ML090820113

From kanterella
Jump to navigation Jump to search

Email Regarding Seismic Action Plan
ML090820113
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/05/2009
From: George Thomas
NRC/NRR/DE/EMCB
To: Wang A
Plant Licensing Branch IV
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME0174, TAC ME0175
Download: ML090820113 (1)


Text

From: George Thomas Sent: Monday, January 05, 2009 4:42 PM To: Alan Wang Cc: Kamal Manoly

Subject:

RE: Seismic Action Plan

Alan, Based on our review and input provided by RES, we find the Action Plan and schedule proposed by PG&E at better chararacterizing the potential shoreline fault near Diablo Canyon plant to be reasonably complete and comprehensive in scope and acceptable.

Thanks.

George Thomas Structural Engineer NRR/DE/EMCB 415-6181 From: Alan Wang Sent: Wednesday, December 17, 2008 4:03 PM To: Michael Markley; Kamal Manoly; George Thomas; Annie Kammerer; Yong Li; Undine Shoop

Subject:

FW: Seismic Action Plan I thought USGS was going to provide results of their studies in April 09. Looks like their plan does not complete data collection and studies until 6/09 and fault characterization until 9/09. I will check to see why the discrepancy. Alan From: Guldemond, Bill [1]

Sent: Wednesday, December 17, 2008 10:56 AM To: Vincent Gaddy; Alan Wang Cc: Jones, Thomas G≺ Michael Peck; Cluff, Lloyd; Becker, James

Subject:

Seismic Action Plan Vince/Alan, Please find attached the action plan and schedule for continued efforts at better characterizing the potential fault near Diablo Canyon. Feel free to contact me or, for technical discussions, Loyd Cluff (415-973-2791) of our geosciences department.

Bill Guldemond

<<Shoreline Fault Characterization schedule.pdf>> <<Action plan for Shoreline fault study.doc>>

E-mail Properties

Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D2314C01D)

Subject:

RE: Seismic Action Plan Sent Date: 1/5/2009 4:42:22 PM Received Date: 1/5/2009 4:42:22 PM From: George Thomas Created By: George.Thomas@nrc.gov Recipients:

Alan.Wang@nrc.gov (Alan Wang)

Tracking Status: None Kamal.Manoly@nrc.gov (Kamal Manoly)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 9723 1/5/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: