ML16120A389

From kanterella
Jump to navigation Jump to search
1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional
ML16120A389
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/28/2016
From: Lacal M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07250-MLL/GRC/SPD 1-SR-2016-001-00
Download: ML16120A389 (8)


Text

ODCM 2.1 MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 102-07250-MLL/GRC/SPD April 28, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 / License No. NPF 41 Special Report 1-SR-2016-001-00 Enclosed please find Special Report 1-SR-2016-001-00, which is prepared and submitted pursuant to PVNGS Offsite Dose Calculation Manual (ODCM) requirements.

This report discusses the nonfunctionality of a fuel building ventilation system high range radioactive gaseous effluent monitor for more than 7 days.

Copies of this Special Report are being forwarded to the Nuclear Regulatory Commission (NRC), NRC Region IV, and the Senior Resident Inspector.

Arizona Public Service Company makes no commitments in this letter.

If you have questions regarding this submittal, please contact Mark McGhee, Nuclear Regulatory Affairs Department Leader, at (623) 393-4972.

Sincerely, MLL/GRC/SPD

Enclosure:

Special Report 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Diablo Canyon Palo Verde Wolf Creek

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 2 NOT PART OF TRANSMITTAL Do Not Send With Original bccs or ccs INTERNAL USE ONLY Original:

Via EIE or Fed Ex:

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 cc:

Hard Copy:

Mr. M. L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 1600 E Lamar Blvd Arlington, TX 76011-4511 Mr. S. P. Lingam U.S. Nuclear Regulatory Commission M/S 8 H4A 11555 Rockville Pike Rockville, MD 20852 Ms. M. M. Watford U.S. Nuclear Regulatory Commission M/S 0-8B1A 11555 Rockville Pike Rockville, MD 20852 cc:

Electronic Copy Siva.Lingam@nrc.gov Margaret.Watford@nrc.gov Charles.Peabody@nrc.gov

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 3 FOR PVNGS INTERNAL USE ONLY bcc:

Jaramillo, T. M.

Green, M. G.

Fallon, M. R.

Dornseif, S.

Cameron, G. R.

DiLorenzo, M. D.

McGhee, M. A.

Weber, T. N.

Andrews, G. W.

Lange, R.

Moeller, C.

Paramithas, P.

Bence, D. R.

McSparran, P. A.

Kharrl, C.

McLaughlin, M. E.

Lacal, M. L.

Cadogan, J. J.

Mims, D. C.

Bement, R. S.

Edington, R. K.

Arter, C. L. [for the OSRC]

PVOC (Anissa Fogel)

Baum, S. A. [Legal]

Mellegers, J. L [Legal]

PVNGS Owner Services STARS Distribution CERTREC (pvupdate@certrec.com)

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 4 SOURCE DOCUMENTS

1. CR 16-06672
2. CR 16-06999
3. ODCM Revision 27
4. CAD 1-16-024 VERIFICATION OF ACCURACY Document Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).

Digitally signed by Dornseif, Sean (Z10769)

Dornseif, Sean (Z10769) DN: cn=Dornseif, Sean (Z10769)

Date: 2016.04.27 12:35:12 -07'00'

/Sean Dornseif/___ _____

Signature Printed Date RP Technical Reviewer: I have reviewed and verified that the technical information has been accurately translated and correctly described.

Digitally signed by Routolo, Robert Routolo, Robert M(Z99739)

DN: cn=Routolo, Robert M(Z99739)

M(Z99739)

/Bob Routolo/ _____

Reason: I have reviewed this document Date: 2016.04.27 12:45:50 -07'00' Signature Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.

Digitally signed by Oreshack, Fara J(Z18189)

Oreshack, Fara DN: cn=Oreshack, Fara J(Z18189)

Reason: I have reviewed this document J(Z18189) Date: 2016.04.27 12:38:02 -07'00'

/Fara Oreshack/ _____

Signature Printed Date Other Licensing Document Changes: Check NO or List LDCR numbers UFSAR [X] NO [ ] Yes LDCR .

TS Bases [X] NO [ ] Yes LDCR .

TRM [X] NO [ ] Yes LDCR .

OTHER [X] NO [ ] Yes Tracking Number

Document Authorization Routing Slip Do Not Send With Original or ccs Date Prepared: 04/27/2016 FileName/Path: H:\NRA\Compliance Group\Special Report\Working\U1 RU-146 SPECIAL INSTRUCTIONS:

BRIEF DESCRIPTION:

Special Report 1-2016-001-00 Unit 1 RU-146 Due To Agency By: 04/29/2016 Hard Due Date: Yes No Post-mark By To Final Approver Target Date: Actual Date: Signature Date:

SIGNATURE DATE STA.

ROUTE TO INDIVIDUAL REQUIRED IF REVIEW APPROVAL REVIEWED/ COMMENTS NO.

CHECKED APPROVED

1. E. Pittman Digitally signed by Routolo, Routolo, Robert M(Z99739)
2. B. Routolo DN: cn=Routolo, Robert Robert M(Z99739)

Reason: I am approving this document M(Z99739) Date: 2016.04.27 12:47:31

-07'00'

3. G. Cameron
4. G. Andrews
5. M. Lacal 6.

7.

8.

9.

10.

RETURN TO: STA: FOR QUESTIONS:: EXT:

Anissa Fogel 7636 Sean Dornseif 6695

Enclosure Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional

Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional Docket No. STN 50-528, Unit 1 Reporting Requirement:

The Palo Verde Nuclear Generating Station Offsite Dose Calculation Manual revision 27 (ODCM) includes functionality requirements for radioactive gaseous effluent monitoring instrumentation. Action 42 of Table 2-1, specifies the following: when the number of FUNCTIONAL High Range Monitors is less than required by the Minimum Channels FUNCTIONAL requirement, the station will initiate the Preplanned Alternate Sampling Program to monitor the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

a) Either restore the nonfunctional channel(s) to FUNCTIONAL status within 7 days of the event, or b) Prepare and submit a Special Report to the Commission within 14 days following the event outlining the action(s) taken, the cause of the nonfunctionality, and the plans and schedule for restoring the system to FUNCTIONAL status.

Initial Conditions:

At 0235 Mountain Standard Time (MST) on April 15, 2016, Unit 1 was in a refueling outage. The fuel building ventilation system high range radioactive gaseous effluent monitor (RU-146) was declared nonfunctional due to its 120 VAC Class 1E power supply being removed from service in support of a unit modification.

RU-146 was not restored to FUNCTIONAL status within 7 days.

Actions Taken:

The Preplanned Alternate Sampling Program was initiated to monitor appropriate parameters pursuant to ODCM Requirement ACTION 42 of Table 2-1 on April 17, 2016, at 1425 MST. On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL after restoration of power and completion of the channel check surveillance test.

Cause of the Nonfunctionality:

There was no equipment malfunction associated with the nonfunctionality of RU-146.

The cause for exceeding the 7 days allowed by ODCM Action 42 of Table 2-1 was due to the schedule being extended to address issues with the unit modification designed to improve the reliability of 120 VAC inverters. The cumulative effect of the maintenance performed was RU-146 being out of service for greater than 7 days.

1

Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Plans and Schedule for Restoring the System to FUNCTIONAL Status:

On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL following completion of the modification work and after completion of the channel check surveillance test.

2

ODCM 2.1 MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 102-07250-MLL/GRC/SPD April 28, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 / License No. NPF 41 Special Report 1-SR-2016-001-00 Enclosed please find Special Report 1-SR-2016-001-00, which is prepared and submitted pursuant to PVNGS Offsite Dose Calculation Manual (ODCM) requirements.

This report discusses the nonfunctionality of a fuel building ventilation system high range radioactive gaseous effluent monitor for more than 7 days.

Copies of this Special Report are being forwarded to the Nuclear Regulatory Commission (NRC), NRC Region IV, and the Senior Resident Inspector.

Arizona Public Service Company makes no commitments in this letter.

If you have questions regarding this submittal, please contact Mark McGhee, Nuclear Regulatory Affairs Department Leader, at (623) 393-4972.

Sincerely, MLL/GRC/SPD

Enclosure:

Special Report 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional cc: M. L. Dapas NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Diablo Canyon Palo Verde Wolf Creek

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 2 NOT PART OF TRANSMITTAL Do Not Send With Original bccs or ccs INTERNAL USE ONLY Original:

Via EIE or Fed Ex:

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 cc:

Hard Copy:

Mr. M. L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 1600 E Lamar Blvd Arlington, TX 76011-4511 Mr. S. P. Lingam U.S. Nuclear Regulatory Commission M/S 8 H4A 11555 Rockville Pike Rockville, MD 20852 Ms. M. M. Watford U.S. Nuclear Regulatory Commission M/S 0-8B1A 11555 Rockville Pike Rockville, MD 20852 cc:

Electronic Copy Siva.Lingam@nrc.gov Margaret.Watford@nrc.gov Charles.Peabody@nrc.gov

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 3 FOR PVNGS INTERNAL USE ONLY bcc:

Jaramillo, T. M.

Green, M. G.

Fallon, M. R.

Dornseif, S.

Cameron, G. R.

DiLorenzo, M. D.

McGhee, M. A.

Weber, T. N.

Andrews, G. W.

Lange, R.

Moeller, C.

Paramithas, P.

Bence, D. R.

McSparran, P. A.

Kharrl, C.

McLaughlin, M. E.

Lacal, M. L.

Cadogan, J. J.

Mims, D. C.

Bement, R. S.

Edington, R. K.

Arter, C. L. [for the OSRC]

PVOC (Anissa Fogel)

Baum, S. A. [Legal]

Mellegers, J. L [Legal]

PVNGS Owner Services STARS Distribution CERTREC (pvupdate@certrec.com)

102-07250-MLL/GRC/SPD ATTN: Document Control Special Report 1-SR-2016-001-00 Page 4 SOURCE DOCUMENTS

1. CR 16-06672
2. CR 16-06999
3. ODCM Revision 27
4. CAD 1-16-024 VERIFICATION OF ACCURACY Document Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).

Digitally signed by Dornseif, Sean (Z10769)

Dornseif, Sean (Z10769) DN: cn=Dornseif, Sean (Z10769)

Date: 2016.04.27 12:35:12 -07'00'

/Sean Dornseif/___ _____

Signature Printed Date RP Technical Reviewer: I have reviewed and verified that the technical information has been accurately translated and correctly described.

Digitally signed by Routolo, Robert Routolo, Robert M(Z99739)

DN: cn=Routolo, Robert M(Z99739)

M(Z99739)

/Bob Routolo/ _____

Reason: I have reviewed this document Date: 2016.04.27 12:45:50 -07'00' Signature Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.

Digitally signed by Oreshack, Fara J(Z18189)

Oreshack, Fara DN: cn=Oreshack, Fara J(Z18189)

Reason: I have reviewed this document J(Z18189) Date: 2016.04.27 12:38:02 -07'00'

/Fara Oreshack/ _____

Signature Printed Date Other Licensing Document Changes: Check NO or List LDCR numbers UFSAR [X] NO [ ] Yes LDCR .

TS Bases [X] NO [ ] Yes LDCR .

TRM [X] NO [ ] Yes LDCR .

OTHER [X] NO [ ] Yes Tracking Number

Document Authorization Routing Slip Do Not Send With Original or ccs Date Prepared: 04/27/2016 FileName/Path: H:\NRA\Compliance Group\Special Report\Working\U1 RU-146 SPECIAL INSTRUCTIONS:

BRIEF DESCRIPTION:

Special Report 1-2016-001-00 Unit 1 RU-146 Due To Agency By: 04/29/2016 Hard Due Date: Yes No Post-mark By To Final Approver Target Date: Actual Date: Signature Date:

SIGNATURE DATE STA.

ROUTE TO INDIVIDUAL REQUIRED IF REVIEW APPROVAL REVIEWED/ COMMENTS NO.

CHECKED APPROVED

1. E. Pittman Digitally signed by Routolo, Routolo, Robert M(Z99739)
2. B. Routolo DN: cn=Routolo, Robert Robert M(Z99739)

Reason: I am approving this document M(Z99739) Date: 2016.04.27 12:47:31

-07'00'

3. G. Cameron
4. G. Andrews
5. M. Lacal 6.

7.

8.

9.

10.

RETURN TO: STA: FOR QUESTIONS:: EXT:

Anissa Fogel 7636 Sean Dornseif 6695

Enclosure Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional

Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional Docket No. STN 50-528, Unit 1 Reporting Requirement:

The Palo Verde Nuclear Generating Station Offsite Dose Calculation Manual revision 27 (ODCM) includes functionality requirements for radioactive gaseous effluent monitoring instrumentation. Action 42 of Table 2-1, specifies the following: when the number of FUNCTIONAL High Range Monitors is less than required by the Minimum Channels FUNCTIONAL requirement, the station will initiate the Preplanned Alternate Sampling Program to monitor the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

a) Either restore the nonfunctional channel(s) to FUNCTIONAL status within 7 days of the event, or b) Prepare and submit a Special Report to the Commission within 14 days following the event outlining the action(s) taken, the cause of the nonfunctionality, and the plans and schedule for restoring the system to FUNCTIONAL status.

Initial Conditions:

At 0235 Mountain Standard Time (MST) on April 15, 2016, Unit 1 was in a refueling outage. The fuel building ventilation system high range radioactive gaseous effluent monitor (RU-146) was declared nonfunctional due to its 120 VAC Class 1E power supply being removed from service in support of a unit modification.

RU-146 was not restored to FUNCTIONAL status within 7 days.

Actions Taken:

The Preplanned Alternate Sampling Program was initiated to monitor appropriate parameters pursuant to ODCM Requirement ACTION 42 of Table 2-1 on April 17, 2016, at 1425 MST. On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL after restoration of power and completion of the channel check surveillance test.

Cause of the Nonfunctionality:

There was no equipment malfunction associated with the nonfunctionality of RU-146.

The cause for exceeding the 7 days allowed by ODCM Action 42 of Table 2-1 was due to the schedule being extended to address issues with the unit modification designed to improve the reliability of 120 VAC inverters. The cumulative effect of the maintenance performed was RU-146 being out of service for greater than 7 days.

1

Palo Verde Nuclear Generating Station Special Report 1-SR-2016-001-00 Plans and Schedule for Restoring the System to FUNCTIONAL Status:

On April 23, 2016, at 1543 MST, RU-146 was declared FUNCTIONAL following completion of the modification work and after completion of the channel check surveillance test.

2