MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO 2024-08-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist 2024-08-06
[Table view] |
Text
ES-301 Transient and Event Checklist Form ES-301-5
Facility: Quad Cities Date of Exam: 6/01/2021 Operating Test No.: ILT 20-1 A E Scenarios (Blue Crew)
P V 1 4 5 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION N I T S A B S A B S A B S A B T I C R T O R T O R T O R T O A M A T O C P O C P O C P O C P L U N Y M(*)
T P E R I U RO RX 5 1 1 1 0 SRO -I (5)NOR 1 1 2 1 1 1 I/C 3,4,5 2,3 2,4,5 12 4 4 2 SRO -U 8 6,9 10 MAJ 7 7 8 3 2 2 1 TS 3,6 3,6 4 0 2 2 RO RX 7 1 1 1 0 NOR 1 1 2 1 1 1 SRO -I (6)I/C 5,8,9 2,3,4 2,5,9 11 4 4 2 6,10 SRO -U MAJ 7 7 8 3 2 2 1
TS 3,4 2 0 2 2 RO (5) RX 2 1 1 1 0 SRO -I NOR 1 1 2 1 1 1 I/C 3,4 4,6 4,6,9 8 4 4 2 SRO -U 10 MAJ 7 7 8 3 2 2 1 TS 0 2 2 RO RX 1 1 0 SRO -I NOR 1 1 1 I/C 4 4 2 SRO -U MAJ 2 2 1 TS 0 2 2 ES-301 Transient and Event Checklist Form ES-301-5
Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES -D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5
Facility: Quad Cities Date of Exam: 6/01/2021 Operating Test No.: ILT 20-1 A E Scenarios (Green Crew)
P V 1 2 3 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION N I T S A B S A B S A B S A B T I C R T O R T O R T O R T O A M A T O C P O C P O C P O C P L U N Y M(*)
T P E R I U RO RX 5 1 1 1 0 SRO -I (1)NOR 1 1 2 1 1 1 I/C 3,4,5 3,4,5 2,3 11 4 4 2 SRO -U 8 6,8 MAJ 7 7 7 3 2 2 1 TS 3,6 4,5 4 0 2 2 RO (1)RX 2 1 1 1 0 NOR 1 1 2 1 1 1 SRO -I (6)I/C 3,4 3,4 4,6 6 4 4 2
SRO -U MAJ 7 7 7 3 2 2 1 TS 0 2 2
RO (2) RX 6 1 1 1 0 SRO -I NOR 1 1 2 1 1 1 I/C 5,8,9 2,5 5,6,8 8 4 4 2 SRO -U MAJ 7 7 7 3 2 2 1 TS 0 2 2
RO () RX 2 1 1 1 0 SRO -I (2)NOR 1 1 2 1 1 1 I/C 2,3,4 3,4,8 2,3,4 11 4 4 2 SRO -U 5 6 MAJ 7 7 7 3 2 2 1 TS 4,5 3,4 4 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES -D -1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at -the-controls (ATC) and balance-of -plant (BOP) positions. Instant SROs (SRO -I) mu st serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO -I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5
ES-301 Transient and Event Checklist Form ES-301-5
Facility: Quad Cities Date of Exam: 6/01/2021 Operating Test No.: ILT 20-1 A E Scenarios (Purple Crew)
P V 2 3 5 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION N I T S A B S A B S A B S A B T I C R T O R T O R T O R T O A M A T O C P O C P O C P O C P L U N Y M(*)
T P E R I U RO RX 2 1 1 1 0 SRO -I (7)NOR 1 1 2 1 1 1 I/C 2,3,4 3,4, 2,4,5 13 4 4 2 SRO -U 5 8 6,9 10 MAJ 7 7 8 3 2 2 1 TS 4,5 3,6 4 0 2 2 RO RX 7 1 1 1 0 NOR 1 1 2 1 1 1 SRO -I (8)I/C 3,4 3,4,5 2,5,9 11 4 4 2 6,8,10 SRO -U MAJ 7 7 8 3 2 2 1
TS 4,5 2 0 2 2 RO (6) RX 6 1 1 1 0 SRO -I NOR 1 1 2 1 1 1 I/C 2,5 5,6,8 4,6,9 9 4 4 2 SRO -U 10 MAJ 7 7 8 3 2 2 1 TS 0 2 2 RO RX 1 1 0 SRO -I NOR 1 1 1 I/C 4 4 2 SRO -U MAJ 2 2 1 TS 0 2 2 ES-301 Transient and Event Checklist Form ES-301-5
Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES -D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5
Facility: Quad Cities Date of Exam: 6/01/2021 Operating Test No.: ILT 20-1 A E Scenarios (Red Crew)
P V 1 2 3 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION N I T S A B S A B S A B S A B T I C R T O R T O R T O R T O A M A T O C P O C P O C P O C P L U N Y M(*)
T P E R I U RO RX 6 1 1 1 0 SRO -I (3)NOR 1 1 2 1 1 1 I/C 3,4,5 2,5 2,3,4 10 4 4 2 SRO -U 8 6 MAJ 7 7 7 3 2 2 1 TS 3,6 3,4 4 0 2 2 RO RX 5 1 1 1 0 NOR 1 1 2 1 1 1 SRO -I (4)I/C 2,3,4 2,3,4 2,3 11 4 4 2 5 6,8 SRO -U MAJ 7 7 7 3 2 2 1 TS 4,5 3,4 4 0 2 2
RO (3) RX 2 1 1 1 0 SRO -I NOR 1 1 2 1 1 1 I/C 3,4 3,4 5,6,8 7 4 4 2 SRO -U MAJ 7 7 7 3 2 2 1 TS 0 2 2 RO (4) RX 5 1 1 1 0 SRO -I NOR 1 1 2 1 1 1 I/C 5,8,9 2,3,8 4,6 8 4 4 2 SRO -U MAJ 7 7 7 3 2 2 1
TS 0 2 2 I nstructions:
- 1. Check the applicant level and enter the operating test number and Form ES -D -1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at -the-controls (ATC) and balance-of -plant (BOP) positions. Instant SROs (SRO -I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO -I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO -I in manipulating plant controls.