| title = Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376)
| title = Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376)
| author name = Hughey J D
| author name = Hughey J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Bauer E R, Duke P R
| addressee name = Bauer E, Duke P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| docket = 05000272, 05000311
| license number =  
| license number =  
| contact person = Hughey J D
| contact person = Hughey J
| case reference number = TAC MF1375, TAC MF1376
| case reference number = TAC MF1375, TAC MF1376
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
| page count = 2
| page count = 2
| project = TAC:MF1375, TAC:MF1376
| project = TAC:MF1375, TAC:MF1376
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:From:Hughey, JohnTo:"Duke, Paul R."; Bauer, Emily R.Subject:Request For Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Waterpiping (TAC MF1375 & 1376)Date:Tuesday, October 29, 2013 8:38:00 AMPaul, By letter dated April 3, 2013 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML13093A382), as supplemented by letter dated August 15,2013 (ADAMS Accession No. ML13227A338), PSEG Nuclear, LLC (the licensee),submitted Relief Request SC-14R-133 for the repair of buried portion of the nuclearservice water supply and discharge headers at the Salem Generating Station, Units 1 and2. To complete its review, the NRC staff requests the following additional information forclarification with regard to the licensee's submittal dated August 15, 2013.
{{#Wiki_filter:From:           Hughey, John To:             "Duke, Paul R."; Bauer, Emily R.
RAI 31:
In the licensee's August 15, 2013, letter, in response to NRC Request for AdditionalInformation (RAI) number 7(c), the licensee stated that "...The WEKO seal can be used asa repair for remaining bell thickness of less than 0.042 inch in localized areas, includingcompletely corroded (i.e. , thickness of 0 inch), provided that the harness assemblies areintact..."


(a) Discuss how a localized area with a thickness of 0 inch can be repaired using theWEKO seal. Describe how the through wall hole can be backfilled to prevent groundwateringression into the pipe or service water leaking from the pipe and whether the exteriorcoating will be applied at the defect area.
==Subject:==
(b) Discuss the maximum allowable defect area having zero thickness that can berepaired using the WEKO seal and that would not affect the structural integrity of the bell-spigot joint. Provide structural analysis that supports the maximum allowable defect areaof zero thickness.  
Request For Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water piping (TAC MF1375 & 1376)
(c) Provide a sketch or drawing showing the potential location(s) of such defect area on thebell-spigot joint.
Date:            Tuesday, October 29, 2013 8:38:00 AM
RAI 32:
: Paul, By letter dated April 3, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13093A382), as supplemented by letter dated August 15, 2013 (ADAMS Accession No. ML13227A338), PSEG Nuclear, LLC (the licensee),
Relief Request SC-14R-133 was submitted the pursuant to 10 CFR 50.55a(a)(3)(i). TheNRC staff has determined that consideration of the relief request under the requirementsof 10 CFR 50.55a(a)(3)(i) may not be appropriate. Please advise if PSEG requests thatthe NRC consider the request pursuant to 10CFR50.55a(a)(3)(ii) based on hardship orunusual difficulty justification.
submitted Relief Request SC-14R-133 for the repair of buried portion of the nuclear service water supply and discharge headers at the Salem Generating Station, Units 1 and
: 2. To complete its review, the NRC staff requests the following additional information for clarification with regard to the licensees submittal dated August 15, 2013.
 
===RAI 31===
In the licensees August 15, 2013, letter, in response to NRC Request for Additional Information (RAI) number 7(c), the licensee stated that "...The WEKO seal can be used as a repair for remaining bell thickness of less than 0.042 inch in localized areas, including completely corroded (i.e. , thickness of 0 inch), provided that the harness assemblies are intact..."
(a) Discuss how a localized area with a thickness of 0 inch can be repaired using the WEKO seal. Describe how the through wall hole can be backfilled to prevent groundwater ingression into the pipe or service water leaking from the pipe and whether the exterior coating will be applied at the defect area.
(b) Discuss the maximum allowable defect area having zero thickness that can be repaired using the WEKO seal and that would not affect the structural integrity of the bell-spigot joint. Provide structural analysis that supports the maximum allowable defect area of zero thickness.
(c) Provide a sketch or drawing showing the potential location(s) of such defect area on the bell-spigot joint.
 
===RAI 32===
Relief Request SC-14R-133 was submitted the pursuant to 10 CFR 50.55a(a)(3)(i). The NRC staff has determined that consideration of the relief request under the requirements of 10 CFR 50.55a(a)(3)(i) may not be appropriate. Please advise if PSEG requests that the NRC consider the request pursuant to 10CFR50.55a(a)(3)(ii) based on hardship or unusual difficulty justification.
Please contact me with PSEG staff availability for a teleconference regarding these RAIs.
Please contact me with PSEG staff availability for a teleconference regarding these RAIs.
Thank you,John John Hughey Salem / Hope Creek / TMI Project ManagerNRR / Division of Operating Reactor LicensingPhone: 301-415-3204e-mail: John.Hughey@nrc.gov
Thank you, John John Hughey
}}
 
Salem / Hope Creek / TMI Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov}}

Latest revision as of 11:54, 4 November 2019

Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376)
ML13304B936
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/29/2013
From: John Hughey
Plant Licensing Branch 1
To: Bauer E, Duke P
Public Service Enterprise Group
Hughey J
References
TAC MF1375, TAC MF1376
Download: ML13304B936 (2)


Text

From: Hughey, John To: "Duke, Paul R."; Bauer, Emily R.

Subject:

Request For Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water piping (TAC MF1375 & 1376)

Date: Tuesday, October 29, 2013 8:38:00 AM

Paul, By letter dated April 3, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13093A382), as supplemented by letter dated August 15, 2013 (ADAMS Accession No. ML13227A338), PSEG Nuclear, LLC (the licensee),

submitted Relief Request SC-14R-133 for the repair of buried portion of the nuclear service water supply and discharge headers at the Salem Generating Station, Units 1 and

2. To complete its review, the NRC staff requests the following additional information for clarification with regard to the licensees submittal dated August 15, 2013.

RAI 31

In the licensees August 15, 2013, letter, in response to NRC Request for Additional Information (RAI) number 7(c), the licensee stated that "...The WEKO seal can be used as a repair for remaining bell thickness of less than 0.042 inch in localized areas, including completely corroded (i.e. , thickness of 0 inch), provided that the harness assemblies are intact..."

(a) Discuss how a localized area with a thickness of 0 inch can be repaired using the WEKO seal. Describe how the through wall hole can be backfilled to prevent groundwater ingression into the pipe or service water leaking from the pipe and whether the exterior coating will be applied at the defect area.

(b) Discuss the maximum allowable defect area having zero thickness that can be repaired using the WEKO seal and that would not affect the structural integrity of the bell-spigot joint. Provide structural analysis that supports the maximum allowable defect area of zero thickness.

(c) Provide a sketch or drawing showing the potential location(s) of such defect area on the bell-spigot joint.

RAI 32

Relief Request SC-14R-133 was submitted the pursuant to 10 CFR 50.55a(a)(3)(i). The NRC staff has determined that consideration of the relief request under the requirements of 10 CFR 50.55a(a)(3)(i) may not be appropriate. Please advise if PSEG requests that the NRC consider the request pursuant to 10CFR50.55a(a)(3)(ii) based on hardship or unusual difficulty justification.

Please contact me with PSEG staff availability for a teleconference regarding these RAIs.

Thank you, John John Hughey

Salem / Hope Creek / TMI Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov