Special IR 05000361-12-403, 05000362-12-403, Errata for San Onofre Nuclear Generating Station, Units 2 and 3 - Preliminary Greater than Green Finding and Exercise of Discretion
ML12166A334
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/13/2012
From: Blount T
Division of Reactor Safety IV
To: Peter Dietrich
Southern California Edison Co
References
EA-11-067, EA-12-083 IR-12-403
Download: ML12166A334 (5)


See also: IR 05000361/2012403

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

June 13, 2012

EA-12-083

EA-11-067

Mr. Peter Dietrich

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: ERRATA FOR SAN ONOFRE NUCLEAR GENERATING STATION,

UNITS 2 AND 3 - NRC SPECIAL INSPECTION REPORT 05000361/2012403;

05000362/2012403; PRELIMINARY GREATER THAN GREEN FINDING; AND

EXERCISE OF DISCRETION

Dear Mr. Dietrich:

Please replace the cover page with the enclosed revised page. This Errata corrects the Subject

of the report to include the words, AND EXERCISE OF DISCRETION. We regret any

inconvenience this may have caused.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them.

Sincerely,

/RA/

Thomas Blount, Acting Director

Division of Reactor Safety

P. Dietrich -2-

Docket No: 50-361; 50-362

License No: NPF 10; NPF 15

Enclosure:

Errata - Cover Page for San Onofre Nuclear Generating Station,

Units 2 And 3 - NRC Special Inspection Report 05000361/2012403;

05000362/2012403, dated June 11, 2012

cc: Electronic Distribution for SONGS

P. Dietrich -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Engineer, DRP/D (David.You@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Chief, ACES (Heather.Gepford@nrc.gov)

Senior Enforcement Specialist (Ray.Kellar@nrc.gov)

Enforcement Specialist (Christi.Maier@nrc.gov)

Allegations Coordinator (Judith.Weaver@nrc.gov)

Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch

Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M

Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43

Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6

Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

RidsOeMailCenter

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)

P. Dietrich -4-

R:\_REACTORS\_SONGS\2012\SO2012403-Errata-NonSGI-MKB.docx ML12166A334

ADAMS: No : Yes  : SUNSI Review Complete Reviewer Initials: TXB

Category B  : Publicly Available  : Non-Sensitive

Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

AD:DRS

TBlount

/RA/

6/13/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

June 11, 2012

EA-12-083

EA-11-067

Mr. Peter Dietrich

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

NRC SPECIAL INSPECTION REPORT 05000361/2012403; 05000362/2012403;

PRELIMINARY GREATER THAN GREEN FINDING; AND EXERCISE OF

DISCRETION

Dear Mr. Dietrich:

On May 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security

baseline inspection at your San Onofre Nuclear Generating Station, Units 2 and 3. The

enclosed inspection report documents the inspection results, which were discussed on

May 16, 2012, with Mr. Doug Bauder, Vice President and Station Manager, and other members

of your staff.

The inspection examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

The attached report documents one finding that has preliminarily been determined to be Greater

than Green (i.e., finding of greater than very low security significance) that may result in the

need for further evaluation to determine the significance and, therefore, the need for additional

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION