ML14167A298

From kanterella
Jump to navigation Jump to search
Draft Outlines (Folder 2)
ML14167A298
Person / Time
Site: Oyster Creek
Issue date: 04/02/2014
From: Ridosh J
Exelon Nuclear Generation Corp
To:
Operations Branch I
Shared Package
ML13333A261 List:
References
TAC- U01893
Download: ML14167A298 (23)


Text

ILT 13-1 NRC Scenario 1 (New)

Scenario Outline Facility: Oyster Creek Scenario No.: 1 Op Test No.: 13*1 NRC Examiners: Operators:

Initial Conditions:

  • 2% power with mode switch in STARTUP
  • Air Compressor #3 is tagged OOS
  • Steam chest warming is in progress Turnover:
  • Continue with rod withdrawal. Complete step 10 Group 3-1 starting at rod 26*23. When rod pulls are complete wait for further direction from Reactor Engineering. Timing of rod position 00-02 is not required and Continuous Rod Withdrawal is authorized per Reactor Engineering.

Event No. Malf. No. Event Type* Event Description 1 N/A R ATC Raise reactor power with control rods lAW the ReMA MAL-2 CRD007_ c ATC Stuck control rod (26-23) 2623 3

ICH- c BOP ICS003A Leak in Isolation Condenser Shell B TS SAO 4 MAL- c BOP Loss of VMCC 1 B2 EDS0048 TS SAO 5

MAL-RBC001A c BOP The in-service RBCCW pump trips The standby RBCCW pump also trips resulting in a loss 6

MAL-RBC0018 c ATC of all RBCCW flow which requires the ATC to scram the reactor; eiQht rods fail to insert 7 MAL-M Crew Steam leak in Drywell NSS017A 8

MAL-CRD001A c Crew CAD Flow Control Valve fails closed

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Transient, (TS) Tech Specs ILT 13-1 NRC Scenario 1 Page 1 of 26

ILT 13-1 NRC Scenario 2 (New)

Scenario Outline Facility: Oyster Creek Scenario No.: ~ Op Test No.: 13-1 NRC Examiners: Operators:

Initial Conditions:

  • 97% power
  • Main Generator voltage control is in Manual Turnover:
  • Place the AVR in automatic service lAW 336.1, section 8, starting at Step 8.2
  • Raise reactor power to 100% with recirculation flow Event No. Malf. No. Event Type* Event Description 1 N/A N BOP Return the AVA to service lAW 336.1.

2 N/A R ATC Raise reactor power to 100% with recirculation flow.

MAL-3 MSS005A c BOP Trip of Steam Packing Exhauster 1.

MAL-NIS020F I ATC APRM 6 fails upscale with a failure of Y2 scram on 4 RLY-RPS003B, TS SAO RPS2.

0048 5

MAL- c BOP Trip of USS 1A3.

EDS003C TS SAO ICH-6 TSii5A, c ATC Turbine high vibration requiring a manual scram.

TSIOi4A MAL-CFWOi28 SRV-Feedwater line break with failure of Feedwater check 7 CFW002B M Crew valves and loss of all Feedwater and Condensate SRV- Pumps.

CFW003B VLV-8 CSS004, 006, Oi i, c Crew Failure of Core Spray Isolation Valves to auto open.

012

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Transient, (TS) Tech Specs ILT 13-1 NRC Scenario 2 Page 1 of 26

ILT 13-1 NRC Scenario 3 (Modified)

Scenario Outline Facility: Oyster Creek Scenario No.:~ Op Test No.: 13-1 NRC Examiners: Operators:

Initial Conditions:

  • 95% power
  • EDG-2 is OOS for maintenance
  • Surveillance 636.4.003, Diesel Generator Load Test, is in progress on EDG-1
  • An operator is stationed at EDG-1 for the surveillance
  • All EDG-1 diesel alarms are in their normal state Turnover:
  • Complete surveillance 636.4.003, Diesel Generator Load Test, starting at step 6.7, due to a question of operability (oil sight glass was low on the last shift)

Event No. Malt. No. Event Type* Event Description 1

MAL- c BOP Trip of EDG-1 during performance of surveillance DGN004A TS SAO 636.4.003.

MAL- I ATC 2 NIS019_0 BOP LPRM 28-25A upscale failure (input to APRM 4).

18A TS SAO MAL- c ATC 3 CRD005 - BOP Outward drifting control rod (rod 18-11 ).

18-11 TS SAO 4 MAL-A Fuel failure requiring power reduction with recirc RXS001 ATC flow 5

MAL-M Fuel failure will increase requiring a reactor scram RXS001 Crew and reactor isolation MAL-Isolation Condenser B tube leak with steam valves ICS002B M 6 VLV- Crew failing to close leads to RPV Emergency ICS007, c Depressurization 008 (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Transient, (TS) Tech Specs ILT 13-1 NRC Scenario 3 Page 1 of 20

ES-401 Written Examination Outline Form ES-401-1 Facility: ILT 13-1 NRC Written Exam Date of Exam: 05/19/14 RO KIA Category Points SRO-Only Points Tier Group K K K K K K A A A A G Tota A2 G* Total 1 2 3 4 5 6 1 2 3 4

  • I 1 3 3 3 4 3 4 20 3 4 7 1.

Emergency 2 1 1 2 1 1 1 7 2 1 3 Plant Tier Evolutions Total 4 4 5 5 4 5 27 5 5 10 s

1 3 2 2 3 2 3 2 2 3 2 2 26 3 2 5 2.

Plant 2 1 1 1 1 1 1 1 1 2 1 1 12 0 2 1 3 Systems Tier Totals 4 3 3 4 3 4 3 3 5 3 3 38 5 3 8 1 2 3 4 1 2 3 4

3. Generic Knowledge & Abilities 10 7 Categories 3 2 3 2 2 2 2 1 Note 1. Ensure that at least two topics from every applicable KJA category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KJA category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to section D.1.b of ES-401, for guidance regarding elimination of inappropriate KJA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant specific priority, only those KAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KJA categories.

7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the KJA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KJA's

8. On the following pages, enter the KJA numbers, a brief description of each topic, the topics' importance ratings (IR) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. If fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the KJA Catalog, and enter the KJA numbers, descriptions, IRs, and point totals(#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10CFR55.43

ES-401 2 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Emergency and Abnormal Plant Evolutions- Tier 1 Group 1 EAPE #I Name Safety Function KJA Topic(s)

AA2.02- Ability to determine and/or interpret the following as they apply to 295018 Partial or Total Loss of X PARTIAL OR COMPLETE LOSS OF 3.2 1 CCW/8 COMPONENT COOLING WATER:

Cooling water temQ_erature EA2.02 -Ability to determine and/or 295031 Reactor Low Water interpret the following as they apply to X 4.2 2 Level I 2 REACTOR LOW WATER LEVEL:

Reactor power EA2.04- Ability to determine and/or interpret the following as they apply to 295030 Low Suppression Pool X LOW SUPPRESSION POOL WATER 3.7 3 Water Level I 5 LEVEL : Drywelll suppression chamber differential pressure: Mark-1&11

' 2.4.4 1 - Emergency Procedures I Plan:

295026 Suppression Pool High X Knowledge of the emergency action 4.6 4 Water Temp. I 5 level thresholds and classifications.

2.4.9- Emergency Procedures I Plan:

Knowledge of low power I shutdown 295028 High Drywell X implications in accident (e.g., loss of 4.2 5 Temperature I 5 coolant accident or loss of residual heat removal) mitigation strategies.

2.4.45- Emergency Procedures I Plan:

295038 High Off-site Release Ability to prioritize and interpret the X 4.3 6 Rate 19 significance of each annunciator or jalarm.

2.2.44- Ability to interpret control room indications to verify the status and 295021 Loss of Shutdown X operation of a system. and understand 4.4 7 Cooling 14 how operator actions and directives affect plant and system conditions.

AK1.02- Knowledge of the operational implications of the following concepts as 700000 Generator Voltage and they apply to GENERATOR VOLTAGE X 3.3 39 Electric Grid Disturbances AND ELECTRIC GRID DISTURBANCES and the following:

Over-excitation.

EK1.03- Knowledge of the operational implications of the following concepts as 295031 Reactor Low Water Level/2 X they apply to REACTOR LOW WATER 3.7 40 LEVEL : Water level effects on reactor power AK1.02 - Knowledge of the operational implications of the following concepts 600000 Plant Fire On-site I 8 X 2.9 41 as they apply to Plant Fire On Site: Fire Fiqhtinq AK2.01 - Knowledge of the interrelations between CONTROL 295016 Control Room X ROOM ABANDONMENT and the 4.4 42 Abandonment I 7 following: Remote shutdown panel:

Plant-Specific AK2.01 - Knowledge of the 295001 Partial or Complete interrelations between PARTIAL OR Loss of Forced Core Flow X COMPLETE LOSS OF FORCED CORE 3.6 43 Circulation 11 & 4 FLOW CIRCULATION and the following: Recirculation system AK2.01 - Knowledge of the 295004 Partial or Total Loss of interrelations between PARTIAL OR X 3.1 44 DC Pwrl6 COMPLETE LOSS OF D.C. POWER and the following: Battery charger

ES-401 2 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Emergency and Abnormal Plant Evolutions- Tier 1 Group 1 EAPE #I Name Safety Function KJA Topic(s)

AK3.02- Knowledge of the reasons for 295023 Refueling Ace Cooling the following responses as they apply to X 3.4 45 Mode /8 REFUELING ACCIDENTS : Interlocks associated with fuel handling equipment AK3.04 - Knowledge of the reasons for 295005 Main Turbine the following responses as they apply to X 3.2 46 Generator Trip I 3 MAIN TURBINE GENERATOR TRIP:

