RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
(EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12187A682
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 07/05/2012
From: Gullott D
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RS-12-114
Download: ML12187A682 (13)


Text

4300 Winfield Road

'.4 rrenv lie. U60555 Exeton Generation . 630 657 2000 Office RS-12-114 July 5, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units I and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

July 5, 2012 U. S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2014 through 2017, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2014 and 2015. Attachments 1 through 11 provide responses to RIS 2012-07 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2016, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual -site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.

David M. Gullott Manager - Licensing Exelon Generation Company, LLC Attachment 1 - Completed NRC Form 536 for Braidwood Station Attachment 2 - Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 - Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 - Completed NRC Form 536 for LaSalle County Station Attachment 6 - Completed NRC Form 536 for Limerick Generating Station - ILT Attachment 7 - Completed NRC Form 536 for Limerick Generating Station - LSRO Attachment 8 - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 9 - Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 10 - Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 11 - Completed NRC Form 536 for Three Mile Island Nuclear Station

Attachment I Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150 -0131 EXPIRES: 09130)2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection rs used to plan budgets and resources for operator ezamna ons. Send commends regartAng tun en estimate to the information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission. Washington, DC 20555.0001, or by ite net e-mall to Infecdlects.ResourceCrvcgov. and to the Desk Officer, Office of Information and E XAMINATION DATA Regulatory Affairs, NEOB-10202, (3150.0131), Office of Management and Budget, Wash ngton, DC 20503. It a means used to impose an information collection does not display a currently void OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 II NRC Docket Nos. STN 50-456 and STN 50-457 IA. PROPOSED EXAMINATION PREPA RATIO N SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS S. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY2015 Cy 2016 CY 2017 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 01/05/2015 11/07/2016 N/A ALTERNATE DATE N/A 01/26/2015 1 10/24/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS E XAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE ISEPTEMBEF DECEMBERI MARCH JUNE ISEPTEMBERI DECEMBER ESTIMATED NUMBER OF 0 0 1 0 1 0 0 1 12 CANDIDATES CIRC FORM 536 (92011)

Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information confection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commissar, Washington, DC 20555-0001, or by internet a-mati to InfbwRecis.Resou rx c.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Wasttington, 20503. if a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to end to, the information r ecton.

FACILITY N GtON Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 II NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS S. INITIAL OPERATOR LICENSE EMINATIONS PROPOSED NUMBER CY 2014 Cy 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS 6 4 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 9 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/02/14 - 06/13/14 08/17/15 - 08/28/15 N/A 06/19/17 - 06/30/17 ALTERNATE DATE 06/16/14 - 06/27/14 08/31/15 - 09/11/15 N/A 07/031/17 - 07/ 14/ 17 C. PROPOSED GENERIC FUNDA MENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 Cy 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0 0 0 0 0 0 15 CANDIDATES NRC FORM 536 (9-20111

Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (4.2411)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resouncas for operator examinations. Send comments regarding burden estimate to the Information Services Brame OPERATOR LICENSING (T-5153), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mail to InfocoNects.ResourceQrvc gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150.0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information comedian.

C REGION FACIUTY Clinton Power Station Facility Operating License No. NPF-62 I11 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2014 CY 2015 CY 2016 CY 2017 0 4 0 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES N/A 03/16/2015 N/A 02/21/2017 N/A 03/23/2015 N/A 02/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 1 0 1 0 1 0 1 0 1 12 CANDIDATES NRC FORM 536 (9.2611)

Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION JAPPROVE_D BY OMB: No. 3150.0131 EXPIRES: 0913012014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request: I tour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the information Services Branch OPERATOR LICENSING (T-5 F53). U.S. Nuclear Regulatory commission, Washington, DC 20555-0001, or by Internet a-mail to Infocoif .Resource nrc.gov, and to the Desk Officer, ice of Information a EXAMINATION DATA Regulatory Affairs, NE03.10202, (3150.0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a c urrently vat OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infomatlo n collection.

FACILrrY N CRE _10- N Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR- 19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPE RATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY2015 CY 2016 NUMBER OF REACTOR OPERATORS 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 5 7 NUMBER OF SENIOR REACTOR 0

OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03102/2015 08/08/2016 ALTERNATE DATE N/A 03/23/2015 08/22/2016 C. PROPOSED GENERI C FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH I JUNE ISEPTEMBER! DECEMBER ESTIMATED NUMBER OF 0 1 0 1 0 1 0 0 12 0 1 0 CANDIDATES NRC FORM 536 (9-2011)

Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to Man budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (r-5 F53), US. Nuclear Regulatory Commission, Washington, DC 205550001, or by internet a*

mail to knfocdlects.Rescurce nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to moose an informed on collection does not display a currently va ld 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information c ollection.

FACILITY r^t^,R c9oty LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF- 18 Iii NRC Docket Nos. STN 50-373 and 50-374 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS E. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY2015 CY 2016 NUMBER OF REACTOR OPERATORS 5 0 7 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 0 5 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 0 i NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 10/14/2014 N/A 10/11/2016 ALTERNATE DATE 10/20/2014 N/A 10/17/2016 C. PROPOSED GENERI C FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 PROPOSED NUMBER MARCH ESTIMATED NUMBER OF 0 CANDIDATES NRC FORM 536 (9.2011)

Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: No. 3150.4131 EXPIRES: 0913012014 19-2011) Estimated burden per response to comply with this voluntary information collection request 1 This infomation collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DO 20555-0001, or by hdemet a-mail to tnfacaiects.Resource@nm.gov, and to the Desk officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information co llection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to to, the utfmmation collection.

FACILITY CAP-010 Limerick Generating Station, Units I and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY2017 NUMBER OF REACTOR OPERATORS 6 0 8 0 NUMBER OF SENIOR REACTOR 10 6 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 4 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/06/2014 N/A 10/03/2016 N/A ALTERNATE DATE 10/14/2014 N/A 10/11/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED 1 NUMBER MARCH JUNE SEPTEMBEF DECEMBER MARCH JUNE ,SEPTEMBEF DECEMBER I 1 ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (9-2011)

Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 04/3012014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request t hour. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to t e Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuc lear Regulatory Caomission, Washingkun, DC 20555-0001, or by Internet e-mail to krfuedlects.Reso .gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Ofte of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid t control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information t ollection.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS S. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 6 0 PROPOSED DATES PRIMARY DATE N/A N/A 07/18/2016 N/A ALTERNATE DATE N/A N/A I 07/25/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CV 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER) DECEMBER MARCH JUNE SEPTEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 I 0 CANDIDATES NRC FORM 53 2 1

RttaCnment i Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION 'APPROVED BY OMS: NO. 3150 -0131 EXPIRES: 0 913 0/2 01 4 (9-2011}

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information resection is used to an budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mati to lnfacolects.Resou ,gav, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, fEo&10202, (3150-0131), Office of Management and Budget Washington, DC 201503. If a means used to impose an information collection does not display a currently valid 0Ma control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

WNWAMAWNWANOWROMPOW FACILITY Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPE RATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS 4 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/19/2014 N/A N/A N/A ALTERNATE DATE 06/02/2014 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GEE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER, DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 CANDIDATES hlRC FORM 536 (92011)

Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09130/2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Infonnatton Series Branch OPERATOR LICENSING (T-5 F53), U.S. Nucle ar Regulatory commission, Washington, DC 20555.0001, or by Internet e-EXAMINATION DATA mat to tnfocokcts.Resource@nre.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202. (3150-0131), Office of M an agement and Budget, Washington, DC 20503. If a means used to impose an information collect ion does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC RE t N Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 EXAMINATIONS 1

ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPE RATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS 0 6 0 3 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED *See LGS e PROPOSED DATES PRIMARY DATE N/A 03/23/2015 N/A ALTERNATE DATE N/A 03/30/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS E XAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER ARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER ESTIMATED NUMBER OF 0 0 0 0 0 CANDIDATES NRC FORM 53e (9-2011)

Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 536 U .S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150 -0131 EXPIRES: 081301`2014 (9-2011)

Estanated burden per response to comply with this vol untary Information collection request: 1 hay. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (17-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by urternet a-mati to nfocdtcis.Resource@nre.gov , and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, fEOB-10202, (3150.0131), Office of Management and Budget, Washington, DC 20503, If a means used to Impose an nfarmabon collection does not display a nmently valid 0M6 control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the nfamation collection, FACtUTY RC R Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY 2015 Cy 2016 CY 2017 NUMBER OF REACTOR OPERATORS 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 5 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/21/2014 N/A 04/25/2016 N/A ALTERNATE DATE 05/19/2014 N/A 05/23/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 Cy 20 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER ECEMBER ESTIMATED NUMBER OF 0 0 0 10 0 0 0 0 CANDIDATES NRC FORM 536 (9-2011)

Attachment 11 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31504131 EXPIRES: 09130/2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the information Services Branch OPERATOR LICENSING (T-5 F53). U,S. Nuclear Regulatory Co emission, Washington, DC 20555.0001, of by Internet e-EXAM INATION DATA mail to Infocollarts.Resaurca rwc,gov, and to the Desk Officer, Office of information and Regulatory Atfahs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently vat OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACtt.trY NRC tent Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY2016 CY2017 NUMBER OF REACTOR OPERATORS 4 4 0 5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 8 9 0 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/10/2014 08/17/2015 N/A 08/21/2017 ALTERNATE DATE 04/07/2014 1 09/14/2015 1 N/A 1 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE ISEPTEMBERI DECEMBER MARCH I JUNE ISEPTEMBERI DECEMBER ESTIMATED NUMBER OF 12 0 0 0 0 1 0 1 0 CANDIDATES NRC FORM 536 (9.20111