MONTHYEARML0907005152008-03-11011 March 2008 Email from Pacific Gas and Electric Company Re Summary of Conference Call Held on November 21, 2009 Project stage: Other ML0906901982008-11-20020 November 2008 Email from Pacific Gas & Electric Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0907005252008-11-21021 November 2008 Summary of Conference Call Held on November 21, 2009 Prepared by Pacific Gas and Electric Company Project stage: Other ML0906902092008-11-21021 November 2008 Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & Electric Project stage: Meeting ML0908201402008-11-26026 November 2008 Yong Li Preliminary Conclusions Regarding New Shoreline Fault Project stage: Other ML0835402662008-12-17017 December 2008 Shoreline Fault Study Project stage: Other ML0907205162008-12-17017 December 2008 Email from Pacific Gas and Electric Regarding Seismic Action Plan (ME0174 and ME0175) Project stage: Other ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule Project stage: Other ML0908201132009-01-0505 January 2009 Email Regarding Seismic Action Plan Project stage: Other ML0907201032009-03-11011 March 2009 Additional Slides - Seismic Information Project stage: Other ML0907200912009-03-11011 March 2009 Email from Pacific Gas and Electric Company Enclosing Additional Seismic Slides Project stage: Other ML0907005432009-03-11011 March 2009 E-mail from Pacific Gas and Electric Company Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0909304592009-04-0808 April 2009 NRC Review of Potential Shoreline Fault Project stage: Approval ML0930805082009-11-0505 November 2009 Review of Potential New Shoreline Fault Project stage: Approval 2008-03-11
[Table View] |
Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & Electric| ML090690209 |
| Person / Time |
|---|
| Site: |
Diablo Canyon  |
|---|
| Issue date: |
11/21/2008 |
|---|
| From: |
Hardenbeck J, Langenheim V, Watt J Pacific Gas & Electric Co |
|---|
| To: |
Office of Nuclear Reactor Regulation |
|---|
| Wang, A B, NRR/DORL/LPLIV, 415-1445 |
| Shared Package |
|---|
| ML090690193 |
List: |
|---|
| References |
|---|
| TAC ME0174, TAC ME0175 |
| Download: ML090690209 (6) |
|
Text
Summary of Preliminary Findings from the USGS/PG&E hazard studies for the Central Coastal California Region Seismicity data from the USGS: J. Hardebeck, Areo-magnetic data from V. Langenheim, Marine-magnetic data from J. Watt
Regional Seismicity Based on Local Velocity Model Double-difference Tomography (tomoDD):
- solves jointly for velocity model and earthquake locations
- absolute and relative arrival times
- improves both absolute and relative earthquake locations Earthquake Data:
- ~1400 earthquakes (exclude San Simeon aftershocks)
- ~26,000 P-wave and ~3000 S-wave absolute arrival times
- ~11,000 P-wave and ~5000 S-wave relative arrival times from waveform cross-correlation
Focal Mechanisms Ray tracing in 3D velocity model.
Black: good quality (A-C of Hardebeck & Shearer) single-event mechanisms.
G l
lit i
l t
Grey: lower quality single-event mechanisms, checked for reasonableness.
Red: composite mechanisms.
DCPP
Seismicity Comparison with raw (unprocessed) aeromagnetic data
Seismicity Comparison with raw (unprocessed) Marine Magnetic Data