ML12166A334: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:June 13, 2012  
{{#Wiki_filter:UNITE D S TATE S
  EA-12-083  
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
EA-11-067  
                                                    RE G IO N I V
Mr. Peter Dietrich Senior Vice President and   Chief Nuclear Officer  
                                              1600 EAST LAMAR BLVD
Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128  
                                        AR L INGTON , TEXAS 7 60 11 - 4511
                                                June 13, 2012
SUBJECT: ERRATA FOR SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NRC SPECIAL INSPECTION REPORT 05000361/2012403; 05000362/2012403; PRELIMINARY GREATER THAN GREEN FINDING; AND EXERCISE OF DISCRETION  
EA-12-083
EA-11-067
Dear Mr. Dietrich:
Mr. Peter Dietrich
Please replace the cover page with the enclosed revised page. This Errata corrects the Subject of the report to include the words, "AND EXERCISE OF DISCRETION". We regret any inconvenience this may have caused.  
Senior Vice President and
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
  Chief Nuclear Officer
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Southern California Edison Company
San Onofre Nuclear Generating Station
Should you have any questions concerning this inspection, we will be pleased to discuss them.  
P. O. Box 128
  Sincerely,   /RA/ Thomas Blount, Acting Director Division of Reactor Safety  
San Clemente, CA 92674-0128
SUBJECT: ERRATA FOR SAN ONOFRE NUCLEAR GENERATING STATION,
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
              UNITS 2 AND 3 - NRC SPECIAL INSPECTION REPORT 05000361/2012403;
P. Dietrich - 2 -
              05000362/2012403; PRELIMINARY GREATER THAN GREEN FINDING; AND
  Docket No:  50-361; 50-362 License No:  NPF 10; NPF 15
              EXERCISE OF DISCRETION
Enclosure:  Errata - Cover Page for San Onofre Nuclear Generating Station, 
Dear Mr. Dietrich:
  Units 2 And 3 -  NRC Special Inspection Report 05000361/2012403;    05000362/2012403, dated June 11, 2012
Please replace the cover page with the enclosed revised page. This Errata corrects the Subject
cc:  Electronic Distribution for SONGS
of the report to include the words, AND EXERCISE OF DISCRETION. We regret any
P. Dietrich - 3 -
inconvenience this may have caused.
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
DRP Deputy Director (Troy.Pruett@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)
available electronically for public inspection in the NRC Public Document Room or from the
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Senior Project Engineer (Nick.Taylor@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
Project Manager (Randy.Hall@nrc.gov) Chief, ACES (Heather.Gepford@nrc.gov)  Senior Enforcement Specialist (Ray.Kellar@nrc.gov) Enforcement Specialist (Christi.Maier@nrc.gov) Allegations Coordinator (Judith.Weaver@nrc.gov) Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43 Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6 Branch Chief, RI DRS (James.Trapp@nrc.gov)  Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) RidsOeMailCenter Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Electronic Reading Room).
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource RIV/ETA: OEDO (Michael.McCoppin@nrc.gov) 
Should you have any questions concerning this inspection, we will be pleased to discuss them.
P. Dietrich - 4 -
                                                      Sincerely,
      R:\_REACTORS\_SONGS\2012\SO2012403-Errata-NonSGI-MKB.docx ML12166A334
                                                      /RA/
ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  TXB Category B  Publicly Available  Non-Sensitive
                                                      Thomas Blount, Acting Director
  Non-publicly Available  Sensitive KEYWORD:  SUNSI Review Complete
                                                      Division of Reactor Safety
AD:DRS    TBlount    /RA/    6/13/2012    OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
"Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this transmittal document is decontrolled."
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMAT
ION    June 11, 2012
  EA-12-083
EA-11-067
Mr. Peter Dietrich Senior Vice President and    Chief Nuclear Officer
Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA  92674-0128
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -  NRC SPECIAL INSPECTION REPORT 05000361/2012403; 05000362/2012403;  PRELIMINARY GREATER THAN GREEN FINDING; AND EXERCISE OF DISCRETION
Dear Mr. Dietrich:
On May 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your San Onofre Nuclear Generating Station, Units 2 and 3.  The enclosed inspection report documents the inspection results, which were discussed on May 16, 2012, with Mr. Doug Bauder, Vice President and Station Manager, and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
P. Dietrich                                -2-
Docket No: 50-361; 50-362
License No: NPF 10; NPF 15
Enclosure:
Errata - Cover Page for San Onofre Nuclear Generating Station,
  Units 2 And 3 - NRC Special Inspection Report 05000361/2012403;
  05000362/2012403, dated June 11, 2012
cc: Electronic Distribution for SONGS


The attached report documents one finding that has preliminarily been determined to be Greater than Green (i.e., finding of greater than very low security significance) that may result in the need for further evaluation to determine the significance and, therefore, the need for additional
P. Dietrich                                    -3-
  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Senior Project Engineer (Nick.Taylor@nrc.gov)
Project Engineer, DRP/D (David.You@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Chief, ACES (Heather.Gepford@nrc.gov)
Senior Enforcement Specialist (Ray.Kellar@nrc.gov)
Enforcement Specialist (Christi.Maier@nrc.gov)
Allegations Coordinator (Judith.Weaver@nrc.gov)
Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch
Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M
Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43
Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6
Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
RidsOeMailCenter
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)
 
