-1, calculates T s (Bulk Drywell Temperature).

Standard: Determines T 8 (Bulk Drywell Temperature) is 206°F C:!:.rF)

Comment:

SAT/UNSAT Task Standard: Bulk Drywell Temperature has been calculated.

JPM Stop Time: _ _ __

NRC RO Admin JPM 1 Page 6 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC RO Admin JPM 1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC RO Admin JPM 1 Page 7 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. J PM Data Sheet with recorder TR-1 OOA on RB 51' filled out.
2. Copy of procedure EMG-SP26, Rev 1, DetE~rmining Bulk Drywell Temperature NRC RO Admin JPM 1 Page 8 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant was at rated power when an event occurred which required entry into the Primary Containment Control EOP
2. Computer point DWTEMP is questionable
3. Recorder IA55 has lost power
4. Recorder TR-1 OOA is operable
5. EMG-SP26, Determining Bulk Drywell Temperature has been completed through step 3.1.2 Task Cue:

Determine bulk Drywell temperature lAW Support Procedure 26, Determining Bulk Drywell Temperature, beginning at step 3.2 NRC RO Admin JPM 1 Page 9 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Data Sheet TR-1 OOA on RB 51' Recorder Point Cc>m~ ID PT Value {°F}

PT. 1 TE-100A, El 50' TE103A 205 PT. 2 TE-1008, El50' TE1038 203 PT. 3 TE-100C, El50' TE103C 204 PT. 4 TE-1 OOD, El 50' TE103D 205 PT. 5 TE-100E, El50' TE103E 203

-~

Recorder Point Cc>m~ ID PT Value {°F}

PT. 6 TE-104A, El93' TE104A 214 PT. 7 TE-1 048, El 93' TE1048 216 PT. 8 TE-104C, El 93' TE104C 215 PT. 9 TE-1040, El 93' TE104D 214 PT. 10 TE-1 04E, El 93' TE104E 216

"----- ----~-~-

Recorder Point Cc>m~ ID PT Value {°F}

PT. 11 TE-1 05A, El 95' TE105A Upscale PT. 12 TE-1058, El 95' TE1058 240 PT.13TE-105C, El95' TE105C 242 NRC RO Admin JPM 1 Page 10 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2000101408 Task

Title:

Plot Heatup Rate Job Performance Measure No.: NRC RO Admin JIPM 2 KIA

Reference:

_2_._1._2_5_,_(3_._9_,__)_ _ _ _ _ __

Examinee: ExaminE~r:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is starting-up after a refuel outag~3
2. The plant has been heating up for the last 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> during control rod withdrawals
3. Control rod withdrawals will be continuing at the start of the third hour (time 1000)

Task Standard: Heatup rate has been calculated lAW the JPM key, and required actions documented Required Materials: None.

General

References:

1. 201, Plant Startup, Rev 73 NRC RO Admin JPM 2 Page 1 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue:

Given RPV pressures/temperatures over the last 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, perform the following:

1. Plot the RPV heatup rate lAW Procedure 201, Plant Startup, step 5.34 (see attached data)
2. Determine the hourly heatup rate between 0800 and 0900. Determine if the hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

If the limit has been exceeded, state what actions can be done to reduce the heatup rate.

3. Determine the hourly heatup rate between 0900 and 1000. Determine if the hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

If the limit has been exceeded, state what actions can be done to reduce the heatup rate.

Time Critical Task: No.

Validation Time: 15 Minutes NRC RO Admin JPM 2 Page 2 of 14

Appendix C Job Performance Mea8ure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat bacl< of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: Determine the Tsat by converting Reactor Pressure to its corresponding saturation temperature using the provided Temp/Press table Standard: Determines the Tsat by converting Reactor Pressure to its corresponding saturation temperature using using the provided Temp/Press table and records the supplied table Comment:

SAT/UNSAT NRC RO Admin JPM 2 Page 3 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: Plot the heatup on the attached graph Standard: Plots the heatup on the attached graph as shown in the Key Comment:

SAT/UNSAT NRC RO Admin JPM 2 Page 4 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: Determine the heatup rate for the first hour (time 0800- 0900)

Standard: Determines the heatup rate for the first hour (0800- 0900). The heatup rate is 79 °F/hr.

Comment:

SAT/UNSAT NRC RO Admin JPM 2 Page 5 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: Determine the heatup rate for the first hour (time 0800- 0900) is less than the procedural limit of 90 °F/hr (no actions are required)

Standard: Determines the heatup rate for the first hour (time 0800- 0900) is less than the procedural limit of 90 oF/hr (no actions are required)

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: Determine the heatup rate for the second hour .

(time 0900- 1000)

Standard: Determines the heatup rate for the second hour (0900- 1000).

The heatup rate is 96.6 oF/hr.

Comment:

SAT/UNSAT NRC RO Admin JPM 2 Page 6 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: Determine the heatup rate for the second hour (time 0900- 1000) is greater than the procedural limit of 90 °F/hr Standard: Determines the heatup rate for the se!cond hour (time 0900 -

1000) is greater than the procedural limit of 90 oF/hr. The heatup rate is 96.6 oF/hr.

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: Determine that the withdrawal of control rods should be delayed or performed more slowly (to reduce the heatup rate) or similar.

Standard: Determines that the withdrawal of control rods should be delayed or performed more slowly (to reduce the heatup rate) or similar.

Comment:

SAT/UNSAT Terminating Cue: Determines heatup rate for the 2nd hour is greater than procedural limit. Recommends action to reduce heatup rate.

JPM Stop Time: _ _ __

NRC RO Admin JPM 2 Page 7 of 14

KEY 0

LL 630

( ])

-I-

J ctl I-(])

a.

540 450 E

Q)

I-c ctl 0

360 0

()

270

- I-0

()

ctl Q) 180 0:::

90 0

0 0.5 1 1.5 2 2.5 3 3.5 4 Hours Time 0800 0810 0820 0830 0840 0850 0900 0910 0920 0930 0940 0950 1000 Press NA NA NA NA NA 27 30 60 80 110 130 144 160 I

I Tsat. 195 208 229.8 247.8

.~L 260.5 269.8 274.0 i 307.3 323.9 344.2 355.6 362.9 370.6 NRC RO Admin JPM 2 Page 8 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC RO Admin JPM 2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC RO Admin JPM 2 Page 9 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Have a copy of procedure 201, Plant Startup, available upon request
2. Have a calculator for the applicant NRC RO Admin JPM 2 Page 10 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is starting-up after a refuel outage
2. The plant has been heating up for the last 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> during control rod withdrawals
3. Control rod withdrawals will be continuing at the start of the third hour (time 1000)

Task Cue:

Given RPV pressures/temperatures over the last 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, perform the following:

1. Plot the RPV heatup rate lAW Procedure 201, Plant Startup, step 5.34 (see attached data)
2. Determine the hourly heatup rate between 0800 and 0900. Determine if the hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

If the limit has been exceeded, state what actions can be done to reduce the heatup rate.

3. Determine the hourly heatup rate between 0900 and 1000. Determine if the hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

If the limit has been exceeded, state what actions can be done to reduce the heatup rate.

NRC RO Admin JPM 2 Page 11 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Provide your answers below and on the attached graph.

1. Provide the plot the attached graph.
2. Hourly heatup rate from 0800- 0900 is:

The hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

(circle one)

If exceeded, what actions can be done to reduce the heatup rate (be specific):

3. Hourly heatup rate from 0900 - 1000 is:

The hourly heatup limit in procedure 201, HAS/HAS NOT been exceeded.

(circle one)

If exceeded, what actions can be done to reduce the heatup rate (be specific):

NRC RO Admin JPM 2 Page 12 of 14

..- 630 0

LL (1)

I....

J 540

+""'

ro I....

(1)

a. 450 E

(1)

I-

+""'

c ro 360 0

0 0 270 I....

0

+""'

(.)

ro (1) 0::

180 90 0

0 0.5 1 1 .5 2 2.5 3 3.5 4 Hours Time 0800 0810 0820 0830 0840 0850 0900 0910 0920 0930 0940 0950 1000 Press NA NA NA NA NA 27 30 60 80 110 130 144 160 Tsat 195 208 229.8 L . _ __

247.8 260.5


L. -** - -

NRC RO Admin JPM 2 Page 13 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Saturation Temperature (degrees F) from Pressure (PSIG) in one pound increments To read temperature at 108 psig go to row 10x and column 8.

Note: 0 psig == 14.7 psi a

~ 012 3 4 56 7 8 9 Ox 212.0 215.4 218.5 221.5 224.4 ~~2T2 229.8 232.3 234.8 237.1 1x 239.4 241.6 243.7 245.8 247.8 24H.8 251.7 253.5 255.3 257.1 2x 258.8 260.5 262.1 263.7 265.3 26E>.8 268.3 269.8 271.2 272.6 3x 274.0 275.4 276.7 278.1 279.4 ~~80.6 281.9 283.1 284.4 285.6 4x 286.7 287.9 289.0 290.2 291.3 292.4 293.5 294.5 295.6 296.6 5x 297.7 298.7 299.7 300.7 301.7 ~~0~~.6 303.6 304.6 305.5 306.4 6x 307.3 308.2 309.1 310.0 310.9 ~~1"1.8 312.6 313.5 314.3 315.2 7x 316.0 316.8 317.7 318.5 319.3 ~~20.1 320.8 321.6 322.4 323.2 8x 323.9 324.7 325.4 326.1 326.9 ~~21'.6 328.3 329.0 329.8 330.5 9x 331.2 331.9 332.6 333.2 333.9 ~~34.6 335.3 335.9 336.6 337.2 10x 337.9 338.5 339.2 339.8 340.5 ~~41.1 341.7 342.3 342.9 343.6 11x 344.2 344.8 345.4 346.0 346.6 ~~41'.2 347.7 348.3 348.9 349.5 12x 350.1 350.6 351.2 351.8 352.3 ~~52.9 353.4 354.0 354.5 355.1 13x 355.6 356.2 356.7 357.2 357.8 ~~58.3 358.8 359.3 359.8 360.4 14x 360.9 361.4 361.9 362.4 362.9 ~~63.4 363.9 364.4 364.9 365.4 15x 365.9 366.4 366.8 367.3 367.8 368.3 368.8 369.2 369.7 370.2 16x 370.6 371.1 371.6 372.0 372.5 372.9 373.4 373.9 374.3 374.8 17x 375.2 375.6 376.1 376.5 377.0 ~~7/'.4 377.8 378.3 378.7 379.1 18x 379.6 380.0 380.4 380.8 381.3 ~~81' .7 382.1 382.5 382.9 383.3 19x 383.8 384.2 384.6 385.0 385.4 385.8 386.2 386.6 387.0 387.4 20x 387.8 388.2 388.6 389.0 389.4 ~189.8 390.2 390.5 390.9 391.3 21x 391.7 392.1 392.5 392.8 393.2 ~~9~1.6 394.0 394.3 394.7 395.1 22x 395.5 395.8 396.2 396.6 396.9 :197.3 397.7 398.0 398.4 398.7 23x 399.1 399.4 399.8 400.2 400.5 400.9 401.2 401.6 401.9 402.3 24x 402.6 403.0 403.3 403.7 404.0 404.3 404.7 405.0 405.4 405.7 25x 406.0 406.4 406.7 407.0 407.4 407'.7 408.0 408.4 408.7 409.0 26x 409.4 409.7 410.0 410.3 410.7 411.0 411.3 411.6 411.9 412.3 27x 412.6 412.9 413.2 413.5 413.8 414.2 414.5 414.8 415.1 415.4 28x 415.7 416.0 416.3 416.6 417.0 417'.3 417.6 417.9 418.2 418.5 29x 418.8 419.1 419.4 419.7 420.0 420.3 420.6 420.9 421.2 421.5 30x 421.8 422.1 422.3 422.6 422.9 423.2 423.5 423.8 424.1 424.4 31x 424.7 425.0 425.2 425.5 425.8 426.1 426.4 426.7 426.9 427.2 32x 427.5 427.8 428.1 428.4 428.6 42B.9 429.2 429.5 429.7 430.0 33x 430.3 430.6 430.8 431.1 431.4 431.7 431.9 432.2 432.5 432.7 34x 433.0 433.3 433.5 433.8 434.1 434.3 434.6 434.9 435.1 435.4 35x 435.7 435.9 436.2 436.4 436.7 437'.0 437.2 437.5 437.7 438.0 36x 438.3 438.5 438.8 439.0 439.3 439.5 439.8 440.0 440.3 440.6 37x 440.8 441.1 441.3 441.6 441.8 442.1 442.3 442.6 442.8 443.1 38x 443.3 443.5 443.8 444.0 444.3 444.5 444.8 445.0 445.3 445.5 39x 445.7 446.0 446.2 446.5 446.7 447'.0 447.2 447.4 447.7 447.9 40x 448.2 448.4 448.6 448.9 449.1 449.3 449.6 449.8 450.0 450.3 41x 450.5 450.7 451.0 451.2 451.4 451.7 451.9 452.1 452.4 452.6 42x 452.8 453.1 453.3 453.5 453.7 454.0 454.2 454.4 454.6 454.9 43x 455.1 455.3 455.5 455.8 456.0 456,.2 456.4 456.7 456.9 457.1 44x 457.3 457.6 457.8 458.0 458.2 458.4 458.7 458.9 459.1 459.3 45x 459.5 459.8 460.0 460.2 460.4 460.6 460.8 461.1 461.3 461.5 46x 461.7 461.9 462.1 462.3 462.6 462.. 8 463.0 463.2 463.4 463.6 47x 463.8 464.0 464.2 464.5 464.7 464.9 465.1 465.3 465.5 465.7 48x 465.9 466.1 466.3 466.5 466.7 467.0 467.2 467.4 467.6 467.8 49x 468.0 468.2 468.4 468.6 468.8 469.0 469.2 469.4 469.6 469.8 50x 470.0 470.2 470.4 470.6 470.8 471.0 471.2 471.4 471.6 471.8 51x 472.0 472.2 472.4 472.6 472.8 473.0 473.2 473.4 473.6 473.8 52x 474.0 474.2 474.4 474.6 474.8 475.0 475.2 475.3 4~r5.5 475.7 NRC RO Admin JPM 2 Page 14 of 14

Appendix C Job Performance MeasUire Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2000101404 Task

Title:

Perform a Reactor Heat Balance 1\_~a_n_u_a_llyL__________

Job Performance Measure No.: NRC RO Admin ...-

IPM - - -

KIA

Reference:

_2_._2_.1_2_,_(_3._7.£_)_ _ _ _ _ __

Examinee: Examim~r:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom - - - X - - Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

NRC RO Admin JPM 3 Page 1 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initial Conditions:

1. The reactor has been steady at full power for several hours
2. The most recent stable PPC Core Thermal Power (15-minute average) was 1928 MWth
3. All prerequisites to perform this procedure have been met
4. Calculating RWCU system differential temperature is not required
5. The following indications are provided:
a. APRMs indicate 100% power
b. RPV water level instrument NR GEMAC indicates 161"
c. Local total Feedwater LiP from the venturi transmitter (FT-422-1) indicates 491.0 inches of water
d. Core LiP indicates 16.5 psid
e. Reactor pressure (NR recorder Panel !>FI6F) indicates 1020 psig
f. Feedwater temperature (recorder Panel 5F/5F) indicates 312 oF
g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
h. Total recirculation flow (recorder Panel 3F) indicates 15 x 104 gpm
i. RWCU flow (recorder Panel 3F) indicates 400 gpm Task Standard: Core Thermal Power is calculated Required Materials: Calculator General

References:

1. 1001.6, Core Heat Balance and Feedwater Flow Calculation, Rev 29 Initiating Cue: Calculate core thermal power (CTP) lAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation- Power Range. Report if it is conservative or not.

Time Critical Task: No.

Validation Time: 15 Minutes NRC RO Admin JPM 3 Page 2 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark -/

Performance Step: 1 Procedure Step: Provides repeat baclc of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Verifies Prerequis~tes and reviews Precautions and Limitations.

Standard: All prerequisites to perform this procedure have been met and is stated in the Initial Conditions.

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 3 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step:

Calculates feedwater flow per Method 1 by performing the following:

1. Record local total Feedwater 11P in inches of water from the venturi transmitter (FT-422-1) in the Feedwater Pump Room.
2. Records feedwater temperature from 5F/6F Recorder (100101), rounded to nearest whole degree (critical task).
3. Obtain the specific volume (v) of the Feedwater at 1100 psia and the temperature above from Attachment 1001.6-3 and records (critical task).
4. Calculates total Feedwater flow: F =0.0429387 SQRT (t1P/v)

(critical task).

Standard: Calculates feedwater flow per Method 1 by performing the following:

1. Record local total Feedwater t1P in inches of water from the venturi transmitter (FT-422-1) in the Feedwater Pump Room.

(491.0)

2. Records feedwater temperature from 5F/6F Recorder (1001 01 ), rounded to nearest whole degree (critical task). (312 OF)
3. Obtains the specific volume (v) of the Feedwater at 1100 psia and the temperature above from Attachment 1001.6-3 and records (critical task). (0.01749)
4. Calculates total Feedwater flow (critical task). (F =7.19)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 4 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step:

Record reactor pressure to the nearest whole pound. (Narrow range recorder on Panel 5F/6F.

Standard: Records reactor pressure to the near,est whole pound. (Narrow range recorder on Panel 5F/6F. (1020 psig)

Comment:

SAT/UNSAT Performance Step: 5 Procedure Step:

Record feedwater temperature to the nearest whole degree.

(Recorder on Panel 5F/6F)

Standard: Records feedwater temperature to the nearest whole degree.

(Recorder on Panel 5F/6F (312 °F)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 5 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 6 Procedure Step:

Record recirculation flow to the nearest thousand gpm. (Recorder on Panel 3F)

Standard: Records recirculation flow to the nearest thousand gpm.

(Recorder on Panel 3F) (15)

Comment:

SAT/UNSAT Performance Step: 7 Procedure Step:

Calculate the reactor absolute pressure by adding the value of step 4 (procedure step 5.2.1) + 14."7 pounds pressure Standard: Calculates the reactor absolute pressure by adding the value of step 4 (procedure step 5.2.1) + 14."7 pounds pressure (1 034.7 psi a)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 6 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 8 Procedure Step:

Record Main Steam enthalpy from Attachment 1001.6-5, at saturated conditions using calculat,ed absolute pressure.

Standard: Records Main Steam enthalpy from Attachment 1001.6-5, at saturated conditions using calculated absolute pressure.

(1191.61)

Comment:

SAT/UNSAT Performance Step: 9 Procedure Step:

Record the Feedwater enthalpy from Attachment 1001.6-6 for compressed water at 1100 psia using Feedwater temperature.

Standard: Records the Feedwater enthalpy from Attachment 1001.6-6 for compressed water at 1100 psia using Feedwater temperature.

(283.94)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 7 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 10 Procedure Step:

Calculate the difference of the Main Steam and Feedwater enthalpies.

Standard: Calculates the difference of the Main Steam and Feedwater enthalpies and records. (1191.61 -- 283.94 =907.67)

Comment:

SAT/UNSAT Performance Step: 11 Procedure Step:

Record Total Flow Venturi method FLO (tot) from line (D) of the Feedwater flow calculation worksheet.

Standard: Records Total Flow Venturi method FLO (tot) from line (D) of the Feedwater flow calculation worksheet. (7.19 Mlbm/hr)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 8 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 12 Procedure Step:

Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTU/hr.

Standard: Calculates the product of the Feedwater flow and the enthalpy difference to obtain MBTU/hr and record. (6526.15)

Comment:

SAT/UNSAT Performance Step: 13 Procedure Step:

Convert MBTU/hr to Megawatts. (MBTU/hr x 0.293) and record.

Standard: Converts MBTU/hr to Megawatts. (MBTU/hr x 0.293) and record.

(1912.16)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 9 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 14 Procedure Step:

Record RWCU flow to the nearest gpm (recorder panel 3F) on line (K) of Attachment 1001.6-2.

Standard: Records RWCU flow to the nearest gpm (recorder panel 3F) on line (K) of Attachment 1001.6-2. (400 gpm)

Comment:

SAT/UNSAT Performance Step: 15 Procedure Step:

Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation.

Fixed Losses= [(K) x 0.0136] + 9.0 Standard: Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), pe!r the following equation.

Fixed Losses= [(K) x 0.0136] + 9.0 (400 x 0.0136] + 9.0 = 14.44)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 10 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 16 Procedure Step:

Add the Fixed Losses from line (L) to the Megawatts from Line (J) and record the Calculated (CTP) 011 line (N).

Standard: Add the Fixed Losses from line (L) to the Megawatts from Line (J) and record the Calculated (CTP) 011 line (N). (1926.60 MW)

Comment:

SAT/UNSAT Performance Step: 17 Procedure Step:

Record PPC Core Thermal Power (CTP) on Line M. (Use the 15 min. average value after reactor powe~r is stable for at least 15 minutes.)

Standard: Records PPC Core Thermal Power (CTP) on Line M. (1928)

Comment:

SAT/UNSAT NRC RO Admin JPM 3 Page 11 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 18 Procedure Step:

Subtract the Calculated CTP from the PPC Core Thermal Power

[Line (M) - line (N)].

Standard: Subtracts the Calculated CTP from the PPC Core Thermal Power

[Line (M) - line (N)]

(1.4)

Comment:

SAT/UNSAT Task Standard: Core Thermal Power is calculated JPM Stop Time: _ _ __

NRC RO Admin JPM 3 Page 12 of 17

KEY Data Collection and Calculations Preparer: Date: Time:

Prerequisites met: BB Initials Method 1: Total Flow Venturi Calculation A 5.1.1.1 DP From Total Flow Venturi Transmitter (FT-422-1) Local Transmitter DP Reading 491.0 in H20 B 5.1.1.2 Feed water Temperature (ID I 01) Panel 5F/6F Recorder 312 deg F c 5.1.1.3 Specific Volume at 1100 psia and (B) Attachment 1001.6-3 or ASME Steam Tables 0.01749 fellbm D 5.1.1.4 TOTAL FEEDWATER FLOW FT = 0.0429387 X SQRT[(A) I (C)] 7.19 Mlbmlhr A Loop BLoop C Loop Method 2:3 Loop Flow Calculation IF E 5.1.2.1 5.L2.2 Feedwater Pump Room Nozzle DP Gauges (RV45)

A verag~:: Nuak DP D = :N.Jl I

A= :N.Jl II B = :N.Jl E = :N.Jl II c = :N.Jl F = :N.Jl Bl II in H20 II Pos 15 = :N.Jl Pos 16 = :N.Jl Pos 17 = :N.Jl G 5.1.2.3 Loop Temperature: Recorder 13R-005 deg F Loop Specific Volume at 1400 psia: :N.Jl :N.Jl :N.Jl H 5.1.2.4 ft 3/lbm Attachment 1001.6-4 or ASME Steam Tables I 5.1.2.5 Nozzle Discharge Coefficient x Conversion Factor 0.02252 0.02291 0.02269 Loop Flow:

J 5.1.2.5 FA= :N.Jl Fs = :N.Jl Fe= :N.Jl Mlbm/hr

= (/) X SQRT[(F) I (H)]

K 5.1.2.6 TOTAL FEEDWA TER FLOW FT =FA+ F8 +Fe :N.Jl Mlbm/hr NRC RO Admin JPM 3 Page 13 of 17

KEY A 5.2.1 Reactor Pressure (ID-45) Panel 5F/6F Narrow Range Recorder 1020 psig B 5.2.2 Feedwater Temperature (ID 101) Panel 5F/6F Recorder 312 degF c 5.2.3 Recirculation Flow Panel 3F Recorder 15 104 gpm D 5.2.4 Reactor Absolute Pressure (A)+ !4.7 1034.7 psi a E 5.2.5 Main Steam Enthalpy (hMs) Attachment 1001.6-5 or ASME Steam Tables 1191.61 BTU/Ibm F 5.2.6 Feedwater Enthalpy (hFw) Attachment 1001.6-6 or ASME Steam Tables 283.94 BTU/Ibm G 5.2.7 Enthalpy Difference (hMs- hFW) (E)- (F) 907.67 BTU/Ibm H 5.2.8 Total Feedwater Flow Attachment 100 1.6-l, (D) or (K) 7.19 Mlbm/hr I 5.2.9 Feedwater Flow x Enthalpy Difference (H) X (G) 6526.15 MBTU/hr J 5.2.10 Conversion to MWTH 0.293 x (I) 1912.16 MWTH K 5.2.11 RWCU Flow Panel 3F Recorder 400 gpm P""w 11  :-,-.,.,--. r . r.* -..--: r.r. ~~ ,4~ -.~

L ~ ..l.i.l t-1xea Losses Ltt<.J X u.u Ubj T 'J.U 14.44 MWTH M 5.2.14 PPC Core Thermal Power (CTP) PPC CTP !5 Minute Average 1928 MWTH N 5.2.13 Calculated Core Thermal Power (J) + (L) 1926.60 MWTH

!.4 f---

0 5.2.15 Core Thermal Power Comparison (M)- (N)

X Positive Value~

MWrH Conservative t--

Negative Value~

Non-Conservative Comments:

NRC RO Admin JPM 3 Page 14 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC RO Admin JPM 3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC RO Admin JPM 3 Page 15 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Have a marked up copy of procedure 1001.6 rev 29 for the applicant
2. Have a calculator for the applicant NRC RO Admin JPM 3 Page 16 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The reactor has been steady at full power for several hours
2. The most recent stable PPC Core Thermal Power (15-minute average) was 1928 MWth
3. All prerequisites to perform this procedure have been met
4. Calculating RWCU system differential temperature is not required
5. The following indications are provided:
j. APRMs indicate 100% power
k. RPV water level instrument NR GEMAC indicates 161" I. Local total Feedwater ~p from the Vt3nturi transmitter (FT-422-1) indicates 491.0 inches of water
m. Core ~P indicates 16.5 psid
n. Reactor pressure (NR recorder Pam~ I ~iF/6F) indicates 1020 psig
o. Feedwater temperature (recorder Panel 5F/5F) indicates 312 oF
p. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr 4
q. Total recirculation flow (recorder Panel 3F) indicates 15 x 10 gpm
r. RWCU flow (recorder Panel 3F) indicates 400 gpm Task Cue:

Calculate core thermal power (CTP) lAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - PoWE!r Range. Report if it is conservative or not.

NRC RO Admin JPM 3 Page 17 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: EPAA105101 Task

Title:

Review a Completed State/Local Notification Form Job Performance Measure No.: NRC RO Admin -JPM 4 KIA

Reference:

_G_c_2_._4-"-.3~9_,_(3_._9L_)_ _ _ _ __

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant was at rated power when an event occurred
2. The Shift Manager has assumed the role of Shift Emergency Director (SED)
3. The SED has made his initial emergency decllaration of an Unusual Event today at 1225 (EAL MU4: UNPLANNED loss of safety system annunciation or indication in the control room for 15 minutes or longer.)
4. No radiological release is in progress or expected
5. You are fulfilling the role as Shift Communicator
6. Wind direction is from 215 o
7. Wind speed is 18 MPH Initiating Cue: The SED has just handed you the completed State/Local Notification Form. Review the State/Local Notification Form (page 1 only). State if the Form is ready to make notifications, or not ready. If not ready to make notifications, state all reasons why.

Required Materials: None NRC RO Admin JPM 4 Page 1 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. EP-MA-114-100-F-03, State/Local Notifica1tion Form, Rev H
2. EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, Rev 7
3. EP-MA-114-1 00, Mid-Atlantic State/Local Notifications
4. EP-AA-112-1 00-F-05, Mid-Atlantic Shift Communicator (CR) Checklist Task Standard: Reviews the completed State/Local Notification Form (page 1 only), and notes the discrepancies as stated in this ,JPM.

Time Critical Task: No.

Validation Time: 7 Minutes NRC RO Admin JPM 4 Page 2 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ~

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT NOTE: The following steps may be performed in any order.

~ Performance Step: 2 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • It is not signed by the Shift Emergency Director (SED)

Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • It is not signed by the Shift Emergency Director (SED)

Comment:

SAT/UNSAT NRC RO Admin JPM 4 Page 3 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • "Initial Declaration" is not selected but should be selected Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:
  • "Initial Declaration" is not selected but should be selected Comment:

SAT/UNSAT Performance Step: 4 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • "DECLARED AT' Time is incorrect. It should be 1225 ..

Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • "DECLARED AT' Time is incorrect. It should be 4 minutes, NOT 8 minutes.

Comment:

SAT/UNSAT NRC RO Admin JPM 4 Page 4 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • "No Non-routine Radiological Release" should be selected, but is not selected Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:
  • "No Non-routine Radiological Release" should be selected, but is not selected Comment:

SAT/UNSAT NRC RO Admin JPM 4 Page 5 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 6 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • Wind speed and wind directi1on values are reversed on the form Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:
  • Wind speed and wind direction values are reversed on the form Comment:

SAT/UNSAT NRC RO Admin JPM 4 Page 6 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step:

Review the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • The "Verified With" block is not filled out.

Standard: Reviews the State/Local Notification Form (page 1). Recognizes the Form is not ready to make notifications for the following reasons:

  • The "Verified With" block is not filled out.

Comment:

SAT/UNSAT Terminating Cue: Reviews the completed State/Local Notification Form (page 1 only), and notes the discrepancies as stated in this JPM.

JPM Stop Time:

NRC RO Admin JPM 4 Page 7 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC RO Admin JPM 4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC RO Admin JPM 4 Page 8 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Have a copy of the following to hand out to the applicant:
a. EP-MA-114-100, Mid-Atlantic State/Local Notifications
b. EP-AA-112-1 00-F-05, Mid-Atlantic Shift Communicator (CR)

Checklist NRC RO Admin JPM 4 Page 9 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant was at rated power when an event occurred
2. The Shift Manager has assumed the role of Shift Emergency Director (SED)
3. The SED has made his initial emergency d1eclaration of an Unusual Event today at 1225 (EAL MU4: UNPLANNED loss of safety system annunciation or indication in the control room for 15 minutes or longer.)
4. No radiological release is in progress or expected
5. You are fulfilling the role as Shift Communicator
6. Wind direction is from 215 o
7. Wind speed is 18 MPH Task Cue:

The SED has just handed you the completed State/Local Notification Form.

Review the State/Local Notification Form (page 1 only). State if the Form is ready to make notifications, or not ready. If not ready to make notifications, state all reasons why.

NRC RO Admin JPM 4 Page 10 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT EP-MA-114-1 00-F-03 Revision H Page 1 of 2 STATE I LOCAL NOTIFICATION FORM (Or Electronic Facsimile)

MESSAGE NO. 1 VERIFIED WITH: EMERGENCY DIRECTOR APPROVAL:

1. CALL STATUS is: 2. This is* at Oyster Creek Generating Station.

[ ] This is a DRILL. My phone number is

  • The current time is *

[X] This is an ACTUAL EVENT *Completed by Communicat or,*3t time notification is performed: use PPC time 24-hour clock

3. EMERGENCY CLASSIFICATION: DECLARED AT: THIS REPRESENTS A/AN:

[X] UNUSUAL EVENT [ ]INITIAL DECLARATION

[ ] ALERT TIME: 1228 [ ] ESCALATION

[ ] SITE AREA EMERGENCY (use PPC time in 2*t-h our clock) []NO CHANGE

[ ] GENERAL EMERGENCY [ ] REDUCTION

[]RECOVERY DATE: Today IN CLASSIFICATION STATUS

[ ] TERMINATION

4. EMERGENCY ACTION LEVEL (EAL) NUMBER IS: Unusual Eve! nt: MU4 BRIEF NON-TECHNICAL DESCRIPTION:

MU4: UNPLANNED loss of safety system annunciation 01r in dication in the control room for 15 minutes or longer.)

5. NON-ROUTINE RADIOLOGICAL RELEASE STATUS:

[ ] NO non-routine radiological release in progress

[ ] AIRBORNE non-routine radiological release in progress

[ ] LIQUID non-routine radiological release in progress

[ ] Non-routine radiological release TERMINATED

6. METEOROLOGY:

Wind Direction is FROM: 18 {degrees)

Wind Speed is: 215° (miles per hour)

7. CONCLUSION: [ ] This is a DRILL. [X]Thi s is an ACTUAL EVENT.
  • PERFORM final roll call (General Emergency Only)
  • ASK if there is any questions about the information provided an d PROVIDE clarification as needed.
  • READ: "This concludes the notification message" NRC RO Admin JPM 4 Page 11 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET EP-MA-114-100-f-4)3 Revt~n H Page 2 of2 STATE I LOCAL N*OTIFIC:A'TION FORM MESSAGE I'ID. - - - -

"1 !5 Mlnutt Notifications 15 Mtfli>>'ti' ollllotif~tion s UtWSUAl EVENT. ALE Rl or SllE AAE.A ~*EfEMl EME~GENCY EMERGENCY i rl"<t ~Mt>N~,.;;! :4 *hQl)t <;IO<;~)

. "'.rr,t COt'!~~<f c4*howr ~-) ln1hl! Ri!Hd!! f ln~l Roll ~ '?1.!

KJ$P Of'f1~ of ErM<tfilli\'ney M"'n.J{)*'tlllt-nC :TiM~l

<'\,# 1 ,Af\A ~ 0'\fiQ. A a"'> *~*blif,L

,ii(Y't

  • ~,.~ Q"\0'~ * ,.,., . .,VY'"* *~

_ MJSP (~"* ot Em1!1'9*'rt<:y Man.:tgem*m 0

~::ni.;;e:~.c:~.~ * £d. u~**.:tt >*f.:.;.~.:::

_ _ Oet!an Co*u;nty 0 VER:iF~CATION CAlL RECEIVED 0

D Tm>'E- _ _ _ __

_ _ mmal Roll C:aH Compi<E'ted P~or; C011tac~d: - - - - - - -

VERifiCATION CALL RECEfVED fOllOW-UP NOT1FIC.ATIONS

  • IIII~C ~stdrerrt lnspe-ctor

~l*J-~*..47 *2~~ Qf 2! ::. it~{l.;!!Jffii fOLLOW-UP NOTtF1CATIDNS TiM-e _ _

?ersoo ::wr..aca:-c, NRC RO Admin JPM 4 Page 12 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 3430302302 Task

Title:

Determine Operator Qualifications_U_s_in_.g,__LM_S________

Job Performance Measure No.: NRC SRO Admin- JPM 1

KIA

Reference:

_G_2._1_.8_(,_4_.1-L..)_ _ _ _ _ __

Examinee: ExamimH:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task succe!ssfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power Task Standard: Determines which Operators are qualified to perform the tasks using LMS Required Materials: None.

General

References:

1. NGET Initiating Cue: Given the LMS sheets and the tasks required, determine which Operator is qualified to perform the tasks. Today's date is June 20, 2014.

Time Critical Task: No.

Validation Time: 9 minutes NRC SRO Admin JPM 1 Page 1 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark -/

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue .

..IPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step:

Reviews the tasks and the LMS sheets and determines who is qualified to perform the tasks as shown on the KEY.

Standard: Reviews the tasks and the LMS sheets and determines who is qualified to perform the tasks as shown on the KEY.

NOTE: Even though this JPM only has one ('1) critical step, it is a multi-part JPM and all parts must be correct for this critical step to be SAT.

Comment:

SATIUNSAT Terminating Cue: Determines which Operators are qualified to perform the tasks using LMS JPM Stop Time:

NRC SRO Admin JPM 1 Page 2 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC SRO Admin JPM 1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC SRO Admin JPM 1 Page 3 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Setup

1. Have LMS sheets (RO 1.doc, RO 2.doc, RO 3.doc, EO 4.doc, EO 5.doc, and EO 6.doc).

NRC SRO Admin JPM 1 Page 4 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Number Task Desc:ription 1 Write a clearance (tagout) for a system (which will include disabling fire suppression systems)

Qualification required:

  • Clearance and Taggin~1 V\/riter (Oyster Creek)
  • N-OC-SA-CT WRITEH 2 Review and approve the clearance
  • Clearance and Taggin~1 Approver (Oyster Creek)
  • N-OC-SA-CT APPRO\/ER 3 Hang/remove the tags and ali!~n the systems lAW the clearance
  • Clearance and Tagging! Applier/Remover(Oyster Creek)
  • N-OC-SA-CT APPLIE RREMOVER 4 Perform the duties of a fire wa tctl while the clearance is active
  • Fire Extinguisher (Fire 'Natch)
  • N-AN-SA-FI REWATCHI 5 Once the clearance is remove d and the system is pressurized, perform a VT-2 ir1spection
  • VT2 QUALIFIED AT O<
  • N-OC-NDE-VT2 QUAL EXAM KEY NRC SRO Admin JPM 1 Page 5 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET O~erator Task 1 Task 2 Task4 RO 1 No No No R02 No No No R03 No E04 No No No EO 5 No No No E06 No No No EXAM KEY NRC SRO Admin JPM 1 Page 6 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power Task Cue:

Given the LMS sheets and the tasks required, determine which Operator is qualified to perform the tasks. Today's date is June 20, 2014.

Work control requires the following tasks performed:

Task Number Task Desc:ription 1 Write a clearance (tagout) for a system (which will include disabling fire suppression systems) 2 Review and approve the clearance 3 Hang/remove the tags and ali!~n the systems lAW the clearance 4 Perform the duties of a fire wa tch while the clearance is active 5 Once the clearance is remove d and the system is pressurized, perform a VT-2 ir1spection Is the 0Qerator Qualified to Perform *tho Task? (Yes I No) 0Qerator Task 1 Task2 Task 3 Task4 Task 5 RO 1 R02 R03 E04 EO 5 E06 NRC SRO Admin JPM 1 Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.:

Task

Title:

Applying Work Hour Rules Job Performance Measure No.: NRC SRO Admin* JPM 2 KlA

Reference:

_G_.2_.1-'-.5"'----'-(3=---*~9),_____ _ _ _ __

Examinee: Examine~r:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Peri'ormance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to siimulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at reduced power during coastdown at the end of the operating cycle and is preparing for a refuel outage starting in a few days
2. The Operators shown have been off for the 6-day period (Monday-Saturday) prior to the schedule provided
3. The schedule shows the Reactor Operator work schedule for the next 9 days in order to support outage readiness for :3 Reactor Operators
4. Shift turnover is NOT included in the schedule shown [each turnover (on-coming and off-going) is 15 minutes in length]
5. The average minimum days-off rule and 54--hr rule has already been verified as satisfactory Task Standard: The 10CFR26 Work Hour Limits a1re violated by Hyman Rickover and Albert Einstein, but NOT violated by Robert Oppenheimer, for the reasons given.

Required Materials: None.

NRC SRO Admin JPM 2 Page 1 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. LS-AA-119, Fatigue management and Work Hour Limits, revision 10
2. LS-AA-119-1003, Calculating Work Hours, Revision 2 Initiating Cue: lAW LS-AA-119-1003, Calculating Work Hours, determine for each Operator if the schedule violates the 1OCFH26 Work Hour Limits. For any violations, state the work hour limit that will be exceeded.

Time Critical Task: No.

Validation Time: 15 minutes NRC SRO Admin JPM 2 Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Note: The steps may be completed in any order.

Performance Step: 2 Procedure Step: Determine that Work Hour Limits for Hyman Rickover is violated Standard: Determines that Work Hour Limits Waiver for Hyman Rickover is violated Comment:

SAT/UNSAT NRC SRO Admin JPM 2 Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: Determine that Work. Hour Limits violation for Hyman Rick over is due to less than a 10-hour break between successive work periods Standard: Determine that Work Hour Limits violation for Hyman Rickover is due to less than a 10-hour break between successive work periods Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: Determine that Work Hour Limits for Albert Einstein is violated Standard: Determines that Work Hour Limits for Albert Einstein is violated Comment:

SAT/UNSAT Performance Step: 5 Procedure Step: Determine that Work Hour Limits violation for Albert Einstein is due more than 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period Standard: Determines that Work Hour Limits violation for Albert Einstein is due more than 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period Comment NRC SRO Admin JPM 2 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information SAT/UNSAT Performance Step: 6 Procedure Step: Determine that Work Hour Limits for Robert Oppenheimer is not violated Standard: Determines that Work Hour Limits for Robert Oppenheimer is not violated Comment:

SAT/UNSAT Terminating Cue: The 10CFR26 Work Hour Limits are violated by Hyman Rickover and Albert Einstein, but NOT violated by Robert Oppenheimer, for the reasons given.

JPM Stop Time:

NRC SRO Admin JPM 2 Page 5 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC SRO Admin JPM 2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC SRO Admin JPM 2 Page 6 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET EXAM KEY Hyman Rickover: Work Hour Limits 1s v1olatea aue 1to ess than a 10-hour break between successive work periods (between completing shift at 0115 on July 9 and starting shift at 0745 on July 10).

Name Sunda~ Monda~ Tuesda~ Wednesda_y Thursda~ Frida~ Saturda~

Jul~ 5 Jul~ 6 Jul~ 7 Jul~ 8 Jul~ 9 Jul~ 10 Jul~ 11

~ ~ ~- ---

Hyman On-shift JIT On-shift On-shift On-shift On-shift On-shift Rickover 0745- Training 0745-2015 0745-2015 0745-2015 0745-1615; 1545-0115 1615 0800-1600 Total 12 24 36 44 53 61 69 Hours (Daily) (12) (12) (12) (8) (8) (8) (8)

Albert Einstein: Work Hour Limits is violated due to exceeding 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period (28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> worked on July 6 and July 7)

  • ---~

Name Sunda~ Monda~ Tuesda~ Wednesday Thursda~ Frida~ Saturda~

Jul~ 5 Jul~ 6 Jul~ 7 Jul~ 8 Jul~ 9 Jul~ 10 Jul~ 11 Albert JIT On-shift On-shift On-shift On-shift On-shift On-shift Einstein Training 0745-1615 0745-2200 0745-2200 0745-1615 0745-1615 0745-1400 0800-1600 Total 8 22 36 44 52 60 68 Hours (Daily) (8) (14) (14) (8) (8) (8) (8)

-~

Robert Oppenheimer: No Work Hour Limits is exGeeded.

Name Sunda~ Monda~ Tuesda~ Wednes da ~ Thursda~ Frida~ Saturda~

Jul~ 5 Jul~ 6 Jul~ 7 ~8 Jul~ 9 Jul~ 10 Jul~ 11 Robert On-On-shift On-shift On-shift JIT Oppenheimer On-shift shift Sick 0745- 0745- 0745- Trainir1g 2015 2015 2015 0745-2015 0745- Day 0800-16 00 2015 Total Hours 12 24 36 44 56 68 68 (Daily)

(12) (12) (12) (8) (12) (12) (0)

NRC SRO Admin JPM 2 Page 7 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator/JPM Setu.Q

1. Provide a copy of LS-AA-119-1 003, Calculating Work Hours, to the applicant
2. Have a copy of LS-AA-119, Fatigue Management and Work Hour Limits, available on request NRC SRO Admin JPM 2 Page 8 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at reduced power during coastdown at the end of the operating cycle and is preparing for a refue~ outage starting in a few days
2. The Operators shown have been off for the 6-day period (Monday-Saturday) prior to the schedule provided
3. The schedule shows the Reactor Operator work schedule for the next 9 days in order to support outage readiness for 3 Reactor Operators
4. Shift turnover IS included in the schedule shown [each turnover (on-coming and off-going) is 15 minutes in length]
5. The average minimum days-off rule and 54-hr rule has already been verified as satisfactory Task Cue:

lAW LS-AA-119-1 003, Calculating Work Hours, determine for each Operator if the schedule violates the 10CFR26 Work Hour Limits. For any violations, state the work hour limit that will be exceeded.

NRC SRO Admin JPM 2 Page 9 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Name Sunda)£ Monda)£ Tuesda)£ Wednesda)£ Thursda)£ Frida)£ Saturda)£ Sunda)£ Monda)£ Jul)£5 Jul)£6 Jul)£7 Jul)£8 Jul)£9 Jul)£10 Jul)£11 Jul)£12 Jul)£13 JIT On-shift On-shift Hyman On-shift On-shift On-shift On-shift Training 0745- 0745- OFF OFF Rickover 0745-2015 0745-1615 1545-0115 0745-1615 0800-2015 2015 1600 On-shift On-shift JIT On-shift Albert On-shift On-shift On-shift 0745- 0745-Training 0745- OFF OFF Einstein 0745-2200 0745-1615 0745-1615 1615 2200 0800-1600 1615 J!T Robert On-c:hift

~ o~~shift I On-shift On-shift On-shift Sick I

J I

1 * .... 1 1 Training f'"\CC occ Oppenheimer I 0745- 0745 I 0745-2015 I 0745-2~15 ~VII 2015 2015- 0800-1600 0745-20151 II Day ___________

NOTE: The 15-min turnover at the start and end of shift IS included in the table above.

NRC SRO Admin JPM 2 Page 10 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 3420302026 Review Surveillance Test 619.3.0'16, RPS I High Drywell Task

Title:

Pressure Scram Test and Calibration Job Performance Measure No.: NRC SRO ADMIN- -JPM3 KIA

Reference:

_8_2_._2_.1_2___,(_4_.1..[_)___________

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance ------

Actual Performance X Classroom X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power
2. Surveillance Test 619.3.016, RPS I High Drywell Pressure Scram Test and Calibration, was just completed Task Standard: Section 7.0, Acceptance Criteria, is reviewed and found to be unsatisfactory due to sensor RE04A not meeting the criteria. Tech Spec required actions are stated.

Required Materials: A completed 619.3.016 NRC SRO Admin JPM 3 Page 1 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. 619.3.016, RPS I High Drywell Pressure Scram Test and Calibration, Revision 33
2. Tech Spec Table 3.1.1
3. GE 237E566, Reactor Protection System, sheets 1 and 5
4. 420, Instrumentation Setpoints, Revision 13
5. LS-AA-125, Corrective Action Program (CAP) Procedure, Revision 17 Initiating Cue: Perform the Acceptance Criteria review of 619.3.016, High Drywell Pressure Scram Test and Calibration. Note any diiscrepancies, and state the required actions, if any.

Time Critical Task: No.

Validation Time: 25 Minutes NRC SRO Admin JPM 3 Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue .

..IPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: 7.1 If the following criteria are met, components tested by this procedure meet Technical Specifications requirements for operability.

As-Left trip value for all sensors is:

1. Unadjusted: 2.9 2: 0.1 psig (2.8 to 3.0)

OR

2. Adjusted: 2.9 2: 0.05 psig (2.85 to 2.95)

Standard: Reviews Acceptance Criteria of 619.3.016, High Drywell Pressure Scram Test and Calibration, Attachment 619.3.016-2, Test Data Sheet Comment:

SAT/UNSAT NRC SRO Admin JPM 3 Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Note: The following steps are not required to be performed in the order provided.

~ Performance Step: 3 Procedure Step: 7.2 If any criteria of Step 7.1 are not met, declare the affected components inoperable and follow the requirements of Technical Specifications and Procedure LS-ti.A-*125.

Standard: Notes that sensor RE04A is outside of the allowed band (actual value of 2.98 with the allowed band of 2.85- 2.95). Declares sensor RE04A inoperable.

Comment:

SAT/UNSAT NRC SRO Admin JPM 3 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: 7.2 Determine Tech Spec applicability Standard: Determines that, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, either restore the inoperable channel or place the inoperable channel and/or that Trip System in the tripped condition, or take the action to insert control rods.

Note 1: The failed instrument inputs into the reactor scram circuit.

Determines sensor loss on Tech Spec applicability. Determines that sensor RN04A only affects a sin~~le Trip System. TS Table 3.1.1.A (Scram) requires the minirnurn number of Instrument Channels per Operable Trip System as 2. One Trip System only has 1 operable instrument.

TS Table 3.1.1.A (Scram) requires the minimum number of Operable or Operating (tripped) Trip System as 2. There is currently only 1 operable or operating (tripped) Trip System.

Note nn applies:

With one required channel inoperable in one Trip System, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, restore the inoperable channel or place the inoperable channel and/or that Trip System in the tripped

  • condition.
  • An inoperable channel or Trip System need not be placed in the tripped condition where this would cause the Trip Function to occur. In these cases, if the inoperable channel is not restored to OPERABLE status within the required time, the Action Required shall be taken.

Otherwise, take the Action Required.

Note 2: The Applicant may also state that an IR/CR (incident report/condition report) be generatE3d and that notifications to Plant Management are required. (Not required for Critical Step)

Comment:

SAT/UNSAT NRC SRO Admin JPM 3 Page 5 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 7.3.1 As Found trip point for the followin~~ is less than or equal to 3.5 psig:

  • RE04A
  • RE04C Standard: Verifies sensor trip as-found setpoints < 3.5 psig (no problems)

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 7.3.2 Control Room alarms perform as specified Standard: Verifies alarms performed as specified (no problems)

Comment:

SAT/UNSAT NRC SRO Admin JPM 3 Page 6 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 7.3.3 Plant Computer PIDs perform as specified Standard: Verify plant computer PIDs performed as specified (no problems)

Comment:

SAT/UNSAT Terminating Cue: Section 7.0, Acceptance Criteria, is reviewed and found to be unsatisfactory due to sensor RE04A not meeting the criteria. Tech Spec required actions are as stated.

JPM Stop Time:

NRC SRO Admin JPM 3 Page 7 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC SRO Admin JPM 3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC SRO Admin JPM 3 Page 8 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. A completed surveillance procedure 619.3.016, High Drywell Pressure Scram Test and Calibration, with instrument HE04A setting outside of the allowed adjusted band of 2.85-2.95 (ie, 2.98).
2. Allow the Applicants access to RAPs, 420, and Tech Specs.

NRC SRO Admin JPM 3 Page 9 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power
2. Surveillance Test 619.3.016, RPS I, High Drywell Pressure Scram Test and Calibration, was just completed Task Cue:

Perform the Acceptance Criteria review of 619.3.016, RPS I, High Drywell Pressure Scram Test and Calibration. Note any discrepancies, and state the required actions, if any.

NRC SRO Admin JPM 3 Page 10 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: EPAA101013 Determine Recommendation of Kl Issuance During an Task

Title:

Emergency Job Performance Measure No.: NRC SRO ADMII\J-JPM4 KIA

Reference:

_8_2_._3_.1_4_,(~3-.8-'-)_ _ _ _ __

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance - - - - - Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant was at rated power when a LOCA occurred inside the Primary Containment
2. The reactor scrammed 20 minutes ago
3. RPV water level is -30" and steady
4. Stack RAGEMS has risen from 2.1 E+OO 1-JCI/CC HRM to 2.7 E+01 1-JCI/CC HRM over the last 15 minutes
5. Containment Hi-Range Radiation Monitors inclicate 585 R/hr
6. The RB Vent Radiation Monitors indicate 8 mr/hr
7. The Shift Manager has assumed the role of Shift Emergency Director (SED)
8. The Emergency Response Facilities (TSC, EOF) have not been activated yet Task Standard: Kl issuance should be recommended for the off-site Field Monitoring Team, and to the on-site emergency work.ers.

NRC SRO ADMIN JPM4 Page 1 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Required Materials: None.

General

References:

1. EP-AA-113, Personnel Protective Actions, Revision 10
2. EP-AA-1 010, Radiological Emergency Plan Annex for Oyster Creek Station, Revision 2
3. EP-AA-114-F-01, Release In Progress Det~errnination, Revision D Initiating Cue: With only the information provided, and lAW EP-AA-113, Personnel Protective Actions, determine if the SED shall recommend Kl issuance to:
1) Off-site Field Monitoring Teams, and/or
2) On-site Emergency Teams Time Critical Task: No Validation Time: 16 Minutes NRC SRO ADMIN JPM4 Page 2 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: _ _ _ __

Standard: Provides repeat back of initiating cue . Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT NRC SRO ADMIN JPM4 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 2 Procedure Step: 4.4.1.1.A (EP-AA-*113)

Assess the potential of high thyroid exposure to emergency workers in, or projected to be sent into, areas where the possibility exists of exposure to radioactive iodine as follows:

For Field Monitoring Teams or othm Exelon emergency workers working offsite, determine if either of the following conditions exist:

Condition 1

  • There is an Offsite Release in Progress And
  • There has been a loss or potential loss of the Fuel Clad Barrier Or Condition 2
  • Dose Assessments project iodine thyroid exposure for emergency workers will be ~::_50 Rem Committed Dose Equivalent (CDE)

Standard: Determines that an offsite release is in progress (as evidenced by the Stack RAGEMS)

This meets the first bullet of Condition 1.

Comment:

SAT/UNSAT NRC SRO ADMIN JPM4 Page 4 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: Procedure Step: 4.4.1.1.A Assess the potential of high thyroid exposure to emergency workers in, or projected to be sent into, areas where the possibility exists of exposure to radioactive iodine as follows:

For Field Monitoring Teams or other Exelon emergency workers working offsite, determine if either of the following conditions exist:

Condition 1

  • There is an Offsite Release in Progress And
  • There has been a loss or potential loss of the Fuel Clad Barrier Or Condition 2 Dose Assessments project iodine thyroid exposure for emergency workers will be 2:.. 50 Rem Committed Dose Equivalent (CDE)

Standard: Determines either that a loss or potential loss of Fuel Clad Barrier exists (as evidenced by RPV water level at -30")

This meets the second bullet of Condition 1.

Comment:

SAT/UNSAT NRC SRO ADMIN JPM4 Page 5 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: 4.4.1.1.A Assess the potential of high thyroid exposure to emergency workers in, or projected to be sent into, areas where the possibility exists of exposure to radioactive iodine as follows:

For Field Monitoring Teams or othm Exelon emergency workers working offsite, determine if either of the following conditions exist:

Condition 1

  • There is an Offsite Release in Progress And
  • There has been a loss or potential loss of the Fuel Clad Barrier Or Condition 2 Dose Assessments project iodine thyroid exposure for emergency workers will be ~50 Rem Committed Dose Equivalent (CDE)

Standard: Determines the indications meet the 2 parts of Condition 1 to recommend issuance of Kl to the off-site Field Monitoring Teams.

Thus, with the information provided, Kl issuance to off-site Field Monitoring Teams should be recommended.

Note: The Station (Shift) Emergency Director must authorize issuance of Kl to Exelon emergency workers Comment:

SAT/UNSAT NRC SRO ADMIN JPM4 Page 6 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 4.4.1.1.8 For OSC Emergency Teams and othBr onsite workers, determine if either of the following conditions exist:

Condition 1

  • Workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Loss of the Fuel Clad barrier is a good indication of possible high iodine concentrations.

OR Condition 2

  • The calculated iodine thyroid exposure (actual or projected) for emergency workers, base on station Radiation Protection procedures or use of the DAPAR Program, will be ?:.50 Rem Committed Dose Equivalent (CDE).

Standard: Determines there is currently a loss of the Fuel Clad Barrier, which is a good indication of possible high iodine concentrations Comment:

SAT/UNSAT NRC SRO ADMIN JPM4 Page 7 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 6 Procedure Step: 4.4.1.1.8 For OSC Emergency Teams and other onsite workers, determine if either of the following conditions ,exist:

Condition 1

  • Workers will be entering an unknown radiological atmosphere that is suspecte~d to have a high iodine concentration. Loss of the Fuel Clad barrier is a good indication of possible high iodine concentrations.

OR Condition 2

  • The calculated iodine thyroid exposure (actual or projected) for emergency workers, base on station Radiation Protection procedures or us1e of the DAPAR Program, will be ;:::_50 Rem Committed Dose Equivalent (CDE).

Standard: Determines the indications meet Condition 1 to recommend issuance of Kl to the on-site Emergency Teams.

Thus, with the information provided, Kl issuance to on-site Emergency Teams should be recommended.

Comment:

SAT/UNSAT Terminating Cue: Kl issuance should be recommended for the off-site Field Monitoring Team, and to the on-site emergency workers.

JPM Stop Time:

NRC SRO ADMIN JPM4 Page 8 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Compleition JPM Number: NRC SRO ADMIN JPM4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC SRO ADMIN JPM4 Page 9 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Have a copy of the EALs from EP-AA-1 010 for each applicant.
2. Have a copy of EP-AA-113 for each applicant.
3. Have a copy of the EAL User's Guide for each applicant.

NRC SRO ADMIN JPM4 Page 10 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant was at rated power when a LOCA occurred inside the Primary Containment
2. The reactor scrammed 20 minutes ago
3. RPV water level is -30" and steady
4. Stack RAGEMS has risen from 2.1 E+OO !JCI!CC HRM to 2.7 E+01

!JCI!CC HRM over the last 15 minutes

5. Containment Hi-Range Radiation Monitors indicate 585 R/hr
6. The RB Vent Radiation Monitors indicate 8 mr/hr
7. The Shift Manager has assumed the role of Shift Emergency Director (SED)
8. The Emergency Response Facilities (TSC, EOF) have not been activated yet Task Cue:

With only the information provided, and lAW EP-AA-113, Personnel Protective Actions, determine if the SED shall recommend Kl issuance to:

1) Off-site Field Monitoring Teams, and/or
2) On-site Emergency Teams NRC SRO ADMIN JPM4 Page 11 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2000502401 Task

Title:

Classify an Emergency or Abnormal Event Job Performance Measure No.: NRC SRO Admin- JPM 5 KIA

Reference:

_2_._4_.4_1_,_(4_._61_)_ _ _ _ _ __

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

NRC SRO Admin JPM 5 Page 1 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initial Conditions (Part 1):

1. You are the Unit Supervisor for the operating shift
2. The plant is operating at 100% power.
3. Wind Speed is 5 mph
4. Wind direction is from 100 degrees
5. The following conditions are reported from the Site Protection Shift Supervisor;
a. Received valid Aircraft threat notification from the NRC
b. An unauthorized vehicle has gained access to the site
c. Security has disabled and surrounded the vehicle in the employee parking lot
d. The driver of the vehicle has not surrendered and the threat is unknown but is considered a HOSTILE ACTION condition as determined by Station Security lAW Security Procedures Current Conditions (Part II):
1. You are the Unit Supervisor for the operating shift
2. The plant is operating at 100% power.
3. Wind Speed is 5 mph
4. Wind direction is from 100 degrees
5. The aircraft has just crashed into the intake structure. A resulting explosion destroyed all equipment in the North intake.
6. The driver of the vehicle has forcefully entered into the MOB; the threat is considered a HOSTILE ACTION condition as determined by Station Security lAW Security Procedures Task Standards:

Part 1: The event is classified as an Alert (HA 1) and the State/Local Notification Form is correctly filled out lAW the key.

Part II: The event is classified as a Site Area Emer91ency (HS1) and the State/Local Notification Form is correctly filled out lAW the key.

Required Materials: None.

General

References:

1. EP-AA-1 010, Exelon EP Annex for Oyster Creek, Rev 7
2. EP-MA-114-1 00, Mid-Atlantic State/Local Notifications, Rev 19
3. EP-MA-114-1 00-F-03, State/Local Notification Form, Rev F NRC SRO Admin JPM 5 Page 2 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cues:

Part 1: State the minimum classification for these conditions and complete the State and Local Notification Form for Shift Manager approval.

(NOTE: Completing the form is part of the classific:ation for exam purposes)

Part II: State the minimum classification for thes13 conditions and complete the State and Local Notification Form for Shift Manager approval.

(NOTE: Completing the form is part of the classific:ation for exam purposes)

Time Critical Task: Yes. 15-min each for Part I & II Validation Time: 20 Minutes NRC SRO Admin JPM 5 Page 3 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat bacl< of initiating cue.

Part I JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: Determined Emergency Classification and associated EAL.

Standard: Declares "ALERT" - Cat. HA 1.

Notified by Station Security that this is a Security Condition with hostile action (owner controlled)

Time Critical Portion of JPM complete Time Complete (<15 minutes)

Comment:

SATIUNSAT NRC SRO Admin JPM 5 Page 4 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: Completes Status block Standard: Fill in the block with:

Check the line that states "This is a Drill" or "Actual Event" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 5 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: Completes s.!!!~!]L~.!JICV Classification block Standard: Fill in the block with:

Check the line that states "ALERT' Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 6 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: Completes Declaration block Standard: Fill in the block with:

An "ALERT" was declared at "current time" on "current date". The EAL is "HA1" Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: Completes Represents A/AN block Standard: Fill in the block with:

Check the line that states "Initial declaration" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 7 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: Completes EAL number and Event Description block Standard: Fill in the block with:

The EAL is "HA1" Description similar to; "Notified by Station Security that this is a Security Condition with hostile action (owner controlled)"

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: Completes Radioactive Release Status block Standard: Fill in the block with:

Check the line that states that "There is no abnormal radiological release in progress" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 8 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: Completes Meteorological Condition block Standard: Fill in the block with:

From the Weather screen record; VVind direction is from 100 degrees and wind speed is 5 miles pe~r hour Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 9 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 10 Procedure Step: Completes Conclusion block Standard: Fill in the block with:

Check the line that states "This is a Drill" or "This is an Actual Event" Comment:

SAT/UNSAT Part I Terminating Cue: An Alert (HA 1) is declared and the State/Local Notification Form is filled out lAW the JPM key.

Part I JPM Stop Time: _ _ __

NRC SRO Admin JPM 5 Page 10 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: Provides repeat back of initiating cue.

Part II JIPM Start Time: ______

Standard: Provides repeat back of initiating cue . Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 12 Procedure Step: Determined Emergency Classification and associated EAL.

Standard: Declares "SITE AREA EMERGENCY"- Cat. HS1.

Notified by Station Security that this is a Security Condition with hostile action (Protected Area)

Time Critical Portion of JPM complete Time Complete ____ (<15 minutes)

Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page11of21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 13 Procedure Step: Completes Status block Standard: Fill in the block with:

Check the line that states "This is a Drill" or "Actual Event" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 12 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 14 Procedure Step: Completes Emerqency Classification block Standard: Fill in the block with:

Check the line that states "SITE AHEA EMERGENCY" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 13 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 15 Procedure Step: Completes Declaration block Standard: Fill in the block with:

An "SITE AREA EMERGENCY" was declared at "current time" on "current date". The EAL is "HS1" Comment:

SAT/UNSAT Performance Step: 16 Procedure Step: Completes Represents A/AN block Standard: Fill in the block with:

Check the line that states "Escalation" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 14 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 17 Procedure Step: Completes EAL number and Event Description block Standard: Fill in the block with:

The EAL is "HS 1" Description similar to; "Notified by Station Security that this is a Security Condition with hostile action (protected area)"

Comment:

SAT/UNSAT Performance Step: 18 Procedure Step: Completes Radioactive Release Status block Standard: Fill in the block with:

Check the line that states that "There is no abnormal radiological release in progress" Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 15 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 19 Procedure Step: Completes Meteorological Condition block Standard: Fill in the block with:

From the Weather screen record; VVind direction is from 100 degrees and wind speed is 5 miles per hour Comment:

SAT/UNSAT NRC SRO Admin JPM 5 Page 16 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 20 Procedure Step: Completes Conclusion block Standard: Fill in the block with:

Check the line that states "This is a Drill" or "This is an Actual Event" Comment:

SAT/UNSAT Part II Terminating Cue: A Site Area Emergency (HIS1) is declared and the State/Local Notification Form is filled out lAW the JPM key.

Part II JPM Stop Time: _ __

NRC SRO Admin JPM 5 Page 17 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC SRO Admin JPM 5 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC SRO Admin JPM 5 Page 18 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup 1 . Have a copy of EALs for the applicant

2. Have blank State/Local Notification Forms for the applicant for Parts I & II
3. Have a copy of EP-AA-114-1 00 for the applicant (available on request)
4. Have a copy of the EAL User's Guide for the applicant (available on request)

NRC SRO Admin JPM 5 Page 19 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. You are the Unit Supervisor for the operating shift
2. The plant is operating at 100% power.
3. Wind Speed is 5 mph
4. Wind direction is from 100 degrees
5. The following conditions are reported from the Site Protection Shift Supervisor;
a. Received valid Aircraft threat notification from the NRC
b. An unauthorized vehicle has gained access to the site
c. Security has disabled and surrounded the vehicle in the employee parking lot
d. The driver of the vehicle has not surrendered and the threat is unknown but is considered a HOSTILE ACTION condition as determined by Station Security lAW Security Procedures Task Cue:

State the minimum classification for these conditions and complete the State and Local Notification Form for Shift Manager approval.

(NOTE: Completing the form is part of the classific:ation for exam purposes)

THIS JPM IS TIME CRITICAL NRC SRO Admin JPM 5 Page 20 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Current Conditions:

1. You are the Unit Supervisor for the operating shift
2. The plant is operating at 100% power.
3. Wind Speed is 5 mph
4. Wind direction is from 100 degrees
5. The aircraft has just crashed into the intake structure. A resulting explosion destroyed all equipment in the North intake
6. The driver of the vehicle has forcefully entered into the MOB; the threat is considered a HOSTILE ACTION condition as determined by Station Security lAW Security Procedures Task Cue:

State the minimum classification for these conditions and complete the State and Local Notification Form for Shift Manager approval.

(NOTE: Completing the form is part of the classification for exam purposes)

THIS JPM IS TIME CRITICAL NRC SRO Admin JPM 5 Page 21 of 21

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2040101412 Shutdown the Second RWCU Pump with NRHX High Task

Title:

Temperature (Alternate Path)

Job Performance Measure No.: NRC Sim JPM 1 ------

KIA

Reference:

204000 A4.01 (3.1/3.0)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at -99% power
2. Both RWCU Pumps are in service
3. An EO has been briefed, has a copy of the procedure, and is standing by in the Reactor Building to assist in shutting down a RWCU Pump
4. All applicable Prerequisites and Precautions and Limitations of Procedure 303 have been verified or are met Task Standard: RWCU Pump B has been secured lAW 303.

Required Materials: None.

General

References:

1. 303, Reactor Cleanup Demineralizer System, Revision 139
2. RAP-D8b, NRHX OUTLET TEMP HI, Revision 001 Initiating Cue: Secure RWCU Pump B lAW 303, Reactor Cleanup Demineralizer System, starting at Step 22.4 NRC Sim JPM 1 Page 1 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.

Validation Time: 20 Minutes NRC Sim JPM 1 Page 2 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Review Precautions and Limitations.

Standard: Precautions and Limitations have been verified per the Initial Conditions.

Comment:

SAT/UNSAT NRC Sim JPM 1 Page 3 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 22.4.1 Open the Minimum Flow Valves for both pumps using the local toggle switches:

  • V-16-36, Minimum Flow Valve Pump A
  • V-16-37, Minimum Flow Valve Pump 8 Standard: Directs the EO to open the Minimum Flow Valves for both pumps using the local toggle switches:
  • V-16-36, Minimum Flow Valve Pump A
  • V-16-37, Minimum Flow Valve Pump 8 Booth/Cue: Initiate Trigger 1, then report minimum flow valves for both RWCU Pumps are open Comment:

SAT/UNSAT NRC Sim JPM 1 Page 4 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Note: The Applicant will perform several cycles of manipulations using the RWCU Pump B discharge valve, V-16-50, and then the System Flow Control valve FCV-ND16. The cycle will repeat until the discharge valve V-16-50 is fully closed.

Performance Step: 4 Procedure Step: 22.4.2 Slowly close the discharge valve for the pump being removed from service by momentarily cyclin!~ the discharge valve control switch between CLOSE and mid position until a small decrease in pressure is seen (Panel 3F).

  • V-16-49, RECIRC PUMP A DISCHARGE OR
  • V-16-50, RECIRC PUMP B DISCHARGE Standard: Slowly closes RWCU Pump B discharge valve V-16-50 by momentarily cycling the discharge valve control switch between CLOSE and mid position until a small decrease in pressure is seen (Panel 3F) (red light on and green light on; RECIRC PUMP DISCHARGE PRESS lowers slight!y)

Comment:

SAT/UNSAT NRC Sim JPM 1 Page 5 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 22.4.3, 22.4.3.1, ~~ 22.4.3.2 Perform either or both of the following! to increase pump discharge pressure to approximately the original value while adjusting PCV-ND11 as need to maintain system pressure at approximately 90 psig.

22.4.3.1 Slowly close FCV-ND16 22.4.3.2 Slowly close V-16-54, FCV Bypass Standard: Rotates SYSTEM FLOW CONTROLLER FCV-ND16 CCW to increase pump discharge pressure to approximately the original value.

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 22.4.4 Continue to close the discharge valve by momentarily cycling the discharge valve control switch between CLOSE and mid position while adjusting flow and pressure until the valve is fully closed.

Standard: Continues to close the discharge valv~e by momentarily cycling the discharge valve control switch between CLOSE and mid position while adjusting flow and pressure with FCV-ND16 knob CCW until the discharge valve is fully closed. (green light on; red light off)

Comment:

SAT/UNSAT NRC Sim JPM 1 Page 6 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 22.4.5 Stop the Cleanup Recirculation Pump being removed from service.

Standard: Stops the Cleanup Recirculation Pump B by placing RECIRC PUMP NC02B switch to STOP (green light on; red light off)

Booth: When the standby RWCU Pump is secured, place LOA-RBC009 to 0.39 Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 22.4.6 Close the Minimum Flow Valves for both pumps using the local toggle switches:

  • V-16-36, Minimum Flow Valve Pump A
  • V-16-37, Minimum Flow Valve Pump B Standard: Directs the EO to close the Minimum Flow Valves for both pumps using the local toggle switches:
  • V-16-36, Minimum Flow Valve Pump A
  • V-16-37, Minimum Flow Valve Pump B Booth Insert LOA-RCU022 to 0 and LOA-HCU023 to 0; Then report minimum flow valves for both RWCU Pumps are closed Comment:

SAT/UNSAT NRC Sim JPM 1 Page 7 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 22.4.7, 22.4.7.1, & 22.4.7.2 Perform either or both of the following1 to adjust system flow to approximately 380-420 gpm 22.4.7.1 Throttle FCV-ND16 as necessary 22.4.7.2 Throttle V-16-54, FCV Bypass, as necessary Standard: Throttle SYSTEM FLOW CONTROLLER FCV-ND16 knob if required to adjust CLEANUP DEMIN INLET FLOW to approximately 380-420 gpm Note: If RWCU flow is already in this requirHd range, then no manipulations in this Step are required.

Comment:

SAT/UNSAT NRC Sim JPM 1 Page 8 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: The following step will initiate the Alternate Path Performance Step: 10 Procedure Step: 22.4.8 Adjust the PPC heat balance input for RWCU Flow to the value indicated on the 3F Recorder (IJ13).

Standard: Adjusts the PPC heat balance input for RWCU Flow to match the indicated flow (2: 5 GPM).

Evaluator/ During performance of this step, at th13 Evaluator's discretion, INSERT Trigger 3, ANN-D-88 to ON, to initiate the Alternate Path.

Booth:

CUE: When the student opens the 'D' annunciator RAPs, hand them a yellow exam copy of RAP-D8b.

Comment:

SAT/UNSAT Performance Step: 11 Procedure Step: Respond to annunci1ator D8b.

May Direct the EO to verify high system temperature. (RK05, TIS-IJ33)

Standard: Responds to annunciator D8b.

May Direct the EO to verify high system temperature. (RK05, TIS-IJ33)

CUE: As the EO, report that TIS-IJ33 at HK05 indicates 155 oF and rising rapidly.

NOTE/CUE: If NRHX Temperature is requested again, report that it is now 165

°F and rising rapidly.

CUE: If the US is contacted, direct the applicant to confirm actions lAW the RAP.

Comment:

SAT/UNSAT NRC Sim JPM 1 Page 9 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: Steps 12, 13, and 14 may be performed in any order.

Performance Step: 12 Procedure Step: Trip RWCU Pumps Standard: Trips RWCU Pumps with their control switches (red light OFF; green light ON)

Comment:

SAT/UNSAT

  • NOTE: It is only CRITICAL to complete performance step 13 OR 14

,/* Performance Step: 13 Procedure Step: Close V-16-1, CU Inlet Isolation Valve From Reactor Vessel Standard: Closes V-16-1, CU Inlet Isolation Valve From Reactor Vessel, with its control switch (red light OFF; green light ON)

Comment:

SAT/UNSAT

___ v'_*_ _ Performance Step: 14 Procedure Step: Close V-16-14, Clean-Up Inlet Isolation Valve Standard: Closes Close V-16-14, Clean-Up Inlet Isolation Valve, with its control switch (red light OFF; green light ON)

CUE: Once V-16-14 is closed, state that another Operator will continue with the actions in the RAP Comment:

SAT/UNSAT Terminating Cue: The NRHX high temperature annunciator is received, the RWCU Pumps are secured and the system isolation valves are manually closed.

JPM Stop Time: _ _ __

NRC Sim JPM 1 Page 10 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC SIM JPM 1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 1 Page 11 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup NOTE: Reset to IC-152 (password: 2014iltnrc) OR perform the following

1. Reset to full power IC and lower power to -*95,Qfo with recirc flow
2. Start the standby RBCCW Pump and achieve a System Flow of 700 GPM
3. Raise RBCCW flow through the NRHX as follows:
a. Insert LOA-RBC009 to 0.80
b. When the standby RWCU Pump is secured, place LOA-RBC009 to 0.39
4. Place the second RWCU Pump in service IAVV 303, section 22
a. Leave the heat balance screen up and available (with System Flow at or slightly above that flow attained above)
5. Place the following on Trigger 1:
a. LOA-RCU022 to 1 This opens RWCU Pump A minimum flow valve V-16-36
b. LOA-RCU023 to 1 This opens RWCU Pump B minimum flow valve V-16-37
c. These valves will be closed during JIPM performance
6. Place the following on Trigger 3:
a. ANN-D-88 to ON
7. Insert BKR-RCU001 to FAIL AUT TRIP
8. Insert BKR-RCU002 to FAIL AUT TRIP
a. This will prevent any automatic trips of the RWCU Pumps
9. Insert VLV-RCU001 to FAIL AUT CL 10.1nsert VLV-RCU004 to FAIL AUT CL NRC Sim JPM 1 Page 12 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at -99% power
2. Both RWCU Pumps are in service
3. An EO has been briefed, has a copy of the procedure, and is standing by in the Reactor Building to assist in shutting down a RWCU Pump
4. All applicable Prerequisites and Precautions and Limitations of Procedure 303 have been verified or are met Task Cue:

Secure RWCU Pump B lAW 303, Reactor Cleanup Demineralizer System, starting at Step 22.4 NRC Sim JPM 1 Page 13 of 13

Appendix C Job Performance MeasUire Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2020101008 Secure A Reactor Recirc Pump and Respond To A Recirc Task

Title:

Pump Trip (Alternate Path)

Job Performance Measure No.: NRC Sim JPM 2 ------

KIA

Reference:

202001 A4.01 (3.7 I 3.7))

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Reactor Power has been lowered to facilitate Recirc Pump removal.
2. All Prerequisites for 301.2 section 6.1 are rnet.
3. An EO is in the field with a copy of the procedure.

Task Standard: V-37-31, C Recirc Pump Suction Valve, has been taken to CLOSE.

Required Materials: A partially completed 301.2 General

References:

1. 301.2, Reactor Recirculation System, revision 87
2. ABN-2, Recirculation System Failures, revision 24 NRC Sim JPM 2 Page 1 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue:

Your have been directed to secure the 'C' Reactor Recirc Pump in accordance with procedure 301.2 Reactor Recirculation System; do not maintain reactor power constant.

Time Critical Task: No.

Validation Time: 10 minutes NRC Sim JPM 2 Page 2 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark -/

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: 8.2 of Procedure 30'1.2 Reviews Precautions and Limitations Standard: Reviews Precautions and Limitations Comment:

SAT/UNSAT NRC Sim JPM 2 Page 3 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 8.3.4 of Procedure 301.2 PLACE the individual MG-SET SPEED CONTROLLER for the pump to be removed from service in MANUAL.

Standard: Places the C Reactor Recirc Pump MG-SET SPEED CONTROLLER in MANUAL. (red MAI\I light on green AUTO light off)

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 8.3.6 of Procedure 301.2 REDUCE pump speed by turning the manual adjustment knob in counter clockwise direction concurrent with 8.3.6.1 and 8.3.6.2 Standard: Reduces pump speed by turning the manual adjustment knob in counter clockwise direction concurrent with 8.3.6.1 and 8.3.6.2 while in mode V.

Comment:

SAT/UNSAT NRC Sim JPM 2 Page 4 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lnforma1tion

~------------------

Performance Step: 5 Procedure Step: 8.3.6.1 of Procedure 301.2 MONITOR individual loop flow and core differential pressure to prevent reverse flow in the loop.

Standard: Monitors individual loop flow and core differential pressure to prevent reverse flow in the loop.

Comment:

SAT/UNSAT NOTE: When the 'C' Recirc Pump lowers to 35 Hz, the pump will trip and initiate the Alternate Path. When the applicant enters ABN-2, hand them a clean copy of ABN-2.

Performance Step: 6 Procedure Step: 4.1.2.1 of ABN-2 CONFIRM open the DISCH BYPASS valve V-37-33 (C Pump)

Standard: Confirms open the DISCH BYPASS valve V-37-33 (C Pump)

(Red light ON and Green light OFF)

Comment:

SAT/UNSAT NRC Sim JPM 2 Page 5 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 4.1.2.2 of ABN-2 CLOSE the DISCHARGE valve V-37-*32 (C Pump)

Standard: Closes DISCHARGE valve V-37-3~~ (C Pump). Monitors for indications of C loop flow lowering. Confirms Red light OFF and Green light ON. Reports the C Recirc Pump Discharge valve failed to close.

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 4.2.2.1 of ABN-2 CLOSE the SUCTION valve V-37-31 (C Pump)

Standard: Closes SUCTION valve V-37-31 (C Pump). Monitors for indications of C loop flow lowering. Confirms Red light OFF and Green light ON. Reports the C Recirc Pump Suction valve closed CUE: When the applicant has taken V-37-31 to CLOSE, inform them another operator will continue with the procedure and the JPM is complete.

Comment:

SAT/UNSAT Terminating Cue: V-37-31, C Recirc Pump Suction Valve, has been taken to CLOSE.

JPM Stop Time:

NRC Sim JPM 2 Page 6 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 2 Page 7 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Reset to full power IC or equivalent.

NOTE: The initial conditions of the JPM may not match with the simulator IC. I NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatiblt3 with this and other JPMs that are scheduled to be run concurrently.

2. Lower Reactor Power as desired to perform this JPM in conjunction with another JPM but DO NOT Master Recirc Flow lower than 40Hz ..
3. Ensure that one Recirc Temperature recorder on 3F is selected to the 'C' Recirc Loop.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. Insert Event Trigger below. This will trip the C Recirc Pump when the P-display indicates less than 35 Hz:
  • hwx02d121s.lt.35 on Trigger 1
  • Insert MAL-RFC001 C on Trigger 1
6. Insert VLV-NSS014 to MECH SZ. This will prevent the applicant from closing the C Recirc Pump Discharge Valve V-37 -32
7. Have a copy of 301.2 section 8 for the applicant.
8. Have a clean copy of ABN-2 to hand to the applicant when the Alternate Path is initiated.

NRC Sim JPM 2 Page 8 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. Reactor Power has been lowered to facilitate Recirc Pump removal.
2. All Prerequisites for 301.2 section 6.1 are met.
3. An EO is in the field with a copy of the procedure.

Initiating Cue:

You have been directed to secure the 'C' Reactor Recirc Pump in accordance with procedure 301.2 Reactor Recirculation System; do not maintain reactor power constant.

NRC Sim JPM 2 Page 9 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2070101002 Add Makeup to the Isolation Condenser System Task

Title:

(Alternate Path)

Job Performance Measure No.: NRC Sim JPM 3 ------

KIA

Reference:

207000 A3.05 (3.6/3.8)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Penformance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task succe,ssfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Reactor is 100% power and stable
2. A Isolation condenser level is 6.9 feet due to inadvertent draining from the shell
3. Drain valves has been shut and no more leakage is present Task Standard: All 'A' Isolation Condenser AC, DC, and Vent valves have been manually closed.

Required Materials: None.

General

References:

1. 307, Isolation Condenser System, Revision 124
2. RAP-C3a, COND A FLOW HI POSSIBLE RUPTURE, Revision 004 Initiating Cue: As US, I am directing you to restore Isolation Condenser 'A' shell level to the normal band using Condensate Transfer lAW procedure 307, Section 7.3.2 Time Critical Task: No.

NRC Sim JPM 3 Page 1 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation Time: 6 Minutes NRC Sim JPM 3 Page 2 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Review Prerequisites, Precautions and Limitations.

Standard: Prerequisites, Precautions and Limitations have been verified and/or are met.

Cue: All Prerequisites, Precautions and Limitations have been verified and/or are met.

Comment:

SATIUNSAT NRC Sim JPM 3 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 7.3.2.1 Record initial shell level Standard: Records initial shell level on attachment 307-15 Cue: Indicated shell level on LTIG06A is 6.9 feet (per Initial Conditions)

Comment:

SAT/UNSAT NRC Sim JPM 3 Page 4 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 4 Procedure Step: 7.3.2.2 Open V-11-257 Standard: Rotates keylock control switch to open on 5F/6F Comment:

SAT/UNSAT Performance Step: 5 Procedure Step: 7.3.2.3 Open V-11-36 Standard: Places control switch to open on Panel 5F/6F Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 7.3.2.4 Verify annunciator ISOL COND MU VLV OPEN (RAP-K6d) alarms Standard: Verifies annunciator ISOL COND MU VLV OPEN (RAP-K6d) alarms Comment:

SAT/UNSAT NRC Sim JPM 3 Page 5 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: The following step will initiate the Alternate Path Performance Step: 7 Procedure Step: 7.3.2.5 Fill Isolation Condenser Shell 'A' so indicated level is between 7.3 and 7. 7 feet.

Cue: If the applicant requests level, report that level is 7.0 feet and rising Evaluator/ While filling, at the discretion of the Le~ad Evaluator, Insert Trigger 1, C-3-a, COND A FLOW HI POSSIBLE RUPTURE alarm Booth:

Evaluator: When the applicant opens RAP-C3a, hand them the yellow copy ofthe RAP.

Comment:

SAT/UNSAT NRC Sim JPM 3 Page 6 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 8 Procedure Step: RAP-C3a Automatic Actions Closes Isolation Condenser System A Valves.

  • V-14-30, Steam Inlet Valve to 'l\" Emergency Condenser
  • V-14-31, Steam Inlet Valve to 'l\' Emergency Condenser
  • V-14-34, Emergency Condenser NE01A Condensate Return Valve
  • D V-14-36, Isolation Valve Emerg13ncy Condenser NE01A Closes Isolation Condenser System A Valves.

Standard:

  • V-14-30, Steam Inlet Valve to 'A" Emergency Condenser
  • V-14-31, Steam Inlet Valve to 'A' Emergency Condenser
  • V-14-34, Emergency Condenser NE01A Condensate Return Valve
  • D V-14-36, Isolation Valve Emergency Condenser NE01A NOTE: The applicant may close these Isolation Valves prior to referring to the RAP (manually confirming actions that failed to automatically occur).

Comment:

SAT/UNSAT NRC Sim JPM 3 Page 7 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information

./ Performance Step: 9 Booth/Cue: As the Reactor Building EO, call th~3 Control Room and report there is a pipe break tube leak in Isolation Condenser 'A' Procedure Step: RAP-C3a, Manual Corrective Actions IF pipe break tube leak is verified, THEN Perform the following:

  • EVACUATE Reactor Building.
  • PLACE V-14-30, V-14-31, V-14*-34, V-14-36 Also Cond Isolation Valves Control Switches to CLOSE.
  • D PLACE V-14-5 and V-14-20, Emergency Condenser NE01A High Point Vent Valves Control Switches to CLOSE.

Standard:

  • Evacuates the Reactor Building [SEE CUE BELOW].
  • Places V-14-30, V-14-31, V-14-34, V-14-36 A lso Cond Isolation Valves Control Switches to CLOSE [Performed in Step 8].
  • D Places V-14-5 and V-14-20, Emergency Condenser NE01A High Point Vent Valves Control Switches to CLOSE.

Cue: Inform the applicant another operator will Evacuate the Reactor Building Cue: When V-14-5 and V-14-20 are closed, inform the applicant another operator will continue with the procedure.

Comment:

SAT/UNSAT Terminating Cue: All 'A' Isolation Condenser AC, DC, and Vent valves have been manually closed.

JPM Stop Time: _ _ __

NRC Sim JPM 3 Page 8 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 3 Page 9 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Reset to full power (1 00%) [Or reset to any power IC if performing concurrent to another JPM]
2. Have a copy of 307 section 7 and Attachment 307-18 for the applicant
3. Have a yellow copy of RAP-C3a to hand to the applicant in Step 7
4. Insert ANN-N-7b to OFF- disables 2-demin pumps running alarm
5. Place the following on Trigger 1:
i. ANN-C-3a to ON NRC Sim JPM 3 Page 10 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. Reactor is 100% power and stable
2. A Isolation condenser level is 6.9 feet due to inadvertent draining from the shell
3. Drain valves has been shut and no more leakage is present Task Cue:

As US, I am directing you to restore Isolation Condenser 'A' shell level to the normal band using Condensate Transfer lAW procedure 307, Section 7.3.2 NRC Sim JPM 3 Page 11 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2230101509 Task

Title:

Purge the Primary Containment Job Performance Measure No.: NRC Sim JPM 4 ------

KIA

Reference:

223001 A4.07 (4.2/4.1)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power preparing for a shutdown
2. Entry into the Primary Containment will be required
3. The Primary Containment is being prepared to be purged with air, lAW 312.9, Primary Containment Control
4. All Prerequisites of Section 9.0, Purging Priimary Containment With Air, are complete Initiating Cue: Purge the Primary Containment witlh air lAW 312.9, Primary Containment Control, starting at Step 9.3.6 Required Materials: None.

General

References:

1. 312.9, Primary Containment Control, Revision 58 Task Standard: Drywell air purge has been initiated NRC Sim JPM 4 Page 1 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.

Validation Time: 15 Minutes NRC Sim JPM 4 Page 2 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: Verifies Prerequisiites and reviews Precautions and Limitations.

Standard: Verifies Prerequisites and reviews PrE~cautions and Limitations.

Comment:

SAT/UNSAT NRC Sim JPM 4 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 9.3.6.1 Confirm closed Drywell Vent and Bypass valves:

  • V-23-21
  • V-23-22
  • V-27-1
  • V-27-2 Standard: Confirm closed Drywell Vent and Bypass valves:
  • V-23-21
  • V-23-22
  • V-27-1
  • V-27 -2 (green lights on; red lights off)

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 9.3.6.2 If the REACTOR MODE SELECTOR switch is in the RUN position, THEN place DRYWELL VEI\IT-PURGE INTERLOCK BYPASS switch in BYPASS position (Panei12XR)

Standard: Places DRYWELL VENT-PURGE INTERLOCK BYPASS switch in the BYPASS position Comment:

SAT/UNSAT NRC Sim JPM 4 Page 4 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 9.3.6.3 Open Torus Vent valves (Panel11 F):

  • V-28-17
  • V-28-18 Standard: Opens Torus Vent valves (Panel1'1 F):
  • V-28-17
  • V-28-18 By taking their control switches CV\f (~Jreen lights off; red lights on)

Note/Cue: As Drywell pressure lowers, annunciator C3f, OW PRESS HI/LO may alarm. State that another operator will respond.

Comment:

SAT/UNSAT NRC Sim JPM 4 Page 5 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 6 Procedure Step: 9.3.6.4 Monitor the following:

  • Stack gas activity (Panel 1OF)
  • Stack gas activity (Panel 1R)

Standard: Monitors the following:

  • Stack gas activity (Panel 1OF)
  • Stack gas activity (Panel 1R)

Comment:

SAT/UNSAT Performance Step: 7 Procedure Step: 9.3.6.5 Mark the time the depressurization was started on the stack gas recorder (Panel 1OF).

Note/Cue: These are electronic recorders. If questioned or the applicant attempts to electronically mark the recorders, state that the recorders have been marked.

Standard:

Comment:

SAT/UNSAT Note: Step 9.3.6.6 is a conditional statement which requires no actions and is not provided here.

Performance Step: 8 NRC Sim JPM 4 Page 6 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Procedure Step: 9.3.6.7 Verify Torus pressure is approximately zero as indicated on the pressure recorder (Panel 12XR)

Standard: Verifies Torus pressure is approximately zero as indicated on the pressure recorder Cue: State that time compression is used here and that Torus pressure indicates approximately zero as indicated on the pressure recorder Comment:

SAT/UNSAT NRC Sim JPM 4 Page 7 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 9.3.6.8 Close Torus Vent valves (Panel 11 F):

  • V-28-17
  • V-28-18 Standard: Closes Torus Vent valves (Panel 11 F):
  • V-28-17
  • V-28-18 By taking their control switches CGW (green lights on; red lights off) (Closing only 1 valve will meet the~ Critical Step)

Comment:

SAT/UNSAT Performance Step: 10 Procedure Step: 9.3.7.1 Confirm closed Torus Vent and Bypass valves (Panel11 F):

  • V-28-17
  • V-28-18
  • V-28-47 Standard: Confirm closed Torus Vent and Bypass valves (Panel11 F):
  • V-28-17
  • V-28-18
  • V-28-47 (green lights on; red lights off) cue: Upon completion of this step, inform the applicant another operator will continue with the procedure.

Comment:

SAT/UNSAT Terminating Cue: Drywell air purge has been initiatHd.

JPM Stop Time:

NRC Sim JPM 4 Page 8 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 4 Page 9 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. This JPM can be performed at any power IHVHI
2. Insert the following:
a. ANN-C4f to OFF
b. ANN-C5f to OFF
c. This keeps the Torus-OW Vacuum Breakers Open annunciators off
3. Have a copy of 312.9 section 9.0 marked up to and including step 9.3.5.

NRC Sim JPM 4 Page 10 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power preparing for a shutdown
2. Entry into the Primary Containment will be required
3. The Primary Containment is being prepared to be purged with air, lAW 312.9, Primary Containment Control
4. All Prerequisites of Section 9.0, Purging Primary Containment With Air, are complete Task Cue:

Purge the Primary Containment with air lAW 3'12.9, Primary Containment Control, starting at Step 9.3.6 NRC Sim JPM 4 Page 11 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2620104001 De-energize 1A 1 Substation Transformer by Cross-tieing USS Task

Title:

1A1 to USS 181 Job Performance Measure No.: NRC Sim JPM 5 -----

KIA

Reference:

262001 A 1.05 (3.2/3.5)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is in a COLD SHUTDOWN CONDITION
2. Transformer USS 1A1 is over-heated and needs to be removed from service while still supplying power to USS 1A 1
3. Section 8.0, De-Energizing Unit Substation Transformers, of procedure 337,4160 Volt Electrical System, is complete up to Section 8.1.3
4. An EO has been briefed, has a copy of the procedure, and is standing by for support
5. Electrical Maintenance has been briefed and is standing by for support Task Standard: USS 1A 1 transformer has been removed from service lAW procedure 337, Section 8.0 Required Materials: None.

NRC Sim JPM 5 Page 1 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. 337,4160 Electrical System, Revision 97 Initiating Cue: Continue in procedure 337, 4160 Electrical System, starting at Step 8.1.3, to de-energize Transformer 1A 1 Time Critical Task: No.

Validation Time: 12 Minutes NRC Sim JPM 5 Page 2 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: Verifies Prerequisites and reviews Precautions and Limitations.

Standard: Verifies Prerequisites and reviews Pmcautions and Limitations.

Comment:

SAT/UNSAT NOTE: No BOOTH actions are required for this JPM. The Evaluator will perform Cues from the field.

NRC Sim JPM 5 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 8.1.3.1 Rack in Tie Breaker EC Standard: Directs the EO to rack-in breaker EC Booth/Cue: Report that Breaker EC is racked-in.

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 8.1.3.2 Close Tie Breaker EC (Panel 8F/9F)

Standard: Closes Tie Breaker EC with the control switch to CLOSE (green light off; red light on)

Note: Annunciator T8a will alarm and the Applicant may respond to the associated RAP (no actions required)

Comment:

SAT/UNSAT NRC Sim JPM 5 Page 4 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 8.1.3.3 Rack in Tie Breaker ED Standard: Directs the EO to rack-in breaker ED Booth/Cue: Report that Breaker ED is racked-in.

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 8.1.3.4

1. Place Synchroscope Switch for Tie Breaker ED to ON
2. Place TIE BREAKER ED control switch to CLOSE
3. Verify TIE BREAKER ED red closed light is illuminated
4. Place the Synchroscope Switch for Tie Breaker ED to OFF Standard: 1. Places Synchroscope Switch for Tie Breaker ED to ON
2. Checks voltages matched on Running and Incoming
3. Places TIE BREAKER ED control switch to CLOSE (green light off; red light on)
4. Verifies TIE BREAKER ED red closed light is illuminated
5. Places the Synchroscope Switch for Tie Breaker ED to OFF (Note: Only steps 1 & 3 required for Critical Step)

Note: Annunciator T8e will alarm and the Applicant may respond to the associated RAP (no actions required)

Comment:

SAT/UNSAT NRC Sim JPM 5 Page 5 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 8.1.3.5 Install jumper from TB6-22 to TB6-24 in Panel 8F/9F Cue: Report that the jumper from TB6-22 to TB6-24 in Panel 8F/9F is installed, and has been concurrently verified. Also report that both performers have signed for the step.

Standard: Jumper installed.

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 8.1.3.6 Rack in Tie Breaker US 1T Standard: Directs the EO to rack-in Breaker us*1T Booth/Cue: Report that Breaker US1T is racked-in.

Comment:

SAT/UNSAT NRC Sim JPM 5 Page 6 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 8.3.1.7 Close TIE BREAKER US1T (Panel 8F/9F)

Standard: Closes TIE BREAKER US1T with the control switch to CLOSE (green light off; red light on)

Note: Annunciator U7b will alarm and the Applicant may respond to the associated RAP (no actions required)

Comment:

SAT/UNSAT Performance Step: 10 Procedure Step: 8.3.1.8 Open MAIN BREAKER 1A1M (Panei8F/9F)

Standard: Opens MAIN BREAKER 1A1M with the control switch to TRIP (green light on; red light off)

Comment:

SAT/UNSAT NRC Sim JPM 5 Page 7 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 8.1.3.9 Open FEEDER BREAKER 1A1P (Panei8F/9F)

Standard: Opens FEEDER BREAKER 1A1P with the control switch to TRIP (green light on; red light off)

Cue: At the conclusion of this step, repmt that another Operator will complete the procedure.

Comment:

SAT/UNSAT Terminating Cue: USS 1A1 transformer has been removed from service lAW procedure 337, Section 8.0 JPM Stop Time: _ _ _ __

NRC Sim JPM 5 Page 8 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 5 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ __

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 5 Page 9 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. The plant is in a scrammed condition with the reactor Mode switch in Shutdown
2. Insert LOA-EDS022 to CLOSE
a. This places the Tie Breaker EC 69 Permissive switch in Close
3. Insert the following:
a. LOA-EDS021 to RACKED IN
i. This will rack-in Tie Breaker EC
4. Insert LOA-EDS031 to CLOSE
a. This places the Tie Breaker ED 69 Permissive switch in Close
5. Insert the following:
a. LOA-EDS030 to RACKED IN
i. This will rack-in Tie Breaker ED
6. Insert the following:
a. LOA-EDS068 to JUMPERED
i. This inserts jumpers on breaker US1T
7. Insert the following:
a. LOA-EDS067 to RACKED IN
i. This will rack-in Breaker US1T NRC Sim JPM 5 Page 10 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is in a COLD SHUTDOWN CONDITION
2. Transformer USS 1A 1 is over-heated and needs to be removed from service while still supplying power to USS 11A'I
3. Section 8.0, De-Energizing Unit Substation Transformers, of procedure 337,4160 Volt Electrical System, is complete up to Section 8.1.3
4. An EO has been briefed, has a copy of the procedure, and is standing by for support
5. Electrical Maintenance has been briefed and is standing by for support Task Cue:

Continue in procedure 337, 4160 Electrical System, starting at Step 8.1.3, to de-energize Transformer 1A1 NRC Sim JPM 5 Page 11 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2450201302 Perform Anticipatory Scram Turbine Stop Valve Closure Test Task

Title:

with RPS Actuation (Alternate Path~----------------~-

Job Performance Measure No.: NRC Sim JPM 6 -----------

KIA

Reference:

212000 A2.19 (3.8/3.9)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance ------

Actual Performance X Classroom ----------

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is steady at 90% power with no other testing in-progress.
2. All prerequisites have been verified.
3. The procedure is complete up through step 6.2:.
4. All relays have been flagged Task Standard: The Candidate recognizes a% scram when Turbine Stop Valve
  1. 2 is tested and places the MAIN STOP VALVE TEST SELECT switch in OFF, resets the% scram, notifies the Shift Manager, and exits the test.

Required Materials: None.

General

References:

1. Procedure 619.4.002, Anticipatory Scram Turbine Stop Valve Closure Test (>45% Load), revision 23 NRC Sim JPM 6 Page 1 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Perform Procedure 619.4.002, Anticipatory Scram Turbine Stop Valve Closure Test (>45% Load), starting at Step 6.:~. You will perform all verifications lAW the surveillance.

Time Critical Task: No.

Validation Time: 11 minutes NRC Sim JPM 6 Page 2 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.

Standard: Verifies Prerequisites and reviews Precautions and Limitations.

Comment:

SAT/UNSAT NRC Sim JPM 6 Page 3 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: Procedure step 6.3 requires no actions or verifications by the candidate and is not listed as a Performance Step here.

Performance Step: 3 Procedure Step: 6.4 Place the Main Stop Valve Test Select switch in No.3 position Standard: Places the MAIN STOP VALVE TEST SELECT switch in No.3 position Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 6.5 Momentarily press pushbutton Main Stop Valve Test Standard: Momentarily presses the MAIN STOP VALVE TEST pushbutton Comment:

SAT/UNSAT NRC Sim JPM 6 Page 4 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 6.5.1 Verify No. 3 Stop Valve closed Standard: Verifies No.3 Stop Valve closed (MAIN STOP VALVE POSITION No. 3 pointer points to C. The Candidate may also verify position indication lights on Panel 7F, red li!~ht: OFF and green light ON.)

Cue: If the Candidate starts to go around front to Panel 7F, state that No. 3 Stop Valve indicates closed.

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 6.5.2 Verify the following:

  • Relay 1K12 energized
  • Relay 2K11 energized
  • Relay 1K52 energized
  • Relay 2K51 energized Standard: Verifies the following relays energized: 1K12, 2K11, 1K52, and 2K51.

Cue: RPS relays are not modeled. State that Relays 1K12, 2K11, 1K52, and 2K51 are energized.

Comment:

SAT/UNSAT NOTE: Procedure step 6.6 requires no actions or verifications by the candidate and is not listed as a Performance Step here.

NRC Sim JPM 6 Page 5 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lnforma1tion Performance Step: 7 Procedure Step: 6. 7 Place the Main Stop Valve Test Select switch in No. 2 position Standard: Places the MAIN STOP VALVE TEST SELECT switch in No.2 position Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 6.7.1 Verify No. 3 Stop Valve opens Standard: Verifies No.3 Stop Valve opens (MAIN STOP VALVE POSITION No. 3 pointer points to 0. The Candidate may also verify position indication lights on Panel 7F as reel light ON and green light OFF)

Cue: If the Candidate starts to go around front to Panel 7F, state that No. 3 Stop Valve indicates open.

Comment:

SAT/UNSAT NRC Sim JPM 6 Page 6 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 6.7.2 Verify all Stop valves open Standard: Verifies all Stop valves open (all MAIN STOP VALVE POSITION No. 1, 2, 3, 4 pointers point to 0. The Candidate may also verify position indication lights on PanellF as red lights ON and green lights OFF)

Cue If the Candidate starts to go around front to Panel 7F, state that all Stop Valves indicates open.

Comment:

SAT/UNSAT NOTE: The following step will result in an unexpncted % scram. This initiates the Alternate Path.

Performance Step: 10 Procedure Step: 6.8 Momentarily press pushbutton Main Stop Valve Test Standard: Momentarily presses pushbutton Main Stop Valve Test Note: This will result in a% scram condition. When recognized by the candidate, provide the cue below.

Cue: Relay 1K11 is de-energized Comment:

SAT/UNSAT Note: The Candidate will now apply prior Step 6.6.

NRC Sim JPM 6 Page 7 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 6.6.1 Immediately open No. 2 Stop Valve by placing the Main Stop Valve Test Select switch in OFF.

Standard: Immediately opens No. 2 Stop Valve by placing the MAIN STOP VALVE TEST SELECT switch in OFF Notify the When TSV 2 indicates full open, DELETE MAL-RLY-RPS021A Booth:

Comment:

SAT/UNSAT Performance Step: 12 Procedure Step: 6.6.2 Reset the half-scram Note/Cue: The candidate may ask for concurrent verification for resetting the

%scram. State that you will perform the concurrent verification and agree with what ever action the candidate proposes.

Standard: Resets the half-scram by pressing the SCRAM SYSTEM RESET pushbutton (RPS 1 SCRAM SOLENOIDS ON)

Comment:

SAT/UNSAT NRC Sim JPM 6 Page 8 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 13 Procedure Step: 6.6.3 Notify the Shift Manager Standard: Notifies the Shift Manager Cue: As the Shift Manager, acknowledge the report Comment:

SAT/UNSAT Performance Step: 14 Procedure Step: 6.6.4 Exit this procedure Standard: Exits this procedure Comment:

SAT/UNSAT Terminating Cue: The Candidate recognizes a % scram when Turbine Stop Valve #2 is tested and places the MAIN STOP VALVE TEST SELECT switch in OFF, resets the% scram, notifies the Shift Manager, and exits the test.

JPM Stop Time:

NRC Sim JPM 6 Page 9 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 6 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 6 Page 10 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Reset to full power IC-115 and reduce recirculation flow to <90% power.*

(about 40hz)

2. Insert Trigger: on Trigger 1, insert the following:
  • hwx31d047r.lt.0.50
3. Insert malfunction RL Y-RPS021A on TriggHr '1. When Stop Valve #2 goes closed, this will de-energize relay 1K11.
4. Verify all Turbine Stop Valve selsyns indicate OPEN on Panel 14R.
5. Have a copy of the procedure completed up to and including step 6.2.

(619.4.002).

6. When Stop Valve #2 is re-opened, delete HLY-RPS021A.
7. Place flags on RPS relays: 1K11, 1K12, 2K11, 2K12 NRC Sim JPM 6 Page 11 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is steady at 90% power with no other testing in-progress.
2. All prerequisites have been verified.
3. The procedure is complete up through step 6.2.
4. All relays have been flagged Task Cue:

Perform Procedure 619.4.002, Anticipatory Scram Turbine Stop Valve Closure Test (>45% Load), starting at Step 6.3. You will perform all verifications lAW the surveillance.

NRC Sim JPM 6 Page 12 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2790101001 Swap Instrument Air Compressors with a loss of Instrument Air Task

Title:

(Alternate Path)

Job Performance Measure No.: NRC Sim JPM 7 (RO/SRO)

KIA

Reference:

300000 K4.04 (2.8 I 2.9)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power.

NRC Sim JPM 7 Page 1 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue:

1. Place #2 Compressor in LEAD and #1 Compressor in LAG lAW 334, Instrument and Service Air System, Section 7.4. This includes air compressor starts from the Control Room.

o All prerequisites and precautions and limitations are met o Steps 7.4.1.1 and 7.4.1.2 have been completed by the EO who is at the air compressors with the a copy of the procedure o The announcement for starting air compressors has been made o Local Air Compressor #2 indication indicates "stopped in Auto Restart" o All starting and stopping of air compressors will be done from the Control Room Required Materials: None General

References:

1. 334, Instrument and Service Air System, revision 123
2. ABN-35, Loss of Instrument Air, revision 10 Task Standard: The reactor has been scrammed lAW ABN-1.

Time Critical Task: No.

Validation Time: 10 minutes NRC Sim JPM 7 Page 2 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ../

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: 7.4.1.6 STARTS the #2 Compressor: PLACE the Panel 7F Control Switch to STOP, and allow the switch to spring return to normal after stop. PLACE the Panel 7F Control Switch to START, and hold for 3-5 seconds, or press the local start (green) button.

Standard: Starts the #2 Compressor by placing the Panel 7F Control Switch to STOP, and allow the switch to spring return to normal after stop. Then places the Panel 7F Control Switch to START, and hold for 3-5 seconds.

CUE: May call the EO to verify air compressor #2 local indication (provided in Initial Conditions). If called report that air compressor

  1. 2 local display indicates "stopped in Auto Restart".

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 3 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Note: Step 7.4.1.7 is N/A Performance Step: 3 Procedure Step: 7.4.1.8 DIRECTS the EO to verify:

  • Bearing oil pressure is 40-50 psig, for #1 and #2 Air Compressors, 45 to 55 psig for #3 Air Compressor.
  • TBCCW is observed flowing in the sight glass, and TBCCW leaving the compressor is less than 125°F.

CUE: As the EO directed to verify air compressor #2 indications following the start, report a good start on air compressor #2 and all indications are in the normal range.

Standard: DIRECTS the EO to verify:

  • Bearing oil pressure is 40-50 psig" for #1 and #2 Air Compressors, 45 to 55 psig for #3, Air Compressor.
  • TBCCW is observed flowing in the sight glass, and TBCCW leaving the compressor is less than 125°F.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 4 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: The following step will initiate the Alternate Path

./ Performance Step: 4 Procedure Step: 7.4.1.9 STOP the compressor to be removed from service by placing the control switch to the STOP. (Panel 7F)

Standard: Stops the compressor to be removed from service by placing the control switch to the STOP. (Panel 7F). Verifies indications the compressor is stopped.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 5 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 7.4.1.1 0 Directs the EO to confirm the air compressor #1 for LAG operation settings are as specified in Attachment 334-9.

CUE: Report that air compressor #1 setting have been adjusted lAW Attachment 334-9 and air compressm #1 is in LAG.

BOOTH: Place Air Compressor #1 in LAG.

Standard: Air Compressor #1 is in LAG and settings have been adjusted lAW Attachment 334-9.

NOTE: 20 seconds after Compressor #1 is stopped, instrument air pressure indication will lower to 50 psig and annunciator M-3-b, RCVR 2 I INST AIR PRESS LO will alarm. (This will occur automatically).

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 6 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 6 Procedure Step: RAP-M3b and ABN-35 lAW the RAP and ABN, the applicant may request the EO to verify local air compressor indications OR start Air Compressor #3. May also start Air Compressor #1 lAW HU*-AA-1 04-101 since it failed to auto start.

CUE: 1. If requested, report local Air Compressor #2 discharge pressure of (Panel 7F current value) psig and lowering

2. If requested, report Local #3 To9gl e switch is in SELECT.

1 Standard: Starts Air Compressor #3 (also accept starting Air Compressor

  1. 1)

Comment:

SAT/UNSAT Performance Step: 7 Procedure Step: 4.3 lAW the ABN, when pressure reaches 95 psig OR M-3-b annunciator alarms, dispatches an op~erator to check for Air Dryer malfunctions, valve lineup error, air leaks in the system, malfunction of the loading switch on the operating air compressor.

CUE: Acknowledge the cue, however do not report back any findings.

Standard: When pressure reaches 95 psig, dispatches an operator to check step 4.3 items.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 7 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 8 Procedure Step: 4.4 Alert station personnel by making the following announcement on the Plant PA system.

CUE: Inform the applicant another operator will make the announcement.

Standard: Announcement is made over PA systE3m.

Comment:

SAT/UNSAT Performance Step: 9 Procedure Step: 4.5 Starts Air Compressor #3 (if not alneady done previously)

Standard: Starts Air Compressor #3 (also accept starting Air Compressor

  1. 1 ). All available air compressors should be running.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 8 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 10 Procedure Step: 4.6 Determines and isolates source of air loss CUE: Do not provide a source for the air loss.

Standard: The applicant will not be able to determine the source of the loss of air.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 9 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 4.9 When lA pressure drops to 80 psig, dispatches an operator to bypass the Air Dryers, Pre-filters, and Post-filters.

CUE: Acknowledge the request, but do not report back the status of bypassing the Air Dryers, Pre-filters, and Post-filters.

Standard: When lA pressure drops to 80 psig, an operator is dispatched to bypass the Air Dryers, Pre-filters, and Post-filters.

Comment:

SAT/UNSAT Performance Step: 12 Procedure Step: 4.10 & 4.1 0.1 Verifies V-6S-2 has isolated then diispatches an operator to close V-6S-7.

CUE: Acknowledge the request, but do not report back the status of V-6S-2 or closing of V-6S-7 Standard: Verifies V-6S-2 has isolated then dispatches an operator to close V-6S-7.

Comment:

SAT/UNSAT NRC Sim JPM 7 Page 10 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 13 Procedure Step: 3.0 When lA pressure drops to 55 psig OR 2 or more control rods begin to drift in the core, SCRAM IAVV ABN-1 NOTE: When lA pressure reaches 60 psig, one rod will drift into the core.

When pressure lowers to 55 psig, a sHcond rod will drift into the core Standard: The applicant inserts a manual reactor scram lAW ABN-1.

Comment:

SAT/UNSAT Terminating Cue: The reactor has been scrammed lAW ABN-1.

JPM Stop Time:

NRC Sim JPM 7 Page 11 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Sim JPM 7 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Sim JPM 7 Page 12 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Reset to full power IC or equivalent.

NOTE: The initial conditions of the JPM may not match with the simulator IC. I NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert LOA-CAS038 to LEAD (This places air compressor #2 in the LEAD setting)
3. Insert the following Conditional Triggers on Trigger 1 (or a Trigger not being used by another JPM).

o Event Action (Line 1): hwx05o127g

4. Insert the following on Trigger 1 (or the Trigger assigned in Step 3):

o IND-CAS001 to 50 over 5 minutes on a 20 second time delay o ANN-M-38 on a 20 second time delay o MAL-CRD006_2231 on a 4 minute time dEday o MAL-CRD006_3023 on a 4 min 30 sec time delay

5. Ensure air compressor #2 is labeled "stopped in Auto Restart"
6. Have a copy of procedure 334, section 7.4, for swapping the air compressors for the applicant marked up with steps 7.4.1.1 and 7.4.1.2 complete and a copy of Attachment 334-9 NRC Sim JPM 7 Page 13 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.

Initiating Cue:

2. Place #2 Compressor in LEAD and #1 Compressor in LAG lAW 334, Instrument and Service Air System, Section 7.4. This includes air compressor starts from the Control Room.

o All prerequisites and precautions and limitations are met o Steps 7.4.1.1 and 7.4.1.2 have been completed by the EO who is at the air compressors with the a copy of the procedure o The announcement for starting air compressors has been made o Local Air Compressor #2 indication indicates "stopped in Auto Restart" o All starting and stopping of air compressors will be done from the Control Room NRC Sim JPM 7 Page 14 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2880101403 Task

Title:

Swap Control Room Ventilation Fans (Alternate Path)

Job Performance Measure No.: NRC JPM Sim 8 ------

KIA

Reference:

290003 A4.02 (2.8/2.8)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

Actual Performance X Classroom -----

Simulator X Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The B Control Room Ventilation System is currently in service and needs to be removed from service for maintenance.
2. All prerequisites have been verified to perform the procedure, including TBCCW and Instrument, Service and Breathin!~ Air Systems.
3. An EO has been briefed on the evolution, has a copy of the procedure and a radio and is ready to support the evolution.
4. The procedure has been completed up to and iincluding step 10.4.6.

Task Standard: The Control Room Ventilation Systems have been swapped from B to A, and the A Ventilation System has been placed in the PART RECIRC emergency mode.

Required Materials: None.

General

References:

1. Procedure 331.1, Control Room and Old Cable Spreading Room Heating, Ventilation and Air Conditioning System, revision 39.
2. RAP-10F1k, AREA MON HI, Rev 004.

NRC JPM Sim 8 Page 1 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Swap Control Room Ventilation Systems lAW Procedure 331.1, Control Room and Old Cable Spreading Room Heating, Ventilation and Air Conditioning System, starting at step 10.4.7.

Time Critical Task: No.

Validation Time: 15 minutes NRC JPM Sim 8 Page 2 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: _ _ _ __

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.

Standard: Reviews Precautions and Limitations.

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 3 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 10.4.7 Stop 8 Control Room HVAC by placing FN-826-0088 System Initiation switch to OFF (Panel 9XR).

Standard: Places the CONTROL ROOM HVA.C 8 SYSTEM INITIATION control switch to OFF (red light OFF, green light ON).

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 10.4.8 Verify FN-826-0088, Supply Fan stopped.

Standard: Verifies CONTROL ROOM HVAC 13 Supply Fan OFF (red light OFF, green light ON).

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 4 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 10.4.9 Verify Isolation Dampers are closed.

  • DM-826-039 (Panel 9XR)
  • DM-826-040 (Panel 9XR)

Standard: Verifies Isolation Dampers are closed.

  • DM-826-039 (Panel 9XR) (md light OFF, green light ON)
  • DM-826-040 (Panel 9XR) (red light OFF, green light ON)

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 10.4.1 0 Momentarily place the A Control Room HVAC System Bypass switch in RESET (Panel 11 R).

Standard: Momentarily places the CONTROL ROOM HVAC A SYSTEM BYPASS switch in RESET.

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 5 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 10.4.11 Place mode selector for System A to the desired position (Panel 11R).

Cue: If the Applicant asks which mode to b1~ in, state "normal mode".

Standard: Confirms the CONTROL ROOM HVAC A SYSTEM MODE switch is in NORM.

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 10.4.12 Start "A" Control Room HVAC by pllacing FN-826-008A System Initiation switch to ON (Panel11 R).

Standard: Places the CONTROL ROOM HVAC .A SYSTEM INITIATION switch to ON (red light ON, green li,ght OFF).

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 6 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 10.4.13 Verify Isolation Dampers are open.

  • DM-826-042 (Panel 11 R)
  • DM-826-043 (Panel 11 R)

Standard: Verifies Isolation Dampers are open.

  • DM-826-042 (Panel 11 R) (red light ON, green light OFF)
  • DM-826-043 (Panel11 R) (rE!d light ON, green light OFF)

Comment:

SAT/UNSAT Performance Step: 10 Procedure Step: 10.4.14 Verify FN 826-008A, Supply Fan is running.

Standard: Verifies CONTROL ROOM HVAC A Supply Fan ON (red light ON, green light OFF).

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 7 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 10.4.15 CONFIRM CLOSED refrigeration compressor circuit breakers on side of air conditioning unit I-82E>-001A based on heat load.

(New Cable Spreading Room)

Note/Cue: The Applicant may ask how many breakers to close: close those breakers which were opened earlier.

Directs the EO to confirm CLOSED refrigeration compressor Standard:

circuit breakers on side of air conditioning unit I-826-001A based on heat load. (New Cable Spreading Room)

Report that two circuit breakers are closed (those which were Cue:

opened earlier.

Comment:

SAT/UNSAT NOTE: Step 10.4.16 is N/A. If asked by the applicant, state this step is not necessary.

NRC JPM Sim 8 Page 8 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 12 Procedure Step: 10.4.17 Standard: Start FN-826-009, Kitchen and Toilet Fan as needed by placing its five-minute timer control switch in START.

Note/Cue 1: This is not modeled in the simulator. The kitchen fan timer is in start.

Comment:

SAT/UNSAT NOTE: The following steps presents an Alternate Path for the Applicant.

Performance Step: 13 Note: If the Applicant does not respond to the front panel alarm while at the back panel, provide the cue below.

Cue: Respond to the control room alarm.

Procedure Step: Provides repeat back of initiating cue.

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. When the Applicant locates the alarm response procedure RAP-10F1k, then provide a copy of the alarm response to the Applicant.

NOTE: Depending on what JPM is perforrnecl in parallel with this JPM, the applicant may not recognize to respond to annunciator 1OF k. When this annunciator comes in tell the applicant to respond to all annunciators on Panel 1OF, or cue them that 1OF1 k came into alarm.

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 9 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 14 Procedure Step: RAP-1 OF1 k Check area radiation monitors to determine area of high radiation (Panel 2R).

Standard: Checks area radiation monitors to determine area of high radiation (Panel 2R). Determines that area radiation monitor R01 0-A 1 is above the high alarm setpoint.

Comment:

SAT/UNSAT Performance Step: 15 Procedure Step: RAP-1 OF1 k Confirm high radiation condition at radiation monitors:

  • R0148-7, R0148-9
  • R014C-9, R015C-1 0 Standard: Confirm high radiation condition at radiation monitors:
  • R0148-7, R0148-9
  • R014C-9, R015C-1 0 Confirms that no high radiation at these monitors exists Comment:

SAT/UNSAT NRC JPM Sim 8 Page 10 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information NOTE: Since no high radiation is confirmed, then entry into the Secondary Containment Control EOP is not required and the~ next RAP step (not included here) is NA.

Performance Step: 16 Procedure Step: RAP-1 OF1 k Refer to EP-AA-1010, Radiological Emergency Plan for Oyster Creek Generating Station to determine EAL.

Standard: Refers the SRO to EP-AA-1010, Radiological Emergency Plan for Oyster Creek Generating Station to d1atermine EAL.

Cue: As the SRO, acknowledge the report.

Comment:

SAT/UNSAT Performance Step: 17 Procedure Step: RAP-10F1k Notify the Shift Manager.

Standard: Notifies the Shift Manager.

Cue: As the Shift Manager, acknowledge the report.

Comment:

SAT/UNSAT NRC JPM Sim 8 Page 11 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 18 Procedure Step: RAP-10F1k As directed, announce over the pa!~e system the evacuation requirements of the specific area.

Standard: As directed, announces over the page system the evacuation requirements of the specific area.

Cue: Another Operator will make the announcement.

Comment:

SAT/UNSAT Performance Step: 19 Procedure Step: RAP-10F1k For R010A-1, R010A-2 or R010A-3, place the Control Room HVAC in PART RECIRC in accordance with Procedure 331.1, Control Room and Old Cable Spreading Room Heating Ventilation and Air Conditioning.

Standard: Places the CONTROL ROOM HVA.C .A SYSTEM MODE switch in PART RECIRC (amber PART RECIRC light ON, NORM light OFF).

Comment:

SAT/UNSAT Task Standard: The Control Room Ventilation Fans have been swapped from B to A, and the A Ventilation System has been placed in the PART RECIRC emergency mode.

JPM Stop Time: - - * - - -

NRC JPM Sim 8 Page 12 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC JPM Sim 8 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC JPM Sim 8 Page 13 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Reset to full power IC-115
2. Verify CR HVAC System B is in operation
3. Have procedure 331.1, section 10 complete up to and including step 10.4.5.
4. Have a clean copy of RAP-10F1k, AREA MON HI.
5. Have a copy of 331.1, step 5.4, ready to hand to the applicant for Step 19.
6. Insert the following conditional trigger on Trig~1er 1: hwx22o303b.gt.O
a. This will activate Trigger 1 when the CR Vent System A damper OM 826-042 red light comes on
7. Place the following on Trigger 1:
a. ICH-RMS005A to 0.8 on a 2 minute time delay
i. This places radiation monitor R01 0-A 1 above its high alarm setpoint of 5 mr/hr (to 6.3 mr/hr) (Admin Bldg Entr to Turb Bldg ARM) after 2 minutes. When this radiation monitor goes above it upscale limit, annunciator 1OF1 k, AREA MON HI.

Note: The 2 minute time delay may be made longer or shorter if required.

It is intended that the actions above occur whE3n the Applicant has completed the procedure to swap CR HVAC fans; or, the above actions may be manually inserted at the required time without the trigger.

NRC JPM Sim 8 Page 14 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The B Control Room Ventilation Fan is currently in service and needs to be removed from service for maintenance.
2. All prerequisites have been verified to perform the procedure, including TBCCW and Instrument, Service and Breathing Air Systems.
3. An EO has been briefed on the evolution, has a copy of the procedure and a radio and is ready to support the evolution.
4. The procedure has been completed up to and including step 10.4.6.

Task Cue:

Swap Control Room Ventilation Systems lAW Procedure 331.1, Control Room and Old Cable Spreading Room Heatin9, Ventilation and Air Conditioning System, starting at step 10.4.7.

NRC JPM Sim 8 Page 15 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 3420302008 Task

Title:

Vent the Control Rod Drive Over Piston Volume

.~~~~~------------

Job Performance Measure No.: NRC Plant JPM 1- - - - - - - - - -

KIA

Reference:

295037 EA 1.05 (3.9/4.0)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance ------

X Actual Performance Classroom --------

Simulator Plant X Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant was at rated power when an event occurred. Present plant conditions include the following:
a. An Electric A TWS is in progress
b. All other methods to insert Control Rods 1/-\W EMG-SP21 have failed
c. RP has been contacted; permission has been granted to go above 7ft.

Initiating Cue:

1. Vent the Control Rod Drive Over Piston Volume lAW EMG-SP21 Section 4.7 Required Materials: None General

References:

1. EMG-SP21, Alternate Insertion of Control Hods, Rev 1 Task Standard: The Control Rod Drive Over Piston Volume has been vented.

NRC Plant JPM 1 Page 1 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.

Validation Time: 8 minutes NRC Plant JPM 1 Page 2 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SAT/UNSAT Performance Step: 2 Procedure Step: 4.7.1 USE this method ONLY if all other insertion methods fail.

Standard: Confirms all other insertion methods have failed (per Initial Conditions).

CUE: If asked by the applicant, inform them all other insertion methods have failed.

Comment:

SAT/UNSAT NRC Plant JPM 1 Page 3 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 4.7.2 CONFIRM all available CRD pumps are running. (Panel 4F)

Standard: Call the Control Room to confirm all available CRD pumps are running. (Panel 4F)

CUE: All CRD Pumps are running.

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 4.7.3 CLOSE Cooling Water PCV Isolation valve V-15-24. (RB 23 SE)

Standard: Closes Cooling Water PCV Isolation valve V-15-24. (RB 23 SE)

CUE: V-15-24 is Closed.

Comment:

SAT/UNSAT NRC Plant JPM 1 Page 4 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 4.7.4 CLOSE Exhaust Header Root valve V-15-25. (RB 23 SE)

Standard: Closes Exhaust Header Root valve V-15-25. (RB 23 SE)

CUE: V-15-25 is Closed.

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 4.7.5 CLOSE Stabilizer Unit Outlet valve V--15-40. (RB 23 SE)

Standard: Closes Stabilizer Unit Outlet valve V-*15-40. (RB 23 SE)

CUE: V-15-40 is Closed.

Comment:

SAT/UNSAT NRC Plant JPM 1 Page 5 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 4.7.6 CONFIRM Closed Cooling Water PC\/ Bypass valve V-15-131.

(RB 23 SE)

Confirms closed Cooling Water PCV Bypass valve V-15-131.

Standard:

(RB 23 SE)

CUE: V-15-131 is Closed.

Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 4.7.7 OPEN drain valve V-15-74. (RB 23 SE)

Standard: Opens drain valve V-15-74. (RB 23 SE)

CUE: V-15-74 is Open, another operator will complete the procedure.

Comment:

SAT/UNSAT Task Standard: The Control Rod Drive Over Piston Volume has been vented.

JPM Stop Time: _ _ _ __

NRC Plant JPM 1 Page 6 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Plant JPM 1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Plant JPM 1 Page 7 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. None NRC Plant JPM 1 Page 8 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initial Conditions:

1. The plant was at rated power when an event occurred. Present plant conditions include the following:
a. An Electric ATWS is in progress
b. All other methods to insert Control Rods lAW EMG-SP21 have failed*
c. RP has been contacted; permission has been granted to go above 7ft.

Task Cue:

Vent the Control Rod Drive Over Piston Volume IAVV EMG-SP21 Section 4.7 There will be no manipulations of plant components.

All mainuplations are to be simulated.

NRC Plant JPM 1 Page 9 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2090501403/2090504401 Align the Core Spray System to the Condensate Storage Tank Task

Title:

for Emergency Operations Job Performance Measure No.: NRC Plant JPM 2:- - - - - -

KIA

Reference:

295030 EA 1.06 (3.4/3.4)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

X Actual Performance Classroom -----

Simulator Plant X Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The Reactor is shutdown.
2. Reactor water level is being maintained at *160 inches with feedwater.
3. Drywell pressure is 1.1 psig and stable.
4. Torus water level is 140 inches and lowering clue to a leak.
5. The Reactor Building is accessible.
6. You have a full set of Building Keys.

Initiating Cue:

1. Line up and makeup to the torus from the CST via Core Spray System 1 in accordance with EMG-SP37. Steps 3.2.1, 3.2.:2, :3.2.3 and 3.2.4 have already been performed.

Required Materials: None General

References:

1. EMG-SP37, Makeup to the Torus via Core Spray System, Rev 001.

NRC Plant JPM 2 Page 1 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: Makeup to the torus from the CST via Core Spray System 1 in accordance with Support Procedure 37 has been linBd-up.

Time Critical Task: No.

Validation Time: 30 minutes NRC Plant JPM 2 Page 2 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ./

Performance Step: 1 Procedure Step: Provides repeat bacl~ of initiating cue.

JPM Start Time: ______

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: 3.2.5.1 Place the Core Spray pump suction valve breakers in OFF:

  • V-20-3 (MCC 1A21A RB 23' SVV)
  • V-20-32 (MCC 1B21A RB 23' NE)

Standard: Places the Core Spray pump suction valve breakers in OFF:

  • V-20-3 (MCC 1A21A RB 23' SVV)
  • V-20-32 (MCC 1B21A RB 23' NE)

CUE: The breakers for valve V-20-3 and V-20-32 are in the OFF position. (Split CUES for each valve if required)

Comment:

SATIUNSAT NRC Plant JPM 2 Page 3 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 3.2.5.2 Unlock and open the following CST valves:

  • V-20-1 (NW corner Room)
  • V-20-5 (NW corner Room)
  • V-20-34 (NW corner Room)

Standard: Unlocks and opens the following CST valves:

  • V-20-1 (NW corner Room)
  • V-20-5 (NW corner Room)
  • V-20-34 (NW corner Room)

CUE: Valves V-20-1, V-20-5, and V-20-34 are unlocked and open.

(Split CUES for each valve if requir,ed)

Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 3.2.5.3 Start ONE of the following Core Spray System 1 main pumps NZ01A or NZ01C.

Standard: Calls the Control Room to start Core Spray System 1 main pump NZ01A or NZ01C.

Cue: Core Spray Pump NZ01A is running.

Comment:

NRC Plant JPM 2 Page 4 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information SAT/UNSAT NOTE: Step 3.2.6 is N/A Performance Step: 5 Procedure Step: 3.2. 7 Unlock and place the breaker for V-20-27 in the ON position (MCC 1A21 8 R8 23' E).

Standard: Unlocks and places the breaker for V.-20-27 in the ON position (MCC 1A21 8 R8 23' E).

CUE: V-20-27 breaker is ON.

Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 3.2.8 Open Torus Test Flow Return valve V-20-27 (Keylock R8 51' NW)

Standard: On R8 51' NW, opens Torus Test Flow Return valve V-20-27 by placing upper keylock switch to the OPEN position (red light ON).

CUE: Valve V-20-27 indicates full open and Torus water level is rising.

This JPM is complete.

Comment:

SAT/UNSAT Terminating Cue: Makeup to the torus from the CST via Core Spray System 1 in accordance with Support Procedure 37 has been lined-up.

NRC Plant JPM 2 Page 5 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information JPM Stop Time:

NRC Plant JPM 2 Page 6 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Plant JPM 2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Plant JPM 2 Page 7 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. Have a copy of SP-37 marked up to and including step 3.2.4 NRC Plant JPM 2 Page 8 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initial Conditions:

1. The Reactor is shutdown.
2. Reactor water level is being maintained at '160 inches with feedwater.
3. Drywell pressure is 1.1 psig and stable.
4. Torus water level is 140 inches and lowering due to a leak.
5. The Reactor Building is accessible.
6. You have a full set of Building Keys.

Task Cue:

Line up and makeup to the torus from the CST via Core Spray System 1 in accordance with EMG-SP37. Steps 3.2.1, 3.2.2, 3.2.3 and 3.2.4 have already been performed.

There will be no manipulations of plant components.

All mainuplations are to be simulated.

NRC Plant JPM 2 Page 9 of 9

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 2630104008 Task

Title:

Swap Static Chargers from C 1 to <.:.._~2-------*---

Job Performance Measure No.: NRC Plant JPM 3- - - - - -

KIA

Reference:

263000 K1.02 (3.2/3.3)

Examinee: Examiner:

Facility Evaluator: Date:

Method of Testing:

Simulated Performance -----

X Actual Performance Classroom -----

Simulator Plant X Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power
2. Static Charger C1 is currently supplying 125 VDC Bus C
3. Static Charger C2 is in standby and is ready to be placed in service
4. This task is being performed for equipment rotation
5. The SRO has addressed all applicable Tech Specs
6. Procedure 340.3, 125 Volt DC Distribution System C, has been completed up to and including Step 8.3.2 Task Standard: Static Charger C2 is supplying Bus C lAW 340.3 Required Materials: None.

General

References:

1. 340.3, 125 VDC Distribution Systems C, Revision 36 NRC Plant JPM 3 Page 1 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Transfer operation from Charger C1 to the Alternate Static Charger C2 lAW procedure 340.3, 125 Volt DC Distribution System C, starting at Step 8.3.3.

Time Critical Task: No.

Validation Time: 10 Minutes NRC Plant JPM 3 Page 2 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark ~

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time: - - - - - - -

Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

Comment:

SATIUNSAT Performance Step: 2 Procedure Step: Verifies Prerequisites and reviews Precautions and Limitations.

Standard: Verifies Prerequisites and reviews Precautions and Limitations.

Comment:

SAT/UNSAT NRC Plant JPM 3 Page 3 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 8.3.3.1 Open the DC OUTPUT breaker at the charger cabinet:

BTCHG C1\DC OUTPUT, Battery Charger C-1 DC Output breaker or BTCHG C2\DC OUTPUT, Battery Charger C-2 DC Output breaker Opens the DC OUTPUT breaker at the charger cabinet:

Standard:

BTCHG C1\DC OUTPUT, Battery Charger C-1 DC Output breaker (Breaker to the OFF position)

Cue: The Battery Charger C-1 DC Output breaker is open Comment:

SAT/UNSAT Performance Step: 4 Procedure Step: 8.3.3.2 Verify annunciator window 9XF-2-d, BUS C UV alarms Standard: Calls the Control Room to verify annunciator window 9XF2d, BUS C UV is in alarm Cue: Annunciator window 9XF2d, BUS C UV is in alarm Comment:

SAT/UNSAT NRC Plant JPM 3 Page 4 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 8.3.3.3 Open the breaker at Distribution Center C for the charger:

DC-C 125V\2, DC-C 125V Breaker 2 for Battery Charger C1 Output or DC-C 125V\ 1, DC-C 125V Breaker 1 for Battery Charger C2 Output.

Standard: Opens the breaker at Distribution Center C for the charger:

DC-C 125V\2, DC-C 125V Breaker 2 for Battery Charger C1 Output (Breaker to the OFF position)

Cue: DC-C 125V Breaker 2 for Battery Charger C 1 Output is open Comment:

SAT/UNSAT Performance Step: 6 Procedure Step: 8.3.3.4 Verify annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN alarms Standard: Calls the Control Room to verify annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN is in alarm Cue: Annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN is in alarm Comment:

SAT/UNSAT NRC Plant JPM 3 Page 5 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 8.3.4.1 Close the breaker at Distribution Ctanter C for the charger:

DC-C 125V\2, DC-C 125V Breaker 2 for Battery Charger C1 Output or DC-C 125V\1, DC-C 125V Breaker 1 for Battery Charger C2 Output Standard: Close the breaker at Distribution Center C for the charger:

DC-C 125V\1, DC-C 125V Breaker 1 for Battery Charger C2 Output (Breaker to the ON position)

Cue: DC-C 125V Breaker 1 for Battery Charger C2 Output is closed Comment:

SAT/UNSAT Performance Step: 8 Procedure Step: 8.3.4.2 Verify annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN clears Standard: Calls the Control Room to verify annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN clears Cue: Annunciator window 9XF-5-d, BUS C INPUT BRKRS OPEN is clear Comment:

SAT/UNSAT NRC Plant JPM 3 Page 6 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 9 Procedure Step: 8.3.4.3 Adjust static charger C 1 or C2 float voltage rheostat to set voltage at or slightly above battery bus voltage Cue: Inform the applicant they have a sc:rewdriver with them (for the voltage adjustments)

Static Charger C2 float voltage is 131 volts.

Bus DC-C voltage is 132 volts Standard: Adjusts static charger C2 float voltage~ rheostat to set voltage at or slightly above battery bus voltage by rotating the screw-adjust rheostat until float voltage is equal to or slightly above 132 volts Cue: After adjustment, report that Static charger C2 float voltage indicates 132.5 volts.

Comment:

SAT/UNSAT Performance Step: 10 Procedure Step: 8.3.4.4 Close the DC OUTPUT breaker at the charger cabinet:

BTCHG C1\DC OUTPUT, Battery Charger C-1 DC Output breaker or BTCHG C2\DC OUTPUT, Battery Charger C-2 DC Output breaker Standard: Closes the DC OUTPUT breaker at the charger cabinet:

BTCHG C2\DC OUTPUT, Battery Charger C-2 DC Output breaker (Breaker to the ON position)

Cue: Battery Charger C-2 DC Output brea~:er is closed Comment:

SAT/UNSAT NRC Plant JPM 3 Page 7 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 8.3.5 Maintain voltage on Distribution CentHr C in accordance with Section 11 .0 Procedure Step: 11.3.1 If the battery is not on an equalizing charge, then maintain voltage between 130.6 and 135 Cue: C Bus voltage indicates 132 VDC Standard: Adjust the appropriate Static Charger rheostat as necessary to maintain DC System voltage as follows: lf_the battery is not on an equalizing charge, then MAINTAIN voltage between 130.6 and 135 (no adjustments are required)

Comment:

SAT/UNSAT NRC Plant JPM 3 Page 8 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 12 Procedure Step: 8.3.5.1 When C Bus voltage is adjusted above 130.5 VDC, then verify annunciator window 9XF-2-d, BUS C UV clears Standard: Calls the Control Room to verify annunciator window 9XF-2-d, BUS C UV is clear Cue: Annunciator window 9XF-2-d, BUS C UV is clear Comment:

SAT/UNSAT Note: There are other steps to exit the Tech Specs and to shutdown the C1 Charger but this concludes the JPM.

Terminating Cue: Static Charger C2 is supplying Bus C lAW 340.3 JPM Stop Time: _ _ _ __

NRC Plant JPM 3 Page 9 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC Plant JPM3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC Plant JPM 3 Page 10 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET JPM Setup

1. When creating the procedure for the candidates' use, include section 11.0 NRC Plant JPM 3 Page 11 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power
2. Static Charger C1 is currently supplying 12!5 VDC Bus C
3. Static Charger C2 is in standby and is ready to be placed in service
4. This task is being performed for equipment rotation
5. The SRO has addressed all applicable Tecll Specs
6. Procedure 340.3, 125 Volt DC Distribution System C, has been completed up to and including Step 8.3.2 Task Cue:

Transfer operation from Charger C1 to the Alternate Static Charger C2 lAW procedure 340.3, 125 Volt DC Distribution System C, starting at Step 8.3.3.

There will be no manipulations of plant components.

All mainuplations are to be simulated.

NRC Plant JPM 3 Page 12 of 12

ILT 13-1 NRC Scenario 1 (New)

Scenario Outline Facility: Ovster Creek Scenario No.: .1 Op Test No.: 13-1 NRC Examiners: Operators:

Initial Conditions:

  • 2% power with mode switch in STARTUP
  • Air Compressor #3 is tagged OOS
  • Steam chest warming is in progress Turnover:
  • Continue with rod withdrawal. Complete step 10 Group 3-1 starting at rod 34-39. When rod pulls are complete wait for further direction from Reactor Engineerin!~* Timing of rod position 00-02 is not required and Continuous Rod Withdrawal is authorized per Reactor Engineering.

Event No. Malf. No. Event Type* Event Description 1 N/A R ATC Raise reactor power with control rods lAW the ReMA MAL-2 CRD007_ c ATC Stuck control rod (26-23) 2623 3

ICH- c BOP ICS003A Leak in Isolation Condenser Shell B TS SRO 4

MAL- c ATC Loss of VMCC 1 B2 EDS004B BOP TS SRO MAL-5 RBC001A c BOP The in-service RBCCVV pump trips The standby RBCCW pump also trips resulting in a loss 6

MAL-RBC001B c ATC of all RBCCW flow which requires the ATC to scram the reactor; eight rods fail jto insert MAL-7 M Crew Steam leak in DrywE311 NSS017A 8

MAL-CRD001A c Crew CRD Flow Control Valve fails closed

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)aje~r Transient, (TS) Tech Specs ILT 13-1 NRC Scenario 1 Page 1 of 27

ILT 13-1 NRC Scenario 1 (New)

Simulator Summary Event Event Summary 1 The ATC will withdraw control rods to raise reactor power lAW the pull sheet and 302.2. (ATC: Reactivity Manipulation) 2 The ATC will respond to indications of a stuck control rod (26-23).

The ATC will apply and insert signal to the stuck rod lAW ABN-6. The control rod will then move. The ATC will then continue withdrawing control rods. (ATC: Component Failure) 3 The BOP will respond to lowering level in Isolation Condenser B shell lAW RAP-C6b. The BOP will attempt fill the IC shell from Panel 5F/6F. The RB EO will report IC-A shell level is 6.6 ft. and slowly lowering (non-recoverable). The BOP will isolate IC-B and the SRO will declare IC B inoperable and apply Tech Spec 3.8.C. (BOP:

Component Malfunction; SRO: Tech Spec) 4 The crew will respond to the trip of VMCC 182 and enter ABN-51, Loss of VMCC 1B2. The BOP will restore power to PSP-2 and the ATC will reset the% scram. The SRO will review TS 3.7 and enter a 30 hr cold shutdown LCO. (ATC: Component Malfunction; BOP:

Component Malfunction; SRO: Tech Specs) 5 The in-service RBCCW pump will trip and the crew will enter ABN-19.

The BOP will diagnose a tripped pump and will start the standby RBCCW pump. (BOP: Component Malfunction) 6 The standby RBCCW pump will trip resulting in a loss of all RBCCW flow. The ATC will manually scram the reactor and may secure all running Recirculation Pumps (subsequent ABN action). Eight rods will fail to insert and the crew will enter RPV Control -with A TWS.

(ATC: Component Malfunction) (PRA) 7 Three minutes after the mode switch is tak.en to Shutdown, a small but increasing RPV steam leak (LOCA) into the Primary Containment occurs. The steam leak will significantly increase requiring the crew to spray the OW to reduce Containment pressure. (Crew: Major) 8 The in-service CRD Flow Control Valve fails closed and manually driving control rods that failed to insert will no longer work. The ATC will swap Flow Control Valves lAW procedure 302.1, Control Rod Drive System, and continue manually driving all control rods that failed to insert OR will scram the affected rods individually from their individual scram test switches on Panel 6XR. (ATC: Component Malfunction)

ILT 13-1 NRC Scenario 1 Page 2 of 27

ILT 13-1 NRC Scenario 1 (New)

Critical The crew will be required to manually insert rods that failed to scram Task 1 to achieve a shutdown reactor Critical When Drywell or Torus pressure exceeds 12 psig, OR before Drywell Task 2 bulk temperature is determined it cannot be maintained below 281 °F, spray the dryweiiiAW SP-29, Initiation of the Containment Spray System for Drywell Sprays.

ES-301-4 Target Quantitative Actual Event Attributes Attributes Numbect!L__

1. Total malfunctions (5-8) 7 2-8
2. Malfunctions after EOP entry (1-2) 2 7-8
3. Abnormal events (2-4) 2 4-5
4. Major transients (1-2) 1 7
5. EOPs entered/requiring substantive 2 6-7 actions (1-2)
6. EOP contingencies requiring substantive 1 6 actions (0-2)
7. Critical tasks (2-3) 2 7,8 ILT 13-1 NRC Scenario 1 Page 3 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No. NRC Sim 1 Event No.: 1 I Event

Description:

Withdraw Control Rods to raise rea cto r ~ower

~

Initiation: Following shift turnover Cues: As directed by the SRO following shift turnover Time Position Applicant's Ac tio ns or Behavior SRO

  • Directs ATC to withdraw cor1trc)I rods lAW the pull sheet and 302.2
  • Acts as the Reactivity Mana ge r during the reactivity manipulation ATC
  • Withdraws control rods lAW' th e pull sheet and 302 . 2 0 VERIFY the PERMIT ligl1t is illuminated 0 CONFIRM the ROD POWE:R Switch ON 0 SELECT the control rod to be withdrawn by momentarily depressing the pushbutt on on the CONTROL ROD SE LE CT pushbutton matrix
  • Verifies the control rc>d ~ight is lit
  • Verifies no other con*tro I rods are selected 0 TURN the ROD CONTR OL Switch to ROD OUT NOTCH position and simultaneo us Iy TURN the NOTCH OVERRIDE 0 VERIFY the WITHDRAVVI ight remains illuminated for the durahon of rod withdrawal and an increasing rod position d isp lay is presented 0 ALLOW the rod to settle 0 ne notch before the desired position by simultaneoucdly releasing the Rod Control Switch and the Notch 0\rer ride Switch one digit before the desired notch position (one. notch above the target notch) is reached, unless the ccmt rol rod is being withdrawn to the full-out position 0 VERIFY that the rod late he s in an even-numbered position before the SE TTL E light extinguishes NOTE: The third rod the candidate will move, Rod 26-2: 3, will not move and Event 2 will occur. Rod withdrawal may continue after Rod 26-23 is un-stuck at the discretion of the Lead Evaluator.

ILT 13-1 NRC Scenario 1 Page 4 of 27

ILT 13-1 NRC Scenario 1 (New)

BOP

  • Provides peer check for con trol rod movements
  • Verifies the following during switch movement 0 Amber OVERRIDE light is illuminated 0 Green INSERT light is ill uminated following switch movement and remains 1:m for approximately 1 second 0 Rod position readout mo mentarily displays the next lower odd-numbered digit as tt1e drive unlatches Terminus: Control rods are withdrawn to the discretion of the Lead Evaluator.

Notes/Comments ILT13-1 NRCScenario1 Page 5 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No.: _NRC Sim 1 Event No.: 2 Event

Description:

A control rod will be stuck at (20sition 12 (26-23}

Initiation: When the ATC attempts to withdraw Control Rod 26-23.

Cues: Control Rod 26-23 will not move when withdrawal signal is applied.

Time Position Applicant's Actions or Behavior ATC

  • Enters and executes ABN-6 OR 302.2 P&L 6.2. 7 0 Verifies that no Control Rod Blocks are in effect.

0 If CRD DR WTR PRESS indicates< 250 psid, adjusts to 250 psid.

0 If using ABN-6 and the US requests, consult with the System Manager and Reactor Engineering to determine if Procedure 235 should be performed concurrently with ABN-6. [ROLE PLAY 1]

ROLE PLAY 1: If requested, report as the System Manager and Reactor Engineering to complete actions of ABN-6, then perform actions of Procedure 235 if still necessary.

0 If the Control Rod will not move, apply RAISE drive water pressure to 300 psid and then attempt to withdraw the rod. [ROLE PLAY 2]

ROLE PLAY 2: When the ATC raises drive water pressure the first time, DELETE MAL-CRD007 2623.

SRO

  • May directs entry into ABN-Ei or use 302.2 P&L 6.2.7 to free stuck rod
  • May notify SMIWWM/Reactor Engineering BOP
  • May announce entry into ABN-6 (may be performed by ATC)

Terminus: Control rod 26-23 has been un-stuck and is withdrawn to position 48.

ILT 13-1 NRC Scenario 1 Page 6 of 27

ILT 13-1 NRC Scenario 1 (!New)

Notes/Comments ILT 13-1 NRC Scenario 1 Page 7 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 1 Event No.: 3 Event

Description:

Leak in Isolation Condenser Shell Bl!rigger 1]

Initiation: Control rod 26-23 has been un-stuck and is withdrawn to position 48., or as directed by the Lead Examiner.

Cues: Annunciator C6b, SHELL B LVL HI/LO; ISOL CONDENSER B LEVEL indicates lower than normal Time Position Applicant's Actions or Behavior BOP

0 Reports Isolation Condenser shell level and trend.

0 May restore shell water level lAW procedure 307, Isolation Condenser System, section 7.4.1, using Demineralized Water.

  • Records initial shell water level on Attachment 307-15
  • Opens V-11<34 on Panel 5F/6F .
  • Commences filling isolation condenser until shell level indicates between 7.3 and 7.7 feet.

0 After shell level makeup has been initiated, reports Isolation Condenser Shell level is not rising.

0 May direct the EO to investigate Isolation Condenser B. [ROLE PLAY]

ROLE PLAY: When asked as the EO to investigate, report IC-B shell level is "CURRENT VALUE" ft. and lowering. There is water on the floor under the ICs. The water is contained, directed to the floor drain, and no equipment is affected. If asked to verify 1-7 sump is not overflowing, report it is not overflowing and is not isolated.

0 If directed to isolate Isolation Condenser B, places the following switchHs in CLOSE:

  • AC V-14-3:2 (steam)
  • DC V-14-33 (steam)
  • DC V-14-35 (condensate return)
  • AC V-14-37 (condensate return} --

Lead Evaluator: At the discretion of the Lead Evaluator, call the Control Room as the Shift Manager and direct the crew to Manually Isolate Isolation Condenser B.

SRO

0 The shell side of each condenser shall contain a minimum water volume of 22,730 gallons. If the minimum volume cannot be maintained or if a source of makeup water is not available to the ILT 13-1 NRC Scenario 1 Page 8 of 27

ILT 13-1 NRC Scenario 1 (New) condenser, the condenser shall be considered inoperable.

0 If one isolation co ndenser becomes inoperable during the run mo de the reactor may remain in operation for a pe~ riod not to exceed 7 days provided the motor operated isolation and condensate makE.*up valves in the operable isolation condens er are verified daily to be operable.

  • May direct arming IC-B thermal overloads lAW 307 step 11.7.1
  • Notifies SMIWWM about Is olation Condenser B .
  • May direct the BOP to isolate Isolation Condenser B .

Terminus: Isolation Condenser B is declared inoperabll e and the SRO has applied Tech Specs.

Notes/Comments ILT 13-1 NRC Scenario 1 Page 9 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 1 Event No.: 1 Event

Description:

Respond to trip of VMCC 1B2 rTriaaer 31 Initiation: Isolation Condenser B is declared inoperable and the SRO has applied Tech Specs.or as directed by the Lead Examiner Cues: Annunciators G3c, RPS MG SET 2 TRIP; G1c, SCRAM CONTACTOR OPEN; 9XF4a, PROT SYS PNL 2 PWR LOST; 9XF5c, CIP-3 INV AC INP LOST Time Position Applicant's Actions or Behavior

==-======================~!

BOP

  • Recognizes and reports loss of VMCC 1B2
  • Performs ABN-51 o Confirms CIP-3 INV AC INP LOST (9XF-5-c) alarm received o Verifies the Trans Output green Off light is lit on Panel 7R o Restores power to PSP-2 by placing the Power Select switch in the TRANS position o Resets the following:

o Half Scram signal (4F) o Main Steam Isolation signal (4F) o APRM lights (5R) o APRM flow converters (3R, 5R) o Main Steam Line Rad Monitor drawers o Annunciators o NOTE: The following are simulated photographs. The candidate can simulate and assume indications are as expected.

  • Resets the INOP status LED on APRM FCTR cards
  • Verifies status LED on FCTR card is GREEN
  • Verifies Curve Select Display is "0" o Resets/verifies reset annunciator 9XF-4-a, PROT SYS PNL PWR LOST o Informs the US the following valves inoperable (1 F/2F) lAW Tech Spec 3.7 and 3.5.A.3 (only if 'B' Battery is unavailable- it will begin discharging but will be available for several hours)
  • V-14-31, DC Steam Inlet Valve to 'A' Condenser
  • V-14-34, DC Condensate Return Valve from 'A' Condenser
  • V-16-2, Inlet Isolation Valve to Cleanup Auxiliary Pump
  • V-16-14, Clean-Up Inlet Isolation Valve o Informs the US the B Battery is INOPERABLE as soon

"--------'----------L----a_s_it_b_e_,~Q'-in_s'---'-di-=-s-=-ch'---a'---r--'>L__:_gin___g_ _ _____

ILT 13-1 NRC Scenario 1 Page 10 of 27

  • ILT 13-1 NRC Scenario 1 (New) 0 Monitors 125 VDC 8 Bus Voltage 0 Reduces loads as directed by the US utilizing the 8 Battery Load List 0 Monitors 125 VDC A Bus Voltage 0 Verifies the following alarms are received:

0 MCC-1AB2 PWR XFER (9XF-2-c) 0 VACP-1 PWR XFER (9XF-3-c) 0 IP-4 PWR XFER (9XF-7-c) 0 Confirms one Fire Diesel Pump is operating in MANUAL mode and the other Fire Diesel Pump in AUTO mode 0 Directs the EO to investigate the loss of VMCC 182

[ROLE PLAY]

ROLE PLAY: As the EO sent to investigate the trip ofVMCC 182, report the feeder breaker to VMCC 1 82 tripped on overload 0 Informs US of Tech Specs section 3.7, Auxiliary Power 0 Notifies the Director of Operations and the WWM 0 Informs US to refer to EP-AA-1010 0 Reports ABN-51 is COQ:!f>lete SRO

  • Directs entry into ABN-51
  • Notifies SMIWWM about the loss of VMCC 182
  • Declares B Battery inoperable as soon as it begins to discharge
  • Reviews/applies Tech Spec 3.7'.8 0 The reactor shall be PLACED IN the COLD SHUTDOWN CONDITION if the availability of power falls below that requin~d by Specification A above
  • Declares the following valves inoperable (1 F/2F) lAW Tech Spec 3.5.A.3 (only if 'B' BattHry is fully discharged) 0 V-14-31, DC Steam Inlet Valve to 'A' Condenser 0 V-14-34, DC Condensate Return Valve from 'A' Condenser 0 V-16-2, Inlet Isolation Valve to Cleanup Auxiliary Pump 0 V-16-14, Clean-Up Inlet Isolation Valve ATC
  • Makes plant announcement of ~~mtry into ABN-51
  • Following restoration of RPS-2, resets the following:

0 Half Scram signal 0 Main Steam Isolation ~nal ILT 13-1 NRC Scenario 1 Page 11 of 27

ILT 13-1 NRC Scenario 1 (New)

Terminus: ABN-51 actions are complete and the SRO has reviewed/applied Tech Specs 3.7.8 and 3.5.A.3 Notes/Comments ILT 13-1 NRC Scenario 1 Page 12 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No . : NRC Sim 1 Event No.: § I Event

Description:

The in-service RBCCW j;2Umj;2 tri12s I"Trigger 5]

Initiation: ABN-51 actions are complete and the SRO has reviewed/applied Tech Specs 3.7.B and 3.5.A.3, or as directed by the Lead Examiner Cues: Annunciators C3c, RBCCW PUMP 1-1 TRIP; Eld, E7f, F7b, CCW FLOW LO for all Recirculation Pumps; RBCCW PUMP 1-1 indicates tripped Time Position Applicant's Actions or Behavior BOP

  • Checks RBCCW HX OUTLET PRESS and RBCCW PUMP 1-1 indications and recognizes RBCCW Pump 1-1 has tripped
  • Enters and performs immediate actions of ABN-19 .
  • Starts RBCCW Pump 1-2 by placing its control switch to START (must be started within 1 minute)
  • Reports RBCCW Pump 1-1 tripped and RBCCW Pump 1-2 was started and indications are normal
  • Directs EO to determine if RBCCW Pump 1-1 tripped on overload and to perform running checks on RBCCW Pump 1-2 [ROLE PLAY]

ROLE PLAY: When directed as the EO to check RBCCW Pump 1-1 for overload and to perform running checks on RBCCW Pump 1-2, report that RBCCW Pump 1-1 tripped on overload and report that running checks on RBCCW Pump 1-2 are SAT.

SRO

  • Directs entry into ABN-19
  • Notifies SMIWWM about the failed RBCCW Pump 1-1 ATC
  • Makes plant announcement about ABN-19 entry (may be performed by BOP)

Terminus: RBCCW Pump 1-2 has been manually started ILT 13-1 NRC Scenario 1 Page 13 of 27

ILT 13-1 NRC Scenario 1 (New)

Notes/Comments ILT 13-1 NRC Scenario 1 Page 14 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No. : NRC Sim 1 Event No.: 6 Event

Description:

The standby (second} RBCCW PurQQ. trips resulting in a loss of all RBCCW flow [Trigger 7]

Initiation: RBCCW Pump 1-2 has been manually starte d, or as directed by the Lead Examiner Cues: Annunciators C4c, RBCCW PUMP 1-2 TRIP; E7' d, E7f, F7b, F7d, F7f, CCW FLOW LO for all Recirculation Pumps; Time Position Applicant's Act ions or Behavior SRO

  • Recognizes a loss of all RBC CW flow has occurred and enters ABN-19
  • May direct tripping all Recirc ulation Pumps
  • Trips all operating Recirculati on Pumps lAW ABN-19
  • Depresses both MANUALS CRAM pushbuttons
  • Places the REACTOR MOD E SELECTOR switch in SHUTDOWN
  • Places ROPS in BYPASS
  • Places recirculation flow to rn inimum
  • Inserts IRMs ILT 13-1 NRC Scenario 1 Page 15 of 27

ILT 13-1 NRC Scenario 1 (New)

  • Starts the standby CRD Pum p with its control switch to START
  • Resets the scram by pressin1g tlhe SCRAM SYSTEM RESET pushbutton, or directs the EC>to close the CRD Charging Header Isolation Valve V 52 [ROLE PLAY]

ROLE PLAY: To close the CRD Charging Header Isola tion Valve V-15-52, INSERT Trigger 9. Report when complete.

  • Places the REACTOR MODl::SELECTOR switch in REFUEL
  • Places the ROD WORTH Ml NIMIZER keylock in BYPASS
  • Places the CRD DRIVE WATER PRESSURE CONTROL NC18 switch to CLOSE
  • Places ROD POWER to ON
  • Selects a control rod by pres sing the associated pushbutton on the ROD DISPLAY MAT~ux CRITICAL TASK 1
  • Places the ROD CONTROL *switch to ROD IN
  • Places ADS TIMER switche sin BYPASS when directed Crew
  • Performs SP-16 to bypass tl1e LO-LO MSIV isolation
  • Obtains 4 EOP plugs
  • In the EOP BYPASS PLUG:3 Panels in the rear of 6R & 7R:
  • Places plugs into BP1 & BP:2
  • Places the ISOL SIGNAL BYPASS V-6-395 switch to BYPASS
  • Controls RPV water level in the desired band using:

0 Feedwater Regulating Valves 0 Feedwater Regulating Valves Block valves 0 Feedwater Low Flow'Jalves 0 Heater Bank Outlet ls1:::>lation Valves 0 Feedwater & Conden,sate Pumps

  • When directed by the SRO, controls RPV water level as directed following entry into RPV Control - no A TWS
  • Reports entry into RPV Con trol - No A TWS on low RPV water level ILT 13-1 NRC Scenario 1 Page 16 of 27

ILT 13-1 NRC Scenario 1 (New)

  • When RPV level begins to rise following the scram, then performs the following:
  • Trips 2 Feed Pumps with their control switches
  • Places all MFRVs in MANUAL
  • Enters SP-2 (Cond/FW) when directed
  • Controls RPV water level usin!J the following as necessary:
  • Main Feed Regulating ValvH (IIIIFRV) Block valves
  • Heater Bank Outlet Isolation valves
  • If an RPV isolation occurred (due to reaching RPV Lo-Lo Level post scram), directs the Crew to maintain RPV pressure (approximately) 800- 1000 psig using the Isolation Condensers (SP-11) and/or EMRVs (SP-12) (may be performed by BOP)

Terminus: The reactor is scrammed, all Recirculation Pumps are tripped, and RPV water level and pressure are under control Notes/Comments

,--------------------------~~-----------~

ILT 13-1 NRC Scenario 1 Page 17 of 27

ILT 13-1 NRC Scenario 1 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 1 Event No.: 7 Event

Description:

Large steam leak in the Drvwell [Trigger 11] with eight control rods failing to insert Initiation: The reactor is scrammed, all Recirculation Pumps are tripped, and RPV water level and pressure are under control, or as directed by the Lead Examiner Cues: Drywell pressure and temperature rising; Annunciators C3f, DW PRESS HI/LO; C1f, C2f, DW PRESS HI-HI Time Position

~~~~~~~~~9=~~~~~~~~~~=-

Applicant's Actions or Behavior J

Crew

  • Reports DW pressure rising

&

  • Reports EOP entry on high Drywell pressure and temperature ATC)
  • Performs SP-1 (Verifications)
  • Lines up Drywell Sprays IAV\1 SP-29 o Confirms all Recirculation Pumps are tripped o Trips all Drywell Recirculation Fans by placing their control switches to OFF
  • Initiates Drywell Sprays lAW SP-29 o For DW Spray System 1(2)
  • Places the SYSTEM MODE SELECT switch to the CRITICAL TASK 2 DW SPRAY positiion
  • Verifies TORUS CLG DISCHARGE valve closes
  • Verifies DW SPRAY DISCHARGE valve opens
  • Confirms the SYSTEM MODE SELECT switch is in the DW SPRAY position
  • Verifies TORUS CLG DISCHARGE valve is closed
  • Verifies DW SPRAY DISCHARGE valve is open
  • Starts and ESW PUMP by placing its control switch in START
  • Places and holds the SYSTEM 1(2) PUMPS START PERMISSIVE keylock to the pump to be started
  • Maintains DW Pressure between 4-12 psig

~~~~~~~~~~~~----------------

ILT 13-1 NRC Scenario 1 Page 18 of 27

ILT 13-1 NRC Scenario 1 (New)

  • Maintains RPV water level in the desired band 138" - 175" lAW SP-2 (FW/Cond) and/or SP-3 (CRD)
  • Maintains RPV Pressure in t he band directed by the SRO SRO
  • May reduce the RPV pressu re band to approximately 500-700 psig due to the leak
  • If RPV pressure falls < 500 ~>Si!~. informs the crew the Yarways are no longer avail<:ible for RPV level indication
  • Directs entry into Primary C ontainment Control EOP and re-entry into RPV Control - no ,A.TWS (high OW Pressure)
  • Directs entry into ABN-36 wt1en the LOOP occurs
  • Before bulk Drywell tempera ture reaches 281°F:

0 Verifies Drywell tempera ture/pressure within the CSIL Curve 0 Verifies Torus water Ieve~I< 348" 0 Directs lineup of Drywell Sprays lAW SP-29

  • When it is determined Drywell temperature cannot be maintained below 281°F, directs initiation of Drywell Sprays CRITICAL TASK 2

()R

  • When Dryweii/Torus pressure reaches 12 psig, directs initiation of Drywell Sprays IAVV SP-29
  • May Anticipate ED (using Tu rbine Bypass Valves and/or Isolation Condensers)

FLOOR: Raise the steam leak at the Lead Examiners Discresion Terminus: Drywell Sprays have been initiated and Drywell pressure is lowering Notes/Comments ILT13-1 NRCScenario1 Page 19 of 27

ILT 13-1 NRC Scenario 1 (Ne1w)

Op-Test No.: 13-1 NRC Scenario No .: NRC Sim 1 Event No.: l! I Event

Description:

CRD Flow Control Valve fails closed ffiigger 13]

Initiation: When the SECOND Control Rod that faile d to manually insert post scram, or as directed by the Lead Examiner, insert Trigger 13 Cues: Annunciator H5c, CRD HIGH TEMP; DRIVE WA.TER FLOW, COOLING WATER FLOW, CLG WTR/REACTOR LlP, & DRIVE WTR/REA. CTOR LlP go downscale Time Position Applicant's Actions or Behavior I I I Crew

  • Reports abnormal CRD indi cations .
  • Reports the CRD FCV (NC~WA) indicates closed .
  • May direct the EO to investi gate the failed CRD FCV [ROLE PLAY 1].
  • Enters ABN-6, Control Rod Malfunctions, section 13, Flow Control Valve NC-30A!B Fa ils Closed.
  • Places CRD FCV NC30B in service lAW procedure 302.1, section 6.3.3.

0 Places the CRD FLOW CONTROLLER in MAN.

0 Directs the EO to open t he standby FCV inlet/outlet valves

[ROLE PLAY 2].

0 Directs the EO to place the 4-Way Valve in position to supply both controllers [IROLE PLAY 3].

0 Places the CRD FLOW CONTROL VALVES switch to the B position.

0 Directs the EO to place the 4-Way Valve in position to supply the in-service cor1troller [ROLE PLAY 4].

0 Verifies normal CRD ind ications.

0 Places the CRD FLOW CONTROLLER in AUTO.

0 Directs the EO to close 1: he failed FCV inlet/outlet valves

[ROLE PLAY 5].

  • Reports the standby CRD F<~Vis in service and indications are normal.
  • May continue in EMG-SP21 and attempt to reset the scram and re-scram. This is unsuccessful.
  • May continue in EMG-SP21 and attempt to scram each rod by their individual scram test switches. This is a success path.

CRITICAL TASK 1

  • Manually drives all rods that failed to scram to less than ILT 13-1 NRC Scenario 1 Page 20 of 27

ILT 13-1 NRC Scenario 1 (New) position 04 Crew

  • Announces entry into ABN- 6, c.Jontrol Rod Malfunctions, due to CRD FCV NC30A failing 'clo sed.
  • May check CRD Temperatu res on Panel 8R and report there are several control rods with high temperatures.

SRO

  • Directs entry into ABN-6, Ccmt rol Rod Malfunctions, due to CRD FCV NC30A failing clo se d.
  • May directs swapping CRD FC Vs lAW procedure 302.1, section 6.3.3.
  • Notifies the SMMIWM abou tU1e failed CRD FCV.

CRITICAL TASK 1

  • Directs inserting all rods tha t fa iled to scram to less than position 04 ROLE 1. When/if asked as the EO to investigate t he in-service CRD FCV (NC30A),

PLAY report that it is closed, was leaking air badly. , and that you have isolated the air supply to the valve.

2. (Step 6.3.3.1.1.2.b) When/if asked as th eE:o to open the standby CRD FCV inlet/outlet valves, insert Trigger 15a nd report the valves OPEN (V-15-1 8' v-1 5-19).
3. (Step 6.3.3.1.1.3) When/if asked as the EO to place the 4-Way Valve in position to supply both controllers, state it is in the position to supply both controller (NO booth actions are require d).
4. (Step 6.3.3.1.1.5) When/if asked as the EO to place the 4-Way Valve in position to supply the in-service controlle rs tate it is in the position to supply NC30B (NO booth actions are rec~ui red).
5. (Step 6.3.3.1.1.8.a) When/if asked as th eE:o to close the failed FCV inlet/outlet valves, state the valves are cl OS ed insert Trigger 17 (closes V-15-16, V-15-17).

ROLE The ONLY success paths lAW SP-21 (Hy draulic A TWS) are to manually PLAY drive all rods in after the Crew swaps CRD Flow Control Valves or scram each rod with their individual scr*am test switches on Panel SR.

If the Crew requests an EO to Vent the CRI) ( )ver-Piston volume inform NOTE them V-15-24 and V-15-25 are mechanical! ys.*eized and cannot be operated.

Terminus: CRD FCV NC30B is in service and CRD pa1*am eters indicate normal and the Crew insert all control rods to less than posi tio n 04.

ILT 13-1 NRC Scenario 1 Page 21 of 27

ILT 13-1 NRC Scenario 1 (New)

Procedures Used Event Procedure 1

  • 302.2
  • ABN-6 3
  • 307, section 7 and Attachment 307-15
  • ABN-51
  • RAP-C9XF4a
  • ABN-19
  • ABN-19
  • ABN-1

ILT 13-1 NRC Scenario 1 (New)

  • ABN-36 8
  • ABN-6
  • 302.1 ILT 13-1 NRC Scenario 1 Page 23 of 27

ILT 13-1 NRC Scenario 1 (New)

Simulator Setup

1. Reset to IC-151. Password: 2014iltnrc
2. Verify B & C MFRVs are in MAN and closed
3. Have a copy of 302.2, 201, & 402.2 for the applicants
4. Place Air Compressor #3 in PTL and hang tag
5. Have a copy of Scenario 1 pull-sheets (SequencH Step Numbers 9-11 completed through step 10 and rod 34-15 of step 10) in yellow. Place in binder in simulator in front of Step 8 (or hand to students as part of their pre-scenario brief).
6. Verify the RWM is in BYPASS and tagged OOS
7. Verify Nls are on IRMs Event Trigger Malfunction 1 NA NA

-~------------1 2 Preset- MAL-CRD007-*26-23

  • NOTE: DE LETE this malfunction when the Applicar1t raises CRD drive pressure th1~ 1st time to rod 26-23 lAW ABN-6. (See Booth actions for Event 2).

3 T1-

  • IMF-ANN-C -6B
  • ICH-ICSOO~~ A from 7.2' to 0' over a 3-minute ram1J This will cause IC B shell water level indication to lower to 0' over a 3-minute period. Note th at this malfunction set to lower to 0' will !Jive an indication on Panel 1F/2F of 0'.

4 T3- MAL-EDS004B

  • Loss ofVM cc 182 5 TS- MAL -RBCOO 1A ILT 13-1 NRC Scenario 1 Page 24 of 27

ILT 13-1 NRC Scenario 1 (New)

  • Trips RBCC W Pump 1-1 6 T7~ MAL-RBC001 B
  • Trips RBCC,W Pump 1-2 T9~ LOA-CRD024 t oO
  • This closes CRD Supply Water Valve to Charging \Arat13r Header valve V-15-52 7 Preset~ MAL-CRD022- ~223, 0231,2251,3051, 5031, 5023, 30 03,2203
  • This will res ult in eight control rods failing to sc1ram Preset~ hwx03i271 s.eq .1
  • This will act ivate Trigger 11 when the Mode Switc h is taken to SHUTDOWN SWI-CASO 11 t(:>OFF Preset~
  • This fails th e ARI Normal/Bypass switch in thE~ NORMAL position so the only succes s path to drive rods is swapping th e failed CRD flow control valve in Evemt #8 or opening individual scram test~;witches for the rods that failed to scrarn MAL-NSS017B to 10% over 20 minutes Conditional with a 2-minute time delay T11 ~
  • This will ca use a steam leak in the Drywell 8 T13 ~ MAL-CRD001 A to 0
  • This closes CRD FCV NC30A ILT 13-1 NRC Scenario 1 Page 25 of 27

ILT 13-1 NRC Scenario 1 (New)

T13--+ MAL-ANN-H-5C to ON on a 30 sec time delay LOA-CRD012 to *1 T15--+

LOA-CRD0111:o *1

  • This opens the alternate FCV NC30B inlet/outlet valves.

LOA-CRD009 to 0 T17--+

LOA-CRD01 0 to 0

  • This closes the failed FCV NC30A inlet/outlet valves ILT 13-1 NRC Scenario 1 Page 26 of 27

ILT 13-1 NRC Scenario 1 (New)

Shift Turnover Current plant conditions:

  • 2% power with mode switch in STARTUP
  • Air Compressor #3 is tagged OOS
  • Steam chest warming is in progress Shift Activities
  • Continue with rod withdrawal. Complete step 10 Group 3-1 starting at rod 34-39.

When rod pulls are complete wait for further direction from Reactor Engineering.

Timing of rod position 00-02 is not required and Continuous Rod Withdrawal is allowed per Reactor Engineering.

ILT 13-1 NRC Scenario 2 (New)

Scenario Outline Facility: Oyster Creek Scenario No.:~ Op Test No.: 13-1 NRC Examiners: Operators:

Initial Conditions:

  • 97% power
  • Main Generator voltage control is in Manual Turnover:
  • Place the AVR in automatic service lAW 336.1, section 8, starting at Step 8.2 Event No. Malf. No. Event Type* Event I I I I Description I

1 N/A N BOP Return the AVR to service lAW 336.1.

MAL-2 MSS005A c BOP Trip of Steam Pc:1cking Exhauster 1.

MAL-NIS020F I ATC APRM 6 fails upscale with a failure of Y2 scram on 3 RLY-RPS003B, TS SRO RPS 2.

0048 4

MAL- c BOP Trip of USS 1A3.

EDS003C TS SRO 5

ICH- c Turbine high vibration requiring a manual scram.

TSI15A, ATC TSI014A R MAL-CFW012B Feedwater line break with failure of Feedwater check SRV-6 CFW002B M Crew valves and loss of all Feedwater and Condensate SRV- Pumps.

CFW003B VLV-7 CSS004, 006, 011' c Crew Failure of Core Spray Isolation Valves to auto open.

012 (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Transient, {TS) Tech Specs ILT 13-1 NRC Scenario 2 Page 1 of 25

ILT 13-1 NRC Scenario 2 (New)

Simulator Summary Event Event Summary 1 The BOP will return the AVR to automatic service lAW 336.1. The BOP will place the AVR MODE Switch to the AUTO position and confirm indications voltage regulation is in automatic. (BOP: Normal Evolution) 2 The BOP will respond to the failure of the in-service steam packing exhauster. The BOP will start the standby Exhauster and throttle open its discharge valve to maintain the correct vacuum. (BOP:

Component Malfunction) 3 APRM 6 will fail high with no expected % scram on RPS 2. The SRO will direct entry into ABN-39, RPS Failures. The ATC will insert a manual %scram on RPS 2. The SRO will apply Tech Spec 3.1.1.

(ATC: Instrument Malfunction; SRO: Tech Spec) 4 The BOP will respond to a loss of USS 11\3 and execute ABN-46, Loss of USS 1A3. The BOP will start Service Water Pump 1-2, restore power to ER-42, and confirm HP Screen Wash Pump 1-2 and LP Screen Wash Pump 1-4 are runnin~~- The SRO will review and apply Tech Spec 3.7. (BOP: Component Malfunction; SRO: Tech Specs) 5 The crew will respond to turbine VIBRATION HI annunciator and recognize rising bearing vibrations to the level that requires a power reduction and manual scram. The ATC will manually scram the reactor and BOP will confirm trip of the turbine. ABN-1, Reactor Scram, and ABN-10, Turbine Trip, procedures will be entered. The crew will be required to open the Main Condenser Vacuum Breaker to mitigate the turbine high vibration.(ATG: Component Malfunction; ATC: Reactivity Manipulation) 6 The crew will respond to a large Feedwater line break compounded with the failure of the Feedwater isolation check valves. The crew will enter the RPV Control- no ATWS EOP. During the event, all condensate and feedwater pumps will trip. The crew will Emergency Depressurize (ED) if RPV water level reaches 0" OR lower RPV pressure to allow low pressure systems to inject. (Crew: Major Evolution) (PRA)

ILT 13-1 NRC Scenario 2 Page 2 of 25

ILT 13-1 NRC Scenario 2 (New) 7 The crew will respond to the failure of the Core Spray Parallel Isolation valves to automatically open. The valves will open manually from their control switches on panel1 F/2F. (Crew: Component Malfunction After EOP) (PRA)

Critical The crew must manually scram the reactor on Turbine High Vibration.

Task 1 An automatic scram may not occur ancl turbine damage may result in entry into Emergency Action Levels for a loss of the primary decay heat removal mechanism.

Critical The SRO will direct Emergency Depressurization when RPV water Task 2 level reaches 0" TAF provided at least one injection source is lined up and running OR with low pressure injection systems running that have the capacity to restore and maintain RPV water level the SRO will direct lowering RPV pressure as necessary to allow low pressure systems to inject.

Critical The crew recognizes that the Core Spray Parallel Isolation Valves Task 3 failed to automatically open at- 300# reactor pressure and manually opens at least one valve in each Core Spray system to allow Core Spray to inject into the RPV to restore RPV water level above T AF.

ES-301-4 Target Quantitative Actual Event Attributes Attributes Number(s)

1. Total malfunctions (5-8) 6 2-7
2. Malfunctions after EOP entry (1-2) 1 7
3. Abnormal events (2-4) 3 3-5
4. Major transients (1-2) 1 6
5. EOPs entered/requiring substantive 2 6 actions (1-2)
6. EOP contingencies requiring substantive 1 6 actions (0-2)
7. Critical tasks (2-3) 3 5-7 ILT 13-1 NRC Scenario 2 Page 3 of 25

ILT 13-1 NRC Scenario 2 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRCSi m 2 Event No.: 1 Event

Description:

Return the AVR to service lAW 3:~6.1.

Initiation: Following shift turnover Cues: As directed by the SRO following shift turnover Time Position Applicant's Actions or Be havior SRO

  • Directs the BOP to shift 1from manual to automatic voltage regulation lAW 336.1, section 8, startin gat Step 8.2 BOP
  • Shifts from manual to automatic voltag e regulation lAW 336.1, section 8, step 8.2.

0 Verifies the EX2100e TRANSFER VOLTMETER (8F/9F) is reading Zero (+/- 1°/c>)

0 Places the AVR MODE Switch (AV R\97CS Panel 8F/9F) to the AUTO position and allow swit ch to return to center.

(Panel 8F/9F) 0 Confirms the AUTO light illuminate d above AVR MODE Switch. (AVR\97CS Panel 8F/9F) 0 Confirms the PSS Status is Enable d locally at the HMI ROLE PLAY: As the EO at the HMI, report that the PSS is active (336.1 step 8.5) 0 Removes VOLTAGE CONTROL IN MANUAL operator aids installed per Section 7.0.

0 May verify Terminal Voltage or Exci tation are within the requirements of 336.1, section 5.0, on the PJM website.

[FLOOR ROLE PLAY]

FLOOR ROLE PLAY: If the applicant requests (or attempts to ver ify on the PJM website) that Terminal Voltage or MG Excitation (VARS) are within the limits of section 5.0, inform them that the requirements of section 5.0 are satisfacto ry.

0 May notify the Power team when in auto Terminus: The AVR is in automatic voltage control ILT 13-1 NRC Scenario 2 Page 4 of 25

ILT 13-1 NRC Scenario 2 (New)

Notes/Comments ILT 13-1 NRC Scenario 2 Page 5 of 25

ILT 13-1 NRC Scenario 2 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 2 Event No.:~ I Event

Description:

Trir;2 of Steam Packing Exhauster 1 [Trigger 1]

Initiation: The AVR is in automatic voltage control, or as directed by the Lead Examiner Cues: Annunciator Q8c, EXHAUSTER TRIP Time Position Applicant's Actions or Behavior BOP

  • Responds to annunciator Q8c, EXHAUSTER TRIP 0 Reports Exhauster Bllower 1 has tripped 0 Verifies gland steam prBssure 0 Closes Exhauster Blower 1 Valve V-7-38 0 Starts Exhauster Blower 2 and verifies the red light on 0 Throttles open Exhauster Valve 2 V-7-39 0 Adjusts Exhauster Valve 2 V-7-39 to maintain GLAND STM HEADER VACUUM at 15- 17.5 inches of water 0 Reports Exhauster B!lower 2 is in service
  • Directs EO to investigate the trip of Exhauster Blower 1 [Role Play]
  • As the EO sent to investigate the trip of Exhauster Blower 1, report there are indications of an overload on the breaker.

ROLE PLAY

  • May send an EO to the Turbine Building operating floor to investigate; report as the EO you are on the TB operating floor.
  • May have RP check radiation levels on the Turbine Building operating floor; acknowledge the report.

SRO

  • Notifies SMNVWM for repair
  • May direct condenser vacuum as key parameter
  • May evacuate the TB operating floor Terminus: Exhauster Blower 2 has been started and proper gland steam header vacuum is established ILT 13-1 NRC Scenario 2 Page 6 of 25

ILT 13-1 NRC Scenario 2 (New)

Notes/Comments ILT 13-1 NRC Scenario 2 Page 7 of 25

ILT 13-1 NRC Scenario 2: (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 2 Event No.:~

Event

Description:

APRM 6 UQscale Failure with no RPS 2% Scram [Trigger 3]

Initiation: Exhauster Blower 2 has been started and proper gland steam header vacuum is established, or as directed by the Lead Examiner Cues: Annunciators G2f, APRM HIHIIINOP II; G3f, APRM HI; APRM 6 indicates 150 with the HI-HI and HI lights on Time Position Applicant's Actions or Behavior I

-~

ATC

scram should have occurred 0 Checks the following:

0 recirculation flow 0 feedwater flow and temperature 0 reactor pressure 0 reactor water level

  • May Bypass APRM 6 lAW 403 if directed SRO
  • Directs entry into ABN-39, RPS Failures and directs the ATC to insert a %scram on R.PS 2 (may direct inserting a %scram prior to referencing ABN-39)
  • Reviews Tech Spec 3.1 and verifies RPS 2 and APRM 6 are in the tripped condition and meeting their design function
  • Notifies SMNVWM for the APRM and RPS failures
  • Notifies the Director of Ope~ rations I SM I RE
  • Determines no other action is currently required
  • Makes plant page for entry into ABN-39, RPS Failures ILT 13-1 NRC Scenario 2 Page 8 of 25

ILT 13-1 NRC Scenario 2 (New)

  • May verify APRM 6 indic ation on Panel 5R Terminus: RPS 2 is tripped and the SRO has revie wed/applied the Tech Specs Notes/Comments ILT 13-1 NRC Scenario 2 Page 9 of 25

ILT 13-1 NRC Scenario 2 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 2 Event No.: 4 Event

Description:

Loss of 480 VAG Bus USS 1A3 [Trigger 5].

Initiation: RPS 2 is tripped and the SRO has reviewed/applied the Tech Specs, or as directed by the Lead Examiner.

Cues: Annunciators S8f, FOR TO 460V 1A3 TRIP, and U5a, 1A3 MN BRKR TRIP Time Position Applicant's Actions or Behavior BOP Per RAPs S-8-f, FOR TO 460V 1A3 TRIP, and U-5-a, 1A3 MN BRKR TRIP (NOTE: Applicant may directly enter and execute ABN-46 instead of RAP).

  • Checks Breaker position and Bus amps
  • Has EO check at the local breaker cubicle for relay targets
  • Verifies trip of 4160V Breaker 1A3P
  • Refers to ABN-46
  • Checks Bus loads have shed
  • Determines cause of Breaker trip [BOOTH]

BOOTH: When requested to investigate cause of USS 1A3 trip, report that the 1A3P breaker tripped on overload Per ABN-46, LOSS OF USS 1A3:

IMMEDIATE OPERATOR ACTIONS

  • Has an EO restore power to Panel ER-42 [BOOTH]

BOOTH: When requested, insert LOA-CWS0049 to B31 (Trigger 7) to restore power to B31. Report to Control Room when complete. (ABN-46 step 4.2.1)

ILT 13-1 NRC Scenario 2 Page 10 of 25

ILT 13-1 NRC Scenario 2 (New)

  • Has an EO confirm HP Screen Wash Pump 1-2 and LP Screen Wash Pump 1-4 are running [BOOTH]

BOOTH: NOTE: Screen Wash Control Panel and Low Pressure Screen Wash pumps are not modeled. When requested to confirm HP Screen Wash Pump 1-2 and LP Screen Wash Pump 1-4 are running, report they are both running. May request EO to check intake dp.

  • Monitors North intake DP, Circ Water pump amps and main condenser vacuum
  • Notifies Security of the loss of security lighting at the intake
  • Requests Work Week Manager to mobilize Electrical Maintenance for troubleshooting and repair ATC
  • May assist in communications associated with execution of RAPs and ABN-46 SRO
  • Directs entry into ABN-46, Loss of USS 1A3
  • Determines that USS 1A3 is inoperable per Tech Spec 3.7 and determines that the plant must be placed in the cold shutdown condition Terminus: ABN-46 has been performed and the SHO has addressed Tech Specs.

Notes/Comments ILT 13-1 NRC Scenario 2 Page 11 of 25

ILT 13-1 NRC Scenario 2 (New)

Op-Test No.: 13-1 NRC Scenario Nc).: NRC Sim 2 Event No.: .§.

Event

Description:

Turbine VIBRATION HI annunci'ato r reguiring a manual scram

[Trigger 9] (See Lead Evaluator Cue below}

Initiation: ABN-46 has been performed and the SRC) h as addressed Tech Specs., or as directed by the Lead Examiner Cues: Annunciator Q3b, VIBRATION HI; Turbine be ari ngs 6 and 7 vibrations rising Time Position Applicant's Ac~tions or Behavior BOP

  • Responds to annunciate rQ 3b, VIBRATION HI 0 Reports turbine beari ng vibration levels 0 Reports Bearing 6 at 10 mils and rising and bearing 7 at 10 mils and rising. Rep arts that the RAP requires a manual turbine trip at: ar1y level > 12 mils LEAD EVALUATOR: IF the simulator fails to provid1ei ndications of Turbine mils rising, THEN inform the crew that Bearing 6 & 7 are at 10 rnil sand steady. After the ATC lowers power, inform the crew that BearinQ 6 & 7 are 13 mils and risinQ.
  • Controls RPV water leve Ia s directed following the scram 0 Reports entry into R PV Control - No A TWS on low RPV water level 0 When RPV level begi ns to rise following the scram, then performs the followin!g:

0 Trips 2 Feed Pum ps with their control switches 0 Places all MFRVs in MANUAL 0 Closes all MFRVs 0 Directs the EO to clo se CRD Supply Water Valve to Charging Water He a der valve V-15-52 [ROLE PLAY]

ROLE PLAY: As the EO directed to close CRD Sup ply Water Valve to Charging Water Header valve V-15-52, insert Trigger 30. Report wh en complete.

0 Enters SP-2 (Cond/Fw) when directed 0 Controls RPV wat:er level using the following as necessary:

0 Feedwater Re gu lating valves 0 Main Feed Re gu lating Valve (MFRV) Block valves 0 Feedwater LmNF~low valves ILT 13-1 NRC Scenario 2 Page 12 of 25

ILT 13-1 NRC Scenario 2 (New) o Heater Bank Outlet Isolation valves o Feedwater and Condensate pumps

  • Performs SP-1 as directed
  • Makes plant announcement for reactor scram SRO
  • Directs the ATC to reduce reactor power with Recirc Flow

[Lead Evaluator I Booth - Raise turbine vibration lAW the NOTE on page 22]

CRITICAL TASK 1

  • Directs the ATC to manually scram the reactor lAW ABN-1
  • Directs entry into RPV Control - No A TWS o Directs the Crew to maintain RPV water level 138" - 160" using SP2 (Cond/FW) and/or SP3 (CRD) o Directs the Crew to maintain RPV pressure (approximately) 800 -- 1000 psig using the Isolation Condensers (SP-11) and/or EMRVs (SP-12) o May direct pressure control on TBV before Vacuum Breaker is opened lAW ABN-10 and if an RPV isolation has not occurred
  • Directs entry into ABN-1 0, Turbine Trip o Directs main condenser Vacuum Breaker, V--2-44 opened NOTE: When V-2-44 is opened, The Main Turbine vibration (high mils) malfunction will automatically be deleted (return to normal) AND Event #7 will initiate.
  • Directs SP-1 (Confirmation of Automatic Initiations and Isolations) 1f------t-----+-----------*-*-----------*-----

ATC

  • Reduces power with Rec:irc Flow prior to reaching 12 mils on bearing 6 or 7 [BOOTH]

CRITICAL TASK 1

  • Scrams the reactor lAW ABN-1 o Depresses both Manual Scram Pushbuttons o Places the Reactor IVIode Selector switch in SHUTDOWN o Verifies all control rods fully inserted o Reports immediate scram actions complete
  • Performs ABN-1 0, Turbine Trip o Verifies turbine valves closed o Verifies 230 KV breakers open o Verifies GENERATOR FIELD BREAKER open o Verifies plant loads supplied by Startup Transformers

~---~---~------------

ILT 13-1 NRC Scenario 2 Page 13 of 25

ILT 13-1 NRC Scenario 2 (New) 0 Confirms CLOSED HWC H2 Inlet Isolation Valve, V-567-005 0 Requests SRO confirmation to open main condenser Vacuum Breaker, V-2 -44 0 Opens main cond enser Vacuum Breaker, V-2-44 with its control switch 0 Starts the Auxiliary 0 il Pumps 0 Starts the Turbine Be aring Oil Lift Pump

  • Performs SP-11 (ICs) an d/or SP-12 (EMRVs) to maintain RPV pressure as directe d 0 SP-11 (ICs) 0 Trips Recirculatio n Pump A for use with IC-A (or Recirculation Purr1p E for use with IC-B) 0 Verifies RPV water level < 160" 0 Cycles Condensa te Return Valve V-14-34 as necessary to mair1tain RPV Pressure with IC-A (or V-14-35 for IC-B) 0 SP-12 (EMRVs) 0 Verifies Torus water level is > 90" 0 Places one or mo re EMRV control switch in the MAN position, then bac k to AUTO Terminus: The reactor is scrammed, the main coneJenser vacuum breaker is open, and RPV water level and pressure are unde1*control Notes/Comments

,.--------'--'---------'------'-------------------------~---

ILT 13-1 NRC Scenario 2 Page 14 of 25

ILT 13-1 NRC Scenario 2 (New)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 2 Event No.: 617 Event

Description:

Feedwater line break in the Turbine Building with the failure of Feedwater Check Valves and the loss of all Condensate/Feedwater Pumgs

[Automatically initiates when V-2-44 is opened in Event #6]. Core Spray Parallel Isolation Valves fail to automatically open.

Initiation: The reactor is scrammed, the main condenser vacuum breaker is open, and RPV water level and pressure are under control, or as directed by the Lead Examiner Cues: Feedwater Flow rises greater than Steam Flow; Annunciators P2f, CONDENSER BAY 1-2 LEVEL HI; J8c, FCS/RFRC TROUBLE; P3f, PUMP ROOM 1-3 LEVEL HI; Feedwater flow rising; Annunciator J8a, TRUNNION ROOM TEMP HI; Turbine Building 6P goes positive; Annunciatots K1 b, K2b, K3b, PUMP A, B, C TRIP Time Position Applicant's Actions or Behavior Crew

  • Responds to Annunciators P2f, CONDENSER BAY 1-2 LEVEL HI 0 Directs an EO to perform the following:
  • Verify level locally
  • Verify pumps are in AUTO
  • VERIFY pump discharge valves are open [ROLE PLAY]

ROLE PLAY: As the EO directed to investigate the Condenser Bay hi level, report the following: all pumps are in AUTO and operating, pump discharge valves are open, and level is 36" water column and rising. Also report there is water raining down from the ceiling in the Feed Pump Room (this is also stated on Page 15 but should be promptly reported to the Control Room).

  • Responds to annunciator JBc, FCS/RFRC TROUBLE 0 Checks for feed pump runout condition and feed/steam flow 0 Reports feedwater flow is rising and A/C MFRVs are opening further
  • Responds to annunciator J8a, TRUNNION ROOM TEMP HI 0 Reads individual readouts of tunnel temperature on Panel 1OR and reports 0 Monitors Trunnion Room temperatures ROLE PLAY: When directed as the EO to perform in-plant SP-3 actions, insert Trigger
13. Report when complete.

ILT 13-1 NRC Scenario 2 Page 15 of 25

ILT 13-1 NRC Scenario 2 (New)

  • Responds to annunciators K1 b, K2b, K3b, PUMP A, B, C TRIP o Reports all Condensate and Feedwater Pumps tripped o Dispatches EO to investigate [ROLE PLAY]

ROLE PLAY: When directed as the EO investigate the loss of Condensate/Feeedwater Pumps, report that water is raining down from the ceiling in the Feedwater Pump Room.

  • Reports RPV water level lowering
  • Reports RPV water level low-low (90")
  • Bypasses ADS by placing ADS TIMER keylock switches to BYPASS
  • Performs SP-7 o Starts a SLC Pump by placing key into the STANDBY LIQUID CONTROL keylock and rotating to FIRE SYS 1 or FIRE SYS 2 o Verifies proper indications o Reports SLC injecting lAW SP-7
  • Bypasses ADS Timers
  • Initiates Isolation Condensers for Level Restoration (cycles IC DC Condensate Return Valves open then closes them)
  • Performs SP-9 (Core Spray) o Verifies Core Spray suction valves open o Confirms closed Core Spray Test Flow Return valves o Confirms one Core Spray Main pump operating in each Core Spray System o Confirms one Core Spray Booster pump operating in each Core Spray System o Confirms open Core Spray Discharge valves o When RPV pressure is< 305 psig, recognizes/reports Core Spray Parallel Isolation Valves did not open as expected CRITICAL TASK 3 o Manually opens all Core Spray Parallel Isolation Valves by placing their control 8witches to OPEN (Critical Task)
  • Reports Core Spray injecting ILT 13-1 NRC Scenario 2 Page 16 of 25

ILT 13-1 NRC Scenario 2 (New)

  • Reports RPV water level rising
  • Lowers RPV pressure by opening some EMRVs by placing CRITICAL TASK 2 AUTO DEPRESS VALVI::switches to MAN (or all available EMRVS to ED) or with Isolation Condensers
  • Bypasses ROPS by plac in£1 ROPS in BYPASS, if directed
  • Performs SP-4 0 Presses the OVERRI DE switches that are lit 0 Presses all ACTUATI::D switches 0 Cycles the Parallel Is alation valves as required to maintain RPV water I,eve I
  • Reports Torus Water ten1perature > 95 oF- EOP entry (due to using EMRVs for pres sure control)
  • Performs SP-25 (Torus Cooling) 0 Confirms the SYSTEIVI MODE SELECT switch in TORUS COOLING position 0 Starts the selected E:S'I'J Pump by placing its control switch to START 0 Places and holds the SYSTEM PUMPS START PERMISSIVE keylocl<switch in the selected pump position 0 Starts the selected C ontainment Spray Pump by placing its control switch to START 0 Reports Torus Coolin g is in service SRO
  • Directs RPV pressure co ntroiiAW SP-11 (Isolation Condensers) and/or SP- 12 (EMRVs)
  • May direct a reactor power reduction with recirculation flow or control rods when the ris ing feedwater flow is reported
  • If required, may direct th e following:

0 When Trunnion Room temperature is anticipated to exceed 176° F, directs the ATC to manually scram the reactor lAW ABN-*1 OR enters RPV Control EOP based on conserving RP\I inventory 0 Directs SP-2 (Fee dwater) and SP-3 (CRD) to maintain RPV water level 1:38"- 160" 0 Directs SP-1 (Autc~ Initiation Verification) 0 Directs SP-7 (SLC )

0 With RPV water le ve~ below 61 ":

  • Directs AD~) bypassed
  • Directs lsolc:ition Condensers initiated, then ILT 13-1 NRC Scenario 2 Page 17 of 25

ILT 13-1 NRC Scenario 2 (New) removed

  • Directs lowe~ring RPV pressure as required to allow low pr*essure systems to inject (Critical Task)
  • If RPV wate~r level reaches 0", directs entry into CRITICAL TASK 2 Emergency Depressurization - No A TWS (Critical Ta sk)
1. Direc:ts ROPS bypassed
2. Verif ies Torus water level > 90"
3. Direc:ts all EMRVs open CRITICAL TASK 3 0 Directs RPV water level 100" - 175" with Core Spray lAW SP-4 (Critica I Task)
  • If Torus Temperature ex1:eE3ds 95F, may enter and direct Primary Containment Cc1ntrol EOP on high Torus water temperature 0 Directs Torus Coolin~l initiated lAW SP-25 Terminus: RPV pressure has lowered to allow Core Spray injecting into the RPV and RPV water level is rising.

Notes/Comments ILT 13-1 NRC Scenario 2 Page 18 of 25

ILT 13-1 NRC Scenario 2 (New)

Procedures Used Event Procedure 1

  • Copy of 336.1 handed out 2
  • Copy of REMA handed out 3
  • ABN-29
  • 403
  • 403-2 in 403 book 5
  • ABN-46
  • ABN-10
  • ABN-1
  • 317
  • 317.1
  • 317.4
  • 317.5 ILT 13-1 NRC Scenario 2 Page 19 of 25

ILT 13-1 NRC Scenario 2 (New)

  • ABN-17
  • 202.1 8
  • SP25
  • SP2
  • SP3
  • SP4
  • SP7
  • SP9 ILT 13-1 NRC Scenario 2 Page 20 of 25

ILT 13-1 NRC Scenario 2 (New)

Simulator Setup

1. Reset to IC-115
2. Lower reactor power to 97% with recirc flow
3. Place the AVR in manual voltage control lAW 336.1, section 7
4. Have copy of 336.1 (complete procedure) for applicants; mark step 8.1.1 and 8.1.2 complete
5. Have a blank copy of Attachment 403-2 in the 403 binder
6. Ensure Service Water Pump 1-1 is running and Service Water Pump 1-2 is secured NOTE: If snapping this scenario to 0 (zero), when resetting, the AVR may return to AUTO on reset. The AVR must then be returned to manual.

Event Trigger Malfunction 1 N/A N/A 2 Trigger 1 ~ MAL-MSSO 05A

  • Trips St~3am Packing Blower 1 3 Trigger 3 ~ MAL-NIS02 OF to 150
  • This cau ses APRM 6 to fail upscale Presets RLY-RPSOCl38 RLY-RPSO 048
  • This cau se,s a failure of RPS 2 to %

scram fr om the upscale APRM 6 4 Trigger 5 ~ MAL-EDSO 03C

  • This will insert a loss of USS 1A3 Trigger 7 ~ LOA-CWSO49 to 831
  • This will restore power to ER-42 ILT 13-1 NRC Scenario 2 Page 21 of 25

ILT 13-1 NRC Scenario 2 (New) 5 Trigger 9----+ ICH-TSI015A to 10 mils ICH-TSI014A to 10 mils

  • This creates a high vibration to turbine bearing *7 (10 mils) and bearing 6 (10 mils)

NOTE: Booth change final value of Bearing 6 & 7 to 13 mils on a 3 minute ramp, at the direction of the LEAD EXAMINER, after the ATC reduces recirc flow to lower power.

Trigger 30- LOA-CRD024 to 0

  • This closes CRD Supply Water Valve to Chargin!~ Water Header valve V-15-52 NOTE: The following Presets will delete the high Turbine Vibration when the crew opens V-2-44, Main Condenser Vacuum Breaker AND initiate Event #7 Insert the following Event Trigger (1) and PRESET----+ Command (2) on Trigger 15:
1) hwx05o094r
2) DMF ICH-TSI015A Insert the following Event Trigger (1) and PRESET----+ Command (2) on Trigger 17:
1) hwx05o094r
2) DMF ICH-TSI014A ILT 13-1 NRC Scenario 2 Page 22 of 25

ILT 13-1 NRC Scenario 2 (New)

ILT 13-1 NRC Scenario 2 Page 23 of 25

ILT 13-1 NRC Scenario 2 (New) 7 Preset~ VLV-CSS0111to FAIL AUTO OPEN (for V-20-40)

VLV-CSS004 to FAIL AUTO OPEN (for V-20-15)

VLV-CSS012 to FAIL AUTO OPEN (forV-20-41)

VLV-CSS006 to FAIL AUTO OPEN (for V-20-21)

  • This prevents the auto opening of all Core Spray Parallel Isolation valves, but does allow manual manipulation ILT 13-1 NRC Scenario 2 Page 24 of 25

ILT 13-1 NRC Scenario 2 (New)

Shift Turnover Current plant conditions:

  • 97% power
  • Main Generator voltage control is in Manual Shift Activities:
  • Place the AVR in automatic service lAW 336.1, section 8, starting on step 8.2 ILT 13-1 NRC Scenario 2 Page 25 of 25

ILT 13-1 NRC Scenario 3 (Modified)

Scenario Outline Facility: Oyster Creek Scenario No.: ~ Op Test No.: ~3-1 NRC Examiners: Operators:

Initial Conditions:

  • 95% power
  • EDG-2 is OOS for maintenance
  • Surveillance 636.4.003, Diesel Generator Load Test, is in progress on EDG-1
  • An operator is stationed at EDG-1 for the surveillance
  • All EDG-1 diesel alarms are in their normal state Turnover:
  • Complete surveillance 636.4.003, Diesel Generator Load Test, starting at step 6.7, due to a question of operability (oil sight glass was low on the last shift)

Event No. Malf. No. Event Type* Event I I I I Description I

1 MAL- c BOP Trip of EDG-1 during performance of surveillance DGN004A 636.4.003.

TS SRO MAL- I ATC 2 NIS019_0 BOP LPRM 28-25A upscale failure (input to APRM 4).

18A TS SRO MAL- c ATC 3 CRD005_ BOP Outward drifting control rod (rod 18-11).

18-11 TS SRO 4

MAL-R Fuel failure requiring power reduction with recirc RXS001 ATC flow 5 MAL-M Fuel failure willl increase requiring a reactor scram RXS001 Crew and reactor isolation MAL-ICS002B Isolation Condenser B tube leak with steam valves M

6 VLV- Crew failing to close ~eads to RPV Emergency ICS007, c Depressurization 008

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Transient, (TS) Tech Specs ILT 13-1 NRC Scenario 3 Page 1 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Simulator Summary Event Event Summary 1 The BOP will continue with 636.4.003, Diesel Generator #1 Load Test at step 6.7. One minute after the diesel starts it will trip and the BOP will momentarily place the EDG-1 NOHMAL START switch in the STOP position. Investigation will reveal EDG-1 tripped on an overspeed condition. The SRO will determines a COLD SHUTDOWN CONDITION LCO applies lAW TS 3.7.C.3 due to neither diesel being available. (BOP: Component Malfunction; SRO: Tech Specs) 2 The BOP will respond to an LPRM upscale failure, affecting APRM 4.

The ATC will bypass APRM 4 and reset the Y:z scram and the BOP will bypass the LPRM from the APRM and the alarm circuit lAW procedure 403. Following successful LPRM bypass, the ATC will un-bypass APRM 4. The SRO will verify APRM 4 operability with Tech Spec 3.1. (ATC: Instrument Malfunction; BOP: Instrument Malfunction; SRO: Tech Specs)

The ATC will respond to an outward drifting control rod (rod 18-11 ).

3 The ATC will enter ABN-6 and attempt to drive the rod to its original position. The rod will continue to move out at which time the ATC will drive the rod to position 00. The BOP will manually scram the rod from panel 6XR. The Reactor Building Operator will Isolate the HCU for rod 18-11. The SRO will evaluate TS 3.2.B.4, Reactivity Control, for applicability and determine that it does not apply since there are not more than six control rods inoperable. (ATC: Component Malfunction; BOP: Component Malfunction; SRO Tech Spec) 4 The crew will respond to rising Off-Gas activity and enter ABN-26, High Main Steam/Off-Gas/Stack Effluent .Activity. When the Off-Gas HI HI alarm is received, the ATC will reduce power with Recirculation Flow to attempt to lower Off-Gas activity. (ATC: Reactivity Manipulation) (PRA) 5 The fuel failure will increase and activity will continue to rise and the crew will scram the reactor and shut MSIVs lAW ABN-26, High Main Steam/Off-Gas/Stack Effluent Activity. (Crew: Major)

ILT 13-1 NRC Scenario 3 Page 2 of 20

ILT 13-1 NRC Scenario 3 (Modified) 6 A tube leak will occur in Isolation Condenser B and the steam line will not be able to be isolated. Entry into Radioactivity Release Control EOP. The Shift Dose Assessor will call the control room and report that offsite dose has exceeded that required for a General Emergency. This will require the SRO to direct an Emergency Depressurization from the Radioactivity Release EOP. This will render the EMRVs as the only method available for RPV pressure control. (Crew: Major; Crew: Component Malfunction After EOP)

(PRA)

Critical When Main Steam Line Radiation Monitors are > 800 mr/hr and Off-Task 1 Gas activity is rising OR if the Off-Gas HI HI alarm is received and does not clear within 15 minutes, THEN scram the reactor and manually isolate the reactor if it doesn't isolate automatically.

Critical When a GE from offsite dose has been dl3Ciared, then Emergency Task 2 Depressurize the RPV.

ES-301-4 Target Quantitative Actual Event Attributes Attributes Number(s)

1. Total malfunctions (5-8) 6 1-6
2. Malfunctions after EOP entry (1-2) 1 6
3. Abnormal events (2-4) 2 3-4
4. Major transients (1-2) 2 5-6
5. EOPs entered/requiring substantive 1 5 actions (1-2)
6. EOP contingencies requiring substantive 1 6 actions (0-2)
7. Critical tasks (2-3) 2 5-6 ILT 13-1 NRC Scenario 3 Page 3 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Op-Test No.: 13-1 NRC Scenario No .: NRC Sim 3 Event No.: 1 Event

Description:

Tri12 of EDG-1 during 12erformance<)f surveillance 636.4.003.

Initiation: Following shift turnover Cues: Annunciator T4b, EDG 1 DISABLED; T1b, U ((>UT RELAY TRIP; EDG-1 UNIT START light extinguishes Time Position Applicant's A ctions or Behavior BOP

  • Continues with surveillan ce 636.4.003 at starting at step 6.7.

0 Verifies the following fo r EDG-1:

  • UNIT START and uNIT IDLE lights are extinguished
  • EDG-1 diesel alar ms are in their normal state
  • EDG-1 MODE SE LE_CTOR switch is in the PEAKING position 0 Verifies an operator isstationed at EDG-1 [part of initial conditions]

0 Positions the NORM AL START switch for EDG 1 to the START position NOTE: 45 seconds after starting EDG-1 it will trip.

  • Responds to annunciator T-4-b 0 Positions the NORM AL START switch for EDG 1 to the STOP position (per s te~> 6.10 of surveillance) 0 Directs EO at EDG-1 to investigate cause of the trip.

[ROLE PLAY]

ROLE PLAY: Report that EDG-1 tripped on oven*,pe~ed.

NOTE/CUE: If asked to verify proper operation of th e creepy crank, acknowledge the report and inform them the creepy crank is operati ng properly.

SRO

  • Provides oversight for ED G --1 surveillance .
  • May direct RAP-T4b be performed [may designate T4b as an expected alarm]
  • Declares EDG-1 INOPEF~A BLE.
  • Applies Tech Spec 3.7.C. 3 0 If both diesel generat ors become inoperable during power operation, the reacto rs hall be placed in the COLD SHUTDOWN CONDI Tl ON.

ILT 13-1 NRC Scenario 3 Page 4 of 20

ILT 13-1 NRC Scenario 3 (Modified)

  • Notifies SMNVWM about EDG status Terminus: EDG-1 has been declared INOPERABLE and the SRO has reviewed/applied Tech Specs.

Notes/Comments ILT 13-1 NRC Scenario 3 Page 5 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 3 Event No.: g Event

Description:

LPRM 28-25A upscale failure (input to APRM 4)

[Trigger 3]

Initiation: EDG-1 has been declared INOPERABLE and the SRO has reviewed/applied Tech Specs., or as directed by the Lead Examiner Cues: Annunciators G1c, SCRAM CONTACTOR OPEN; G1d, CHANNEL I; G1f, APRM HI-HI/INOP I; G3f, APRM HI; G6f, LPRM HI; APRM 4 indicates high;LPRM 28-25A indicates high; Annunciator H?a, ROD BLOCK Time Position Applicant's Actions or Behavior BOP

  • BypassesLPRM 28-25A lAW 403 o Obtain permission from the US to bypass an LPRM associated with an APRM o Directs the ATC to bypass APRM 4 o Perform the following for an LPRM detector in an APRM channel:
  • Rotate red input bypass switch in the counterclockwise direction
  • Position alarm bypass toggle switch to BYPASS
  • Verify white BYPASS light Lit
  • Verify amber light Lit adjacent to bypassed detector
  • Verify white INPUT BYP light for the APRM channel Lit
  • Adjusts APRM 4 gain if not within 1%
  • Directs SRO to update Attachment 403-2
  • Notify Reactor Engineer

~------~------~---------------------------------------------

ILT 13-1 NRC Scenario 3 Page 6 of 20

ILT 13-1 NRC Scenario 3 (Modified)

ATC

  • Reports APRM 4 indicate s high with HI and HI-HI lights lit
  • Reports all other APRMs indicate normal
  • Monitors reactor power
  • Bypasses APRM 4 by pia cing the APRM BYPASS to CH 4 prior to bypassing the LF)RM; may reset the% scram at this point
  • Monitors APRM 4 output to insure proper response with the LPRM detector bypasse d when the LPRM is bypassed
  • Un-bypasses APRM 4 after the LPRM is bypassed
  • Directs BOP to bypass A PHM 4 and LPRM 28-25A lAW 403
  • Directs ATC to reset the *1Y2 scram (when APRM 4 is bypassed or after APRM 4 is returr1ed to normal)
  • Notifies Reactor Enginee r, SMIWWM of the event

~~

Notes/Comments ILT 13-1 NRC Scenario 3 Page 7 of 20

ILT 13-1 NRC Scenario 3 (IVIodified)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 3 Event No.:~

Event

Description:

Respond to an outward driftinq control rod (rod 18-11) rTRIGGER 51 Initiation: LPRM 28-25A is bypassed and the SRO has reviewed Tech Specs 3.1.B.1, or as directed by the Lead Examiner Cues: Annunciator H6a, ROD DRIFT; Control rod position indication for control rod 18-11 is rising Time Position Applicant's Actions or Behavior ATC

  • Responds to Annunciator H6a, ROD DRIFT 0 Reports control rocl 18-11 is drifting outward of the core 0 Reports entry into ABN-6
  • Places ROD POWER Switch to ON
  • When the control rod is returned to its programmed position, then removes the insert signal
  • Reports that the control rod continues to drift outward
  • Applies a continuous INSERT signal to the control rod using the ROD CONTROL switch
  • Following the rod scram, removes the insert signal
  • Directs the EO to isolate the associated HCU lAW with Procedure 302.1, Control Rod Hydraulic System [ROLE PLAY]
  • Places ROD POWER switch to OFF
  • Notifies Reactor Engineering

ROLE As the EO directed to isolate HCU 18-11, report that HCU 18-11 is isolated PLAY (no booth actions required)

BOP

  • Scrams the affected control rod from Panel 6XR lAW procedure 235 0 May direct the EO to verify the following valves open at HCU 18-11: 101, 102, &108 [ROLE PLAY]

ROLE PLAY: When directed as the EO to verify the 101, 102, and 108 valves open at HCU 18-11, report that the valves are open OR directs the EO to isolate HCU 18-11 with cooling water.

ILT 13-1 NRC Scenario 3 Page 8 of 20

ILT 13-1 NRC Scenario 3 (Modified) 0 Obtain Key #129 from the key locker located in the Shift Managers office for Panel 6XR 0 Unlocks Pane16XR 0 Selects the control! rod 18-11 and places the toggle switch to the open (scram) position (up position) 0 Verifies that the scram display illuminates for 18-11 rod position indicator (Panel 4F) [BOOTH]

BOOTH: When control rod 18-11 indicates in a scrammed condition, then DELETE MAL-CRDOOS 1811.

0 When rod movement stops, removes the scram signal by placing the 18-'11 toggle switch to the closed position (down position) 0 Verifies the scram si~lnal is removed 0 Locks Panel 6XR 0 Returns the key to the kel" locker in SM office SRO

  • Directs entry into ABN-6
  • Notifies SMIWWM and Reactor Engineering about the drifting control rod

ILT 13-1 NRC Scenario 3 (Modified)

Op-Test No.: 13-1 NRC Scenario No.: NRC Sim 3 Event No.: 1 Event

Description:

Fuel Failures Leads to a Reactor Power Reduction [Trigger 9]

Initiation: Control rod 18-11 is valved out at position 00, and the SRO has reviewed/applied the Tech Specs, or as directed by the Lead Examiner Cues: Annunciators 10F1k, AREA MON HI; 10F2c, OFFGAS HI; Offgas radiation monitors rising Time Position Applicant's Actions or Behavior BOP

  • Reports Main Steam and Off-Gas radiation rising (rna y be reported by ATC)
  • Responds to annunciator 1OF1 k, AREA MON HI 0 Reports the SJAE AREA ARM is above the highs etpoint
  • Reports offgas radiation monitors rising
  • Performs ABN-26, High Main Steam I Off-Gas I Stack Effluent Activity 0 Directs Chemistry to sample the following for offga sand reactor coolant activity 0 Informs the Unit Supervisor of Technical Specificat ions 3.6.E & 4.6.E 0 Informs Reactor Engineering of the rise in Off gas effluent activity 0 When the OFFGAS HI (10F1c) annunciator is rece ived, notifies Chemistry of the changes
  • Makes plant announcement of entry into ABN-26 (may be performed by ATC)

SRO

  • Directs entry into ABN-26, High Main Steam I Off-Gas I Stack Effluent Activity ATC
  • Reports Main Steam and Off-Gas radiation rising (rna y be reported by BOP)
  • Performs ABN-26, High Main Steam I Off-Gas I Stack Effluent Activity 0 When the OFF GAS HI (1 OF1 c) annunciator is rece ived, reduces reactor power taking the MASTER RECIR c ILT13-1 NRCScenario3 Page 10 of 20

ILT 13-1 NRC Scenario 3 (Modified)

SPEED CONTROLLE:R knob in the CCW direction 0 May insert Cram rods*

  • May direct performance of ABN-1 Attachment 4 Terminus: The ATC reduced reactor power when tl1e OFFGAS HI (10F1c) annunciator was received Notes/Comments ILT 13-1 NRC Scenario 3 Page 11 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Op-Test No.: 13-1 NRC Scenario No .: NRC Sim 3 Event No.:§ Event

Description:

Fuel Failure Will Rise Resulting In .A Reactor Scram and Reactor Isolation Initiation: The ATC reduced reactor power when the 0 FFGAS HI (1 OF1 c) annunciator was received, or as directed by the Lead Examiner Cues: Annunciator 10F1c, OFFGAS HI-HI; Offgas r*adi ation monitors rising Time Position Applicant's ;tions or Behavior FLOOR At the Lead Evaluator's discretion, wherItt1e OFF GAS HI-HI (1 OF2c)

Evaluator annunciator is received and reactor power is reduced again to clear the alarm, a 15-minute waiting period begin*s t<) see if the alarm will clear. The alarm is designed to NOT clear. Thereto re , announce to the SRO that time compression is being used here and tha t 15 minutes have elapsed and Offgas has isolated [BOOTH]

BOOTH When the Floor Evaluator has announced time compression above, insert Trigger 13 to isolate the AOG system.


~------------*--------- -----

ATC

  • Performs ABN-26, High I\tla in Steam I Off-Gas I Stack Effluent Activity 0 When the OFFGAS HI-H I (1 OF2c) annunciator is received, reduces re'act or power taking the MASTER RECIRC SPEED CO NT ROLLER knob in the CCW direction CRITICAL TASK 1
  • Scrams the reactor lAW AB N-1 (may also scram due to offsite dose rate) 0 Depresses both MamJa I Scram Pushbuttons 0 Places the Reactor Mod e Selector switch in SHUTDOWN 0 Verifies all control rocIs fully inserted 0 Reports immediate sc;ra m actions complete
  • Performs ABN-26 0 Confirm V-7-31, Off Gas* Exhaust Isolation Valve closed 0 Confirms AOV-0001 N-C)001 B, AOG Inlet Valves closed 0 Places Drain Valves 'v--/-291SOV-016 control switch in the CLOSE position 0 Closes the following ' ral ves (the following valves will be ILT13-1 NRCScenario3 Page 12 of 20

ILT 13-1 NRC Scenario 3 (Modified) closed if RPV Lo-Lo Iev el was reached post scram):

0 MSIVs 0 Isolation CondeSE! rt ube side vent valves 0 V-24-29, Reactor water sample valve 0 w V-24-29, Reactor ater sample valve 0 V-6-395, Drywell J\ir Supply valve 0 May evacuate the Re actor Building and Turbine Building 0 Refers SRO to EP-N\-1 010 SRO

  • When the time compress io n has been announced, directs the A TC to scram the reacto ra nd perform ABN-1 [the SRO may CRITICAL TASK 1 direct a reactor scram pri or to time compression being announced if they believet he rise in main steam activity cannot be turned]
  • Following the scram, dire~cts closure of the MSIVs and sample valves lAW ABN -26 (the valves will be closed if RPV Lo-Lo level was reached pc>st scram):
  • Directs entry into RPV C on trol- No ATWS EOP 0 Directs the Crew to mai ntain RPV water level 138" - 160" using SP2 (Cond/FW ) a nd/or SP3 (CRD) 0 Directs the Crew to mai ntain RPV pressure (approximately) 800-- 1000 psig using the Isolation Condensers (SP-11) or EMRVs (SP-12)

BOP

  • Controls RPV water leve Ia s directed following the scram 0 Reports entry into RP v Control - No A TWS on low RPV water level 0 When RPV level begi ns to rise following the scram, then performs the followin g:

0 Trips 2 Feed Pum ps with their control switches 0 Places all MFRVs in MANUAL 0 Closes all MFRVs 0 Directs the EO to clo se CRD Supply Water Valve to Charging Water Hea der valve V-15-52 [ROLE PLAY]

ROLE PLAY: As the EO directed to close CRD SupJJly Water Valve to Charging Water Header valve V-15-52, insert Trigger 11. Report whe n complete.

0 Enters SP-2 (Cond!F'N) when directed ILT 13-1 NRC Scenario 3 Page 13 of 20

ILT 13-1 NRC Scenario 3 (Modified) 0 Controls RPV water level using the following as necessary:

0 Feedwater Regulating valves 0 Main Feed Regulating Valve (MFRV) Block valves 0 Feedwater Low Flow valves 0 Heater Bank Outlet Isolation valves 0 Feedwater and Condensate pumps

  • Performs SP-11 (ICs) and/or SP-12 (EMRVs) to maintain RPV pressure as directed 0 SP-11 (ICs) 0 Trips Recirculation Pump A for use with IC-A (or Recirculation Pump E for use with IC-B) 0 Verifies RPV watelr level < 160" 0 Cycles Condensate Return Valve V-14-34 as necessary to maintain RPV Pressure with IC-A (or V-14-35 for IC-B) 0 SP-12 (EMRVs) 0 Verifies Torus water level is> 90" 0 Places one or more EMRV control switch in the MAN position, then back to AUTO

~- ------**-

Terminus: The reactor has been scrammed, MSIVs closed, and RPV water level and pressure are under control Notes/Comments


~--- -----

ILT13-1 NRCScenario3 Page 14 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Op-Test No.: 13-1 NRC Scenario Nc>.: NRC Sim 3 Event No.: 6 Event

Description:

Leak in Isolation Condenser Tub ea nd Rising Isolation Condenser Area Radiation Levels Leading to Emergency DeQre ss urization [Trigger 15]

Initiation: The reactor has been scrammed, MSIVs c los ed, and RPV water level and pressure are under control, or as directed by the Le<:~d Examiner Cues: Annunciators 1OF1 k, AREA MON HI; C6a, S~~E LL A LVL HI/LO; C7b, SHELL TEMP HI; Isolation Condenser shell water level risin g Time Position Applicant's Ac;tions or Behavior Crew

  • Responds to annunciate rs *10F1k, AREA MON HI; C6a, SHELL A LVL HI/LO; Cirb, SHELL TEMP HI 0 Reports Isolation Con de nser shell level high and ARM rising 0 Diagnosis an lsolatior 'ondenser tube leak
  • Attempts to close IC-A stea m valves and reports the valves will not close 0 May direct an EO to rna nually close the valves
  • Reports when the IC ARIVI reaches 1000 mr/hr (MAX SAFE)
  • Performs Emergency De pre:)ssurization - No A TWS EOP CRITICAL TASK 2 0 Places ROPS in BYP AS*s when directed 0 Places all EMRV switch *es to MAN
  • Directs entry into the Ra dio activity Release Control EOP 0 Directs RO to close lcdOl ation Condenser A isolation valves 0 Directs RO to monitor*IC;ARM 0 Determines fuel failur es when the Isolation Condenser ARM reaches MAX SAF'E or from Offgas HI-HI alarms ROLE PLAY: When the IC ARM has reached the MAX SAFE value (1 000 mr/hr) and the US has determined fuel failures, call the US as the Shift manager and report the following: As the Emergency Director, you are decla rin g a General Emergency EAL RG1.

CRITICAL TASK 2

  • Directs entry into EmergE~nc;y Depressurization - No ATWS EOP 0 Directs ROPS bypas sed ILT 13-1 NRC Scenario 3 Page 15 of 20

ILT 13-1 NRC Scenario 3 (Modified) 0 Verifies Torus water level> 90" 0 Directs RO to manually open all EMRVs

  • Directs securing Core Spray lAW SP-1 0 if not required for adequate core cooling Terminus: Emergency Depressurization has been pe1formed by the crew and RPV water level is under control.

The Emergency Plan call RG1 was provided to the SRO as part of the scenario.

Notes/Comments ILT13-1 NRCScenario3 Page 16 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Procedures Used Event Procedure 1

  • 403 3
  • ABN-6
  • 235 4
  • ABN-26 5
  • ABN-1
  • Radioactivity Release Control EOP

ILT 13-1 NRC Scenario 3 (Modified)

Simulator Setup

1. Reset to IC-115 lower power to 95% with Recirc Flow 1
2. Have a copy of 636.4.003 marked up to and including step 6.6
3. Tag out EDG-2
4. Protect Core Spray System 1 EDG-1 CRD Pump A, & Containment I I Spray System 1.
5. Display PPC point EDG1 KW (analog) on a PPC terminal screen
6. Place a signed copy of Att 403-2 in the 403 binder Event Trigger Malfunction N/A Preset~ LOA-DGNO 12 to TRIP LOA-DGNO 09 to STOP STL-DGNO<)4 to OFF STL-DGN-0 05A to OFF ANN-T-4F t oON
  • This dis*ables EDG-2 1 Preset~ Insert the fo llowing Event Trigger (1) and Command (2) on Trigger 1:
1) Hwx<)6o118w.eq.1 Trigger 1 ~ MAL-DGNO 04A on a 45 second delay MAL-DGNO 05A on a 45 second delay
  • This ens ures EDG-1 trips 2 Trigger 3 ~ MAL-NIS01 9 018A to 125
  • This will cause LPRM 28-25A (input into AP RM 4) to go upscale and result in% sere:im from APRM 4 being higher than scram setpoint.

3 Trigger 5 ~ MAL-CRDO 05 1811

  • This mai function will be deleted within ILT 13-1 NRC Scenario 3 Page 18 of 20

ILT 13-1 NRC Scenario 3 (Modified) the seen ariio, following the individual scram of the control rod 4 Trigger 9- MAL-RXSO()1 to 0.0008, starting at 0.0002, over a 15 mi nute ramp

  • This insE~rts a fuel failure 5/6 Trigger 11- LOA-CRDO:24 to 0
  • This clo,ses CRD Supply Water Valve to Chargin.g VVater Header valve V-15-52 Trigger 13- VLV-OGSO*~2 to CLOSE (V-7-31)

VLV-OGSO*11 to CLOSE (V-7-29)

LOA-OGSO 07 to CLOSE (AOV001A)

LOA-OGSO 08 to CLOSE (AOV001 B)

  • This will isolate the AOG System from the Offg;as Hi-Hi radiation monitor timeout Presets- VLV-ICSOOj5 to MECH SZ (V-14-30)

VLV-ICSOO 6 to MECH SZ (V-14-31)

  • This will keep the IC-A steam admissicm valves open Trigger 15- MAL-ICSOO 2A to 25%
  • This ins erts a tube leak in Isolation Conden.serA ICH-RMSO"?.7A to 3 over 2 minutes with a 1 minute tirr1e delay
  • This rais es the Isolation Condenser ARM to Max Safe value (1 000 mr/hr)

ILT 13-1 NRC Scenario 3 Page 19 of 20

ILT 13-1 NRC Scenario 3 (Modified)

Shift Turnover Current plant conditions:

  • 95% power
  • EDG-2 is OOS for maintenance
  • Surveillance 636.4.003, Diesel Generator Load Test, is in progress on EDG-1.
  • An operator is stationed at EDG-1 for the surve~illance
  • All EDG-1 diesel alarms are in their normal state Shift Activities
  • Complete surveillance 636.4.003, Diesel Generator Load Test, starting at step 6.7, due to a question of operability (oil sinht glass was low on the last shift)

ILT 13-1 NRC Scenario 3 Page 20 of 20