Letter Sequence Other |
---|
|
Results
Other: ML083540261, ML083540266, ML090690198, ML090700515, ML090700525, ML090700543, ML090720091, ML090720103, ML090720516, ML090820113, ML090820140
|
MONTHYEARML0907005152008-03-11011 March 2008 Email from Pacific Gas and Electric Company Re Summary of Conference Call Held on November 21, 2009 Project stage: Other ML0906901982008-11-20020 November 2008 Email from Pacific Gas & Electric Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0907005252008-11-21021 November 2008 Summary of Conference Call Held on November 21, 2009 Prepared by Pacific Gas and Electric Company Project stage: Other ML0906902092008-11-21021 November 2008 Meeting Slides, Summary of Preliminary Findings from the Usgs/Pg&E Hazard Studies for the Central Coastal California Region, Diablo Canyon Power Plant, Unit Nos. 1 and 2, from Pacific Gas & Electric Project stage: Meeting ML0908201402008-11-26026 November 2008 Yong Li Preliminary Conclusions Regarding New Shoreline Fault Project stage: Other ML0835402662008-12-17017 December 2008 Shoreline Fault Study Project stage: Other ML0907205162008-12-17017 December 2008 Email from Pacific Gas and Electric Regarding Seismic Action Plan (ME0174 and ME0175) Project stage: Other ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule Project stage: Other ML0908201132009-01-0505 January 2009 Email Regarding Seismic Action Plan Project stage: Other ML0907201032009-03-11011 March 2009 Additional Slides - Seismic Information Project stage: Other ML0907200912009-03-11011 March 2009 Email from Pacific Gas and Electric Company Enclosing Additional Seismic Slides Project stage: Other ML0907005432009-03-11011 March 2009 E-mail from Pacific Gas and Electric Company Regarding Preliminary Data for Seismic Discussion Project stage: Other ML0909304592009-04-0808 April 2009 NRC Review of Potential Shoreline Fault Project stage: Approval ML0930805082009-11-0505 November 2009 Review of Potential New Shoreline Fault Project stage: Approval 2008-03-11
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24036A3382024-02-0505 February 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 8 Meeting Slides ML24030A4672024-01-30030 January 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 1 Meeting Slides ML23255A0012023-09-13013 September 2023 PG&E Slides for 9/13 Public Meeting Related to Diablo Canyon License Renewal ML23249A1592023-09-13013 September 2023 License Renewal Application Pre-Application Meeting: September 13, 2023 ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23143A0882023-05-24024 May 2023 May 24, 2023, Public Meeting Slides Related to Diablo Canyon License Renewal ML23118A0902023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides ML23143A0952023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides for PG&E Presentation ML23079A0452023-03-16016 March 2023 RIC 2023 Slides - Maureen Zawalick TH19 ML22339A1022022-12-0505 December 2022 Pg_E Presentation for NRC Public Meeting ML22236A5472022-08-24024 August 2022 NRC Slides for Decommissioning Engagement Panel 8-24-2022 Meeting ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 ML22200A0722022-07-21021 July 2022 PG&E Slides for Post-Shutdown Decommissioning Activities Report Public Meeting, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan - July 21, 2022 ML21223A0842021-08-11011 August 2021 Slides for Post Shutdown EP pre-submittal Public Teleconference 8-30-2021 ML20310A2792020-11-0505 November 2020 Slides for Defueled TS Pre-Submittal Public Teleconference November 24, 2020 (L-2020-LRM-0101) ML21060B1872020-01-26026 January 2020 Enclosure 3 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Slides ML19233A0722019-08-27027 August 2019 NEIMA Meeting Slides Public ML18295A0732018-10-24024 October 2018 Final Diablo Canyon Decommissioning Engagement Panel Meeting Oct 24 2018 ML17296A2222017-08-29029 August 2017 Presentation on Reactor Decommissioning for the August 29, 2017 at Congressman Salud Carbajal'S Public Meeting at San Luis Obispo Near Diablo Canyon ML16335A4392016-11-30030 November 2016 PG&E Reg Conference Presentation - NRC-11152016 ML15232A0102015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15216A4112015-08-0404 August 2015 TSTF-505: August 4, 2015 Public Meeting ML15216A4082015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15209A9442015-07-28028 July 2015 June 24, 2015, Summary of Annual Assessment Meeting with Pacific Gas and Electric and Public Open House Regarding Diablo Canyon Power Plant 2014 Performance ML15202A0982015-07-21021 July 2015 Slides for the August 5, 2015 Diablo Canyon Power Plant License Renewal Application Public Scoping Meeting ML15117A2262015-04-28028 April 2015 Nuclear Regulatory Commission April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15117A0692015-04-28028 April 2015 Pacific Gas and Electric Co. April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15035A0062015-02-0404 February 2015 Meeting Presentation, Diablo Canyon Power Plant Process Protection System Replacement Lessons Learned Using ISG 6 NRC Meeting on Digital I&C. ML15029A0942015-02-0303 February 2015 Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation ML15014A2232015-01-14014 January 2015 Slides Regulatory Conference - January 14, 2015 ML14195A3742014-07-10010 July 2014 Update of Industry Actions Related to Diablo Canyon OE ML14188A9702014-07-0808 July 2014 14-07-08 ISG-06 Experience Presentation July 8 2014 Digital IC Meeting ML14155A3742014-06-0404 June 2014 May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13150A1712013-11-19019 November 2013 1978 - Rhrp Cavitation ML13150A1812013-11-19019 November 2013 Trade-Off Between Tank Vortexing Margin and ECCS Function ML13274A5142013-10-0202 October 2013 License Slides, 10/2/13 Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 (TAC ML13269A0052013-09-26026 September 2013 Licensee Slides for 9/26/13 Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B ML13268A0022013-09-25025 September 2013 Slide Presentation for 9/25/13 Preapplication Meeting - Use of Leak-before-break for Fuel Structural Analyses and Coolable Geometry ML13268A0052013-09-24024 September 2013 Slide Presentation for 9/24/13 Pre-application Meeting, Diesel Generator License Amendment Request ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13066A7402013-03-0707 March 2013 Licensee Slides from 3/7/13 Pre-Application Meeting with Pacific Gas and Electric Company(Tac MF0687 & MF0688) ML13044A7352013-02-12012 February 2013 Licensee Slides from 2/12/13 Public Meeting to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13024A4052013-01-24024 January 2013 Licensee Slides from 1/24/13 Meeting to Discuss Offsite Power ML13018A1342013-01-15015 January 2013 Pacific Gas and Electric Handouts from January 15, 2013 Meeting Regarding Pending License Amendment Request Related to Diesel Generator Technical Specifications ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12226A2552012-08-0707 August 2012 License Slides from 8/7/12 Meeting with Pacific Gas and Electric Regarding Future License Amendment Associated with Diesel Generator Technical Specifications ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a 2024-02-05
[Table view] |
Text
Seismicity October 1987 to March 2007 ri f DCPP sg Ho au e
on lt z J. Hardebeck (USGS)
Seismicity ross sections October 1987 to March 2007 J. Hardebeck (USGS)
Focal mechanisms show predominantly strike-slip motion in the offshore region sg ri f 1 N 15 E Ho au e
on lt z DCPP Black: good quality single-event mechanisms Gray: lower quality single-event mechanisms Red: composite mechanisms J. Hardebeck (USGS)
Reprocessed gravity data n
Sa s
for the region ea dr An ult Fa t
aul iF sgr Ho
Marine Data CF Collection Ca mb ria Fa ult June 2008 Morro Bay 35 ft R/V Parke Snavely Survey area = 900 km2 Los Os os Fa Ed ult Line Spacing (800/400 m) na Fau Pt. lt Rock samples Buchon ri sg e Olson Fault San Luis Bay Ho Zon Fault ult Wilmar Ave.
Fa Fault Oc e
Fa ano ult Picture taken by: D. Scheirer
F Ca mb ria Fa ult Los Os os Faul Edn t a Fa ult ri Olson Fault San Luis Bay sg e Ho Zon Fault ult Wilmar Ave.
Fa Fault Oc e
Fa ano ult
ri f sg Ho DCPP au e
on lt z Janet Watt (USGS)
~ 20 m 200 m v.e ~ 3
~ 20 m 200 m v.e ~ 3 2 m multibeam bathymetry collected off Point Buchon DCPP
Initial Evaluation of Seismic Demands from Assumed Fault
- Based on the size of the fault
- 24 km length (extended to the intersection with Hosgri)
- M = 6.5
- 1 km from DCPP (assumed)
Initial Evaluation of Ground Motion (84th Percentile Deterministic)