ML17261B169
| ML17261B169 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 02/10/2016 |
| From: | Brian Fuller Operations Branch I |
| To: | Exelon Nuclear |
| Shared Package | |
| ML15219A259 | List: |
| References | |
| TAC U01929 | |
| Download: ML17261B169 (2) | |
Text
Enhancements from NRC PREP week on JPM's and Simulator scenarios
- 1.
NRC scenario 1
- a.
Changed initial conditions from 100% to 97% power
- b.
Added cue to event #1 to move to event #2 as directed by lead evaluator
- c.
Added EO roleplays for CRD pump in event #3
- 2.
NRC scenario 2
- a.
Changed RBCCW pump from #2 to #1 in event #1
- b.
Updated which valves closed and didn't close report in event #2
- c.
Removed "places off-gas selector switch to isolate and bypass in event #5
- d.
Indicated which trigger number is assigned to event #6
- e.
Added action to "drive cram array first then normal pattern" in event #7 /8
- f.
Added arrows to indicate actions of the critical task in event #7 /8
- g.
Changed desired band from -20 to 20 to -20" to 30" in event #7 /8
- h.
Fixed font on shift turnover page
- 3.
NRC scenario 3
- a.
Reassigned trigger numbers to events #2,3,4.
- b.
Enhanced Cue of EMRV tailpipe temps in event #2
- c.
Removed action to refer to T.S 3.5.A.3
- d.
Added Booth action to re-initate EMRV leak if switch was placed back in Auto in event
- 2
- e.
Removed reference to T.S. 3.4.B in SRO actions in event #2
- f.
Added step to perform SP-10 in event #6/7
- g.
Added words "And/Or" between SP-58 and SP-60 in event #8
- 4.
NRC scenario 4
- a.
Swapped Event #4 and event #5 in the scenario
- b.
Changed BACP-1 to VACP-1 in actions in event #4
- c.
Changed trigger number in event #8
- 5.
NRC control Room JPM 1
- a.
Added cue in step 7
- 6.
NRC Control Room JPM 2
- a.
Added cue in step 4
- b.
Added reference to procedure 303
- c.
Added setup instructions to have copy of 303 pre-printed
- 7.
NRC Control Room JPM 3
- a.
Removed step 12 and added cue to end JPM on step 11
- b.
Removed wording "and differential temperature <80F" from terminating cue
- 8.
NRC Control Room JPM 4
- a.
Added cue for stop watch number on step 4
- b.
Update procedure step numbers on steps 8-16
- c.
Added cue for status of relays and SOE on step 16
- d.
Added cues on steps on step 19 and 20
- 9.
- a.
Removed duplicate word "hijacked" in initial conditions
- b.
Removed cue to provide candidate to obtains in binder in step 4
- 10. NRC Admin JPM 5
- a.
Provided larger RPS prints to applicant
- a.
Reworded Task Cue to perform uncompleted items in step 78 of the 201-2
- b.
Updated Step 78 of the 201-2 for pre supplied procedures
- c.
Added prepared copy of 201-6 for students
- d.
Changed SRM 22 reading on 201-2 to 1
- a.
Added bypass APRM 5 to first bullet in step 8 on attachment 1 of MA-AA-716-004
- b.
Added words "and does not approve" to step 2 and made step 2 critical
- a.
Developed prepared copies of EP-AA-113-F02 for students
- a.
Swapped whole JPM out. New JPM involves EAL classification after simulator scenario