MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Report
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML23325A1612023-10-26026 October 2023 Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22308A1662022-11-0404 November 2022 23rd Refueling Outage Steam Generator Tube Inspection Report ML22091A3072022-04-0101 April 2022 Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study ML21077A2562021-03-18018 March 2021 El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML19136A4092019-05-16016 May 2019 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2018 ML19046A3512019-02-15015 February 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R21 ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17181A5152017-06-29029 June 2017 Flooding Focused Evaluation Summary ML17248A5262017-05-30030 May 2017 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC ML17006A2172017-01-0505 January 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R19 ML16306A4442016-11-14014 November 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16321A0032016-10-31031 October 2016 WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. ML16221A6042016-09-13013 September 2016 Staff Assessment of Information Provided Under Title 10 of Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of Near-Term Task Force Review of Insights from . ML16120A3892016-04-28028 April 2016 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15188A0492015-06-30030 June 2015 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R18 ML15111A4302015-04-17017 April 2015 Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015 ML15076A0732015-03-10010 March 2015 Seismic Hazard and Screening Report ML15012A4462015-01-0606 January 2015 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R18 ML15027A1222014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61 ML14184B3822014-06-27027 June 2014 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R18 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14126A6362014-04-30030 April 2014 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. ML14087A1882014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML14034A1472014-01-24024 January 2014 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17 ML13329A0382013-08-31031 August 2013 WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. ML13252A1112013-08-31031 August 2013 WCAP-17680-NP, Supplement 1, Rev. 0, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 2 - Supplemental Information. CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance ML13120A5032013-04-10010 April 2013 Technical Requirements Manual, Revision 57 ML1307003422013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13022A4072013-01-14014 January 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17) ML12355A7482012-12-31031 December 2012 Evacuation Time Estimate Study; Cover Through Section 4 ML12355A7512012-12-14014 December 2012 Evacuation Time Estimate Study; Section 5 Through 12 ML12355A7522012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix a Through H ML12278A1002012-09-0707 September 2012 Pressurized Water Reactor (PWR) Internals Aging Management Program Plan ML12229A1192012-08-0303 August 2012 Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) ML12229A1202012-08-0303 August 2012 Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS ML12200A0312012-06-26026 June 2012 Third 10-Year Interval, First Period: Owner'S Activity Report Number U3R16 2024-01-19
[Table view] Category:Miscellaneous
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML21077A2562021-03-18018 March 2021 El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 ML19136A4092019-05-16016 May 2019 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2018 ML19046A3512019-02-15015 February 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R21 ML17181A5152017-06-29029 June 2017 Flooding Focused Evaluation Summary ML17006A2172017-01-0505 January 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R19 ML16306A4442016-11-14014 November 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16221A6042016-09-13013 September 2016 Staff Assessment of Information Provided Under Title 10 of Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of Near-Term Task Force Review of Insights from . ML16120A3892016-04-28028 April 2016 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional ML15188A0492015-06-30030 June 2015 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R18 ML15111A4302015-04-17017 April 2015 Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015 ML15012A4462015-01-0606 January 2015 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R18 ML14184B3822014-06-27027 June 2014 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R18 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14034A1472014-01-24024 January 2014 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17 ML13252A1112013-08-31031 August 2013 WCAP-17680-NP, Supplement 1, Rev. 0, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 2 - Supplemental Information. CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance ML1307003422013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13022A4072013-01-14014 January 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17) ML12200A0312012-06-26026 June 2012 Third 10-Year Interval, First Period: Owner'S Activity Report Number U3R16 ML11195A0172011-07-0606 July 2011 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U2R16 ML11189A0952011-06-29029 June 2011 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Reports (January 2010 - December 2010) ML1103107342011-01-19019 January 2011 Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number U3R15 ML1024400382010-08-20020 August 2010 Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number 1R15 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1013103942010-04-30030 April 2010 Submittal of Steam Generator Tube Inspection Report ML1006805162010-03-0202 March 2010 Third 10-Year Interval, First Period, Second Outage: Owner'S Activity Report Number 2R15 ML1015302192009-12-16016 December 2009 APS 2004 Pump Installation Completion Report for PVNGS Firing Range Well. Filed with Adwr on Aug. 3, 2004 (PV-406) PVNGS ML0933104422009-11-18018 November 2009 Steam Generator Tube Inspection Report ML0932401312009-11-12012 November 2009 Special Report 2-SR-2009-001-00 ML0923801522009-08-18018 August 2009 Third 10-Year Interval, First Outage of the First Period, Owner'S Activity Report - 3R14 ML0920202692009-07-16016 July 2009 Revised Steam Generator Tube Inspection Report ML1015907552009-06-12012 June 2009 Final Corrective Action Plan Report for 80-Acre Wsr, Submitted to Adeq June 12, 2009 ML0910304182009-03-31031 March 2009 2008 Decommissioning Funding Status Report ML0905801982009-02-17017 February 2009 Third 10-Year Interval, First Outage of the First Period, Owner'S Activity Report - U1R14 ML0825504022008-09-0303 September 2008 Third 10-Year Interval - Fourteenth Refueling Outage - Owner'S Activity Report ML1015503122008-05-15015 May 2008 APS 2008 PVNGS 2007 Annual Monitoring and Compliance Report App No. P-100388 ML0810102292008-04-10010 April 2008 Lesson Learned Inputs for the Reactor Oversight Program Safety Culture Evaluation for Use at 4/17/08 Public Meeting ML0807400502008-03-0505 March 2008 Response to Request for Additional Information Related to 2006 Steam Generator Tube Inspections ML0803702332008-01-24024 January 2008 Radioactive Waste Shipment Delay Special Report 1-SR-2008-001-00 ML0800901932008-01-0202 January 2008 Steam Generator Tube Inspection Report 2024-01-19
[Table view] |
Text
ODCM 2.1 MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 102-07250-MLL/GRC/SPD April 28, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 / License No. NPF 41 Special Report 1-SR-2016-001-00 Enclosed please find Special Report 1-SR-2016-001-00, which is prepared and submitted pursuant to PVNGS Offsite Dose Calculation Manual (ODCM) requirements.
This report discusses the nonfunctionality of a fuel building ventilation system high range radioactive gaseous effluent monitor for more than 7 days.
Copies of this Special Report are being forwarded to the Nuclear Regulatory Commission (NRC), NRC Region IV, and the Senior Resident Inspector.
Arizona Public Service Company makes no commitments in this letter.
If you have questions regarding this submittal, please contact Mark McGhee, Nuclear Regulatory Affairs Department Leader, at (623) 393-4972.
Sincerely, MLL/GRC/SPD
Enclosure:
Special Report 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Diablo Canyon Palo Verde Wolf Creek
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 2 NOT PART OF TRANSMITTAL Do Not Send With Original bccs or ccs INTERNAL USE ONLY Original:
Via EIE or Fed Ex:
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 cc:
Hard Copy:
Mr. M. L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 1600 E Lamar Blvd Arlington, TX 76011-4511 Mr. S. P. Lingam U.S. Nuclear Regulatory Commission M/S 8 H4A 11555 Rockville Pike Rockville, MD 20852 Ms. M. M. Watford U.S. Nuclear Regulatory Commission M/S 0-8B1A 11555 Rockville Pike Rockville, MD 20852 cc:
Electronic Copy Siva.Lingam@nrc.gov Margaret.Watford@nrc.gov Charles.Peabody@nrc.gov
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 3 FOR PVNGS INTERNAL USE ONLY bcc:
Jaramillo, T. M.
Green, M. G.
Fallon, M. R.
Dornseif, S.
Cameron, G. R.
DiLorenzo, M. D.
McGhee, M. A.
Weber, T. N.
Andrews, G. W.
Lange, R.
Moeller, C.
Paramithas, P.
Bence, D. R.
McSparran, P. A.
Kharrl, C.
McLaughlin, M. E.
Lacal, M. L.
Cadogan, J. J.
Mims, D. C.
Bement, R. S.
Edington, R. K.
Arter, C. L. [for the OSRC]
PVOC (Anissa Fogel)
Baum, S. A. [Legal]
Mellegers, J. L [Legal]
PVNGS Owner Services STARS Distribution CERTREC (pvupdate@certrec.com)
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 4 SOURCE DOCUMENTS
- 1. CR 16-06672
- 2. CR 16-06999
- 3. ODCM Revision 27
- 4. CAD 1-16-024 VERIFICATION OF ACCURACY Document Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).
Digitally signed by Dornseif, Sean (Z10769)
Dornseif, Sean (Z10769) DN: cn=Dornseif, Sean (Z10769)
Date: 2016.04.27 12:35:12 -07'00'
/Sean Dornseif/___ _____
Signature Printed Date RP Technical Reviewer: I have reviewed and verified that the technical information has been accurately translated and correctly described.
Digitally signed by Routolo, Robert Routolo, Robert M(Z99739)
DN: cn=Routolo, Robert M(Z99739)
M(Z99739)
/Bob Routolo/ _____
Reason: I have reviewed this document Date: 2016.04.27 12:45:50 -07'00' Signature Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.
Digitally signed by Oreshack, Fara J(Z18189)
Oreshack, Fara DN: cn=Oreshack, Fara J(Z18189)
Reason: I have reviewed this document J(Z18189) Date: 2016.04.27 12:38:02 -07'00'
/Fara Oreshack/ _____
Signature Printed Date Other Licensing Document Changes: Check NO or List LDCR numbers UFSAR [X] NO [ ] Yes LDCR .
TS Bases [X] NO [ ] Yes LDCR .
TRM [X] NO [ ] Yes LDCR .
OTHER [X] NO [ ] Yes Tracking Number
Document Authorization Routing Slip Do Not Send With Original or ccs Date Prepared: 04/27/2016 FileName/Path: H:\NRA\Compliance Group\Special Report\Working\U1 RU-146 SPECIAL INSTRUCTIONS:
BRIEF DESCRIPTION:
Special Report 1-2016-001-00 Unit 1 RU-146 Due To Agency By: 04/29/2016 Hard Due Date: Yes No Post-mark By To Final Approver Target Date: Actual Date: Signature Date:
SIGNATURE DATE STA.
ROUTE TO INDIVIDUAL REQUIRED IF REVIEW APPROVAL REVIEWED/ COMMENTS NO.
CHECKED APPROVED
- 1. E. Pittman Digitally signed by Routolo, Routolo, Robert M(Z99739)
- 2. B. Routolo DN: cn=Routolo, Robert Robert M(Z99739)
Reason: I am approving this document M(Z99739) Date: 2016.04.27 12:47:31
-07'00'
- 3. G. Cameron
- 4. G. Andrews
- 5. M. Lacal 6.
7.
8.
9.
10.
RETURN TO: STA: FOR QUESTIONS:: EXT:
Anissa Fogel 7636 Sean Dornseif 6695
Enclosure Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional
Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional Docket No. STN 50-528, Unit 1 Reporting Requirement:
The Palo Verde Nuclear Generating Station Offsite Dose Calculation Manual revision 27 (ODCM) includes functionality requirements for radioactive gaseous effluent monitoring instrumentation. Action 42 of Table 2-1, specifies the following: when the number of FUNCTIONAL High Range Monitors is less than required by the Minimum Channels FUNCTIONAL requirement, the station will initiate the Preplanned Alternate Sampling Program to monitor the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:
a) Either restore the nonfunctional channel(s) to FUNCTIONAL status within 7 days of the event, or b) Prepare and submit a Special Report to the Commission within 14 days following the event outlining the action(s) taken, the cause of the nonfunctionality, and the plans and schedule for restoring the system to FUNCTIONAL status.
Initial Conditions:
At 0235 Mountain Standard Time (MST) on April 15, 2016, Unit 1 was in a refueling outage. The fuel building ventilation system high range radioactive gaseous effluent monitor (RU-146) was declared nonfunctional due to its 120 VAC Class 1E power supply being removed from service in support of a unit modification.
RU-146 was not restored to FUNCTIONAL status within 7 days.
Actions Taken:
The Preplanned Alternate Sampling Program was initiated to monitor appropriate parameters pursuant to ODCM Requirement ACTION 42 of Table 2-1 on April 17, 2016, at 1425 MST. On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL after restoration of power and completion of the channel check surveillance test.
Cause of the Nonfunctionality:
There was no equipment malfunction associated with the nonfunctionality of RU-146.
The cause for exceeding the 7 days allowed by ODCM Action 42 of Table 2-1 was due to the schedule being extended to address issues with the unit modification designed to improve the reliability of 120 VAC inverters. The cumulative effect of the maintenance performed was RU-146 being out of service for greater than 7 days.
1
Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Plans and Schedule for Restoring the System to FUNCTIONAL Status:
On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL following completion of the modification work and after completion of the channel check surveillance test.
2
ODCM 2.1 MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 102-07250-MLL/GRC/SPD April 28, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 / License No. NPF 41 Special Report 1-SR-2016-001-00 Enclosed please find Special Report 1-SR-2016-001-00, which is prepared and submitted pursuant to PVNGS Offsite Dose Calculation Manual (ODCM) requirements.
This report discusses the nonfunctionality of a fuel building ventilation system high range radioactive gaseous effluent monitor for more than 7 days.
Copies of this Special Report are being forwarded to the Nuclear Regulatory Commission (NRC), NRC Region IV, and the Senior Resident Inspector.
Arizona Public Service Company makes no commitments in this letter.
If you have questions regarding this submittal, please contact Mark McGhee, Nuclear Regulatory Affairs Department Leader, at (623) 393-4972.
Sincerely, MLL/GRC/SPD
Enclosure:
Special Report 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Diablo Canyon Palo Verde Wolf Creek
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 2 NOT PART OF TRANSMITTAL Do Not Send With Original bccs or ccs INTERNAL USE ONLY Original:
Via EIE or Fed Ex:
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 cc:
Hard Copy:
Mr. M. L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 1600 E Lamar Blvd Arlington, TX 76011-4511 Mr. S. P. Lingam U.S. Nuclear Regulatory Commission M/S 8 H4A 11555 Rockville Pike Rockville, MD 20852 Ms. M. M. Watford U.S. Nuclear Regulatory Commission M/S 0-8B1A 11555 Rockville Pike Rockville, MD 20852 cc:
Electronic Copy Siva.Lingam@nrc.gov Margaret.Watford@nrc.gov Charles.Peabody@nrc.gov
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 3 FOR PVNGS INTERNAL USE ONLY bcc:
Jaramillo, T. M.
Green, M. G.
Fallon, M. R.
Dornseif, S.
Cameron, G. R.
DiLorenzo, M. D.
McGhee, M. A.
Weber, T. N.
Andrews, G. W.
Lange, R.
Moeller, C.
Paramithas, P.
Bence, D. R.
McSparran, P. A.
Kharrl, C.
McLaughlin, M. E.
Lacal, M. L.
Cadogan, J. J.
Mims, D. C.
Bement, R. S.
Edington, R. K.
Arter, C. L. [for the OSRC]
PVOC (Anissa Fogel)
Baum, S. A. [Legal]
Mellegers, J. L [Legal]
PVNGS Owner Services STARS Distribution CERTREC (pvupdate@certrec.com)
102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 4 SOURCE DOCUMENTS
- 1. CR 16-06672
- 2. CR 16-06999
- 3. ODCM Revision 27
- 4. CAD 1-16-024 VERIFICATION OF ACCURACY Document Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).
Digitally signed by Dornseif, Sean (Z10769)
Dornseif, Sean (Z10769) DN: cn=Dornseif, Sean (Z10769)
Date: 2016.04.27 12:35:12 -07'00'
/Sean Dornseif/___ _____
Signature Printed Date RP Technical Reviewer: I have reviewed and verified that the technical information has been accurately translated and correctly described.
Digitally signed by Routolo, Robert Routolo, Robert M(Z99739)
DN: cn=Routolo, Robert M(Z99739)
M(Z99739)
/Bob Routolo/ _____
Reason: I have reviewed this document Date: 2016.04.27 12:45:50 -07'00' Signature Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.
Digitally signed by Oreshack, Fara J(Z18189)
Oreshack, Fara DN: cn=Oreshack, Fara J(Z18189)
Reason: I have reviewed this document J(Z18189) Date: 2016.04.27 12:38:02 -07'00'
/Fara Oreshack/ _____
Signature Printed Date Other Licensing Document Changes: Check NO or List LDCR numbers UFSAR [X] NO [ ] Yes LDCR .
TS Bases [X] NO [ ] Yes LDCR .
TRM [X] NO [ ] Yes LDCR .
OTHER [X] NO [ ] Yes Tracking Number
Document Authorization Routing Slip Do Not Send With Original or ccs Date Prepared: 04/27/2016 FileName/Path: H:\NRA\Compliance Group\Special Report\Working\U1 RU-146 SPECIAL INSTRUCTIONS:
BRIEF DESCRIPTION:
Special Report 1-2016-001-00 Unit 1 RU-146 Due To Agency By: 04/29/2016 Hard Due Date: Yes No Post-mark By To Final Approver Target Date: Actual Date: Signature Date:
SIGNATURE DATE STA.
ROUTE TO INDIVIDUAL REQUIRED IF REVIEW APPROVAL REVIEWED/ COMMENTS NO.
CHECKED APPROVED
- 1. E. Pittman Digitally signed by Routolo, Routolo, Robert M(Z99739)
- 2. B. Routolo DN: cn=Routolo, Robert Robert M(Z99739)
Reason: I am approving this document M(Z99739) Date: 2016.04.27 12:47:31
-07'00'
- 3. G. Cameron
- 4. G. Andrews
- 5. M. Lacal 6.
7.
8.
9.
10.
RETURN TO: STA: FOR QUESTIONS:: EXT:
Anissa Fogel 7636 Sean Dornseif 6695
Enclosure Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional
Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional Docket No. STN 50-528, Unit 1 Reporting Requirement:
The Palo Verde Nuclear Generating Station Offsite Dose Calculation Manual revision 27 (ODCM) includes functionality requirements for radioactive gaseous effluent monitoring instrumentation. Action 42 of Table 2-1, specifies the following: when the number of FUNCTIONAL High Range Monitors is less than required by the Minimum Channels FUNCTIONAL requirement, the station will initiate the Preplanned Alternate Sampling Program to monitor the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:
a) Either restore the nonfunctional channel(s) to FUNCTIONAL status within 7 days of the event, or b) Prepare and submit a Special Report to the Commission within 14 days following the event outlining the action(s) taken, the cause of the nonfunctionality, and the plans and schedule for restoring the system to FUNCTIONAL status.
Initial Conditions:
At 0235 Mountain Standard Time (MST) on April 15, 2016, Unit 1 was in a refueling outage. The fuel building ventilation system high range radioactive gaseous effluent monitor (RU-146) was declared nonfunctional due to its 120 VAC Class 1E power supply being removed from service in support of a unit modification.
RU-146 was not restored to FUNCTIONAL status within 7 days.
Actions Taken:
The Preplanned Alternate Sampling Program was initiated to monitor appropriate parameters pursuant to ODCM Requirement ACTION 42 of Table 2-1 on April 17, 2016, at 1425 MST. On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL after restoration of power and completion of the channel check surveillance test.
Cause of the Nonfunctionality:
There was no equipment malfunction associated with the nonfunctionality of RU-146.
The cause for exceeding the 7 days allowed by ODCM Action 42 of Table 2-1 was due to the schedule being extended to address issues with the unit modification designed to improve the reliability of 120 VAC inverters. The cumulative effect of the maintenance performed was RU-146 being out of service for greater than 7 days.
1
Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Plans and Schedule for Restoring the System to FUNCTIONAL Status:
On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL following completion of the modification work and after completion of the channel check surveillance test.
2