Main generator trip AK3.01 - Knowledge of the reasons for the following responses as they apply to 295003 Partial or Complete Loss of AC /6 X PARTIAL OR COMPLETE LOSS OF 3.3 47 A.C. POWER : Manual and auto bus transfer AA1.03- Ability to operate and/or monitor the following as they apply to 295006 SCRAM /1 X 3.7 48 SCRAM : Reactor/turbine pressure regulating system EA 1.01 -Ability to operate and/or 295037 SCRAM Conditions monitor the following as they apply to Present and Reactor Power SCRAM CONDITION PRESENT AND X 4.6 49 Above APRM Downscale or REACTOR POWER ABOVE APRM Unknown /1 DOWNSCALE OR UNKNOWN :

Reactor Protection System EA 1.01 -Ability to operate and/or 295028 High Drywell monitor the following as they apply to X 3.8 50 Temperature I 5 HIGH DRYWELL TEMPERATURE:

Drywell spray: Mark-1&11 EA2.06- Ability to determine and/or 295025 High Reactor Pressure interpret the following as they apply to X 3.7 51

/3 HIGH REACTOR PRESSURE: Reactor water level AA2.01 -Ability to determine and/or interpret the following as they apply to 295019 Partial or Total Loss of lnst. Air /8 X PARTIAL OR COMPLETE LOSS OF 3.5 52 INSTRUMENT AIR: Instrument air system pressure EA2.01 -Ability to determine and/or 295038 High Off-site Release Rate /9

  • x interpret the following as they apply to HIGH OFF-SITE RELEASE RATE:

3.3 53 tOff-site 2.1.23- Conduct of Operations: Ability 295018 Partial or Total Loss of to perform specific system and X 4.3 54 CCW/8 integrated plant procedures during all modes of plant operation.

2.2.22- Equipment Control: Knowledge 295026 Suppression Pool High Water Temp. I 5 X of limiting conditions for operations and 4.0 55 safety_ limits.

2.2.37- Equipment Control: Ability to 295024 High Drywell Pressure I X determine operability and/or availability 3.6 56 5

of safety related equiQ_ment.

2.4.1 - Emergency Procedures I Plan:

295030 Low Suppression Pool X Knowledge of EOP entry conditions and 4.6 57 Water Level/ 5 immediate action steps.

AA 1.05- Ability to operate and/or 295021 Loss of Shutdown monitor the following as they apply to X 3.0 58 Cooling /4 LOSS OF SHUTDOWN COOLING :

Reactor recirculation KJA Category Totals: 3 3 3 4 3/3 4/4 Group Point Total:

l 2017

ES-401 3 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Emergency and Abnormal Plant Evolutions- Tier 1 Group 2 EAPE #I Name Safety Function KIA Topic(s) 2.1.20- Conduct of Operations: Ability 295008 High Reactor Water X to interpret and execute procedure 4.6 8 Level/2 steps AA2.02- Ability to determine and/or 295009 Low Reactor Water interpret the following as they apply to X 3.7 9 Level I 2 LOW REACTOR WATER LEVEL

  • Steam flow/feed flow mismatch EA2.01 Ability to determine and/or interpret the following as they apply to 295036 Secondary SECONDARY CONTAINMENT HIGH Containment High Sump/Area X 3.2 10 SUMP/AREA WATER LEVEL:

Water Level I 5 Operability of components within the affected area AK1.02- Knowledge of the operational implications of the following concepts as 295017 High Off-site Release Rate /9 X they apply to HIGH OFF-SITE 3.8 59 RELEASE RATE : Protection of the general public EK2.06- Knowledge of the 295034 Secondary interrelations between SECONDARY Containment Ventilation High X CONTAINMENT VENTILATION HIGH 3.9 60 Radiation I 9 RADIATION and the following:

PCIS/NSSSS: Plant-Specific EK3.01 - Knowledge of the reasons for 295032 High Secondary the following responses as they apply to Containment Area Temperature X HIGH SECONDARY CONTAINMENT 3.5 61

/5 AREA TEMPERATURE:

Emergency/normal depressurization AA1.01 -Ability to operate and/or 295010 High Drywell Pressure monitor the following as they apply to X 3.4 62

/5 HIGH DRYWELL PRESSURE : Drywell ventilation/cooling AA2.02- Ability to determine and/or 295007 High Reactor Pressure interpret the following as they apply to

/3 X 4.1 63 HIGH REACTOR PRESSURE : Reactor power 2.4.2 - Emergency Procedures/Plan:

295033 Secondary Knowledge of system set points, Containment Area Radiation X 4.5 64 interlocks and automatic actions Levels /9 associated with EOP entry conditions.

AK3.04- Knowledge of the reasons for 295002 Loss of Main the following responses as they apply to Condenser Vac I 3 X 3.4 65 LOSS OF MAIN CONDENSER VACUUM: Bypass valve closure KIA Category Totals: 1 1 2 1 1/2 1/1 Group Point Total:

I 7/3

ES-401 4 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems- Tier 2 Group 1 K K K K K K A A A Imp System #I Name A2 G Q#

1 2 3 4 5 6 1 3 4 A2.01 -Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM : and (b) based on those predictions. use 212000 RPS X 3.9 11 procedures to correct. control, or mitigate the consequences of those abnormal conditions or operations: RPS motor-generator set failure A2.04- Ability to (a) predict the impacts of the following on the REACTOR WATER LEVEL CONTROL SYSTEM ; and (b) 259002 Reactor Water Level based on those predictions, use X 3.1 12 Control procedures to correct control, or mitigate the consequences of those abnormal conditions or operations: RFP runout condition: Plant-Specific 2.4.47 - Emergency Procedures I Plan: Ability to diagnose and recognize trends in an accurate 209001 LPCS X 4.2 13 and timely manner !utilizing the appropriate control room reference material.

2.2.40- Equipment Control:

262001 AC Electrical X Ability to apply Technical 4.7 14 Distribution Specifications for a system.

A2.07 Ability to (a) predict the impacts of the following on the STANDBY GAS TREATMENT SYSTEM : and (b) based on those predictions, use 261000 SGTS X 2.8 15 procedures to correct. control, or mitigate the consequences of those abnormal conditions or operations: A. C.

electrical failure K 1 .05 - Knowledge of the physical connections and/or cause- effect relationships 212000 RPS X between REACTOR 3.3 1 PROTECTION SYSTEM and the following: Process radiation monitoring system K1.02 - Knowledge of the physical connections and/or cause- effect relationships 215005 APRM I LPRM X between AVERAGE POWER 3.7 2 RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM and the following: IRM K2.01 - Knowledge of electrical 209001 LPCS X power supplies to the following: 3.0 3 Pump power K2.01 - Knowledge of electrical 239002 SRVs X power supplies to the following: 2.8 21 SRV solenoids

ES-401 4 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems- Tier 2 Group 1 K K K K K K A A A Imp System # I Name A2 G Q#

1 2 3 4 5 6 1 3 4 K3. 05 - Knowledge of the effect that a loss or malfunction of the STANDBY GAS TREATMENT 261000 SGTS X 3.2 5 SYSTEM will have on following:

Secondary containment radiation/ contamination levels K3.04- Knowledge of the effect that a loss or malfunction of the INTERMEDIATE RANGE 215003 IRM X 3.6 6 MONITOR (IRM) SYSTEM will have on following: Reactor power indication K4.02 - Knowledge of (INSTRUMENT AIR SYSTEM) design feature(s) and or 300000 Instrument Air X 3.0 7 interlocks which provide for the following: Cross-over to other air systems K4.03- Knowledge of PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM 223002 PCIS/Nuclear SUPPLY SHUT-OFF design X 3.5 17 Steam Supply Shutoff feature(s) and/or interlocks which provide for the following:

Manual initiation capability:

Plant -Soecific K5.01 - Knowledge of the operational implications of the following concepts as they apply 263000 DC Electrical X to D.C. ELECTRICAL 2.6 9 Distribution DISTRIBUTION : Hydrogen generation during battery charaina K5.02 - Knowledge of the operational implications of the 262001 AC Electrical X following concepts as they 2.6 10 Distribution apply to A. C. ELECTRICAL DISTRIBUTION: Breaker control K6.01 - Knowledge of the effect that a loss or malfunction of the following will have on the 205000 Shutdown Cooling X SHUTDOWN COOLING 3.3 11 SYSTEM (RHR SHUTDOWN COOLING MODE) : A.C.

electrical power K6.03- Knowledge of the effect that a loss or malfunction of the 264000 EDGs X following will have on the 3.5 12 EMERGENCY GENERATORS (DIESEL/JET) : Lube oil oumos A1.01 -Ability to predict and/or monitor changes in parameters associated with operating the 211000 SLC X 3.6 13 STANDBY LIQUID CONTROL SYSTEM controls including:

Tank level

ES-401 4 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems -Tier 2 Group 1 K K K K K K A A A Imp System #I Name A2 G Q#

1 2 3 4 5 6 1 3 4 A 1.01 -Ability to predict and/or monitor changes in parameters 259002 Reactor Water associated with operating the X 3.8 14 Level Control REACTOR WATER LEVEL CONTROL SYSTEM controls including: Reactor water level A2.01 -Ability to (a) predict the impacts of the following on the SOURCE RANGE MONITOR (SRM) SYSTEM ; and (b) based 215004 Source Range on those predictions, use X 2.7 15 Monitor procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Power supply degraded A2.02- Ability to (a) predict the impacts of the following on the CCWS and (b) based on those 400000 Component Cooling predictions, use procedures to X 2.8 16 Water correct, control, or mitigate the consequences of those abnormal operation: High/low surge tank level A3.03- Ability to monitor automatic operations of the 207000 Isolation X ISOLATION (EMERGENCY) 3.5 8 (Emergency) Condenser CONDENSER including:

Reactor water level: BWR-2,3 A3.09- Ability to monitor automatic operations of the AUTOMATIC 218000 ADS X 4.1 18 DEPRESSURIZATION SYSTEM including: Reactor vessel water level A4.01 -Ability to manually operate and/or monitor in the 262002 UPS (AC/DC) X control room: Transfer from 2.8 19 alternative source to preferred source A4.04- Ability to manually operate and/or monitor in the

  • 239002 SRVs X 4.3 20 control room: Suppression pool temperature 2.2.40- Equipment Control:

264000 EDGs X Ability to apply technical 3.4 4 specifications for a system.

2.2.42- Equipment Control::

Ability to recognize system 261000 SGTS X parameters that are entry-level 3.9 22 conditions for Technical

~ecifications.

