NRR E-mail Capture - Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements
ML21054A311
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/23/2021
From: Samson Lee
NRC/NRR/DORL/LPL4
To: Richardson M
Pacific Gas & Electric Co
References
L-2021-LLE-0007
Download: ML21054A311 (3)


Text

From: Lee, Samson Sent: Tuesday, February 23, 2021 2:53 PM To: Richardson, Michael

Subject:

Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements (EPID: L-2021-LLE-0007)

By letter dated February 4, 2021 (ADAMS Accession No. ML21049A50), Pacific Gas and Electric Company submitted a request for a one-time exemption from the following requirements at Diablo Canyon Power Plant, Units 1 and 2, ending June 30, 2021:

(1) 10 CFR 55.59(a)(1) and (c)(1) such that the current licensed operator requalification program period could be extended, on a one-time basis, from 24 to 25 months (2) the annual operating test required in 10 CFR 55.59(a)(2) from the 12-month interval to an interval of 13 months, and (3) the comprehensive requalification written examination required in 10 CFR 55.59(a)(2) from the 24-month interval to an interval of 25 months The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> to complete. The NRC staff expects to complete this review by April 5, 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Samson Lee Diablo Canyon Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168 Docket Nos. 50-275 and 50-323

Hearing Identifier: NRR_DRMA Email Number: 1041 Mail Envelope Properties (DM8PR09MB618313B85C1B19C189707E0A9A809)

Subject:

Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements (EPID: L-2021-LLE-0007)

Sent Date: 2/23/2021 2:52:55 PM Received Date: 2/23/2021 2:52:55 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"Richardson, Michael" <MJRm@pge.com>

Tracking Status: None Post Office: DM8PR09MB6183.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3275 2/23/2021 2:52:55 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: