ML17264A340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17264A340
| number = ML17264A340
| issue date = 02/09/1996
| issue date = 02/09/1996
| title = Proposed Tech Specs Re Ltop Limits Using Util Proposed Methodology
| title = Proposed Tech Specs Re LTOP Limits Using Util Proposed Methodology
| author name =  
| author name =  
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AttachmentIIMarkedUpCopyofR.E.GinnaNuclearPowerPlantTechnicalSpecificationsIncludedPages:5.0-229602i30388960209PDRADGCK05000244PPDR~
{{#Wiki_filter:Attachment  II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:
eportingRequirements5.65.6ReportingRequirements5.6.6PTLR(continued)C.d.TheRCSpressureandtemperatureanlimitsshallbethosepreviouslyreviewedandapproveytheNRCiAmendmentNo.48.TheacceptabilityoftheP/TlimitsaredocumentedinNRCletter,"R.E.Ginna-AcceptanceforReferencingofPressureLimitsReport,"Dece995.Specifically,thelimitsandmethodologyaredescribedinthefollowingdocumens:p~-rl.AmendmentNo.48toFacilityOperatingLicenseNo.DPR-18,R.E.GinnaNuclearPowerPlant,Harch6,1992.2.LetterfromC.I.Grimes,NRC,toR.A.Newton,WestinghouseElectricCorporation,"AcceptanceforReferencingTopicalReportWCAP-14040,Revision1,'HethodologyusedtoDevelopColdOverpressureHitigatingSystemSetpointsandRCSHeatupandCooldownLimitCurves',"October16,1995.3.LetterfromR.C.Hecredy,RochesterGasandElectricCorporation(RGEE),toDocumentControlDesk,NRC,AttentionA.R.Johnson,"TechnicalSpecificationsImprovementProgram,ReactorCoolantSystem(RCS)PressureandTemperatureLimitsReport(PTLR),"December8,1995.ThePTLRshallbeprovidedtotheNRCuponissuanceforeachreactorvesselfluencyperiodandforrevisionsorsupplementthereto.R.E.GinnaNuclearPowerPlant5.0-22AmendmentNo.61 AttachmentIIIProposedTechnicalSpecificationsIncludedPages:5.0-22 eportingRequirements~~5.65.6ReportingRequirements5.6.6PTLR(continued)c~TheRCSpressureandtemperaturelimitsshallbethosepreviouslyreviewedandapprovedbytheNRCinAmendmentNo.48.TheacceptabilityoftheP/TlimitsaredocumentedinNRCletter,"R.E.Ginna-AcceptanceforReferencingofPressureLimitsReport,"December26,1995.TheanalyticalmethodsusedtodeterminetheLTOPlimitsshallbethosepreviouslyreviewedbytheNRC.Specifically,theP/TlimitsandLTOPmethodologyaredescribedinthefollowingdocuments:l.AmendmentNo.48toFacilityOperatingLicenseNo.DPR-18,R.E.GinnaNuclearPowerPlant,Harch6,1992.2.LetterfromC.I.Grimes,NRC,toR.A.Newton,WestinghouseElectricCorporation,"AcceptanceforReferencingTopicalReportWCAP-14040,Revision1,'HethodologyusedtoDevelopColdOverpressureHitigatingSystemSetpointsandRCSHeatupandCooldownLimitCurves',"October16,1995.3.LetterfromR.C.Hecredy,RochesterGasandElectricCorporation(RGKE),toDocumentControlDesk,NRC,AttentionA.R.Johnson,"TechnicalSpecificationsImprovementProgram,ReactorCoolantSystem(RCS)PressureandTemperatureLimitsReport(PTLR),"December8,1995.d.ThePTLRshallbeprovidedtotheNRCuponissuanceforeachreactorvesselfluencyperiodandforrevisionsorsupplementthereto.R.E.GinnaNuclearPowerPlant5.0-22AmendmentNo.g  
5.0-22 9602i30388 960209 PDR    ADGCK    05000244 P                  PDR  ~
}}
 
eporting Requirements 5.6 5.6  Reporting Requirements 5.6.6        PTLR (continued)
C. The  RCS pressure and temperature an          limits shall  be those previously reviewed and approve      y the NRC i Amendment No. 48.     The acceptability of the P/T limits are documented in NRC letter, "R.E. Ginna-Acceptance for Referencing of Pressure Limits Report,"
Dece            995. Specifically, the limits and methodology are described in the following documen s: p~-r
: l. Amendment No. 48 to Facility Operating License No.
DPR-18, R.E. Ginna Nuclear Power Plant, Harch 6, 1992.
: 2. Letter from C. I. Grimes, NRC, to R.A. Newton, Westinghouse Electric Corporation, "Acceptance for Referencing Topical Report WCAP-14040, Revision 1,
                        'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.
: 3. Letter from    R.C. Hecredy, Rochester Gas and  Electric Corporation (RGEE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)
Pressure and Temperature    Limits Report (PTLR),"
December 8, 1995.
: d. The PTLR  shall  be  provided to the NRC upon issuance  for each reactor vessel fluency period and for revisions or supplement thereto.
R.E. Ginna Nuclear Power Plant            5.0-22                    Amendment No. 61
 
Attachment III Proposed Technical Specifications Included Pages:
5.0-22
 
                                                                    ~
eporting Requirements 5.6
                                                                                    ~
5.6  Reporting Requirements 5.6.6         PTLR (continued) c ~ The  RCS  pressure and temperature  limits shall be those previously reviewed  and approved  by the NRC in Amendment No.
: 48. The acceptability of the P/T limits are documented in NRC letter, "R.E. Ginna - Acceptance for Referencing of Pressure Limits Report," December 26, 1995. The analytical methods used to determine the LTOP limits shall be those previously reviewed  by the NRC. Specifically, the P/T limits  and LTOP methodology are  described in the following documents:
: l. Amendment No. 48 to Facility Operating License No.
DPR-18, R.E. Ginna Nuclear Power Plant, Harch 6, 1992.
: 2. Letter from  C.I. Grimes, NRC, to R.A. Newton, Westinghouse  Electric Corporation, "Acceptance for Referencing Topical Report WCAP-14040, Revision 1,
                        'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.
: 3. Letter from  R.C. Hecredy, Rochester Gas and Electric Corporation (RGKE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)
Pressure and Temperature  Limits Report (PTLR),"
December 8, 1995.
: d. The PTLR  shall be provided to the NRC upon issuance for    each reactor vessel fluency period and for revisions or supplement thereto.
R.E. Ginna Nuclear Power Plant          5.0-22                      Amendment No. g}}

Latest revision as of 08:04, 10 November 2019

Proposed Tech Specs Re LTOP Limits Using Util Proposed Methodology
ML17264A340
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A337 List:
References
NUDOCS 9602130388
Download: ML17264A340 (4)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

5.0-22 9602i30388 960209 PDR ADGCK 05000244 P PDR ~

eporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 PTLR (continued)

C. The RCS pressure and temperature an limits shall be those previously reviewed and approve y the NRC i Amendment No. 48. The acceptability of the P/T limits are documented in NRC letter, "R.E. Ginna-Acceptance for Referencing of Pressure Limits Report,"

Dece 995. Specifically, the limits and methodology are described in the following documen s: p~-r

l. Amendment No. 48 to Facility Operating License No.

DPR-18, R.E. Ginna Nuclear Power Plant, Harch 6, 1992.

2. Letter from C. I. Grimes, NRC, to R.A. Newton, Westinghouse Electric Corporation, "Acceptance for Referencing Topical Report WCAP-14040, Revision 1,

'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.

3. Letter from R.C. Hecredy, Rochester Gas and Electric Corporation (RGEE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR),"

December 8, 1995.

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluency period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.0-22 Amendment No. 61

Attachment III Proposed Technical Specifications Included Pages:

5.0-22

~

eporting Requirements 5.6

~

5.6 Reporting Requirements 5.6.6 PTLR (continued) c ~ The RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC in Amendment No.

48. The acceptability of the P/T limits are documented in NRC letter, "R.E. Ginna - Acceptance for Referencing of Pressure Limits Report," December 26, 1995. The analytical methods used to determine the LTOP limits shall be those previously reviewed by the NRC. Specifically, the P/T limits and LTOP methodology are described in the following documents:
l. Amendment No. 48 to Facility Operating License No.

DPR-18, R.E. Ginna Nuclear Power Plant, Harch 6, 1992.

2. Letter from C.I. Grimes, NRC, to R.A. Newton, Westinghouse Electric Corporation, "Acceptance for Referencing Topical Report WCAP-14040, Revision 1,

'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.

3. Letter from R.C. Hecredy, Rochester Gas and Electric Corporation (RGKE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR),"

December 8, 1995.

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluency period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.0-22 Amendment No. g