Text
To:
Todd Fish, Chief Examiner From:
Jeff Ridosh, Oyster Creek Regulatory Exam Author
Subject:
Revisions to Oyster Creek Exam Materials for the July 2011 Initial NRC License Examination Date:
June 27,2011 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held June 13-15, 2011.
A.
Administrative JPMs:
- a. Added Tech Spec clarification to step 3 for Reactor Coolant Leakage and EDG Fuel oil tank level.
- 2. SROJPM3
- a. Changed As-Left values of IBOllAl to 29.9 in. WC and IBOllA2 to 29.7 in.
WC in the student handouts.
B.
rontrol Room JPMs:
- 1. JPM 2
- a. Reformatted JPM from Exelon format to ES-C-l format.
- b. Added a CUE to step 4 for the Main Stop Valve Test pushbutton.
- 2. JPM 3
- a. Added statement to the Task Initiating Cue stating that the 'A' Isolation Condenser is the preferred system.
- 3. JPM 5
- a. Changed Task Standard to allow the applicant to re-open breaker S IA when IA fails to automatically open. Changed Cue for Step 15 to reflect the new standard.
- 4. JPM 6
- a. Added a cue to performance step 4 to inform the applicant procedure 403 has ah'eady been reviewed an bypassing APRM 8 is allowed. This is also stated in the Initial Conditions.
- b. Added statement to Task Standard and step 7 that APRM indication should be 100% + 1 % of CTP by meter indication on Panel 5R.
- c. Added Terminating Cue and JPM Stop Time on page 7.
- d. Fixed typo in JPM footer.
- 1
- 5. JPM 8
- a. Added a statement in the Simulator Setup to ensure the TURB BLDG VENT ISOLATION pushbutton on PanelllR is depressed/reset before beginning JPM.
C.
In-plant JPMs:
L JPM2
- a. Deleted steps 6 and 7. Added cue in step 5 to inform applicant IC-A shell level is rising and the JPM is complete.
- 2. JPM 3
- a. Added a cue in step 4 to inform the applicant that the Bypass Switch for Service Water Pump 1-2 breaker at USS IB3 is in BYPASS.
D.
Simulator scenarios:
- 1. Scenario 1 (Backup Scenario):
- a. No comments or changes.
- 2. Scenario 2:
- a. No comments or changes.
- 3. Scenario 3:
- a. Changed the ramp rate and severity of Event #4. The new severity of the EPR failing low is 900 psig and ramp rate is 180 seconds. Updated the Event Summary on page 2 and initiating cue on page 10 reflecting the change.
- b. Fixed a typo on page 26 for Trigger 13 (LOA-CRD052).
- c. Added a statement to place TBCCW Pump #2 in PTL and hang a tag on it on page 25 in the Simulator Setup section.
- d. Added a statement on pages 14 & 18 for Event #6 allowing the crew to enter ABN-17 or ABN-58. Actions are the same in both ABNs for this event.
Added ABN-58 to the list of procedures that may be used on page 24.
- 4. Scenario 4:
- a. Edited the Note on page 21 for Trigger 7 to state that the Condensate Pump A high amps will automatically delete when the pump is tripped.
- b. Fixed Trigger 13 typo on page 22.
- c. Fixed a typo on Role Play 1 on page 8.
- d. Deleted Role Play 2 on page 8.
- e. Added Pressure Control strategy for the ATC on page 12.
- f. Changed the initial Torus Leak rate severity to 4000 to ensure leak is within the makeup capacity of one Core Spray system.