June 12, 2008 Mr. Charles G. Pardee Chief Nuclear Officer (CNO) and Senior Vice President Exelon Generation Company, LLC Chief Nuclear Officer (CNO)
AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
SENIOR REACTOR OPERATOR RETAKE EXAMINATION - OYSTER CREEK
Dear Mr. Pardee:
In a telephone conversation on June 12, 2008, between Mr. Joseph DAntonio, Senior Operations Engineer, and Mr. Neil Patrou, Exam Developer, arrangements were made for the administration of a retake initial licensing examination for one applicant at Oyster Creek during the week of August 18, 2008.
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 7, 2008. The examination and the supporting reference materials will be due by July 28, 2008. Pursuant to Title 10, Section 10 CFR 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested examination, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary senior reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination date. Because your applicant for this NRC retake examination previously passed the written and job
C. G. Pardee 2
performance measures examinations, administered on April 14-18 and April 22, 2008, you may request a waiver of those portions. If the application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, which expires on June 30, 2009, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRCs public website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Patrou has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5046.
Sincerely,
/RA/
John G. Caruso, Chief Operations Branch Division of Reactor Safety Docket No. 50-219 License No. DPR-16
C. G. Pardee 2
performance measures examinations, administered on April 14-18 and April 22, 2008, you may request a waiver of those portions. If the application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, which expires on June 30, 2009, approved these information collections. The public reporting burden for this collection of information is estimated to average 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic reading room page of the NRCs public website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Patrou has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5046.
Sincerely,
/RA/
John G. Caruso, Chief Operations Branch Division of Reactor Safety Docket No. 50-219 License No. DPR-16 SUNSI Review Complete: TF (Reviewer=s Initials)
ADAMS PKG: ML081630455 ADAMS ACC#ML081640460 DOCUMENT NAME: T:\\DRS\\Operations Branch\\DANTONIO\\Exam 08 OC Aug 08 (U01775)\\120dayexamRetakeltr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
OFFICE RI/DRS RI/DRS RI/DRS NAME CJBixler/TF for JMDAntonio/TF for JGCaruso/TF for DATE 06/12/08 06/12/08 06/12/08 OFFICIAL RECORD COPY
C. G. Pardee 3
cc w/encl:
C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon T. Rausch, Site Vice President, Oyster Creek Nuclear Generating Station J. Randich, Plant Manager, Oyster Creek Generating Station J. Kandasamy, Regulatory Assurance Manager, Oyster Creek R. DeGregorio, Senior Vice President, Mid-Atlantic Operations K. Jury,Vice President, Licensing and Regulatory Affairs P. Cowan, Director, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk, AmerGen Mayor of Lacey Township P. Mulligan, Chief, NJ Dept of Environmental Protection R. Shadis, New England Coalition Staff E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs G. Ludlam, Director of Training - Oyster Creek, AmerGen
C. G. Pardee 4
Distribution w/encl: VIA E-MAIL S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS J. Caruso, DRS J. DAntonio, DRS D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP M. Ferdas, DRP, Senior Resident Inspector J. Kulp, DRP, Resident Inspector J. DeVries, DRP, Resident OA S. Williams, RI OEDO H. Chernoff, NRR R. Nelson, NRR G. Miller, PM, NRR J. Hughey, NRR, Backup Distribution w/encl:
DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File