| number = ML092440362
| number = ML092440362
| issue date = 09/01/2009
| issue date = 09/01/2009
| title = Davis Besse - Mid-Cycle Performance Review and Inspection Plan
| title = Mid-Cycle Performance Review and Inspection Plan
| author name = Cameron J L
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B6
| author affiliation = NRC/RGN-III/DRP/B6
| addressee name = Allen B
| addressee name = Allen B
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2009 EA-03-0214 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
 
September 1, 2009 EA-03-0214  
 
Mr. Barry Allen  
 
Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station  
 
5501 North State Route 2, Mail Stop A-DB-3080  
 
Oak Harbor, OH 43449-9760  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DAVIS-BESSE NUCLEAR POWER STATION
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DAVIS-BESSE NUCLEAR POWER STATION


==Dear Mr. Allen:==
==Dear Mr. Allen:==


On August 19, 2009, the NRC staff completed its performance review of the Davis-Besse Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.  
On August 19, 2009, the NRC staff completed its performance review of the Davis-Besse Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009.
 
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.  
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
 
Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). As discussed during the July 15, 2009, End-of-Cycle public meeting, the NRC has completed its review of your activities to comply with the requirements of the 2004 and 2007 Confirmatory Orders. You will receive separate correspondence describing the results of our reviews. No additional inspections are planned regarding those activities. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility.
Plant performance for the most recent quarter at Davis-Besse was within the Licensee  
 
Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance  
 
at a level requiring no additional NRC oversight (Green). As discussed during the July 15, 2009, End-of-Cycle public meeting, the NRC has completed its review of your activities to comply with the requirements of the 2004 and 2007 Confirmatory Orders. You will receive separate correspondence describing the results of our reviews. No additional inspections are planned regarding those activities. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.
B. Allen   


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
B. Allen                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3  
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                              /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3


==Enclosure:==
==Enclosure:==
Davis Besse Inspection/Activity Plan DISTRIBUTION See next page  
Davis Besse Inspection/Activity Plan DISTRIBUTION See next page


Letter to B. Allen from J. Cameron dated September 1, 2009.  
Letter to B. Allen from J. Cameron dated September 1, 2009.


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DAVIS-BESSE NUCLEAR POWER STATION cc w/encl: Honorable Dennis Kucinich J. Hagan, President and Chief  
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
 
DAVIS-BESSE NUCLEAR POWER STATION cc w/encl:     Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC K. Fili, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.
Nuclear Officer - FENOC   J. Lash, Senior Vice President of     Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of  
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO
 
Fleet Engineering - FENOC K. Fili, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp. Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC   C. O'Claire, State Liaison Officer, Ohio Emergency Management Agency   R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff   Director, Ottawa County EMA   Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center   Mayor of Elmore   Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge   Village Administrator of Oak Harbor Mayor of Put-in-Bay   G. Mortensen, INPO  


B. Allen    
B. Allen                                                                   In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely, /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3  
                                                                          /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3


==Enclosure:==
==Enclosure:==
Davis Besse Inspection/Activity Plan DISTRIBUTION See next page  
Davis Besse Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2008 to 2009\Mid-cycle letters\
Davis Besse 2009 MOC Letter.doc Publicly Available                        Non-Publicly Available                    Sensitive              Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE                  RIII                      RIII NAME                    GWright:dtp                JCameron DATE                    08/27/08                  08/27/08 OFFICIAL RECORD COPY


DOCUMENT NAME:  G:\Branch TSS\ALL MOC\midcycle 2008 to 2009\Mid-cycle letters\ Davis Besse 2009 MOC Letter.doc  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy OFFICE RIII  RIII        NAME GWright:dtp JCameron    DATE 08/27/08 08/27/08    OFFICIAL RECORD COPY
Letter to B. Allen from J. Cameron dated September 1, 2009.
 
Letter to B. Allen from J. Cameron dated September 1, 2009.  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
: Susan Bagley  
DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:
 
Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDavisBesse Resource RidsNrrDirsIpob Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
RidsNrrDorlLpl3-2  
 
RidsNrrPMDavisBesse Resource RidsNrrDirsIpob Resource Cynthia Pederson Steven Orth Jared Heck  


Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Davis-Besse Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates                                                                                                              No. of Staff Start      End      Inspection Activity                                                          Title                      on Site ER F/UP      - FOLLOWUP TO NON DECLARATION OF ALERT                                                            1 08/04/2009  09/30/2009  IP 71153              Followup of Events and Notices of Enforcement Discretion BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                        1 09/14/2009  09/18/2009  IP 7112101            Access Control to Radiologically Significant Areas 09/14/2009  09/18/2009  IP 7112102            ALARA Planning and Controls 09/14/2009  09/18/2009  IP 71151-OR01        Occupational Exposure Control Effectiveness BI ENG        - COMPONENT DESIGN BASES INSPECTION                                                              6 10/19/2009  11/20/2009  IP 7111121            Component Design Bases Inspection BI ENG        - ENGINEERING INSERVICE INSPECTION                                                                1 02/15/2010  03/05/2010  IP 2515/172          Reactor Coolant System Dissimiliar Metal Butt Welds 02/15/2010  03/05/2010  IP 7111108P          Inservice Inspection Activities - PWR BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                        1 02/22/2010  02/26/2010  IP 7112101            Access Control to Radiologically Significant Areas 02/22/2010  02/26/2010  IP 7112102            ALARA Planning and Controls ISFSI        - ISFSI INSPECTION                                                                                1 04/01/2010  04/30/2010  IP 60855.1            Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG        - TRIENNIAL FIRE INS INFO GATHERING TRIP                                                          3 04/12/2010  04/16/2010  IP 7111105T          Fire Protection [Triennial]
BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                        1 04/19/2010  04/23/2010  IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/19/2010  04/23/2010  IP 71151-BI01        Reactor Coolant System Activity BI ENG        - TRIENNIAL FIRE PROTECTION INSPECTION                                                            3 04/26/2010  05/14/2010  IP 7111105T          Fire Protection [Triennial]
BI EP        - EP ROUTINE INSPECTION / PI VERIFICATION                                                        2 04/26/2010  04/30/2010  IP 7111402            Alert and Notification System Testing 04/26/2010  04/30/2010  IP 7111403            Emergency Response Organization Augmentation Testing 04/26/2010  04/30/2010  IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 04/26/2010  04/30/2010  IP 71151-EP01        Drill/Exercise Performance 04/26/2010  04/30/2010  IP 71151-EP02        ERO Drill Participation 04/26/2010  04/30/2010  IP 71151-EP03        Alert & Notification System BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                        1 08/30/2010  09/03/2010  IP 7112101            Access Control to Radiologically Significant Areas 08/30/2010  09/03/2010  IP 7112102            ALARA Planning and Controls 08/30/2010  09/03/2010  IP 71151-OR01        Occupational Exposure Control Effectiveness


Inspection / Activity Plan Page 1 of 2 08/25/2009 Report 22 09/01/2009
Davis-Besse Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates                                                                                                                           No. of Staff Start     End     Inspection Activity                                                       Title                                       on Site BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                     1 1/01/2010   11/05/2010   IP 7112203           Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1/01/2010   11/05/2010   IP 71151-PR01        RETS/ODCM Radiological Effluent BI OL         - LIC. OPERATOR REQUAL. PROGRAM EVALUATION                                                                     2 1/15/2010   11/19/2010   IP 7111111B          Licensed Operator Requalification Program}}
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Davis-Besse ER F/UP-FOLLOWUP TO NON DECLARATION OF ALERT 1 1    IP Followup of Events and Notices of Enforcement Discretion 71153 08/04/2009 09/30/2009 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 09/14/2009 09/18/2009 1    IP A LARA Planning and Controls 7112102 09/14/2009 09/18/2009 1    IP Occupational Exposure Control Effectiveness 71151-OR01 09/14/2009 09/18/2009 BI ENG-COMPONENT DESIGN BASES INSPECTION 6 1    IP Component Design Bases Inspection 7111121 10/19/2009 11/20/2009 BI ENG-ENGINEERING INSERVICE INSPECTION 1 1    IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 02/15/2010 03/05/2010 1    IP Inservice Inspection Activities - PWR 7111108P 02/15/2010 03/05/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 02/22/2010 02/26/2010 1    IP A LARA Planning and Controls 7112102 02/22/2010 02/26/2010 ISFSI-ISFSI INSPECTION 1 1    IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2010 04/30/2010 BI ENG-TRIENNIAL FIRE INS INFO GATHERING TRIP 3 1    IP Fire Protection [Triennial]
7111105T 04/12/2010 04/16/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 04/19/2010 04/23/2010 1    IP Reactor Coolant System Activity 71151-BI01 04/19/2010 04/23/2010 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION 3 1    IP Fire Protection [Triennial]
7111105T 04/26/2010 05/14/2010 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 1    IP A lert and Notification System Testing 7111402 04/26/2010 04/30/2010 1    IP Emergency Response Organization Augmentation Testing 7111403 04/26/2010 04/30/2010 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/26/2010 04/30/2010 1    IP Drill/Exercise Performance 71151-EP01 04/26/2010 04/30/2010 1    IP ERO Drill Participation 71151-EP02 04/26/2010 04/30/2010 1    IP A lert & Notification System 71151-EP03 04/26/2010 04/30/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 08/30/2010 09/03/2010 1    IP A LARA Planning and Controls 7112102 08/30/2010 09/03/2010 1    IP Occupational Exposure Control Effectiveness 71151-OR01 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/25/2009 Report 22 09/01/2009
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Davis-Besse BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 11/01/2010 11/05/2010 1    IP RETS/ODCM Radiological Effluent 71151-PR01 11/01/2010 11/05/2010 BI OL-LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2 1     IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 03:41, 14 November 2019

Mid-Cycle Performance Review and Inspection Plan
ML092440362
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/01/2009
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To: Allen B
FirstEnergy Nuclear Operating Co
References
EA-03-0214
Download: ML092440362 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2009 EA-03-0214 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Allen:

On August 19, 2009, the NRC staff completed its performance review of the Davis-Besse Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). As discussed during the July 15, 2009, End-of-Cycle public meeting, the NRC has completed its review of your activities to comply with the requirements of the 2004 and 2007 Confirmatory Orders. You will receive separate correspondence describing the results of our reviews. No additional inspections are planned regarding those activities. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the End-of-Cycle review.

B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis Besse Inspection/Activity Plan DISTRIBUTION See next page

Letter to B. Allen from J. Cameron dated September 1, 2009.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION cc w/encl: Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC K. Fili, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO

B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis Besse Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2008 to 2009\Mid-cycle letters\

Davis Besse 2009 MOC Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp JCameron DATE 08/27/08 08/27/08 OFFICIAL RECORD COPY

Letter to B. Allen from J. Cameron dated September 1, 2009.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDavisBesse Resource RidsNrrDirsIpob Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Davis-Besse Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site ER F/UP - FOLLOWUP TO NON DECLARATION OF ALERT 1 08/04/2009 09/30/2009 IP 71153 Followup of Events and Notices of Enforcement Discretion BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/14/2009 09/18/2009 IP 7112101 Access Control to Radiologically Significant Areas 09/14/2009 09/18/2009 IP 7112102 ALARA Planning and Controls 09/14/2009 09/18/2009 IP 71151-OR01 Occupational Exposure Control Effectiveness BI ENG - COMPONENT DESIGN BASES INSPECTION 6 10/19/2009 11/20/2009 IP 7111121 Component Design Bases Inspection BI ENG - ENGINEERING INSERVICE INSPECTION 1 02/15/2010 03/05/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 02/15/2010 03/05/2010 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/22/2010 02/26/2010 IP 7112101 Access Control to Radiologically Significant Areas 02/22/2010 02/26/2010 IP 7112102 ALARA Planning and Controls ISFSI - ISFSI INSPECTION 1 04/01/2010 04/30/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI ENG - TRIENNIAL FIRE INS INFO GATHERING TRIP 3 04/12/2010 04/16/2010 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/19/2010 04/23/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/19/2010 04/23/2010 IP 71151-BI01 Reactor Coolant System Activity BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 04/26/2010 05/14/2010 IP 7111105T Fire Protection [Triennial]

BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 04/26/2010 04/30/2010 IP 7111402 Alert and Notification System Testing 04/26/2010 04/30/2010 IP 7111403 Emergency Response Organization Augmentation Testing 04/26/2010 04/30/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/26/2010 04/30/2010 IP 71151-EP01 Drill/Exercise Performance 04/26/2010 04/30/2010 IP 71151-EP02 ERO Drill Participation 04/26/2010 04/30/2010 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/30/2010 09/03/2010 IP 7112101 Access Control to Radiologically Significant Areas 08/30/2010 09/03/2010 IP 7112102 ALARA Planning and Controls 08/30/2010 09/03/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness

Davis-Besse Inspection / Activity Plan 09/01/2009 - 12/31/2010 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1/01/2010 11/05/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1/01/2010 11/05/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI OL - LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2 1/15/2010 11/19/2010 IP 7111111B Licensed Operator Requalification Program