K1.04- Knowledge of the physical connections and/or cause- effect relationships 259002 Reactor Water X between REACTOR WATER 3.5 23 Level Control LEVEL CONTROL SYSTEM and the following: Reactor feedwater flow

ES-401 4 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems -Tier 2 Group 1 K K K K K K A A A Imp System #I Name A2 G Q#

1 2 3 4 5 6 1 3 4 K4.01 - Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM 218000 ADS X design feature(s) and/or 3.7 24 interlocks which provide for the following: Prevent inadvertent initiation of ADS IC>gjc A3.01 -Ability to monitor automatic operations of the D.C.

263000 DC Electrical ELECTRICAL DISTRIBUTION X 3.2 25 Distribution including: Meters, dials, recorders, alarms, and indicating lights K6.04 - Knowledge of the effect 400000 Component Cooling that a loss or malfunction of the X 3.0 26 Water following will have on the CCWS: Pum_Qs KIA Category Totals: 3 2 2 3 2 3 2 2/3 3 2 2/2 Group Point Total:

I 2615

ES-401 5 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems- Tier 2 Group 2 K K K K K K A A A Q System # I Name A2 G Imp.

1 2 3 4 5 6 1 3 4 #

A2.07 -Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those 223001 Primary CTMT and 16 X predictions, use procedures to 4.3 Aux.

correct control. or mitigate the consequences of those abnormal conditions or operations: High drywell pressure 2.4.11 - Emergency Procedures 201003 Control Rod and 17 X I Plan: Knowledge of abnormal 4.2 Drive Mechanism condition procedures.

A2.02 -Ability to (a) predict the impacts of the following on the RECIRCULATION SYSTEM:

and (b) based on those 202001 Recirculation predictions, use procedures to X 3.9 18 System correct, control, or mitigate the consequences of those abnormal conditions or operations: Recirculation svstem leak K1.22- Knowledge of the physical connections and/or 256000 Reactor cause- effect relationships X 2.8 27 Condensate between REACTOR CONDENSATE SYSTEM and the followinq: Offqas system K2.02 - Knowledge of electrical 201001 CRD Hydraulic X power supplies to the following: 3.6 28 Scram valve solenoids K3.05 - Knowledge of the effect that a loss or malfunction of the PLANT VENTILATION 288000 Plant Ventilation X 3.1 29 SYSTEMS will have on following: Reactor building pressure: Plant-Specific K4.05 - Knowledge of MAIN TURBINE GENERATOR AND 245000 Main Turbine Gen. AUXILIARY SYSTEMS design X 2.9 30 I Aux. feature(s) and/or interlocks which provide for the following:

Turbine protection K5.05- Knowledge of the operational implications of the following concepts as they apply 204000 RWCU X 2.6 31 to REACTOR WATER CLEANUP SYSTEM : Flow controllers K6.01 - Knowledge of the effect that a loss or malfunction of the 290003 Control Room X following will have on the 2.7 32 HVAC CONTROL ROOM HVAC:

Electrical power

ES-401 5 Form ES-401-1 ILT 13-1 NRC Written Exam Written Examination Outline Plant Systems -Tier 2 Group 2 K K K K K K A A A Q System #I Name A2 G Imp.

1 2 3 4 5 6 1 3 4 #

A 1.01 -Ability to predict and/or monitor changes in parameters 233000 Fuel Pool associated with operating the X 2.6 33 Cooling/Cleanup FUELPOOLCOOUNGAND CLEAN-UP controls including:

Surge tank level A2.17 -Ability to (a) predict the impacts of the following on the RECIRCULATION SYSTEM; and (b) based on those 202001 Recirculation predictions, use procedures to X 3.1 34 System correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of seal cooling water A3.05- Ability to monitor automatic operations of the 271000 Off-gas X OFFGAS SYSTEM including: 2.9 35 System indicating lights and alarms A4.11 - Ability to manually 241000 Reactor/Turbine X operate and/or monitor in the 3.1 36 Pressure Regulator control room: Turbine speed 2.2.22 - Equipment Control:

290002 Reactor Vessel Internals X Knowledge of limiting conditions 4.0 37 for 01=1erations and safety limits.

A3.03 - Ability to monitor automatic operations of the 202002 Recirculation Flow RECIRCULATION FLOW Control X 3.1 38 CONTROL SYSTEM including:

Scoop tube operation: BWR-2,3,4 KIA Category Totals: 1 1 1 1 1 1 1 1/2 2 1 1/1 Group Point Total:

I 12/3

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: ILT 13-1 NRC Written Exam Date: 05/19/14 RO SRO-Only Category K/A# Topic IR Q# IR Q#

Ability to interpret and execute procedure 2.1.20 4.6 19 steps.

Knowledge of individual licensed operator responsibilities related to shift staffing, such 2.1.4 as medical requirements, "no-solo" operation, 3.8 25 maintenance of active license status, 10CFR55. etc.

1' Conduct of Operations Knowledge of conduct of operations 2.1 '1 3.8 66 requirements.

Ability to coordinate personnel activities 2.1.8 3.4 67 outside the control room.

Ability to use plant computers to evaluate 2.1 .19 3.9 75 system or component status.

Subtotal 3 2 Knowledge of pre- and post-maintenance 2.2.21 4.1 20 operability_ requirements.

Ability to determine operability and I or 2.2.37 4.6 23 availability of safety related equipment 2.

Equipment Knowledge of the process for controlling 2.2.14 3.9 68 Control equiQment configuration or status.

Knowledge of limiting conditions for 2.2.22 4.0 69 operations and safety limits.

Subtotal 2 2 Knowledge of radiation or contamination hazards that may arise during normal.

2.3.14 3.8 21 abnormal, or emergency conditions or activities.

Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms.

2.3.15 3.1 24 portable survey instruments, personnel

3. monitoring equipment, etc.

Radiation Control Knowledge of Radiological Safety Procedures pertaining to licensed operator duties, such as response to radiation monitor 2.3.13 3.4 70 alarms, containment entry requirements, fuel handling responsibilities, access to locked high radiation areas, aligning filters, etc.

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Knowledge of Radiological Safety Principles pertaining to licensed operator duties, such as 2.3.12 containment entry requirements, fuel handling 3.2 71 responsibilities, access to locked high-radiation areas, aligning filters, etc.

2.3.11 Ability to control radiation releases. 3.8 74 Subtotal 3 2 Ability to prioritize and interpret the 2.4.45 4.3 22 significance of each annunciator or alarm.

4.

Emergency 2.4.17 Knowledge of EOP terms and definitions. 3.9 72 Procedures I Ability to prioritize and interpret the Plan 2.4.45 significance of each annunciator or 4.1 73 alarm.

Subtotal 2 1 Tier 3 Point Total 10 7

ES-401 Record of Rejected KIA's Form ES-401-4 Randomly Tier I Group Reason for Rejection Selected KIA KIA 295038 2.4.4 supports testing at the RO level, but not the 111 SRO 295038 2.4.45 SRO-Only level due to job responsibilities. KIA was rejected and a new KIA was randomly selected.

KIA 2.1.44 supports testing at the RO level, but not the SRO-Only 3 SRO 2.1.4 level due to job responsibilities. KIA was rejected and a new KIA was randomly selected.

KIA 2.4.35 supports testing at the RO level, but not the SRO-Only 3SRO 2.4.45 level due to job responsibilities. KIA was rejected and a new KIA was randomly selected.

KIA 295023 AK3.05 applies to a BWR-1. Oyster Creek is a 111 RO 295023 AK3.02 BWR-2. KIA was rejected and a new KIA was randomly selected.

KIA 2.2.3 applies to a multi-unit site. Oyster Creek is a single unit 3 RO 2.2.22 site. KIA was rejected and a new KIA was randomly selected.

KIA 295028 EA1.02 was rejected due to overlap with RO 111 RO 295028 EA1.01 question #62, KIA 295010 AA 1.01. A new KIA was randomly selected.

KIA 295022 AK3.02 was rejected due not being able to develop 112 RO 295002 AK3.04 three credible distractors at the RO level. A new KIA was randomly selected.

KIA 290001 K1.02 was rejected due not being able to develop 212 RO 256000 K1.22 three credible distractors at the RO level. A new KIA was randomly selected.

KIA 295035 2.1.27 was rejected due to not being able to develop three credible distractors at the RO level. A new KIA was 112 RO 295033 2.4.2 randomly selected at the RO level. A new KIA was randomly selected.

KIA 2.3.13 supports testing at the RO level, but not the SRO-Only 3 SRO 2.3.15 level due to job responsibilities. KIA was rejected and a new KIA was randomly selected.

KIA 201003 2.4.50 supports testing at the RO level, but not the 212 SRO 201003 2.4.11 SRO-Only level due to job responsibilities. KIA was rejected and a new KIA was randomly selected.

KIA 295003 AK3.07 was rejected due to not being able to develop three credible distractors at the RO level. A new KIA 111 RO 295003 AK3.01 was randomly selected at the RO level. A new KIA was randomly selected.

KIA 295033 2.1.27 was rejected due to not being able to develop three credible distractors at the RO level. A new KIA was 112 RO 295033 2.4.2 randomly selected at the RO level. A new KIA was randomly selected.

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Oyster Creek Date of Examination: 05/19/14 Examination Level: RO [gl SRO D Operating Test Number: 13-1 NRC Administrative Topic Type Describe activity to be performed (See Note) Code*

Determine Bulk Drywell Temperature; 2.1.20 (4.6) [RO Conduct of Operations M,R Admin JPM 1]

Plot RPV Heatup Rate During a Startup; 2.1.25 (3.9) [RO Conduct of Operations D,R Admin JPM 2]

Perform a Manual Core Heat Balance Calculation lAW Equipment Control D,R 1001.6; 2.2.12 (3.7) [RO Admin JPM 3]

Radiation Control Review a Completed State/Local Notification Form; 2.4.39 Emergency Procedures/Plan M,R (3.9) [NRC RO Admin JPM 4]

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(:::_ 3 for ROs;:::. 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ~ 1)

(P)revious 2 exams (:::_ 1; randomly selected)

ES 301, Page 22 of 27

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Oyster Creek Date of Examination: 05/19/14 Examination Level: RO 0 SRO 1Z1 Operating Test Number: 13-1 NRC Administrative Topic Type Describe activity to be performed (See Note) Code*

Determine Operator Qualifications Using LMS; 2.1.8 (4.1)

Conduct of Operations D,R

[SRO Admin JPM 1]

Conduct of Operations M,R Apply Work Hour Rules; 2.1.5 (3.9) [SRO Admin JPM 2]

Review Completed Surveillance Test 619.3.016, RPS I Equipment Control N,R High Drywell Pressure Scram Test And Calibration; 2.2.12 (4.1) [SRO Admin JPM 3]

Determine Recommendation of Kl Issuance During an Radiation Control D,R Emergency; 2.3.14 (3.8) [SRO Admin JPM 4]

Classify an Emergency Event and Initiate a State/Local Emergency Procedures/Plan D,R Notification Form; 2.4.41 (4.6) [SRO Admin JPM 5]

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(~ 3 for ROs; ~ 4 for SROs & RO retakes)

(N)ew or (M)odified from bank(.:::_ 1)

(P)revious 2 exams ~ 1; randomly selected)

ES 301, Page 22 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: O~ster Creek Date of Examination: 05/19/14 Exam Level: RO [gl SR0-1 D SRO-U D Operating Test Number: 13-1 NRC Control Room Systems@ (8 for RO); (7 for SR0-1); (2 or 3 for SRO-U, including 1 ESF)

Safety System I JPM Title Type Code*

Function

a. Shutdown the Second RWCU Pump with a high NRHX temperature M,A,S 2 alarm and isolation failure (Alternate Path); 204000 A4.01 (3.1/3.0) [NRC Sim JPM 1]
b. Bypass an Inoperable Acoustic Monitor for EMRV NR 108E; 239002 M,EN,S 3 A4.03 (3.8/3.9) [NRC Sim JPM 2]
c. Add Makeup to the Isolation Condenser System (Alternate Path); D,A,S 4 207000 A3.05 (3.6/3.8) [NRC Sim JPM 3]
d. Purging the Primary Containment with Elevated Stack Radiation P,A, EN,S 5 (Alternate Path); 223001 A4.07 (4.2/4.1) [NRC Sim JPM 4]
e. De-energize 1A1 Transformer by Cross-tieing USS 1A1 to USS 181; D,S,L 6 262001 A 1.05 (3.2/3.5l[NRC Sim JPM 5]
f. Perform the Anticipatory Scram Turbine Stop Valve Closure Test D,A,S 7 (Alternate Path); 212000 A2.19 (3.8/3.9) [NRC Sim JPM 6]
g. Swap Instrument Air Compressors; 300000 K4.04 (2.8/2.9) [NRC Sim M, S 8 JPM 7J
h. Swap Control Room Ventillation Fans (Alternate Path); 290003 A4.02 D,A,S 9 (2.8/2.8) [NRC Sim JPM 8}

In-Plant Systems@ (3 for RO); (3 for SR0-1); (3 or 2 for SRO-U)

i. Control CRD in the plant Post-Scram lAW SP-3; 201001 A1.03 (2.9/2.8) P, L,R, E 1

[NRC Plant JPM 1]

j. Align Core Spray System to the Condensate Storage Tank for Emergency D,R,L,E 2 Operations; 295030 EA 1.06_(_3.4/3.4)LNRC Plant JPM 2]
k. Swap Static Chargers from C1 to C2; 263000 K1.02 (3.2/3.3) [NRC Plant D 6 JPM 3]

@ All RO and SR0-1 control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO I SR0-1 I SRO-U (A)Iternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank ~91 ~8 I ~4 (E)mergency or abnormal in-plant  :::_ 1 I :::_1 I :::_ 1 (EN)gineered safety feature - I - I :::. 1 (control room system (L)ow-Power I Shutdown  :::_ 1 I :::_1 I :::_ 1 (N)ew or (M)odified from bank including 1(A)  :::_21  ;::2 I :::_ 1 (P)revious 2 exams ~3I ~3 I ~ 2 (randomly selected)

(R)CA  :::_ 1 I :::_1 I ;:_ 1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Oyster Creek Date of Examination: 05/19/14 Exam Level: RO D SR0-1 [8:1 SRO-U D Operating Test Number: 13-1 NRC Control Room Systems@ (8 for RO); (7 for SR0-1); (2 or 3 for SRO-U, including 1 ESF)

Safety System I JPM Title Type Code*

Function

a. Shutdown the Second RWCU Pump with a high NRHX temperature M,A,S 2 alarm and isolation failure (Alternate Path); 204000 A4.01 (3.1/3.0) [NRC Sim JPM 1]
b. Bypass an Inoperable Acoustic Monitor for EMRV NR1 08E; 239002 M, EN, S 3 A4.03 (3.8/3.9) [NRC Sim JPM 2]
c. Add Makeup to the Isolation Condenser System (Alternate Path); D,A,S 4 207000 A3.05 (3.6/3.8) [NRC Sim JPM 3]
d. Purging the Primary Containment with Elevated Stack Radiation P,A,EN,S 5 (Alternate Path); 223001 A4.07 (4.2/4.1) [NRC Sim JPM 4]

e.

f. Perform the Anticipatory Scram Turbine Stop Valve Closure Test D,A,S 7 (Alternate Path); 212000 A2.19 (3.8/3.9) [NRC Sim JPM 6]
g. Swap Instrument Air Compressors; 300000 K4.04 (2.8/2.9) [NRC Sim M,S 8 JPM 7]
h. Swap Control Room Ventillation Fans (Alternate Path); 290003 A4.02 D,A,S 9 (2.8/2.8) [NRC Sim JPM 8]

In-Plant Systems@ (3 for RO); (3 for SR0-1); (3 or 2 for SRO-U)

i. Control CRD in the plant Post-Scram lAW SP-3; 201001 A1.03 (2.9/2.8) P,L,R,E 1

[NRC Plant JPM 1]

j. Align Core Spray System to the Condensate Storage Tank for Emergency D, R, L, E 2 Operations; 295030 EA1.06 (3.4/3.4) [NRC Plant JPM 2]
k. Swap Static Chargers from C1 to C2; 263000 K1.02 (3.2/3.3) [NRC Plant D 6 JPM 3]

@ All RO and SR0-1 control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO I SR0-11 SRO-U (A)Iternate path 4-61 4-6 I 2-3 (C)ontrol room (D)irect from bank ~91 ~8 I ~4 (E)mergency or abnormal in-plant ~ 1 I ~1 I ~ 1 (EN)gineered safety feature - I - I ~ 1 (control room system (L)ow-Power I Shutdown ~1 I ~1 I ~1 (N)ew or (M)odified from bank including 1 (A) ~21 ~2 I ~1 (P)revious 2 exams ~31 .S3 I ~ 2 (randomly selected)

(R)CA ~ 1I ~1 I ~ 1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Oyster Creek Date of Examination: 05119114 Exam Level: RO 0 SR0-1 0 SRO-U 1ZJ Operating Test Number: 13-1 NRC Control Room Systems@ (8 for RO); (7 for SR0-1); (2 or 3 for SRO-U, including 1 ESF)

Safety System I JPM Title Type Code*

Function

a. Shutdown the Second RWCU Pump with a high NRHX temperature M,A,S 2 alarm and isolation failure (Alternate Path); 204000 A4.01 (3.113.0) [NRC Sim JPM 1J
b. Bypass an Inoperable Acoustic Monitor for EMRV NR 108E; 239002 M, EN,S 3 A4.03 (3.813.9) [NRC Sim JPM 2]

c.

d.

e.

f.

g.

h. Swap Control Room Ventillation Fans (Alternate Path); 290003 A4.02 D,A,S 9 (2.812.8) [NRC Sim JPM 8]

In-Plant Systems@ (3 for RO); (3 for SR0-1); (3 or 2 for SRO-U)

i. Control CRD in the plant Post-Scram lAW SP-3; 201001 A1.03 (2.912.8) P, L, R, E 1

[NRC Plant JPM 1]

j.

k. Swap Static Chargers from C1 to C2; 263000 K1.02 (3.213.3) [NRC Plant D 6 JPM 3]

@ All RO and SR0-1 control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO I SR0-11 SRO-U (A)Iternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank ~91 ~8 I ~4 (E)mergency or abnormal in-plant ~1 I ~1 I ~ 1 (EN)gineered safety feature - I - I ~ 1 (control room system (L)ow-Power I Shutdown ~ 1I ~1 I ~1 (N)ew or (M)odified from bank including 1 (A) ~21 ~2 I ~1 (P)revious 2 exams ~31 ~3 I ~ 2 (randomly selected)

(R)CA ~1 I ~1 I ~ 1 (S)imulator ES-301, Page 23 of 27