Third 10-Year Interval, First Period, Second Outage: Owners Activity Report Number 2R15
ML100680516
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/02/2010
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06142-TNW/RJR
Download: ML100680516 (5)


Text

10 CFR 50.55a Palo Verde Nuclear Generating Station A subsidiary of Pinnacle West Capital Corporation Thomas N. Weber Department Leader Tel. 623-393-5764 Regulatory Affairs Fax 623-393-5442

-Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06142-TNW/RJR March 02, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2, Docket No. STN 50-529 Third 10-Year Interval, First Period, Second Outage:

Owner's Activity Report Number 2R15 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-I) for Unit 2 refueling outage 15 (2R1 5). The outage ended on December 2, 2009.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, TNW/RAS/RJR/gat

Enclosure:

Fifteenth Refueling Outage Owner's Activity Report, Report U2RI 5 cc:

E. E. Collins Jr.

R. J. Hall R. I. Treadway NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS AP'17 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek 0

a, F.-

ENCLOSURE Unit 2 Fifteenth Refueling Outage Owner's Activity Report Report U2R15

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 2R15 Plant: Palo Verde Nuclear Generating Staiton, 5801 S. Wintersberg Road, Tonopah, Arizona 85354-7529 Unit No.:

2 (if applicable)

Commercial service date:

Sep 19, 1986 Refueling Outage No.:

15 Current inspection interval Current inspection period 3rd

( 1st, 2m, 3d, 4h, other) 1 st (1

t, 2nd, 3d)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 10/01/2009 - Revision 1 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4, N-685 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of U2R15 conform to the requirements of Section Xl.

(refueling outage number)

Folley, Roy (Z07131)

Digitally signed by Folley, Roy C(Z07131)

C DN: cn=Folley, Roy C(Z07131)

,Reason: I am signing for Program Owner

'!.. Doug
Hansen

/

Date: 2010.02.05 11:27:24 -07'00' Signed Datt:

Feb 5. 2009 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hoagstrom, Robert

Hogstrom, W(YH245o) o mDN:

cn=Hogstrom, Robert (YH2450)

Robert (YH2450)

,~Reason:

I have reviewed this

//

Date: 2010.02.05 12:16:18-07'00' Commissions NB 9685 "A, N, I, C" Az 264 (Inspector's Signature)

National Board, State, Province, and Endorsements Date:

Feb 5, 2010 PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description None 1/8/2010 2

Palo Verde Nuclear Generating Station Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number S/G #2 Downcomer Blowdown Sample Isolation Valve (1/2")

2 2JSGBUV0222 Seal Weld Leak-Perform Suitability Evaluation 10/15/2009 Work Order # 3390553 DG Jacket Water Cooler 3

2MDGBE05 Material buildup of corroded areas 10/26/2009 Work Order # 3216595 Diesel Engine Emergency Generator Train A 3

2MDGAH01 Fabricate and Install new pipe clamp to replace failed clamp 2/24/2009 Work Order # 3285209 EW Heat Exchanger 3

2MEWAE01 EW Heat Exchanger Base Material repair 11/12/2009 Work Order # 3321771

  1. 1 Cold Leg S/N 2-1 1

2MRCEE01A Install SG Tube Mech Plugs 11/2/2009 Work Order # 3362789

  1. 1 Hot Leg S/N 2-1 1

2MRCEE01A Install SG Tube Mech Plugs 11/2/2009 Work Order# 3362794

  1. 2 Cold Leg S/N 2-2 1

2MRCEE01B Install SG Tube Mech Plugs 11/2/2009 Work Order # 3362796

  1. 2 Hot Leg S/N 2-2 1

2MRCEE01B Install SG Tube Mech Plugs 11/2/2009 Work Order #3362797 EW Heat Exchanger 3

2MEWBEO1 EW Heat Exchanger Base Material repair 10/27/2009 Work Order #3362964 Diesel Engine Emergency Generator Train A 3

2MDGAH01 Fuel Retum line(l" carbon steel) leak-Suitability Eval. Only 10/15/2009 Work Order #3307483 2/5/2010 3