March 25, 2009

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT

05000327/2009402 AND 05000328/2009402

Dear Mr. Swafford:

On March 5, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on March 5, 2009, with Mr. James Dvorak and other members of your staff. This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). B TVA

2 Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosure: Inspection Report 05000327/2009402 and 05000328/2009402

w/Attachment: Supplemental Information

cc w/Encl.: (See Page 3) TVA

3 cc w/Encl:

Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000

Thomas Coutu Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Walter M. Justice, II Interim Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902

John C. Fornicola General Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Fredrick C. Mashburn Acting Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Christopher R. Church Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000

_________________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME M. Ernstes J. Wallo

H. Gepford

DATE 3/25/2009 3/19/2009

3/18/2009