ML091750832: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:MEMORANDUM TO: FROM:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2009 MEMORANDUM TO:                    Michael 1. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                            Kaly N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
DATE AND CATEGORY UNITED NUCLEAR REGULATORY WASHINGTON, D.C.
 
June 26, 2009 Michael 1. Markley, Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Kaly N. Kalyanam, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor FORTHCOMING CONFERENCE CALL WITH OPERATIONS, Thursday, July 16, 2009 8:30 a.m. -4:30 p.m. U.S. Nuclear Regulatory One White Flint 11555 Rockville Pike, Room Rockville, Maryland Arkansas Nuclear One 1448 S.R. 333 Russellville, Arkansas 72802 The purpose of the conference call between the Entergy Operations, Inc. (Entergy, the licensee), and the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR) staff is to discuss the Arkansas Nuclear One (ANO), Units 1 and 2, Draft Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21,2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091190322);
==SUBJECT:==
provide feedback on the licensee's plans and discuss any points of disagreement; and discuss the licensee's path forward. This is a Category 1 meeting via conference call. The public invited to participate in this meeting and will have one or opportunities to communicate with the NRC after the portion, but before the meeting is adjourned.
FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC.
DATE AND TIME:                    Thursday, July 16, 2009 8:30 a.m. - 4:30 p.m.
LOCATIONS:                        U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-6B02 Rockville, Maryland 20852 Arkansas Nuclear One 1448 S.R. 333 Russellville, Arkansas 72802 PURPOSE:                          The purpose of the conference call between the Entergy Operations, Inc. (Entergy, the licensee), and the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR) staff is to discuss the Arkansas Nuclear One (ANO), Units 1 and 2, Draft Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21,2009 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML091190322); provide feedback on the licensee's plans and discuss any points of disagreement; and discuss the licensee's path forward.
CATEGORY 1:*                      This is a Category 1 meeting via conference call. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Proprietary
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.
M. -2 information may be discussed at certain times during the meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
 
PARTICIPANTS:
M. Markley                                          -2 information may be discussed at certain times during the meeting.
NRC ANO. Units 1 and 2 M. Scott, NRR Mark Harris J. Lehning, NRR Billy Butler N. Kalyanam, NRR Iver Jacobson (Contractor) et. al. Natalie Mosher Interested members of the public can participate in this meeting via a toll-free audio teleconference.
These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
Please call one of the meeting contacts listed below before July 14. 2009, 4:30 p.m. (Eastern Savings Time) to get the telephone number and the pass code. MEETING Kaly N. Kalyanam, NRR Alan Wang, NRR 301-415-1480 301-415-1445 kaly.kalyanam@nrc.gov alan.wang@nrc.gov Natalie Mosher, Entergy 479-858-4635 nmosher@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
PARTICIPANTS:                     NRC                                   ANO. Units 1 and 2 M. Scott, NRR                         Mark Harris J. Lehning, NRR                       Billy Butler N. Kalyanam, NRR                     Iver Jacobson (Contractor) et. al.                               Natalie Mosher Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before July 14. 2009, 4:30 p.m.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary .of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
(Eastern Savings Time) to get the telephone number and the pass code.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-313 and 50-368  
MEETING CONTACTS:                Kaly N. Kalyanam, NRR                 Alan Wang, NRR 301-415-1480                         301-415-1445 kaly.kalyanam@nrc.gov                 alan.wang@nrc.gov Natalie Mosher, Entergy 479-858-4635 nmosher@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary .of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-313 and 50-368


==Enclosure:==
==Enclosure:==


Agenda cc w/encl: Distribution via Listserv FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC.
Agenda cc w/encl: Distribution via Listserv
AND U.S. NUCLEAR REGULATORY COMMISSION THURSDAY, JULY 16, 2009, 8:30 A.M. -4:30 Introductions Discuss the Arkansas Nuclear One, Units 1 and 2, Draft NRC Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091190322), with representatives of the Entergy staff to reach a common understanding and agreement on path forward. Entergy also to discuss any proposed contingencies. Public Participation Adjourn Enclosure M. -2 information may be discussed at certain times during the meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
PARTICIPANTS:
NRC ANO, Units 1 and 2 M. Scott, NRR Mark Harris J. Lehning, NRR Billy Butler N. Kalyanam, NRR Iver Jacobson (Contractor) et. a!. Natalie Mosher Interested members of the public can participate in this meeting via a toll-free audio teleconference.
Please call one of the meeting contacts listed below before July 14, 2009, 4:30 p.m. (Eastern Savings Time) to get the telephone number and the pass code. MEETING Kaly N. Kalyanam, NRR Alan Wang, NRR 301-415-1480 301-415-1445 kaly.kalyanam@nrc.gov alan .wang@nrc.gov Natalie Mosher, Entergy 479-858-4635 n mosher@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-313 and 50-368


==Enclosure:==
AGENDA FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC. (ENTERGY)
AND U.S. NUCLEAR REGULATORY COMMISSION (NRC)
THURSDAY, JULY 16, 2009, 8:30 A.M. - 4:30 P.M.
: 1. Introductions
: 2. Discuss the Arkansas Nuclear One, Units 1 and 2, Draft NRC Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091190322), with representatives of the Entergy staff to reach a common understanding and agreement on path forward. Entergy also to discuss any proposed contingencies.
: 3. Public Participation
: 4. Adjourn Enclosure


Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
'     .. ML091750832                     'via email OFFICE         NRRlLPL4/PM         NRR/LPL4/LA           NRRIDSS/SSIB   NRR/LPL4/BC             NRRlLPL4/PM NAME           NKalyanam           JBurkhardt'           MScott SNB for MMarkley               NKalyanam DATE           6/25/09             6/24/09               6/25/09       6/26/09                 6/26/09}}
PUBLIC RidsNrrLAJBurkhardt Resource SSmith, NRR/DSS/SSIB Branch Reading RidsOgcMailCenter Resource CTucci, NRR RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource JClark, RIV RidsNrrAdro Resource RidsOpaMail Resource L Trocine, EDO RIV RidsNrrDorl Resource RidsRgn4MailCenter Resource SBurnell, OPA RIV RidsNrrDorlLpl4 Resource MScotl, NRR/DSS/SSIB OWFN Receptionist (paper) RidsNrrDssSsib Resource JLehning, NRR/DSS/SSIB TWFN Receptionist (paper) RidsNrrPMANO Resource PKlein, NRR/DSS/SSIB PMNS Resource ADAMS Accession No'.. ML091750832  
'via email OFFICE NRRlLPL4/PM NRR/LPL4/LA NRRIDSS/SSIB NRR/LPL4/BC NRRlLPL4/PM NAME NKalyanam JBurkhardt' MScott SNB for MMarkley NKalyanam DATE 6/25/09 6/24/09 6/25/09 6/26/09 6/26/09 OFFICIAL RECORD COPY}}

Revision as of 05:37, 14 November 2019

07/16/2009-Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information for GL-2004-02 Sent to Arkansas Nuclear One, Units 1 and 2 on June 22, 2009
ML091750832
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/26/2009
From: Kalyanam N
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC MC4663, TAC MC4664
Download: ML091750832 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2009 MEMORANDUM TO: Michael 1. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Kaly N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC.

DATE AND TIME: Thursday, July 16, 2009 8:30 a.m. - 4:30 p.m.

LOCATIONS: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-6B02 Rockville, Maryland 20852 Arkansas Nuclear One 1448 S.R. 333 Russellville, Arkansas 72802 PURPOSE: The purpose of the conference call between the Entergy Operations, Inc. (Entergy, the licensee), and the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR) staff is to discuss the Arkansas Nuclear One (ANO), Units 1 and 2, Draft Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21,2009 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML091190322); provide feedback on the licensee's plans and discuss any points of disagreement; and discuss the licensee's path forward.

CATEGORY 1:* This is a Category 1 meeting via conference call. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Proprietary

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.

M. Markley -2 information may be discussed at certain times during the meeting.

These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS: NRC ANO. Units 1 and 2 M. Scott, NRR Mark Harris J. Lehning, NRR Billy Butler N. Kalyanam, NRR Iver Jacobson (Contractor) et. al. Natalie Mosher Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before July 14. 2009, 4:30 p.m.

(Eastern Savings Time) to get the telephone number and the pass code.

MEETING CONTACTS: Kaly N. Kalyanam, NRR Alan Wang, NRR 301-415-1480 301-415-1445 kaly.kalyanam@nrc.gov alan.wang@nrc.gov Natalie Mosher, Entergy 479-858-4635 nmosher@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary .of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-313 and 50-368

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC. (ENTERGY)

AND U.S. NUCLEAR REGULATORY COMMISSION (NRC)

THURSDAY, JULY 16, 2009, 8:30 A.M. - 4:30 P.M.

1. Introductions
2. Discuss the Arkansas Nuclear One, Units 1 and 2, Draft NRC Request for Additional Information for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 21, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091190322), with representatives of the Entergy staff to reach a common understanding and agreement on path forward. Entergy also to discuss any proposed contingencies.
3. Public Participation
4. Adjourn Enclosure

' .. ML091750832 'via email OFFICE NRRlLPL4/PM NRR/LPL4/LA NRRIDSS/SSIB NRR/LPL4/BC NRRlLPL4/PM NAME NKalyanam JBurkhardt' MScott SNB for MMarkley NKalyanam DATE 6/25/09 6/24/09 6/25/09 6/26/09 6/26/09