ML17261B169

From kanterella
Jump to navigation Jump to search

NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2)
ML17261B169
Person / Time
Site: Oyster Creek
Issue date: 02/10/2016
From: Brian Fuller
Operations Branch I
To:
Exelon Nuclear
Shared Package
ML15219A259 List:
References
TAC U01929
Download: ML17261B169 (2)


Text

Enhancements from NRC PREP week on JPM's and Simulator scenarios

1.

NRC scenario 1

a.

Changed initial conditions from 100% to 97% power

b.

Added cue to event #1 to move to event #2 as directed by lead evaluator

c.

Added EO roleplays for CRD pump in event #3

2.

NRC scenario 2

a.

Changed RBCCW pump from #2 to #1 in event #1

b.

Updated which valves closed and didn't close report in event #2

c.

Removed "places off-gas selector switch to isolate and bypass in event #5

d.

Indicated which trigger number is assigned to event #6

e.

Added action to "drive cram array first then normal pattern" in event #7 /8

f.

Added arrows to indicate actions of the critical task in event #7 /8

g.

Changed desired band from -20 to 20 to -20" to 30" in event #7 /8

h.

Fixed font on shift turnover page

3.

NRC scenario 3

a.

Reassigned trigger numbers to events #2,3,4.

b.

Enhanced Cue of EMRV tailpipe temps in event #2

c.

Removed action to refer to T.S 3.5.A.3

d.

Added Booth action to re-initate EMRV leak if switch was placed back in Auto in event

  1. 2
e.

Removed reference to T.S. 3.4.B in SRO actions in event #2

f.

Added step to perform SP-10 in event #6/7

g.

Added words "And/Or" between SP-58 and SP-60 in event #8

4.

NRC scenario 4

a.

Swapped Event #4 and event #5 in the scenario

b.

Changed BACP-1 to VACP-1 in actions in event #4

c.

Changed trigger number in event #8

5.

NRC control Room JPM 1

a.

Added cue in step 7

6.

NRC Control Room JPM 2

a.

Added cue in step 4

b.

Added reference to procedure 303

c.

Added setup instructions to have copy of 303 pre-printed

7.

NRC Control Room JPM 3

a.

Removed step 12 and added cue to end JPM on step 11

b.

Removed wording "and differential temperature <80F" from terminating cue

8.

NRC Control Room JPM 4

a.

Added cue for stop watch number on step 4

b.

Update procedure step numbers on steps 8-16

c.

Added cue for status of relays and SOE on step 16

d.

Added cues on steps on step 19 and 20

9.

NRC Admin JPM 4 (RO)

a.

Removed duplicate word "hijacked" in initial conditions

b.

Removed cue to provide candidate to obtains in binder in step 4

10. NRC Admin JPM 5
a.

Provided larger RPS prints to applicant

11. NRC Admin JPM 1 SRO
a.

Reworded Task Cue to perform uncompleted items in step 78 of the 201-2

b.

Updated Step 78 of the 201-2 for pre supplied procedures

c.

Added prepared copy of 201-6 for students

d.

Changed SRM 22 reading on 201-2 to 1

12. NRC admin JPM 2 SRO
a.

Added bypass APRM 5 to first bullet in step 8 on attachment 1 of MA-AA-716-004

b.

Added words "and does not approve" to step 2 and made step 2 critical

13. NRC admin JPM 4 SRO
a.

Developed prepared copies of EP-AA-113-F02 for students

14. NRC Admin JPM 5 SRO
a.

Swapped whole JPM out. New JPM involves EAL classification after simulator scenario