Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24019A201 | 19 January 2024 | Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 | |
ML23325A161 | 26 October 2023 | Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle | Boric Acid Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Finite Element Analysis Code Reconciliation Earthquake Pressure Boundary Leakage Exclusive Use Affidavit |
ML22308A166 | 4 November 2022 | 23rd Refueling Outage Steam Generator Tube Inspection Report | |
ML22091A307 | 1 April 2022 | Independent Spent Fuel Storage Installation (Isfsi), Evacuation Time Estimate Study | Pandemic |
ML21077A256 | 18 March 2021 | El Paso Electric Co., Application for Approval of Indirect Transfer of Control of Licenses Pursuant to 10 C.F.R. 50.80 and 72.50 | |
ML21005A271 | 29 December 2020 | 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 | Finite Element Analysis COVID-19 |
ML19136A409 | 16 May 2019 | Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2018 | |
ML19046A351 | 15 February 2019 | Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R21 | |
ML18187A417 | 6 July 2018 | License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Post Accident Monitoring Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination License Renewal Exemption Request Earthquake Fuel cladding Coast down Power Uprate Affidavit |
ML17181A515 | 29 June 2017 | Flooding Focused Evaluation Summary | Safe Shutdown Internal Flooding FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML17248A526 | 30 May 2017 | 3INT-ISI-3, Revision 4, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 3, Enclosure 3 to 102-07551-MDD/MSC | Weld Overlay Nondestructive Examination VT-2 Aging Management Liquid penetrant Dissimilar Metal Weld |
ML17006A217 | 5 January 2017 | Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R19 | |
ML16306A444 | 14 November 2016 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Ultimate heat sink Hydrostatic Fukushima Dai-Ichi Earthquake |
ML16321A003 | 31 October 2016 | WCAP-18030-NP, Revision 1, Criticality Safety Analysis for Palo Verde Nuclear Generating Station Units 1, 2, and 3. | Non-Destructive Examination Earthquake Fuel cladding |
ML16221A604 | 13 September 2016 | Staff Assessment of Information Provided Under Title 10 of Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of Near-Term Task Force Review of Insights from . | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML16120A389 | 28 April 2016 | 1-SR-2016-001-00, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional | Offsite Dose Calculation Manual |
ML15336A084 | 30 November 2015 | NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. | Boric Acid |
ML15188A049 | 30 June 2015 | Third 10-Year Interval, Third Period: Owner'S Activity Report Number U3R18 | |
ML15111A430 | 17 April 2015 | Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015 | Boric Acid Non-Destructive Examination Operating Basis Earthquake Code Reconciliation Liquid penetrant Pressure Boundary Leakage |
ML15076A073 | 10 March 2015 | Seismic Hazard and Screening Report | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML15012A446 | 6 January 2015 | Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R18 | |
ML15027A122 | 19 December 2014 | Technical Specification (TS) Bases Revision 61 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Missed surveillance Pressure and Temperature Limits Report Surveillance Frequency Control Program Operability Determination Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Power Uprate |
ML14184B382 | 27 June 2014 | Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R18 | |
ML14189A533 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 | Commercial Grade Dedication Coatings |
ML14189A543 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
ML14189A537 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 | Boric Acid Fitness for Duty Commercial Grade Dedication Coatings Anchor Darling Grace period Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | |
ML14189A531 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 | Commercial Grade Dedication Loctite |
ML14189A500 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 | |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
ML14189A498 | 19 June 2014 | Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request | Commercial Grade Dedication Coatings Finite Element Analysis |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Fitness for Duty Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Anchor Darling Nondestructive Examination FLEX Grace period Loctite Weak link |
RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 | 19 June 2014 | Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 | Boric Acid Non-Destructive Examination Fire Barrier Commercial Grade Dedication Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination FLEX Loctite Weak link |
ML14126A636 | 30 April 2014 | APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Fukushima Dai-Ichi Earthquake Scaffolding Flow Induced Vibration |
ML14087A188 | 11 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14034A147 | 24 January 2014 | Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17 | |
ML13329A038 | 31 August 2013 | WCAP-17787-NP, Rev 0, Palo Verde Nuclear Generating Station STAR Program Implementation Report. | Shutdown Margin Nondestructive Examination Temporary Modification Fuel cladding |
ML13252A111 | 31 August 2013 | WCAP-17680-NP, Supplement 1, Rev. 0, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 2 - Supplemental Information. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Fukushima Dai-Ichi Earthquake Scaffolding |
CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance | 16 May 2013 | Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance | Mission time Coatings |
ML13120A503 | 10 April 2013 | Technical Requirements Manual, Revision 57 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Offsite Circuit Fire Protection Program Fire Watch Power change |
ML130700342 | 28 February 2013 | APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX |
ML13022A407 | 14 January 2013 | Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17) | |
ML12355A748 | 31 December 2012 | Evacuation Time Estimate Study; Cover Through Section 4 | |
ML12355A751 | 14 December 2012 | Evacuation Time Estimate Study; Section 5 Through 12 | |
ML12355A752 | 14 December 2012 | Evacuation Time Estimate Study; Appendix a Through H | |
ML12278A100 | 7 September 2012 | Pressurized Water Reactor (PWR) Internals Aging Management Program Plan | Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML12229A119 | 3 August 2012 | Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) | Mission time |
ML12229A120 | 3 August 2012 | Attachment 5, PVNGS Engineering Study 13-NS-C089, Revision 0, PRA Evaluation of LPSI Pump Failing to Trip on RAS | |
ML12200A031 | 26 June 2012 | Third 10-Year Interval, First Period: Owner'S Activity Report Number U3R16 | VT-2 |