EPID:L-2020-LLA-0176, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System (Approved, Closed) |
|
MONTHYEARDCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Request ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G Project stage: RAI DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Response to RAI ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Response to RAI ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Request ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue Project stage: Request ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20231A6522020-08-24024 August 2020 Summary of Teleconference with Pacific Gas & Electric Company Regarding an Exigent Amendment Request to Modify Diablo Canyon Power Plant, Units 1 & 2, Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System EPID L-2020-LLA-017 Project stage: Meeting ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 Project stage: Other ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances Project stage: Approval ML20245E3952020-09-0303 September 2020 Transmittal Letter with Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other ML20245E3122020-09-0303 September 2020 Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other 2020-08-19
[Table View] |
Text
From:
Diane Curran To:
Dixon-Herrity, Jennifer Cc:
David Lochbaum; Jane Swanson (janeslo@icloud.com); Linda Seeley; Jill ZamEk
Subject:
[External_Sender] Comments on No Significant Hazards Determination for Diablo Canyon LAR Date:
Monday, August 24, 2020 3:28:13 PM Attachments:
2020.08.21 Lochbaum Declaration Before NRC Staff.pdf
Dear Ms. Dixon-Herrity,
On Friday July 21, by the e-mail below, I filed comments by San Luis Obispo Mothers for Peace (SLOMFP) on a proposed No Significant Hazards Determination for a License Amendment Request by Pacific Gas and Electric Co. for the Diablo Canyon nuclear power plant. The comments consisted of a declaration prepared by nuclear engineer David Lochbaum on SLOMFPs behalf.
After filing the comments, I noticed an error in the caption for Mr. Lochbaums declaration. It should have said BEFORE THE NRC STAFF, not BEFORE THE ATOMIC SAFETY AND LICENSING BOARD. The attached revised declaration corrects that error. It also corrects the electronic title of the document to reflect the correct date of filing, August 21 (not August 20). The declaration has not been changed in any other way.
Please substitute the attached declaration for the one I sent on Friday.
Sincerely, Diane Curran
Diane Curran Harmon Curran Spielberg & Eisenberg LLP 1725 DeSales Street NW, Suite 500 Washington, DC 20036 (240)393-9285
Counsel to SLOMFP
From: Diane Curran Sent: Friday, August 21, 2020 4:59 PM To: Jennifer.dixon-herrity@nrc.gov Cc: David Lochbaum <davelochbaum@gmail.com>; Jane Swanson (janeslo@icloud.com)
<janeslo@icloud.com>; Linda Seeley <lindaseeley@gmail.com>
Subject:
No Significant Hazards Comments
Dear Ms. Dixon-Herrity,
Attached please find a cover letter and No Significant Hazards comments by San Luis Obispo Mothers for Peace.
Sincerely, Diane Curran