IR 05000327/2009404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams|number = ML092960060}}
{{Adams
| number = ML092960060
| issue date = 10/23/2009
| title = NRC Security Inspection Report 05000327-09-404, 05000328-09-404
| author name = Ernstes M
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Swafford P
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| license number = DPR-077, DPR-079
| contact person =
| document report number = IR-09-404
| document type = Inspection Report Correspondence, Letter
| page count = 4
}}


{{IR-Nav| site = 05000327 | year = 2009 | report number = 404 }}
{{IR-Nav| site = 05000327 | year = 2009 | report number = 404 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 23, 2009
[[Issue date::October 23, 2009]]


Mr. PrestonChief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
==SUBJECT:==
 
SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2009404 AND 05000328/2009404
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2009404 AND 05000328/2009404


==Dear Mr. Swafford:==
==Dear Mr. Swafford:==
On October 9, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. In addition we completed an inspection of the Independent Spent Fuel Storage Installation (ISFSI). The purpose of this inspection was to evaluate whether the protection of the ISFSI was in compliance with the Sequoyah Physical Security Plan for the ISFSI and the additional security measures imposed by the NRC Order dated October 16, 2002. The enclosed inspection report documents the inspection results, which were discussed on October 9, 2009, with Mr. T. Cleary and other members of your staff.
On October 9, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. In addition we completed an inspection of the Independent Spent Fuel Storage Installation (ISFSI). The purpose of this inspection was to evaluate whether the protection of the ISFSI was in compliance with the Sequoyah Physical Security Plan for the ISFSI and the additional security measures imposed by the NRC Order dated October 16, 2002. The enclosed inspection report documents the inspection results, which were discussed on October 9, 2009, with Mr. T. Cleary and other members of your staff.


This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the  TVA 2  enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). Should you have any questions concerning this letter, please contact us.


Sincerely,Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety  Docket Nos.:  50-327, 50-328 License Nos.:  DPR-77, DPR-79 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


===Enclosure:===
Based on the results of this inspection, no findings of significance were identified.
NRC Security Inspection Report 05000327/2009404 AND 05000328/2009404


===w/Attachment:===
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the TVA    2 enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
Supplemental Information cc w/encl.:  (See page 3)  TVA 3  cc w/Encl: Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN  37384-2000  Christopher R. Church Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN  37384-2000  Thomas Coutu Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN  37402-2801 Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN  37402-2801  Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN  37402-2801 Beth A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN  37384-2000 Patrick J. Asendorf General Manager Nuclear Emergency Services Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN  37402-2801  Christopher E. Glover Manager Nuclear Security Operations Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN  37402-2801  Nick C. Eggemeyer Site Security Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN  37384-2000  TVA 2  enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). Should you have any questions concerning this letter, please contact us.


Sincerely,/RA/ Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.:  50-327, 50-328 License Nos.:  DPR-77, DPR-79 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).


===Enclosure:===
Should you have any questions concerning this letter, please contact us.
NRC Security Inspection Report 05000327/2009404 AND 05000328/2009404


===w/Attachment:===
Sincerely, Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure: NRC Security Inspection Report 05000327/2009404 AND 05000328/2009404 w/Attachment: Supplemental Information cc w/encl.: (See page 3) TVA  3 cc w/Encl:   Patrick J. Asendorf Timothy P. Cleary  General Manager Site Vice President  Nuclear Emergency Services Sequoyah Nuclear Plant  Tennessee Valley Authority Tennessee Valley Authority  6B Lookout Place P.O. Box 2000  1101 Market Street Soddy-Daisy, TN 37384-2000  Chattanooga, TN 37402-2801 Christopher R. Church  Christopher E. Glover Plant Manager  Manager Sequoyah Nuclear Plant  Nuclear Security Operations Tennessee Valley Authority  Tennessee Valley Authority P.O. Box 2000  6B Lookout Place Soddy-Daisy, TN 37384-2000 1101 Market Street Chattanooga, TN 37402-2801 Thomas Coutu Vice President  Nick C. Eggemeyer Nuclear Support  Site Security Manager Tennessee Valley Authority  Sequoyah Nuclear Plant 3R Lookout Place Tennessee Valley Authority 1101 Market Street  P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37384-2000 Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Beth A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE /RA/  /RA/  /RA/
Supplemental Information cc w/encl.: (See page 3) Distribution w/encl: Rids Nrr PM Sequoyah Resource R. West, NSIR (hard copy w/ encl) D. Riffle, NSIR (hard copy w/ encl) RIDSNRRDIRS PUBLIC (OUO Removed)  X PUBLICLY AVAILABLE    NON-PUBLICLY AVAILABLE    SENSITIVE        X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________           x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE /RA/  /RA/  /RA/ NAME MErnstes  J. Wallo   E. Guthrie   DATE 10/23/2009  10/222009  10/22/2009   E-MAIL COPY?     YESNO       YESNO       YESNO       YESNO       YESNO       YESNO     OFFICIAL RECORD COPY DOCUMENT NAME:  I:\PSBII\REACTORS\SEQUOYAH\Reports\2009\Sequoyah 2009-404.doc
NAME MErnstes  J. Wallo E. Guthrie DATE 10/23/2009  10/222009  10/22/2009 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO
}}
}}

Latest revision as of 02:13, 14 November 2019

NRC Security Inspection Report 05000327-09-404, 05000328-09-404
ML092960060
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/23/2009
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Swafford P
Tennessee Valley Authority
References
IR-09-404
Download: ML092960060 (4)


Text

ber 23, 2009

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2009404 AND 05000328/2009404

Dear Mr. Swafford:

On October 9, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. In addition we completed an inspection of the Independent Spent Fuel Storage Installation (ISFSI). The purpose of this inspection was to evaluate whether the protection of the ISFSI was in compliance with the Sequoyah Physical Security Plan for the ISFSI and the additional security measures imposed by the NRC Order dated October 16, 2002. The enclosed inspection report documents the inspection results, which were discussed on October 9, 2009, with Mr. T. Cleary and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the TVA 2 enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely, Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure: NRC Security Inspection Report 05000327/2009404 AND 05000328/2009404 w/Attachment: Supplemental Information cc w/encl.: (See page 3) TVA 3 cc w/Encl: Patrick J. Asendorf Timothy P. Cleary General Manager Site Vice President Nuclear Emergency Services Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6B Lookout Place P.O. Box 2000 1101 Market Street Soddy-Daisy, TN 37384-2000 Chattanooga, TN 37402-2801 Christopher R. Church Christopher E. Glover Plant Manager Manager Sequoyah Nuclear Plant Nuclear Security Operations Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6B Lookout Place Soddy-Daisy, TN 37384-2000 1101 Market Street Chattanooga, TN 37402-2801 Thomas Coutu Vice President Nick C. Eggemeyer Nuclear Support Site Security Manager Tennessee Valley Authority Sequoyah Nuclear Plant 3R Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37384-2000 Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Beth A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/

NAME MErnstes J. Wallo E. Guthrie DATE 10/23/2009 10/222009 10/22/2009 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO