ML082250262
| ML082250262 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/11/2008 |
| From: | Caruso J Operations Branch I |
| To: | Rausch T AmerGen Energy Co |
| Shared Package | |
| ML081630455 | List: |
| References | |
| Download: ML082250262 (4) | |
Text
August 11, 2008 Mr. Timothy S. Rausch Vice President AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, NJ 08731
SUBJECT:
OPERATOR LICENSING RETAKE EXAMINATION APPROVAL (OYSTER CREEK GENERATING STATION)
Dear Mr. Rausch:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examination at Oyster Creek Generating Station.
The NRC has completed its review of the operator license application submitted in connection with this examination and separately provided a list of approved applicants to Gregg W. Ludlam, Training Director. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examination in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors@. The NRC staff will administer the simulator operating tests during the week of August 18, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at (610) 337-5389.
Please contact your Chief Examiner, Joseph DAntonio, at 610-337-5085, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete operating test) specified for this applicant.
Sincerely,
/RA/
John G. Caruso, Acting Chief Operations Branch Division of Reactor Safety Docket No. 050-219
T. Rausch 2
cc:
C. Pardee, Chief Nuclear Officer (CNO) and Senior Vice President, Exelon Generation Company, LLC C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon J. Randich, Plant Manager, Oyster Creek Generating Station J. Kandasamy, Regulatory Assurance Manager, Oyster Creek R. DeGregorio, Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing and Regulatory Affairs P. Cowan, Director, Licensing B. Fewell, Esq., Associate General Counsel, Exelon Correspondence Control Desk, AmerGen Mayor of Lacey Township P. Mulligan, Chief, NJ Dept of Environmental Protection R. Shadis, New England Coalition Staff E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs Director of Training - Oyster Creek, AmerGen
T. Rausch 3
E-Mail:
S. Collins, RA M. Dapas, DRA D. Roberts, DRS S. Hansell, DRS J. Caruso, DRS J. DAntonio, DRS, Chief Examiner D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP M. Ferdas, DRP, Senior Resident Inspector J. Kulp, DRP, Resident Inspector J. DeVries, DRP, Resident OA S. Williams, RI OEDO H. Chernoff, NRR R. Nelson, NRR G. Miller, PM, NRR J. Hughey, NRR, Backup Region I Docket Room (with concurrences)
Distribution:
C. Bixler, DRS Master Exam File
Mr. Timothy S. Rausch Vice President AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, NJ 08731
SUBJECT:
OPERATOR LICENSING RETAKE EXAMINATION APPROVAL (OYSTER CREEK GENERATING STATION)
Dear Mr. Rausch:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examination at Oyster Creek Generating Station.
The NRC has completed its review of the operator license application submitted in connection with this examination and separately provided a list of approved applicants to Gregg W. Ludlam, Training Director. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examination in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors@. The NRC staff will administer the simulator operating tests during the week of August 18, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at (610) 337-5389.
Please contact your Chief Examiner, Joseph DAntonio, at 610-337-5085, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete operating test) specified for this applicant.
Sincerely,
/RA/
John G. Caruso, Acting Chief Operations Branch Division of Reactor Safety Docket No. 050-219 SUNSI Review Complete: JC (Reviewer=s Initials)
ADAMS PKG: ML081630455 ADAMS ACC: ML082250262 DOCUMENT NAME: G:\\DRS\\Operations Branch\\DANTONIO\\Exam 08 OC Aug 08 (U01775)\\ExamApprovalLtr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CB JDAntonio/JD JGCaruso/JC DATE 08/11/08 08/11/08 08/11/08 OFFICIAL RECORD COPY