10 CFR 50.55a A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-07402-TNW January 5, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3, Docket No. STN 50-530 Third 10-Year Interval, Third Period:

Owners Activity Report Number U3R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 19 (U3R19). The outage ended on November 6, 2016.

No commitments are being made to the NRC by this letter. Should you have any questions concerning the content of this letter, please contact Michael DiLorenzo, Licensing Section Leader, at (623) 393-3495.

Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS/af

Enclosure:

Unit 3 Nineteenth Refueling Outage Owners Activity Report, Report U3R19 cc:

K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 Weber, Thomas N(Z00499)

Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this document Date: 2017.01.05 16:34:52 -07'00'

ENCLOSURE Unit 3 Nineteenth Refueling Outage Owners Activity Report Report U3R19

FORM OAR-1 OWNER'S ACTIVITY REPORT Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: _3 __

(if applicable)

Commercial service date: __

J_an_8,__, 1_9_8_8 __

Refueling Outage No.: _1_9 _____ _

Current inspection interval IWB, IWC, IWD, IWF =3rd, IWE, IWL =2nd (1, 2°', 3, 4'", other)

Current inspection period IWB, IWC, IWD, IWF, IWE =3rd, IWL =2nd (1", 2°',3)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Ed., 2003 Ad.,

IWL 2007 Ed., 2008 Ad.

Date and revision of inspection plans ISi = 8/29/13 R3, Press Test= 3/19/14 R4, IWE = 9/22/15 R1, IWL = 8/27/15 R3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _2_0_0_1 _E_d_., _2_00_3_A_d_. ___________________ _

CodeCasesused:_N_-_53_2_-4 _____________________________ _

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U3R19 conform to the requirements of Section XI.

(refueling outage number)

Lehman, Wi 11 i am Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

T(z60076)

Reason: I prepared this document Date: 2016.12.13 11 :03:29 -007'00' Signed---------------------

ate: ____________ _

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. *The Hartford Steam Boiler Inspection and Insurance Company of Connecticut By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

H Digitally signed by Hagstrom,

OQStrom, Robert(YH2450)

DN: cn=Hogstrom, Robert Robert (YH2450) (YH24so)

Date: 2016.12.14 07:50:09-07'00' Commissions N.B. 9685 "A, N, I, C" (Inspector's Signature)

National Board, State, Province, and Endorsements Date: ____________ _

PV-E0796 Ver. 1

2 Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 19 Examination Category Item Number Description of Work Evaluation Description F-A 3SI223H003 AS FOUND COLD LOAD SETTINGS GREATER THAN ALLOWED 16-16768-002 F-A 3SG002H008 LOOSE NUT ON PIPE STRUT OF HANGER 16-16195-002 F-A 3SI179H011 LOCKING NUTS ON THREADED RODS FOUND LOOSE 16-16086-002 F-A 3SG002H012 SPRING HANGER INDICATOR RECESSED INSIDE CASING 16-17216-003 Items with flaws or relevant conditions that Table 1 required evaluation for continued service

3 Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 19 Table 2 Abstract of repair/replacement activities required for continued service Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number 3

3PSPBL025 FABRICATE AND INSTALL NEW SPOOL 11/02/16 3824506 2

3PSGEL002 REPLACE PIPING AND FITTINGS 11/04/16 4506710 3

3MEWBE01 BASE METAL REPAIR ON HEAT EXCHANGER 10/31/16 4678271 2

3MSIBE01 WELDED TUBE PLUGS INSTALLED IN HEAT EXCHANGER 10/27/16 4786062