ML12083A183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)
Page 1 of 11  Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)
JPM Number: 2012 SRO Admin 5 Revision Number: 03 Date: 03/04/2012 Developed By:
JPM Number: 2012 SRO Admin 5 Revision Number:
Instructor                           Date Validated By:
03 Date: 03/04/2012 Developed By:
SME or Instructor                          Date Reviewed By:
Instructor Date Validated By:
Operations Representative                     Date Approved By:
SME or Instruct or Date Reviewed By:
Training Department                         Date SRO Admin 5.doc               SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operations Representative Date Approved By:
Page 1 of 11
Training Department Date 2012 SRO Admin 5
 
- Rev 03  SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
2012 SRO Admin 5 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                       Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                       Rev:
________ 10. Verify performance time is accurate
Procedure                       Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date 2012 SRO Admin 5
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
- Rev 03  SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Page 3 of 11 Revision Record (Summary)
SME / Instructor                                 Date SME / Instructor                                 Date SME / Instructor                                 Date SRO Admin 5.doc                   SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11
 
2012 SRO Admin 5 - Rev 03 Revision Record (Summary)
Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
Revision 01, JPM revised to update format and procedure revisions.
Revision 01, JPM revised to update format and procedure revisions.
Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.
Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.
Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.
Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.
SRO Admin 5.doc                  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11


2012 SRO Admin 5  
2012 SRO Admin 5 - Rev 03 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:
- Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
* A blank EP-MW-114-100-F01 (NARS form)
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:
* A blank EP-AA-111-F06 (Quad Cities Plant Based PAR Flowchart)
A blank EP
* Full-sized Hot EAL Boards
-MW-114-100-F01 (NARS form)
* All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1 NARS form completed as follows:
A blank EP
Utility Message 1                  State Message N/A Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified: Time = T0 -60 minutes Date = today EAL# = FS1 Block #4. Accident Terminated: Time:=N/A, Date:=N/A Block #5. Release Status       = None Block #6. Type of Release = N/A Block #7. Wind Direction       = 232 degrees Block #8. Wind Speed:           Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]
-AA-111-F06 (Quad Cities Plant Based PAR Flowchart) Full-sized Hot EAL Boards All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1Utility Message  1 State Message  N/A NARS form completed as follows:
Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified:
Time = "T0  
-60 minutes" Date =   "today" EAL# = "FS1" Block #4. Accident Terminated:
Time:=N/A, Date:=N/A Block #5. Release Status  
= None Block #6. Type of Release
  = N/A Block #7. Wind Direction  
= 232 degrees Block #8. Wind Speed:
Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]
Approved by [provide SM signature]
Approved by [provide SM signature]
Block #11 Transmitted By [provide name] Phone Number [309
Block #11 Transmitted By [provide name] Phone Number [309-227-2210]
-227-2210]   Time/Date "T0  
Time/Date T0 -50 minutes/Today Block #12 Received By [provide name] Organization =
-50 minutes/Today" Block #12 Received By [provide name] Organization =
IEMA, Time/Date: T0 -50 minutes/Today Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date T0 -48 minutes/Today SRO Admin 5.doc                     SRRS: 3D.105 (when utilized for operator initial or continuing training)
IEMA, Time/Date: "T0 -50 minutes/Today" Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date "T0 -48 minutes/Today" 2012 SRO Admin 5
Page 4 of 11
- Rev 03  SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 5 of 11 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
2012 SRO Admin 5 - Rev 03 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)
50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)
All Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.
All plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.
plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.
Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.
T0 is the current time. T0 is _______
T0 is the current time. T0 is _______
The CURRENT plant conditions are as follows:
The CURRENT plant conditions are as follows:
o Drywell pressure is 3 psig and rising.
o Drywell pressure is 3 psig and rising.
o RPV pressure is 700 psig and lowering at approximately 10 psig/min.
o RPV pressure is 700 psig and lowering at approximately 10 psig/min.
o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches. o There has been NO Change in release status, or meteorological data since message #1 was sent.
o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND: IF a change is NOT required, THEN explain what plant changes would require a change.
o There has been NO Change in release status, or meteorological data since message #1 was sent.
(Consider ONLY the fission product barrier series EALs)
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:
OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.
IF a change is NOT required, THEN explain what plant changes would require a change.
 
(Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.
Provide examinee with:
Provide examinee with:
A copy of EP
* A copy of EP-MW-114-100-F01 Nuclear Accident Reporting System (NARS)
-MW-114-100-F01 "Nuclear Accident Reporting System" (NARS) Utility Message #1Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Utility Message #1 form completely filled out as a Site Area Emergency Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
form completely filled out as a Site Area Emergency
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11


2012 SRO Admin 5  
2012 SRO Admin 5 - Rev 03 Information For Evaluators Use:
- Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11 Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11


2012 SRO Admin 5  
2012 SRO Admin 5 - Rev 03 JPM Start Time:
- Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP               ELEMENT                             STANDARD                        SAT   UNSAT Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.
Page 7 of 11  JPM Start Time:
    *      *Declares a General               Recognizes that the conditions             ___    ___      ___
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.
Emergency.*                      for FG1 are met due to Drywell radiation and Drywell pressure.
* Declares a General Emergency. Recognizes that the conditions for FG1 are met due to Drywell radiation and Drywell pressure.
(Loss of RCS, Fuel Clad, and Potential Loss of Containment)
(Loss of RCS, Fuel Clad, and Potential Loss of Containment)
___ ___ ___ EVALUATOR: Record the actual time that candidate makes classification _________ This completes the FIRST of two time
EVALUATOR: Record the actual time that candidate makes classification _________
-critical requirements (classification <
This completes the FIRST of two time-critical requirements (classification < 15 minutes) and starts the SECOND (notifications < 14 minutes)
15 minutes) and starts the SECOND (notifications  
EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.
< 14 minutes)
NARS       Fills out Utility Message         Records Utility Message #2.               ___     ___     ___
EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.
form        Number.
NARS form Fills out Utility Message Number. Records Utility Message #2.
NARS       Fills out State Message           Records N/A for State Message             ___     ___     ___
___ ___ ___ NARS form Fills out State Message Number. Records N/A for State Message Number. ___ ___ ___ Block #1 Fills out block #1 information regarding Status.
form        Number.                          Number.
Records [B] Drill/Exercise in block #1. ___ ___ ___ *Block #2 Fills out block #2 information regarding Station. Records [F] Quad Cities in block #2. ___ ___ ___ *Block #3 Fills out block #3 information regarding onsite condition. Records [D] General Emergency.
Block #1   Fills out block #1 information   Records [B] Drill/Exercise in             ___    ___      ___
___ ___ ___ *Block #4 Fills out block #4 information regarding Accident Classified & Accident Terminated. Records Accident Classification as Time= Classification time Date= today's date EAL=FG1 Records N/A for Accident Terminated in Time and Date space. ___ ___ ___ Block #5 Fills out block #5 information regarding Release Status.
regarding Status.                block #1.
Records [A] None.
*Block #2   *Fills out block #2 information Records [F] Quad Cities in                   ___    ___      ___
___ ___ ___
regarding Station.*            block #2.
2012 SRO Admin 5
*Block #3   *Fills out block #3 information Records [D] General                         ___    ___      ___
- Rev 03  SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
regarding onsite condition.*    Emergency.
Page 8 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number Block #6 Fills out block #6 information regarding Type of Release.
*Block #4   *Fills out block #4 information Records Accident Classification              ___    ___      ___
Records [A] N/A.
regarding Accident Classified as
___ ___ ___ EVALUATOR: Candidate may take information from initial conditions, which state "meteorological conditions have not changed" OR they may look up the data on the station computer.
            & Accident Terminated.*        Time= Classification time Date= todays date EAL=FG1 Records N/A for Accident Terminated in Time and Date space.
IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: "Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour".
Block #5   Fills out block #5 information Records [A] None.                             ___     ___     ___
*Block #7 Fills out block #7 information regarding Wind Direction. Records 232 degrees.
regarding Release Status.
___ ___ ___ *Block #8 Fills out block #8 information regarding Wind Speed. Records [A] Meters/Sec = 2.46 and       [B] Miles/Hr = 5.51.
SRO Admin 5.doc                   SRRS: 3D.105 (when utilized for operator initial or continuing training)
___ ___ ___ EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply: "NO". Refers to EP
Page 7 of 11
-AA-111-F-06, "Quad Cities Plant Based PAR Flow Chart", to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.
 
Obtains and uses EP
2012 SRO Admin 5 - Rev 03 Comment STEP               ELEMENT                             STANDARD                        SAT   UNSAT Number Block #6   Fills out block #6 information   Records [A] N/A.                           ___     ___     ___
-AA-111-F-06, to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.
regarding Type of Release.
___ ___ ___ EVALUATOR: The candidate should utilize EP
EVALUATOR: Candidate may take information from initial conditions, which state meteorological conditions have not changed OR they may look up the data on the station computer.
-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.
IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour.
*Block #9 information regarding Recommended Actions. Utilizes EP
*Block #7   *Fills out block #7 information Records 232 degrees.                         ___     ___     ___
-AA-111 F-06 Quad Cities Plant Based PAR Flowchart and determines PARS of "Evacuate 2 Mile Radius & 5 Miles Downwind
regarding Wind Direction.*
[D] Illinois sub
*Block #8   *Fills out block #8 information Records [A] Meters/Sec = 2.46               ___    ___      ___
-areas 1,2 [E] Iowa sub
regarding Wind Speed.*          and     [B] Miles/Hr = 5.51.
-areas 1,2,5
EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply:
___ ___ ___ Block #10 Fills out block #10 information regarding Additional Information.
NO.
Records NONE.
Refers to EP-AA-111-F-06,         Obtains and uses EP-AA-111-                ___    ___      ___
___ ___ ___ NARS form Submits NARS form for verification.
Quad Cities Plant Based         F-06, to determine loss of fuel PAR Flow Chart, to              clad barrier, loss of RCS barrier, determine loss of fuel clad      and a potential loss of barrier, loss of RCS barrier,     containment exists.
Submits NARS form for verification.
and a potential loss of containment exists.
___ ___ ___
EVALUATOR: The candidate should utilize EP-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.
2012 SRO Admin 5
*Block #9   Fills out block #9              Utilizes EP-AA-111 F-06 Quad               ___    ___      ___
- Rev 03  SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
information regarding            Cities Plant Based PAR Recommended Actions.            Flowchart and determines PARS of Evacuate 2 Mile Radius & 5 Miles Downwind
Page 9 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE: When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.
[D] Illinois sub-areas 1,2
NARS form Signs on the Approved By line and submits NARS form for transmittal.
[E] Iowa sub-areas 1,2,5 Block #10   Fills out block #10               Records NONE.                              ___    ___      ___
Submits NARS form for transmittal
information regarding Additional Information.
___ ___ ___ CUE: When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form. Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.
NARS       Submits NARS form for             Submits NARS form for                     ___     ___     ___
form        verification.                    verification.
SRO Admin 5.doc                   SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11
 
2012 SRO Admin 5 - Rev 03 Comment STEP               ELEMENT                           STANDARD                        SAT   UNSAT Number CUE:       When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.
NARS       Signs on the Approved By       Submits NARS form for                      ___    ___      ___
form      line and submits NARS form     transmittal for transmittal.
CUE:       When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form.
Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.
JPM Stop Time:
JPM Stop Time:
SRO Admin 5.doc                SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11


2012 SRO Admin 5  
2012 SRO Admin 5 - Rev 03 JPM  
- Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                       Job Title:       EO           RO     SRO         FS STA/IA             SRO Cert JPM Title:         Classify Event and Determine Protective Action Recommendations (PARS)
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
JPM Number:       2012 SRO Admin 5                                 Revision Number: 03 Task Number and Title:
Classify Event and Determine Protective Action Recommendations (PARS)
S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.
JPM Number:
S-EP-P02 (Freq: LIC=A) (ILT-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP-AA-111.
2012 SRO Admin 5 Revision Number:
K/A Number and Importance:         K/A:   2.4.44 Rating:           4.4 Suggested Testing Environment: Simulator Alternate Path:     Yes     No   SRO Only:     Yes       No       Time Critical:         Yes       No Reference(s): EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment:         Simulator       Control Room               In-Plant           Other Testing Method:         Simulate       Perform Estimated Time to Complete: 15 minutes to classify Actual Time Used:                         minutes 14 minutes to notify Actual Time Used:                        minutes EVALUATION
Task Number and Title:
03 S-EP-P01 (Freq: LIC=A) (ILT
-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP
-AA-111 and EP
-AA-112. S-EP-P02 (Freq: LIC=A) (ILT
-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP
-AA-111. K/A Number and Importance:
K/A: 2.4.44 Rating: 4.4 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes to classify Actual Time Used:
minutes 14EVALUATION


==SUMMARY==
==SUMMARY==
:
:
minutes to notify    Actual Time Used:
Were all the Critical Elements performed satisfactorily?               Yes                   No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory         Unsatisfactory Comments:
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                       (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                               Date:
Satisfactory Unsatisfactory Comments:           Evaluator's Name
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature:   Date:
Page 10 of 11
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
Line 192: Line 181:
o Drywell pressure is 3 psig and rising.
o Drywell pressure is 3 psig and rising.
o RPV pressure is 700 psig and lowering at approximately 10 psig/min.
o RPV pressure is 700 psig and lowering at approximately 10 psig/min.
o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches. o There has been NO Change in release status, or meteorological data since message #1 was sent.
o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND: IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs)
o There has been NO Change in release status, or meteorological data since message #1 was sent.
OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:
IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number: 00 Date:03/04/2012 Developed By:
Page 1 of 10  Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number:
Instructor                             Date Validated By:
2012 SRO Admin 4 Revision Number:
SME or Instructor                           Date Reviewed By:
00 Date: 03/04/2012 Developed By:
Operations Representative                         Date Approved By:
Instructor Date Validated By:
Training Department                         Date SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor Date Reviewed By:
Page 1 of 10
Operations Representative Date Approved By:
Training Department Date 2012 SRO Admin 4
- Rev 00  G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date 2012 SRO Admin 4
- Rev 00  G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10 Revision Record (Summary)
Revision 00, This JPM was developed new for the 2012 ILT NRC Exam.


2012 SRO Admin 4  
2012 SRO Admin 4 - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
- Rev 00 G:\DRSIII\License Examinations
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
\2012\Quad Cities
________      1. Task description and number, JPM description and number are identified.
\Proposed\SRO ADMIN JPMs
________      2. Knowledge and Abilities (K/A) references are included.
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
________      3. Performance location specified. (in-plant, control room, simulator, or other)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
________      4. Initial setup conditions are identified.
________      5. Initiating cue (and terminating cue if required) are properly identified.
________      6. Task standards identified and verified by SME review.
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                          Rev:
Procedure                          Rev:
Procedure                          Rev:
________      9. Verify cues both verbal and visual are free of conflict.
________      10. Verify performance time is accurate
________      11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                      Date SME / Instructor                                      Date SME / Instructor                                      Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10
 
2012 SRO Admin 4 - Rev 00 Revision Record (Summary)
Revision 00,      This JPM was developed new for the 2012 ILT NRC Exam.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10
 
2012 SRO Admin 4 - Rev 00 SIMULATOR SETUP INSTRUCTIONS
: 1. Simulator setup is not applicable.
: 1. Simulator setup is not applicable.
: 2. Evaluator, be prepared to fill in a time for "10 minutes ago" on the candidates copy of the Initial Conditions.
: 2. Evaluator, be prepared to fill in a time for 10 minutes ago on the candidates copy of the Initial Conditions.
: 3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.
: 3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10


2012 SRO Admin 4  
2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
- Rev 00 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
The following annunciators were received 10 minutes ago, at:_______
The following annunciators were received 10 minutes ago, at:_______
901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
* 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
The Service Water Rad Monitor indicates downscale on recorder 1
* 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
-1705-12, Process Liquid Monitor, on Panel 901
* The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
-2. The "FAIL" light is lit on the SPING Terminal on Panel 912
* The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.
-4 associated with SPING Channel 11
The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.
-01. The EO has just reported that breaker MCC 17 1 Ckt 25 is tripped and will not reset.
INITIATING CUE For this situation:
INITIATING CUE For this situation:
Identify the Required Actions.
* Identify the Required Actions.
Complete the necessary paperwork.
* Complete the necessary paperwork.
Complete the necessary notifications.
* Complete the necessary notifications.
 
(Be prepared to provide a blank Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.)
(Be prepared to provide a blank Outage Report, QCOS 1700
- 04, AFTER the candidate has obtained a copy for himself/herself.)
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


2012 SRO Admin 4  
2012 SRO Admin 4 - Rev 00 JPM Start Time:
- Rev 00 G:\DRSIII\License Examinations
Comment STEP                 ELEMENT                           STANDARD                SAT     UNSAT Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.
\2012\Quad Cities
    *        *Recognize that the Initial         Service Water Rad Monitor Conditions render the Service       declared inoperable Water Rad Monitor inoperable*
\Proposed\SRO ADMIN JPMs
*ODCM       *Identify the correct               Collect and analyze grab        ___      ___      ___
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Condition    REQUIRED ACTION and                 samples for beta or gamma C        COMPLETION TIME per C.1:             activity at an LLD  1E-07 Action C.1                                        &#xb5;Ci/ml once per 12 hours Collect and analyze grab or                                            identified.
Page 6 of 10  JPM Start Time:
samples for beta or gamma QCOS activity at an LLD  1E-07 Step G.1.a
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.
              &#xb5;Ci/ml Once per 12 hours*
* Recognize that the Initial Conditions render the Service Water Rad Monitor inoperable Service Water Rad Monitor declared inoperable
*ODCM       *Identify the correct               Restore the Service Water        ___      ___      ___
    *ODCM Condition C Action C.1 or QCOS Step G.1.a Identify the correct REQUIRED ACTION and COMPLETION TIME per C.1:
Condition    REQUIRED ACTION and                 Rad Monitor to OPERABLE C        COMPLETION TIME per C.2:             status within 30 days Action C.2                                        identified.
Collect and analyze grab samples for beta or gamma activity at an LLD  1E-07 Ci/ml Once per 12 hours Collect and analyze grab samples for beta or gamma activity at an LLD  1E-07 Ci/ml once per 12 hours identified.
Restore the Service Water Rad or Monitor to OPERABLE status QCOS Step G.1.b    within 30 days*
___ ___ ___ *ODCM Condition C Action C.2 or QCOS Step G.1.b Identify the correct REQUIRED ACTION and COMPLETION TIME per C.2:
CUE       When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number: IR 3456789 QCOS    Record the following                   Unit: 1, Date and Time and       ___      ___      ___
Restore the Service Water Rad Monitor to OPERABLE status within 30 days Restore the Service Water Rad Monitor to OPERABLE status within 30 days identified.
1700-04  information on Attachment A:            IR # 3456789 recorded on Step H.1.a Unit: 1                                QCOS 1700-04 Attachment A
___ ___ ___ CUE When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number: QCOS 1700-04 Step H.1.a IR 3456789 Record the following information on Attachment A:
Date:
Unit: 1 Date:  Time:  IR #: 3456789 Unit: 1, Date and Time and IR # 3456789 recorded on QCOS 1700-04 Attachment A ___ ___ ___
Time:
2012 SRO Admin 4
IR #: 3456789 G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
- Rev 00  G:\DRSIII\License Examinations
Page 6 of 10
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCOS 1700-04 Step H.1.b  Record the following information on Attachment A:
Instrument: "2251
-887" or "Service Water Radiation Monitor" Date and Time declared Inop:


Instrument and the Date and Time it was declared inoperable recorded on QCOS 1700-04 Attachment A. ___ ___ ___ QCOS 1700-04 Step H.1.c Record the following information on Attachment A:
2012 SRO Admin 4 - Rev 00 Comment STEP                  ELEMENT                          STANDARD                SAT      UNSAT Number QCOS    Record the following                    Instrument and the Date         ___      ___      ___
1700-04  information on Attachment A:            and Time it was declared Step H.1.b Instrument: 2251-887 or              inoperable recorded on Service Water Radiation                QCOS 1700-04 Attachment A.
Monitor Date and Time declared Inop:
QCOS        Record the following                Reason for inoperability        ___     ___     ___
1700-04      information on Attachment A:        recorded on QCOS 1700-04 Step H.1.c                                         Attachment A.
Reason for inoperability:
Reason for inoperability:
(Loss of power or equivalent)
(Loss of power or equivalent)
Reason for inoperability recorded on QCOS 1700
QCOS     Record the following                    Date and time 30 days from      ___     ___     ___
-04 Attachment A.
1700-04   information on Attachment A:           the time that instrument was Step H.1.d Date and time 30 days from             declared inoperable the time that instrument was           recorded on QCOS 1700-04 Attachment A.
___ ___ ___ QCOS 1700-04 Step H.1.d Record the following information on Attachment A:
declared inoperable.
Date and time 30 days from the time that instrument was declared inoperable.
EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.
Date and time 30 days from the time that instrument was declared inoperable recorded on QCOS 1700
Provide the following technician name: Lee Williams
-04 Attachment A.
* QCOS       *Notify Chemistry to perform         Chemistry notified to            ___      ___      ___
___ ___ ___ EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.
1700-04      LCO requirements per CY-QC-         perform LCO requirements Step H.2    130-650, and record on               per CY-QC-130-650.
Provide the following technician name: Lee Williams
attachment A.
* QCOS 1700-04 Step H.2  Notify Chemistry to perform LCO requirements per CY
* Date and time of notification and Person notified recorded on QCOS 1700-04 Attachment A.
-QC-130-650, and record on attachment A. Chemistry notified to perform LCO requirements per CY-QC-130-650. Date and time of notification and Person notified recorded on QCOS 1700
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-04 Attachment A.
Page 7 of 10
___ ___ ___
2012 SRO Admin 4
- Rev 00  G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review. QCOS 17 00-04 Step H.3  Review Outage Report actions for accuracy.
Unit Supervisor signature signed off on QCOS 1700
-
04 Attachment A, Step H.3 and submitted to Shift Manager for review.
___ ___ ___ CUE If not already addressed, ask the candidate the following question: "What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?"
ODCM Condition G or QCOS 1700-04 Step F.2 Identify the correct REQUIRED ACTION for CONDITION G:
Explain why the inoperability


was not corrected in a timely manner in the next Radioactive Effluent Release Report.
2012 SRO Admin 4 - Rev 00 Comment STEP                  ELEMENT                          STANDARD                SAT      UNSAT Number CUE        ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review.
Condition G reporting requirement identified.
QCOS        Review Outage Report actions        Unit Supervisor signature        ___      ___      ___
___ ___ ___ CUE Inform the candidate that the JPM is complete.
1700-04      for accuracy.                        signed off on QCOS 1700-Step H.3                                          04 Attachment A, Step H.3 and submitted to Shift Manager for review.
CUE        If not already addressed, ask the candidate the following question:
What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?
ODCM        Identify the correct REQUIRED        Condition G reporting            ___      ___      ___
Condition    ACTION for CONDITION G:              requirement identified.
G        Explain why the inoperability or        was not corrected in a timely QCOS        manner in the next Radioactive 1700-04      Effluent Release Report.
Step F.2 CUE       Inform the candidate that the JPM is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10


2012 SRO Admin 4  
2012 SRO Admin 4 - Rev 00 JPM  
- Rev 00 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job Title:         EO         RO     SRO       FS STA/IA           SRO Cert JPM Title: Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4                     Revision Number: 00 Task Number and Title:       S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
K/A Number and Importance:                   K/A: 2.3.15               Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Determine ODCM Compensatory Measures JPM Number:
Suggested Testing Environment:               Simulator/Classroom Alternate Path:     Yes     No SRO Only:           Yes         No       Time Critical:     Yes     No Reference(s):
2012 SRO Admin 4 Revision Number:
CY-QC-170-301, Rev 10,Offsite Dose Control Manual (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, Service Water Effluent Gross Activity Radiation Monitor Outage Report CY-QC-130-650, Rev. 11, Inoperable Chemistry Instruments LCO Requirements QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILURE Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 15 minutes                    Actual Time Used:                  minutes EVALUATION
00 Task Number and Title: S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.
K/A Number and Importance:
K/A: 2.3.15   Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Suggested Testing Environment:   Simulator/Classroom Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
CY-QC-170-301, Rev 10,"Offsite Dose Control Manual" (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, "Service Water Effluent Gross Activity Radiation Monitor Outage Report" CY-QC-130-650, Rev. 11, "Inoperable Chemistry Instruments LCO Requirements" QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILUR E Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15EVALUATION


==SUMMARY==
==SUMMARY==
:
:
minutes Actual Time Used:  minutes Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory Unsatisfactory Comments:         Evaluator's Name
Evaluators Signature:                                                       Date:
:   (Print) Evaluator's Signature
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
Page 9 of 10
2012 SRO Admin 4  
 
- Rev 00   INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
The following annunciators were received 10 minutes ago, at:_______
The following annunciators were received 10 minutes ago, at:_______
901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
* 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
The Service Water Rad Monitor indicates downscale on recorder 1
* 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
-1705-12, Process Liquid Monitor, on Panel 901-2. The "FAIL" light is lit on the SPING Terminal on Panel 912
* The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
-4 associated with SPING Channel 11
* The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.
-01. The EO has just reported that breaker MCC 17 1 Ckt 25 is tripped and will not reset.
The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.
INITIATING CUE For this situation:
INITIATING CUE For this situation:
Identify the Required Actions. Complete the necessary paperwork.
* Identify the Required Actions.
Complete the necessary notifications.
* Complete the necessary paperwork.
* Complete the necessary notifications.
 
Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number: 2012 SRO Admin 3 Revision Number: 03 Date: 03/04/2012 Developed By:
Instructor                            Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                        Date Approved By:
Training Department                          Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9


SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
2012 SRO Admin 3 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 9  Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number:
2012 SRO Admin 3 Revision Number:
03 Date:  03/04/2012 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date 2012 SRO Admin 3  
- Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                             Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                                             Rev:
________ 10. Verify performance time is accurate
Procedure                                             Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     9. Verify cues both verbal and visual are free of conflict.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date 2012 SRO Admin 3
________     10. Verify performance time is accurate
- Rev 03  SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Page 3 of 9 Revision Record (Summary)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Revision 02, This version was used on the NRC Exam for ILT Class 07
SME / Instructor                                       Date SME / Instructor                                       Date SME / Instructor                                       Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-01. Revision 03.
Page 2 of 9
This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam 2012 SRO Admin 3
 
- Rev 03  SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
2012 SRO Admin 3 - Rev 03 Revision Record (Summary)
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.
Revision 02,   This version was used on the NRC Exam for ILT Class 07-01.
: 1. Manual Setup
Revision 03. This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: Prepare QCOS 0005
Page 3 of 9
-08 Rev 28 completed with the following information D.1.a Partial for Step H1 only D.1.b Signed, date Today  Time: 30 min ago D.2 "1" H.1.a. "3" H.1.a.(1) & (2)
 
Initialed H.1.a.(3) "N/A" H.1.b. Initialed H.1.c.(1) "N/A" H.1.c.(2) Initialed H.1.d Initialed H.1.e.(1) & (2)
2012 SRO Admin 3 - Rev 03 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.
Initialed H.1.f Initialed H.1.g Initialed H.1.h.(1) Initialed H.1.h.(2) "N/A" H.1.i. Initialed H.1.j.(1) & (2)
: 1. Manual Setup: Prepare QCOS 0005-08 Rev 28 completed with the following information D.1.a             Partial for Step H1 only           H.1.l.(1) (a-g)             N/A D.1.b             Signed, date Today                H.1.l.(2).(a)               Initialed Time: 30 min ago                  H.1.l.(2).(b)               Initialed D.2              1                               H.1.l.(2).(c)               Both Initialed H.1.a.           3                                H.1.l.(2).(d)               Initialed H.1.a.(1) & (2)   Initialed                         H.1.l.(2).(e)               Initialed H.1.a.(3)         N/A                              H.1.l.(2).(f)               OOS H.1.b.           Initialed                         H.1.l.(3) (a-g)             N/A H.1.c.(1)         N/A                             H.1.l.(4) (a-f)             All steps N/A H.1.c.(2)        Initialed                          H.1.m.(1) (a-f)             Initialed H.1.d            Initialed                          H.1.m.(2) (a-h)             N/A H.1.e.(1) & (2)  Initialed                          H.1.m.(3) (a-g)             N/A H.1.f            Initialed                          H.1.m.(4) (a-i)             N/A H.1.g            Initialed                          H.2 (all steps lined)       N/A H.1.h.(1)        Initialed                          H.3 (all steps lined)       N/A H.1.h.(2)        N/A                             H.4.a                       N/A checked H.1.i.            Initialed                                                      Comments None H.1.j.(1) & (2)  Initialed                          H.4.b                       Signed Joe Barker H.1.k            Initialed                                                      Date: Today Attachments D & E N/A
Initialed H.1.k Initialed H.1.l.(1) (a
: 2. Prepare QCOS 0005-08 Rev 28, page 10 completed with the following information H.1.l(3)                 Marked N/A H.1.l(4)(b) and (d)       Not initialed and 4450 VAC written in column to the right of the line H.1.l(4)                 All other steps initialed by JB
-g)  "N/A" H.1.l.(2).(a)
Initialed H.1.l.(2).(b)
Initialed H.1.l.(2).(c)
Both Initialed H.1.l.(2).(d)
Initialed H.1.l.(2).(e)
Initialed H.1.l.(2).(f)
  "OOS" H.1.l.(3) (a
-g) "N/A" H.1.l.(4) (a
-f) All steps "N/A" H.1.m.(1) (a
-f) Initialed H.1.m.(2) (a
-h) "N/A" H.1.m.(3) (a
-g) "N/A" H.1.m.(4) (a
-i) "N/A" H.2 (all steps lined)
"N/A" H.3 (all steps lined)
"N/A" H.4.a   N/A checked Comments "None" H.4.b Signed "Joe Barker" Date: Today Attachments D & E "N/A2. Prepare QCOS 0005
-08 Rev 28, page 10 completed with the following information H.1.l(3)   Marked N/A H.1.l(4)(b) and (d)
Not initialed and 4450 VAC written in column to the right of the line H.1.l(4)   All other steps initialed by JB
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9


2012 SRO Admin 3  
2012 SRO Admin 3 - Rev 03 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
- Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
Tech Spec 3.8.1 Condition B was entered.
Tech Spec 3.8.1 Condition B was entered.
The U1 ANSO was ordered to perform QCOS 0005
The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.
-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005
INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.
-08 step H.1.
Provide the examinee: A completed surveillance, QCOS 0005-08, with the information recorded as indicated in the setup.
 
INITIATING CUE
 
Review QCOS 0005
-08 and inform the Shift Manager when the review is complete.
Provide the examinee: A completed surveillance, QCOS 0005-08, with the information recorded as indicated in the setup.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9


2012 SRO Admin 3  
2012 SRO Admin 3 - Rev 03 JPM Start Time:
- Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT  UNSAT  Number STEP               ELEMENT                               STANDARD Reviews the completed               Attention to detail used in                 ___  ___      ___
Page 6 of 9  JPM Start Time:
surveillance and identifies          reviewing Tech Spec required the following problems:              surveillances.
STEP ELEMENT SAT STANDARD UNSAT Comment Number  Reviews the completed surveillance and identifies the following problems:
EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.
Attention to detail used in reviewing Tech Spec required surveillances.
CUE: When candidate notices that the Bus 23-1 and 13-1 TIE breaker is marked OOS and inquires as to its actual status; inform the candidate that it was just taken OOS for EMs to repair the breaker.
___ ___ ___ EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.
*H.1.l.   *H.1.l recognized as not             ONE of the sections H.1.l.(1)                ___  ___      ___
CUE: When candidate notices that the Bus 23
satisfied.
-1 and 13-1 TIE breaker is marked "OOS" and inquires as to it's actual status; inform the candidate that it was just taken OOS for EM's to repair the breaker.
* through (4) MUST be satisfied.
*H.1.l. H.1.l recognized as not satisfied. H.1.l.(2).f Bus 23
H.1.l.(2).f Bus 23-1 and 13-1 TIE GCB is recorded as OOS.
-1 and 13-1 TIE GCB is recorded as "OOS". and H.1.l.(4) marked N/A ONE of the sections H.1.l.(1) through (4) MUST be satisfied.
and H.1.l.(4) marked N/A CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)
___ ___ ___ CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)
IF the candidate directs the ANSO to re-perform the step, then provide the prepared page 9 of QCOS 0005-08.
IF the candidate directs the ANSO to re
IF the candidate re-performs H.1.l.(4) line-by-line, then provide the following information:
-perform the step, then provide the prepared page 9 of QCOS 0005
* H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed?               YES
-08. IF the candidate re
* H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC?                           4450 VAC
-performs H.1.l.(4) line
* H.1.l(4)c Busses 24 AND 24-1 TIE GCBs capable of being closed?
-by-line, then provide the following information:
YES for both
H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed?         YES H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC?                                     4450 VAC H.1.l(4)c Busses 24 AND 24
* H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC?                         4450 VAC
-1 TIE GCBs capable of being closed?
* H.1.l(4)e Bus 14-1 AND 24-1 TIE GCB capable of being closed?           YES
YES for both H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC?                                 4450 VAC H.1.l(4)e Bus 14
* H.1.l(4)f Bus 24-1 AND 14-1 TIE GCB capable of being closed?           YES EVALUATOR NOTE: If the candidate declares that QCOS 0005-08 is unsatisfactory as presented, the next step will be Not Applicable.
-1 AND 24-1 TIE GCB capable of being closed?       YES H.1.l(4)f Bus 24
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-1 AND 14-1 TIE GCB capable of being closed?       YES EVALUATOR NOTE: If the candidate declares that QCOS 0005
Page 6 of 9
-08 is unsatisfactory as presented, the next step will be Not Applicable.  


2012 SRO Admin 3  
2012 SRO Admin 3 - Rev 03 Comment SAT  UNSAT  Number STEP               ELEMENT                               STANDARD
- Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
*H.1.l(4)   Obtains information required        Procedure acceptance criteria                ___  ___      ___
Page 7 of 9 STEP ELEMENT SAT STANDARD UNSAT Comment Number *H.1.l(4) (b) & (d) Obtains information required to complete section H.1.l.(4)
(b) & (d)   to complete section H.1.l.(4)       not met due to voltage on the Unit 2 4160 Busses is too high.
Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high. Procedure acceptance criteria not met due to voltage on the Unit 2 4160 Busses is too high.
            *Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high.
___ ___ ___ EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: "The Unit 2 Unit Supervisor will address any corrective actions. Continue your review."
* EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: The Unit 2 Unit Supervisor will address any corrective actions.
CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.
Continue your review.
*H.1.l Identify the applicable Tech Spec CONDITION T.S. 3.8.1 Cond A for one Offsite Line Inop T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop Identifies the following:
CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.
T.S. 3.8.1 Cond A for one Offsite Line Inop; 7 Day LCO T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop; 12 hour LCO
*H.1.l     *Identify the applicable Tech       Identifies the following:                    ___  ___      ___
___ ___ ___ H.4 Identify that Step H.4 (for a Satisfactory Surveillance) is incorrectly filled out and should NOT be marked N/A.
Spec CONDITION T.S. 3.8.1 Cond A for one T.S. 3.8.1 Cond A for one           Offsite Line Inop; 7 Day LCO Offsite Line Inop T.S. 3.8.1 Cond D for one T.S. 3.8.1 Cond D for one           Offsite Line and one DG Inop; Offsite Line and one DG            12 hour LCO Inop
Step H.4 revised to reflect that surveillance was NOT Satisfactory
* H.4         Identify that Step H.4 (for a       Step H.4 revised to reflect that            ___  ___      ___
___ ___ ___ EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23
Satisfactory Surveillance) is       surveillance was NOT incorrectly filled out and         Satisfactory should NOT be marked N/A.
-1 AND 13-1 TIE GCB is Out
EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23-1 AND 13-1 TIE GCB is Out-Of Service and the Voltages on Busses 24 and 24-1 are too high.
-Of Service and the Voltages on Busses 24 and 24
H.5         Identify that Step H.5 should       Step H.5 filled out as UNSAT.             ___  ___      ___
-1 are too high.
be filled out as UNSAT.
H.5 Identify that Step H.5 should be filled out as "UNSAT".
CUE: Inform the candidate that the JPM is complete JPM Stop Time:
Step H.5 filled out as "UNSAT".
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
___ ___ ___ CUE: Inform the candidate that the JPM is complete JPM Stop Time:
Page 7 of 9


2012 SRO Admin 3  
2012 SRO Admin 3 - Rev 03 Operators Name:                                           Job Title:         EO         RO     SRO       FS STA/IA           SRO Cert JPM Title:     Review Electrical Distribution Surveillance JPM Number:       2012 SRO Admin 3                                     Revision Number: 03 Task Number and Title:
- Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.
Page 8 of 9 Operator's Name
K/A Number and Importance:         K/A: 2.2.40               Rating:           SRO 4.7 Ability to apply Technical Specifications for a system.
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
Suggested Testing Environment: Simulator or Classroom Alternate Path:     Yes     No SRO Only:             Yes         No       Time Critical:     Yes     No Reference(s): QCOS 0005-08, Rev. 28 Actual Testing Environment:         Simulator           Control Room               In-Plant     Other Testing Method:         Simulate         Perform Estimated Time to Complete: 20 minutes                   Actual Time Used:                 minutes EVALUATION  
Review Electrical Distribution Surveillance JPM Numbe r: 2012 SRO Admin 3 Revision Number:
Task Number and Title:
03 SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.
K/A Number and Importance:
K/A: 2.2.40 Rating: SRO 4.7 Ability to apply Technical Specifications for a system.
Suggested Testing Environment:
Simulator or Classroom Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QCOS 0005-08, Rev. 28 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory Unsatisfactory Comments:                 Evaluator's Name
Evaluators Signature:                                                     Date:
:   (Print) Evaluator's Signature
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
Page 8 of 9
 
INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
Tech Spec 3.8.1 Condition B was entered.
Tech Spec 3.8.1 Condition B was entered.
The U1 ANSO was ordered to perform QCOS 0005
The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.
-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005
INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.
-08 step H.1.


INITIATING CUE
Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number: 01 Date: 03/04/2012 Developed By:
Instructor                            Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                        Date Approved By:
Training Department                          Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 8


Review QCOS 000 5-08 and inform the Shift Manager when the review is complete.  
2012 SRO Admin 2 - Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                          Rev:
Procedure                          Rev:
Procedure                          Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                      Date SME / Instructor                                      Date SME / Instructor                                      Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8


SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
2012 SRO Admin 2 - Rev 01 Revision Record (Summary)
Page 1 of 8  Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number:  2012 SRO Admin 2 Revision Number:
Revision 00,       This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES-301 and Appendix C. It was modeled after a JPM from the 2006 ILT Exam at Dresden.
01 Date:  03/04/2012 Developed By:
Revision 01,       JPM updated for 2012 ILT NRC Exam.
Instructor Date  Validated By:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor Date  Reviewed By:
Page 3 of 8
Operations Representative Date  Approved By:
Training Department Date 2012 SRO Admin 2
- Rev 01  SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 belo
: w. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date 2012 SRO Admin 2  
- Rev 01 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8 Revision Record (Summary)
Revision 00, This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES
-301 and Appendix C.
It was modeled after a JPM from the 2006 ILT Exam at Dresden.
Revision 01, JPM updated for 2012 ILT NRC Exam.


2012 SRO Admin 2  
2012 SRO Admin 2 - Rev 01 SETUP INSTRUCTIONS
- Rev 01 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8  SETUP INSTRUCTIONS
: 1. This JPM may be administered in any setting with the necessary procedures available.
: 1. This JPM may be administered in any setting with the necessary procedures available.
: 2. Fill out OP
: 2. Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
: 3. In the Hours on Shift table:
: 3. In the Hours on Shift table:
Enter 4 shifts of 8 hours as a Unit Supervisor.
* Enter 4 shifts of 8 hours as a Unit Supervisor.
Enter 1 shift of 8 hours as the WEC supervisor.
* Enter 1 shift of 8 hours as the WEC supervisor.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8


2012 SRO Admin 2  
2012 SRO Admin 2 - Rev 01 INITIAL CONDITIONS You are the Shift Manager.
- Rev 01 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8 INITIAL CONDITIONS You are the Shift Manager.
An SRO is in the process of license reactivation.
An SRO is in the process of license reactivation.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
INITIATING CUE Perform the Shift Manager review of OP
INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.
-AA-105-102, Attachment 2 for the licensee.
Approve if acceptable or, if not, identify any discrepancies.
Approve if acceptable or, if not, identify any discrepancies.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


2012 SRO Admin 2  
2012 SRO Admin 2 - Rev 01 JPM Start Time:
- Rev 01 G:\DRSIII\License Examinations
Comment STEP                 ELEMENT                               STANDARD                    SAT     UNSAT Number Review OP-AA-105-                     Reviews OP-AA-105-102,                 ___      ___      ___
\2012\Quad Cities
102, Attachment 2.                    Attachment 2.
\Proposed\SRO ADMIN JPMs
        *Check that Hours on                   Notes that 8 hours listed in the       ___      ___      ___
\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8  JPM Start Time:
Shift are applicable for              Hours on Shift are for WEC license reactivation                  Supervisor which does not AND                                    count toward the required 40 that licensee has the required        hours AND determines that 40 hours.*                            licensee has ONLY 32 hours toward the required 40 hours.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Review OP-AA-105- 102, Attachment 2. Reviews OP-AA-105-102, Attachment 2.
        *Check that the required Plant         Notes that the Date and Active         ___      ___      ___
___ ___ ___  Check that Hours on Shift are applicable for license reactivation AND that licensee has the required 40 hours. Notes that 8 hours listed in the Hours on Shift are for WEC Supervisor which does not count toward the required 40 hours AND determines that licensee has ONLY 32 hours toward the required 40 hours.
Tour has been completed.*              License Signature for the required Plant Tour are missing on the Shift Position Log.
___ ___ ___  Check that the required Plant Tour has been completed. Notes that the Date and Active License Signature for the required Plant Tour are missing on the Shift Position Log.
Returns OP-AA-105-102                 OP-AA-105-102 Attachment 2             ___      ___      ___
___ ___ ___  Returns OP-AA-105-102 Attachment 2 without signing.
Attachment 2 without signing.          returned without signing Licensees license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.
OP-AA-105-102 Attachment 2 returned without signing Licensee's license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.
NOTE: The JPM is complete.
___ ___ ___ NOTE: The JPM is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 8


2012 SRO Admin 2  
2012 SRO Admin 2 - Rev 01 JPM  
- Rev 01 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job Title:         EO         RO   SRO       FS STA/IA         SRO Cert JPM Title:     Reactivation of SRO License JPM Number:         2012 SRO Admin 2                                     Revision Number: 01 Task Number and Title:
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102.
Reactivation of SRO License JPM Number:
K/A Number and Importance:           K/A: 2.1.4               Rating:           SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment: Classroom Alternate Path:     Yes     No               SRO Only:         Yes             No Time Critical:       Yes     No Reference(s):         OP-AA-105-102, Rev. 09, NRC Active License Maintenance Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 10 minutes                    Actual Time Used:                  minutes EVALUATION
2012 SRO Admin 2 Revision Number:
Task Number and Title:
01 SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102. K/A Number and Importance
: K/A: 2.1.4 Rating: SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no
-solo" operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment:
Classroom Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
OP-AA-105-102, Rev. 09, NRC Active License Maintenance
 
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
:
minutes Actual Time Used:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:           Evaluator's Name
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 7 of 8
:   Date:
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Shift Manager.
INITIAL CONDITIONS You are the Shift Manager.
An SRO is in the process of license reactivation.
An SRO is in the process of license reactivation.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
INITIATING CUE Perform the Shift Manager review of OP
INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.
-AA-105-102, Attachment 2 for the licensee.
Approve if acceptable or, if not, identify any discrepancies.
Approve if acceptable or, if not, identify any discrepancies.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number: 02 Date: 03/04/2012 Developed By:
Page 1 of 10  Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number:
Instructor                             Date Validated By:
02 Date: 03/04/2012 Developed By:
SME or Instructor                           Date Reviewed By:
Instructor Date Validated By:
Operations Representative                       Date Approved By:
SME or Instructor Date Reviewed By:
Training Department                           Date SRO Admin 1.doc       SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operations Representative Date Approved By:
Page 1 of 10
Training Department Date 2012 SRO Admin 1
 
- Rev 02  G:\DRSIII\License Examinations
2012 SRO Admin 1 - Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                         Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                         Rev:
________ 10. Verify performance time is accurate
Procedure                         Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date 2012 SRO Admin 1
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
- Rev 02  G:\DRSIII\License Examinations
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\2012\Quad Cities
SME / Instructor                                     Date SME / Instructor                                     Date SME / Instructor                                     Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\SRO ADMIN JPMs
Page 2 of 10
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10 Revision Record (Summary)
Revision 01, This is a LORT Bank JPM (AD
-SRO-6) that was used on the 2011 ILT NRC      License Exam. Updated Fire Permit information.
Revision 02, This JPM updated for 2012 ILT NRC Exam.


2012 SRO Admin 1  
2012 SRO Admin 1 - Rev 02 Revision Record (Summary)
- Rev 02 G:\DRSIII\License Examinations
Revision 01,      This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.
\2012\Quad Cities
Revision 02,      This JPM updated for 2012 ILT NRC Exam.
\Proposed\SRO ADMIN JPMs
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
 
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
2012 SRO Admin 1 - Rev 02 SIMULATOR SETUP INSTRUCTIONS
OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
* OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
* QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
: 2. Verify the following for this JPM setup:
: 2. Verify the following for this JPM setup:
A current revision of OP
* A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows:
-MW-201-007 Attachment 1 "Fire Protection Impairment Permit" is filled out as follows 1) One detector, (1
: 1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500
: 2) Fill out Section I INITIATOR of the Fire Protection Permit as follows:
-01 Attachment C).
Initiator: IMD Supervisor                   Station: Quad             Unit: 01 Name: K. Arney                               Phone: X 2667             Dept/Co: IMD/Exelon Sch. Start Date: current                     Bldg: TB                 EPN#: 1-4141-109 Sch. End Date: current + 1                   Elev: 611                 Door #: N/A AR/WR/OOS#: 1081 11-01                       Row/Col: E/14             Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.
: 2) Fill out Section I "INITIATOR" of the Fire Protection Permit as follows:
Initiator: "IMD Supervisor" Station: "Quad" Unit: "01" Name:   "K. Arney" Phone: "X 2667" Dept/Co: "IMD/Exelon" Sch. Start Date: "current" Bldg: "TB" EPN#: "1-4141-109Sch. End Date: "current + 1" Elev: "611" Door #: "N/A" AR/WR/OOS#: "1081 11
-01" Row/Col: "E/14" Det. Zone: "N/A" Pent #: "N/A" Do NOT check the Structural fireproofing OR Wall Penetration boxes.
Impairment
Impairment


== Description:==
== Description:==
  "Disconnect and test Turbine Oil Reservoir smoke detector 1
Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.
-4141-109 per surveillance per surveillance procedure and reconnect."
: 3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
: 3) Fill out section II. "FIRE MARSHAL REVIEW" of the Fire Protection Impairment Permit as follows:
: a. Fire Zone(s): 8.2.7.c   / For Barriers: Check the Functional box.
: a. Fire Zone(s): 8.2.7.c   / For Barriers: Check the "Functional" box. b. Technical Requirement Manual? Check the "Yes" box and write in QCAP 1500
: b. Technical Requirement Manual? Check the Yes box and write in QCAP 1500-01
-01 c. Mark "None" in the Fire Watch Required: block and "N/A" below.
: c. Mark None in the Fire Watch Required: block and N/A below.
: d. For Additional Compensatory Measures: Check the "NO" box and "N/A" the "Required?" line.
: d. For Additional Compensatory Measures: Check the NO box and N/A the Required? line.
: e. Fire Detector Operability Check Required? Check the "Yes" box.
: e. Fire Detector Operability Check Required? Check the Yes box.
: f. NEIL Notification Required? Check the "NO" box.
: f. NEIL Notification Required? Check the NO box.
: g. Fire Marshal Instructions: "Return to operable status in 14 days"
: g. Fire Marshal Instructions: Return to operable status in 14 days
: h. Restoration/Testing Requirements: "Completion of Work Package".
: h. Restoration/Testing Requirements: Completion of Work Package.
: i. Sign and date as Fire Marshal for Authorization Block.
: i. Sign and date as Fire Marshal for Authorization Block.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10


2012 SRO Admin 1  
2012 SRO Admin 1 - Rev 02 INITIAL CONDITIONS
- Rev 02 G:\DRSIII\License Examinations
-       You are the Work Execution Center Senior Reactor Operator.
\2012\Quad Cities
-       An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
\Proposed\SRO ADMIN JPMs
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10 INITIAL CONDITIONS
- You are the Work Execution Center Senior Reactor Operator.
- An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
EVALUATOR:
EVALUATOR: Provide candidate with a copy of fire permit 1121, OP-MW-201-007, .
Provide candidate with a copy of fire permit 1121, OP
-MW-201-007, Attachment 1.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


2012 SRO Admin 1  
2012 SRO Admin 1 - Rev 02 JPM Start Time:
- Rev 02 G:\DRSIII\License Examinations
Comment STEP                   ELEMENT                             STANDARD                    SAT     UNSAT Number Obtains Procedures.               Obtains a copy of OP-MW-201-           ___      ___      ___
\2012\Quad Cities
007, QCAP 1500-01, QCOA 4100-11 as necessary.
\Proposed\SRO ADMIN JPMs
EVALUATOR: The candidate may perform the following steps in any order.
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Reviews Fire Permit.               Reviews Fire Permit to                 ___      ___      ___
Page 6 of 10  JPM Start Time:
determine what is being impaired. Determines that one detector will be disconnected.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Obtains Procedures.
QCAP         Determines effect of               Reviews QCAP 1500-01 Att. A           ___      ___      ___
Obtains a copy of OP
1500-01      disconnecting detectors.          page 3 and determines that one Att. A                                        detector, if removed, will make page 3                                          the detection system inoperable (all 6 are required).
-MW-201-007, QCAP 1500
EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.
-01, QCOA 4100-11 as necessary.
___ ___ ___ EVALUATOR: The candidate may perform the following steps in any order.
Reviews Fire Permit.
Reviews Fire Permit to determine what is being impaired. Determines that one detector will be disconnected.
___ ___ ___ QCAP 1500-0 1 Att. A  page 3 Determines effect of disconnecting detectors.
Reviews QCAP 1500
-01 Att. A page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).
___ ___ ___ EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.
The following errors are built into the permit:
The following errors are built into the permit:
The Fire Protection Permit was filled out improperly in section II. "FIRE MARSHAL REVIEW" as follows: None is marked in the "Fire Watch Required:" block (should be marked "hourly" with performed by marked as "IMD").
The Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW as follows:
NO is checked in the box for "Additional Compensatory Measures" (should be marked "YES" and a Description of the additional Compensatory Measures should be included i.e., "backup suppression established or verified.")
* None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500
* NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)
-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).
-01 Attachment C page 2).
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 6 of 10
2012 SRO Admin 1
- Rev 02  G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCAP 1500-01 Att. C  page 2 Determines consequence of making the detection system inoperable.
Reviews QCAP 1500
-01 Att. C page 2 (or determines info from QCAP 1500-01 Att. A page 3) and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).
___ ___ ___ QCAP 1500-01 *D.1.c.(2)
*D.2.c.(2)
Determines hourly fire watch established within one hour. Reviews QCAP 1500
-01 step D.1.c.(2) and D.2.c.(2) and determines an hourly fire watch must be conducted if this permit is approved.
___ ___ ___ QCAP 1500-01 *D.2.c.(4)
Determines backup suppression required within one hour. Reviews step D.2.c.(4) and determines backup suppression


will also be required.
2012 SRO Admin 1 - Rev 02 Comment STEP                  ELEMENT                            STANDARD                    SAT      UNSAT Number QCAP        Determines consequence of          Reviews QCAP 1500-01 Att. C            ___      ___      ___
1500-01      making the detection system        page 2 (or determines info from Att. C      inoperable.                        QCAP 1500-01 Att. A page 3) page 2                                          and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).
QCAP        *Determines hourly fire            Reviews QCAP 1500-01 step              ___      ___      ___
1500-01      watch established within one      D.1.c.(2) and D.2.c.(2) and
*D.1.c.(2)    hour.*                            determines an hourly fire watch
*D.2.c.(2)                                      must be conducted if this permit is approved.
QCAP        *Determines backup                Reviews step D.2.c.(4) and            ___      ___      ___
1500-01      suppression required within        determines backup suppression
*D.2.c.(4)    one hour.*                        will also be required.
(page 65 of 93)
(page 65 of 93)
___ ___ ___ OP-MW-201-007 Attach. 1 Determines that the Fire Watch Performed By field must be filled in "IMD" or other appropriate department.
OP-MW-       Determines that the Fire           Recognizes the N/A is not            ___      ___      ___
Recognizes the "N/A" is not correct for this field.
201-007      Watch Performed By field           correct for this field.
___ ___ ___ NOTE: The candidate may choose to correct the provided impairment. This is acceptable.
Attach. 1    must be filled in IMD or other appropriate department.
 
NOTE: The candidate may choose to correct the provided impairment. This is acceptable.
2012 SRO Admin 1
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
- Rev 02  G:\DRSIII\License Examinations
Page 7 of 10
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number  Reviews the permit for accuracy and Notifies the Evaluator of his conclusions.
The candidate reviews the permit for accuracy in accordance with OP
-MW-201-007 "FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL" step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II.  "FIRE MARSHAL REVIEW" None is marked in the "Fire Watch Required:"
blo ck (should be marked "hourly" with performed by marked as "IMD").
NO is checked in the box for "Additional Compensatory Measures" (should be marked "YES" and a Description of the additional Compensatory Measures should be included i.e., "backup suppression


established or verified.")
2012 SRO Admin 1 - Rev 02 Comment STEP                  ELEMENT                            STANDARD                    SAT      UNSAT Number Reviews the permit for            The candidate reviews the              ___      ___      ___
___ ___ ___ EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift. NOTE: The JPM is complete.
accuracy and Notifies the          permit for accuracy in Evaluator of his conclusions.      accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW
* None is marked in the Fire Watch Required:
block (should be marked hourly with performed by marked as IMD).
* NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)
EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.
NOTE: The JPM is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10


2012 SRO Admin 1  
2012 SRO Admin 1 - Rev 02 JPM  
- Rev 02 G:\DRSIII\License Examinations
\2012\Quad Cities
\Proposed\SRO ADMIN JPMs
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job Title:         EO         RO     SRO       FS STA/IA           SRO Cert JPM Title:         Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:         2012 SRO Admin 1                                     Revision Number: 02 Task Number and Title:
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:           K/A: 2.1.25               Rating:           SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.
Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:
Suggested Testing Environment: Simulator Alternate Path:       Yes     No     SRO Only:       Yes         No       Time Critical:     Yes     No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 12.5 minutes                  Actual Time Used:                  minutes EVALUATION
2012 SRO Admin 1 Revision Number:
Task Number and Title:
02 4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:
K/A: 2.1.25 Rating: SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.
Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP
-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12.5EVALUATION


==SUMMARY==
==SUMMARY==
:
:
minutes Actual Time Used:
The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.
minutes The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:               Evaluator's Name
Page 9 of 10
:   (Print) 2012 SRO Admin 1
 
- Rev 02  G:\DRSIII\License Examinations
2012 SRO Admin 1 - Rev 02 Evaluators Signature:                                                       Date:
\2012\Quad Cities
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\SRO ADMIN JPMs
Page 10 of 10
\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 10 of 10 Evaluator's Signature
INITIAL CONDITIONS
:   Date:
-     You are the Work Execution Center Senior Reactor Operator.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-     An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
INITIAL CONDITIONS - You are the Work Execution Center Senior Reactor Operator.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
- An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift
SRRS: 3D.105 (when utilized for operator initial or continuing training)}}
. INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.}}

Revision as of 07:25, 12 November 2019

2012 Quad Cities Nuclear Power Station Initial License Examination SRO Admin JPMs
ML12083A183
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/04/2012
From:
Exelon Nuclear
To:
NRC/RGN-III
Shared Package
ML11354A187 List:
References
Download: ML12083A183 (49)


Text

Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)

JPM Number: 2012 SRO Admin 5 Revision Number: 03 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 11

2012 SRO Admin 5 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11

2012 SRO Admin 5 - Rev 03 Revision Record (Summary)

Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.

Revision 01, JPM revised to update format and procedure revisions.

Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.

Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11

2012 SRO Admin 5 - Rev 03 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:

  • Full-sized Hot EAL Boards
  • All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1 NARS form completed as follows:

Utility Message 1 State Message N/A Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified: Time = T0 -60 minutes Date = today EAL# = FS1 Block #4. Accident Terminated: Time:=N/A, Date:=N/A Block #5. Release Status = None Block #6. Type of Release = N/A Block #7. Wind Direction = 232 degrees Block #8. Wind Speed: Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]

Approved by [provide SM signature]

Block #11 Transmitted By [provide name] Phone Number [309-227-2210]

Time/Date T0 -50 minutes/Today Block #12 Received By [provide name] Organization =

IEMA, Time/Date: T0 -50 minutes/Today Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date T0 -48 minutes/Today SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11

2012 SRO Admin 5 - Rev 03 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.

The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.

50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)

All plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.

Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.

T0 is the current time. T0 is _______

The CURRENT plant conditions are as follows:

o Drywell pressure is 3 psig and rising.

o RPV pressure is 700 psig and lowering at approximately 10 psig/min.

o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.

o There has been NO Change in release status, or meteorological data since message #1 was sent.

THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:

IF a change is NOT required, THEN explain what plant changes would require a change.

(Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.

Provide examinee with:

Utility Message #1 form completely filled out as a Site Area Emergency Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11

2012 SRO Admin 5 - Rev 03 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11

2012 SRO Admin 5 - Rev 03 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.

  • *Declares a General Recognizes that the conditions ___ ___ ___

Emergency.* for FG1 are met due to Drywell radiation and Drywell pressure.

(Loss of RCS, Fuel Clad, and Potential Loss of Containment)

EVALUATOR: Record the actual time that candidate makes classification _________

This completes the FIRST of two time-critical requirements (classification < 15 minutes) and starts the SECOND (notifications < 14 minutes)

EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.

NARS Fills out Utility Message Records Utility Message #2. ___ ___ ___

form Number.

NARS Fills out State Message Records N/A for State Message ___ ___ ___

form Number. Number.

Block #1 Fills out block #1 information Records [B] Drill/Exercise in ___ ___ ___

regarding Status. block #1.

  • Block #2 *Fills out block #2 information Records [F] Quad Cities in ___ ___ ___

regarding Station.* block #2.

  • Block #3 *Fills out block #3 information Records [D] General ___ ___ ___

regarding onsite condition.* Emergency.

  • Block #4 *Fills out block #4 information Records Accident Classification ___ ___ ___

regarding Accident Classified as

& Accident Terminated.* Time= Classification time Date= todays date EAL=FG1 Records N/A for Accident Terminated in Time and Date space.

Block #5 Fills out block #5 information Records [A] None. ___ ___ ___

regarding Release Status.

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11

2012 SRO Admin 5 - Rev 03 Comment STEP ELEMENT STANDARD SAT UNSAT Number Block #6 Fills out block #6 information Records [A] N/A. ___ ___ ___

regarding Type of Release.

EVALUATOR: Candidate may take information from initial conditions, which state meteorological conditions have not changed OR they may look up the data on the station computer.

IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour.

  • Block #7 *Fills out block #7 information Records 232 degrees. ___ ___ ___

regarding Wind Direction.*

  • Block #8 *Fills out block #8 information Records [A] Meters/Sec = 2.46 ___ ___ ___

regarding Wind Speed.* and [B] Miles/Hr = 5.51.

EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply:

NO.

Refers to EP-AA-111-F-06, Obtains and uses EP-AA-111- ___ ___ ___

Quad Cities Plant Based F-06, to determine loss of fuel PAR Flow Chart, to clad barrier, loss of RCS barrier, determine loss of fuel clad and a potential loss of barrier, loss of RCS barrier, containment exists.

and a potential loss of containment exists.

EVALUATOR: The candidate should utilize EP-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.

  • Block #9 Fills out block #9 Utilizes EP-AA-111 F-06 Quad ___ ___ ___

information regarding Cities Plant Based PAR Recommended Actions. Flowchart and determines PARS of Evacuate 2 Mile Radius & 5 Miles Downwind

[D] Illinois sub-areas 1,2

[E] Iowa sub-areas 1,2,5 Block #10 Fills out block #10 Records NONE. ___ ___ ___

information regarding Additional Information.

NARS Submits NARS form for Submits NARS form for ___ ___ ___

form verification. verification.

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11

2012 SRO Admin 5 - Rev 03 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE: When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.

NARS Signs on the Approved By Submits NARS form for ___ ___ ___

form line and submits NARS form transmittal for transmittal.

CUE: When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form.

Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.

JPM Stop Time:

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11

2012 SRO Admin 5 - Rev 03 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Classify Event and Determine Protective Action Recommendations (PARS)

JPM Number: 2012 SRO Admin 5 Revision Number: 03 Task Number and Title:

S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.

S-EP-P02 (Freq: LIC=A) (ILT-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP-AA-111.

K/A Number and Importance: K/A: 2.4.44 Rating: 4.4 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes to classify Actual Time Used: minutes 14 minutes to notify Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11

INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.

The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.

50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)

All plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.

Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.

T0 is the current time. T0 is _______

The CURRENT plant conditions are as follows:

o Drywell pressure is 3 psig and rising.

o RPV pressure is 700 psig and lowering at approximately 10 psig/min.

o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.

o There has been NO Change in release status, or meteorological data since message #1 was sent.

THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:

IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number: 00 Date:03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2012 SRO Admin 4 - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2012 SRO Admin 4 - Rev 00 Revision Record (Summary)

Revision 00, This JPM was developed new for the 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2012 SRO Admin 4 - Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Simulator setup is not applicable.
2. Evaluator, be prepared to fill in a time for 10 minutes ago on the candidates copy of the Initial Conditions.
3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.

The following annunciators were received 10 minutes ago, at:_______

  • 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
  • 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
  • The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
  • The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.

The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.

INITIATING CUE For this situation:

  • Identify the Required Actions.
  • Complete the necessary paperwork.
  • Complete the necessary notifications.

(Be prepared to provide a blank Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2012 SRO Admin 4 - Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.

  • *Recognize that the Initial Service Water Rad Monitor Conditions render the Service declared inoperable Water Rad Monitor inoperable*
  • ODCM *Identify the correct Collect and analyze grab ___ ___ ___

Condition REQUIRED ACTION and samples for beta or gamma C COMPLETION TIME per C.1: activity at an LLD 1E-07 Action C.1 µCi/ml once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Collect and analyze grab or identified.

samples for beta or gamma QCOS activity at an LLD 1E-07 Step G.1.a

µCi/ml Once per 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s*

Condition REQUIRED ACTION and Rad Monitor to OPERABLE C COMPLETION TIME per C.2: status within 30 days Action C.2 identified.

Restore the Service Water Rad or Monitor to OPERABLE status QCOS Step G.1.b within 30 days*

CUE When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number: IR 3456789 QCOS Record the following Unit: 1, Date and Time and ___ ___ ___

1700-04 information on Attachment A: IR # 3456789 recorded on Step H.1.a Unit: 1 QCOS 1700-04 Attachment A

Date:

Time:

IR #: 3456789 G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2012 SRO Admin 4 - Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number QCOS Record the following Instrument and the Date ___ ___ ___

1700-04 information on Attachment A: and Time it was declared Step H.1.b Instrument: 2251-887 or inoperable recorded on Service Water Radiation QCOS 1700-04 Attachment A.

Monitor Date and Time declared Inop:

QCOS Record the following Reason for inoperability ___ ___ ___

1700-04 information on Attachment A: recorded on QCOS 1700-04 Step H.1.c Attachment A.

Reason for inoperability:

(Loss of power or equivalent)

QCOS Record the following Date and time 30 days from ___ ___ ___

1700-04 information on Attachment A: the time that instrument was Step H.1.d Date and time 30 days from declared inoperable the time that instrument was recorded on QCOS 1700-04 Attachment A.

declared inoperable.

EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.

Provide the following technician name: Lee Williams

  • QCOS *Notify Chemistry to perform Chemistry notified to ___ ___ ___

1700-04 LCO requirements per CY-QC- perform LCO requirements Step H.2 130-650, and record on per CY-QC-130-650.

attachment A.

  • Date and time of notification and Person notified recorded on QCOS 1700-04 Attachment A.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2012 SRO Admin 4 - Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review.

QCOS Review Outage Report actions Unit Supervisor signature ___ ___ ___

1700-04 for accuracy. signed off on QCOS 1700-Step H.3 04 Attachment A, Step H.3 and submitted to Shift Manager for review.

CUE If not already addressed, ask the candidate the following question:

What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?

ODCM Identify the correct REQUIRED Condition G reporting ___ ___ ___

Condition ACTION for CONDITION G: requirement identified.

G Explain why the inoperability or was not corrected in a timely QCOS manner in the next Radioactive 1700-04 Effluent Release Report.

Step F.2 CUE Inform the candidate that the JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2012 SRO Admin 4 - Rev 00 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number: 00 Task Number and Title: S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.

K/A Number and Importance: K/A: 2.3.15 Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Suggested Testing Environment: Simulator/Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

CY-QC-170-301, Rev 10,Offsite Dose Control Manual (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, Service Water Effluent Gross Activity Radiation Monitor Outage Report CY-QC-130-650, Rev. 11, Inoperable Chemistry Instruments LCO Requirements QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILURE Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.

The following annunciators were received 10 minutes ago, at:_______

  • 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
  • 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
  • The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
  • The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.

The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.

INITIATING CUE For this situation:

  • Identify the Required Actions.
  • Complete the necessary paperwork.
  • Complete the necessary notifications.

Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number: 2012 SRO Admin 3 Revision Number: 03 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

2012 SRO Admin 3 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

2012 SRO Admin 3 - Rev 03 Revision Record (Summary)

Revision 02, This version was used on the NRC Exam for ILT Class 07-01.

Revision 03. This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

2012 SRO Admin 3 - Rev 03 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.

1. Manual Setup: Prepare QCOS 0005-08 Rev 28 completed with the following information D.1.a Partial for Step H1 only H.1.l.(1) (a-g) N/A D.1.b Signed, date Today H.1.l.(2).(a) Initialed Time: 30 min ago H.1.l.(2).(b) Initialed D.2 1 H.1.l.(2).(c) Both Initialed H.1.a. 3 H.1.l.(2).(d) Initialed H.1.a.(1) & (2) Initialed H.1.l.(2).(e) Initialed H.1.a.(3) N/A H.1.l.(2).(f) OOS H.1.b. Initialed H.1.l.(3) (a-g) N/A H.1.c.(1) N/A H.1.l.(4) (a-f) All steps N/A H.1.c.(2) Initialed H.1.m.(1) (a-f) Initialed H.1.d Initialed H.1.m.(2) (a-h) N/A H.1.e.(1) & (2) Initialed H.1.m.(3) (a-g) N/A H.1.f Initialed H.1.m.(4) (a-i) N/A H.1.g Initialed H.2 (all steps lined) N/A H.1.h.(1) Initialed H.3 (all steps lined) N/A H.1.h.(2) N/A H.4.a N/A checked H.1.i. Initialed Comments None H.1.j.(1) & (2) Initialed H.4.b Signed Joe Barker H.1.k Initialed Date: Today Attachments D & E N/A
2. Prepare QCOS 0005-08 Rev 28, page 10 completed with the following information H.1.l(3) Marked N/A H.1.l(4)(b) and (d) Not initialed and 4450 VAC written in column to the right of the line H.1.l(4) All other steps initialed by JB
3. This completes the setup for this JPM.

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

2012 SRO Admin 3 - Rev 03 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.

You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.

Tech Spec 3.8.1 Condition B was entered.

The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.

INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.

Provide the examinee: A completed surveillance, QCOS 0005-08, with the information recorded as indicated in the setup.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

2012 SRO Admin 3 - Rev 03 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD Reviews the completed Attention to detail used in ___ ___ ___

surveillance and identifies reviewing Tech Spec required the following problems: surveillances.

EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.

CUE: When candidate notices that the Bus 23-1 and 13-1 TIE breaker is marked OOS and inquires as to its actual status; inform the candidate that it was just taken OOS for EMs to repair the breaker.

  • H.1.l. *H.1.l recognized as not ONE of the sections H.1.l.(1) ___ ___ ___

satisfied.

  • through (4) MUST be satisfied.

H.1.l.(2).f Bus 23-1 and 13-1 TIE GCB is recorded as OOS.

and H.1.l.(4) marked N/A CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)

IF the candidate directs the ANSO to re-perform the step, then provide the prepared page 9 of QCOS 0005-08.

IF the candidate re-performs H.1.l.(4) line-by-line, then provide the following information:

  • H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed? YES
  • H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC? 4450 VAC
  • H.1.l(4)c Busses 24 AND 24-1 TIE GCBs capable of being closed?

YES for both

  • H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC? 4450 VAC
  • H.1.l(4)e Bus 14-1 AND 24-1 TIE GCB capable of being closed? YES
  • H.1.l(4)f Bus 24-1 AND 14-1 TIE GCB capable of being closed? YES EVALUATOR NOTE: If the candidate declares that QCOS 0005-08 is unsatisfactory as presented, the next step will be Not Applicable.

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

2012 SRO Admin 3 - Rev 03 Comment SAT UNSAT Number STEP ELEMENT STANDARD

  • H.1.l(4) Obtains information required Procedure acceptance criteria ___ ___ ___

(b) & (d) to complete section H.1.l.(4) not met due to voltage on the Unit 2 4160 Busses is too high.

  • Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high.
  • EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: The Unit 2 Unit Supervisor will address any corrective actions.

Continue your review.

CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.

  • H.1.l *Identify the applicable Tech Identifies the following: ___ ___ ___

Spec CONDITION T.S. 3.8.1 Cond A for one T.S. 3.8.1 Cond A for one Offsite Line Inop; 7 Day LCO Offsite Line Inop T.S. 3.8.1 Cond D for one T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop; Offsite Line and one DG 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> LCO Inop

  • H.4 Identify that Step H.4 (for a Step H.4 revised to reflect that ___ ___ ___

Satisfactory Surveillance) is surveillance was NOT incorrectly filled out and Satisfactory should NOT be marked N/A.

EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23-1 AND 13-1 TIE GCB is Out-Of Service and the Voltages on Busses 24 and 24-1 are too high.

H.5 Identify that Step H.5 should Step H.5 filled out as UNSAT. ___ ___ ___

be filled out as UNSAT.

CUE: Inform the candidate that the JPM is complete JPM Stop Time:

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

2012 SRO Admin 3 - Rev 03 Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Review Electrical Distribution Surveillance JPM Number: 2012 SRO Admin 3 Revision Number: 03 Task Number and Title:

SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.

K/A Number and Importance: K/A: 2.2.40 Rating: SRO 4.7 Ability to apply Technical Specifications for a system.

Suggested Testing Environment: Simulator or Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOS 0005-08, Rev. 28 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9

INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.

You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.

Tech Spec 3.8.1 Condition B was entered.

The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.

INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.

Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number: 01 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

2012 SRO Admin 2 - Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

2012 SRO Admin 2 - Rev 01 Revision Record (Summary)

Revision 00, This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES-301 and Appendix C. It was modeled after a JPM from the 2006 ILT Exam at Dresden.

Revision 01, JPM updated for 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

2012 SRO Admin 2 - Rev 01 SETUP INSTRUCTIONS

1. This JPM may be administered in any setting with the necessary procedures available.
2. Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
3. In the Hours on Shift table:
  • Enter 4 shifts of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as a Unit Supervisor.
  • Enter 1 shift of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as the WEC supervisor.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

2012 SRO Admin 2 - Rev 01 INITIAL CONDITIONS You are the Shift Manager.

An SRO is in the process of license reactivation.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.

INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.

Approve if acceptable or, if not, identify any discrepancies.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

2012 SRO Admin 2 - Rev 01 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Review OP-AA-105- Reviews OP-AA-105-102, ___ ___ ___

102, Attachment 2. Attachment 2.

  • Check that Hours on Notes that 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> listed in the ___ ___ ___

Shift are applicable for Hours on Shift are for WEC license reactivation Supervisor which does not AND count toward the required 40 that licensee has the required hours AND determines that 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.* licensee has ONLY 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> toward the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

  • Check that the required Plant Notes that the Date and Active ___ ___ ___

Tour has been completed.* License Signature for the required Plant Tour are missing on the Shift Position Log.

Returns OP-AA-105-102 OP-AA-105-102 Attachment 2 ___ ___ ___

Attachment 2 without signing. returned without signing Licensees license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.

NOTE: The JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

2012 SRO Admin 2 - Rev 01 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number: 01 Task Number and Title:

SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102.

K/A Number and Importance: K/A: 2.1.4 Rating: SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): OP-AA-105-102, Rev. 09, NRC Active License Maintenance Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS You are the Shift Manager.

An SRO is in the process of license reactivation.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.

INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.

Approve if acceptable or, if not, identify any discrepancies.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number: 02 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2012 SRO Admin 1 - Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2012 SRO Admin 1 - Rev 02 Revision Record (Summary)

Revision 01, This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.

Revision 02, This JPM updated for 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2012 SRO Admin 1 - Rev 02 SIMULATOR SETUP INSTRUCTIONS

1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
  • OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
  • QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
2. Verify the following for this JPM setup:
  • A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows:
1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
2) Fill out Section I INITIATOR of the Fire Protection Permit as follows:

Initiator: IMD Supervisor Station: Quad Unit: 01 Name: K. Arney Phone: X 2667 Dept/Co: IMD/Exelon Sch. Start Date: current Bldg: TB EPN#: 1-4141-109 Sch. End Date: current + 1 Elev: 611 Door #: N/A AR/WR/OOS#: 1081 11-01 Row/Col: E/14 Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.

Impairment

Description:

Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.

3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
a. Fire Zone(s): 8.2.7.c / For Barriers: Check the Functional box.
b. Technical Requirement Manual? Check the Yes box and write in QCAP 1500-01
c. Mark None in the Fire Watch Required: block and N/A below.
d. For Additional Compensatory Measures: Check the NO box and N/A the Required? line.
e. Fire Detector Operability Check Required? Check the Yes box.
f. NEIL Notification Required? Check the NO box.
g. Fire Marshal Instructions: Return to operable status in 14 days
h. Restoration/Testing Requirements: Completion of Work Package.
i. Sign and date as Fire Marshal for Authorization Block.
3. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2012 SRO Admin 1 - Rev 02 INITIAL CONDITIONS

- You are the Work Execution Center Senior Reactor Operator.

- An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.

EVALUATOR: Provide candidate with a copy of fire permit 1121, OP-MW-201-007, .

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2012 SRO Admin 1 - Rev 02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Obtains Procedures. Obtains a copy of OP-MW-201- ___ ___ ___

007, QCAP 1500-01, QCOA 4100-11 as necessary.

EVALUATOR: The candidate may perform the following steps in any order.

Reviews Fire Permit. Reviews Fire Permit to ___ ___ ___

determine what is being impaired. Determines that one detector will be disconnected.

QCAP Determines effect of Reviews QCAP 1500-01 Att. A ___ ___ ___

1500-01 disconnecting detectors. page 3 and determines that one Att. A detector, if removed, will make page 3 the detection system inoperable (all 6 are required).

EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.

The following errors are built into the permit:

The Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW as follows:

  • None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
  • NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)

The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2012 SRO Admin 1 - Rev 02 Comment STEP ELEMENT STANDARD SAT UNSAT Number QCAP Determines consequence of Reviews QCAP 1500-01 Att. C ___ ___ ___

1500-01 making the detection system page 2 (or determines info from Att. C inoperable. QCAP 1500-01 Att. A page 3) page 2 and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).

QCAP *Determines hourly fire Reviews QCAP 1500-01 step ___ ___ ___

1500-01 watch established within one D.1.c.(2) and D.2.c.(2) and

  • D.2.c.(2) must be conducted if this permit is approved.

QCAP *Determines backup Reviews step D.2.c.(4) and ___ ___ ___

1500-01 suppression required within determines backup suppression

  • D.2.c.(4) one hour.* will also be required.

(page 65 of 93)

OP-MW- Determines that the Fire Recognizes the N/A is not ___ ___ ___

201-007 Watch Performed By field correct for this field.

Attach. 1 must be filled in IMD or other appropriate department.

NOTE: The candidate may choose to correct the provided impairment. This is acceptable.

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2012 SRO Admin 1 - Rev 02 Comment STEP ELEMENT STANDARD SAT UNSAT Number Reviews the permit for The candidate reviews the ___ ___ ___

accuracy and Notifies the permit for accuracy in Evaluator of his conclusions. accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW

block (should be marked hourly with performed by marked as IMD).

  • NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)

EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.

NOTE: The JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2012 SRO Admin 1 - Rev 02 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number: 02 Task Number and Title:

4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance: K/A: 2.1.25 Rating: SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12.5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

2012 SRO Admin 1 - Rev 02 Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 10

INITIAL CONDITIONS

- You are the Work Execution Center Senior Reactor Operator.

- An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.

SRRS: 3D.105 (when utilized for operator initial or continuing training)