ML21124A061

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance
ML21124A061
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/04/2021
From: Samson Lee
NRC/NRR/DORL/LPL4
To: Richardson M
Pacific Gas & Electric Co
References
L-2021-LLA-0056
Download: ML21124A061 (3)


Text

From: Lee, Samson Sent: Tuesday, May 4, 2021 9:14 AM To: Richardson, Michael

Subject:

Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance (EPID: L-2021-LLA-0056)

By letter dated March 29, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21088A437), Pacific Gas and Electric Company (PG&E or the licensee) requested changes to the Technical Specifications (TSs) for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Diablo Canyon). The proposed amendments would revise TS 3.8.1, AC [alternating current] Sources - Operating, Condition F Completion Time to allow a separate one-time Completion Time of 7 days during the planned maintenance for each diesel fuel oil (DFO) transfer pump (DFOTP) 0-1 and 0-2, with the portable DFOTP staged and available. The one-time Completion Time of 7 days for DFOTP 0-1 and 0-2 supports planned maintenance to maintain high reliability of the DFOTPs. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> to complete. The NRC staff expects to complete this review by May 4, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Samson Lee

Diablo Canyon Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168 Docket Nos. 50-275 and 50-323

Hearing Identifier: NRR_DRMA Email Number: 1166 Mail Envelope Properties (SA1PR09MB86537AA8E546094AEB2E39309A5A9)

Subject:

Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance (EPID: L-2021-LLA-0056)

Sent Date: 5/4/2021 9:13:41 AM Received Date: 5/4/2021 9:13:41 AM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"Richardson, Michael" <MJRm@pge.com>

Tracking Status: None Post Office: SA1PR09MB8653.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3343 5/4/2021 9:13:41 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: