ML22193A320

From kanterella
Jump to navigation Jump to search
2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines
ML22193A320
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/07/2021
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML20139A013 List:
References
Download: ML22193A320 (4)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Quad Cities Nuclear Power Station Date of Examination:

6/01/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:

ILT 20-1 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. Startup of a Reactor Recirculation Pump

[Recirculation System; 202001 A4.01 3.7/3.7]

L, D, S 1

b. Startup RWCU System in Reject Mode with a HELB in the Regen Room

[Reactor Water Cleanup System 204000 A2.10 2.7/2.8]

A, N, S 2

c. Control Reactor Pressure using the Main Steam Line Drains

[Main and Reheat Steam System, 239001 A4.02 3.2/3.2]

D, S 3

d. Startup the HPCI System in Pressure Control Mode

[Heat Removal From Reactor Core, 206000 A4.04 3.7/3.7]

N, S, EN 4

e. Start-Up the RHRSW System with Reduced Pump Capacity

[RHR/LPCI: Torus/Suppression Pool Cooling Mode, 219000 A4.05 3.4/3.4]

A, D, S 5

f. Energize Bus 14-1 with Crosstie Failure and Subsequent SBO Startup

[A.C. Electrical Distribution; 262001 A4.04 3.6/3.7]

A, D, S 6

g. Withdraw an SRM for Maintenance

[Source Range Monitor System 215004 A4.02 3.6/3.7]

N, S 7

h. Unisolate and Start Reactor Building Ventilation System

[Plant Ventilation Systems 288000 A4.01 3.1/2.9]

D, S 9

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Change-Over SSMP Suction from CCSTs to the Fire Main

[Fire Protection System; 286000 A1.05 3.2/3.2]

D, R 8

j. Locally Reset a Control Room Ventilation Isolation

[Control Room Heating, Ventilation, and Air Conditioning 290003 A4.01 3.2/3.2]

N, R 9

k. Locally Start 1/2 EDG with a Failure of the 1/2 DGCWP.

[Emergency Generators (Diesel/Jet); 264000 A3.06 3.1/3.2]

A, D, R, E 6

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Quad Cities Date of Examination:

6/01/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:

ILT 20-1 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. Startup of a Reactor Recirculation Pump

[Recirculation System; 202001 A4.01 3.7/3.7]

L, D, S 1

b. Startup RWCU System with a Subsequent Line Break in the Heat Exchanger Room

[Reactor Water Cleanup System 204000 A2.10 2.7/2.8]

A, N, S 2

c. Control Reactor Pressure using the Main Steam Line Drains

[Main and Reheat Steam System, 239001 A4.02 3.2/3.2]

D, S 3

e. Start-Up the RHRSW System with Reduced Pump Capacity

[RHR/LPCI: Torus/Suppression Pool Cooling Mode, 219000 A4.05 3.4/3.4]

A, D, S, EN 5

f. Energize Bus 14-1 with Crosstie Failure and Subsequent SBO Startup

[A.C. Electrical Distribution; 262001 A4.04 3.6/3.7]

A, D, S 6

g. Withdraw an SRM for Maintenance

[Source Range Monitor System 215004 A4.02 3.6/3.7]

N, S 7

h. Unisolate and Start Reactor Building Ventilation System

[Plant Ventilation Systems 288000 A4.01 3.1/2.9]

D, S 9

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Change-Over SSMP Suction from CCSTs to the Fire Main

[Fire Protection System; 286000 A1.05 3.2/3.2]

D, R 8

j. Locally Reset a Control Room Ventilation Isolation

[Control Room Heating, Ventilation, and Air Conditioning 290003 A4.01 3.2/3.2]

N, R 9

k. Locally Start the U-1/2 EDG with a Failure of the 1/2 EDGCWP

[Emergency Generators (Diesel/Jet); 264000 A3.06 3.1/3.2]

A, D, R, E 6

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1