Line 2: Line 2:
| number = ML13282A500
| number = ML13282A500
| issue date = 10/09/2013
| issue date = 10/09/2013
| title = Comanche Peak Nuclear Power Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information
| title = Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Flores R
| addressee name = Flores R
Line 13: Line 13:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000445/2014008]]
See also: [[see also::IR 05000445/2014008]]


=Text=
=Text=
{{#Wiki_filter:October 9, 2013  
{{#Wiki_filter:UNITE D S TATE S
 
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
Rafael Flores, Senior Vice President  
                                                    R E G IO N I V
                                                1600 EAST LAMAR BLVD
                                          AR L INGTON , TEXAS 7 60 11 - 4511
                                                October 9, 2013
Rafael Flores, Senior Vice President
  and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:        COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
                NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE
                INSPECTION (NRC INSPECTION REPORT 05000445/2014008 and
                05000446/2014008) AND REQUEST FOR INFORMATION
Dear Mr. Flores:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at the Comanche Peak
Nuclear Power Plant in January and February of 2014. The inspection team will be comprised
of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in
accordance with Inspection Procedure 71111.05T, "Fire Protection (Triennial)," the NRCs
baseline fire protection inspection procedure.
The schedule for the inspection is as follows:
        Information gathering visit:    January 8 - 9, 2014
        Onsite inspection:              January 27 - 31, 2014
                                        February 10 - 14, 2014
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies
to address Section B.5.b of the NRC Order EA-02-026, Order for Interim Safeguards and
Security Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).


  and Chief Nuclear Officer
R. Flores                                        -2-
Three individuals will participate in the information gathering visit to select the fire areas for
evaluation, identify additional documents needed to support the inspection, obtain unescorted
access, and meet with the key personnel who will support the inspection. The fire area
selection will require a walkdown of candidate fire areas in company with key personnel from
your staff. The enclosure to this letter provides an initial list of the documents the team will need
for their review. We request that your staff transmit copies of the documents listed in the
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please
send this information so that it will arrive in the NRC Region IV office in Arlington, Texas, by the
dates listed in the enclosure.
During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access; and the
availability of knowledgeable plant engineering and licensing organization personnel to serve as
points of contact during the inspection.
We request that during the onsite inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection are
those documents that establish that your fire protection program satisfies the NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance. For
the B.5.b portion of the inspection, those documents implementing your mitigating strategies
and demonstrating the management of your commitments for the strategies are of specific
interest. Also, please ensure appropriate personnel are available to support the team at the site
during the inspection. These personnel should be knowledgeable of the plant systems required
to achieve and maintain safe shutdown conditions from inside and outside the control room, the
electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire protection
systems, and the fire protection program and its implementation and the B.5.b program
implementation should be available to support the team at the site during the inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant  
R. Flores                                      -3-
P.O. Box 1002
Your cooperation and support during this inspection will be appreciated. If you have questions
Glen Rose, TX  76043
concerning this inspection or the inspection team's information or logistical needs, please
contact Eduardo D. Uribe, the team lead inspector, in the Region IV office at (817) 200-1534, or
by email, Eduardo.Uribe@nrc.gov.
                                              Sincerely,
                                                /RA/
                                              Geoffrey B. Miller, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket: 50-445/50-446
License No.: NPF-87/NPF-89
Enclosure: Triennial Fire Protection Inspection Documentation Request
cc w/enclosure: Electronic Distribution for the Comanche Peak Nuclear Power Plant
Electronic Distribution to the Comanche Peak Nuclear Power Plant


   SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE
R. Flores                                      -4-
Electronic distribution by RIV:
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant - Vacant
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Daniel.Rich@nrc.gov)
R:\_REACTORS\_CPSES\2013\CP 2014008 TFP RFI-EDU.docx                  ML
SUNSI Rev Compl.  Yes  No ADAMS                  Yes  No    Reviewer Initials   EDU
Publicly Avail          Yes  No Sensitive      Yes No      Sens. Type Initials EDU
RIV: DRS/EB2/RI                                          C:DRP/A          C: EB2
EDUribe                                                  WCWalker          GBMiller
/RA/                                                      /RA/              /RA/
10/8/13                                                  10/8/13          10/8/13
OFFICIAL RECORD COPY                                T=Telephone        E=E-mail      F=Fax


INSPECTION (NRC INSPECTION REPORT 05000445/2014008 and
                                            ENCLOSURE
05000446/2014008) AND REQUEST FOR INFORMATION
                Triennial Fire Protection Inspection Documentation Request
Dear Mr. Flores:
Please provide the following documentation (items 1 - 5) prior to the onsite information
gathering visit, preferably no later than December 20, 2013. Whenever practical, please provide
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
copies electronically. Please provide an index of the requested documents which includes a
Region IV staff will conduct a triennial fire protection baseline inspection at the Comanche Peak
brief description of what the documents are related to, and the numerical heading associated
Nuclear Power Plant in January and February of 2014. The inspection team will be comprised of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with Inspection Procedure 71111.05T, "Fire Protection (Triennial)," the NRC's  
with the request (i.e., where it can be found in the list of documents requested).
baseline fire protection inspection procedure.  
1. The current version of your fire protection program and fire hazards analysis.
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
    acceptable plant response.
3. Copies of the licensing basis documents for fire protection (safety evaluation reports,
    pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from
    the NRC regarding fire protection/fire safe shutdown, etc.).
4. The fire probabilistic risk assessment or portions of the plants individual plant examination
    for external events (IPEEE) report addressing fire events. Also, include the results of any
    post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response
    to probabilistic risk assessment updates.
5. A copy of the documents that support your multiple spurious operation evaluations (i.e.,
    expert panel reports, evaluation packages, etc.).
Please provide the following documentation (items 6- 48) prior to the week of January 13, 2014,
to support inspection preparation. Whenever practical, please provide copies electronically.
Drawings should be provided as paper copies of sufficient size such that all details are legible.
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant
    locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
    zone delineation; (c) the locations of fire protection equipment, such as detection,
    suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The
    specific documents needed to support inspection preparation will be discussed during the
    site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator
    response procedures for fires, fire fighting procedures, etc.).
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions
    from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability
    with or without control room evacuation.
                                                  -1-                                    Enclosure


10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the
The schedule for the inspection is as follows:
    event of a fire (safe shutdown equipment list).
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and
    maintain hot standby and cold shutdown for normal and alternate shutdown. Please provide
    one copy of the piping and instrumentation (flow) diagrams for these systems of a size
    sufficient to read all details. These should include the systems used for reactor coolant
    system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control,
    including the essential support systems.
12. A listing, with descriptions, of design change packages which were determined to impact fire
    protection and post-fire safe shutdowns, performed since the last triennial fire protection
    inspection.
13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations)
    performed since the last triennial fire protection inspection.
14. A listing of open and closed corrective action documents initiated since the last triennial fire
    protection inspection, which relate to the fire protection program or equipment, including
    corrective actions for fire-induced circuit failures, both single and multiple spurious
    actuations (for the selected fire areas). Include Corrective Action Process document
    number, date, and subject.
15. A listing of the applicable codes and standards (with the versions/dates) related to the
    design of plant fire protection features and evaluations of any code deviations. Copies of
    these codes should be available for review.
16. Drawings of the portions of the emergency lighting system which support fire response.
17. Procedures used to remove smoke from safety-related areas and the engineering studies or
    calculations which support the design basis.
18. Drawings of communication systems credited in the license basis for firefighting and plant
    operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps and suppression systems. Also, include a list
    of maintenance and surveillance testing procedures which verify fuse and breaker
    coordination in accordance with the post-fire safe shutdown coordination analysis.
21. Results of the last performance and trending of the fire pump flow tests and yard loop flow
    test.
22. Maintenance rule performance criterion and a summary of the performance history for
    systems or functions monitored within the maintenance rule program that support the fire
    protection program or involve safe shutdown equipment, over the period since the last
    triennial fire protection inspection.
                                                -2-


     Information gathering visit:  January 8 - 9, 2014
23. A copy of fire protection program requirements (e.g., limiting conditions for operation,
  Onsite inspection:  January 27 - 31, 2014          February 10 - 14, 2014
     surveillance test requirements) covered by technical specifications, technical requirements
The purpose of the information gathering visit is to obtain information and documentation needed to support the inspection and to become familiar with the fire protection program, fire  
    manual, updated final safety analysis report, or similar documents.
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies
24. Copies of internal and external self-assessments, audits, peer-assessments or similar
to address Section B.5.b of the NRC Order EA-02-026, "Order for Interim Safeguards and  
    reviews related to post-fire safe shutdown capability or the fire protection program
Security Compensatory Measures," dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
    completed since the last triennial fire protection inspection.
  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
25. A list of manual actions taken outside the control room which are credited to mitigate the
R. Flores - 2 -      Three individuals will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
access, and meet with the key personnel who will support the inspection. The fire area
    group actions by the initiating fire area or zone and indicate where the action must take
selection will require a walkdown of candidate fire areas in company with key personnel from
    place.
your staff. The enclosure to this letter provides an initial list of the documents the team will need
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
for their review.  We request that your staff transmit copies of the documents listed in the enclosure to the NRC Region IV office for team
    basis documents that describe the purpose/function/operating characteristics of the safe
use in preparation for the inspection.  Please send this information so that it will arrive in the NRC Region IV office in Arlington, Texas, by the
    shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and reactivity
    control, including the essential support systems).
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.
    These should depict how power gets from the switchyard to the engineered safety feature
    loads (480V and 4160V).
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
    giving location and the key equipment being protected.
29. A list of repairs (and the procedures that control the actions) needed to: a) reach and/or
    maintain hot shutdown, and b) reach and/or maintain cold shutdown.
30. A list of high to low pressure interface valves.
31. A copy of procedures governing the training and operation of the fire brigade.
32. Organization charts of site personnel down to the level of fire protection staff personnel.
33. A contact list of key site personnel who will be supporting this inspection, giving location of
    their office and phone number onsite.
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
    during the week of February 10, 2014. Please put us in contact, during the onsite
    information gathering trip, with the appropriate personnel for planning drills.
35. The team would like to perform a walkthrough of the procedure for control room evacuation
    due to fire with qualified operators in the plant during the week of January 27, 2014.
                                                -3-


dates listed in the enclosure.  
    The team would like to perform a walkthrough of a sample of manual actions required for
    other fires not requiring control room evacuation. Please put us in contact, during the onsite
    information gathering trip, with the appropriate personnel for planning the walkthrough.
The following documents (items 36 - 48) involve B.5.b mitigating strategies.
36. A copy of the license condition that incorporated the requirements issued to address the
    requirements of Section B.5.b of the NRC Order EA-02-026, Order for the NRC Interim
    Safeguards and Security Compensatory Measures, dated February 25, 2002, and 10 CFR
    50.54(hh)(2).
37. A list of all modifications to regulatory commitments made to meet the requirements of
    Section B.5.b of the NRC Order EA-02-026, Order for the NRC Interim Safeguards and
    Security Compensatory Measures, dated February 25, 2002; the subsequently imposed
    license conditions; and 10 CFR 50.54(hh)(2).
38. A list of procedures/guidelines which were revised or generated to implement the mitigation
    strategies. These could be extensive damage mitigation guidelines (EDMGs), severe
    accident management guidelines (SAMGs), emergency operating procedures (EOPs),
    abnormal operating procedures (AOPs), etc.
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear
    Energy Institute 06-12 and the site-specific procedures or guidelines that are used to
    implement each strategy.
40. A list of engineering evaluations/calculations that were used to verify engineering bases for
    the mitigation strategies.
41. Copies of piping and instrumentation diagrams (P&ID) or simplified flow diagrams for
    systems relied upon in the mitigation strategies. These could be the type used for training.
42. A list of modification packages and simplified drawings/descriptions of modifications that
    were made to plant systems to implement the mitigation strategies.
43. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to
    be used to implement the mitigation strategies.
44. A list of B.5.b strategies, if any, which have implementing details that differ from that
    documented in the submittals to the NRC and the safety evaluation report.
45. A copy of site general arrangement drawing(s) that show the majority of buildings/areas
    referenced in B.5.b documents.
46. Training records/ training matrix/ lesson plans related to B.5.b.
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required
    to implement any mitigating strategies.
                                                -4-


48. The team would like to perform a walkthrough of the procedure implementing a sample
During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access; and the
    mitigating strategies and the inventory equipment (hoses, fittings, pumps, etc.) required to
availability of knowledgeable plant engineering and licensing organization personnel to serve as
    be used to implement the mitigation strategies during the week of February 10, 2014.
points of contact during the inspection. 
    Please put us in contact with the appropriate personnel for planning the walkthrough during
 
    the onsite information gathering trip.
The following documentation needs (items 49 - 52) will be dependent upon sample selections,
We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the
and will be finalized during discussions with your staff. Please provide the required documents
team for their review.  Of specific interest for the fire protection portion of the inspection are
prior to the week of January 17, 2014. Whenever practical, please provide copies electronically.
those documents that establish that your fire protection program satisfies the NRC regulatory
Drawings should be provided as paper copies of sufficient size such that all details are legible.
requirements and conforms to applicable NRC and industry fire protection guidance.  For the B.5.b portion of the inspection, those documents implementing your mitigating strategies
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the
and demonstrating the management of your commitments for the strategies are of specific interest.  Also, please ensure appropriate personnel are available to support the team at the site
    information-gathering trip).
during the inspection.  These personnel should be knowledgeable of the plant systems required
50. List of identified fire induced circuit failure configurations (for the selected fire areas) that
to achieve and maintain safe shutdown conditions from inside and outside the control room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire protection systems, and the fire protection program and its implementation and the B.5.b program
    could prevent operation or cause maloperation of equipment credited for safe shutdown in
implementation should be available to support the team at the site during the inspection. 
    the event of a fire. Include failure configurations associated with hot shorts, open circuits, or
 
    shorts to ground identified as potentially causing spurious or multiple spurious actuations or
    maloperations of this equipment.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the O
51. Cable routing information for components and equipment credited for safe shutdown in the
ffice of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
    selected fire areas. This information request item will be discussed and finalized with your
respond to, a request for information or an information collection requirement unless the
    staff during the information gathering visit.
requesting document displays a currently valid Office of Management and Budget control
52. Drawings showing the location details for detection and suppression systems in the selected
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
    fire areas.
 
                                                  -5-
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
 
R. Flores - 3 -      Your cooperation and support during this inspection will be appreciated.  If you have questions
concerning this inspection or the inspection team's information or logistical needs, please
contact Eduardo D. Uribe, the team lead inspector, in the Region IV office at (817) 200-1534, or
 
by email, Eduardo.Uribe@nrc.gov.  Sincerely, 
/RA/ 
Geoffrey B. Miller, Chief Engineering Branch 2
 
Division of Reactor Safety
 
Docket:  50-445/50-446
License No.:  NPF-87/NPF-89
Enclosure:  Triennial Fire Protection Inspection Documentation Request
cc w/enclosure:  Electronic Distribution for the Comanche Peak Nuclear Power Plant
 
Electronic Distribution to the Comanche Peak Nuclear Power Plant
 
 
 
R. Flores - 4 -      Electronic distribution by RIV:
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
 
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Tom.Blount@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant - Vacant
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Daniel.Rich@nrc.gov)
 
 
SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials EDU Publicly Avail  Yes  No Sensitive  Yes No Sens. Type Initials EDU RIV: DRS/EB2/RI
  C:DRP/A C: EB2 EDUribe  WCWalker GBMiller /RA/  /RA/ /RA/ 10/8/13  10/8/13
10/8/13 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
R:\_REACTORS\_CPSES\2013\CP 2014008 TFP RFI-EDU.docx ML     
- 1 - Enclosure ENCLOSURE  Triennial Fire Protection Inspection Documentation Request
Please provide the following documentation (items 1 - 5) prior to the onsite information
 
gathering visit, preferably no later than December 20, 2013.  Whenever practical, please provide copies electronically.  Please provide an index of the requested documents which includes a brief description of what the documents are related to, and the numerical heading associated
with the request (i.e., where it can be found in the list of documents requested). 
 
1. The current version of your fire protection program and fire hazards analysis.
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response. 
3. Copies of the licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
4. The fire probabilistic risk assessment or portions of the plant's individual plant examination for external events (IPEEE) report addressing fire events.  Also, include the results of any post-IPEEE reviews, and listings of actions take
n/plant modifications conducted in response to probabilistic risk assessment updates.
5. A copy of the documents that support your multiple spurious operation evaluations (i.e., expert panel reports, evaluation packages, etc.). 
Please provide the following documentation (items 6- 48) prior to the week of January 13, 2014, to support inspection preparation.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible. 
 
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; (c) the locations of fire protection equipment, such as detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.  The
specific documents needed to support inspection preparation will be discussed during the
site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.). 
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.
 
 
  - 2 -  10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the event of a fire (safe shutdown equipment list). 
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide
one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for reactor coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.
12. A listing, with descriptions, of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed since the last triennial fire protection inspection. 
13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations) performed since the last triennial fire protection inspection.
14. A listing of open and closed corrective action documents initiated since the last triennial fire protection inspection, which relate to the fire protection program or equipment, including corrective actions for fire-induced circuit failures, both single and multiple spurious
actuations (for the selected fire areas).  Include Corrective Action Process document
number, date, and subject.
15. A listing of the applicable codes and standards (with the versions/dates) related to the design of plant fire protection features and evaluations of any code deviations.  Copies of
these codes should be available for review.
16. Drawings of the portions of the emergency lighting system which support fire response. 
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations which support the design basis.
18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
 
20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.  Also, include a list of maintenance and surveillance testing procedures which verify fuse and breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
21. Results of the last performance and trending of the fire pump flow tests and yard loop flow test.  22. Maintenance rule performance criterion and a summary of the performance history for systems or functions monitored within the maintenance rule program that support the fire
protection program or involve safe shutdown equipment, over the period since the last triennial fire protection inspection. 
  - 3 -  23. A copy of fire protection program requirements (e.g., limiting conditions for operation, surveillance test requirements) covered by technical specifications, technical requirements manual, updated final safety analysis report, or similar documents.
24. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program
completed since the last triennial fire protection inspection.
25. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should
group actions by the initiating fire area or zone and indicate where the action must take
place.  26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe
shutdown systems (RCS makeup, RCS pressure
control, decay heat removal, and reactivity control, including the essential support systems).
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.  These should depict how power gets from the switchyard to the engineered safety feature
loads (480V and 4160V). 
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected. 
29. A list of repairs (and the procedures that control the actions) needed to:  a) reach and/or maintain hot shutdown, and b) reach and/or maintain cold shutdown.
30. A list of high to low pressure interface valves.
31. A copy of procedures governing the training and operation of the fire brigade.
 
32. Organization charts of site personnel down to the level of fire protection staff personnel.
 
33. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of February 10, 2014.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning drills.
35. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of January 27, 2014. 
 
  - 4 -  The team would like to perform a walkthrough of a sample of manual actions required for other fires not requiring control room evacuation.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning the walkthrough.
The following documents (items 36 - 48) involve B.5.b mitigating strategies.
 
36. A copy of the license condition that incorporated the requirements issued to address the requirements of Section B.5.b of the NRC Order EA-02-026, "Order for the NRC Interim Safeguards and Security Compensatory Measures," dated February 25, 2002, and 10 CFR
 
50.54(hh)(2).
37. A list of all modifications to regulatory
commitments made to meet the requirements of Section B.5.b of the NRC Order EA-02-026, "Order for the NRC Interim Safeguards and Security Compensatory Measures," dated February 25, 2002; the subsequently imposed
license conditions; and 10 CFR 50.54(hh)(2).
38. A list of procedures/guidelines which were revised or generated to implement the mitigation strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.
40. A list of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.
41. Copies of piping and instrumentation diagr
ams (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies.  These could be the type used for training.
42. A list of modification packages and simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.
43. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.
44. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals to the NRC and the safety evaluation report.
45. A copy of site general arrangement drawing(s) that show the majority of buildings/areas
referenced in B.5.b documents.
46. Training records/ training matrix/ lesson plans related to B.5.b.
 
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.
 
  - 5 -  48. The team would like to perform a walkthrough of the procedure implementing a sample mitigating strategies and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies during the week of February 10, 2014.
Please put us in contact with the appropriate personnel for planning the walkthrough during  
the onsite information gathering trip.  
The following documentation needs (items 49 - 52) will be dependent upon sample selections, and will be finalized during discussions with your staff. Please provide the required documents prior to the week of January 17, 2014. Whenever practical, please provide copies electronically.
Drawings should be provided as paper copies of sufficient size such that all details are legible.
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the  
information-gathering trip).
50. List of identified fire induced circuit failure configurations (for the selected fire areas) that could prevent operation or cause maloperation of equipment credited for safe shutdown in the event of a fire. Include failure configurations associated with hot shorts, open circuits, or shorts to ground identified as potentially causing spurious or multiple spurious actuations or  
maloperations of this equipment.  
51. Cable routing information for components and equipment credited for safe shutdown in the selected fire areas. This information request item will be discussed and finalized with your staff during the information gathering visit.  
52. Drawings showing the location details for detection and suppression systems in the selected fire areas.
}}
}}

Latest revision as of 13:46, 4 November 2019

Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information
ML13282A500
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/09/2013
From: Geoffrey Miller
NRC/RGN-IV/DRS/EB-2
To: Flores R
Luminant Generation Co
References
Download: ML13282A500 (9)


See also: IR 05000445/2014008

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

October 9, 2013

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE

INSPECTION (NRC INSPECTION REPORT 05000445/2014008 and

05000446/2014008) AND REQUEST FOR INFORMATION

Dear Mr. Flores:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the Comanche Peak

Nuclear Power Plant in January and February of 2014. The inspection team will be comprised

of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in

accordance with Inspection Procedure 71111.05T, "Fire Protection (Triennial)," the NRCs

baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit: January 8 - 9, 2014

Onsite inspection: January 27 - 31, 2014

February 10 - 14, 2014

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies

to address Section B.5.b of the NRC Order EA-02-026, Order for Interim Safeguards and

Security Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

R. Flores -2-

Three individuals will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

selection will require a walkdown of candidate fire areas in company with key personnel from

your staff. The enclosure to this letter provides an initial list of the documents the team will need

for their review. We request that your staff transmit copies of the documents listed in the

enclosure to the NRC Region IV office for team use in preparation for the inspection. Please

send this information so that it will arrive in the NRC Region IV office in Arlington, Texas, by the

dates listed in the enclosure.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access; and the

availability of knowledgeable plant engineering and licensing organization personnel to serve as

points of contact during the inspection.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents that establish that your fire protection program satisfies the NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For

the B.5.b portion of the inspection, those documents implementing your mitigating strategies

and demonstrating the management of your commitments for the strategies are of specific

interest. Also, please ensure appropriate personnel are available to support the team at the site

during the inspection. These personnel should be knowledgeable of the plant systems required

to achieve and maintain safe shutdown conditions from inside and outside the control room, the

electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire protection

systems, and the fire protection program and its implementation and the B.5.b program

implementation should be available to support the team at the site during the inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

R. Flores -3-

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact Eduardo D. Uribe, the team lead inspector, in the Region IV office at (817) 200-1534, or

by email, Eduardo.Uribe@nrc.gov.

