ML14318A510: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:RO APPL. TO REV: 14-2 NRC RO C001 JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED:
{{#Wiki_filter:ENT~RGY  NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO         14-2 NRC RO     TASK TITLE:       Perform RHR Lineup Verification Per ST -2AN C001 APPL . TO    JPM NUMBER REV :            DATE:                    NRC KJA SYSTEM NUMBER:         _.2:......1_.:.....31--'(._4_
NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Perform RHR Lineup Verification Per ST -2AN NRC KJ A SYSTEM NUMBER: _.2:......1_. :.....31--'(._4_. 6i.-) JAF QUAL STANDARD NUMBER: 15 Minutes ---CANDIDATE NAME: LOGIN ID: JPM Completion Perform Location: Simulator DATE PERFORMED:  
                                                                                                      .6i.-)- - - - -
")ERFORMANCE EVALUATION
JAF TASK NUMBER:                              JAF QUAL STANDARD NUMBER:
: TIME TO COMPLETE: Minutes ---D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ESTIMATED COMPLETION TIME :
                            -  Minutes SUBMITTED:
APPROVED:
CANDIDATE NAME:                                                 LOGIN ID:
JPM Completion   Perform Location :       Simulator DATE PERFORMED:                   TIME TO COMPLETE :                 Minutes
                                                            ---
")ERFORMANCE EVALUATION :      D   Satisfactory         D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER  
SIGNATURE/PRINTED CANDIDATE REVIEW:
-1 of 8-RO APPL. TO Current Update: Outstanding Items 14-2 NRC RO C001 JPM NUMBER Date D Technical Review D Questions and Answers ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Perform RHR Lineup Verification Per ST-2AN By:. lnt D Additional Information D Validation D Procedural Change Required Comments: C8] None Current Update By: Date lnt Previous Revision Date: -2 of 8-RO APPL. TO 14-2 NRC RO C001 JPM NUMBER ENTERGY NU LEAR NORTHEAST JOB PERFO MANCE MEASURE TASK Tl iT LE: Perform RHR Lineup Verification Per ST-2AN I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-2AN , RHR Loop A Monthly Oper a bility Test Ill. TOOLS AND EQUIPMENT
SIGNATURE REVIEWED BY:                                       DOC. COMPLETE:
* None IV. SET UP REQUIREMENTS A. Provide a copy of ST-2AN complete up to step 8.1. B. Reset the simulator to an IC (IC-66) ith RHR in a normal standby lineup , except for the following: a. 10MOV-16A , MIN FLOWVLV , is closed. b. 1 OMOV-66A , HX A BYP VLV , i s losed. c. 10MOV-57 , RHR DISCH TO RA W , is open. d. 10MOV-18 , SHUTDOWN CLG S CT , is open. V. EVALUATOR NOTES A. The candidate should , at a minimum observe the change in equipment status light indication when equipment is operated.
PROGRAM ADMINISTER
B. If simulating this task , then inform th candidate tha t the conditions of each step need only be properly identified and not actually p rformed. C. The candidate should demonstrate p oper use of HU tools such as procedure use , self checking , placekeeping and three-p o int communication. D. Should Candidate inform CRS that ST cannot be continued due to the out of position valve or out of spec readings , etc ... , inform Candidate the deviation has been noted and for them to continue with the ST. VI. TASK CONDITIONS A. ST-2AN , RHR Loop A Monthly Oper bility Test , i s in progress. B. Other operators have prepared ST -2 N up to Section 8.1. C. RHR Loop A level switches are oper r ble. D. RHR Loop A is in the standby LPCI I neup. VII. INITIATING CUE t form the candidate , " Complete ST-2AN Sections e.1 and 8.2." -3 of 8-RO 14-2 NRC RO C001 TASK TITLE: Perform RHR Lineup Verific tion C -CRITICAL STEP -EVALUATION I STEP STANDARD COMMENT 1. IF 10LS-100 (RHR loop A Co tacts Operator in Relay Room to SAT/UNSAT containment spray line level switch) ver fy lights for 10LS-100 and 10LS-and 10LS-101 (RHR loop' A LPCI 10 are OFF on alarm module 10-keep-full level switch) are operable , 74 1-44 inside panel AR-8 THEN perform the following:
                                          -1 of 8-
EV ALUTOR ROLE PLAY: Verify RHR Loop A keep-full level ln d rm the Candidate that the lights switch alarms are clear by one of the for 10LS-100 and 10LS-101 are following methods: OPF.
 
* Verify lights for 1 OLS-1 00 and -OR-10LS-101 are off on alarm module 1 0-7 4-1-44 inside panel AR-8 in relay room Uti izes any EPIC station and verifies poi p ts EPIC-D-129 and EPIC-D-130
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO             14-2 NRC RO     TASK TITLE:     Perform RHR Lineup Verification Per ST-2AN C001 APPL. TO          JPM NUMBER Current Update:                        By:.
* Verify associated EPIC points ind i cate NORMAL (EPIC-D-129 and EPIC-D-130) indicate NORMAL , 2. Mark Steps 8.1.2 through 8.1.1 0 N/A M rks Steps 8.1.2 through 8.1.1 0 SAT/UNSAT N/ *3. IF RHR Loop A is in standby LPCI Ve ifies the following lineup at panel CRITICAL STEP lineup per OP-13, Section E, THEN 09 3 and documents in ST-2AN: (bolded items only) perform the following:
Date                            lnt Outstanding Items D Technical Review                                D  Additional Information D Questions and Answers                          D    Validation D Procedural Change Required                     C8] None Comments:
SAT I UNSAT Verify the following lineup at panel 09-3:
Current Update                                 By:
Date                                     lnt Previous Revision Date:
                                            -2 of 8-
 
ENTERGY NU LEAR NORTHEAST JOB PERFO MANCE MEASURE RO              14-2 NRC RO              TASK TliTLE:   Perform RHR Lineup Verification Per ST-2AN C001 APPL. TO          JPM NUMBER I.     SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-2AN, RHR Loop A Monthly Operability Test Ill. TOOLS AND EQUIPMENT
* None IV. SET UP REQUIREMENTS A. Provide a copy of ST-2AN complete up to step 8.1.
B. Reset the simulator to an IC (IC-66) ith RHR in a normal standby lineup, except for the following :
: a. 10MOV-16A, MIN FLOWVLV, is closed .
: b. 1OMOV-66A, HX A BYP VLV, is losed.
: c. 10MOV-57, RHR DISCH TO RA W , is open.
: d. 10MOV-18, SHUTDOWN CLG S CT, is open.
V.     EVALUATOR NOTES A. The candidate should, at a minimum observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform th candidate that the conditions of each step need only be properly identified and not actually p rformed .
C. The candidate should demonstrate p oper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .
D. Should Candidate inform CRS that ST cannot be continued due to the out of position valve or out of spec readings, etc .. . , inform Candidate the deviation has been noted and for them to continue with the ST.
VI. TASK CONDITIONS A. ST-2AN, RHR Loop A Monthly Oper bility Test, is in progress.
B. Other operators have prepared ST-2 N up to Section 8.1.
C. RHR Loop A level switches are operr ble.
D. RHR Loop A is in the standby LPCI I neup.
VII . INITIATING CUE t form the candidate, "Complete ST-2AN Sections e. 1 and 8.2. "
                                                        -3 of 8-
 
RO             14-2 NRC RO C001 TASK TITLE:             Perform RHR Lineup Verific tion
-
C   -CRITICAL STEP STEP                              STANDARD EVALUATION I COMMENT
: 1. IF 10LS-100 (RHR loop A               Co tacts Operator in Relay Room to       SAT/UNSAT containment spray line level switch) ver fy lights for 10LS-100 and 10LS-and 10LS-101 (RHR loop' A LPCI       10 are OFF on alarm module 10-keep-full level switch) are operable, 74 1-44 inside panel AR-8 THEN perform the following:
EV ALUTOR ROLE PLAY:
                                                    ~
Verify RHR Loop A keep-full level     lnd rm the Candidate that the lights switch alarms are clear by one of the for 10LS-100 and 10LS-101 are following methods:                   OPF.
* Verify lights for 1OLS-1 00 and -OR-10LS-101 are off on alarm module 10-7 4-1-44 inside panel AR-8 in relay room               Uti izes any EPIC station and verifies poi pts EPIC-D-129 and EPIC-D-130
* Verify associated EPIC points   indicate NORMAL (EPIC-D-129 and EPIC-D-130) indicate NORMAL
  ,   2. Mark Steps 8.1 .2 through 8.1.10 N/A M rks Steps 8.1 .2 through 8.1.1 0       SAT/UNSAT N/
    *3. IF RHR Loop A is in standby LPCI     Ve ifies the following lineup at panel CRITICAL STEP lineup per OP-13, Section E, THEN     09 3 and documents in ST-2AN:         (bolded items only) perform the following:                                                         SAT I UNSAT Verify the following lineup at panel 09-3:
* MAN INJ VLV 10RHR-81A-
* MAN INJ VLV 10RHR-81A-
* MAN INJ VLV 10RHR-81A-Open Open
* MAN INJ VLV 10RHR-81A-Open Open
* RHR HX A DISCH TO TORUS
* RHR HX A DISCH TO TORUS
* RHR HX A DISCH TO TORUS OR RCIC 10AOV-71A-Closed OR RCIC 10AOV-71A-Closed
* RHR HX A DISCH TO TORUS OR RCIC 10AOV-71A- Closed OR RCIC 10AOV-71A- Closed
* VLV CNTRL 10AOV-71A 10A-* VLV CNTRL 10AOV-71A 10A-S41A-CLOSE S41A-CLOSE
* VLV CNTRL 10AOV-71A 10A-
* LPCI OUTBD INJ VLV 10MOV-* LPCI OUTBD INJ VLV 10MOV-27A-Open 27A-Open -4 of 8-RO 14-2 NRC RO C001 TASK TITLE: Perform RHR Lineup STEP 3. Verify the following lineup at panel (cont.) 09-3 (cont.):
* VLV CNTRL 10AOV-71A 10A-               S41A- CLOSE S41A- CLOSE
* LPCIINBO INJ VLV 10MOV-25A -Closed
* LPCI OUTBD INJ VLV 10MOV-
* MIN FLOWVLV Open
* LPCI OUTBD INJ VLV 10MOV-27A- Open 27A- Open
* OW SPRAY OUTBO VLV 1 OMOV-26A-Closed
                                                    -4 of 8-
* OW SPRAY INBO VLV 10MOV-31A-Closed
 
* HX A INLET VLV Open
RO             14-2 NRC RO C001 TASK TITLE:             Perform RHR Lineup Verific~tion EVALUATION I STEP J          STANDARD COMMENT
* HX A OUTLET VLV 10MOV-12A -Open
: 3. Verify the following lineup at panel ve~ifies the following lineup at panel CRITICAL STEP (cont.) 09-3 (cont.):                         09 Ia and documents in ST-2AN          (bolded items only)
* HX A BYP VLV Open
(co t.):                                SAT I UNSAT I
* RHR TEST TORUS CLG & SPRAY 1 OMOV-39A-Closed
* LPCIINBO INJ VLV 10MOV-25A
* TORUS SPRAY INBO VLV 1 OMOV-38A -Closed J STANDARD the following lineup at panel 09 I a and documents in ST -2AN (co t.): I
            -Closed
* LPCIINBO INJ VLV 10MOV-25A -Closed * *MIN FLOW VLV Closed NOTE: The bolded ite rp s in this step are improperly Should the Candidate inf o rm the CRS that the ST cannot be l bontinued due to the improperly item, inform the Candidate deviation has been noted, co n tinue with the ST , and the de y iation will be corrected by an o ther Operator later.
* LPCIINBO INJ VLV 10MOV-25A
* OW SPRAY OUTBO VLV 1 OMOV-26A-Closed
                                                      -Closed
* OW SPRAY INBO VLV 10MOV-31A-Closed
* MIN FLOWVLV 10MOV-16A-Open                             *       *MIN FLOW VLV 10MOV-16A-Closed EV~LUATOR NOTE: The bolded iterps in this step are improperly ali ~ ned. Should the Candidate inform the CRS that the ST cannot be lbontinued due to the improperly ali~ ned item, inform the Candidate th~ deviation has been noted, continue with the ST, and the deyiation will be corrected by another Operator later.
* HX A INLET VLV Open
* OW SPRAY OUTBO VLV
* HX A OUTLET VLV 10MOV-12A -Open * *HX A BYP VLV Closed
* OW SPRAY OUTBO VLV 1OMOV-26A- Closed 1OMOV-26A- Closed
* RHR TEST TORUS CLG & SPRAY 1 OMOV-39A-Closed
* OW SPRAY INBO VLV 10MOV-
* TORUS SPRAY INBO VLV 1 1 1 OMOV-38A-Closed !I -5 of 8-EVALUATION I COMMENT CRITICAL STEP (bolded items only) SAT I UNSAT RO 14-2 NRC RO C001 TASK TITLE p rf e orm RHRL" me up v "fi f en II EVALUATION I f STEP I STANDARD COMMENT 3. Verify the following lineup at panel Ve ifies the following lineup at panel CRITICAL STEP (cont.) 09-3 (cont.): 09 J 3 and documents in ST-2AN (bolded items only) (co t.): SAT I UNSAT
* OW SPRAY INBO VLV 10MOV-31A- Closed 31A- Closed
* RHR TEST & TORUS CLG 1 OMOV-34A-Closed
* HX A INLET VLV 10MOV-65A-Open
* RHR TEST & TORUS CLG 1 OMOV-34A-Closed
* HX A INLET VLV 10MOV-65A-Open
* RHRSW TO RHR 10MOV-148A -Closed
* HX A OUTLET VLV 10MOV-12A
* RHRSW TO RHR 10MOV-148A -Closed
            -Open
* TORUS SUCT VLV 10MOV-13A -Open
* HX A OUTLET VLV 10MOV-12A
* TORUS SUCT VLV 10MOV-13A -Open
                                                      -Open
* SHUTDOWN CLG SUCT VLV 10MOV-15A-Closed
* HX A BYP VLV 10MOV-66A-Open
* SHUTDOWN CLG SUCT VLV 10MOV-15A-Closed
                                              *       *HX A BYP VLV 10MOV-66A-Closed
* TORUS SUCT VLV 10MOV-13C -Open
* RHR TEST TORUS CLG &
* TORUS SUCT VLV 10MOV-13C -Open
* RHR TEST TORUS CLG &
* SHUTDOWN CLG SUCT VLV 10MOV-15C-Close
SPRAY 1OMOV-39A- Closed SPRAY 1OMOV-39A- Closed
* SHUTDOWN CLG SUCT VLV 10MOV-15C-Close
* TORUS SPRAY INBO VLV
* RHRSW DISCH VLV FROM HX A 1 OMOV-89A-Closed
* TORUS SPRAY INBO VLV 1OMOV-38A - Closed 11 1OMOV-38A- Closed
* RHRSW DISCH VLV FROM HX A 1 OMOV-89A -Closed
                                                  !I
* HX A INBD VENT VLV 10MOV-166A -Closed
                                                    -5 of 8-
* HX A INBD VENT VLV 10MOV-166A-Closed
 
* HX A OUTBD VENT VLV 10MOV-167A-Closed
RO               14-2 NRC RO C001 TASK TITLE               p e rform RHRL"me up ven"fiIC~ fIIOn II EVALUATION I STEP                         I         STANDARD f                                                                                          COMMENT
* HX A OUTBD VENT VLV 10MOV-167A-Closed
: 3. Verify the following lineup at panel   Ve ifies the following lineup at panel CRITICAL STEP (cont. ) 09-3 (cont.):                         09J3 and documents in ST-2AN           (bolded items only)
* RHRSW TO RHR 10MOV-149A -Closed
(co t.):                                 SAT I UNSAT
* RHRSW TO RHR 10MOV-149A -Closed II
* RHR TEST & TORUS CLG 1OMOV-34A- Closed
* RHR DISCH TO RADW 1 OMOV-67 -Closed
* RHR TEST & TORUS CLG 1OMOV-34A- Closed
* RHR DISCH TO RADW 1 OMOV-67 -Closed
* RHRSW TO RHR 10MOV-148A
* SHUTDOWN CLG SUCT 10MOV-17-Closed
              -Closed
* SHUTDOWN CLG SUCT I, 10MOV-17-Closed II -6 of 8-RO 14-2 NRC RO C001 TASK TITLE Perform RHR Lineup Verification , STEP *4. Verify the following lineup at panel 09-4:
* RHRSW TO RHR 10MOV-148A
* RHR DISCH TO RADW 1 OMOV-57 -Closed
                                                            -Closed
* SHUTDOWN CLG SUCT 10MOV-18-Closed STANDARD Ve ifies the following lineup at panel 09 i 4 and documents in ST -2AN ( CO!l t. ): * *RHR DISCH TO RADW 10MOV-57-Open * *SHUTDOWN CLG SUCT 10MOV-18.:....
* TORUS SUCT VLV 10MOV-13A
Open I EV t LUATOR NOTE: The bolded ite I s above are improperly aligned. Sh uld the Candidate inform the that the ST cannot be co 1 tinued due to the improperly ali g ned item, inform the Candidate the l deviation has been noted, co n tinue with the ST, and the de y iation will be corrected by an q ther Operator later. EVALUATOR:
              -Open
the task at this point. EVALUATION I COMMENT CRITICAL STEP (balded items only) SAT/UNSAT Task Standard:
* TORUS SUCT VLV 10MOV-13A
RHR lineup verification performed Improper lineup of minimum flow valve, heat exchanger bypass valve, discharge valve to Radwaste, and sh u tdown cooling isolation valve identified.  
                                                            -Open
-7 of 8-HA DOUT
* SHUTDOWN CLG SUCT VLV 10MOV-15A- Closed
* SHUTDOWN CLG SUCT VLV 10MOV-15A- Closed
* TORUS SUCT VLV 10MOV-13C
              -Open
* TORUS SUCT VLV 10MOV-13C
                                                            -Open
* SHUTDOWN CLG SUCT VLV 10MOV-15C- Close
* SHUTDOWN CLG SUCT VLV 10MOV-15C- Close
* RHRSW DISCH VLV FROM HX A 1OMOV-89A- Closed
* RHRSW DISCH VLV FROM HX A 1OMOV-89A - Closed
* HX A INBD VENT VLV 10MOV-166A - Closed
* HX A INBD VENT VLV 10MOV-166A- Closed
* HX A OUTBD VENT VLV 10MOV-167A- Closed
* HX A OUTBD VENT VLV 10MOV-167A- Closed
* RHRSW TO RHR 10MOV-149A
                -Closed
* RHRSW TO RHR 10MOV-149A
                                                            -Closed II
* RHR DISCH TO RADW 1OMOV Closed
* RHR DISCH TO RADW 1OMOV Closed
* SHUTDOWN CLG SUCT 10MOV Closed
* SHUTDOWN CLG SUCT I, 10MOV Closed I
                                                        -6 of 8-
 
RO             14-2 NRC RO C001 TASK TITLE             Perform RHR Lineup Verification EVALUATION I STEP                                 STANDARD COMMENT
  *4. Verify the following lineup at panel   Ve ifies the following lineup at panel     CRITICAL STEP 09-4:                                  09i 4 and documents in ST-2AN               (balded items only)
(CO!lt. ):                                   SAT/UNSAT
* RHR DISCH TO RADW 1OMOV Closed                *     *RHR DISCH TO RADW 10MOV Open
* SHUTDOWN CLG SUCT 10MOV Closed                *     *SHUTDOWN CLG SUCT 10MOV-18.:.... Open I
EVt LUATOR NOTE: The bolded ite I s above are improperly aligned.
Sh uld the Candidate inform the C~S that the ST cannot be co1tinued due to the improperly aligned item, inform the Candidate thel deviation has been noted, continue with the ST, and the deyiation will be corrected by
,                                              anqther Operator later.
EVALUATOR:   Terr ~ inate the task at this point.
Task Standard: RHR lineup verification performed Improper lineup of minimum flow valve, heat exchanger bypass valve, discharge valve to Radwaste, and sh utdown cooling isolation valve identified.
                                                  -7 of 8-
 
HA DOUT
* ST-2AN, RHR Loop A Monthly Operability Test, is in progress.
* ST-2AN, RHR Loop A Monthly Operability Test, is in progress.
* Other operators have prepared ST -2AN up to Section 8.1.
* Other operators have prepared ST -2AN up to Section 8.1.
* RHR Loop A level swi ches are operable.
* RHR Loop A level swi ches are operable.
* RHR Loop A is in the tandby LPCI lineup. Complete ST -2AN Sections 8.1 a d 8.2. I 8 of 8-RO APPL. TO REV: NRC 14-2 RO C002 JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: ENTERGY NUC EAR NORTHEAST I JOB MEASURE TASK Re-activation of RO License NRC KIA SYSTEM NUMBER:
* RHR Loop A is in the tandby LPCI lineup.
____ _ JAF QUAL STANDARD NUMBER: 20 Minute I ---SUBMITTED: .--z:;-----z_, _ r-2-OPERATIONS REVIEW:
Complete ST-2AN Sections 8.1 a d 8.2.
_,. ( APPROVED: CANDIDATE NAME: JPM Complet i on Perform Classroom TE PERFORMED:
I 8 of 8-
Minutes PERFORMANCE EVALUATION
 
: D Satisfact ry D Unsatisfactory  
ENTERGY NUC EAR NORTHEAST I
--------------
JOB PERFOR ~ ANCE MEASURE RO           NRC 14-2 RO             TASK TIT~E:   Re-activation of RO License C002 APPL . TO        JPM NUMBER REV:                  DATE:                        NRC KIA SYSTEM NUMBER:         .....:2:..:..
---------------------------
                                                                                            . 1.:...:...4..:.._(l.::.3:..::..3~..-)_ _ _ __
-------------------------------------
JAF TASK NUMBER:                                      JAF QUAL STANDARD NUMBER:
------COMMENTS: (MANDATORY FOR UNSATISFACTO R Y PERFORMANCE)
ESTIMATED COMPLETION TIME :
                                    -  Minute I
                  -z:;- ~ ----z_, _                                           .~ff)/,L_;;
SUBMITTED:    .-
_,. r             OPERATIONS REVIEW:
                                                                            ~~                                                      (
APPROVED :
                        ~                          I CANDIDATE NAME:
JPM Completion      Perform Classroom TE PERFORMED:                                                             Minutes PERFORMANCE EVALUATION :               D   Satisfact ry       D   Unsatisfactory
----------------------------------------- -------------------------------------------
COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER I
SIGNATURE/PRINTED CANDIDATE REVIEW:
RO NRC 14-2 RO C002 APPL. TO JPM NUMBER JOB PERFOR ANCE MEASURE RECORD CHECKLIST TASK TIT E: Re-activation of RO License Current Update: By: Date Outstanding Items D Technical Review D Questions and Answers D Procedural Change Required Comments: Current Update: Date Previous Revision Date: By: -of 8-lnt D Additionallnformation D Validation 1Z1 None Int.
SIGNATURE REVIEWED BY:                                             DOC . COMPLETE :
RO APPL. TO NRC 14-2 RO C002 JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED T i SK INFORMATION TASK Tl E: Re-activation of RO License A. ODS0-30 , Maintenance of NRC Licenses STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. B. C. The candidate should, at a minimum, obse rv e the change in equipment status light indication when equipment is operated. If simulating this task, then inform the that the conditions of each step need only be properly identified and not actually perform d. The candidate should demonstrate proper se of HU tools such as procedure use, self checking, place keeping and three-point communicat on. VI. TASK CONDITIONS A. You are a Reactor Operator (RO) and your RO license became inactive on July 1 , 2014. B. You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4 , 2014. -3 of 8-  
PROGRAM ADMINISTER         I
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows: Yes-This IS required for license re-activation and it meets the standard.
 
No-This IS required for license re-activation, but it does NOT meet the standard.
JOB PERFOR ANCE MEASURE RECORD  ~NO    CHECKLIST RO             NRC 14-2 RO       TASK TIT E:     Re-activation of RO License C002 APPL. TO          JPM NUMBER Current Update:                           By:
N/R-This is NOT required for license re-activation." EVALUATOR:
Date                             lnt Outstanding Items D     Technical Review                             D   Additionallnformation D    Questions and Answers                         D   Validation D    Procedural Change Required                   1Z1  None Comments:
Provide the candidate with the attached handout and worksheet.
Current Update:                                 By:
Provide ODS0-30 if requested. STEP STANDARD EVALUATION I COMMENT *1. Evaluates worksheet step 1 Circles Yes for worksheet step 1. CRITICAL STEP regarding requalification SAT I UNSAT training. EVALUATOR NOTE: This step meets the required standard of being current in requal, which includes passing all exams with at least an 80%. *2. Evaluates worksheet step 2 Circles No for worksheet step 2. CRITICAL STEP regarding a plant tour. SAT I UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO. *3. Evaluates worksheet step 3 Circles No for worksheet step 3 Schedule A. CRITICAL STEP regarding proposed under-SAT I UNSAT instruction watch Schedule A. EVALUATOR NOTE: The RB NPO position does not count towards the required 40 hours on-shift, leaving only 36 hours. -4 of 8-STEP STANDARD EVALUATION I COMMENT *4. Evaluates worksheet step 3 Circles No for worksheet step 3 Schedule B. CRITICAL STEP regarding proposed under-SAT/UNSAT instruction watch Schedule B. EVALUATOR NOTE: This step does not meet the required standard of the 40 hours of on-shift time being performed in the same calendar quarter. *5. Evaluates worksheet step 3 Circles Yes for worksheet step 3 Schedule C. CRITICAL STEP regarding proposed under-SAT/UNSAT instruction watch Schedule C. EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter. EVALUATOR:
Date                                     Int.
Terminate the task at this point. -5 of 8-EVALUATOR'S KEY 1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
Previous Revision Date:
* Does The Above Meet Re-activation Standard?
                                              - of 8-
N/R 2. On your own time , you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
 
* Does The Above Meet Re-activation Standard?
JOB PERFORMANCE MEASURE REQUIRED T  iSK  INFORMATION RO               NRC 14-2 RO             TASK Tl    E:    Re-activation of RO License C002 APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ODS0-30, Maintenance of NRC Licenses ~ nd STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
Yes N/R 3. Below are three proposed schedules for you to stand the watch under instruction.
B. If simulating this task, then inform the cand~date that the conditions of each step need only be properly identified and not actually perform d.
Date Position Hours Attend All Turnovers?
C. The candidate should demonstrate proper se of HU tools such as procedure use, self checking, place keeping and three-point communicat on.
Sept 12 SNO 12 Yes Schedule Sept 13 SNO 12 Yes A Sept 20 RBNPO 12 Yes Sept 21 SNO 12 Yes
VI. TASK CONDITIONS A. You are a Reactor Operator (RO) and your RO license became inactive on July 1, 2014.
* Does The Above Meet Re-activation Standard? Yes G N/R Date Position Hours Attend All Turnovers?
B. You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4, 2014.
Sept 28 SN02 12 Yes Schedule Sept 29 SNO 12 Yes B Sept 30 SNO 12 Yes Oct 01 SNO 12 Yes Oct02 SNO 12 Yes
                                                      -3 of 8-
* Does The.Above Meet Re-activation Standard?
 
Yes N/R Date Position Hours Attend All Turnovers?
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:
Sept22 SNO 12 Yes Schedule Sept 23 SNO 12 Yes c Sept 24 RBNPO 8 No (last 4 hrs of shift in Work Control) Sept 25 SNO 12 Yes Sept27 SNO 12 Yes
Yes- This IS required for license re-activation and it meets the standard.
* Does The Above Meet Re-activation Standard?
No- This IS required for license re-activation, but it does NOT meet the standard.
G No N/R EVALUATOR'S KEY -6 of 8-HANDOUT
N/R- This is NOT required for license re-activation."
EVALUATOR: Provide the candidate with the attached handout and worksheet. Provide ODS0-30 if requested .
STEP                                           STANDARD                           EVALUATION I COMMENT
    *1. Evaluates worksheet step 1       Circles Yes for worksheet step 1.                                 CRITICAL STEP regarding requalification                                                                             SAT I UNSAT training .
EVALUATOR NOTE: This step meets the required standard of being current in requal, which includes passing all exams with at least an 80%.
    *2. Evaluates worksheet step 2       Circles No for worksheet step 2.                                   CRITICAL STEP regarding a plant tour.                                                                               SAT I UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO.
    *3. Evaluates worksheet step 3       Circles No for worksheet step 3 Schedule A.                       CRITICAL STEP regarding proposed under-                                                                             SAT I UNSAT instruction watch Schedule A.
EVALUATOR NOTE: The RB NPO position does not count towards the required 40 hours on-shift, leaving only 36 hours.
                                                                  -4 of 8-
 
STEP                                       STANDARD                           EVALUATION I COMMENT
*4. Evaluates worksheet step 3   Circles No for worksheet step 3 Schedule B.                     CRITICAL STEP regarding proposed under-                                                                       SAT/UNSAT instruction watch Schedule B.
EVALUATOR NOTE: This step does not meet the required standard of the 40 hours of on-shift time being performed in the same calendar quarter.
*5. Evaluates worksheet step 3   Circles Yes for worksheet step 3 Schedule C.                     CRITICAL STEP regarding proposed under-                                                                       SAT/UNSAT instruction watch Schedule C.
EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter.
EVALUATOR: Terminate the task at this point.
                                                    -5 of 8-
 
EVALUATOR'S KEY
: 1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
* Does The Above Meet Re-activation Standard?                                     N/R
: 2. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
* Does The Above Meet Re-activation Standard?                 Yes               N/R
: 3. Below are three proposed schedules for you to stand the watch under instruction.
Date         Position                     Hours     Attend All Turnovers?
Sept 12       SNO                         12         Yes Schedule     Sept 13       SNO                         12         Yes A       Sept 20       RBNPO                       12         Yes Sept 21       SNO                         12         Yes
* Does The Above Meet Re-activation Standard?           Yes   G             N/R Date         Position                     Hours     Attend All Turnovers?
Sept 28       SN02                       12         Yes Schedule     Sept 29       SNO                         12         Yes B       Sept 30       SNO                         12         Yes Oct 01         SNO                         12         Yes Oct02         SNO                         12         Yes
* Does The.Above Meet Re-activation Standard?           Yes               N/R Date         Position                     Hours     Attend All Turnovers?
Sept22       SNO                         12         Yes Schedule     Sept 23       SNO                         12         Yes c       Sept 24       RBNPO                       8         No (last 4 hrs of shift in Work Control)
Sept 25       SNO                         12       Yes Sept27       SNO                         12       Yes
* Does The Above Meet Re-activation Standard?         G         No         N/R EVALUATOR'S KEY
                                                      -6 of 8-
 
HANDOUT
* You are a Reactor Operator (RO) and your RO license became inactive on July 1, 2014 .
* You are a Reactor Operator (RO) and your RO license became inactive on July 1, 2014 .
* You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4, 2014. Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows: Yes -This IS required for license re-activation and it meets the standard.
* You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4, 2014.
No-This IS required for license re-activation, but it does NOT meet the standard.
Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:
N/R-This is NOT required for license re-activation.  
Yes - This IS required for license re-activation and it meets the standard.
-7 of 8-WORKSHEET I. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
No- This IS required for license re-activation, but it does NOT meet the standard.
* Does The Above Meet Re-activation Standard?
N/R- This is NOT required for license re-activation.
Yes No N/R 2. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
                                -7 of 8-
* Does The Above Meet Re-activation Standard?
 
Yes No N/R 3. Below are three proposed schedules for you to stand the watch under instruction.
WORKSHEET I. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
Date Position Hours Attend All Turnovers?
* Does The Above Meet Re-activation Standard?                 Yes     No         N/R
Sept 12 SNO 12 Yes Schedule Sept 13 SNO 12 Yes A Sept 20 RBNPO 12 Yes Sept 21 SNO 12 Yes
: 2. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?                 Yes     No         N/R
Yes No N/R Date Position Hours Attend All Turnovers?
: 3. Below are three proposed schedules for you to stand the watch under instruction.
Sept 28 SN02 12 Yes Schedule Sept 29 SNO 12 Yes B Sept 30 SNO 12 Yes Oct 01 SNO 12 Yes Oct02 SNO 12 Yes
Date         Position                     Hours     Attend All Turnovers?
* Does The Above Meet Re-activation Standard?
Sept 12       SNO                         12         Yes Schedule     Sept 13       SNO                         12         Yes A       Sept 20       RBNPO                       12         Yes Sept 21       SNO                         12         Yes
Yes No N/R Date Position Hours Attend All Turnovers?
* Does The Above Meet Re-activation Standard?           Yes     No         N/R Date         Position                     Hours     Attend All Turnovers?
Sept 22 SNO 12 Yes Schedule Sept 23 SNO 12 Yes c Sept 24 RBNPO 8 No (last 4 hrs of shift in Work Control) Sept 25 SNO 12 Yes Sept 27 SNO 12 Yes
Sept 28       SN02                         12         Yes Schedule     Sept 29       SNO                         12         Yes B       Sept 30       SNO                         12         Yes Oct 01       SNO                         12         Yes Oct02         SNO                         12         Yes
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?           Yes     No         N/R Date         Position                     Hours     Attend All Turnovers?
Yes No N/R -8 of 8-RO APPL. TO REV: NRC 14-2 RO EC JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: JPM Completion Perform Classroom ATE PERFORMED: PERFORMANCE EVALUATION:
Sept 22       SNO                         12       Yes Schedule     Sept 23       SNO                         12       Yes c       Sept 24       RBNPO                       8         No (last 4 hrs of shift in Work Control)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Perform ST-23C , Jet Pump Operability-Two Loop NRC KJA SYSTEM NUMBER: _2_.2_._12_(,_3_
Sept 25       SNO                         12       Yes Sept 27       SNO                         12       Yes
.7-'-) ____ _ JAF QUAL STANDARD NUMBER: 45 Minutes ---OPERATIONS REVIEW: .s-; TIME TO COMPLETE: Minutes 0 Satisfactory 0 Unsatisfactory  
* Does The Above Meet Re-activation Standard?           Yes     No         N/R
                                                      -8 of 8-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO          NRC 14-2 RO      TASK TITLE :   Perform ST-23C , Jet Pump Operability- Two Loop EC APPL . TO      JPM NUMBER REV:              DATE :                    NRC KJA SYSTEM NUMBER:       _2_.2_._12_(,_3_
                                                                                        .7-'-)_ _ _ __
JAF TASK NUMBER:                              JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME :
                              -  Minutes SUBMITTED:                                    OPERATIONS REVIEW:       ~d z~
                                                                    ~                        .s-;
APPROVED :
CANDIDATE NAME :
JPM Completion    Perform Classroom ATE PERFORMED:                    TIME TO COMPLETE :               Minutes PERFORMANCE EVALUATION:          0   Satisfactory       0 Unsatisfactory
-------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------
COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER RO APPL. TO Current Update: Outstanding Items NRC 14-2 RO EC JPM NUMBER Date D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Perform ST-23C , Jet Pump Operability-Two Loop By: lnt D Additionallnformation D Validation D Procedural Change Required 1Z1 None Comments: Current Update: By: Date Int. Previous Revision Date: -2 of 15-RO APPL. TO NRC 14-2 RO EC JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Perform ST-23C, Jet Pump Operability-Two Loop A. ST-23C, Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Prepare a copy of ST-23C filled out up to step 8.1. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated. B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, . place keeping and three-point communication. VI. TASK CONDITIONS A. ST-23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.
SIGNATURE/PRINTED CANDIDATE REVIEW:
B. The required data for completing ST-23C is included on the provided handout. C. Baseline data collection is complete and an "established pattern" exists. -3 of 15-  
SIGNATURE REVIEWED BY:                                       DOC . COMPLETE:
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform ST-23C steps 8.1 through 8.4. Then assess the results against the Level 1 Acceptance Criteria of section 1 0.1.1 and 1 0.1.2 by completing the provided worksheet." EVALUATOR:
PROGRAM ADMINISTER
Provide the candidate with the attached handout , worksheet , and the prepared copy of ST-23C. STEP STANDARD EVALUATION I COMMENT 1. Record data for ST -23C step Records data for ST-23C section 8.1 per the provided key. SAT I UNSAT 8.1. EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number. 2. Calculate the value for ST-Calculates and r ecords a value of 6.5 Mlbmlhr pe r the SAT I UNSAT 23C step 8.2. provided key. 3. Record data for ST -23C step Records data for ST-23C step 8.3 on Attachment 5 per the SAT I UNSAT 8.3 on Attachment
 
: 5. provided key. EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number. 4. Record data for ST -23C step Record data for ST -23C step 8.4 on Attachment 2 per the SAT I UNSAT 8.4 on Attachment
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST RO             NRC 14-2 RO       TASK TITLE:     Perform ST-23C, Jet Pump Operability- Two Loop EC APPL. TO          JPM NUMBER Current Update:                          By:
: 2. provided key. EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number. -4 of 15-STEP STANDARD EVALUATION I COMMENT *5. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.1 is UNSAT CRITICAL STEP Criteria 1 0.1.1. and provides brief description of why (see provided key). SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1.1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr (5%). *6. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.2 is UNSAT CRITICAL STEP Criteria 1 0.1.2. and provides brief description of why (see provided key). SAT I UNSAT EVALUATOR NOTE: Level 1 Acceptance Criteria 1 0.1.2 is NOT met because both:
Date                            lnt Outstanding Items D   Technical Review                              D    Additionallnformation D   Questions and Answers                        D    Validation D   Procedural Change Required                   1Z1 None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2 of 15-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION RO               NRC 14-2 RO             TASK TITLE:       Perform ST-23C, Jet Pump Operability- Two Loop EC APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-23C, Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Prepare a copy of ST-23C filled out up to step 8.1.
EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking,
          . place keeping and three-point communication .
VI. TASK CONDITIONS A. ST-23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.
B. The required data for completing ST-23C is included on the provided handout.
C. Baseline data collection is complete and an "established pattern" exists.
                                                        -3 of 15-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform ST-23C steps 8.1 through 8.4. Then assess the results against the Level 1 Acceptance Criteria of section 10.1 .1 and 10.1 .2 by completing the provided worksheet. "
EVALUATOR: Provide the candidate with the attached handout, worksheet, and the prepared copy of ST-23C.
STEP                                         STANDARD                         EVALUATION I COMMENT
: 1.     Record data for ST-23C step       Records data for ST-23C section 8.1 per the provided key.         SAT I UNSAT 8.1.
EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.
: 2.     Calculate the value for ST-       Calculates and records a value of 6.5 Mlbmlhr per the             SAT I UNSAT 23C step 8.2.                     provided key.
: 3.     Record data for ST-23C step       Records data for ST-23C step 8.3 on Attachment 5 per the         SAT I UNSAT 8.3 on Attachment 5.               provided key.
EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.
: 4.     Record data for ST-23C step       Record data for ST-23C step 8.4 on Attachment 2 per the           SAT I UNSAT 8.4 on Attachment 2.               provided key.
EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.
                                                                -4 of 15-
 
STEP                                 STANDARD                         EVALUATION I COMMENT
*5. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.1 is UNSAT         CRITICAL STEP Criteria 10.1.1 .         and provides brief description of why (see provided key).       SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1 .1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr (5%).
*6. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.2 is UNSAT         CRITICAL STEP Criteria 10.1.2.         and provides brief description of why (see provided key) .     SAT I UNSAT EVALUATOR NOTE: Level 1 Acceptance Criteria 10.1.2 is NOT met because both:
* Loop A flows are greater than 5% from predicted on Attachments 3 and 4 AND
* Loop A flows are greater than 5% from predicted on Attachments 3 and 4 AND
* Jet Pump 3 and 4 dPs are greater than 20% below established values. EVALUATOR:
* Jet Pump 3 and 4 dPs are greater than 20% below established values .
Terminate
EVALUATOR: Terminate the task at this point.
                                              -5 of 15-
 
EVALUATOR'S KEY JET PUMP OPERABILITY TEST FOR TWO LOOP OPERATION (EPIC                          ST-23C AVAILABLE)
Init 8.0  PROCZD'URB 8.1  Record the following:
8.1.1      Total Core Flow                        93.5          (% rated)
EPIC - A-3330                TH 8 .1. 2    Loop A Jet Pump Flow                  32.5        Mlbm/hr 02-3FI-92A                  TH 8.1.3      Loop B Jet Pump Flow                  39.0        Mlbm/hr 02-3FI-92B                  TH 8 .1. 4    A Pump Speed        = 60  x 3 ~pump power    - 1.3 =
60    3~    2.63
                                          - 1 .3  =    81.5
                                                                    '
X A- 399                                                TH 8 .1.5    B Pump Speed      = 58.5    x 3~pump power + 1.9 =
 
* ST -23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.
* ST -23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.
* The required data for completing ST -23C is included on the provided handout.
* The required data for completing ST -23C is included on the provided handout.
* Baseline data collection is complete and an "established pattern" exists. Perform ST -23C section 8.0. Then assess the results against the Level 1 Acceptance Criteria of section 1 0.1.1 and 1 0.1.2 by completing the provided worksheet.  
* Baseline data collection is complete and an "established pattern" exists.
-13 of 15-HANDOUT Parameter Instrument I EPIC Point Value Total Core Flow EPIC-A-3330 93.5% rated Loop A Jet Pump Flow 02-3FI-92A 32.5 Mlbm/hr Loop B Jet Pump Flow 02-3FI-92B 39.0 Mlbm/hr A Pump Power EPIC-A-399 2.63 MW B Pump Power EPIC-A-400 2.61 MW A Recirc Loop Flow EPIC-A-3317 17.422 Mlbm/hr B Recirc Loop Flow EPIC-A-3318 16.602 Mlbm/hr Rx Total Core Flow EPIC-A-0414 71.4 Mlbm/hr WTSUB EPIC-A-6254 72.9 Mlbm/hr Recirc Pump A Speed 02-184SI-16A1 82.46% Recirc Pump B Speed 02-184SI-16B1 82.50% Double Tapped JP 1 Flow 02-3FI-87A 3.45 lbs/hr x 10 6 Double Tapped JP 6 Flow 02-3FI-87C 3.3 lbs/hr x 10 6 Double Tapped JP 11 Flow 02-3FI-87B 4.0 lbs/hr x 10 6 Double Tapped JP 16 Flow 02-3FI-87D 4.11bs/hr x 10 6 Recirc Loop A Ave Jet Pmp %PSID EPIC-A-3382 31.01% psid Recirc Loop B Ave Jet Pmp %PSID EPIC-A-3381 48.71% psid Rx Core Diff Press EPIC-A-405 17.6 psid P6 10 Min Avg Core Thermal Power EPIC-A-3390 2437.8 MWth Jet Pump 1 dP EPIC-A-942 32.0% psid Jet Pump 2 dP EPIC-A-944 33.2% psid Jet Pump 3 dP EPIC-A-946 16.4% psid Jet Pump 4 dP EPIC-A-948 24.0% psid Jet Pump 5 dP EPIC-A-950 35.3% psid Jet Pump 6 dP EPIC-A-952 30.3% psid Jet Pump 7 dP EPIC-A-954 35.1% psid Jet Pump 8 dP EPIC-A-956 34.8% psid Jet Pump 9 dP EPIC-A-958 34.0% psid Jet Pump 10 dP EPIC-A-960 35.0% psid Jet Pump 11 dP EPIC-A-943 51.2% psid Jet Pump 12 dP EPIC-A-945 43.7% psid Jet Pump 13 dP EPIC-A-947 50.1% psid Jet Pump 14 dP EPIC-A-949 49.2% psid Jet Pump 15 dP EPIC-A-951 49.7% psid Jet Pump 16 dP EPIC-A-953 51.1% psid Jet Pump 17 dP EPIC-A-955 46.1% psid Jet Pump 18 dP EPIC-A-957 51.8% psid Jet Pump 19 dP EPIC-A-959 48.2% psid Jet Pump 20 dP EPIC-A-961 46.4% psid -14 of 15-WORKSHEET Level 1 Status (circle one) If UNSAT, describe why below Acceptance Criteria 1 0.1.1 SAT UNSAT 10.1.2 SAT UNSAT -15 of 1 5-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO
Perform ST -23C section 8.0. Then assess the results against the Level 1 Acceptance Criteria of section 10.1.1 and 10.1.2 by completing the provided worksheet.
_____ _ APPL. TO 14-2 NRC RO RC JPM NUMBER TASK TITLE: Determine Worker Exposure for Emergent Work REV: DATE: NRC KIA SYSTEM NUMBER: 2.3.4 (3.2/3.7) JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 20 Minutes _ ____:..;_:__
                            -13 of 15-
SUBMITTED: APPROVED:
 
CANDIDATE NAME: LOGIN ID: JPM Completion Perform Location: Classroom DATE PERFORMED: n ERFORMANCE EVALUATION
HANDOUT Parameter         Instrument I EPIC Point       Value Total Core Flow                       EPIC-A-3330         93.5% rated Loop A Jet Pump Flow                   02-3FI-92A       32.5 Mlbm/hr Loop B Jet Pump Flow                   02-3FI-92B       39.0 Mlbm/hr A Pump Power                           EPIC-A-399           2.63 MW B Pump Power                           EPIC-A-400           2.61 MW A Recirc Loop Flow                     EPIC-A-3317       17.422 Mlbm/hr B Recirc Loop Flow                     EPIC-A-3318       16.602 Mlbm/hr Rx Total Core Flow                     EPIC-A-0414       71.4 Mlbm/hr WTSUB                                 EPIC-A-6254       72.9 Mlbm/hr Recirc Pump A Speed                   02-184SI-16A1           82.46%
: TIME TO COMPLETE: Minutes ---D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
Recirc Pump B Speed                   02-184SI-16B1           82 .50%
6 Double Tapped JP 1 Flow                 02-3FI-87A       3.45 lbs/hr x 10 6
Double Tapped JP 6 Flow                 02-3FI-87C       3.3 lbs/hr x 10 6
Double Tapped JP 11 Flow               02-3FI-87B       4.0 lbs/hr x 10 6
Double Tapped JP 16 Flow               02-3FI-87D       4.11bs/hr x 10 Recirc Loop A Ave Jet Pmp %PSID       EPIC-A-3382         31.01% psid Recirc Loop B Ave Jet Pmp %PSID       EPIC-A-3381         48.71% psid Rx Core Diff Press                     EPIC-A-405           17.6 psid P6 10 Min Avg Core Thermal Power       EPIC-A-3390       2437.8 MWth Jet Pump 1 dP                           EPIC-A-942         32.0% psid Jet Pump 2 dP                           EPIC-A-944         33.2% psid Jet Pump 3 dP                           EPIC-A-946         16.4% psid Jet Pump 4 dP                           EPIC-A-948         24.0% psid Jet Pump 5 dP                           EPIC-A-950         35.3% psid Jet Pump 6 dP                           EPIC-A-952         30.3% psid Jet Pump 7 dP                           EPIC-A-954         35.1% psid Jet Pump 8 dP                           EPIC-A-956         34.8% psid Jet Pump 9 dP                           EPIC-A-958         34.0% psid Jet Pump 10 dP                         EPIC-A-960         35.0% psid Jet Pump 11 dP                         EPIC-A-943         51.2% psid Jet Pump 12 dP                         EPIC-A-945         43.7% psid Jet Pump 13 dP                         EPIC-A-947           50.1% psid Jet Pump 14 dP                         EPIC-A-949           49.2% psid Jet Pump 15 dP                         EPIC-A-951           49.7% psid Jet Pump 16 dP                         EPIC-A-953           51.1% psid Jet Pump 17 dP                         EPIC-A-955           46.1% psid Jet Pump 18 dP                         EPIC-A-957           51.8% psid Jet Pump 19 dP                         EPIC-A-959           48.2% psid Jet Pump 20 dP                         EPIC-A-961           46.4% psid
                                        -14 of 15-
 
WORKSHEET Level 1       Status (circle one) If UNSAT, describe why below Acceptance Criteria 10.1 .1       SAT       UNSAT 10.1 .2       SAT       UNSAT
                              -15 of 15-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE
~....,_ ______
RO APPL. TO 14-2 NRC RO RC JPM NUMBER TASK TITLE :         Determine Worker Exposure for Emergent Work REV:             DATE :                           NRC KIA SYSTEM NUMBER:         2.3.4 (3 .2/3.7)
JAF TASK NUMBER:                                     JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME : _      20
____:..;_:__ Minutes SUBMITTED:
APPROVED:
CANDIDATE NAME:                                                       LOGIN ID:
JPM Completion   Perform Location :       Classroom DATE PERFORMED:                       TIME TO COMPLETE:                     Minutes
                                                                    ---
n ERFORMANCE EVALUATION :      D         Satisfactory         D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER  
SIGNATURE/PRINTED CANDIDATE REVIEW:
-1 of 10-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO APPL. TO Current Update: Outstanding Items 14-2 NRC RO RC JPM NUMBER Date D Technical Review D Questions and Answers D Procedural Change Required Comments:
SIGNATURE REVIEWED BY:                                               DOC . COMPLETE :
Current Update Date Previous Revision Date: TASK TITLE: Determine Worker Exposure for Emergent Work By: By: -2 of 10-lnt D Additional Information D Validation 1:8] None lnt ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO APPL. TO 14-2 NRC RO RC JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES TASK TITLE: Determine Worker Exposure for Emergent Work A. EN-RP-201 , Dosimetry Administration Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure adequate copies of the procedures referenced above are available.
PROGRAM ADMINISTER
V. EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated. B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication.
                                                  -1 of 10-
VI. TASK CONDITIONS A. The plant is operating at 1 00% power. B. Two operators are required to enter a locked high radiation area to support an emergent job. C. The job is expected to take 45 minutes D. The job site dose rate is 1500 mRem/hr. E. Operator #1 has received 1147 mRem of dose so far this year. F. Operator #2 has received 450 mRem of dose so far this year. G. Neither operator has received any dose extensions so far this year. H. Neither operator has any undocumented quarters for this year. -3 of 10-RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure fo r Emergent Work . -CRITICAL STEP VII. INITIATING CUE Inform the candidate , " Determine the expected dose that each operator will receive while performing this job. Determine if each operator will need a dose extension in order to receive this dose. Report your results on the provided worksheet." EXAMINER:
 
Provide the candidate with the first handout and worksheet.
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO           14-2 NRC RO RC     TASK TITLE:      Determine Worker Exposure for Emergent Work APPL. TO          JPM NUMBER Current Update:                          By:
STEP STANDARD EVALUATION
Date                             lnt Outstanding Items D Technical Review                                 D    Additional Information D Questions and Answers                             D    Validation D Procedural Change Required                       1:8] None Comments:
/COMMENT 1. Obtain required references. Obtains and utilizes required SAT I UNSAT references , which may include:
Current Update                                   By:
* EN-RP-201 EXAMINER NOTE: See provided key for remaining steps. *2. Determine the expected dose that each Calculates that each operator will CRITICAL operator will receive while performing receive 1125 mRem while performing STEP this job this job. SAT I UNSAT (45 minutesl60 minutes per hour) x (1500 mRemlhour)  
Date                                     lnt Previous Revision Date:
= 1125 mRem *3. Determine if Operator #1 will need a Determines that Operator #1 will need CRITICAL dose extension in order to receive this dose extension in order to receive this STEP dose. dose. SAT I UNSAT 1147 mRem + 1125 mRem = 2272 mRem > 2000 mRem normal dose limit *4. Determine if Operator #2 will need a Determines that Operator #2 will NOT CRITICAL dose extension in order to receive this need dose extension in order to receive STEP dose. this dose. SAT I UNSAT 450 mRem + 1125 mRem = 1575 mRem < 2000 mRem normal dose limit c -4 of 10-RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work STEP STANDARD EVALUATION
                                            -2 of 10-
/COMMENT EXAMINER:
 
If the candidate correctly complete JPM steps 2-4 , provide them with the extra handout , with the following information:  
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO           14-2 NRC RO RC           TASK TITLE:      Determine Worker Exposure for Emergent Work APPL. TO        JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EN-RP-201 , Dosimetry Administration Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure adequate copies of the procedures referenced above are available.
" Operator #1 has been granted a dose extension to 2500 mRem. Operator #2 has NOT been granted a dose extension. Determine the maximum stay time allowed for both Operator #1 and for Operator #2 , such that they do NOT exceed their dose limits. Document your results in the worksheet below." *5. / *6. Determine the maximum stay time allowed for Operator #1 such that dose limit is NOT exceeded. Determine the maximum stay time allowed for Operator #2 such that dose limit is NOT exceeded. Calculates the maximum stay time for Operator #1 is approximately 54 minutes. (2500 mRem-1147 mRem) 11500 mRemlhr = 0.902 hours x (60 minutes per hour) = 54.12 minutes Calculates the maximum stay time for Operator #2 is approximately 62 minutes. (2000 mRem-450 mRem) 11500 mRemlhr = 1.033 hours (60 minutes per hour) = 62 minutes EVALUATOR: Terminate the task at this point. -5 of 10-CRITICAL STEP SAT I UNSAT CRITICAL STEP SAT I UNSAT EVALUATOR'S KEY 1. Expected dose that each operator will receive while performing this job: 1125 mRem 2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one) e No 3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one) Yes G -6 of 10-EVALUATOR'S KEY 1. Maximum stay time allowed for Operator #1 (record final answer in minutes):
V.     EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.
54 minutes 2. Maximum stay time allowed for Operator #2 (record final answer in minutes):
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
62 minutes EVALUATOR'S KEY -7 of 10-HANDOUT
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication.
VI. TASK CONDITIONS A. The plant is operating at 100% power.
B. Two operators are required to enter a locked high radiation area to support an emergent job.
C. The job is expected to take 45 minutes D. The job site dose rate is 1500 mRem/hr.
E. Operator #1 has received 1147 mRem of dose so far this year.
F. Operator #2 has received 450 mRem of dose so far this year.
G. Neither operator has received any dose extensions so far this year.
H. Neither operator has any undocumented quarters for this year.
                                                    -3 of 10-
 
RO       14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work
  . - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Determine the expected dose that each operator will receive while performing this job.
Determine if each operator will need a dose extension in order to receive this dose. Report your results on the provided worksheet. "
EXAMINER: Provide the candidate with the first handout and worksheet.
EVALUATION STEP                                 STANDARD
                                                                                                /COMMENT
: 1. Obtain required references.             Obtains and utilizes required             SAT I UNSAT references, which may include:
* EN-RP-201 EXAMINER NOTE: See provided key for remaining steps.
      *2. Determine the expected dose that each   Calculates that each operator will           CRITICAL operator will receive while performing   receive 1125 mRem while performing             STEP this job                                 this job.                                 SAT I UNSAT (45 minutesl60 minutes per hour) x (1500 mRemlhour) = 1125 mRem
      *3. Determine if Operator #1 will need a     Determines that Operator #1 will need       CRITICAL dose extension in order to receive this dose extension in order to receive this       STEP dose.                                   dose.                                     SAT I UNSAT 1147 mRem + 1125 mRem = 2272 mRem > 2000 mRem normal dose limit
      *4. Determine if Operator #2 will need a     Determines that Operator #2 will NOT         CRITICAL dose extension in order to receive this need dose extension in order to receive       STEP dose.                                   this dose.                                 SAT I UNSAT 450 mRem + 1125 mRem = 1575 mRem < 2000 mRem normal dose limit c
                                                    -4 of 10-
 
RO       14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work EVALUATION STEP                                 STANDARD
                                                                                            /COMMENT EXAMINER: If the candidate correctly complete JPM steps 2-4, provide them with the extra handout, with the following information:
  "Operator #1 has been granted a dose extension to 2500 mRem . Operator #2 has NOT been granted a dose extension.
Determine the maximum stay time allowed for both Operator #1 and for Operator #2, such that they do NOT exceed their dose limits. Document your results in the worksheet below."
    *5. Determine the maximum stay time           Calculates the maximum stay time for      CRITICAL allowed for Operator #1 such that dose   Operator #1 is approximately 54             STEP limit is NOT exceeded .                  minutes.                               SAT I UNSAT (2500 mRem- 1147 mRem) 11500 mRemlhr =0.902 hours x (60 minutes
                                                              =
per hour) 54 .12 minutes
/  *6. Determine the maximum stay time          Calculates the maximum stay time for     CRITICAL allowed for Operator #2 such that dose    Operator #2 is approximately 62             STEP limit is NOT exceeded .                  minutes.                               SAT I UNSAT (2000 mRem- 450 mRem) 11500
                                                              =
mRemlhr 1.033 hours (60 minutes per hour) = 62 minutes EVALUATOR: Terminate the task at this point.
                                                    -5 of 10-
 
EVALUATOR'S KEY
: 1. Expected dose that each operator will receive while performing this job:
1125 mRem
: 2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one) e               No
: 3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one)
Yes             G
                            -6 of 10-
 
EVALUATOR'S KEY
: 1. Maximum stay time allowed for Operator #1 (record final answer in minutes):
54 minutes
: 2. Maximum stay time allowed for Operator #2 (record final answer in minutes):
62 minutes EVALUATOR'S KEY
                            -7 of 10-
 
HANDOUT
* The plant is operating at 100% power.
* The plant is operating at 100% power.
* Two operators are required to enter a locked high radiation area to support an emergent job.
* Two operators are required to enter a locked high radiation area to support an emergent job.
Line 201: Line 642:
* Operator #2 has received 450 mRem of dose so far this year.
* Operator #2 has received 450 mRem of dose so far this year.
* Neither operator has received any dose extensions so far this year.
* Neither operator has received any dose extensions so far this year.
* Neither operator has any undocumented quarters for this year. Determine the expected dose that each operator will receive while performing this job. Determine if each operator will need a dose extension in order to receive this dose. Report your results on the provided worksheet.  
* Neither operator has any undocumented quarters for this year.
-8 of 10-WORKSHEET
Determine the expected dose that each operator will receive while performing this job.
: 1. Expected dose that each operator will receive while performing this job: 2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one) Yes No 3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one) Yes No -9 of 10-EXTRA HANDOUT Operator #1 has been granted a dose extension to 2500 mRem. Operator #2 has NOT been granted a dose extension.
Determine if each operator will need a dose extension in order to receive this dose.
Determine the maximum stay time allowed for both Operator #1 and for Operator #2, such that they do NOT exceed their dose limits. Document your results in the worksheet below. EXTRA WORKSHEET
Report your results on the provided worksheet.
                                -8 of 10-
 
WORKSHEET
: 1. Expected dose that each operator will receive while performing this job:
: 2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one)
Yes             No
: 3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one)
Yes             No
                            -9 of 10-
 
EXTRA HANDOUT Operator #1 has been granted a dose extension to 2500 mRem.
Operator #2 has NOT been granted a dose extension.
Determine the maximum stay time allowed for both Operator #1 and for Operator #2, such that they do NOT exceed their dose limits.
Document your results in the worksheet below.
EXTRA WORKSHEET
: 1. Maximum stay time allowed for Operator #1 (record final answer in minutes):
: 1. Maximum stay time allowed for Operator #1 (record final answer in minutes):
: 2. Maximum stay time allowed for Operator #2 (record final answer in minutes):  
: 2. Maximum stay time allowed for Operator #2 (record final answer in minutes):
-10 of 10-SRO APPL. TO REV: NRC 14-2 SRO C001 JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: JPM Completion Perform Classroom ATE PERFORMED: PERFORMANCE EVALUATION
                                -10 of 10-
: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Verify Fuel Movement Sheets NRC KIA SYSTEM NUMBER: _2_.1_.3_5___.(3_
 
.-'9) ____ _ JAF QUAL STANDARD NUMBER: 20 M i nutes --'--OPERATIONS REVIEW: #-c:b-;zr=::::::->  
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO        NRC 14-2 SRO        TASK TITLE :   Verify Fuel Movement Sheets C001 APPL . TO    JPM NUMBER REV:              DATE:                    NRC KIA SYSTEM NUMBER:         _2_.1_.3_5___.(3_.-'9)_ _ _ __
/ TIME TO COMPLETE: Minutes D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
JAF TASK NUMBER:                              JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME :      20 Minutes
                                                                            #- c:b-;zr=::::::->
                            --'--
SUBMITTED:                                    OPERATIONS REVIEW:      .~
                                                                    /
APPROVED:
CANDIDATE NAME :
JPM Completion  Perform Classroom ATE PERFORMED:                    TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :        D   Satisfactory       D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER SRO APPL. TO Current Update: Outstanding Items NRC 14-2 SRO C001 JPM NUMBER Date D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Verify Fuel Movement Sheets By: lnt D Additional Information D Validation D Procedural Change Required 1Zl None Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
Current Update: By: Date Int. Previous Revision Date: -2of12-SRO APPL. TO NRC 14-2 SRO C001 JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Verify Fuel Movement Sheets A OSP-66.001 , Management of Refueling Activities Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A None EVALUATOR NOTES A The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated. B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication.
SIGNATURE REVIEWED BY:                                       DOC . COMPLETE :
VI. TASK CONDITIONS A Today is October 2 , 2014. B. A refueling outage is underway.
PROGRAM ADMINISTER
C. A refueling error occurred last shift. D. You are the oncoming Refuel Bridge SRO. E. The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO. -3 of 12-  
 
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Verify the previous shift's in-core placement of components (steps 1, 2, 4 , 5 , 6, 7, 9, 10, 11, 12, 14, 15, 16 , and 17 from the provided ICA Transfer Forms)." EVALUATOR:
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO           NRC 14-2 SRO       TASK TITLE:   Verify Fuel Movement Sheets C001 APPL. TO          JPM NUMBER Current Update:                          By:
Provide the candidate with the attached handouts (fuel movement-sheets and pictures of core cells). Provide OSP-66.001 if requested.
Date                          lnt Outstanding Items D    Technical Review                            D     Additional Information D   Questions and Answers                      D    Validation D   Procedural Change Required                 1Zl   None Comments:
STEP STANDARD EVALUATION I COMMENT 1. Verify correct loading of Determines four Control Cell 38-35 bundles are in the SAT I UNSAT Control Cell 38-35. correct location and orientation (ICA Transfer Form steps 1-4):
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2of12-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO             NRC 14-2 SRO             TASK TITLE:        Verify Fuel Movement Sheets C001 APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A   None II. REFERENCES A   OSP-66.001 , Management of Refueling Activities Ill. TOOLS AND EQUIPMENT A   None IV. SET UP REQUIREMENTS A   None EVALUATOR NOTES A   The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
place keeping and three-point communication.
VI. TASK CONDITIONS A   Today is October 2, 2014.
B. A refueling outage is underway.
C. A refueling error occurred last shift.
D. You are the oncoming Refuel Bridge SRO.
E. The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO.
                                                      -3 of 12-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Verify the previous shift's in-core placement of components (steps 1, 2, 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, and 17 from the provided ICA Transfer Forms)."
EVALUATOR: Provide the candidate with the attached handouts (fuel movement-sheets and pictures of core cells). Provide OSP-66.001 if requested.
STEP                                         STANDARD                                 EVALUATION I COMMENT
: 1. Verify correct loading of         Determines four Control Cell 38-35 bundles are in the                     SAT I UNSAT Control Cell 38-35.               correct location and orientation (ICA Transfer Form steps 1-4):
* JLV675
* JLV675
* JLV682
* JLV682
* JLK804
* JLK804
* JLK817 *2. Determine the INCORRECT Determines two Control Cell 14-35 bundles are the correct CRITICAL STEP loading of Control Cell14-35. bundles but in the INCORRECT orientation (ICA Transfer SATIUNSAT Form steps 6 & 7):
* JLK817
    *2 . Determine the INCORRECT           Determines two Control Cell 14-35 bundles are the correct               CRITICAL STEP loading of Control Cell14-35. bundles but in the INCORRECT orientation (ICA Transfer                   SATIUNSAT Form steps 6 & 7):
* JLV678
* JLV678
* JLV670 3. Verify the correct loading of Determines two Control Cell 14-35 bundles are the correct SAT I UNSAT Control Cell 14-35. bundles and in the correct orientation (ICA Transfer Form steps 9 & 1 0):
* JLV670
: 3. Verify the correct loading of     Determines two Control Cell 14-35 bundles are the correct                 SAT I UNSAT Control Cell 14-35.               bundles and in the correct orientation (ICA Transfer Form steps 9 & 10) :
* JLK805
* JLK805
* JLK812 -4of12-  
* JLK812
----STEP STANDARD EVALUATION I COMMENT *4. Determine the INCORRECT Determines one Control Cell 38-15 bundle is in the correct CRITICAL STEP loading of Control Cell 38-15. orientation but is the INCORRECT bundle (ICA Transfer SAT/UNSAT Form step 11 ):
                                                                  -4of12-
* JLV668 (vs. JLV 698) 5. Verify the correct loading of Determines three Control Cell 38-15 bundles are the correct SAT/UNSAT Control Cell 38-15. bundles and in the correct orientation (ICA Transfer Form steps 12, 14, & 15):
 
----
STEP                                         STANDARD                         EVALUATION I COMMENT
*4. Determine the INCORRECT       Determines one Control Cell 38-15 bundle is in the correct     CRITICAL STEP loading of Control Cell 38-15. orientation but is the INCORRECT bundle (ICA Transfer           SAT/UNSAT Form step 11 ):
* JLV668 (vs. JLV 698)
: 5. Verify the correct loading of Determines three Control Cell 38-15 bundles are the correct     SAT/UNSAT Control Cell 38-15.           bundles and in the correct orientation (ICA Transfer Form steps 12, 14, & 15):
* JLV674
* JLV674
* JLK807
* JLK807
* JLK820 *6. Determine the INCORRECT Determines that the two single blade guides in Control Cell CRITICAL STEP loading of Control Cell 14-15. 14-15 are in the wrong orientation (ICA Transfer Form steps SAT/UNSAT 16 & 17). EVALUATOR:
* JLK820
Terminate the task at this point. -5 of 12-HANDOUT
*6. Determine the INCORRECT       Determines that the two single blade guides in Control Cell     CRITICAL STEP loading of Control Cell 14-15. 14-15 are in the wrong orientation (ICA Transfer Form steps     SAT/UNSAT 16 & 17).
EVALUATOR: Terminate the task at this point.
                                                      -5 of 12-
 
HANDOUT
* Today is October 2, 2014.
* Today is October 2, 2014.
* A refueling outage is underway.
* A refueling outage is underway.
* A refueling error occurred last shift .
* A refueling error occurred last shift .
* You are the oncoming Refuel Bridge SRO .
* You are the oncoming Refuel Bridge SRO .
* The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO. Verify the previous shift's in-core placement of components (steps 1, 2, 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, and 17 from the provided ICA Transfer Forms). -6of12-Line No. I 2 3 4 5 6 7 8 c):o II 12 HANDOUT ATTACHMENT 9.1 ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)
* The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO.
Number: R21-0001 Issued (Date): Oct I 2014 Reason for Transfer:
Verify the previous shift's in-core placement of components (steps 1, 2, 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, and 17 from the provided ICA Transfer Forms).
Cycle 21 Refueling Ouage Prepared By: S. Carol in/ S. emw.fUt Reviewed By: B. Drews/ fJJ. 9)'1.(!(W (1) (2) (3) (4)
                                -6of12-
(4a) (4b) (10) Additional Approvals By: _N/A __________________
 
_ SNMC Approval:
HANDOUT ATTACHMENT       9.1                                             ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)
S. Carol in/ I S. emw.fUt Lines __l.:lL thru Date Oct 1, 2014 Description of Material (5) FUEL BUNDLE FUEL BUNDLE DOUBLE BLADE GUIDE FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE DOUBLE BLADE GUIDE FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE NOTES/COMMENTS Line#: Line#: Line#: Line#: (14) SNM Records Serial No. Equipment (5) JLV675 JLV682 N/A JLK804 JLK817 JLV678 JLV670 N/A JLK805 JLK812 JLV698 JLV674 I From ID ICA Coord. (6) (7) SFP 26-BB-2 SFP 26-CC-2 CORE 39-36 37-34 SFP 26-DD-2 SFP 26-EE-2 SFP 26-FF-2 SFP 26-W-3 CORE 15-36 13-34 SFP 26-X-3 SFP 26-Y-3 SFP 26-Z-3 SFP 26-AA-3 Updated by: __________
(1)        Number: R21-0001 (2)        Issued (Date): Oct I 2014 (3)        Reason for Transfer: Cycle 21 Refueling Ouage (4)        Prepared By:       S. Carol in/ S. emw.fUt (4a)      Reviewed By:       B. Drews/ fJJ. 9)'1.(!(W (4b)       Additional Approvals By: _N/A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
_ Lines (15) Verified by: ____________
(10)      SNMC Approval:       S. Carol in/ I S. emw.fUt                   Lines __l.:lL thru       Date Oct 1, 2014 Line Description                         Serial No. I           From                 To            Performed  Dateffime    Verified No. of Material                        Equipment ID     ICA       Coord. ICA        Coord. by          Executed    by (5)                                 (5)               (6)       (7)      (8)       (9)       (II)       (12)         (13)
Lines -7 of 12-To Performed Dateffime ICA Coord. by Executed (8) (9) (II) (12) CORE 39-34 a9J 10/02/14 0300 CORE 37-36 a9J 10/02/14 0310 SFP 26-EE-2 a9J 10/02/14 0320 26-DD-1 CORE 37-34 a9J 10/02/14 0330 CORE 39-36 a9J 10/02/14 0340 CORE 15-34 a9J 10/02/14 0350 CORE 13-36 a9J 10/02/14 0400 SFP 26-DD-2 a9J 10/02/14 0410 26-CC-1 CORE 13-34 a9J 10/02/14 0420 CORE 15-36 a9J 10f02f14 0430 CORE 39-14 a9J 10/02/14 0440 CORE 37-16 a9J 10/02/14 0450 Thru Date Thru Date Verified by (13) e!J) e!J) e!J) e!J) e!J) e!J) e!J) e!J) e!J) e!J) e!J) e!J)
I    FUEL BUNDLE                        JLV675            SFP        26-BB-2  CORE       39-34     a9J       10/02/14 0300 e!J) 2    FUEL BUNDLE                        JLV682            SFP        26-CC-2  CORE       37-36     a9J       10/02/14 0310 e!J) 3    DOUBLE BLADE GUIDE                  N/A              CORE      39-36    SFP       26-EE-2   a9J       10/02/14 0320 e!J) 37-34              26-DD-1 4    FUEL BUNDLE                        JLK804            SFP        26-DD-2  CORE       37-34     a9J       10/02/14 0330 e!J) 5    FUEL BUNDLE                        JLK817            SFP        26-EE-2  CORE       39-36     a9J       10/02/14 0340 e!J) 6    FUEL BUNDLE                        JLV678            SFP        26-FF-2  CORE       15-34     a9J       10/02/14 0350 e!J) 7    FUEL BUNDLE                        JLV670            SFP        26-W-3  CORE       13-36     a9J       10/02/14 0400 e!J) 8    DOUBLE BLADE GUIDE                  N/A              CORE      15-36    SFP       26-DD-2   a9J       10/02/14 0410 e!J) 13-34              26-CC-1 c):o II FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE JLK805 JLK812 JLV698 SFP SFP SFP 26-X-3 26-Y-3 26-Z-3 CORE CORE CORE 13-34 15-36 39-14 a9J a9J a9J 10/02/14 0420 10f02f14 0430 10/02/14 0440 e!J) e!J) e!J) 12  FUEL BUNDLE                        JLV674            SFP      26-AA-3  CORE      37-16      a9J        10/02/14 0450 e!J)
Line No. 13 14 15 16 17 18 19 20 c 21 , 22 23 24 HANDOUT ATTACHMENT 9.1 ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)
NOTES/COMMENTS Line#:
Number: R21-0001 Issued (Date): Oct 1 2014 Reason for Transfer:
Line#:
Cycle 21 Refueling Ouage Prepared By: S. Carol in/ S. &mllin Reviewed By: B. Drews/ 91. (1) (2) (3) (4) (4a) (4b) (10) Additional Approvals By: _N/A. __________________ _ SNMC Approval:
Line#:
S. Carol in/ I S. &mllin Description of Material (5) DOUBLE BLADE GUIDE FUEL BUNDLE FUEL BUNDLE SINGLE BLADE GUIDE SINGLE BLADE GUIDE FUEL BUNDLE FUEL BUNDLE N I A N I A N/A N/A N/A NOTES/COMMENTS Line#: Line#: Line#: Line#: (14) SNM Records Serial No. I From Equipment ID ICA (5) (6) N/A CORE JLK807 SFP JLK820 SFP N/A SFP N/A SFP JLV720 CORE JLV725 CORE Updated by: __________
Line#:
_ Coord. (7) 39-16 37-14 26-BB-1 26-CC-1 25-FF-II 25-FF-1 13-14 15-16 Lines (15) Verified by: ____________ Lines -8 of 12-Lines 13-19 thru __ Date Oct 1, 2014 To Performed Date/Time ICA Coord. by Executed (8) (9) (II) (12) SFP 26-CC-2 a9J 10/02/14 0500 26-BB-1 CORE 37-14 a9J 10/02/14 0510 CORE 39-16 a9J 10J02J14 0520 CORE 13-16 a9J 10/02/14 0530 CORE 15-14 a9J 10/02/14 0540 SFP 35-N-7 a9J 10/02/14 0550 SFP 35-N-6 a9J 10/02/14 0600 Thru Date Thru Date Verified by (13) e:J) e:J) e:J) e:J) e:J) e:J) e:J)
(14)      SNM Records Updated by: _ _ _ _ _ _ _ _ _ __ Lines                          Thru        Date (15)      Verified by: _ _ _ _ _ _ _ _ _ _ _ _ Lines                        Thru        Date
HANDOUT SOUTH NORTH Control Cell 38-35 -9 of 12-HANDOUT SOUTH NORTH Control Cell 14-35 -10of12-HANDOUT SOUTH NORTH Control Cell 38-15 -11of12-HANDOUT SOUTH NORTH Control Cell14-15  
                                                                  -7 of 12-
-12 of 12-SRO APPL. TO REV: NRC 14-2 SRO C002 JPM NUMBER DATE: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Re-activation of SRO License ----NRC KIA SYSTEM NUMBER: _2_.1_.4__;(...._3._8).__
 
___ _ JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 20 Minutes ---SUBMITTED: OPERATIONS "APPROVED: -------------------------------------------------------------------------------------
HANDOUT ATTACHMENT       9.1                                           ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)
CANDIDATE NAME: JPM Completion Perform Classroom  
(1)        Number: R21-0001 (2)        Issued (Date): Oct 1 2014 (3)        Reason for Transfer: Cycle 21 Refueling Ouage (4)        Prepared By:       S. Carol in/ S. &mllin (4a)      Reviewed By:       B. Drews/ 91. ~
'ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION
(4b)       Additional Approvals By: _N/A._ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _
: D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
(10)      SNMC Approval:       S. Carol in/ I S. &mllin                     Lines 13-19 thru __Date Oct 1, 2014 Line Description                      Serial No. I          From                    To             Performed Date/Time     Verified No. of Material                      Equipment ID    ICA       Coord. ICA        Coord.      by       Executed     by (5)                              (5)              (6)        (7)      (8)       (9)       (II)     (12)         (13) 13  DOUBLE BLADE GUIDE                N/A              CORE      39-16    SFP       26-CC-2     a9J       10/02/14 0500 e:J) 37-14                26-BB-1 14  FUEL BUNDLE                      JLK807          SFP        26-BB-1  CORE       37-14       a9J       10/02/14 0510 e:J) 15  FUEL BUNDLE                      JLK820          SFP        26-CC-1  CORE       39-16       a9J       10J02J14 0520 e:J) 16  SINGLE BLADE GUIDE                N/A              SFP        25-FF-    CORE       13-16     a9J       10/02/14 0530 e:J)
II 17  SINGLE BLADE GUIDE                N/A              SFP        25-FF-1  CORE       15-14     a9J       10/02/14 0540 e:J) 18  FUEL BUNDLE                      JLV720          CORE      13-14    SFP       35-N-7     a9J       10/02/14 0550 e:J) 19  FUEL BUNDLE                      JLV725          CORE      15-16    SFP       35-N-6     a9J       10/02/14 0600 e:J)
NIA c
20 NIA 21 N/A
, 22 23  N/A 24  N/A NOTES/COMMENTS Line#:
Line#:
Line#:
Line#:
(14)       SNM Records Updated by: _ _ _ _ _ _ _ _ _ __                  Lines          Thru        Date (15)       Verified by: _ __ _ __ _ _ _ _ _ _ Lines                          Thru        Date
                                                                  -8 of 12-
 
HANDOUT SOUTH NORTH Control Cell 38-35
      -9 of 12-
 
HANDOUT SOUTH NORTH Control Cell 14-35
    -10of12-
 
HANDOUT SOUTH NORTH Control Cell 38-15
    -11of12-
 
HANDOUT SOUTH NORTH Control Cell14-15
    -12 of 12-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO       NRC 14-2 SRO       TASK TITLE :   Re-activation of SRO License C002 APPL. TO      JPM NUMBER REV:              DATE :                    NRC KIA SYSTEM NUMBER:         _2_.1_.4__;(...._3._8).___ _ __
                        ----
JAF TASK NUMBER:                               JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                            -  Minutes SUBMITTED:                                   OPERATIONS     REVIEW~~?';*~
APPROVED :
-------------------------------------------------------------------------------------
CANDIDATE NAME :
JPM Completion   Perform Classroom
'ATE PERFORMED:                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :       D   Satisfactory       D   Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REV I EWED BY: DOC. COMPLETE: PROGRAM ADMINISTER SRO APPL. TO Current Update: Outstanding Items NRC 14-2 SRO C002 JPM NUMBER Date D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Re-activation of SRO License By: lnt D Additional Information D Validation D Procedural Change Required None Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
Current Update: By: Date Int. Previous Revision Date: -2 of 8-SRO APPL. TO NRC 14-2 SRO C002 JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Re-activation of SRO License A. ODS0-30 , Maintenance of NRC Licenses and STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated.
SIGNATURE REVIEWED BY:                                       DOC . COMPLETE :
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
PROGRAM ADMINISTER
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication.
 
VI. TASK CONDITIONS A. You are a Shift Manager and your SRO license became i nactive on July 1 , 2014. B. You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4 , 2014. -3 of 8-  
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO           NRC 14-2 SRO       TASK TITLE:       Re-activation of SRO License C002 APPL. TO          JPM NUMBER Current Update:                          By:
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows: Yes-This IS required for license re-activation and it meets the standard. No-This IS required for license re-activation , but it does NOT meet the standard.
Date                              lnt Outstanding Items D   Technical Review                              D  Additional Information D   Questions and Answers                          D    Validation D   Procedural Change Required                     ~    None Comments:
N/R-This is NOT required for license re-activation
Current Update:                                 By:
." EVALUATOR:
Date                                       Int.
Provide the candidate with the attached handout and worksheet.
Previous Revision Date:
Provide ODS0-30 if requested.
                                              -2 of 8-
STEP STANDARD EVALUATION I COMMENT *1. Evaluates worksheet step 1 Circles Yes for worksheet step 1. CRITICAL STEP regarding requalification SAT I UNSAT training. EVALUATOR NOTE: This step meets the required standard of being current in requal , which includes passing all exams with at least and 80%. *2. Evaluates worksheet step 2 Circles No for worksheet step 2. CRITICAL STEP regarding Emergency Director SAT I UNSAT qualification. EVALUATOR NOTE: This step does not meet the required standard of being currently qualified Emergency Director. 3. Evaluates worksheet step 3 Circles NIR for worksheet step 3. SAT I UNSAT regarding Fire Brigade member qualification.
 
EVALUATOR NOTE: Fire Brigade qualification is not required for a Shift Manager. -4 of 8-  
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO             NRC 14-2 SRO             TASK TITLE:      Re-activation of SRO License C002 APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ODS0-30, Maintenance of NRC Licenses and STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
------STEP STANDARD EVALUATION I COMMENT *4. Evaluates worksheet step 4 Circles No for worksheet step 4. CRITICAL STEP regarding a plant tour. SAT/UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO. *5. Evaluates worksheet step 5 Circles No for worksheet step 5 Schedule A. CRITICAL STEP regarding proposed under-SAT/UNSAT instruction watch Schedule A. EVALUATOR NOTE: The FSS position does not count towards the required 40 hours on-shift, leaving only 36 hours. *6. Evaluates worksheet step 5 Circles No for worksheet step 5 Schedule B. CRITICAL STEP regarding proposed under-SAT I UNSAT instruction watch Schedule B. EVALUATOR NOTE: This step does not meet the required standard of the 40 hours of on-shift time being performed in the same calendar quarter. *7. Evaluates worksheet step 5 Circles Yes for worksheet step 5 Schedule C. CRITICAL STEP regarding proposed under-SAT/UNSAT instruction watch Schedule C. EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter. EVALUATOR:
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
Terminate the task at this point. -5 of 8-EVALUATOR'S KEY 1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
* Does The Above Meet Re-activation Standard?  
place keeping and three-point communication.
<9 No NIR 2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
VI. TASK CONDITIONS A. You are a Shift Manager and your SRO license became inactive on July 1, 2014.
* Does The Above Meet Re-activation Standard?
B. You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4, 2014.
Yes G NIR 3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
                                                      -3 of 8-
* Does The Above Meet Re-activation Standard?
 
Yes No 4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:
* Does The Above Meet Re-activation Standard?
Yes- This IS required for license re-activation and it meets the standard.
Yes NIR 5. Below are three proposed schedules for you to stand the watch under instruction.
No- This IS required for license re-activation , but it does NOT meet the standard.
Date Position Hours Attend All Turnovers?
N/R- This is NOT required for license re-activation ."
Sept 12 SM 12 Yes Schedule Sept 13 SM 12 Yes A Sept 20 FSS 12 Yes Sept 21 CRS 12 Yes
EVALUATOR: Provide the candidate with the attached handout and worksheet. Provide ODS0-30 if requested.
* Does The Above Meet Re-activation Standard?
STEP                                           STANDARD                           EVALUATION I COMMENT
Yes G NIR Date Position Hours Attend All Turnovers?
    *1.     Evaluates worksheet step 1       Circles Yes for worksheet step 1.                                 CRITICAL STEP regarding requalification                                                                             SAT I UNSAT training .
Sept 28 CRS 12 Yes Schedule Sept 29 SM 12 Yes B Sept 30 SM 12 Yes Oct 01 SM 12 Yes Oct02 SM 12 Yes
EVALUATOR NOTE: This step meets the required standard of being current in requal , which includes passing all exams with at least and 80%.
* Does The Above Meet Re-activation Standard?
    *2.     Evaluates worksheet step 2       Circles No for worksheet step 2.                                   CRITICAL STEP regarding Emergency Director                                                                         SAT I UNSAT qualification.
Yes NIR Date Position Hours Attend All Turnovers?
EVALUATOR NOTE: This step does not meet the required standard of being currently qualified Emergency Director.
Sept 22 SM 12 Yes Schedule Sept 23 SM 12 Yes c Sept 24 STA 8 No (last 4 hrs of shift in Work Control) Sept 25 SM 12 Yes Sept 27 SM 12 Yes
: 3. Evaluates worksheet step 3         Circles NIR for worksheet step 3.                                   SAT I UNSAT regarding Fire Brigade member qualification.
* Does The Above Meet Re-activation Standard?
EVALUATOR NOTE: Fire Brigade qualification is not required for a Shift Manager.
e No NIR EVALUATOR'S KEY -6 of 8-HANDOUT
                                                                    -4 of 8-
 
----                                                                           - -
STEP                                     STANDARD                           EVALUATION I COMMENT
*4. Evaluates worksheet step 4   Circles No for worksheet step 4.                                 CRITICAL STEP regarding a plant tour.                                                                         SAT/UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO.
*5. Evaluates worksheet step 5   Circles No for worksheet step 5 Schedule A.                     CRITICAL STEP regarding proposed under-                                                                       SAT/UNSAT instruction watch Schedule A.
EVALUATOR NOTE: The FSS position does not count towards the required 40 hours on-shift, leaving only 36 hours.
*6. Evaluates worksheet step 5   Circles No for worksheet step 5 Schedule B.                     CRITICAL STEP regarding proposed under-                                                                       SAT I UNSAT instruction watch Schedule B.
EVALUATOR NOTE: This step does not meet the required standard of the 40 hours of on-shift time being performed in the same calendar quarter.
*7. Evaluates worksheet step 5   Circles Yes for worksheet step 5 Schedule C.                     CRITICAL STEP regarding proposed under-                                                                       SAT/UNSAT instruction watch Schedule C.
EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter.
EVALUATOR: Terminate the task at this point.
                                                    -5 of 8-
 
EVALUATOR'S KEY
: 1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
* Does The Above Meet Re-activation Standard?               <9         No         NIR
: 2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
* Does The Above Meet Re-activation Standard?                 Yes   G             NIR
: 3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
* Does The Above Meet Re-activation Standard?                 Yes       No
: 4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
* Does The Above Meet Re-activation Standard?                 Yes                 NIR
: 5. Below are three proposed schedules for you to stand the watch under instruction.
Date           Position                   Hours     Attend All Turnovers?
Sept 12       SM                         12         Yes Schedule     Sept 13       SM                         12         Yes A       Sept 20       FSS                         12         Yes Sept 21       CRS                         12         Yes
* Does The Above Meet Re-activation Standard?           Yes   G             NIR Date         Position                     Hours     Attend All Turnovers?
Sept 28       CRS                         12         Yes Schedule     Sept 29       SM                         12         Yes B       Sept 30       SM                         12         Yes Oct 01         SM                         12         Yes Oct02         SM                         12         Yes
* Does The Above Meet Re-activation Standard?           Yes                 NIR Date           Position                   Hours     Attend All Turnovers?
Sept 22       SM                         12         Yes Schedule     Sept 23       SM                         12         Yes c       Sept 24       STA                         8         No (last 4 hrs of shift in Work Control)
Sept 25       SM                         12         Yes Sept 27       SM                         12         Yes
* Does The Above Meet Re-activation Standard?           e         No         NIR EVALUATOR'S KEY
                                                      -6 of 8-
 
HANDOUT
* You are a Shift Manager and your SRO license became inactive on July 1, 2014 .
* You are a Shift Manager and your SRO license became inactive on July 1, 2014 .
* You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4, 2014. Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows: Yes-This IS required for license re-activation and it meets the standard.
* You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4, 2014.
No-This IS required for license re-activation, but it does NOT meet the standard.
Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:
N/R-This is NOT required for license re-activation.  
Yes- This IS required for license re-activation and it meets the standard.
-7 of 8-WORKSHEET
No- This IS required for license re-activation, but it does NOT meet the standard.
N/R- This is NOT required for license re-activation.
                              -7 of 8-
 
WORKSHEET
: l. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
: l. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?                 Yes       No         NIR
Yes No NIR 2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
: 2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?                 Yes       No         NIR
Yes No NIR 3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
: 3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?                 Yes       No         NIR
Yes No NIR 4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
: 4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?                 Yes       No         NIR
Yes No NIR 5. Below are three proposed schedules for you to stand the watch under instruction.
: 5. Below are three proposed schedules for you to stand the watch under instruction.
Date Position Hours Attend All Turnovers?
Date         Position                     Hours     Attend All Turnovers?
Sept 12 SM 12 Yes Schedule Sept 13 SM 12 Yes A Sept 20 FSS 12 Yes Sept 21 CRS 12 Yes
Sept 12       SM                         12         Yes Schedule     Sept 13       SM                         12         Yes A       Sept 20       FSS                         12         Yes Sept 21       CRS                         12         Yes
* Does The Above Meet Re-activation Standard?
* Does The Above Meet Re-activation Standard?           Yes       No         NIR Date         Position                     Hours     Attend All Turnovers?
Yes No NIR Date Position Hours Attend All Turnovers?
Sept 28       CRS                         12         Yes Schedule     Sept 29       SM                         12         Yes B       Sept 30       SM                         12         Yes Oct 01         SM                         12         Yes Oct02         SM                         12         Yes
Sept 28 CRS 12 Yes Schedule Sept 29 SM 12 Yes B Sept 30 SM 12 Yes Oct 01 SM 12 Yes Oct02 SM 12 Yes
* Does The Above Meet Re-activation Standard?           Yes       No         NIR Date         Position                     Hours     Attend All Turnovers?
* Does The Above Meet Re-activation Standard?
Sept22         SM                         12         Yes Schedule     Sept 23       SM                         12         Yes c       Sept 24       STA                         8         No (last 4 hrs of shift in Work Control)
Yes No NIR Date Position Hours Attend All Turnovers?
Sept 25       SM                         12         Yes Sept 27       SM                         12         Yes
Sept22 SM 12 Yes Schedule Sept 23 SM 12 Yes c Sept 24 STA 8 No (last 4 hrs of shift in Work Control) Sept 25 SM 12 Yes Sept 27 SM 12 Yes
* Does The Above Meet Re-activation Standard?           Yes       No         NIR
* Does The Above Meet Re-activation Standard?
                                                      -8 of 8-
Yes No NIR -8 of 8-SRO APPL. TO REV: NRC 14-2 SRO EC JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: JPM Completion Perform Location: Classroom ATE PERFORMED: PERFORMANCE EVALUATION
 
: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Review ST-23C , Jet Pump Operability-Two Loop NRC KJA SYSTEM NUMBER: -=2:..:..:
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO        NRC 14-2 SRO          TASK TITLE:     Review ST-23C , Jet Pump Operability- Two Loop EC APPL . TO    JPM NUMBER REV:              DATE:                          NRC KJA SYSTEM NUMBER:       -=2:..:..:.2=-:....1.;. : 2:. . .J.(. .:. :..4. .;_{,)1_ _ _ __
.2=-:....1.;..::2:.....J.(...:..:.4 . ...;_{,1 ) ____ _ JAF QUAL STANDARD NUMBER: 20 Minutes ---=-.:......
JAF TASK NUMBER:                                  JAF QUAL STANDARD NUMBER:
OPERATIONS REVIEW:  
ESTIMATED COMPLETION TIME :        20     Minutes
/ TIME TO COMPLETE: Minutes D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
                            ---=-.:......
SUBMITTED:                                        OPERATIONS REVIEW:     ~~cd')'~
APPROVED :
                                                                          /
CANDIDATE NAME:
JPM Completion  Perform Location :      Classroom ATE PERFORMED:                      TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :        D       Satisfactory       D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER SRO NRC 14-2 SRO EC APPL. TO JPM NUMBER JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Review ST-23C , Jet Pump Operability-Two Loop Current Update: By: Date Outstanding Items 0 Technical Review 0 Questions and Answers 0 Procedural Change Required Comments: Current Update: Date Previous Revision Date: By: -2 of 6-lnt 0 Additional Information 0 Validation
SIGNATURE/PRINTED CANDIDATE REVIEW:
['8] None Int.
SIGNATURE REVIEWED BY:                                           DOC . COMPLETE :
SRO APPL. TO NRC 14-2 SRO EC JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Review ST-23C , Jet Pump Operability-Two Loop A. ST-23C , Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure a copy of the associated JPM handout is available for each candidate (ST-23C completed up to Management SRO Review-numbers based on failure of JP 4 at 100% power). EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated. B. If simulating this task , then inform the cand i date that the conditions of each step need only be properly identified and not actually performed.
PROGRAM ADMINISTER
C. The candidate should demonstrate proper use of HU too l s such as procedure use , self checking , place keeping and three-point communication.
 
VI. TASK CONDITIONS A. ST-23C , Jet Pump Operability Test for Two Loop Operation (EPIC Available), has been performed and is ready for the Management SRO Review. -3 of 6-  
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO           NRC 14-2 SRO       TASK TITLE:       Review ST-23C, Jet Pump Operability- Two Loop EC APPL. TO          JPM NUMBER Current Update:                           By:
*-CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform the Management SRO Review of ST-23C per section 11.2. Report your findings in the space below, including any required actions or restrictions (Tech Spec , TRM, ODCM , etc.), if applicable
Date                             lnt Outstanding Items 0     Technical Review                               0    Additional Information 0     Questions and Answers                         0    Validation 0     Procedural Change Required                     ['8] None Comments:
." EVALUATOR:
Current Update:                                 By:
Provide the candidate with the attached handout and the prepared copy of ST-23C. STEP STANDARD EVALUATION I COMMENT 1. Review data recorded in ST-Reviews data recorded in ST-23C. SAT I UNSAT 23C. *2. Identify calculation error in Identifies the calculation in step 8.2 should be recorded as CRITICAL STEP step 8.2. 6.5 Mlbmlhr. SAT I UNSAT *3. Identify Level 1 Acceptance Identifies Level 1 Acceptance Criteria 1 0.1.1 is NOT met CRITICAL STEP Criteria 1 0.1.1 is NOT met. due to Recirculation loop jet pump flow mismatch. SAT I UNSAT . EVALATOR NOTE: Level1 Acceptance Criteria 10.1.1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr. ----4 of 6-  
Date                                       Int.
---------STEP STANDARD EVALUATION I COMMENT *4. Identify Level1 Acceptance Identifies Level 1 Acceptance Criteria 1 0.1.2 is NOT met. CRITICAL STEP Criteria 1 0.1.2 is NOT met. SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1.2 is NOT met because both:
Previous Revision Date:
                                              -2 of 6-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO             NRC 14-2 SRO             TASK TITLE:       Review ST-23C, Jet Pump Operability- Two Loop EC APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-23C, Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure a copy of the associated JPM handout is available for each candidate (ST-23C completed up to Management SRO Review- numbers based on failure of JP 4 at 100% power).
EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
place keeping and three-point communication.
VI. TASK CONDITIONS A. ST-23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available) , has been performed and is ready for the Management SRO Review.
                                                      -3 of 6-
 
*-CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform the Management SRO Review of ST-23C per section 11 .2. Report your findings in the space below, including any required actions or restrictions (Tech Spec, TRM, ODCM , etc.), if applicable."
EVALUATOR: Provide the candidate with the attached handout and the prepared copy of ST-23C.
STEP                                           STANDARD                           EVALUATION I COMMENT
: 1.     Review data recorded in ST-       Reviews data recorded in ST-23C .                                 SAT I UNSAT 23C.
    *2.     Identify calculation error in     Identifies the calculation in step 8.2 should be recorded as     CRITICAL STEP step 8.2.                         6.5 Mlbmlhr.                                                     SAT I UNSAT
    *3.     Identify Level 1 Acceptance       Identifies Level 1 Acceptance Criteria 10.1.1 is NOT met         CRITICAL STEP Criteria 10.1.1 is NOT met.       due to Recirculation loop jet pump flow mismatch.                 SAT I UNSAT
                                              .
EVALATOR NOTE: Level1 Acceptance Criteria 10.1.1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr.
                                              --   -
                                                                  -4 of 6-
 
                              ------                                                 -             - -
STEP                                           STANDARD                         EVALUATION I COMMENT
*4. Identify Level1 Acceptance       Identifies Level 1 Acceptance Criteria 10.1.2 is NOT met.       CRITICAL STEP Criteria 10.1.2 is NOT met.                                                                       SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1.2 is NOT met because both:
* Loop flow is greater than 5% from predicted on Attachments 3 and 4 AND
* Loop flow is greater than 5% from predicted on Attachments 3 and 4 AND
* Jet pump 3 and 4 dPs are greater than 20% below established values. 5. Identify required notification. Identifies immediate notification of the Operations Manager SAT I UNSAT or alternate is required. *6. Identify required corrective Identifies Technical Specification LCO 3.4.1 Condition B CRITICAL STEP and compensatory actions. must be entered (restore mismatch within 24 hours). SAT I UNSAT Identifies Technical Specification LCO 3.4.2 Condition A must be entered (be in Mode 3 within 12 hours). EVALUATOR:
* Jet pump 3 and 4 dPs are greater than 20% below established values .
Terminate the task at this point. -5 of 6-HANDOUT
: 5. Identify required notification. Identifies immediate notification of the Operations Manager     SAT I UNSAT or alternate is required .
* ST -23C, Jet Pump Operability Test for Two Loop Operation
*6. Identify required corrective     Identifies Technical Specification LCO 3.4.1 Condition B       CRITICAL STEP and compensatory actions.       must be entered (restore mismatch within 24 hours).             SAT I UNSAT Identifies Technical Specification LCO 3.4.2 Condition A must be entered (be in Mode 3 within 12 hours).
{EPIC Available), has been performed and is ready for the Management SRO Review. Perform the Management SRO Review of ST -23C per section 11.2. Report your findings in the space below, including any required actions or restrictions
EVALUATOR: Terminate the task at this point.
{Tech Spec, TRM, ODCM, etc.), if applicable.  
                                                        -5 of 6-
-6 of 6-SRO APPL. TO REV: NRC 14-2 SRO RC JPM NUMBER DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Determine Visitor RCA Access Requirements NRC KIA SYSTEM NUMBER: _2_. 3_.4---'(.._3._7).__
 
___ _ JAF QUAL STANDARD NUMBER: 15 Minutes ----------------------------------------------------------------------------------------
HANDOUT
CANDIDATE NAME: JPM Completion Perform Location: Classroom ATE PERFORMED: TIME TO COMPLETE:
* ST -23C, Jet Pump Operability Test for Two Loop Operation {EPIC Available), has been performed and is ready for the Management SRO Review.
Minutes PERFORMANCE EVALUATION:
Perform the Management SRO Review of ST -23C per section 11.2. Report your findings in the space below, including any required actions or restrictions {Tech Spec, TRM, ODCM, etc.), if applicable.
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
                              -6 of 6-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO       NRC 14-2 SRO       TASK TITLE :   Determine Visitor RCA Access Requirements RC APPL. TO      JPM NUMBER REV:              DATE:                    NRC KIA SYSTEM NUMBER:         _2_.3_.4---'(.._3._7).___ _ __
JAF TASK NUMBER:                              JAF QUAL STANDARD NUMBER :
ESTIMATED COMPLETION TIME :
                            -  Minutes SUBMITTED:
APPROVED :
-------------------------------------------------------------------------------------
CANDIDATE NAME :
JPM Completion   Perform Location :       Classroom ATE PERFORMED:                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION:         0   Satisfactory       0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER SRO APPL. TO Current Update: Outstanding Items NRC 14-2 SRO RC JPM NUMBER Date D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Determine Visitor RCA Access Requirements By: lnt D Additionallnformation D Validation D Procedural Change Required [2J None Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
Current Update: By: Date Int. Previous Revision Date: -2 of 8-SRO APPL. TO NRC 14-2 SRO RC JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Determine Visitor RCA Access Requirements A. EN-RP-201 , Dosimetry Administration B. EN-RP-202 , Personnel Monitoring Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Ensure sufficient copies of EN-RP-201 and EN-RP-202. V. EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated. B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communicat i on. VI. TASK CONDITIONS A. A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System. B. Dose rates in the associated work area range from 0 -5 mr/hr. C. The evaluation is expected to take approx i mately 6 hours. D. The Operations Manager has designated you as the visitor sponsor and visitor escort. E. Security arrangements have already been completed for visitor access. F. The individual has never been exposed to or monitored for Occupational Radiation Exposure. G. The individual will NOT be trained as a Radworke r and will NOT perform any work. -3 of 8-  
SIGNATURE REVIEWED BY:                                       DOC . COMPLETE :
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public. Identify the individual
PROGRAM ADMINISTER
's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline.
 
Document your results on the provided worksheet." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of the Obtains a copy of EN-RP-201 and/or EN-RP-202 , as SAT I UNSAT correct procedure.
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO           NRC 14-2 SRO       TASK TITLE:       Determine Visitor RCA Access Requirements RC APPL. TO          JPM NUMBER Current Update:                          By:
required.  
Date                            lnt Outstanding Items D    Technical Review                              D   Additionallnformation D     Questions and Answers                          D    Validation D     Procedural Change Required                     [2J None Comments:
*2. Identify procedural Identifies requirements of EN-RP-202 section 5.3.[1] must CRITICAL STEP requirements for allowing the be met: SAT I UNSAT individual to enter the RCA as Perform an indoctrination briefing of Attachment 9.2 . a visitor. *
Current Update:                                 By:
Date                                       Int.
Previous Revision Date:
                                              -2 of 8-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO             NRC 14-2 SRO             TASK TITLE :      Determine Visitor RCA Access Requirements RC APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EN-RP-201 , Dosimetry Administration B. EN-RP-202, Personnel Monitoring Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Ensure sufficient copies of EN-RP-201 and EN-RP-202.
V. EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed .
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
place keeping and three-point communication.
VI. TASK CONDITIONS A. A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System .
B. Dose rates in the associated work area range from 0 - 5 mr/hr.
C. The evaluation is expected to take approximately 6 hours.
D. The Operations Manager has designated you as the visitor sponsor and visitor escort.
E. Security arrangements have already been completed for visitor access.
F. The individual has never been exposed to or monitored for Occupational Radiation Exposure.
G. The individual will NOT be trained as a Radworker and will NOT perform any work.
                                                      -3 of 8-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public. Identify the individual's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline. Document your results on the provided worksheet."
STEP                                             STANDARD                           EVALUATION I COMMENT
: 1.     Obtain a controlled copy of the     Obtains a copy of EN-RP-201 and/or EN-RP-202, as                     SAT I UNSAT correct procedure.                 required.
    *2.     Identify procedural                 Identifies requirements of EN-RP-202 section 5.3.[1] must           CRITICAL STEP requirements for allowing the       be met:                                                               SAT I UNSAT individual to enter the RCA as a visitor.
* Perform an indoctrination briefing of Attachment 9.2 .
* Escort briefed per page 2 of Attachment 9.1 .
* Escort briefed per page 2 of Attachment 9.1 .
* Visitor and escort complete Attachment 9.9 when the briefing is completed.
* Visitor and escort complete Attachment 9.9 when the briefing is completed.
* Assign individual a DLR.
* Assign individual a DLR.
* Assign TEDE limits per EN-RP-201 . EVALUATOR NOTE: See attached key to assist in grading the candidate's completed worksheet.
* Assign TEDE limits per EN-RP-201 .
Each of these requirements may be written out or the appropriate procedure steps may be referenced.  
EVALUATOR NOTE: See attached key to assist in grading the candidate's completed worksheet. Each of these requirements may be written out or the appropriate procedure steps may be referenced.
-4 of 8-STEP STANDARD EVALUATION I COMMENT *3. Identify the individual's annual Identifies the individual's routine annual administrative dose CRITICAL STEP regulatory dose limit. guideline as 100 mrem/year.
                                                                      -4 of 8-
SAT/UNSAT  
 
*4. Identify the individual's Identifies the individual's maximum annual administrative CRITICAL STEP maximum annual administrative dose guideline. dose guideline as 100 mrem/year. SAT/UNSAT  
STEP                                           STANDARD                           EVALUATION I COMMENT
*5. Identify the individual's routine Identifies the individual's routine annual administrative dose CRITICAL STEP annual administrative dose guideline.
*3. Identify the individual's annual Identifies the individual's routine annual administrative dose     CRITICAL STEP regulatory dose limit.           guideline as 100 mrem/year.                                         SAT/UNSAT
guideline as 50 mrem/year.
*4. Identify the individual's         Identifies the individual's maximum annual administrative         CRITICAL STEP maximum annual                   dose guideline as 100 mrem/year.                                   SAT/UNSAT administrative dose guideline.
SAT/UNSAT EVALUATOR:
*5. Identify the individual's routine Identifies the individual's routine annual administrative dose     CRITICAL STEP annual administrative dose       guideline as 50 mrem/year.                                         SAT/UNSAT guideline.
Terminate the task at this point. -5 of 8-EVALUATOR'S KEY 1. Identify the procedural requirements for allowing the individual to enter the RCA as a visitor: Requirements of EN-RP-202 section 5.3.[1] must be met:
EVALUATOR: Terminate the task at this point.
                                                          -5 of 8-
 
EVALUATOR'S KEY
: 1. Identify the procedural requirements for allowing the individual to enter the RCA as a visitor:
Requirements of EN-RP-202 section 5.3.[1] must be met:
* Perform an indoctrination briefing of Attachment 9.2.
* Perform an indoctrination briefing of Attachment 9.2.
* Escort briefed per page 2 of Attachment 9.1.
* Escort briefed per page 2 of Attachment 9.1.
Line 363: Line 993:
* Assign individual a DLR.
* Assign individual a DLR.
* Assign TEDE limits per EN-RP-201.
* Assign TEDE limits per EN-RP-201.
EVALUATOR NOTE: Each of these requirements may be written out or the appropriate procedure steps may be referenced. 2. Identify the individual's annual regulatory dose limit: 100 mrem/year
EVALUATOR NOTE: Each of these requirements may be written out or the appropriate procedure steps may be referenced .
: 2. Identify the individual's annual regulatory dose limit:
100 mrem/year
: 3. Identify the individual's maximum annual administrative dose guideline:
: 3. Identify the individual's maximum annual administrative dose guideline:
100 mrem/year
100 mrem/year
: 4. Identify the individual's routine annual administrative dose guideline:
: 4. Identify the individual's routine annual administrative dose guideline:
50 mrem/year EVALUATOR'S KEY -6 of 8-HANDOUT
50 mrem/year EVALUATOR'S KEY
                                              -6 of 8-
 
HANDOUT
* A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System.
* A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System.
* Dose rates in the associated work area range from 0 -5 mr/hr.
* Dose rates in the associated work area range from 0 -
5 mr/hr.
* The evaluation is expected to take approximately 6 hours.
* The evaluation is expected to take approximately 6 hours.
* The Operations Manager has designated you as the visitor sponsor and visitor escort .
* The Operations Manager has designated you as the visitor sponsor and visitor escort .
* Security arrangements have already been completed for visitor access.
* Security arrangements have already been completed for visitor access.
* The individual has never been exposed to or monitored for Occupational Radiation Exposure.
* The individual has never been exposed to or monitored for Occupational Radiation Exposure.
* The individual will NOT be trained as a Radworker and will NOT perform any work. Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public. Identify the individual's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline.
* The individual will NOT be trained as a Radworker and will NOT perform any work.
Document your results on the provided worksheet.  
Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public.
-7 of 8-WORKSHEET
Identify the individual's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline. Document your results on the provided worksheet.
: 1. Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor: 2. Identify the individual's annual regulatory dose limit: 3. Identify the individual's maximum annual administrative dose guideline:
                              -7 of 8-
: 4. Identify the individual's routine annual administrative dose guideline:  
 
-8 of 8-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO APPL. TO 14-2 NRC SRO EP JPM NUMBER TASK TITLE: Determine Emergency Classification and Initiate Event Notification REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: NRC KIA SYSTEM NUMBER: JAF QUAL STANDARD NUMBER: 30 Minutes --'--CANDIDATE NAME: LOGIN ID: JPM Completion Perform Location: Classroom DATE PERFORMED: TIME TO COMPLETE:
WORKSHEET
Minutes ---ERFORMANCE EVALUATION
: 1. Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor:
: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
: 2. Identify the individual's annual regulatory dose limit:
: 3. Identify the individual's maximum annual administrative dose guideline:
: 4. Identify the individual's routine annual administrative dose guideline:
                                          -8 of 8-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO       14-2 NRC SRO EP     TASK TITLE:     Determine Emergency Classification and Initiate APPL. TO        JPM NUMBER                          Event Notification REV:               DATE:                     NRC KIA SYSTEM NUMBER:         ....:2:..:..4..:..:.*_;_44.:_(~4.:_.4..t_)- - - - -
JAF TASK NUMBER:                               JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME :  --'--
30 Minutes SUBMITTED:
APPROVED:
CANDIDATE NAME:                                                   LOGIN ID:
JPM Completion   Perform Location :       Classroom DATE PERFORMED:                     TIME TO COMPLETE:                   Minutes
                                                            ---
ERFORMANCE EVALUATION :         0   Satisfactory       0   Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER  
SIGNATURE/PRINTED CANDIDATE REVIEW:
-1 of 9-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO APPL. TO Current Update: Outstanding Items 14-2 NRC SRO EP JPM NUMBER Date D Technical Review D Questions and Answers D Procedural Change Required Comments:
SIGNATURE REVIEWED BY:                                         DOC . COMPLETE :
Current Update Date Previous Revision Date: TASK TITLE: Determine Emergency Classification and Initiate Event Notification By: By: -2 of 9-lnt D Additional Information D Validation
PROGRAM ADMINISTER
[8:1 None lnt ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO APPL. TO 14-2 NRC SRO EP JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. IAP-1 B. IAP-2 C. EAP-1.1 D. EAP-4 Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS TASK TITLE: Determine Emergency Classification and Initiate Event Notification A. Ensure sufficient copies of the referenced documents are available , including extra copies of the Part 1 notification form. V. EVALUATOR NOTES A. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , placekeeping and three-point communication. -3 of 9-SRO APPL. TO ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE 14-2 NRC SRO EP JPM NUMBER TASK TITLE: Determine Emergency Classification and Initiate Eve n t Notification VI. TASK CONDITIONS A. The plant was initially operatin9 at 100% power with no equipment out of service. B. An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.
                                            -1 of 9-
C. The Reactor was manually scrammed five minutes ago. E. The following conditions exist now:
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO           14-2 NRC SRO EP   TASK TITLE :    Determine Emergency Classification and Initiate APPL. TO          JPM NUMBER                       Event Notification Current Update:                        By:
Date                         lnt Outstanding Items D Technical Review                               D    Additional Information D Questions and Answers                           D    Validation D Procedural Change Required                     [8:1 None Comments:
Current Update                                 By:
Date                                   lnt Previous Revision Date:
                                            -2 of 9-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO         14-2 NRC SRO EP           TASK TITLE:      Determine Emergency Classification and Initiate APPL. TO        JPM NUMBER                               Event Notification I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. IAP-1 B. IAP-2 C. EAP-1 .1 D. EAP-4 Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Ensure sufficient copies of the referenced documents are available, including extra copies of the Part 1 notification form .
V. EVALUATOR NOTES A. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .
                                                    -3 of 9-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO        14-2 NRC SRO EP           TASK TITLE:       Determine Emergency Classification and Initiate APPL. TO        JPM NUMBER                              Event Notification VI. TASK CONDITIONS A. The plant was initially operatin9 at 100% power with no equipment out of service.
B. An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.
C. The Reactor was manually scrammed five minutes ago.
E. The following conditions exist now:
* Reactor pressure is 200 psig and lowering.
* Reactor pressure is 200 psig and lowering.
* Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.
* Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.
* Drywell pressure is 15 psig and slowly rising.
* Drywell pressure is 15 psig and slowly rising .
* A steam leak in the Reactor Building coming from the Reactor Water Cleanup system has been reported.
* A steam leak in the Reactor Building coming from the Reactor Water Cleanup system has been reported.
* Reactor Water Cleanup isolation valves 12MOV-15 and 12MOV-18 have failed to close.
* Reactor Water Cleanup isolation valves 12MOV-15 and 12MOV-18 have failed to close .
* A team is being assembled to close 12MOV-18 in the field. Expected completion time for the team is 2 hours from now.
* A team is being assembled to close 12MOV-18 in the field . Expected completion time for the team is 2 hours from now.
* Reactor Building differential pressure i s -0.25" H 2 0.
* Reactor Building differential pressure is -0.25" H2 0 .
* No change has been seen in Stack or Reactor Building exhaust radiation levels.
* No change has been seen in Stack or Reactor Building exhaust radiation levels.
* 200' elevation wind speed is 10 mph from 190&deg;.
* 200' elevation wind speed is 10 mph from 190&deg;.
* 30' elevation wind speed is 5 mph from 190&deg;.
* 30' elevation wind speed is 5 mph from 190&deg;.
* Stability class is E. -4 of 9-SRO '-"" 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification VII. INITIATING CUE Inform the candidate of the following: "1. Classify the event and inform the examiner of the classification.
* Stability class is E.
: 2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.
                                                  -4 of 9-
This is a time critical JPM. Your time clock starts once you acknowledge this task." * -CRITICAL STEP STEP STANDARD EVALUATION I COMMENT 1. Obtain applicable reference documents Obtains a copy of applicable reference documents, as SAT I UNSAT needed:
 
SRO       '-""   14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification VII. INITIATING CUE Inform the candidate of the following :
"1. Classify the event and inform the examiner of the classification. 2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.
This is a time critical JPM. Your time clock starts once you acknowledge this task."
* - CRITICAL STEP STEP                                             STANDARD                           EVALUATION I COMMENT
: 1.       Obtain applicable reference documents     Obtains a copy of applicable reference documents, as               SAT I UNSAT needed:
* IAP-1
* IAP-1
* IAP-2
* IAP-2
* EAP-1.1 EVALUATOR:
* EAP-1.1 EVALUATOR: Ensure sufficient copies of these documents are available.
Ensure sufficient copies of these documents are available.  
    *2.     Classify the event                         Classifies the event as General Emergency FG1.1                   CRITICAL STEP based on loss of RCS and Primary Containment barriers               SAT I UNSAT and potential loss of Fuel Clad Barrier within 15 minutes of JPM start time.
*2. Classify the event Classifies the event as General Emergency FG1.1 CRITICAL STEP based on loss of RCS and Primary Containment barriers and potential loss of Fuel Clad Barrier within 15 minutes SAT I UNSAT of JPM start time. JPM start time: Time of classification
JPM start time:
: Time difference:  
Time of classification :
-5 of 9-SRO " 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP STANDARD EVALUATION I COMMENT *3. Implement EAP-1.1, Offsite Completes EAP-1.1 Attachment 1, Part 1 notification CRITICAL STEP Notifications , in order to notify offsite form per attached key within 15 minutes of classification SAT I UNSAT agencies.
Time difference:
time. Time of classification
                                                                        -5 of 9-
: Time of offsite notification
 
: Time difference
SRO   "   14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP                                           STANDARD                         EVALUATION I COMMENT
: EVALUATOR NOTE: Only item 3 , 4 , 5 , 6 , 7 , 9 , and 10 of EAP-1.1 Attachment 1 are deemed critical for this JPM. These items are individually graded in the JPM steps below. All other items are non-critical.
  *3. Implement EAP-1 .1, Offsite               Completes EAP-1 .1 Attachment 1, Part 1 notification         CRITICAL STEP Notifications, in order to notify offsite form per attached key within 15 minutes of classification     SAT I UNSAT agencies.                                 time.
See attached key. *4. Completes Part 1 Notification step 3. Indicates "GENERAL EMERGENCY" in Part 1 CRITICAL STEP Notification step 3 (see attached key). SAT I UNSAT *5. Completes Part 1 Notification step 4. Records today's date and time of declaration in Part 1 CRITICAL STEP Notification step 4 (see attached key). SAT I UNSAT *6. Completes Part 1 Notification step 5. Indicates "No Release" in Part 1 Notification step 5 (see CRITICAL STEP attached key). SAT I UNSAT -----6 of 9-SRO ....,.. 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP STANDARD EVALUATION I COMMENT *6. Completes Part 1 Notification step 6. Indicates "EVACUATE and IMPLEMENT the Kl PLAN CRITICAL STEP for the following ERPA. .. : 1 , 2 , 3, 26 , 27" in Part 1 SAT/UNSAT Notification step 6 (see attached key). *7. Completes Part 1 Notification step 7. Indicates EAL # " FG1.1" in Part 1 Notification step 7 CRITICAL STEP (see attached key). SAT/UNSAT  
Time of classification :
*8. Completes Part 1 Notification step 9. Indicates elevated wind speed of 10 mph in Part 1 CRITICAL STEP Notification step 9 (see attached key). SAT/UNSAT Indicates ground wind speed of 5 mph in Part 1 Not i fication step 9 (see attached key). *9. Completes Part 1 Notification step 10. Indicates elevated wind direction of 190&deg; in Part 1 CRITICAL STEP Notification step 10 (see attached key). SAT/UNSAT Indicates ground wind direction of 190&deg; in Part 1 Notification step 10 (see attached key). EVALUATOR:
Time of offsite notification:
Terminate the task at this point. ---------7 of 9-EVALUATOR'S KEY PART O NE GLNERAL INfORMATION Paqe 1 of 1 NEW YORK STATE UPSTAIR RADIOLOGICAL EMERGENCY DA.TA FORM PART l NOii(JCIIian II 'TillS iii tl) rlplli an inek!ent*
Time difference:
11e J*-A. Fllz.f'Ridl Plri S.lllldbrlur (c-Ml rdll:lll to lndudlllllldloltolng t!Mienttl D  
EVALUATOR NOTE: Only item 3, 4 , 5, 6, 7, 9, and 10 of EAP-1 .1 Attachment 1 are deemed critical for this JPM. These items are individually graded in the JPM steps below. All other items are non-critical. See attached key.
..... CJ o.w.go COUIIIIJ 0 t.IIN Mllil l'vlnt Ulllt ft 0 NIM llllllle f>tOinlt Unit n FIIOII: (Z.!&..I2&#xa3;..
  *4. Completes Part 1 Notification step 3. Indicates "GENERAL EMERGENCY" in Part 1                       CRITICAL STEP Notification step 3 (see attached key) .                       SAT I UNSAT
OTHER) ED Appi'OYilll:
  *5. Completes Part 1 Notification step 4. Records today's date and time of declaration in Part 1       CRITICAL STEP Notification step 4 (see attached key).                       SAT I UNSAT
tNFORMATION tNote: 0 When chldc.ed ll'dl'*-c:hiMe In statue, NOT for D1ace *** u.u.ge1ranamllild an: (Oilflt lllltnm.t 24 HcNr Clodf v*: A. RECI [] NY ..... ; 51848W2GO r;V201 [] o.-* Co.: $11.0150 QtJ111 [] .. ,
  *6. Completes Part 1 Notification step 5. Indicates "No Release" in Part 1 Notification step 5 (see     CRITICAL STEP attached key).                                                 SAT I UNSAT
* i: 34N20t II[.Canlrllil  
                                      ----
*Roam HcllinB a NMP II 2: 02. lll is is: A. An AcNal (a.)AD!:IIcn:ilo Ol. The il: A. UNUSUAL EVE.'ff AREA EMERGI:NcY  
                                                                    -6 of 9-
& il.MEROHNcY TERMINATED B. ALERT ENERAL EMERGENCY
 
: f. Otha-04. Thi1 EmciJmqo ClusifiCIIiall an; trCNJan wreJ *' IJime l (daW) f 1iml:>-24 br OS. of RadiD.:ti>-c Mftriai&!Nc wlbc diiNIIIicd even!; Noltdease Rdaue BELOW &#xa3;oderl.llimilll Ted111K.I Spel'ific.-.
SRO   ....,.. 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP                                                   STANDARD                       EVALUATION I COMMENT
tion D Tb g Ta W11et C. Ret-e ABO ... &#xa3; limilt Specif.eati011 cToWIIer D.
  *6.       Completes Part 1 Notification step 6.         Indicates "EVACUATE and IMPLEMENT the Kl PLAN               CRITICAL STEP for the following ERPA. .. : 1, 2, 3, 26, 27" in Part 1     SAT/UNSAT Notification step 6 (see attached key).
: 06. The fiJlllnwioll'rof<<<iYe ACdQDJ to be impletnetMd BICM:II u pmctkla'ble
  *7.       Completes Part 1 Notification step 7.         Indicates EAL # "FG1.1 " in Part 1 Notification step 7     CRITICAL STEP (see attached key) .                                         SAT/UNSAT
: A. NO NEED,_. Pll0Tt:C11VE ACTJOI'I"'S OII!Side 1he sile {!)EV ACtiATI! llld IMPLEMENT tM ICJ PUN for 1M follCPAing ERPAs and rema.iJliq EIU'As MONITOR lbt EMERGENCY AURTSYSTIM lS o lS 1 2 S 6 7 I 9 10 II l:Z 13 14 IS 16 17 I I 1 9 ;zo 2:z Zl 24 :z9 1'o'fl]L* Qff1lrE. d rJI((OIIITlfS.SHOuL/l.  
  *8.       Completes Part 1 Notification step 9.         Indicates elevated wind speed of 10 mph in Part 1           CRITICAL STEP Notification step 9 (see attached key) .                     SAT/UNSAT Indicates ground wind speed of 5 mph in Part 1 Notification step 9 (see attached key) .
'JH1.5J.llU T&#xa3;R.JN.PY.'-&#xa3;  
  *9.       Completes Part 1 Notification step 10.         Indicates elevated wind direction of 190&deg; in Part 1         CRITICAL STEP Notification step 10 (see attached key) .                   SAT/UNSAT Indicates ground wind direction of 190&deg; in Part 1 Notification step 10 (see attached key).
+ TM,j.lfJJ.f.&J'A'-f.!Al(QN C. SHI!L TER-I:N.rLACE N!CliMPUMIINT lllle Kl PLAN fGr the tollowlna EltPAs llld All mr.inio,a )f()NJTOR till &#xa3;MIJlG&#xa3;NC'W AL&#xa3;RT SYSTJtM I 2 l .. s ' 7 ll 9 10 11 11 tl 14 IS 1 6 1 7 II l!l 20 2 1 l2 23 24 1S 2:6 27 za 29 07. tALl FGU Brief En:nc henl* NOT Clftlr:lfj Dciaiption I; Oilier SiFi6CIIII Oil Jb!lol;tlot Sr.tlll8: A. OperatiOIIIII ffoa'llf'l Dire at tsllrlt me
EVALUATOR: Terminate the task at this point.
* mmula) (dille) (tilllC l4 t. dock) I 09. W111d$pced:
                                            - - - --- -               -
A. 10 MiJWHour at 100 fM(EkYIII:IIl)  
                                                                            -7 of 9-
** 5 Miletlllour ar 30 Feet: !Cii'OIIIIdl 010. Wind Di.ftu:tion:
 
