ML111250617: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/04/2011
| issue date = 05/04/2011
| title = IR 05000269-11-010, IR 05550270-11-010, IR 05000287-11-010, on 08/15 - 09/2011, Notification Oconee Nuclear Report
| title = IR 05000269-11-010, IR 05550270-11-010, IR 05000287-11-010, on 08/15 - 09/2011, Notification Oconee Nuclear Report
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Gillespie T P
| addressee name = Gillespie T
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000269, 05000270, 05000287
| docket = 05000269, 05000270, 05000287
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000269/2011010]]
See also: [[see also::IR 05000269/2011010]]


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 4, 2011 Mr. T. Preston Gillespie, Jr. Site Vice President  
{{#Wiki_filter:UNITED STATES
Duke Energy Carolinas, LLC  
                                  NUCLEAR REGULATORY COMMISSION
Oconee Nuclear Station  
                                                REGION II
7800 Rochester Highway  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Seneca, SC 29672  
                                      ATLANTA, GEORGIA 30303-1257
SUBJECT: NOTIFICATION OCONEE NUCLEAR PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000269,270,287/2011010 Dear Mr. Gillespie: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
                                              May 4, 2011
Region II staff will conduct a component design bases inspection at your Oconee Nuclear Power Plant reactor facility during the period of August 15 - September 30, 2011. The inspection team will be led by Mr. Patrick Higgins, a Senior Reactor Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.  
Mr. T. Preston Gillespie, Jr.
Site Vice President
The inspection will evaluate the capability of risk significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
Duke Energy Carolinas, LLC
Oconee Nuclear Station
During a discussion on April 26, 2011, Mr. Higgins confirmed, with Ms. Judy Smith of your staff,  
7800 Rochester Highway
arrangements for an information gathering site visit and the three-week onsite inspection. The  
Seneca, SC 29672
schedule is as follows:  
SUBJECT:         NOTIFICATION OCONEE NUCLEAR PLANT - COMPONENT DESIGN BASES
* Information gathering visit:  July 11 - July 15, 2011 * Week 1 of onsite inspection: August 29 - September 2, 2011 * Week 2 of onsite inspection: September 12 - September 16, 2011 * Week 3 of onsite inspection: September 26 - September 30, 2011
                INSPECTION - NRC INSPECTION REPORT 05000269,270,287/2011010
The purpose of the information gathering visit is to meet with members of your staff to identify  
Dear Mr. Gillespie:
risk-significant components and operator actions. Information and documentation needed to  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
support the inspection will also be identified and gathered or requested. Mr. Rudolph Bernhard, Region II Senior Reactor Analyst, may accompany Mr. Higgins during the information gathering  
Region II staff will conduct a component design bases inspection at your Oconee Nuclear Power
visit to review probabilistic risk assessment data and identify risk significant components which will be examined during the inspection.
Plant reactor facility during the period of August 15 - September 30, 2011. The inspection team
will be led by Mr. Patrick Higgins, a Senior Reactor Inspector from the NRC's Region II Office.
This inspection will be conducted in accordance with the baseline inspection procedure,
Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
 
The inspection will evaluate the capability of risk significant / low margin components to function
DEC 2   The enclosure lists documents that will be needed prior to the information gathering visit. Please contact Mr. Higgins with any questions prior to preparing materials listed in the enclosure and provide the referenced information to the Region II office by June 10, 2011, unless otherwise noted. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for the inspection preparation.  
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During the information gathering visit, the team leader will also discuss the following inspection support administrative details: office space; site, plant and information system access; required  
During a discussion on April 26, 2011, Mr. Higgins confirmed, with Ms. Judy Smith of your staff,
resources; and information exchange protocol.  
arrangements for an information gathering site visit and the three-week onsite inspection. The
schedule is as follows:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
    *   Information gathering visit:  July 11 - July 15, 2011
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system  
    *   Week 1 of onsite inspection:   August 29 - September 2, 2011
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
    *   Week 2 of onsite inspection:   September 12 - September 16, 2011
    *   Week 3 of onsite inspection:   September 26 - September 30, 2011
This letter does not contain new or amended information collection requirements subject to the  
The purpose of the information gathering visit is to meet with members of your staff to identify
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified and gathered or requested. Mr. Rudolph Bernhard,
Region II Senior Reactor Analyst, may accompany Mr. Higgins during the information gathering
visit to review probabilistic risk assessment data and identify risk significant components which
will be examined during the inspection.
 
DEC                                               2
The enclosure lists documents that will be needed prior to the information gathering visit. Please
contact Mr. Higgins with any questions prior to preparing materials listed in the enclosure and
provide the referenced information to the Region II office by June 10, 2011, unless otherwise
noted. The inspectors will try to minimize your administrative burden by specifically identifying
only those documents required for the inspection preparation.
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: office space; site, plant and information system access; required
resources; and information exchange protocol.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
requirements were approved by the Office of Management and Budget, control number 3150-
0011.  
0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for  
information or an information collection requirement unless the requesting document displays a
information or an information collection requirement unless the requesting document displays a  
currently valid Office of Management and Budget control number.
currently valid Office of Management and Budget control number.  
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Higgins at (404) 997-4615 or me at
Thank you for your cooperation in this matter. If you have any questions regarding the  
(404) 997-4519.
information requested or the inspection, please contact Mr. Higgins at (404) 997-4615 or me at  
                                                Sincerely,
(404) 997-4519.  
                                                /RA/
                                                Binoy B. Desai, Chief
      Sincerely,  
                                                Engineering Branch 1
                                                Division of Reactor Safety
      /RA/ Binoy B. Desai, Chief
Docket Nos.: 50-269,270,287
Engineering Branch 1  
License Nos.: DPR-38,47,55
Division of Reactor Safety
Enclosure:     Information Request for Oconee Nuclear Power Plant Component Design
Docket Nos.: 50-269,270,287  
                Bases Inspection
License Nos.:   DPR-38,47,55  
cc w/encl: (See page 3)
 
Enclosure: Information Request for Oconee Nuclear Power Plant Component Design Bases Inspection
DEC                                   3
cc w/encl: (See page 3)  
cc w/encl:                               Tom D. Ray
 
Division of Radiological Health         Engineering Manager
DEC 3   cc w/encl: Division of Radiological Health  
TN Dept. of Environment & Conservation   Oconee Nuclear Station
TN Dept. of Environment & Conservation  
401 Church Street                       Duke Energy Carolinas, LLC
401 Church Street  
Nashville, TN 37243-1532                 Electronic Mail Distribution
Nashville, TN   37243-1532  
David A. Baxter                         County Supervisor of Oconee County
Vice President, Nuclear Engineering     415 S. Pine Street
David A. Baxter  
Duke Energy Carolinas, LLC               Walhalla, SC 29691-2145
Vice President, Nuclear Engineering  
Electronic Mail Distribution
Duke Energy Carolinas, LLC  
                                        W. Lee Cox, III
Electronic Mail Distribution  
Kent Alter                               Section Chief
Regulatory Compliance Manager           Radiation Protection Section
Kent Alter  
Oconee Nuclear Station                   N.C. Department of Environmental
Regulatory Compliance Manager  
Duke Energy Carolinas, LLC               Commerce & Natural Resources
Oconee Nuclear Station  
Electronic Mail Distribution             Electronic Mail Distribution
Duke Energy Carolinas, LLC  
Sandra Threatt, Manager
Electronic Mail Distribution  
Nuclear Response and Emergency
Environmental Surveillance
Sandra Threatt, Manager  
Bureau of Land and Waste Management
Nuclear Response and Emergency  
Department of Health and Environmental
Environmental Surveillance  
Control
Bureau of Land and Waste Management  
Electronic Mail Distribution
Department of Health and Environmental
Scott L. Batson
Control  
Station Manager
Electronic Mail Distribution  
Oconee Nuclear Station
Duke Energy Carolinas, LLC
Scott L. Batson  
Electronic Mail Distribution
Station Manager  
Senior Resident Inspector
Oconee Nuclear Station  
U.S. Nuclear Regulatory Commission
Duke Energy Carolinas, LLC  
Oconee Nuclear Station
Electronic Mail Distribution  
U.S. Nuclear Regulatory Commission
7812B Rochester Hwy
Senior Resident Inspector  
Seneca, SC 29672
U.S. Nuclear Regulatory Commission  
Terry L. Patterson
Oconee Nuclear Station  
Safety Assurance Manager
U.S. Nuclear Regulatory Commission  
Duke Energy Carolinas, LLC
7812B Rochester Hwy  
Electronic Mail Distribution
Seneca, SC   29672  
Charles Brinkman
Director
Terry L. Patterson  
Washington Operations
Safety Assurance Manager  
Westinghouse Electric Company, LLC
Duke Energy Carolinas, LLC  
Electronic Mail Distribution
Electronic Mail Distribution  
 
