{{#Wiki_filter:April 22, 2009 LICENSEE: Dominion Energy Kewaunee, Inc.  
{{#Wiki_filter:April 22, 2009 LICENSEE:       Dominion Energy Kewaunee, Inc.
 
FACILITY:       Kewaunee Power Station
FACILITY: Kewaunee Power Station  


==SUBJECT:==
==SUBJECT:==
Line 26: Line 25:
==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC., TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION (TAC NO. MD9409)
OF CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC., TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION (TAC NO. MD9409)
On April 15, 2009, the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives from its contractor (Information Systems Laboratory) conducted a conference call (teleconference) with Dominion Energy Kewaunee, Inc. (DEK) staff and their contractor (Maracor) to obtain clarification regarding DEK's responses to the NRC's request for additional information (RAI) about the Kewaunee Power Station (KPS) severe accident mitigation alternatives (SAMA) analysis. The NRC SAMA RAI letter was dated January 8, 2009 (ML083250719), and DEK's response was dated March 9, 2009 (ML090690458).  
On April 15, 2009, the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives from its contractor (Information Systems Laboratory) conducted a conference call (teleconference) with Dominion Energy Kewaunee, Inc. (DEK) staff and their contractor (Maracor) to obtain clarification regarding DEKs responses to the NRCs request for additional information (RAI) about the Kewaunee Power Station (KPS) severe accident mitigation alternatives (SAMA) analysis. The NRC SAMA RAI letter was dated January 8, 2009 (ML083250719), and DEKs response was dated March 9, 2009 (ML090690458).
NRC and its contractor representative discussed their follow-up questions concerning the SAMA RAI responses with DEK staff and their contractor. Clarifications were gained and DEK will supplement their March 9, 2009 SAMA submission with responses to the NRC follow-up questions. Enclosure 1 contains a list of teleconference participants. Enclosure 2 contains the NRCs follow-up questions. No staff decisions were made during the teleconference.
                                              /RA/
Sarah Lopas, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-305


NRC and its contractor representative discussed their follow-up questions concerning the SAMA RAI responses with DEK staff and their contractor. Clarifications were gained and DEK will supplement their March 9, 2009 SAMA submission with responses to the NRC follow-up questions. Enclosure 1 contains a list of teleconference participants. Enclosure 2 contains the NRC's follow-up questions. No staff decisions were made during the teleconference.
==Enclosures:==


              /RA/              Sarah Lopas, Project Manager Projects Branch 1      Division of License Renewal      Office of Nuclear Reactor Regulation Docket No. 50-305
As stated cc w/encls: See next page


==Enclosures:==
ML091060365 OFFICE        LA:DLR                PM:DLR:RPB1        PM:DLR:RPB1          BC:DLR:RPB1 NAME          SFigueroa            SLopas              SHernandez          DPelton DATE          4/17/09              4/20/09              4/20/09            4/22/09
As stated cc w/encls:  See next page


ML091060365 OFFICE LA:DLR PM:DLR:RPB1 PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa SLopas SHernandez DPelton DATE 4/17/09 4/20/09 4/20/09 4/22/09 Letter to Dominion Energy Kewaunee, Inc. from Sarah Lopas dated April 22, 2009
Letter to Dominion Energy Kewaunee, Inc. from Sarah Lopas dated April 22, 2009


==SUBJECT:==
==SUBJECT:==
Line 43: Line 44:
DISTRIBUTION:
DISTRIBUTION:
PUBLIC B. Holian / S. Lee (RidsNrrDlr)
PUBLIC B. Holian / S. Lee (RidsNrrDlr)
D. Pelton (RidsNrrDlrRpb1) B. Pham (RidsNrrDlrRerb) S. Hernandez S. Lopas P. Tam M. Kunowski S. Burton K. Barclay IV. Mitlyng  
D. Pelton (RidsNrrDlrRpb1)
 
B. Pham (RidsNrrDlrRerb)
Kewaunee Power Station cc:  Resident Inspectors Office U.S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI  54216-9510 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc. Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA  23060-6711 Mr. Thomas L. Breene Dominon Energy Kewaunee, Inc. Kewaunee Power Station N490 Highway 42 Kewaunee, WI  54216
S. Hernandez S. Lopas P. Tam M. Kunowski S. Burton K. Barclay IV. Mitlyng
 
Mr. Michael J. Wilson, Director Nuclear Safety & Licensing Dominion Energy Kewaunee, Inc. Kewaunee Power Station N490 Highway 42 Kewaunee, WI  54216 Mr. William R. Matthews Senior Vice President - Nuclear Operations Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA  23060-6711 Mr. Alan J. Price Vice President - Nuclear Engineering Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA  23060-6711 Mr. William D. Corbin Director - Nuclear Engineering Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA  23060-6711
 
Mr. Paul C. Aitken Supervisor - License Renewal Project Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA  23060-6711 Mr. David A. Sommers Supervisor - Nuclear Engineering Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA  23060-6711 Ms. Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. 120 Tredegar Street Riverside 2 Richmond, VA  23219
 
Mr. Stephen E. Scace Site Vice President Dominion Energy Kewaunee, Inc. Kewaunee Power Station N490 Highway 42 Kewaunee, WI  54216 Mr. David R. Lewis Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, N.W.
Washington, DC  20037-1122 Mr. Ken Paplham E 4095 Sandy Bay Rd. Kewaunee, WI  54216
 
Mr. Richard Gallagher Senior Scientist, License Renewal Dominion Resources Services, Inc. Route 156, Rope Ferry Road Waterford, CT  06385
 
Kewaunee Power Station cc:  Mr. Ronald Kazmierczak Regional Director Wisconsin Department of Natural Resources Northeast Region Headquarters 2984 Shawano Avenue P.O. Box 10448 Green Bay, WI  54307-0448
 
Ms. Kathleen Angel Federal Consistency and Coastal Hazards  Coordinator Wisconsin Coastal Management Program P.O. Box 8944 Madison, WI  53708-8944


Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 2SW 5000 Dominion Boulevard Glen Allen, VA   23060-6711 Mr. Jeff Kitsembel, P.E. Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI  53707-7854
Kewaunee Power Station cc:
Resident Inspectors Office                Mr. Paul C. Aitken U.S. Nuclear Regulatory Commission        Supervisor - License Renewal Project N490 Hwy 42                                Innsbrook Technical Center - 3NE Kewaunee, WI 54216-9510                    5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Chris L. Funderburk Director, Nuclear Licensing and            Mr. David A. Sommers Operations Support                        Supervisor - Nuclear Engineering Dominion Resources Services, Inc.          Innsbrook Technical Center - 2SE Innsbrook Technical Center - 2SE          5000 Dominion Boulevard 5000 Dominion Boulevard                    Glen Allen, VA 23060-6711 Glen Allen, VA 23060-6711 Ms. Lillian M. Cuoco, Esq.
Mr. Thomas L. Breene                      Senior Counsel Dominon Energy Kewaunee, Inc.              Dominion Resources Services, Inc.
Kewaunee Power Station                    120 Tredegar Street N490 Highway 42                            Riverside 2 Kewaunee, WI 54216                        Richmond, VA 23219 Mr. Michael J. Wilson, Director            Mr. Stephen E. Scace Nuclear Safety & Licensing                Site Vice President Dominion Energy Kewaunee, Inc.             Dominion Energy Kewaunee, Inc.
Kewaunee Power Station                    Kewaunee Power Station N490 Highway 42                            N490 Highway 42 Kewaunee, WI 54216                        Kewaunee, WI 54216 Mr. William R. Matthews                    Mr. David R. Lewis Senior Vice President - Nuclear Operations Pillsbury Winthrop Shaw Pittman, LLP Innsbrook Technical Center - 2SE          2300 N Street, N.W.
5000 Dominion Boulevard                   Washington, DC 20037-1122 Glen Allen, VA 23060-6711 Mr. Ken Paplham Mr. Alan J. Price                          E 4095 Sandy Bay Rd.
Vice President - Nuclear Engineering      Kewaunee, WI 54216 Innsbrook Technical Center - 2SE 5000 Dominion Boulevard                    Mr. Richard Gallagher Glen Allen, VA 23060-6711                  Senior Scientist, License Renewal Dominion Resources Services, Inc.
Mr. William D. Corbin                      Route 156, Rope Ferry Road Director - Nuclear Engineering            Waterford, CT 06385 Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA 23060-6711


ENCLOSURE 1 LIST OF PARTICIPANTS FOR CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC., TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION April 15, 2009 PARTICIPANTS AFFILIATIONSarah Lopas U.S. Nuclear Regulatory Commission (NRC) Robert Palla Bob Schmidt NRC Information Systems Laboratory Richard Gallagher Dominion Resources Services Paul Aitken Dominion Resources Services Amir Afzali Dominion Resources Services Ray Dremel Maracor
Kewaunee Power Station                    cc:
Mr. Ronald Kazmierczak Regional Director Wisconsin Department of Natural Resources Northeast Region Headquarters 2984 Shawano Avenue P.O. Box 10448 Green Bay, WI 54307-0448 Ms. Kathleen Angel Federal Consistency and Coastal Hazards Coordinator Wisconsin Coastal Management Program P.O. Box 8944 Madison, WI 53708-8944 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Jeff Kitsembel, P.E.
Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854


ENCLOSURE 2 NRC FOLLOW-UP QUESTIONS FOR DOMINION ENERGY KEWAUNEE, INC.
LIST OF PARTICIPANTS FOR CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC.,
REGARDING SEVERE ACCIDENT MITIGATION ALTERNATIVES April 15, 2009 The purpose of these follow-up questions is to clarify responses in the Dominion Energy Kewaunee, Inc. (DEK) severe accident mitigation alternatives (SAMA) analysis request for additional information (RAI) response document dated March 9, 2009, regarding Kewaunee Power Station (KPS). The DEK SAMA RAI response document is available at accession number ML090690458. NRC's SAMA RAIs, dated January 8, 2009, are available at ML083250719. For reference, the original RAI is included with the follow-up question.
TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION April 15, 2009 PARTICIPANTS                      AFFILIATION Sarah Lopas                      U.S. Nuclear Regulatory Commission (NRC)
: 1. RAI 3.b: Section F.2.3.1 states than an assessment of the effects of plant procedure changes shows that the core damage frequency (CDF) would be reduced by a factor of 5 and that a more appropriate fire CDF would be 2.6E-5. Discuss in more detail the assessment of procedure changes and the impact of the changes on the CDF for each of the fire zones listed in Table F-22.
Robert Palla                      NRC Bob Schmidt                      Information Systems Laboratory Richard Gallagher                Dominion Resources Services Paul Aitken                      Dominion Resources Services Amir Afzali                      Dominion Resources Services Ray Dremel                        Maracor ENCLOSURE 1


NRC FOLLOW-UP QUESTIONS FOR DOMINION ENERGY KEWAUNEE, INC.
REGARDING SEVERE ACCIDENT MITIGATION ALTERNATIVES April 15, 2009 The purpose of these follow-up questions is to clarify responses in the Dominion Energy Kewaunee, Inc. (DEK) severe accident mitigation alternatives (SAMA) analysis request for additional information (RAI) response document dated March 9, 2009, regarding Kewaunee Power Station (KPS). The DEK SAMA RAI response document is available at accession number ML090690458. NRCs SAMA RAIs, dated January 8, 2009, are available at ML083250719. For reference, the original RAI is included with the follow-up question.
: 1.      RAI 3.b: Section F.2.3.1 states than an assessment of the effects of plant procedure changes shows that the core damage frequency (CDF) would be reduced by a factor of 5 and that a more appropriate fire CDF would be 2.6E-5. Discuss in more detail the assessment of procedure changes and the impact of the changes on the CDF for each of the fire zones listed in Table F-22.
Explain why the factor of 5 reduction was applied to the IPEEE fire CDF (1.8E-4) rather than the updated fire CDF (1.39E-4) since the latter was used for the assessment described in the RAI response.
Explain why the factor of 5 reduction was applied to the IPEEE fire CDF (1.8E-4) rather than the updated fire CDF (1.39E-4) since the latter was used for the assessment described in the RAI response.
: 2. RAI 3.e.i:
: 2.       RAI 3.e.i: For each major fire risk contributors at KPS, provide an evaluation demonstrating there are no viable SAMA candidates that would further reduce the fire risk. Address the impact of the weaknesses in the fire analysis (as identified in the IPEEE SER/technical evaluation report on this evaluation.
For each major fire risk contributors at KPS, provide an evaluation demonstrating there are no viable SAMA candidates that would further reduce the fire risk. Address the impact of the weaknesses in the fire analysis (as identified in the IPEEE SER/technical evaluation report on this evaluation.
While the response to this RAI addresses the non-fire related events in the important fire cutsets, the potential for reducing fire risk by improvements in detection, mitigation, or the extent of fire damage (e.g., re-routing cable) is not discussed. Discuss these aspects of the identification of fire-related SAMAs.
While the response to this RAI addresses the non-fire related events in the important fire cutsets, the potential for reducing fire risk by improvements in detection, mitigation, or the extent of fire damage (e.g., re-routing cable) is not discussed. Discuss these aspects of the identification of fire-related SAMAs.
: 3. RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.
: 3.       RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.
RAI 6.a: Table F-19 indicates that implementation of SAMA 19 (Use fire water as a backup source for diesel cooling) would result in an increase in CDF. Explain why this occurs. RAI 8a: (Provide an evaluation of) Automate the cross-tie of the existing condensate storage tank (CST) to other water sources rather than installing a new CST.
RAI 6.a: Table F-19 indicates that implementation of SAMA 19 (Use fire water as a backup source for diesel cooling) would result in an increase in CDF. Explain why this occurs.
RAI 8a: (Provide an evaluation of) Automate the cross-tie of the existing condensate storage tank (CST) to other water sources rather than installing a new CST.
The response to these RAIs include additional cost-benefit analysis of potential SAMAs including: adding an automatic RWST refill system, using fire water as backup source for diesel cooling, and automating the existing cross-tie of the CSTs. While the results of these analyses do not appear to indicate the SAMAs are cost beneficial in the baseline analysis, they would be cost beneficial using a 3% discount rate or considering uncertainties. Justify why these improvements should not be evaluated further as potentially cost-beneficial SAMAs.
The response to these RAIs include additional cost-benefit analysis of potential SAMAs including: adding an automatic RWST refill system, using fire water as backup source for diesel cooling, and automating the existing cross-tie of the CSTs. While the results of these analyses do not appear to indicate the SAMAs are cost beneficial in the baseline analysis, they would be cost beneficial using a 3% discount rate or considering uncertainties. Justify why these improvements should not be evaluated further as potentially cost-beneficial SAMAs.
: 4. RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.
ENCLOSURE 2
Reconcile the estimated implementation cost for the RWST refill system ($850K) with that for the CST refill system ($1.4M) provided in response to RAI 8a. (As described, the modifications appear very similar.)
: 4.     RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.
: 5. RAI 7.d: Section F.7.7 discusses the simultaneous implementation of SAMAs 81, 82, 83, 166, 167, 170 and 171. SAMA 160 is not included in the Section F.7.7 discussion but is included in the individual discussion in Sections F.6.17. Clarify which changes in the diesel generator room and switchgear room are included in the combined package.
Reconcile the estimated implementation cost for the RWST refill system ($850K) with that for the CST refill system ($1.4M) provided in response to RAI 8a. (As described, the modifications appear very similar.)
: 5.     RAI 7.d: Section F.7.7 discusses the simultaneous implementation of SAMAs 81, 82, 83, 166, 167, 170 and 171. SAMA 160 is not included in the Section F.7.7 discussion but is included in the individual discussion in Sections F.6.17. Clarify which changes in the diesel generator room and switchgear room are included in the combined package.
Clarify which changes would be made in the diesel generator room, the switchgear room, and the screenhouse area if the combined set of changes described in Section F.7.7 and in the response to RAI 1.f.iii are implemented. Reconcile the statement in this response concerning SAMA 160 with that in the response to RAI 9.
Clarify which changes would be made in the diesel generator room, the switchgear room, and the screenhouse area if the combined set of changes described in Section F.7.7 and in the response to RAI 1.f.iii are implemented. Reconcile the statement in this response concerning SAMA 160 with that in the response to RAI 9.
: 6. Explain why a "gagging device" that could be used to close a stuck-open steam generator safety valve on a faulted steam generator before core damage occurs would not be cost-beneficial given that most of the population dose at Kewaunee is due to steam generator tube rupture events with failure of secondary side isolation. (Such a device was found to be potentially cost beneficial in several recent SAMA evaluations, including Beaver Valley and Indian Point).}}
: 6.     Explain why a gagging device that could be used to close a stuck-open steam generator safety valve on a faulted steam generator before core damage occurs would not be cost-beneficial given that most of the population dose at Kewaunee is due to steam generator tube rupture events with failure of secondary side isolation. (Such a device was found to be potentially cost beneficial in several recent SAMA evaluations, including Beaver Valley and Indian Point).}}

Revision as of 08:04, 14 November 2019

Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Responses to Severs Accident Migration Alternatives Request for Additional Information for Kewaunee Power Station
ML091060365
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/22/2009
From: Sarah Lopas
License Renewal Projects Branch 1
To:
Dominion Energy Kewaunee
Lopas, S, DLR/REBA - 415-1147
References
TAC MD9409
Download: ML091060365 (8)


Text

April 22, 2009 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC., TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION (TAC NO. MD9409)

On April 15, 2009, the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives from its contractor (Information Systems Laboratory) conducted a conference call (teleconference) with Dominion Energy Kewaunee, Inc. (DEK) staff and their contractor (Maracor) to obtain clarification regarding DEKs responses to the NRCs request for additional information (RAI) about the Kewaunee Power Station (KPS) severe accident mitigation alternatives (SAMA) analysis. The NRC SAMA RAI letter was dated January 8, 2009 (ML083250719), and DEKs response was dated March 9, 2009 (ML090690458).

NRC and its contractor representative discussed their follow-up questions concerning the SAMA RAI responses with DEK staff and their contractor. Clarifications were gained and DEK will supplement their March 9, 2009 SAMA submission with responses to the NRC follow-up questions. Enclosure 1 contains a list of teleconference participants. Enclosure 2 contains the NRCs follow-up questions. No staff decisions were made during the teleconference.

/RA/

Sarah Lopas, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosures:

As stated cc w/encls: See next page

ML091060365 OFFICE LA:DLR PM:DLR:RPB1 PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa SLopas SHernandez DPelton DATE 4/17/09 4/20/09 4/20/09 4/22/09

Letter to Dominion Energy Kewaunee, Inc. from Sarah Lopas dated April 22, 2009

SUBJECT:

SUMMARY

OF CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC., TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUESTS FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION (TAC NO. MD9409)

DISTRIBUTION:

PUBLIC B. Holian / S. Lee (RidsNrrDlr)

D. Pelton (RidsNrrDlrRpb1)

B. Pham (RidsNrrDlrRerb)

S. Hernandez S. Lopas P. Tam M. Kunowski S. Burton K. Barclay IV. Mitlyng

Kewaunee Power Station cc:

Resident Inspectors Office Mr. Paul C. Aitken U.S. Nuclear Regulatory Commission Supervisor - License Renewal Project N490 Hwy 42 Innsbrook Technical Center - 3NE Kewaunee, WI 54216-9510 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Chris L. Funderburk Director, Nuclear Licensing and Mr. David A. Sommers Operations Support Supervisor - Nuclear Engineering Dominion Resources Services, Inc. Innsbrook Technical Center - 2SE Innsbrook Technical Center - 2SE 5000 Dominion Boulevard 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Glen Allen, VA 23060-6711 Ms. Lillian M. Cuoco, Esq.

Mr. Thomas L. Breene Senior Counsel Dominon Energy Kewaunee, Inc. Dominion Resources Services, Inc.

Kewaunee Power Station 120 Tredegar Street N490 Highway 42 Riverside 2 Kewaunee, WI 54216 Richmond, VA 23219 Mr. Michael J. Wilson, Director Mr. Stephen E. Scace Nuclear Safety & Licensing Site Vice President Dominion Energy Kewaunee, Inc. Dominion Energy Kewaunee, Inc.

Kewaunee Power Station Kewaunee Power Station N490 Highway 42 N490 Highway 42 Kewaunee, WI 54216 Kewaunee, WI 54216 Mr. William R. Matthews Mr. David R. Lewis Senior Vice President - Nuclear Operations Pillsbury Winthrop Shaw Pittman, LLP Innsbrook Technical Center - 2SE 2300 N Street, N.W.

5000 Dominion Boulevard Washington, DC 20037-1122 Glen Allen, VA 23060-6711 Mr. Ken Paplham Mr. Alan J. Price E 4095 Sandy Bay Rd.

Vice President - Nuclear Engineering Kewaunee, WI 54216 Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Mr. Richard Gallagher Glen Allen, VA 23060-6711 Senior Scientist, License Renewal Dominion Resources Services, Inc.

Mr. William D. Corbin Route 156, Rope Ferry Road Director - Nuclear Engineering Waterford, CT 06385 Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Kewaunee Power Station cc:

Mr. Ronald Kazmierczak Regional Director Wisconsin Department of Natural Resources Northeast Region Headquarters 2984 Shawano Avenue P.O. Box 10448 Green Bay, WI 54307-0448 Ms. Kathleen Angel Federal Consistency and Coastal Hazards Coordinator Wisconsin Coastal Management Program P.O. Box 8944 Madison, WI 53708-8944 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Jeff Kitsembel, P.E.

Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854

LIST OF PARTICIPANTS FOR CONFERENCE CALL WITH DOMINION ENERGY KEWAUNEE, INC.,

TO DISCUSS RESPONSES TO SEVERE ACCIDENT MITIGATION ALTERNATIVES REQUEST FOR ADDITIONAL INFORMATION FOR KEWAUNEE POWER STATION April 15, 2009 PARTICIPANTS AFFILIATION Sarah Lopas U.S. Nuclear Regulatory Commission (NRC)

Robert Palla NRC Bob Schmidt Information Systems Laboratory Richard Gallagher Dominion Resources Services Paul Aitken Dominion Resources Services Amir Afzali Dominion Resources Services Ray Dremel Maracor ENCLOSURE 1

NRC FOLLOW-UP QUESTIONS FOR DOMINION ENERGY KEWAUNEE, INC.

REGARDING SEVERE ACCIDENT MITIGATION ALTERNATIVES April 15, 2009 The purpose of these follow-up questions is to clarify responses in the Dominion Energy Kewaunee, Inc. (DEK) severe accident mitigation alternatives (SAMA) analysis request for additional information (RAI) response document dated March 9, 2009, regarding Kewaunee Power Station (KPS). The DEK SAMA RAI response document is available at accession number ML090690458. NRCs SAMA RAIs, dated January 8, 2009, are available at ML083250719. For reference, the original RAI is included with the follow-up question.

1. RAI 3.b: Section F.2.3.1 states than an assessment of the effects of plant procedure changes shows that the core damage frequency (CDF) would be reduced by a factor of 5 and that a more appropriate fire CDF would be 2.6E-5. Discuss in more detail the assessment of procedure changes and the impact of the changes on the CDF for each of the fire zones listed in Table F-22.

Explain why the factor of 5 reduction was applied to the IPEEE fire CDF (1.8E-4) rather than the updated fire CDF (1.39E-4) since the latter was used for the assessment described in the RAI response.

2. RAI 3.e.i: For each major fire risk contributors at KPS, provide an evaluation demonstrating there are no viable SAMA candidates that would further reduce the fire risk. Address the impact of the weaknesses in the fire analysis (as identified in the IPEEE SER/technical evaluation report on this evaluation.

While the response to this RAI addresses the non-fire related events in the important fire cutsets, the potential for reducing fire risk by improvements in detection, mitigation, or the extent of fire damage (e.g., re-routing cable) is not discussed. Discuss these aspects of the identification of fire-related SAMAs.

3. RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.

RAI 6.a: Table F-19 indicates that implementation of SAMA 19 (Use fire water as a backup source for diesel cooling) would result in an increase in CDF. Explain why this occurs.

RAI 8a: (Provide an evaluation of) Automate the cross-tie of the existing condensate storage tank (CST) to other water sources rather than installing a new CST.

The response to these RAIs include additional cost-benefit analysis of potential SAMAs including: adding an automatic RWST refill system, using fire water as backup source for diesel cooling, and automating the existing cross-tie of the CSTs. While the results of these analyses do not appear to indicate the SAMAs are cost beneficial in the baseline analysis, they would be cost beneficial using a 3% discount rate or considering uncertainties. Justify why these improvements should not be evaluated further as potentially cost-beneficial SAMAs.

ENCLOSURE 2

4. RAI 5.b: For items 22, 23 and 35 (and others) in Table F-3, adding a refueling water storage tank (RWST) low level alarm and/or an automatic refilling system for the RWST could potentially reduce dependency on prior action or eliminate the need for the operator to refill the RWST. Provide an evaluation of these alternative SAMAs.

Reconcile the estimated implementation cost for the RWST refill system ($850K) with that for the CST refill system ($1.4M) provided in response to RAI 8a. (As described, the modifications appear very similar.)

5. RAI 7.d: Section F.7.7 discusses the simultaneous implementation of SAMAs 81, 82, 83, 166, 167, 170 and 171. SAMA 160 is not included in the Section F.7.7 discussion but is included in the individual discussion in Sections F.6.17. Clarify which changes in the diesel generator room and switchgear room are included in the combined package.

Clarify which changes would be made in the diesel generator room, the switchgear room, and the screenhouse area if the combined set of changes described in Section F.7.7 and in the response to RAI 1.f.iii are implemented. Reconcile the statement in this response concerning SAMA 160 with that in the response to RAI 9.

6. Explain why a gagging device that could be used to close a stuck-open steam generator safety valve on a faulted steam generator before core damage occurs would not be cost-beneficial given that most of the population dose at Kewaunee is due to steam generator tube rupture events with failure of secondary side isolation. (Such a device was found to be potentially cost beneficial in several recent SAMA evaluations, including Beaver Valley and Indian Point).