ML14167A312
Jump to navigation
Jump to search
| ML14167A312 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/07/2014 |
| From: | Todd Fish Operations Branch I |
| To: | Ridosh J Exelon Nuclear |
| Shared Package | |
| ML13333A261 | List: |
| References | |
| TAC U01893 | |
| Download: ML14167A312 (2) | |
Text
To:
Todd Fish, NRC Chief Examiner From:
JeffRidosh, Oyster Creek Regulatory Exam Author
Subject:
Revisions to Oyster Creek Exam Materials for the July 2014 Initial NRC License Examination Date:
May 7, 2014 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held April 15-16, 2014.
A.
Administrative JPMs:
- a. Changed work hour times to those representative of actual plant values.
- b. Added a note in work hour table that turnover is included.
- a. Added EAL User's Guide as a reference.
- a. Added EAL User's Guide as a reference.
- c. Changed JPM to time critical.
- d. Added a statement completing the State/Local Notification form is part of the classification for exam purposes.
- 4. ROJPM2
- a. Added clarification to the Task Standard.
- a. Updated Task Standard.
- 6. ROJPM4
- a. Updated time of declaration throughout JPM.
- b. Fixed a typo on wind speed units.
B.
Control Room JPMs:
- 1. JPM 1
- a. Revised critical step criteria for Performance steps 13 & 14.
- 2. JPM 2
- a. Replaced JPM.
- 3. JPM 3
- a. Enhanced initiating cue.
- 4. JPM 4
- a. Changed JPM to not alternate path.
- 5. JPM 5
- a. Modified JPM setup.
- 6. JPM 7
- a. Created a new Alternate Path JPM.
- 7. JPM 8
- a. Added cue to step 11.
C.
In-plant JPMs:
- 1. JPM 1
- a. Replaced JPM.
D.
Simulator scenarios:
- 1. Scenario 1 :
- a. Added a cue to Event #3.
- b. Modified malfunction severity for Event #3.
- c. Added additional crew actions to Event #6.
- 2. Scenario 2:
- a. Added a cue for Event #2.
- b. Adjusted severity of Event #5.
- 3. Scenario 3:
- a. Added a cue for Event # 1.