 
Charles Brinkman  
_ML111250617________________________           X SUNSI REVIEW COMPLETE
Director  
OFFICE             RII:DRS         RII:DRS
Washington Operations  
SIGNATURE         RA             RA
Westinghouse Electric Company, LLC  
NAME                   P. Higgins       B. Desai
Electronic Mail Distribution  
DATE                   5/4/2011       5/4/2011
E-MAIL COPY?         YES      NO   YES     NO YES   NO     YES   NO     YES   NO     YES   NO     YES NO
       
Tom D. Ray Engineering Manager
Letter to Preston Gillespie from Binoy Desai dated May 4, 2011.
Oconee Nuclear Station
SUBJECT:       NOTIFICATION OF OCONEE NUCLEAR POWER PLANT - COMPONENT
Duke Energy Carolinas, LLC
                DESIGN BASES INSPECTION - NRC INSPECTION REPORT
Electronic Mail Distribution
                05000269,270,287/2011010
Distribution w/encl:
County Supervisor of Oconee County
RIDSNRRDIRS
415 S. Pine Street
PUBLIC
Walhalla, SC  29691-2145
RidsNrrPMOconee Resource
 
W. Lee Cox, III
      REQUEST FOR OCONEE NUCLEAR POWER PLANT COMPONENT
Section Chief
                                DESIGN BASES INSPECTION
Radiation Protection Section
Please provide the information electronically in .pdf files, Excel, or other searchable format on
N.C. Department of Environmental
CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate
Commerce & Natural Resources
ease of use. Information in lists should contain enough information to be easily understood to
Electronic Mail Distribution
someone who has knowledge of pressurized water reactor technology.
1.   From your most recent probabilistic safety analysis (PSA) excluding external events and
 
      fires, please provide:
DEC 2  The enclosure lists documents that will be needed prior to the information gathering visit.  Please contact Mr. Higgins with any questions prior to preparing materials listed in the enclosure and provide the referenced information to the Region II office by June 10, 2011, unless otherwise noted.  The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for the inspection preparation.
      a.       Two risk rankings of components from your site-specific probabilistic safety
                analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
During the information gathering visit, the team leader will also discuss the following inspection support administrative details: office space; site, plant and information system access; required
                sorted by Birnbaum Importance.
resources; and information exchange protocol.
      b.       A list of the top 500 cutsets.
2.   From your most recent probabilistic safety analysis (PSA) including external events and
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
      fires, please provide:
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system
      a.       Two risk rankings of components from your site-specific probabilistic safety
(ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
                sorted by Birnbaum Importance.
This letter does not contain new or amended information collection requirements subject to the
      b.       A list of the top 500 cutsets.
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
3.   Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
requirements were approved by the Office of Management and Budget, control number 3150-
      copies of your human reliability worksheets for these items.
0011.
4.   Any pre-existing evaluation or list of components and calculations with low design
      margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
      to design required output, heat exchangers close to rated design heat removal, MOV risk-
information or an information collection requirement unless the requesting document displays a
      margin rankings, etc.).
currently valid Office of Management and Budget control number.
5.   A list of station applicability evaluations/reviews performed and documented in the station
      corrective action program in the past two years for industry events, critical equipment
Thank you for your cooperation in this matter.  If you have any questions regarding the
      failures, and safety related equipment vulnerabilities (as communicated by NRC generic
information requested or the inspection, please contact Mr. Higgins at (404) 997-4615 or me at
      communications, industry communications, 10 CFR Part 21 notifications, etc.).
(404) 997-4519.
6.   A list of operability evaluations completed within the last two years, sorted by associated
      component or system.
      Sincerely,
7.   A list of common-cause failures of components that have occurred at Oconee Nuclear
      Power Plant and have been identified within the last five years.
      /RA/  Binoy B. Desai, Chief 
8.   A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE
Engineering Branch 1
      List), including a description of the reason(s) why each component (i.e. not a
Division of Reactor Safety 
      programmatic or system level concern) is on that list and summaries (if available) of your
Docket Nos.:  50-269,270,287
      plans to address those reasons.
License Nos.:  DPR-38,47,55
9.   A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)
      status.
Enclosure: Information Request for Oconee Nuclear Power Plant Component Design Bases Inspection 
10.   Contact information for a person to discuss PRA information prior to the information
cc w/encl:  (See page 3)
      gathering trip: name, title, phone number, and e-mail address.
X  PUBLICLY AVAILABLE  G  NON-PUBLICLY AVAILABLE  G  SENSITIVE        X  NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ML111250617________________________ X   SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS     SIGNATURE RA RA     NAME P. Higgins B. Desai     DATE 5/4/2011 5/4/2011     E-MAIL COPY?     YES      NO       YES       NO       YES       NO       YES       NO       YES       NO       YES       NO       YES       NO     OFFICIAL RECORD COPY          DOCUMENT NAME:  S:\DRS\ENG BRANCH 1\BRANCH INSPECTION FILES\2011-2012-2013 CYCLE EB1 INSPECTION FOLDERS FOR ALL SITES\OCONEE\OCO
                                                                                          Enclosure
CDBI NOTIFICATION 2011 (SAW).DOC 
  Letter to Preston Gillespie from Binoy Desai dated May 4, 2011.
SUBJECT: NOTIFICATION OF OCONEE NUCLEAR POWER PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT  
05000269,270,287/2011010
Distribution w/encl: RIDSNRRDIRS  
PUBLIC  
RidsNrrPMOconee Resource
  Enclosure REQUEST FOR OCONEE NUCLEAR POWER PLANT COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in ".pdf" files, Excel, or other searchable format on  
CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood to  
someone who has knowledge of pressurized water reactor technology.  
1. From your most recent probabilistic safety analysis (PSA) excluding external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other  
sorted by Birnbaum Importance. b. A list of the top 500 cutsets. 2. From your most recent probabilistic safety analysis (PSA) including external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other  
sorted by Birnbaum Importance. b. A list of the top 500 cutsets.
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide copies of your human reliability worksheets for these items. 4. Any pre-existing evaluation or list of components and calculations with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close  
to design required output, heat exchangers close to rated design heat removal, MOV risk-
margin rankings, etc.). 5. A list of station applicability evaluations/reviews performed and documented in the station corrective action program in the past two years for industry events, critical equipment  
failures, and safety related equipment vulnerabilities (as communicated by NRC generic communications, industry communications, 10 CFR Part 21 notifications, etc.). 6. A list of operability evaluations completed within the last two years, sorted by associated component or system. 7. A list of common-cause failures of components that have occurred at Oconee Nuclear Power Plant and have been identified within the last five years. 8. A list of equipment currently planned for upgrade/improvement by the site (e.g. "ONE" List), including a description of the reason(s) why each component (i.e. not a programmatic or system level concern) is on that list and summaries (if available) of your  
plans to address those reasons. 9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1) status. 10. Contact information for a person to discuss PRA information prior to the information gathering trip: name, title, phone number, and e-mail address.  
Enclosure 11. Provide two sets of PI&D drawings (11x17) for safety-related systems and two sets of one line electrical drawings ( 11X17) for safety related systems  (for onsite week of July 11-
July 15, 2011) 12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of July 11- July 15, 2011) 13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for onsite week of July 11- July 15, 2011)   


                                          2
11. Provide two sets of PI&D drawings (11x17) for safety-related systems and two sets of one
    line electrical drawings ( 11X17) for safety related systems (for onsite week of July 11-
    July 15, 2011)
12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of July 11- July 15,
    2011)
13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for
    onsite week of July 11- July 15, 2011)
                                                                                      Enclosure
}}
}}

Latest revision as of 01:06, 13 November 2019

IR 05000269-11-010, IR 05550270-11-010, IR 05000287-11-010, on 08/15 - 09/2011, Notification Oconee Nuclear Report
ML111250617
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/04/2011
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Gillespie T
Duke Energy Carolinas
References
IR-11-010
Download: ML111250617 (7)


See also: IR 05000269/2011010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 4, 2011

Mr. T. Preston Gillespie, Jr.

Site Vice President

Duke Energy Carolinas, LLC

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672

SUBJECT: NOTIFICATION OCONEE NUCLEAR PLANT - COMPONENT DESIGN BASES

INSPECTION - NRC INSPECTION REPORT 05000269,270,287/2011010

Dear Mr. Gillespie:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Oconee Nuclear Power

Plant reactor facility during the period of August 15 - September 30, 2011. The inspection team

will be led by Mr. Patrick Higgins, a Senior Reactor Inspector from the NRC's Region II Office.

This inspection will be conducted in accordance with the baseline inspection procedure,

Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a discussion on April 26, 2011, Mr. Higgins confirmed, with Ms. Judy Smith of your staff,

arrangements for an information gathering site visit and the three-week onsite inspection. The

schedule is as follows:

  • Information gathering visit: July 11 - July 15, 2011
  • Week 1 of onsite inspection: August 29 - September 2, 2011
  • Week 2 of onsite inspection: September 12 - September 16, 2011
  • Week 3 of onsite inspection: September 26 - September 30, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified and gathered or requested. Mr. Rudolph Bernhard,

Region II Senior Reactor Analyst, may accompany Mr. Higgins during the information gathering

visit to review probabilistic risk assessment data and identify risk significant components which

will be examined during the inspection.

DEC 2

The enclosure lists documents that will be needed prior to the information gathering visit. Please

contact Mr. Higgins with any questions prior to preparing materials listed in the enclosure and

provide the referenced information to the Region II office by June 10, 2011, unless otherwise

noted. The inspectors will try to minimize your administrative burden by specifically identifying

only those documents required for the inspection preparation.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; site, plant and information system access; required

resources; and information exchange protocol.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Higgins at (404) 997-4615 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-269,270,287

License Nos.: DPR-38,47,55

Enclosure: Information Request for Oconee Nuclear Power Plant Component Design

Bases Inspection

cc w/encl: (See page 3)

DEC 3

cc w/encl: Tom D. Ray

Division of Radiological Health Engineering Manager

TN Dept. of Environment & Conservation Oconee Nuclear Station

401 Church Street Duke Energy Carolinas, LLC

Nashville, TN 37243-1532 Electronic Mail Distribution

David A. Baxter County Supervisor of Oconee County

Vice President, Nuclear Engineering 415 S. Pine Street

Duke Energy Carolinas, LLC Walhalla, SC 29691-2145

Electronic Mail Distribution

W. Lee Cox, III

Kent Alter Section Chief

Regulatory Compliance Manager Radiation Protection Section

Oconee Nuclear Station N.C. Department of Environmental

Duke Energy Carolinas, LLC Commerce & Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency

Environmental Surveillance

Bureau of Land and Waste Management

Department of Health and Environmental

Control

Electronic Mail Distribution

Scott L. Batson

Station Manager

Oconee Nuclear Station

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Oconee Nuclear Station

U.S. Nuclear Regulatory Commission

7812B Rochester Hwy

Seneca, SC 29672

Terry L. Patterson

Safety Assurance Manager

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Charles Brinkman

Director

Washington Operations

Westinghouse Electric Company, LLC

Electronic Mail Distribution

_ML111250617________________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME P. Higgins B. Desai

DATE 5/4/2011 5/4/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to Preston Gillespie from Binoy Desai dated May 4, 2011.

SUBJECT: NOTIFICATION OF OCONEE NUCLEAR POWER PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000269,270,287/2011010

Distribution w/encl:

RIDSNRRDIRS

PUBLIC

RidsNrrPMOconee Resource

REQUEST FOR OCONEE NUCLEAR POWER PLANT COMPONENT

DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily understood to

someone who has knowledge of pressurized water reactor technology.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most recent probabilistic safety analysis (PSA) including external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4. Any pre-existing evaluation or list of components and calculations with low design

margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close

to design required output, heat exchangers close to rated design heat removal, MOV risk-

margin rankings, etc.).

5. A list of station applicability evaluations/reviews performed and documented in the station

corrective action program in the past two years for industry events, critical equipment

failures, and safety related equipment vulnerabilities (as communicated by NRC generic

communications, industry communications, 10 CFR Part 21 notifications, etc.).

6. A list of operability evaluations completed within the last two years, sorted by associated

component or system.

7. A list of common-cause failures of components that have occurred at Oconee Nuclear

Power Plant and have been identified within the last five years.

8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE

List), including a description of the reason(s) why each component (i.e. not a

programmatic or system level concern) is on that list and summaries (if available) of your

plans to address those reasons.

9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)

status.

10. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Enclosure

2

11. Provide two sets of PI&D drawings (11x17) for safety-related systems and two sets of one

line electrical drawings ( 11X17) for safety related systems (for onsite week of July 11-

July 15, 2011)

12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of July 11- July 15,

2011)

13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for

onsite week of July 11- July 15, 2011)

Enclosure