Technical Specification 5.6.8 Thomas N.Weber Mail Station 7636 Palo Verde Nuclear Department Leader Tel. 623-393-5764 P0 Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-05790-TNW/DFH January 02, 2008 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528, License No. NPF-41, Steam Generator Tube Inspection Report Attached please find PVNGS' Steam Generator Tube Inspection Report prepared and submitted pursuant to Technical Specifications (TS) Reporting Requirement 5.6.8. This report discusses steam generator tube plugging in Unit 1 during its 1 3th refueling outage.
By copy of this letter and the enclosure, this report is being provided to the NRC Region IV Administrator and the PVNGS Resident Inspector.
No commitments are being made to the NRC by this letter.
If you have any questions, please contact Ray E. Buzard at (623) 393-5317.
Sincerely, LV\.
94 TNW/REB/DFH/gat Attachment cc: (with attachment)
E. E. Collins Jr. NRC Region IV Regional Administrator M. T. Markley NRC NRR Project Manager G. 0. Warnick NRC Senior Resident Inspector for Palo Verde A member of the STARS (strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde e South Texas Project 9 Wolf Creek
Attachment Unit 1 - 13 th Refueling Outage Steam Generator Tube Inspection Report
UNFF ARIZONA PUBLIC SERVICE P.O0. BOX 52034 PHOENIX, AZ 85072 Prepared by: Douglas B Hansen Date: 12-20-2007 Badsgard, Richard A Reviewed by: (Z04080) Date:
Sweeney, Kevin M Approved by: (Z99575) Report Date:____
Commercial Service Date: 1-28-86
Table of Contents 1.0
SUMMARY
2.0 ORIGINAL EXAMINATION PLAN 3.0 CONDITION MONITORING AND OPERATIONAL ASSESSMENT 4.0 EXAMINATION RESULTS 5.0 EXAMINATION TECHNIQUES and EQUIPMENT 6.0 REPAIR TECHNIQUES and EQUIPMENT APPENDIX A - TUBE SUPPORT DIAGRAM, LEGEND, and ANALYSIS CODES APPENDIX B - SG I11
SUMMARY
DATA SHEETS APPENDIX C - SG 12
SUMMARY
DATA SHEETS APPENDIX D - PLI and PLP DATA SHEETS APPENDIX E - PLUG LISTS, PLUG MAPS & PLUG HISTORY APPENDIX F - FORM NIS - I
UNIT 1 STEAM GENERATOR EDDY CURRENT Ul R13 Refueling Outage 1.0 Summary This report is intended to satisfy the requirements of PVNGS Technical Specifications 5.6.8 for the submittal of a Steam Generator Tube Inspection Report. The steam generator (SG) eddy current examination for the 13th refueling outage in Unit 1 (U1R13) was conducted during June 2007.
Mode 4 entry of Unit 1 Cycle 14 was entered on July 11, 2007. The initial examination plan for both steam generators is listed in Table 1. This table summarizes the examinations performned for each of the various categories, examination types, extents, and the number of tubes or tube locations completed. This was the first examination performed in Unit 1 following steam generator replacement in U1R12. This examination is considered a 100% full length tubing inspection (see Table 1) with the Row 1-4 u-bends inspected via rotating coil in lieu of bobbin due to access limitations of the selected bobbin probe sizes.
The examinations resulted in a total of 0 tubes being plugged in SG 11, and 0 tubes being plugged in SG 12. A description of the previous plugging history for these replacement steam generators is contained in Appendix E.
2.0 Original Examination Plan The original examination plan was developed based on the "PYNGS Steam Generator Degradation Assessment" developed per PVNGS Procedure 8 1DP-9RC01I as required by NEI 97-06. In addition, possible damage mechanisms were reviewed along with the specific requirements set forth in Procedure 73TI-9RCO1I and the PVNGS Technical Specifications. The plan is summarized in Table I of this report.
3.0 Condition Monitoring Assessment Per the Steam Generator Program, as defined in PVNGS Procedure 81 DP-9RCO 1, a condition monitoring evaluation was conducted by PVNGS Engineering. As indicated above, no defects exceeding the Technical Specification repair limits or the PVNGS Administrative Plugging criteria were identified. The results of the eddy current examinations are provided in Section 4.0. An engineering evaluation of the as-found condition of inservice tubes did not reveal any degradation exceeding the threshold values for structural and leakage integrity. As such, all steam generator performance criteria were satisfied for Unit 1 Cycle 13. No tube pulls or insitu pressure testing were required based on the results of the examinations.
Tubesheet and Flow Distribution Plate Foreign Object Search and Retrieval (FOSAR) were conducted using a power cart mounted with a remotely operated camera and retrieval tooling. The applicable requirements of the Revision 2 of the EPRI Steam Generator Integrity A4ssessment
Guidelines Section 10.5, Secondary Side Visual Inspections, were applied for the FOSAR inspections. Two (2) pieces of weld wire were identified at the hot leg tubesheet and successfully removed from Steam Generator 12. One (1) of the wires had been observed during eddy current examinations. Plus Point (rotating coil) inspections were subsequently conducted to further verify that no additional piece(s) were present at these locations. The plus point inspections revealed no additional objects. The exams also confirmed no evidence of tube degradation.
As noted in Table 2 there were three (3) possible loose part (PLP) locations identified in Steam Generator 11. The locations arc in areas not accessible by visual exams. Engineering assessment indicated that these locations are in areas of the steam generator where axial flow is dominant and would be less likely to initiate wear. PVNGS has historically taken the position if a loose part is detected by ECT or FOSAR, without the presence of wear, it is reasonable to conclude that the required conditions to promote wear do not exist. The affected and surrounding tubes were inspected with a supplemental and bounding rotating coil examination to confirm that no tube degradation exists. No additional action was required for these locations and the locations will be tracked for future inspection.
Finally, PVNGS Procedure 81DP-9RCOl requires, per the EPRI PWR Steam Generator Examination Guidelines, that a visual inspection of the previously installed steam geneyator plugs be performed to assess plug integrity. Additionally, the Examination Guidelines Section 6.10.1 states - "Verify the location and presence of existing in-service plugs." The conduct of the plug location and integrity verification was performed in UlR13 per procedure 81CP-9RC40. A review of the inspection results indicated that all plugs were accounted for and no evidence of potential plug leakage was identified.
4.0 Examination Results A summary of the bobbin and rotating coil (RC) examination results is located in Table 2 of this report. In addition, Appendix A contains a reference drawing of steam generator support locations.
The summary data sheets of Appendix B and C list all tubes in each steam generator with indications expressed as a percent wall thickness reduction, or as an analysis code. Appendix D contains summary data sheets for tubes classified as possible loose parts.
5.0 Examination Techniques and Equipment The eddy current examinations were performed by Westinghouse Electric Company using Zetec MIZ-70 digital data acquisition instrumentation or the Core Star OMNI 200 instrumentation.
Westinghouse Anser acquisition, software was utilized with both systems. The following frequencies were used for the tube examinations:
Bobbin Coil
- RC.
500 KHz 300 KHz 300 KHz 200 KJ~z 100 KHz 100 KHz 35 KHz 35 KHz
- NOTE: For bobbin coil examinations these frequencies were utilized in both differential and absolute modes.
All tubing was examined with Zetec or Core Star manufactured bobbin coil probes and Zetec RC style probes. Probe diameters were 0.540" to 0.6 10". Plus Point RC probes were used for the characterization of non-quantifiable or distorted bobbin indications. Data acquisition in both steam generators was facilitated by using Westinghouse Pegasys fixtures configured with a dual guide tube in each of the hot and cold legs.
Fiber optic cable was used from containment to the data acquisition room located at the PVNGS North Annex. Primary and secondary analysis was all performed on site. The Primary and Secondary Resolution Analysts, Independent Review Analysts, and data management were also located at PVNGS in the North Annex. Westinghouse provided the data acquisition and primary data analysis. Anatec International, Inc. provided the secondary data analysis.
Each individual from Westinghouse and Anatec International, Inc. who performed data analysis was required to complete and pass a PVNGS site specific Eddy Current Data Analysis Course as well as an associated performance and written examination. All individuals performing data analysis were also required to have Qualified Data Analyst (QDA) certification.
6.0 Repair Techniques and Equipment No repairs were performed as a result of these examinations.
TABLE 1, EXAMINATION.
SUMMARY
SCOPE DESCRIPTION SG I1 SG 12 Exam Description Ex.tents Scope Scope FULL LENGTH TEC-TEH 12245 12245 BOBBIN COLD STRAIGHT SECTION TEC-08C 276 278 BOBBIN
- HOT STRAIGHT SECTION TEH-08H 276 278 BOBBIN
- ROW 1 THRU 4 SHORT 08C-08H 276 278 RADIUS U-BENDS*
HOT STRAIGHT VARIOUS 28 14 RC HOT U & SQUARE BEND VARIOUS 1 0 RC COLD STRAIGHT VARIOUS 21 9 RC COLD U & SQUARE BEND VARIOUS 2 1 RC Notes:
1.*RC examinations were performed on Row 1 thru 4 short radius U-Bends in lieu of bobbin, examination.L
TABLE 2 INDICA-TION
SUMMARY
'DAMAGE, STEAM GENERAO STEAM, GENERATOR, MECHANI SM' 11.12 WEAR 0%-20% 2 2 20%-39% 0 0
> 40% 0 0 PLUGGED (0) (0)
Possible Loose Parts (RC)
PLI 0 0 PLP 3 0 PLUGGED (0) (0)
Volumetric Indications SVI/MVI 0 0 PLUGGED (0) (0)
PREVENTATIVE (0) (0) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1 1 4 4 PLUGGED U21113 (0)(0 TOTAL PLUGGED/% (59 I0.5%) (57 I0.5%)
NOTES
- 1. Numbers in (X) are, tubes numbers plugged in each category'
- 2. The -above represent the numbers of tubes; not indicattions
APPENDIX A TUBE SUPPORT DIAGRAM, LEGEND, and ANALYSIS CODES
PUHGS Steam Generator REPLACMENTS Center of 08H to 08C Row 1 - 17.415 Row 2 - 19.736 Row 3"-'22.056 Row 4 - 24.377 Row 5 - 26.698 Row 6 - 29.019 I
LEGEND ROW: Indicates the row number of a given tube.
COL: Indicates the column number of a given tube.
VOLTS: Indicates the peak-to-peak voltage of a given indication response.
DEG: The measured phase angle of a given indication response.
IIND: Indicates the analysis code or PCT for percent PCT: The percent through the tube wall of a given indication CHN: Indicates the channel used to measure and evaluate the referenced indication LOCN: Gives indication location at INCH 1 to Th4CH2 relative to known landmarks such as supports, vertical straps, and batwings. Typical location codes are as follows:
- 1 Vertical Strap........................ VSl
- 1 Batwing .............................. BWl
- 1 Support Plate in Hot Leg...........O01H
- 7 Support Plate in Cold Leg.......... 07C Top Tube Sheet Cold Leg ............. TSC Tube End Hot Leg ...................... TEll Tube End Cold Leg..................... TEC CRLEN: Indicates the flaw length BEGT and ENDT: Indicates the beginning and end of the test; together they document the examination extent PDIA: Documents the probe diameter PTYPE: The last two characters indicates the probe type used for examination WR-bobbin coil mid-frequency (Westinghouse Replaceable.)
SF-bobbin coil spring flex HP or HZ-RC +point solid body FP or FZ-RC +point, . 115 flexible MB-RC mag bias +point PH-RC +point HF and MF flexible for UBends CAL: Indicates calibration number L: Indicates the leg the examination was conducted from COM: This comment field is utilized to document the UTILlI and UTIL2 sizing measurements and APS Level III comments
Analysis CODES:
Absolute Drift................................................. ADI Apex Anomaly ................................................ APA After Pressure Test.'. .:.: i. .:.............................APT Bad Data ....................................................... BDA Bulge ................................................. ......... BLG Deposit......................................................... DEP Dent from History............................................. DNH Dent ............................................................ DNT Distorted Support Signal With Indication................... DSI DSI from History ............................................. DSH Distorted Top of Tubesheet With Indication ............... DTI Geometric Indication.......................................... GEO ID Chatter...................................................... IDC Indication Not Found ......................................... INF Indication Not Reportable .................................... TINR Location Not Correct ......................................... LNC Multiple Volumetric Indication .............................. MVI No Detectable Defect ......................................... NDD No Discontinuity Found ...................................... NDF Non-Quantifiable Indication ................................. NQI No Tube Sheet Expansion.................................... NTE Obstructed ..................................................... OBS Previous Bobbin Call ......................................... PBC Positive Identification ........................................ PID Positive Identification Verified .............................. PIV Possible Loose Part with Indication ......................... PU Possible Loose Part ........................................... PLP Previous RC Call.............................................. PRC Possible Support Anomaly ................................... PSA Possible Support Indication.................................. PSI Retest With 3 coil Probe ...................................... R3C Retest Identification Check................................... RID Retest with Magnetic Bias RC Probe........................ RMB Single Volumetric Indication................................. SVI Sludge.......................................................... SLG To Be Plugged................................................. TBP Util2 CODES:
Batwing Wrapper Bar Wear ..........................BWW Change......................................................... CH Data Quality Acceptable...................................... DQA History Review ý............................................... HR Inside Diameter ............................................... ID NEW........................................................... NEW No Change..................................................... NC No Loose Part Present ........................................ NLP Manufacturing Induced Groove.............................. MIG Manufacturing Abnormality.................................. LAP Outside Diameter ............................................. OD Pit like indication ............................................. PIT Stake............................................................ SK Senior Level III Review ...................................... SR Tube to Tube Wear ........................................... TTW Volumetric Inside Diameter.................................. VID
APPENDIX B STEAM GENERATOR 11
SUMMARY
DATA SHEETS
SG - 11 Percent Calls Palo Verde 1 U1R13 PVNGS1 20070601 06/11/2007 11:11:07
+----+-----+-----+-----+-----+----+---+ --- + -----
+----+ - - +---------
I ROW COL VOLTS DEG IND PER CHN LOON INOHi INCH2 ORLEN BEGT ENDT PDIA PTYPE CAL L COMI
+-------+-----+-----+-----+-----+----+---+ --- + ----
+-----+ - - +---------
I132 85 .43 0 PCT 7 P3 11O -.27 110 liC .560 ZPSHZ. 87 Cl I I 48 103 .52 0 POT 13 P2 090 -1.74 TEC TEll .610 ZBAZC: 15 HI I
+----+-----+-----+-----+-----+----+---+ --- + ----
+-----+ - - +---------
I ROW COL VOLTS DEG IND PER OHN LOON INOHi INOH2 ORLEN BEGT ENOT PDIA PTYPE. CAL L COMl
+--------+-----+-----+-----+-----+----+---+ --- + ----
+-----+ - -- ---------
Tubes: 2 Records: 2
APPENDIX C STEAM GENERATOR 12
SUMMARY
DATA SHEETS
SG - 12 Percent Calls Palo Verde 1 U1R13 PVNGS1 20070601 06/11/2007 11:17:08
+----+-----+-----+-----+-----+----+---+ --- + +-----+
- - +---------
I ROW COL VOLTS DEG IND PER Cl-N LOCN INCHi INCH2 CRLEN BEGT ENOT PDIA PTYPE
- CAL L COW!
+ ---------
+-----+-----+-----+-----+----+---+ --- + ----
+-----+ - - +---------
I 51 22 .26 0 PCT 10 P2 VS3 1.13 TEH TEC .610 ZBAZC 52 Cl I I 48 107 .47 0 PCT 13 P2 09C -1.63 TEC TEH .610 ZBAZC 10 HI I
+----+-----+-----+-----+-----+----+---+ ----- +-----+ - -- ---------
I ROW COL VOLTS DEG IND PER CHN LOCN INCHi INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L COMl
+---------+-----+-----+-----+-----+----+---+ ----- +-----+ - - +------- --
Tubes: 2 Records: 2
APPENDIX D PLI & PLP DATA SHEETS
SG - 11 ' PLP Calls With Current Cycle and Previous Inspect ion Data Palo Verde 1 U1R113 PVNGS1 20070601 06/11/2007 11:11:23
- --- --- +- +----+-.---+-
-+------+---------+---.-----+- ---- -- -+ -- +-+-----
I INSPOATE ROW CO L VOLTS DEG IND PER CHN LOCN INCHi INCH2 CRIEN BEGT ENOT PDIA PTYPE CAL I COMl
-+-------------------+-----+-----+-----+--.-+--------+- +..- +-----+--
6 71 .08 76 PLP 8 03H 30.01 TEC TEH .610 ZBA1C 71 HISR I 6 71 NDF 2 03H 29.93 03H 04H .560 ZPSHZ 83 HI I I2005/10/01 6 71 NOD TEC TEH .610 RBAI2 116 HI I I2005/10/01 6 71 NOD TSH TSH .600 ZPSHZ 204 HI I TEC TEH .610 ZBA1C 71 HIRI 6 73 .07 77 PLP 8 03H 29.91 04H .560 ZPSHZ 83 HIS I 6 73 NOF 2 03H 29.91 03H TEC TEH .610 RBAI2 116 HI I I2005/10/01 6 73 NOD TSH 204 HI I I2005/10/01 6 73 NOD TSH .600 ZPSHZ HIR I 8 73 .07 75 PIP 8 03H 29.94 TEC TEH .610 ZBALC 71 HII 8 73 NOF 2 03H 29.94 03H 04H .560 ZPSHZ 83 HIS I I2005/10/01 8 73 NOD TEC TEH .610 RBAWR 117 HI I I2005/10/01 8 73 NOD TSH TSH .600 ZPSH-Z 205 HIR I TEC TEH .610 ZBA1C 71 HI I 10 73 .07 83 PIP 8 03H 30.02 73 NOF 2 03H 30.02 03H 04H .560 ZPSHZ 83 HI I 10 HIS I I2005/10/01 10 73 1.60 171 ONT P1 VS3 .62 TEC TEH .610 RBA 12 116 TSH .600 204 HI1 I I2005/10/01 10 73 NOD TSH ZPSHZ I2005/10/01 10 73 NOF 2 VS3 .62 VS3 VS 3 .580 ZPUFZ 238 HIR I HI I I 12 73 .07 75 PIP 8 03H 30.13 TEC TEH .610 ZBA1C 71 HI I I 12 73 NOF 2 03H 30.13 03H 04H .560 ZPSHZ 83 HI I I2005/10/01 12 73 1.25 176 ONT P1 VS3 .68 TEC TEH .610 RBAWR 117 HIS I I2005/10/01 12 73 NOD TSH TSH .600 ZPSHZ 205 F1SR I I2005/10/01 12 73 NOF 2 VS3 .68 V53 V53 .580 ZPUFZ 238 HI I HI I I 14 73 .05 78 PIP 8 03H 29.98 TEC TEH .610 ZBA1C 71 HI I I 14 73 NOF 2 03H 29.98 03H 04H .560 ZPSHZ 83 73 1.02 173 ONT P1 VS3 .79 TEC TEH .610 RBAI2 116 HI I I2005/10/01 14 I2005/10/01 14 73 NOD TSH TSH .600 ZPSH-Z 204 HIS I I2005/10/01 14 73 NDF 2 VS3 .79 VS3 V53 .580 ZPUFZ 238 CIR I HI I I 164 75 2.06 127 INR 8 09C 34.45 TEC TEH .610 ZBAZC 26 CIR I I 164 75 2.34 138 PIP 5 l0C -2.33 10OC l0C .560 ZPSHZ 87 I2005/10/01 164 75 .61 173 ONT P1 05H 34.33 TEH TEC .610 RHALI 10 HI I I2005/10/01 164 75 .49 118 PIP 8 09C 34.45 TEH TEC .610 RBALI 10 HI I I2005/10/01 164 75 1.50 115 PIP 6 l0C -2.33 l0C 10OC .600 ZPSHZ 19 RBO TEC TEH .610 RBAI2 133 HIR I I2005/10/01 164 75 CISR I 2005/10/01 164 75 NOD TSH TSH .600 ZPSHZ 213 75 NOF 2 06H -1.62 06H 06H .600 ZPSHZ 245 CIS I I2005/10/01 164 HISR I I 165 76 .04 83 PIP 6 09C 33.77 TEC TEH .610 ZBAZC 27 CIS I I 165 76 1.27 77 PIP 5 l0C -2.28 10OC l0C .560 ZPSH-Z 87 I2005/10/01 165 76 1.62 115 PIP 6 l0C -2.28 10OC 10OC .600 ZPSHZ 19 HIR I I2005/10/01 165 76 .62 115 PIP 8 09C 34.22 TEC TEH .610 RBAWR 136 Hi I I2005/10/01 165 76 NOD TSH TSH .600 ZPAH-Z 215 HF I CIS I I 1 144 NOD 08C TEC .610 ZBA1C 59 CIS I I 1 144 .08 119 PIP 6 02H 23.34 08H TEH .610 ZBA1C 74 HIS I 1 144 NOD 08C 08H .540 ZPUPH 82 HIS I I 1 144 NOF 8 02H 23.34 02H 03H .560 ZPSHZ 85 I2005/10/01 1 144 NOD 08C TEC .610 RBAI1 2 I2005/10/01 1 144 NOD 08H 08C .540 ZPUPH 7 I2005/10/01 1 144 NOD 08H TEH .610 RBAI2 85 I2005/10/01 1 144 NOD TSH TSH .600 ZPSHZ 163 I 3 192 NOD 08C TEC .610 ZBA1C 60 CI I 3 192 .14 91 PIP 8 03H 33.30 08H TEH .610 ZBA1C 74 HI SR I 3 192 NOD 08C 08H .540 SPUPH 81 CI I 3 192 .98 75 PIP 8 03H - 33.42 03H 04H .560 ZPSHZ 83 HI SR I2005/10/01 3 192 NOD 08C TEC .610 RBA~L 2 CI I2005/10/01 3 192 NOD 08H 08C .540 ZPUPH 7 CI I2005/10/01 3 192 NOD 08H TEH .610 RBAI2 86 HI I2005/10/01 3 192 NOD TSH TSH .600 ZPAHZ 164 HI I 30 201 .11 94 PIP 8 04C 10.93 TEH TEC .610 Z BAiC 65 CISR I 30 201 NOF 2 04C 10.93 04C O5C .560 Z PSHZ 87 CI I2005/10/01 30 201 NOD TEC TEH .610 R BAI2 12 HI 2005/10/01 30 201 NOD TSH TSH .600 Z PAHZ 178 HI
- ----- --- +-
- -+- --- - -+--- ------- - - - - - - - - - - - - - - - - -- - - - - - - - - - - -- - - --- .+.- -
I INSPOATE ROW COL VOLTS DEG IND PER CHN IOCN INCHI INCH2 CRIEN BEGT ENOT POTA PTYPE CAL I COMl
+--------------------------------+-.--..---+----+-----+----------+---+ ----- +-----+ - - +---------
Tubes: 11 Records: 60
SG - 12 PIP Calls With Current Cycle and Previous Inspection Data Palo Verde 1 U1R13 PVNGS1 20070601 06/.11/2007 11:17:14
- + -- -
+ + - - - - --------------------- +-------+- -- -+-- - - - - - -- - - - - - - - - - - - - -- - - - - - - - - -- - - - -
+---------------
I INSPOATE ROW COL VOLTS DEG IND PER Cl-NLOCN INCI-I INCH2 CRLEN BEGT ENOT POTA PTYPE CAL L COMl
+---------------------+---.+-----t t-----+-----+-----+-----+----+---+
----- + + -
+- +---------
11 24 NOD 08H- TEH .610 ZBAZC 74 HI 11 24 .53 84 PIP 8 TSC 7.55 08C TEC .610 ZBAI1C 74 CISR I 11 24 .60 109 PLP 8 TSC 12.61 08C TEC .610 ZBA.1C 74 CISRI 11 24 NOF 8 TSC 7.55 TSC FOP .560 ZPSHZ 85 CI I 11 24 NDF 8 TSC 12.61 TSC FOP .560 ZPSHZ 85 CI I 11 24 NOD 08C 08H- .540 ZPUPI- 87 CI I 1 2005/10/01 1 24 NOD 08C TEC .610 RBAL2 3 Cl I 1 2005/10/01 1 24 NOD 08H 08C .540 ZPUPI- 5 Cl I 1 2005/10/01 1 24 NOD TSH TSH .600 ZPSHZ 54 HI 1 2005/10/01 1 24 NOD 08H TEH .610 RBAL2 194 HI- I 19 202 .47 114 PIP 8 TSH 17.97 TEl- TEC .610 ZBA.1C 72 CISR I 9 202 NOF 8 01H- -2.03 01H- 01H .560 ZPSHZ 80 HIl I 9 202 NOF 8 01H- -2.03 011- 01H .560 ZPSHZ 86 1-iDOAI I2005/10/01 9 202 NOD TSH TSH .600 ZPAHZ 92 HI I I2005/10/01 9 202 NOD TEC TEH .610 RBAL2 190 HI I 8 203 .79 118 PLP 8 TSH 17.17 TEH TEC .610 ZBAIC 72 CISR I 8 203 1.53 87 PIP 8 01H -2.10 011H 01H .560 ZPSHZ 80 HISR I 8 203 NOF P4 01H -2.83 01H 01H .560 ZPSHZ 86 HI I I2005/10/01 8 203 NOD TSH TSH .600 ZPSHZ 91 HI I I2005/10/01 8 203 NOD TEC TEH .610 RBAL2 190 HI I 10 203 .69 122 PLP 8 TSH 15.95 TEH TEC .610 ZBA1C 72 CISR I 10 203 1.13 84 PLP 8 TSH 15.95 TSH 01H .560 ZPSHZ 80 HISR I 10 203 IDQAI 10 203 NOF P4 TSH 15.95 TSH 01H .560 ZPSHZ 86 H-IDQAI I2005/10/01 10 203 NOD TSH TSH .600 ZPAHZ 92 HI I I2005/10/01 10 203 NOD TEC TEH .610 RBAL2 190 HI I
+--------------------+----+-----+----+----+.----+-----+-----+-----+----+---+ ----- +-----+ - - +---------
I INSPOATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENOT POTA PTYPE CAL L COMl
+-----------------------------.-----+----+----+-----+.-----+-------+---------+ + -
- +---------
Tubes: 4 Records: 25 1
APPENDIX E PLUG HISTORY
PLUG HISTORY STEAM GENERATOR 11 STEAM GENERATOR 12 OUTAGE/YEAR NUMBER OF % BOBBIN. NUMBER OF % BOBBIN PLUGS EXAMINED PLUGS EXAMINED FACTORY 2005 3 NA 2 NA BASELINE 10-05 56 100 55 100 U1R13 0 100 0 100 4 4-4 4- +/-
4 4- .4-I +/- 1-TOTAL j 59 57I
APPENDIX F FORM NIS-1
OW NERS'D DTA REPORT FOR INSER VICE ISPE"CTIONS
- 2. PLANT PALO VERDE NUCLEAR GENERATING STATION 2a. ADDRESS 5801 SOUTH WTNTERSBURG ROAD, TONOPAH, ARIZONA 855354
- 3. UNIT NUMBER 1
- 4. OWNERS CERTIFICATE OF AUTHORIZATION NONE
- 5. COMMERCIAL SERVICE DATE 1-28-86
- 6. COMPONENTS INSPECTED:
COMPONENT OR APPURTENANCE MANUFACTURER OR INSTALLER ISERIAL NUMBER STATE OR PROVINCE NATIONAL BOARD NO IMRCEE01A Ansaldo 224 NA 1713
.STEAM GENERATOR 11 IMRCEE01B Ansaldo 225 NA 174 STEAM GENERATOR 12
ADS INIS I WNE-164 DATA REPOR9T FOR
-1 BACK WINSERVI.CIE -INSPECTIONSý
- 7. EXAM DATES June 20)07
- 8. INTSPECTION iNTERVAL 7-19-98 to 7-18-08
- 9. ABSTRACT OF EXAMINATIONS. INCLUDE A LIST OF, EXAMINATIONS AND A STATEMENT CONCERNqING STATUS OF WORK REQUIRED FOR CURRENT INTERVAL.
Table I in the report summary section documents the number and type of each examination performed.
No degraded or defec tive tubes were observed during these examinations. A summary of the tubes with indications of degradation is listed in Appendix B and C of this report for SG II and 12 respectively. The tubes identified on the following pages were plugged as a result of this examination.
The number of tubes plugged are as fol~lows: SG I I = 0 tubes SG 12 =0 tubes WE CERTIFY THAT THE STATEMENTS MADE IN THIS REPORT ARE CORRECT AND THE EXAMINATIONS AND CORRECTIVE MEASURES TAKEN CONFORM TO TH-E RULES OF THlE ASME CODE, SECTION'XI.
Hansen, 41530)b by D)N:c,=Hanbm CouglasB(Z41530).
DATE/~ 1-1107 SIGNED: ARIZONA PUBLIC SERVICE COMPANY B)POUglas B .Lh I; (Z4 1530) DaW 2007.1Z 19 06:ý.5 07300 CERTIFICATE OF INSERVICE I-NSPECTION I, THlE UNDERSIGNED, HOLDING A VALID COMMISSION ISSUED BY THlE NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS AND THE STATE OF PROVINCE OF ARIZONA EMPLOYED BY I-ISB CT OF HARTFORD, CONNECTICUT HAVE INSPECTED THE COMPONENTS DESCRIBED IN THIS OWNERS REPORT DURING THE PERIOD 21To 47--zo-67, AND STATE THAT TO THE BEST OF MY KNOWLEDGE AND BEFLIEF, THI1E OWNER HAS PERFORMED EXAMINATIONS AND TAKEN CORRECTIVE MEASURES DESCRIBED IN THIS OWNERS REPORT IN ACCORDANCE WITH THE REQUIREMENTS OF THlE ASME CODE, SECTION XI. BY SIGNING T~I-S!CERTIHtCATE NEITHER THlE INSPECTOR NOR HIS EMPLOYER MAKES ANY WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THE EXAMINATIONS AND CORRECTIVE MEASURES DESCRIBED IN THIS OWNERS REPORT. FURTH-ERMORE, NEITHIER THE INSPECTOR NOR HIS EMPLOYER SHALL BE LIABLE IN ANY MANNER FOR ANY PERSONAL INJURY. OR PROPERTY DAMAGE OR A.LOSS OF ANY KIND ARISING FROM OR CONNECTED WITH THIS INSPECTION.
INSPECTOR COMMISSIONS AZ.
i\, 2G~k NATL' BOARD, STATE, PROVIN4CE DATE s7-2C -
-