P. Dietrich                          -4-
R:\_REACTORS\_SONGS\2012\SO2012403-Errata-NonSGI-MKB.docx        ML12166A334
ADAMS:      No : Yes    : SUNSI Review Complete        Reviewer Initials: TXB
Category B              : Publicly Available            : Non-Sensitive
                          Non-publicly Available          Sensitive
KEYWORD: SUNSI Review Complete
AD:DRS
TBlount
/RA/
6/13/2012
OFFICIAL RECORD COPY                        T=Telephone      E=E-mail      F=Fax
 
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                                                UNITE D S TATE S
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                    RE G IO N I V
                                              1600 EAST LAMAR BLVD
                                        AR L INGTON , TEXAS 7 60 11 - 4511
                                            June 11, 2012
EA-12-083
EA-11-067
Mr. Peter Dietrich
Senior Vice President and
  Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P. O. Box 128
San Clemente, CA 92674-0128
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
              NRC SPECIAL INSPECTION REPORT 05000361/2012403; 05000362/2012403;
              PRELIMINARY GREATER THAN GREEN FINDING; AND EXERCISE OF
              DISCRETION
Dear Mr. Dietrich:
On May 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your San Onofre Nuclear Generating Station, Units 2 and 3. The
enclosed inspection report documents the inspection results, which were discussed on
May 16, 2012, with Mr. Doug Bauder, Vice President and Station Manager, and other members
of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
The attached report documents one finding that has preliminarily been determined to be Greater
than Green (i.e., finding of greater than very low security significance) that may result in the
need for further evaluation to determine the significance and, therefore, the need for additional
  Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
                            transmittal document is decontrolled.
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
}}
}}

Latest revision as of 03:13, 12 November 2019

Special IR 05000361-12-403, 05000362-12-403, Errata for San Onofre Nuclear Generating Station, Units 2 and 3 - Preliminary Greater than Green Finding and Exercise of Discretion
ML12166A334
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/13/2012
From: Blount T
Division of Reactor Safety IV
To: Peter Dietrich
Southern California Edison Co
References
EA-11-067, EA-12-083 IR-12-403
Download: ML12166A334 (5)


See also: IR 05000361/2012403

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

June 13, 2012

EA-12-083

EA-11-067

Mr. Peter Dietrich

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: ERRATA FOR SAN ONOFRE NUCLEAR GENERATING STATION,

UNITS 2 AND 3 - NRC SPECIAL INSPECTION REPORT 05000361/2012403;

05000362/2012403; PRELIMINARY GREATER THAN GREEN FINDING; AND

EXERCISE OF DISCRETION

Dear Mr. Dietrich:

Please replace the cover page with the enclosed revised page. This Errata corrects the Subject

of the report to include the words, AND EXERCISE OF DISCRETION. We regret any

inconvenience this may have caused.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them.

Sincerely,

/RA/

Thomas Blount, Acting Director

Division of Reactor Safety

P. Dietrich -2-

Docket No: 50-361; 50-362

License No: NPF 10; NPF 15

Enclosure:

Errata - Cover Page for San Onofre Nuclear Generating Station,

Units 2 And 3 - NRC Special Inspection Report 05000361/2012403;

05000362/2012403, dated June 11, 2012

cc: Electronic Distribution for SONGS

P. Dietrich -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Engineer, DRP/D (David.You@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Chief, ACES (Heather.Gepford@nrc.gov)

Senior Enforcement Specialist (Ray.Kellar@nrc.gov)

Enforcement Specialist (Christi.Maier@nrc.gov)

Allegations Coordinator (Judith.Weaver@nrc.gov)

Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch

Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M

Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43

Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6

Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

RidsOeMailCenter

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)

P. Dietrich -4-

R:\_REACTORS\_SONGS\2012\SO2012403-Errata-NonSGI-MKB.docx ML12166A334

ADAMS: No : Yes  : SUNSI Review Complete Reviewer Initials: TXB

Category B  : Publicly Available  : Non-Sensitive

Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

AD:DRS

TBlount

/RA/

6/13/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

June 11, 2012

EA-12-083

EA-11-067

Mr. Peter Dietrich

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

NRC SPECIAL INSPECTION REPORT 05000361/2012403; 05000362/2012403;

PRELIMINARY GREATER THAN GREEN FINDING; AND EXERCISE OF

DISCRETION

Dear Mr. Dietrich:

On May 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security

baseline inspection at your San Onofre Nuclear Generating Station, Units 2 and 3. The

enclosed inspection report documents the inspection results, which were discussed on

May 16, 2012, with Mr. Doug Bauder, Vice President and Station Manager, and other members

of your staff.

The inspection examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

The attached report documents one finding that has preliminarily been determined to be Greater

than Green (i.e., finding of greater than very low security significance) that may result in the

need for further evaluation to determine the significance and, therefore, the need for additional

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION