ML102440038: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/20/2010
| issue date = 08/20/2010
| title = Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number 1R15
| title = Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number 1R15
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'APE Palo Verde Nuclear Generating Station A subsidiary of Pinnacle West Capital Corporation Thomas N. Weber Department Leader Tel. 623-393-5764 Regulatory Affairs Fax 623-393-5442 10 CFR 50.55a'Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06238-TNW/RKR Auciust 20, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a'
  'APE Palo Verde Nuclear A subsidiaryof Pinnacle West Capital Corporation Thomas N. Weber Department Leader             Tel. 623-393-5764 Mail Station 7636 PO Box 52034 Generating Station            Regulatory Affairs             Fax 623-393-5442           Phoenix, Arizona 85072-2034 102-06238- TNW/RKR Auciust 20, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period, Second Outage: Owner's Activity Report Number IR15 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-I) for Unit 1 refueling outage 15 (1 R1 5). The outage ended on May 23, 2010.No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.Sincerely, TNW/RAS/RKRPgat
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period, Second Outage:
Owner's Activity Report Number IR15 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-I) for Unit 1 refueling outage 15 (1 R1 5). The outage ended on May 23, 2010.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, TNW/RAS/RKRPgat


==Enclosure:==
==Enclosure:==
 
Fifteenth Refueling Outage Owner's Activity Report, Report U1 R1 5 cc:     E. E. Collins Jr.       NRC    Region IV Regional Administrator J. R. Hall             NRC    NRR Senior Project Manager L. K. Gibson           NRC     NRR Project Manager (send electronic and paper)
Fifteenth Refueling Outage Owner's Activity Report, Report U1 R1 5 cc: E. E. Collins Jr.J. R. Hall L. K. Gibson J. H. Bashore NRC Region IV Regional Administrator NRC NRR Senior Project Manager NRC NRR Project Manager (send electronic and paper)NRC Senior Resident Inspector (acting) for PVNGS A member of the STARS (Strategic Teaming and Resource 'Sharing)
J. H. Bashore          NRC     Senior Resident Inspector (acting) for PVNGS A member of the   STARS   (Strategic Teaming and Resource 'Sharing) Alliance Callaway
Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde 0 San Onofre
* Palo Verde 0 San Onofre
* South Texas 0 Wolf Creek L4-, 7 kI-14 ENCLOSURE Unit 1 Fifteenth Refueling Outage Owner's Activity Report Report U1 R15 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: U1R15 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 1 Commercial service date: Jan 28, 1986 Refueling Outage No.: 15 (if applicable)
* South Texas 0 Wolf Creek L4-, 7 kI-14
Current inspection interval Current inspection period _3rd 1st E a, 2Wd, 3 rd)Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 07/07/2009  
 
-Revision 0 Edition and Addenda of Section Al applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4 (if applicable)
ENCLOSURE Unit 1 Fifteenth Refueling Outage Owner's Activity Report Report U1 R15
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1R15 conform to the requirements of Section XA.(refueling outage number)Folley, Roy Signed (Z071 31)C 0 Digitally signed by Folley, Roy C(Z07131)SDN: cn=Folley, Roy C(Z07131),Reason: I am signing for Program Owner,_-Douglas B. Hansen Date: 2010.08.11 10:51:51 -07'00'Date: Aug 11,2010.CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
 
Digitally signed by Hogstrom, Robert Hogstrom, N: cn=Hogstrom, Robert (YH2450)Robert (YH2450) o:. I have reviewed this R o b e rt~ ~ ~ ~ ( Y 2 5 ") docum entN B 9 8 "A N ,1 C " z 2 6 Date: 2010.08.19 09:18:21 -OTOO' Commissions NB 9685 "A, N, I, C" AZ 264 (Inspector's Signature)
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: U1R15 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.:                 1                 Commercial service date:                           Jan 28, 1986       Refueling Outage No.:                     15 (if applicable)
National Board, State, Province, and Endorsements Date: Auq 19, 2010 PV-E0796 Ver. 1 Palo Verde Nuclear Generating Station Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description
Current inspection interval                                                                           3rd Current inspection period _                                                                            1st Ea, 2Wd, 3rd)
...... None ......7/21/2010 2 Palo Verde Nuclear Generating Station Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 3 DG "B" Jacket Water Cooler Weld buildup of base material due to exceeding minimum wall 1MDGBE05 thickness 4/20/2010 Work Order # 3320965 DG "B" Lube Oil Cooler Weld buildup of base material due to exceeding minimum wall 3 1MDGBE04 thickness 4/20/2010 Work Order # 3320969 3 DG "B" Intercooler Weld buildup of base material due to exceeding minimum wall 1MDGBE01B thickness 4/20/2010 Work Order # 3455565 EW "B" Heat Exchanger 1 MEWBE01 Perform base material repairs 4/20/2010 Work Order # 3433496 1 Steam Generator  
Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans                                         07/07/2009 - Revision 0 Edition and Addenda of Section Al applicable to repair/replacement activities, if different than the inspection plans                                       Same Code Cases used: N-532-4 (if applicable)
#1 Cold Leg Tube Plugs 5/6/2010 Work Order # 3430794 Stea1MRCEE01A 1 Steam Generator  
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1R15                   conform to the requirements of Section XA.
#1 Hot Leg Tube Plugs 5/6/2010 Work Order #3430799_______1MRCEE01A Wr re 409 1 Steam Generator  
(refueling outage number)
#2 Cold Leg Tube Plugs 5/6/2010 Work Order# 3430806 1 Steam Generator  
Folley, Roy                             C       0 Digitally SDN:        signed Roy cn=Folley,  by Folley, Roy C(Z07131)
#2 Hot Leg Tube Plugs 5/6/2010 Work Order# 3430810 2 Body to Bonnet Seal Weld Repair Body to Bonnet Seal Weld Leak (I"Line)2 1PCHNV646 RepairBodytoBonnetSealWeldLeak__1"_Line)
C(Z07131)
_5/12/2010 Work Order # 3361965 3 DG "A" Intercooler Base metal repair to upper cover on the intercooler 1MDGAE01B
                                                                  ,Reason: I am signing for Program Owner,
__ _ _4/28/2010 Work Order # 3320966 8/11/2010 3}}
_-Douglas B. Hansen Signed        (Z071 31)                                            Date: 2010.08.11 10:51:51 -07'00' Date:                 Aug 11,2010
                                                              . CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Arizona                     and employed by                       HSB CT                     of Hartford, Connecticut                             have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Digitally signed by Hogstrom, Robert Hogstrom,                                 N: cn=Hogstrom, Robert (YH2450)
Robert       b (YH2450)
R oe rt~ (~ Y ~ 2~ 5                 o:. Ihave
                                      ")docum entN reviewed this Date: 2010.08.19 09:18:21 -OTOO'               Commissions                     NBB 9685 9 8      "A N ,1 "A,  N, I, C" C "AZ z264 2 6 (Inspector's Signature)                                                                       National Board, State, Province, and Endorsements Date:                         Auq 19, 2010 PV-E0796 Ver. 1
 
Palo Verde Nuclear Generating Station Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item                     Description               Evaluation Category   Number                     of Work                   Description
                      ......                     None                       ......
7/21/2010                                                                             2
 
Palo Verde Nuclear Generating Station Table 2 Abstract of repair/replacement activities required for continued service Item                                     Description                                   Date   Repair/Replacement Code Class                     Description                                     of Work                                 Completed     Plan Number 3                 DG "B"Jacket Water Cooler   Weld buildup of base material due to exceeding minimum wall 1MDGBE05                                       thickness                               4/20/2010 Work Order # 3320965 DG "B"Lube Oil Cooler     Weld buildup of base material due to exceeding minimum wall 3                         1MDGBE04                                     thickness                                 4/20/2010 Work Order # 3320969 3                       DG "B"Intercooler     Weld buildup of base material due to exceeding minimum wall 1MDGBE01B                                       thickness                               4/20/2010 Work Order # 3455565 EW "B"Heat Exchanger 1 MEWBE01                           Perform base material repairs                       4/20/2010 Work Order # 3433496 1                     Steam Generator #1                           Cold Leg Tube Plugs                             5/6/2010 Work Order # 3430794 Stea1MRCEE01A 1                     Steam Generator #1                           Hot Leg Tube Plugs                             5/6/2010 Work Order #3430799
_______1MRCEE01A                                                                                                          Wr     re     409 1                     Steam Generator #2                         Cold Leg Tube Plugs                             5/6/2010 Work Order# 3430806 1                     Steam Generator #2                           Hot Leg Tube Plugs                             5/6/2010 Work Order# 3430810 2                   Body to Bonnet Seal Weld         Repair Body to Bonnet Seal Weld Leak (I"Line) 2                         1PCHNV646                 RepairBodytoBonnetSealWeldLeak__1"_Line)           _5/12/2010           Work Order # 3361965 3                       DG "A" Intercooler         Base metal repair to upper cover on the intercooler 1MDGAE01B           __                           _         _4/28/2010                           Work Order # 3320966 8/11/2010                                                                                                                                                       3}}

Latest revision as of 13:55, 13 November 2019

Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number 1R15
ML102440038
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/20/2010
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06238- TNW/RKR
Download: ML102440038 (5)


Text

10 CFR 50.55a'

'APE Palo Verde Nuclear A subsidiaryof Pinnacle West Capital Corporation Thomas N. Weber Department Leader Tel. 623-393-5764 Mail Station 7636 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06238- TNW/RKR Auciust 20, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period, Second Outage:

Owner's Activity Report Number IR15 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-I) for Unit 1 refueling outage 15 (1 R1 5). The outage ended on May 23, 2010.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, TNW/RAS/RKRPgat

Enclosure:

Fifteenth Refueling Outage Owner's Activity Report, Report U1 R1 5 cc: E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager (send electronic and paper)

J. H. Bashore NRC Senior Resident Inspector (acting) for PVNGS A member of the STARS (Strategic Teaming and Resource 'Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde 0 San Onofre
  • South Texas 0 Wolf Creek L4-, 7 kI-14

ENCLOSURE Unit 1 Fifteenth Refueling Outage Owner's Activity Report Report U1 R15

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: U1R15 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 1 Commercial service date: Jan 28, 1986 Refueling Outage No.: 15 (if applicable)

Current inspection interval 3rd Current inspection period _ 1st Ea, 2Wd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 07/07/2009 - Revision 0 Edition and Addenda of Section Al applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1R15 conform to the requirements of Section XA.

(refueling outage number)

Folley, Roy C 0 Digitally SDN: signed Roy cn=Folley, by Folley, Roy C(Z07131)

C(Z07131)

,Reason: I am signing for Program Owner,

_-Douglas B. Hansen Signed (Z071 31) Date: 2010.08.11 10:51:51 -07'00' Date: Aug 11,2010

. CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hogstrom, Robert Hogstrom, N: cn=Hogstrom, Robert (YH2450)

Robert b (YH2450)

R oe rt~ (~ Y ~ 2~ 5 o:. Ihave

")docum entN reviewed this Date: 2010.08.19 09:18:21 -OTOO' Commissions NBB 9685 9 8 "A N ,1 "A, N, I, C" C "AZ z264 2 6 (Inspector's Signature) National Board, State, Province, and Endorsements Date: Auq 19, 2010 PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description

...... None ......

7/21/2010 2

Palo Verde Nuclear Generating Station Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 3 DG "B"Jacket Water Cooler Weld buildup of base material due to exceeding minimum wall 1MDGBE05 thickness 4/20/2010 Work Order # 3320965 DG "B"Lube Oil Cooler Weld buildup of base material due to exceeding minimum wall 3 1MDGBE04 thickness 4/20/2010 Work Order # 3320969 3 DG "B"Intercooler Weld buildup of base material due to exceeding minimum wall 1MDGBE01B thickness 4/20/2010 Work Order # 3455565 EW "B"Heat Exchanger 1 MEWBE01 Perform base material repairs 4/20/2010 Work Order # 3433496 1 Steam Generator #1 Cold Leg Tube Plugs 5/6/2010 Work Order # 3430794 Stea1MRCEE01A 1 Steam Generator #1 Hot Leg Tube Plugs 5/6/2010 Work Order #3430799

_______1MRCEE01A Wr re 409 1 Steam Generator #2 Cold Leg Tube Plugs 5/6/2010 Work Order# 3430806 1 Steam Generator #2 Hot Leg Tube Plugs 5/6/2010 Work Order# 3430810 2 Body to Bonnet Seal Weld Repair Body to Bonnet Seal Weld Leak (I"Line) 2 1PCHNV646 RepairBodytoBonnetSealWeldLeak__1"_Line) _5/12/2010 Work Order # 3361965 3 DG "A" Intercooler Base metal repair to upper cover on the intercooler 1MDGAE01B __ _ _4/28/2010 Work Order # 3320966 8/11/2010 3