ML081000114

From kanterella
Jump to navigation Jump to search
Notice of End-of-cycle Public Meeting Between the NRC and Entergy to Present and Discuss Performance Results of the Arkansas Nuclear One, Units 1 and 2, Facility for the Period of January 1 Though December 31, 2007
ML081000114
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/08/2008
From:
NRC Region 4
To:
References
Download: ML081000114 (4)


Text

UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N R EGI ON I V 611 R YAN PLAZA D R IV E, SU ITE 400 AR LI N GTON , TEXAS 76011-4005 April 8, 2008

SUBJECT:

MEETING WITH ENTERGY FACILITY: Arkansas Nuclear One DOCKET: 05000313; 05000368 DATE & TIME: Tuesday, April 22, 2008 6 p.m. (CDT)

LOCATION: Lake Point Conference Center, 601 Lake Point Lane Russellville, AR 72802 PURPOSE: This is the end-of-cycle public meeting between the NRC and Entergy to present and discuss performance results of the Arkansas Nuclear One, Units 1 and 2, facility for the period of January 1 though December 31, 2007.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.

The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC Anton Vegel, Deputy Director, Division of Reactor Projects Jeffrey Clark, Chief, Reactor Projects Branch E William Schaup, Project Engineer, Projects Branch E Fred Sanchez, Senior Resident Inspector Cale Young, Resident Inspector Jeffrey Josey, Resident Inspector Victor Dricks, Region IV Public Affairs Officer

Entergy Operations, Inc. PARTICIPANTS: (Continued)

UTILITY Tim Mitchell, Vice President Operations Brad Berryman, Plant General Manager Dale James, Licensing Manager MEETING CONTACT: George Replogle, Senior Project Engineer Project Branch E (817) 860-8249 george.replogle@nrc.gov DISTRIBUTION:

cc:

Senior Vice President Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Site Vice President Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 General Manager Plant Operations Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802

Entergy Operations, Inc. Director, Nuclear Safety Assurance Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Manager, Licensing Entergy Operations, Inc.

Arkansas Nuclear One 1448 S. R. 333 Russellville, AR 72802 Director, Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Section Chief, Division of Health Emergency Management Section Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, AR 72801

Entergy Operations, Inc. E-Mail To:

( ) NRC Attendees PMNS Mtg Announcement Coordinator EEC E. Collins, RA ATH A. Howell, DRA DDC D. Chamberlain, D:DRP RCJ1 R. Caniano, D:DRS AXV A. Vegel, DD:DRP VDW1 V. Watkins, DD:DRS TWP T. Pruett, DD:DRS REL R. Lantz, C:DRS/OB OEWEB S. Bogle BAB2 Bruce Boger, ADRO OEMAIL D/OE JET3 J. Thorp KXW K. Williams, NSIR/DRP/EP CGM C. Miller, NSIR/DRP/EP JTA J. Adams, RIV OEDO Coordinator FPB P. Bonnett ABW A. Wang, Project Manager, NRR JAC Branch Chief, PBE GDR Senior Project Engineer, PBE AAS1 Senior Resident Inspector VLD V. Dricks, Region IV PAO WAM W. Maier, Region IV RSLO KSF K. Fuller, Region IV RC/ACES GMV M. Vasquez, Region IV Enforcement Specialist LAO, JAK Region IV RA Secretaries AMT Region IV DRP Secretaries LMB, LAR, TEK Region IV DRS Secretaries BST1, MJS Region IV DNMS Secretaries GSM1 Bub Mueller, IRMB LPL P. Longdo, Receptionist AMM A. Mattila, Security Advisor SUNSI Review Completed: GDR ADAMS: Yes G No Initials: _GDR_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive R:\_EOC Meeting Notice\ANO Meeting 4-22-08.doc ML081000114 RIV:SPE:DRP/E PAO RSLO D:DRP/E D:DRP GDReplogle VDricks WAMaier JAClark DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/

4/8/08 4/8/08 4/8/08 4/8/08 4/8/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax