ML090820113: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML090820113
| number = ML090820113
| issue date = 01/05/2009
| issue date = 01/05/2009
| title = Diablo Canyon Power Plant, Units 1 and 2, Email Regarding Seismic Action Plan
| title = Email Regarding Seismic Action Plan
| author name = Thomas G
| author name = Thomas G
| author affiliation = NRC/NRR/DE/EMCB
| author affiliation = NRC/NRR/DE/EMCB
| addressee name = Wang A B
| addressee name = Wang A
| addressee affiliation = NRC/NRR/DORL/LPLIV
| addressee affiliation = NRC/NRR/DORL/LPLIV
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: George Thomas Sent: Monday, January 05, 2009 4:42 PM To: Alan Wang Cc: Kamal Manoly  
{{#Wiki_filter:From:                       George Thomas Sent:                       Monday, January 05, 2009 4:42 PM To:                         Alan Wang Cc:                         Kamal Manoly


==Subject:==
==Subject:==
RE: Seismic Action Plan Alan, Based on our review and input provided by RES, we find the Action Plan and schedule proposed by PG&E at better chararacterizing the potential shoreline fault near Diablo Canyon plant to be reasonably complete and comprehensive in scope and acceptable.  
RE: Seismic Action Plan
 
: Alan, Based on our review and input provided by RES, we find the Action Plan and schedule proposed by PG&E at better chararacterizing the potential shoreline fault near Diablo Canyon plant to be reasonably complete and comprehensive in scope and acceptable.
Thanks. George Thomas Structural Engineer NRR/DE/EMCB 415-6181 From: Alan Wang Sent: Wednesday, December 17, 2008 4:03 PM To: Michael Markley; Kamal Manoly; George Thomas; Annie Kammerer; Yong Li; Undine Shoop  
Thanks.
George Thomas Structural Engineer NRR/DE/EMCB 415-6181 From: Alan Wang Sent: Wednesday, December 17, 2008 4:03 PM To: Michael Markley; Kamal Manoly; George Thomas; Annie Kammerer; Yong Li; Undine Shoop


==Subject:==
==Subject:==
FW: Seismic Action Plan I thought USGS was going to provide results of their studies in April 09. Looks like their plan does not complete data collection and studies until 6/09 and fault characterization until 9/09. I will check to see why the discrepancy. Alan From: Guldemond, Bill [mailto:WGG4@PGE.COM] Sent: Wednesday, December 17, 2008 10:56 AM To: Vincent Gaddy; Alan Wang Cc: Jones, Thomas G≺ Michael Peck; Cluff, Lloyd; Becker, James  
FW: Seismic Action Plan I thought USGS was going to provide results of their studies in April 09. Looks like their plan does not complete data collection and studies until 6/09 and fault characterization until 9/09. I will check to see why the discrepancy. Alan From: Guldemond, Bill [mailto:WGG4@PGE.COM]
Sent: Wednesday, December 17, 2008 10:56 AM To: Vincent Gaddy; Alan Wang Cc: Jones, Thomas G≺ Michael Peck; Cluff, Lloyd; Becker, James


==Subject:==
==Subject:==
Seismic Action Plan Vince/Alan, Please find attached the action plan and schedule for continued efforts at better characterizing the potential fault near Diablo Canyon. Feel free to contact me or, for technical discussions, Loyd Cluff (415-973-2791) of our geosciences department.
Seismic Action Plan Vince/Alan, Please find attached the action plan and schedule for continued efforts at better characterizing the potential fault near Diablo Canyon. Feel free to contact me or, for technical discussions, Loyd Cluff (415-973-2791) of our geosciences department.
Bill Guldemond
Bill Guldemond
  <<Shoreline Fault Characterization schedule.pdf>> <<Action plan for Shoreline fault study.doc>>
<<Shoreline Fault Characterization schedule.pdf>> <<Action plan for Shoreline fault study.doc>>
E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D2314C01D)  
E-mail Properties
 
Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D2314C01D)


==Subject:==
==Subject:==
RE: Seismic Action Plan Sent Date:       1/5/2009 4:42:22 PM Received Date:       1/5/2009 4:42:22 PM From:               George Thomas  
RE: Seismic Action Plan Sent Date:     1/5/2009 4:42:22 PM Received Date:       1/5/2009 4:42:22 PM From:           George Thomas Created By:       George.Thomas@nrc.gov Recipients:
 
Created By:         George.Thomas@nrc.gov  
 
Recipients:
Alan.Wang@nrc.gov (Alan Wang)
Alan.Wang@nrc.gov (Alan Wang)
Tracking Status: None Kamal.Manoly@nrc.gov (Kamal Manoly)
Tracking Status: None Kamal.Manoly@nrc.gov (Kamal Manoly)
Tracking Status: None  
Tracking Status: None Post Office:
 
HQCLSTR02.nrc.gov Files         Size     Date & Time MESSAGE         9723     1/5/2009 Options Expiration Date:
Post Office:
Priority:               olImportanceNormal ReplyRequested:        False Return Notification:     False Sensitivity:     olNormal Recipients received:}}
HQCLSTR02.nrc.gov  
 
Files               Size       Date & Time  
 
MESSAGE       9723       1/5/2009  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:        False Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 08:53, 14 November 2019

Email Regarding Seismic Action Plan
ML090820113
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/05/2009
From: George Thomas
NRC/NRR/DE/EMCB
To: Wang A
Plant Licensing Branch IV
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME0174, TAC ME0175
Download: ML090820113 (1)


Text

From: George Thomas Sent: Monday, January 05, 2009 4:42 PM To: Alan Wang Cc: Kamal Manoly

Subject:

RE: Seismic Action Plan

Alan, Based on our review and input provided by RES, we find the Action Plan and schedule proposed by PG&E at better chararacterizing the potential shoreline fault near Diablo Canyon plant to be reasonably complete and comprehensive in scope and acceptable.

Thanks.

George Thomas Structural Engineer NRR/DE/EMCB 415-6181 From: Alan Wang Sent: Wednesday, December 17, 2008 4:03 PM To: Michael Markley; Kamal Manoly; George Thomas; Annie Kammerer; Yong Li; Undine Shoop

Subject:

FW: Seismic Action Plan I thought USGS was going to provide results of their studies in April 09. Looks like their plan does not complete data collection and studies until 6/09 and fault characterization until 9/09. I will check to see why the discrepancy. Alan From: Guldemond, Bill [1]

Sent: Wednesday, December 17, 2008 10:56 AM To: Vincent Gaddy; Alan Wang Cc: Jones, Thomas G&PR; Michael Peck; Cluff, Lloyd; Becker, James

Subject:

Seismic Action Plan Vince/Alan, Please find attached the action plan and schedule for continued efforts at better characterizing the potential fault near Diablo Canyon. Feel free to contact me or, for technical discussions, Loyd Cluff (415-973-2791) of our geosciences department.

Bill Guldemond

<<Shoreline Fault Characterization schedule.pdf>> <<Action plan for Shoreline fault study.doc>>

E-mail Properties

Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D2314C01D)

Subject:

RE: Seismic Action Plan Sent Date: 1/5/2009 4:42:22 PM Received Date: 1/5/2009 4:42:22 PM From: George Thomas Created By: George.Thomas@nrc.gov Recipients:

Alan.Wang@nrc.gov (Alan Wang)

Tracking Status: None Kamal.Manoly@nrc.gov (Kamal Manoly)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 9723 1/5/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: