MONTHYEARML0907005152008-03-11011 March 2008 Email from Pacific Gas and Electric Company Re Summary of Conference Call Held on November 21, 2009 Project stage: Other ML0906901982008-11-20020 November 2008 Email from Pacific Gas & Electric Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0907005252008-11-21021 November 2008 Summary of Conference Call Held on November 21, 2009 Prepared by Pacific Gas and Electric Company Project stage: Other ML0906902092008-11-21021 November 2008 Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & Electric Project stage: Meeting ML0908201402008-11-26026 November 2008 Yong Li Preliminary Conclusions Regarding New Shoreline Fault Project stage: Other ML0835402662008-12-17017 December 2008 Shoreline Fault Study Project stage: Other ML0907205162008-12-17017 December 2008 Email from Pacific Gas and Electric Regarding Seismic Action Plan (ME0174 and ME0175) Project stage: Other ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule Project stage: Other ML0908201132009-01-0505 January 2009 Email Regarding Seismic Action Plan Project stage: Other ML0907201032009-03-11011 March 2009 Additional Slides - Seismic Information Project stage: Other ML0907200912009-03-11011 March 2009 Email from Pacific Gas and Electric Company Enclosing Additional Seismic Slides Project stage: Other ML0907005432009-03-11011 March 2009 E-mail from Pacific Gas and Electric Company Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0909304592009-04-0808 April 2009 NRC Review of Potential Shoreline Fault Project stage: Approval ML0930805082009-11-0505 November 2009 Review of Potential New Shoreline Fault Project stage: Approval 2008-03-11
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 8, 2009 Mr. John T. Conway Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3, Mail Code 104/6/601 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - NRC PRELIMINARY REVIEW OF POTENTIAL SHORELINE FAULT (TAC NOS. ME0174 AND ME0175)
Dear Mr. Conway:
On November 14,2008, Pacific Gas and Electric (PG&E, the licensee) notified the U.S. Nuclear Regulatory Commission (NRC) that preliminary results from ongoing studies by PG&E and the U.S. Geological Survey (USGS) indicate that there is a zone of seismicity that could indicate the presence of a fault approximately 15 kilometers (km) in length, located approximately 1 km offshore from the Diablo Canyon Power Plant (DCPP). Subsequently, PG&E has informally referred to this zone of seismicity as the potential "Shoreline Fault." PG&E has been collaborating with the USGS to collect and analyze new geological, geophysical, and seismic data to develop improved tectonic models for the central California coastal region through the Collaborative Research and Development Agreement.
PG&E provided a status of this effort to the NRC staff during a November 21, 2008, conference call. PG&E informed the NRC staff that it had performed an initial evaluation of the potential ground motion levels at the DCPP from the hypothesized fault which concluded that these motions would be bounded by the ground motion levels previously determined for the current licensing basis (the larger Hosgri fault). In addition, the licensee stated that the tsunami hazard threat is relatively small since it is a strike-slip fault rather than a reverse fault and, therefore, the tsunami hazard from the potential new fault is not expected to exceed the plant's design-basis tsunami hazard levels. Based on the NRC staff review of the preliminary geophysical data provided by PG&E in preparation for the call and the licensee's preliminary analysis provided during the conference call, the NRC staff concluded that the current licensing basis is bounding and continues to support the safe operation of the DCPP site.
To further support the NRC's initial conclusions, the NRC staff undertook a preliminary independent review of possible implications of the potential Shoreline Fault to the DCPP using the initial information provided by USGS through PG&E. This review is documented in Research Information Letter (RIL)09-001, "Preliminary Deterministic Analysis of Seismic Hazard at Diablo Canyon Nuclear Power Plant from Newly Identified 'Shoreline Fault'," and can be found in Agencywide Documents Access and Management System (ADAMS) Accession No. ML090330523.
J. Conway -2 The NRC staff's assessment indicates that the best estimate 84th percentile deterministic seismic-loading levels predicted for a maximum magnitude earthquake on the potential Shoreline Fault are below those levels for which the plant was previously analyzed in the Diablo Canyon Long-Term Seismic Program. Considering the results of the deterministic analyses as a whole and the current level of uncertainty, the NRC staff concludes that the postulated Shoreline Fault will not likely cause ground motions that exceed those for which the DCPP has already been analyzed. The NRC staff also concludes that the potential Shoreline Fault has a dominant strike-slip faulting mechanism. It is highly unusual for strike-slip faulting to cause the type of significant seafloor elevation change necessary to cause a sizable tsunami and so the NRC staff would not expect any significant changes in the tsunami hazard assessment. Therefore, based on the currently available information, the NRC staff concludes that the design and licensing basis evaluations of the DCPP structures, systems, and components are not expected to be adversely affected and the current licensing basis remains valid and supports continued operability of the DCPP site.
The NRC plans to inform stakeholders of this review and on its continuing review of this matter as additional information becomes available. If you have any questions regarding these evaluations, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov.
Sincerely,
~~.7IJff (i Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv
- .. ML090930459 OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDE/EMCB/BC RESIDE/SGSE B/BC NAME AWang JBurkhardt via email MKhanna via email RHogan: RTH via email DATE 4/8/09 4/6/09 4/8/09 4/6/09 OFFICE RIVIDRP/RPB-B/BC NRRIIDORLLPL4/BC NRR/DORLlLPL4/PM NAME VGaddy via email MMarkley BSingal for AWang JHall For DATE 4/8/09 4/8/09 4/8/09