Retake Exam Final Outlines (Folder 3)
ML082530420
Person / Time
Site: Oyster Creek
Issue date: 06/12/2008
From: Caruso J
Operations Branch I
To:
Hansell S
Shared Package
ML081630455 List:
References
Download: ML082530420 (3)


Text

OC NRC Re-Take Exam 2008 C

SRO l 3 TS BOP MAL-EDS003B Scenario Outline MAL-NIS021 F Facility: Ovster Creek Scenario No.: NRC 1 Op Test No.: 2008-1 Examiners:

Operators:

SRO-Steve Johnston SRO RO I

Initial Conditions:

100% Power RWCU Pump B 00s RWM is bypassed and 00s 8

Turnover:

0 Perform 602.4.004, Main Steam Isolation Valve 10% Closure Test.

MAL-RCUOI 3 VLV-RCU001 M

ALL VLV-RCUOO4 11 Eiwnt 1 Malf. No.

Event SRO BOP NIA (1

2 1

VLV-RPS004 TS SRO I

1 SRO RO C

MAL-CRD005-22-15 1

1 MAL-SWS001A 1 1 1 !E MAL-CFWOI 7 RO MAL-CNS004C 1 1

Event Description Performs 602.4.004, Main Steam Isolation Valve 10%

Closure Test.

MSlV NS04B sticks open during Closure Test TS 3.5.3.

Respond to Loss of USS 1A2 480V bus.

TS 3.7.B, ABN-45 LOSS Of USS 1A2 APRM 6 hop. Failure causes %. scram Control Rod Drift Out AB N -6 I Con t ro I Rod M a If u n ct i o n s Respond to trip of Service Water Pump 1-1 ABN-18 Service Water Failure Response Main Condenser Vacuum Leak Power Reduction required ABN-14 Loss of Condenser Vacuum RWCU Leak in the Reactor Building RWCU fails to isolate Secondary Containment Control EOP Emergency Depressurization required RAP-G2f A Containment Spray pump trips while in Torus Cooling (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 1 Page 1 of 29

OC NRC Retake Exam 2008 4

Scenario Outline MAL-SRO Uncoupled Control Rod ATC ABN-6 Control Rod Malfunction C

SRO EMRV A Inadvertently Opens TS BOP ABN-40 Stuck Open EMRV; TS 3.4.B CRD008-34-11 SWI-ADS001C Facility: Oyster Creek Scenario No.: NRC 2 Op Test No.: 2008-1 6

9 Examiners:

Operators:

SRO-Steve Johnston MAL-CRD005 MAL-RPSOOG C

SRo fails, ARI required SWI-RPS006 ABN-6 Control Rod Malfunction MAL-NSSOI 7A MAL-PCN001 N ALL Vacuum Breaker fails open VLV-CNSOOG SRO Containment Spray System failures leads to PMP-CNS008A ALL Emergency Depressurization Multiple control rod drifts, Manual scram required and Steam leak in Primary Containment, DW/Torus Failure of RWCU System to automatically isolate on ALL high DW pressure MAL-RPS007 Initial Conditions:

90%Power RWM is bypassed and 00s lsophase Bus Fan A is 00s Main Generator voltage control is in manual Turnover:

Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 24KV Main Gen Electrical System Increase reactor Dower to rated IAW the ReMA

1 N/A I

Event Malf. No.

Event Event No.

Description 2

1 N/A I R A Alarms, Pump ANN-E2D VLV-NSSOOG Failures TS 3.3.F.

NRC 2 Page 1 of 26

OC NRC Re-Take Exam 2008 Scenario Outline Facility: Oyster Creek Scenario No.: - NRC 3 Op Test No.: 2008-1 Examiners :

Operators:

RO-Steve Johnston Initial Conditions:

0

%?%Power RWM bypassed and 00s 0

TBCCW pump 2 00s Turnover:

0 Raise reactor power IAW the ReMA Event No.

1 2

3 4

Malf. No.

NIA PMP-CRD002A CRD007-3823 MAL-I CH-CFW069A MAL-NSSOl7A CRD021A CRD021 B MAL-MAL-MAL-CRDOOIA Event TY Pe*

ATC ATC ATC ATC ALL ATC Event Description Raise Reactor Power with Control Rods CRD Pump 1A Shaft Failure Stuck Control Rod Condensate Pump B Motor Bearing Hi Temp Requires Power Reduction with Recirculation Flow to Approximately 65% power Small Steam Leak in Primary Containment with Hydraulic ATWS

~

~~

CRD Flow Control Valve Fails Closed Requiring Alternate Control Rod Insertion Methods (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 3 Page 1 of 18