Sincerely,

/RA/

Geoffrey B. Miller, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-445/50-446

License No.: NPF-87/NPF-89

Enclosure: Triennial Fire Protection Inspection Documentation Request

cc w/enclosure: Electronic Distribution for the Comanche Peak Nuclear Power Plant

Electronic Distribution to the Comanche Peak Nuclear Power Plant

R. Flores -4-

Electronic distribution by RIV:

Acting Regional Administrator (Steven.Reynolds@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant - Vacant

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Jason.Dykert@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Daniel.Rich@nrc.gov)

R:\_REACTORS\_CPSES\2013\CP 2014008 TFP RFI-EDU.docx ML

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials EDU

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials EDU

RIV: DRS/EB2/RI C:DRP/A C: EB2

EDUribe WCWalker GBMiller

/RA/ /RA/ /RA/

10/8/13 10/8/13 10/8/13

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Request

Please provide the following documentation (items 1 - 5) prior to the onsite information

gathering visit, preferably no later than December 20, 2013. Whenever practical, please provide

copies electronically. Please provide an index of the requested documents which includes a

brief description of what the documents are related to, and the numerical heading associated

with the request (i.e., where it can be found in the list of documents requested).

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (safety evaluation reports,

pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from

the NRC regarding fire protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plants individual plant examination

for external events (IPEEE) report addressing fire events. Also, include the results of any

post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response

to probabilistic risk assessment updates.

5. A copy of the documents that support your multiple spurious operation evaluations (i.e.,

expert panel reports, evaluation packages, etc.).

Please provide the following documentation (items 6- 48) prior to the week of January 13, 2014,

to support inspection preparation. Whenever practical, please provide copies electronically.

Drawings should be provided as paper copies of sufficient size such that all details are legible.

6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire

zone delineation; (c) the locations of fire protection equipment, such as detection,

suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The

specific documents needed to support inspection preparation will be discussed during the

site visit.

7. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions

from the control room in the event of a fire outside the control room (III.G.2 areas).

9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability

with or without control room evacuation.

-1- Enclosure

10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the

event of a fire (safe shutdown equipment list).

11. Piping and instrumentation (flow) diagrams showing the components used to achieve and

maintain hot standby and cold shutdown for normal and alternate shutdown. Please provide

one copy of the piping and instrumentation (flow) diagrams for these systems of a size

sufficient to read all details. These should include the systems used for reactor coolant

system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control,

including the essential support systems.

12. A listing, with descriptions, of design change packages which were determined to impact fire

protection and post-fire safe shutdowns, performed since the last triennial fire protection

inspection.

13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations)

performed since the last triennial fire protection inspection.

14. A listing of open and closed corrective action documents initiated since the last triennial fire

protection inspection, which relate to the fire protection program or equipment, including

corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations (for the selected fire areas). Include Corrective Action Process document

number, date, and subject.

15. A listing of the applicable codes and standards (with the versions/dates) related to the

design of plant fire protection features and evaluations of any code deviations. Copies of

these codes should be available for review.

16. Drawings of the portions of the emergency lighting system which support fire response.

17. Procedures used to remove smoke from safety-related areas and the engineering studies or

calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and plant

operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems. Also, include a list

of maintenance and surveillance testing procedures which verify fuse and breaker

coordination in accordance with the post-fire safe shutdown coordination analysis.

21. Results of the last performance and trending of the fire pump flow tests and yard loop flow

test.

22. Maintenance rule performance criterion and a summary of the performance history for

systems or functions monitored within the maintenance rule program that support the fire

protection program or involve safe shutdown equipment, over the period since the last

triennial fire protection inspection.

-2-

23. A copy of fire protection program requirements (e.g., limiting conditions for operation,

surveillance test requirements) covered by technical specifications, technical requirements

manual, updated final safety analysis report, or similar documents.

24. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since the last triennial fire protection inspection.

25. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and reactivity

control, including the essential support systems).

27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.

These should depict how power gets from the switchyard to the engineered safety feature

loads (480V and 4160V).

28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

29. A list of repairs (and the procedures that control the actions) needed to: a) reach and/or

maintain hot shutdown, and b) reach and/or maintain cold shutdown.

30. A list of high to low pressure interface valves.

31. A copy of procedures governing the training and operation of the fire brigade.

32. Organization charts of site personnel down to the level of fire protection staff personnel.

33. A contact list of key site personnel who will be supporting this inspection, giving location of

their office and phone number onsite.

34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of February 10, 2014. Please put us in contact, during the onsite

information gathering trip, with the appropriate personnel for planning drills.

35. The team would like to perform a walkthrough of the procedure for control room evacuation

due to fire with qualified operators in the plant during the week of January 27, 2014.

-3-

The team would like to perform a walkthrough of a sample of manual actions required for

other fires not requiring control room evacuation. Please put us in contact, during the onsite

information gathering trip, with the appropriate personnel for planning the walkthrough.

The following documents (items 36 - 48) involve B.5.b mitigating strategies.

36. A copy of the license condition that incorporated the requirements issued to address the

requirements of Section B.5.b of the NRC Order EA-02-026, Order for the NRC Interim

Safeguards and Security Compensatory Measures, dated February 25, 2002, and 10 CFR

50.54(hh)(2).

37. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the NRC Order EA-02-026, Order for the NRC Interim Safeguards and

Security Compensatory Measures, dated February 25, 2002; the subsequently imposed

license conditions; and 10 CFR 50.54(hh)(2).

38. A list of procedures/guidelines which were revised or generated to implement the mitigation

strategies. These could be extensive damage mitigation guidelines (EDMGs), severe

accident management guidelines (SAMGs), emergency operating procedures (EOPs),

abnormal operating procedures (AOPs), etc.

39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear

Energy Institute 06-12 and the site-specific procedures or guidelines that are used to

implement each strategy.

40. A list of engineering evaluations/calculations that were used to verify engineering bases for

the mitigation strategies.

41. Copies of piping and instrumentation diagrams (P&ID) or simplified flow diagrams for

systems relied upon in the mitigation strategies. These could be the type used for training.

42. A list of modification packages and simplified drawings/descriptions of modifications that

were made to plant systems to implement the mitigation strategies.

43. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to

be used to implement the mitigation strategies.

44. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals to the NRC and the safety evaluation report.

45. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

46. Training records/ training matrix/ lesson plans related to B.5.b.

47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required

to implement any mitigating strategies.

-4-

48. The team would like to perform a walkthrough of the procedure implementing a sample

mitigating strategies and the inventory equipment (hoses, fittings, pumps, etc.) required to

be used to implement the mitigation strategies during the week of February 10, 2014.

Please put us in contact with the appropriate personnel for planning the walkthrough during

the onsite information gathering trip.

The following documentation needs (items 49 - 52) will be dependent upon sample selections,

and will be finalized during discussions with your staff. Please provide the required documents

prior to the week of January 17, 2014. Whenever practical, please provide copies electronically.

Drawings should be provided as paper copies of sufficient size such that all details are legible.

49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

50. List of identified fire induced circuit failure configurations (for the selected fire areas) that

could prevent operation or cause maloperation of equipment credited for safe shutdown in

the event of a fire. Include failure configurations associated with hot shorts, open circuits, or

shorts to ground identified as potentially causing spurious or multiple spurious actuations or

maloperations of this equipment.

51. Cable routing information for components and equipment credited for safe shutdown in the

selected fire areas. This information request item will be discussed and finalized with your

staff during the information gathering visit.

52. Drawings showing the location details for detection and suppression systems in the selected

fire areas.

-5-