To: Todd Fish, Chief Examiner From: Jeff Ridosh, Oyster Creek Regulatory Exam Author

Subject:

Revisions to Oyster Creek Exam Materials for the July 2011 Initial NRC License Examination Date: June 27,2011 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held June 13-15, 2011.

A. Administrative JPMs:

1. SRO JPM 1
a. Added Tech Spec clarification to step 3 for Reactor Coolant Leakage and EDG Fuel oil tank level.
2. SROJPM3
a. Changed As-Left values of IBOllAl to 29.9 in. WC and IBOllA2 to 29.7 in.

WC in the student handouts.

B. rontrol Room JPMs:

1. JPM 2
a. Reformatted JPM from Exelon format to ES-C-l format.
b. Added a CUE to step 4 for the Main Stop Valve Test pushbutton.
2. JPM 3
a. Added statement to the Task Initiating Cue stating that the 'A' Isolation Condenser is the preferred system.
3. JPM 5
a. Changed Task Standard to allow the applicant to re-open breaker S IA when IA fails to automatically open. Changed Cue for Step 15 to reflect the new standard.
4. JPM 6
a. Added a cue to performance step 4 to inform the applicant procedure 403 has ah'eady been reviewed an bypassing APRM 8 is allowed. This is also stated in the Initial Conditions.
b. Added statement to Task Standard and step 7 that APRM indication should be 100% + 1% of CTP by meter indication on Panel 5R.
c. Added Terminating Cue and JPM Stop Time on page 7.
d. Fixed typo in JPM footer.

- 1

5. JPM 8
a. Added a statement in the Simulator Setup to ensure the TURB BLDG VENT ISOLATION pushbutton on PanelllR is depressed/reset before beginning JPM.

C. In-plant JPMs:

L JPM2

a. Deleted steps 6 and 7. Added cue in step 5 to inform applicant IC-A shell level is rising and the JPM is complete.
2. JPM 3
a. Added a cue in step 4 to inform the applicant that the Bypass Switch for Service Water Pump 1-2 breaker at USS IB3 is in BYPASS.

D. Simulator scenarios:

1. Scenario 1 (Backup Scenario):
a. No comments or changes.
2. Scenario 2:
a. No comments or changes.
3. Scenario 3:
a. Changed the ramp rate and severity of Event #4. The new severity of the EPR failing low is 900 psig and ramp rate is 180 seconds. Updated the Event Summary on page 2 and initiating cue on page 10 reflecting the change.
b. Fixed a typo on page 26 for Trigger 13 (LOA-CRD052).
c. Added a statement to place TBCCW Pump #2 in PTL and hang a tag on it on page 25 in the Simulator Setup section.
d. Added a statement on pages 14 & 18 for Event #6 allowing the crew to enter ABN-17 or ABN-58. Actions are the same in both ABNs for this event.

Added ABN-58 to the list of procedures that may be used on page 24.

4. Scenario 4:
a. Edited the Note on page 21 for Trigger 7 to state that the Condensate Pump A high amps will automatically delete when the pump is tripped.
b. Fixed Trigger 13 typo on page 22.
c. Fixed a typo on Role Play 1 on page 8.
d. Deleted Role Play 2 on page 8.
e. Added Pressure Control strategy for the ATC on page 12.
f. Changed the initial Torus Leak rate severity to 4000 to ensure leak is within the makeup capacity of one Core Spray system.