Third 10-Year Interval, First Outage of the First Period, Owners Activity Report - 3R14
ML092380152
Person / Time
Site: Palo Verde 
Issue date: 08/18/2009
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06049-TNW/RJR
Download: ML092380152 (5)


Text

" :t 10 CFR 50.55a' Thomas N. Weber Mail Station 7636 Palo Verde Nuclear DepartmentLeade.

Tel. 623-393-5764' PO Box 52034.

Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 I 02-06049-TNW/RJR IAugust' 18, 2009 ATTN: Document Control Desk,::."

U.S. Nuclear Regulatory Commission., -

Washington, DC-'20555-0001

Dear Sirs:

,,J;. :1 -

1

Subject:

Palo Verde Nuclear Generating Station (PVNGS)*

Unit 3.:.

Docket No.-,STNr 50-530 Third:10-Year Interval, First Outage of the, irst Period, Owner's Activity Report.- 3R14 J"m'r"can Pursuant to,, 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.Case* N-532-4, Arizona Public Service Company (APS) hereby submits-the Owner's Activity Report (Form OAR-I) for Unit 3 refueling outage 14 (3R14). The outage ended on May 28, 2009.

No commitmerts are being made in this!tst~er:..-

Should you need further information rEgarding thissubmittal, please contact Russell A.

Stroud, Licensing Section Leader,'at (62

-,393*51I11.

Sincerely TNW/RAS/RJR/gat

Enclosure:

Unit 3 Fourteenth Refueling Outage Owner's Activity Report cc:

E.-E. Collins Jr.

NRC Region IV Regional Administrator R. Hall NRC NRR Project Manager R. I. Treadway NRC Senior Resident Inspector A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak

  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

ENCLOSURE Unit 3 Fourteenth Refueling Outage Owner's Activity Report

! Palo Veru-"Nuclear.Genheratinig -Station FormOAR-I Owner's Activity Report-Report Number 3R14 Plant Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 (Name and Address of Plant)

Unit No.

3 Commercial Service Date 01/08/1988 Refueling Outage No.

14 (if applicable)

Current Inspection Interval 3rd (1st, 2nd, 3rd, 4th, other)

Current Inspection Period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition through 2003 Addenda Date and Revision of inspection plans 3/24/2009 - Revision 0 Edition and Addenda of Section XI applicable to replair/replacement activities, if different than the inspection plans same Code Case used:

N-460, N-522, N-526, N-532-4, N-534, N-566-2, N-613-1, N-624, N-652-1, N-685, N-695, N-700, N=533-1, N-648-1, N-722, N-729-1 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statments made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 3R14 conform to the requirements of Section XI.

(Refueling Outage Number)

Signed V

Eý,F

  • A_

/

Date 08/04/2009 Owners or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's ActivityReport, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his Employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

-*. 4z"-

Commissions t.6

,-\\

InApictor's Signature National Board, State, Province, and Endorsement Date t_ -

_(

8/4/2009 Page 1 of 3

",-.Palo Verde Nuclear Gennerating Station' Table 1 Items with flaws or relevant conditions that required evaluation for continued service I

Report No. 3R14 Page 2 of 3

PaloVerde Nuclear Generating Station

'Table 2 Abstract of repair/replacement activities required for continued service Code Class Item Description Description of Work Date Complete Repair/ Replacement Plan Number 2

3SG036H01 1 Replaced load coupling collar on the hanger due to 09/19/2008 Work Order # 3223935 discovery of a cracked collar.

Report No. 3R14 Page 3 of 3