A. (Fnlm) Jill ZCJQ * :: (Eie\oaed)
EVALUATOR'S KEY PART ONE GLNERAL INfORMATION                                                               Paqe 1 of 1 NEW YORK STATE UPSTAIR RADIOLOGICAL EMERGENCY DA.TA FORM PART l                                     NOii(JCIIian II
B. (from) 1SD
'TillS iii tl) rlplli an inek!ent* 11e     J*-   A. Fllz.f'Ridl ~ Plri S.lllldbrlur ~.* (c-Ml rdll:lll to lndudlllllldloltolng t!Mienttl D ~~ewvor~~ .....                   CJ o.w.go COUIIIIJ 0 t.IIN Mllil l'vlnt Ulllt ft 0 NIM llllllle f>tOinlt Unit n FIIOII:     (Z.!&..I2&#xa3;.. OTHER)                           ED Appi'OYilll:               (Sifln~ture]
* 111  
GE;Jti~ERAL tNFORMATION                             tNote: 0 When chldc.ed ll'dl'*- c:hiMe In statue, NOT for D1ace
.112 I_ iOI'OWIIdl ou. SUblldy C11W Ele\IIIC!d
  ***         u.u.ge1ranamllild an: (Oilflt                               lllltnm.t                       24 HcNr Clodf         v*:   A. RECI ..~
: I.!DilllliSi  
[]    o.-*
-A B c D G Oil. kparud By-Ccmnnanicalol's nunc:; --t ekP" booe II Iilli . INtmt! .dAnl!!;v), DQ any quetliOIII&?" 0 N.wYorll....
[] NY ..... ; 51848W2GO r;V201 Co.: $11.0150 QtJ111
D D Nine ... Point Unllltt [] lllrw Mile Point Unttt:l *J.,..A. FbP8Itlck NUcle*POWifPianlcut81 EVALUATOR'S KEY -8 of 9-HANDOUT
[] . .,
* i : 34N20t II[.Canlrllil *Roam HcllinB a     NMP II 2: ~2&COrllrGI~ H~
: 02.           lllis is :             A. An AcNal Ema~                      (a.) AD!:IIcn:ilo Ol.           The Eme~ CLmir~e~tian il:
A. UNUSUAL EVE.'ff               ~~E AREA EMERGI:NcY                                   & il.MEROHNcY TERMINATED B. ALERT                                 ENERAL EMERGENCY                               f . Otha-
: 04.           Thi1 EmciJmqo ClusifiCIIiall de~:IIIRCran;                 trCNJan wreJ                                   IJimel (daW)                           *'        f1iml:>-24 br clock~
OS.         I ~: of RadiD.:ti>-c Mftriai&!Nc wlbc diiNIIIicd even!;
Noltdease Rdaue BELOW &#xa3;oderl.llimilll Ted111K.I Spel'ific.-.tion D Tb Aln>Oiiph~~~e          g Ta W11et C. Ret-e ABO... &#xa3;         ~rat limilt T<<blli~ll      Specif.eati011 c To~                      cToWIIer D.   ~rel-ftlCIIIiriuewlllllillll
: 06.           The fiJlllnwioll'rof<<<iYe ACdQDJ ate~ to be impletnetMd BICM:II                             upmctkla'ble:
A. NO NEED,_. Pll0Tt:C11VE ACTJOI'I"'S OII!Side 1he sile ~
lS o lS
{!)EVACtiATI! llld IMPLEMENT tM ICJ PUN for 1M follCPAing ERPAs and
                  ~ rema.iJliq EIU'As MONITOR lbt EMERGENCY AURTSYSTIM 1 2 ~ S 6 7 I 9 10 II l:Z 13 14 IS 16 17 I I 19 ;zo
                                                                                                                        ~*
2:z Zl   24               :z9 1'o'fl]L* Qff1lrE. d rJI((OIIITlfS.SHOuL/l. 'JH1.5J.llU ~EL T&#xa3;R.JN.PY.'-&#xa3; + TM,j.lfJJ.f.&J'A'-f.!Al(QN IS.I:K!I.ad.~M C. SHI!LTER-I:N.rLACE N!CliMPUMIINT lllle Kl PLAN fGr the tollowlna EltPAs llld All mr.inio,a ell'~ )f()NJTOR till &#xa3;MIJlG&#xa3;NC'W AL&#xa3;RT SYSTJtM I 2 l         . s       7 ll 9 10 11 11 tl 14 IS 16 17 II l!l 20 21 l2 23 24 1S 2:6 27                                           za 29
: 07.         tALl           FGU Brief En:nc                                   {~fiCHU/ desr:~fton        henl* NOT Clftlr:lfj Dciaiption I; Oilier SiFi6CIIII lnf~icm Oil           Jb!lol;tlot Sr.tlll8:     A. OperatiOIIIII       ~hllldown            ffoa'llf'l Dire       at tsllrlt me * ~ mmula)
(dille)                 (tilllC l4 t. dock) 10                                              100 I
: 09.           W111d$pced:           A.                   MiJWHour at dcv~on                            fM(EkYIII:IIl) 010.
                                        **
Wind Di.ftu:tion: A. (Fnlm) 5 Jill Miletlllour ar el~
                                                                      ~-ll'~iQD 30 ZCJQ Feet: !Cii'OIIIIdl
                                                                                                                * : : (Eie\oaed)
B. (from)     1SD         * ~- 111 ele~'MiCft              .112           I_iOI'OWIIdl ou.             SUblldy C11W Ele\IIIC!d: I.!DilllliSi - A B c ~ - D ~ *( E l F G t ekP"booe II Iilli Oil.
        .INtmt! .dAnl!!;v), DQ kparud By- Ccmnnanicalol's nunc:;
                                        ~...,.. any quetliOIII&?"
                                                                                      --
0     N.wYorll....               D ~Coun11                D Nine ... Point Unllltt             [] lllrw Mile Point Unttt:l
      *J.,..A. FbP8Itlck NUcle*POWifPianlcut81 ~
EVALUATOR'S KEY
                                                                                  -8 of 9-
 
HANDOUT
* The plant was initially operating at 100% power with no equipment out of service.
* The plant was initially operating at 100% power with no equipment out of service.
* An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.
* An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.
* The Reactor was manually scrammed five minutes ago.
* The Reactor was manually scrammed five minutes ago.
* The following conditions exist now: o Reactor pressure is 200 psig and lowering.
* The following conditions exist now:
o Reactor pressure is 200 psig and lowering.
o Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.
o Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.
o Drywell pressure is 15 psig and slowly rising. o A steam leak in the Reactor Building coming from the Reactor Water Cleanup system has been reported.
o Drywell pressure is 15 psig and slowly rising.
o Reactor Water Cleanup isolation valves 12MOV-15 and 12MOV-18 have failed to close. o A team is being assembled to close 12MOV-18 in the field. Expected completion time for the team is 2 hours from now. o Reactor Building differential pressure is -0.25" H 2 0. o No change has been seen in Stack or Reactor Building exhaust radiation levels. o 200' elevation wind speed is 10 mph from 190&deg;. o 30' elevation wind speed is 5 mph from 190&deg;. o Stability class is E. 1. Classify the event and inform the examiner of the classification.
o A steam leak in the Reactor Building coming from the Reactor Water Cleanup system has been reported.
o Reactor Water Cleanup isolation valves 12MOV-15 and 12MOV-18 have failed to close.
o A team is being assembled to close 12MOV-18 in the field.
Expected completion time for the team is 2 hours from now.
o Reactor Building differential pressure is -0.25" H20.
o No change has been seen in Stack or Reactor Building exhaust radiation levels.
o 200' elevation wind speed is 10 mph from 190&deg;.
o 30' elevation wind speed is 5 mph from 190&deg;.
o Stability class is E.
: 1. Classify the event and inform the examiner of the classification.
: 2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.
: 2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.
This is a time critical JPM. Your time clock starts once you acknowledge this task. -9 of 9-S/RO NRC 1 4-2 A APPL. TO JPM NUMBER REV: DATE: JAF TASK NUMBER: EST I MATED COMPLETION TIME: SUBMITIED: APPROVED: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Resto r e CRD to Normal Al i gnment Follow i ng A TWS (Ait Path) NRC KIA SYSTEM NUMBER: 201001 A2.07 (3.2/3.1) JAF QUAL STANDARD NUMBER: 15 Minutes ---. OPERATIONS REVIEW: , /' ( -------------------------------------------------------------------------------------
This is a time critical JPM. Your time clock starts once you acknowledge this task.
CANDIDATE NAME: JPM Complet i on Location: TE PERFORMED: D Simulated D Plant C8J Performed cgj Simulator TIME TO COMPLETE:
                                    -9 of 9-
Minutes PERFORMANCE EVALUATION
 
: D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 A         TASK TITLE :   Restore CRD to Normal Al ignment Following A TWS (Ait Path)
APPL. TO      JPM NUMBER REV:              DATE:                      NRC KIA SYSTEM NUMBER:         201001 A2 .07 (3.2/3.1)
JAF TASK NUMBER:                                JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                            - -15  - Minutes
                                                                            . ?/')~*
SUBMITIED:                                    OPERATIONS REVIEW: , -;<? ~L---~
                                                                      / '   (
APPROVED :
-------------------------------------------------------------------------------------
CANDIDATE NAME :
JPM Completion    D  Simulated      C8J  Performed Location :       D   Plant           cgj Simulator TE PERFORMED:                    TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :         D   Satisfactory       D   Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 A APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Restore CRD to Normal Alignment Following ATWS (Ait Path) By: lnt D Additionallnformation D Validation D Procedural Change Required 1:8J None Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
Current Update: By: Date Int. Previous Revision Date: -2 of 7-S/RO NRC 14-2 A APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Restore CRD to Normal Alignment Following ATWS (Ait Path) A EP-3 , Backup Control Rod Insertion B. OP-25 , Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A Reset to an appropriate IC (IC-66). B. Ensure the Reactor is scrammed, but RPS i s reset. C. Ensure both CRD pumps are running. D. Ensure full open CRD Drive Water Pressure Control Valve 03MOV-20.
SIGNATURE REVIEWED BY:                                       DOC . COMPLETE:
PROGRAM ADMINISTER
 
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 A       TASK TITLE:     Restore CRD to Normal Alignment Following ATWS (Ait Path)
APPL. TO          JPM NUMBER Current Update:                          By:
Date                            lnt Outstanding Items D    Technical Review                              D   Additionallnformation D   Questions and Answers                        D    Validation D   Procedural Change Required                   1:8J None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2 of 7-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 A             TASK TITLE:      Restore CRD to Normal Alignment Following ATWS (Ait Path)
APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A   None II. REFERENCES A   EP-3, Backup Control Rod Insertion B. OP-25, Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A   None IV. SET UP REQUIREMENTS A   Reset to an appropriate IC (IC-66).
B. Ensure the Reactor is scrammed, but RPS is reset.
C. Ensure both CRD pumps are running .
D. Ensure full open CRD Drive Water Pressure Control Valve 03MOV-20.
E. Ensure full closed CRD Cooling Water Pressure Control Valve 03MOV-22.
E. Ensure full closed CRD Cooling Water Pressure Control Valve 03MOV-22.
F. Ensure CRD Flow Control tapeset is run to maximum. G. Ensure override RD ZAI3FC301 (2), CRD FLOW CONTROLLER-AUTO , is preset at a high value (>95). V. EVALUATOR NOTES A The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.
F. Ensure CRD Flow Control tapeset is run to maximum.
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
G. Ensure override RD ZAI3FC301 (2), CRD FLOW CONTROLLER- AUTO, is preset at a high value
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication.
(>95).
VI. TASK CONDITIONS A An ATWS has occurred.
V. EVALUATOR NOTES A   The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
place keeping and three-point communication.
VI. TASK CONDITIONS A   An ATWS has occurred.
B. Control rods were inserted by raising CRD drive water and cooling water differential pressure.
B. Control rods were inserted by raising CRD drive water and cooling water differential pressure.
C. Another operator is assigned Reactor water level control. -3 of 7-  
C. Another operator is assigned Reactor water level control.
*-CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform EP-3 Section 5.15, CRD Hydraulic System Restoration.
                                                      -3 of 7-
The procedure has been completed up to step 5.15.4. Secure CRD pump 8 and leave CRD pump A running." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of EP-3. SAT I UNSAT EP-3. 2. Select the correct section to Selects Section 5.15. SAT I UNSAT perform the task. Starts at step 5.15.4. *3. IF both CRD pumps are Stops CRD pump 8 by rotating control switch CRITICAL STEP running , THEN shut down one of the CRD pumps. counterclockwise.
 
SAT I UNSAT 4. Establish normal CRD Obtains a controlled copy of OP-25 Section E. SAT I UNSAT Hydraulic System operating values per Section E of OP-25. EVALUATOR NOTE: JPM steps 8-13 may be performed in any order, but each has the potential to affect CRD parameters established in other steps. JPM steps 11 and 12 should only be graded SAT if the associated parameter is ensured in band at the completion of the JPM. This may require the candidate to re-adjust the associated controls.  
*-CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform EP-3 Section 5.15, CRD Hydraulic System Restoration. The procedure has been completed up to step 5.15.4. Secure CRD pump 8 and leave CRD pump A running ."
-4 of 7-STEP STANDARD EVALUATION I COMMENT *5. Establish normal CRD system Attempts to adjust tapeset on CRD FLOW CNTRL 03FIC-CRITICAL STEP flow. 301 to lower CRD system flow. SATIUNSAT EVALUATOR NOTE: The tapeset on 03FIC-301 is failed , such that the controller will not respond to the operator's adjustments while in AUTO. EN-OP-115 provides guidance for the operator to take manual control of a controller that has failed in automatic.
STEP                                       STANDARD                         EVALUATION I COMMENT
: 6. Recognize I report CRD Flow Reports CRD Flow Control Valve failure. SATIUNSAT Control Valve failure. EVALUATOR NOTE: If candidate asks how to proceed , direct them to make a recommendation and then carry out that recommendation.  
: 1.     Obtain a controlled copy of   Obtains a controlled copy of EP-3.                               SAT I UNSAT EP-3.
*7. Places CRD FLOW CNTRL Rotates CRD FLOW CNTRL 03FIC-301 selector clockwise CRITICAL STEP 03FIC-301 in MAN. to MAN. SAT I UNSAT *8. Establish normal CRD system Adjusts knob on CRD FLOW CNTRL 03FIC-301 to establish CRITICAL STEP flow. between 59 and 61 gpm. SAT I UNSAT *9. Establish normal CRD drive Throttles closed CRD Drive Water Motor Operated Pressure CRITICAL STEP water differential pressure.
: 2.     Select the correct section to Selects Section 5.15.                                             SAT I UNSAT perform the task.
Control Valve 03MOV-20 by rotating control switch SATIUNSAT counterclockwise. Adjusts 03MOV-20 as required to establish 260 to 270 psid drive water differential pressure. -5 of 7-  
Starts at step 5.15.4.
------STEP STANDARD EVALUATION I COMMENT 10. Establish normal CRD cooling Fully opens CRD Cooling Water Motor Operated Pressure SAT I UNSAT water valve alignment.
    *3.     IF both CRD pumps are         Stops CRD pump 8 by rotating control switch                     CRITICAL STEP running , THEN shut down one   counterclockwise.                                                SAT I UNSAT of the CRD pumps.
Control Valve 03MOV-22 by rotating control switch clockwise. EVALUATOR CUE: If necessary , report CRD stabilizing valve flow is 6 gpm. EVALUATOR NOTE: The step below is the last step in EP-3 Section 5.15. 11. Ensure reference leg backfill is Dispatches operator to ensure reference leg backfill is SAT I UNSAT restored by performing one of restored. the following:
: 4.       Establish normal CRD           Obtains a controlled copy of OP-25 Section E.                     SAT I UNSAT Hydraulic System operating values per Section E of OP-25.
* Slowly open 03CRD-300 EVALUATOR CUE: Report that backfill has been restored (reactor vessel wtr lvl as requested. backfill sys CRD charging header tie in valve)
EVALUATOR NOTE: JPM steps 8-13 may be performed in any order, but each has the potential to affect CRD parameters established in other steps. JPM steps 11 and 12 should only be graded SAT if the associated parameter is ensured in band at the completion of the JPM. This may require the candidate to re-adjust the associated controls.
* Place all Reference Leg Backfill Systems in service per Section D of OP-27 A EVALUATOR:
                                                                -4 of 7-
Terminate the task at this point. Task Standard:
 
The CRD system is restored to a normal alignment.
STEP                                     STANDARD                           EVALUATION I COMMENT
The CRD flow controller is operated in manual due to failure of the automatic setpoint tape to respond to changes in operator demand. -6 of 7-HANDOUT
*5. Establish normal CRD system Attempts to adjust tapeset on CRD FLOW CNTRL 03FIC-             CRITICAL STEP flow.                       301 to lower CRD system flow.                                     SATIUNSAT EVALUATOR NOTE: The tapeset on 03FIC-301 is failed ,
such that the controller will not respond to the operator's adjustments while in AUTO. EN-OP-115 provides guidance for the operator to take manual control of a controller that has failed in automatic.
: 6. Recognize I report CRD Flow Reports CRD Flow Control Valve failure.                           SATIUNSAT Control Valve failure.
EVALUATOR NOTE: If candidate asks how to proceed, direct them to make a recommendation and then carry out that recommendation.
*7. Places CRD FLOW CNTRL       Rotates CRD FLOW CNTRL 03FIC-301 selector clockwise             CRITICAL STEP 03FIC-301 in MAN.           to MAN.                                                           SAT I UNSAT
*8. Establish normal CRD system Adjusts knob on CRD FLOW CNTRL 03FIC-301 to establish           CRITICAL STEP flow.                       between 59 and 61 gpm .                                           SAT I UNSAT
*9. Establish normal CRD drive   Throttles closed CRD Drive Water Motor Operated Pressure         CRITICAL STEP water differential pressure. Control Valve 03MOV-20 by rotating control switch                 SATIUNSAT counterclockwise.
Adjusts 03MOV-20 as required to establish 260 to 270 psid drive water differential pressure.
                                                    -5 of 7-
 
                                                                                                    - - -                       - --
STEP                                       STANDARD                           EVALUATION I COMMENT
: 10. Establish normal CRD cooling     Fully opens CRD Cooling Water Motor Operated Pressure           SAT I UNSAT water valve alignment.           Control Valve 03MOV-22 by rotating control switch clockwise.
EVALUATOR CUE: If necessary, report CRD stabilizing valve flow is 6 gpm.
EVALUATOR NOTE: The step below is the last step in EP-3 Section 5.15.
11 . Ensure reference leg backfill is Dispatches operator to ensure reference leg backfill is         SAT I UNSAT restored by performing one of   restored .
the following :
* Slowly open 03CRD-300       EVALUATOR CUE: Report that backfill has been restored (reactor vessel wtr lvl     as requested .
backfill sys CRD charging header tie in valve)
* Place all Reference Leg Backfill Systems in service per Section D of OP-27A EVALUATOR: Terminate the task at this point.
Task Standard: The CRD system is restored to a normal alignment. The CRD flow controller is operated in manual due to failure of the automatic setpoint tape to respond to changes in operator demand.
                                                              -6 of 7-
 
HANDOUT
* An ATWS has occurred.
* An ATWS has occurred.
* Control rods were inserted by raising CRD drive water and cooling water differential pressure.
* Control rods were inserted by raising CRD drive water and cooling water differential pressure.
* Another operator is assigned Reactor water level control. Perform EP-3 Section 5.15, CRD Hydraulic System Restoration.
* Another operator is assigned Reactor water level control.
The procedure has been completed up to step 5.15.4. Secure CRD pump B and leave CRD pump A running. -7 of 7-S/RO NRC 14-2 B APPL. TO JPM NUMBER ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Restore ESW after injection into RBCLC REV: DATE: NRC KIA SYSTEM NUMBER: 400000 A4.01 (3.1/3.0) ----JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 15 Minutes ---SUBMITTED: _;::z-/L 2 OPERATIONS REVIEW: . 7 APPROVED: _ ......
Perform EP-3 Section 5.15, CRD Hydraulic System Restoration. The procedure has been completed up to step 5.15.4. Secure CRD pump B and leave CRD pump A running.
CANDIDATE NAME: JPM Completion Location: ATE PERFORMED: 0 Simulated 0 Plant 1:8] Performed 1:8] Simulator TIME TO COMPLETE:
                            -7 of 7-
Minutes PERFORMANCE EVALUATION
 
: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 B             TASK TITLE:     Restore ESW after injection into RBCLC APPL . TO      JPM NUMBER REV:               DATE :                       NRC KIA SYSTEM NUMBER:           400000 A4.01 (3 .1/3.0)
                              ----
JAF TASK NUMBER:                                     JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                                  -  Minutes SUBMITTED:     _;::z- /L 2       ~                OPERATIONS REVIEW: . ~      <~d::~~
                                                                            ~                  7 APPROVED:               ~--"'-"-=----+-----------
_ ......
CANDIDATE NAME :
JPM Completion     0       Simulated     1:8] Performed Location :          0      Plant          1:8] Simulator ATE PERFORMED:                          TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :               0   Satisfactory       0   Unsatisfactory COMMENTS : (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 B APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Restore ESW after injection into RBCLC By: lnt D Additionallnformation D Validation D Procedural Change Required Comments: 1Zl None Current Update: By: Date Int. Previous Revision Date: -2 of 8-S/RO NRC 14-2 B APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Restore ESW after injection into RBCLC A. OP-21, Emergency Service Water B. OP-40 , Reactor Building Closed Loop Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to I C-67. B. Place RBCLC pump control switches in PTL. C. Ensure remote SW22, LIFT LEADS LB-4/LA-6 PER OP-21, is inserted as LIFT. V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
SIGNATURE/PRINTED CANDIDATE REVIEW:
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
SIGNATURE REVIEWED BY:                                             DOC . COMPLETE :
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication.
PROGRAM ADMINISTER
 
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 B       TASK TITLE:    Restore ESW after injection into RBCLC APPL. TO           JPM NUMBER Current Update:                           By:
Date                             lnt Outstanding Items D   Technical Review                             D  Additionallnformation D   Questions and Answers                         D   Validation D   Procedural Change Required                   1Zl None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2 of 8-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO               NRC 14-2 B           TASK TITLE:      Restore ESW after injection into RBCLC APPL. TO           JPM NUMBER I.     SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-21, Emergency Service Water B. OP-40, Reactor Building Closed Loop Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to IC-67.
B. Place RBCLC pump control switches in PTL.
C. Ensure remote SW22, LIFT LEADS LB-4/LA-6 PER OP-21, is inserted as LIFT.
V.     EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , place keeping and three-point communication.
VI. TASK CONDITIONS
VI. TASK CONDITIONS
: 1. The plant is shutdown.
: 1.     The plant is shutdown.
: 2. All RBCLC pumps were placed in Pull to Lock. 3. ESW auto aligned to RBCLC. 4. RBCLC pumps are ready to be returned to service. 5. The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed. -3 of 8-  
: 2.     All RBCLC pumps were placed in Pull to Lock.
* -CRITICAL STEP 'NITIATING CUE Inform the candidate, "Restore the ESW system to normal per OP-21 Section F.3." STEP STANDARD 1. Obtain a controlled copy of OP-21 , Obtains a controlled copy of OP-21. ESW. Reviews Precautions.
: 3.     ESW auto aligned to RBCLC .
Selects section F.3. 2. Perform Implementation section of Determines implementation section Attachment
: 4.     RBCLC pumps are ready to be returned to service.
: 3. of Attachment 3 has been completed , per initial conditions.  
: 5.     The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed.
*3. Reset ESW Logic A by depressing Depresses ESW SYS A INJ SIG ESW SYS A INJ SIG RESET RESET pushbutton. pushbutton. 4. Verify white ESW SYS A INJ SIG Observes white ESW SYS A I NJ light is off. SIG light is off. ' I *5. Reset ESW Logic 8 by depressing Depresses ESW SYS 8 INJ SIG ESW SYS 8 INJ SIG RESET RESET pushbutton. pushbutton. 6. Verify white ESW SYS 8 INJ SIG Observes white ESW SYS 8 INJ light is off. SIG light is off. -4 of 8-EVALUATION I COMMENT SAT I UNSAT SAT I UNSAT CRITICAL STEP SAT I UNSAT SAT I UNSAT CRITICAL STEP SAT I UNSAT SATIUNSAT STEP STANDARD EVALUATION I COMMENT EVALUATOR NOTE: The next 6 va l ves are throttleable , therefore the control switches must be held in the desired position while the valves re-position. Stroke times are each approximately 30-45 seconds. *7. Close ESW RETURN TO SERV Closes ESW RETURN TO SERV CRITICAL STEP WTR 15MOV-1758. WTR 15MOV-1758 by taking control SATIUNSAT switch CCW to Close. *8. Open ESW SYS 8 TEST VLV Opens ESW SYS 8 TEST VLV CRITICAL STEP 46MOV-1028. 46MOV-1028 by taking control SAT I UNSAT switch CW to Open. *9. Close ESW SYS 8 INJ VLV 46MOV-Closes ESW SYS 8 INJ VLV CRITICAL STEP 1018. 46MOV-1018 by taking control SAT I UNSAT switch CCW to Close. /*10. Close ESW RETURN TO SERV Closes ESW RETURN TO SERV CRITICAL STEP WTR 15MOV-175A.
                                                      -3 of 8-
WTR 15MOV-175A by taking control SATIUNSAT switch CCW to Close. *11. Open ESW SYS A TEST VLV Opens ESW SYS A TEST VLV CRITICAL STEP 46MOV-102A.
 
46MOV-102A by taking control SAT I UNSAT switch CW to Open. *12. Close ESW SYS A INJ VLV 46MOV-Closes ESW SYS A INJ VLV CRITICAL STEP 101A. 46MOV-1 01A by taking control SAT I UNSAT switch CCW to Close. 13. Ensure open 15R8C-41 R8CLC Dispatches operator to ensure open SAT I UNSAT Makeup Tank TK-4 Outlet 15R8C-41 R8CLC Makeup Tank TK-4 Outlet. EVALUATOR CUE: 15R8C-41 R8CLC Makeup Tank TK-4 Outlet is () open. -5 of 8-STEP STANDARD EVALUATION I COMMENT 14. Start up RBCLC System per Section EVALUATOR CUE: Time SAT I UNSAT D of OP-40. compression will be invoked and another Operator will restore RBCLC. SIMULATOR OPERATOR ACTION: Start RBCLC pumps A & B. Green flag RBCLC pump C. Inform Candidate RBCLC discharge pressure is stable and > 80 psig. 15. Candidate reads OP-21 Steps EVALUATOR CUE: Inform SAT I UNSAT F.3.14 , 15 , & 16. Candidate no ESW valves were re-positioned during AOP-11. If asked about the position of Breaker 71MCC-152-0D4 , report open. 16. WHEN RBCLC discharge header EVALUATOR CUE: OP-21 SAT I UNSAT pressure is stable at GREATER Attachment 3 Restoration section is THAN OR EQUAL TO 80 psig , complete. perform Restoration section of Attachment
* - CRITICAL STEP
: 3. 17. Shut down ESW per Subsections Obtains Subsections F.1 and F.2. SAT I UNSAT F.1 and F.2. 18. Verify RBCLC System is in normal Determines RBCLC system is in SAT I UNSAT operation.
'NITIATING CUE Inform the candidate, "Restore the ESW system to normal per OP-21 Section F.3."
normal operation. EVALUATOR CUE: If needed , state that the RBCLC system is in normal operation. 19. Verify EDG A and C are shutdown. Determines EDG A and C are SATIUNSAT shutdown. -6 of 8-STEP STANDARD EVALUATION I COMMENT I 20. Verify ventilation loads downstream EVALUATOR CUE: Ventilation SAT/UNSAT of 46MOV-101A do not require loads downstream of 46MOV-101A ESW. do not require ESW. 21. Ensure open ESW SYS A TEST Observes ESW SYS A TEST VL V SAT/UNSAT VLV 46MOV-102A.
STEP                               STANDARD                 EVALUATION I COMMENT
46MOV-102A is open.
: 1.     Obtain a controlled copy of OP-21 , Obtains a controlled copy of OP-21 . SAT I UNSAT ESW.                               Reviews Precautions.
* Red light on, Green light off 22. Ensure closed ESW SYS A I NJ VL V Observes ESW SYS A INJ VLV SAT I UNSAT 46MOV-101A 46MOV-101A is closed.
Selects section F.3.
* Red light off, Green light on *23. Stop ESW PMP A 46P-2A. Stops ESW PMP A 46P-2A by taking CRITICAL STEP control switch CCW to Stop. SAT I UNSAT EVALUATOR CUE: Another operator will shutdown ESW loop B. EVALUATOR:
: 2.     Perform Implementation section of   Determines implementation section       SAT I UNSAT Attachment 3.                       of Attachment 3 has been completed , per initial conditions.
Terminate the task at this point. Task Standard:
  *3.     Reset ESW Logic A by depressing     Depresses ESW SYS A INJ SIG           CRITICAL STEP ESW SYS A INJ SIG RESET             RESET pushbutton.                       SAT I UNSAT pushbutton.
The ESW logic is reset, ESW valves are aligned in a normal configuration , and ESW pump A is shutdown. -7 of 8-HANDOUT
: 4. Verify white ESW SYS A INJ SIG       Observes white ESW SYS A INJ            SAT I UNSAT light is off.                       SIG light is off.
'
I *5.       Reset ESW Logic 8 by depressing ESW SYS 8 INJ SIG RESET Depresses ESW SYS 8 INJ SIG RESET pushbutton.
CRITICAL STEP SAT I UNSAT pushbutton.
: 6. Verify white ESW SYS 8 INJ SIG       Observes white ESW SYS 8 INJ           SATIUNSAT light is off.                         SIG light is off.
                                                  -4 of 8-
 
STEP                         STANDARD                   EVALUATION I COMMENT EVALUATOR NOTE: The next 6 valves are throttleable, therefore the control switches must be held in the desired position while the valves re-position. Stroke times are each approximately 30-45 seconds.
    *7. Close ESW RETURN TO SERV       Closes ESW RETURN TO SERV               CRITICAL STEP WTR 15MOV-1758.               WTR 15MOV-1758 by taking control         SATIUNSAT switch CCW to Close.
    *8. Open ESW SYS 8 TEST VLV       Opens ESW SYS 8 TEST VLV               CRITICAL STEP 46MOV-1028.                   46MOV-1028 by taking control             SAT I UNSAT switch CW to Open.
    *9. Close ESW SYS 8 INJ VLV 46MOV- Closes ESW SYS 8 INJ VLV               CRITICAL STEP 1018.                         46MOV-1018 by taking control             SAT I UNSAT switch CCW to Close.
/ *10. Close ESW RETURN TO SERV       Closes ESW RETURN TO SERV               CRITICAL STEP WTR 15MOV-175A.               WTR 15MOV-175A by taking control         SATIUNSAT switch CCW to Close.
  *11 . Open ESW SYS A TEST VLV       Opens ESW SYS A TEST VLV               CRITICAL STEP 46MOV-102A.                   46MOV-102A by taking control             SAT I UNSAT switch CW to Open.
  *12. Close ESW SYS A INJ VLV 46MOV- Closes ESW SYS A INJ VLV               CRITICAL STEP 101A.                         46MOV-1 01A by taking control           SAT I UNSAT switch CCW to Close.
: 13. Ensure open 15R8C-41 R8CLC     Dispatches operator to ensure open       SAT I UNSAT Makeup Tank TK-4 Outlet       15R8C-41 R8CLC Makeup Tank TK-4 Outlet.
EVALUATOR CUE: 15R8C-41 R8CLC Makeup Tank TK-4 Outlet is open.
()
                                            -5 of 8-
 
STEP                           STANDARD               EVALUATION I COMMENT
: 14. Start up RBCLC System per Section EVALUATOR CUE: Time                 SAT I UNSAT D of OP-40.                       compression will be invoked and another Operator will restore RBCLC.
SIMULATOR OPERATOR ACTION:
Start RBCLC pumps A & B.
Green flag RBCLC pump C.
Inform Candidate RBCLC discharge pressure is stable and > 80 psig.
: 15. Candidate reads OP-21 Steps       EVALUATOR CUE: Inform               SAT I UNSAT F.3.14, 15, & 16.                 Candidate no ESW valves were re-positioned during AOP-11 .
If asked about the position of Breaker 71MCC-152-0D4, report open .
: 16. WHEN RBCLC discharge header       EVALUATOR CUE: OP-21                 SAT I UNSAT pressure is stable at GREATER     Attachment 3 Restoration section is THAN OR EQUAL TO 80 psig,         complete.
perform Restoration section of Attachment 3.
: 17. Shut down ESW per Subsections     Obtains Subsections F.1 and F.2. SAT I UNSAT F.1 and F.2.
: 18. Verify RBCLC System is in normal Determines RBCLC system is in       SAT I UNSAT operation.                       normal operation.
EVALUATOR CUE: If needed , state that the RBCLC system is in normal operation .
: 19. Verify EDG A and C are shutdown. Determines EDG A and C are           SATIUNSAT shutdown .
~
                                            -6 of 8-
 
STEP                             STANDARD                     EVALUATION I COMMENT I 20. Verify ventilation loads downstream EVALUATOR CUE: Ventilation                 SAT/UNSAT of 46MOV-101A do not require         loads downstream of 46MOV-101A ESW.                                 do not require ESW.
21 . Ensure open ESW SYS A TEST           Observes ESW SYS A TEST VLV                SAT/UNSAT VLV 46MOV-102A.                     46MOV-102A is open .
* Red light on, Green light off
: 22. Ensure closed ESW SYS A INJ VL V     Observes ESW SYS A INJ VLV                 SAT I UNSAT 46MOV-101A                           46MOV-101A is closed.
* Red light off, Green light on
  *23. Stop ESW PMP A 46P-2A.               Stops ESW PMP A 46P-2A by taking         CRITICAL STEP control switch CCW to Stop.                 SAT I UNSAT EVALUATOR CUE: Another operator will shutdown ESW loop B.
EVALUATOR: Terminate the task at this point.
Task Standard: The ESW logic is reset, ESW valves are aligned in a normal configuration , and ESW pump A is shutdown.
                                                -7 of 8-
 
HANDOUT
* The plant is shutdown.
* The plant is shutdown.
* All RBCLC pumps were placed in Pull to Lock.
* All RBCLC pumps were placed in Pull to Lock.
Line 506: Line 1,335:
* RBCLC pumps are ready to be returned to service.
* RBCLC pumps are ready to be returned to service.
* The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed.
* The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed.
Restore the ESW system to normal per OP-21 Section F .3. -8 of 8-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 C TASK TITLE: Start F i rst Feedwater Pump APPL. TO JPM NUMBER REV: DATE: NRC KIA-SYSTEM NUMBER: 259001 A4.02 (3.9/3.7) JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 20 M i nutes ---SUBMITTED: __;;:;c: /L ==:z OPERATIONS REVIEW: APPROVED:
Restore the ESW system to normal per OP-21 Section F.3.
CANDIDATE NAME: JPM Completion Location: TE PERFORMED: D Simulated D Plant C8J Performed C8J Simulator TIME TO COMPLETE:
                            -8 of 8-
Minutes PERFORMANCE EVALUATION
 
: D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO           NRC 14-2 C           TASK TITLE :     Start First Feedwater Pump APPL . TO       JPM NUMBER REV:                 DATE :                       NRC KIA-SYSTEM NUMBER:           259001 A4 .02 (3.9/3.7)
JAF TASK NUMBER:                                     JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME :
                                  - -20  - Minutes SUBMITTED :   __;;:;c: /L   ==:z                   OPERATIONS REVIEW:         ~~:-L /'~
APPROVED :       -~JL~~~~---------
CANDIDATE NAME :
JPM Completion       D    Simulated      C8J  Performed Location :           D   Plant           C8J   Simulator TE PERFORMED:                        TIME TO COMPLETE:                   Minutes PERFORMANCE EVALUATION :             D   Satisfactory         D   Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 C APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Start First Feedwater Pump By: lnt D Additional Information D Validation D Procedural Change Required Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
[8J None Current Update: By: Date Int. Previous Revision Date: -2 of 9-S/RO NRC 14-2 C APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-2A, Feedwater System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Start First Feedwater Pump A. Plant in a startup condition near 500 psig (IC-68). B. Ensure both Feedwater pumps are secured. C. Ensure 34MOV-100A and 34MOV-100B are closed. D. Ensure Reactor water level is being maintained in the green band and controlled with 34FCV-137 in AUTO. E. Place FDWTR screen on EPIC slave 1 monitor. V. EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated. B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication. VI. TASK CONDITIONS A. A plant startup is in progress.
SIGNATURE REVIEWED BY:                                             DOC . COMPLETE :
B. Reactor pressure is approaching 500 psig. C. Reactor water level is being controlled with 34FCV-137 in AUTO. -3 of 9-  
PROGRAM ADMINISTER
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Start Feedwater pump A per OP-2A Section D.2. The procedure is in progress up to step D.2.18." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of OP-2A. SATIUNSAT OP-2A. 2. Select the correct section to Selects Section D.2 of OP-2A. SAT I UNSAT perform the task. Proceeds to Step D.2.18. *3. Test RFPT A trip as follows at Depresses A MAN TRIP pushbutton.
 
CRITICAL STEP panel 09-6: SAT I UNSAT
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 C       TASK TITLE:      Start First Feedwater Pump APPL. TO         JPM NUMBER Current Update:                           By:
* Depress A MAN TRIP pushbutton. 4. Verify the following: Observes RFPT A LP Stop Valve green light on, red light SAT I UNSAT off.
Date                             lnt Outstanding Items D     Technical Review                               D     Additional Information D    Questions and Answers                         D     Validation D     Procedural Change Required                     [8J  None Comments:
* RFPT A LP AND HP Stop Valves are closed. Observes RFPT A HP Stop Valve green light on , red light off.
Current Update:                                 By:
* Annunciator 09-6-4-2 RFPT A TRIP is in alarm. Observes annunciator 09-6-4-2 is in alarm. -4 of 9-I STEP STANDARD EVALUATION I COMMENT *5. Reset RFPT A trip as follows Depresses A MAN TRIP RESET pushbutton.
Date                                         Int.
CRITICAL STEP at panel 09-6: SAT I UNSAT
Previous Revision Date:
* Depress AND hold A MAN EVALUATOR NOTE: The candidate should hold the TRIP RESET pushbutton.
                                              -2 of 9-
pushbutton while observing conditions in the next step, but it is only critical that the pushbutton is depressed long enough to reset the trip signal. 6. Verify the following:
 
Observes RFPT A LP Stop Valve green light off, red light SAT/UNSAT on.
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 C             TASK TITLE:      Start First Feedwater Pump APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-2A, Feedwater System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Plant in a startup condition near 500 psig (IC-68) .
* RFPT A LP AND HP Stop Valves are open. Observes RFPT A HP Stop Valve green light off, red light
B. Ensure both Feedwater pumps are secured.
* Annunciator 09-6-4-2 RFPT A TRIP is clear. on. Observes annunciator 09-6-4-2 is clear. *7. Release A MAN TRIP RESET Releases A MAN TRIP RESET pushbutton. CRITICAL STEP pushbutton.
C. Ensure 34MOV-100A and 34MOV-100B are closed .
SAT/UNSAT EVALUATOR CUE: Time compression is in effect. The RFPT A local trip test and reset have been completed SAT per OP-2A steps D.2.20 and D.2.21. 8. Perform RFPT A local trip test Determines RFPT A local trip test has been completed SAT , SAT/UNSAT as follows ... per evaluator cue. 9. Perform RFPT A local trip Determines RFPT A local trip reset has been completed SAT/UNSAT reset as follows ... SAT, per evaluator cue. -5 of 9-STEP STANDARD EVALUATION I COMMENT 10. Open 34FWS-16A (rx fdwtr Dispatches operator to open 34FWS-16A.
D. Ensure Reactor water level is being maintained in the green band and controlled with 34FCV-137 in AUTO.
SAT I UNSAT pump A inlet to FCV-137 isol valve). EVALUATOR CUE: 34FWS-16A is open. 11. WHILE performing the Acknowledges procedure step. SAT I UNSAT following steps, maintain RPV water level BETWEEN 197 and 203 inches on 06LI-94A , EVALUATOR CUE: Another operator will monitor Reactor 8, and C. water level and operation of 34FCV-137. *12. Place RFPT A MSC on high Slowly raises RFPT A MTR SPEED CHANGER until RFPT CRITICAL STEP speed stop as follows: A speed begins to rise. SAT I UNSAT IF 34FCV-137 is in automatic (BAL), THEN perform the following: Slowly raise RFPT A MTR SPEED CHANGER to roll A RFPT. *13. Slowly raise RFPT A MTR Slowly raises RFPT A MTR SPEED CHANGER until high CRITICAL STEP SPEED CHANGER to high speed stop red light illuminates and green light SATIUNSAT speed stop. extinguishes.
E. Place FDWTR screen on EPIC slave 1 monitor.
: 14. Continue to raise MSC for at Raises RFPT A MTR SPEED CHANGER for at least 5 SAT I UNSAT least 5 seconds after reaching seconds after high speed stop red light first illuminates and high speed stop to ensure green light extinguishes.
V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
MSC is fully on high speed stop. -6 of 9-STEP STANDARD EVALUATION I COMMENT 15. Take control of RFPT A speed Adjusts RFP A FLOW CNTRL 06-84A manual control knob SAT IUNSAT with MGU as follows: a small amount in both the clockwise and counterclockwise Raise and lower RFPT A directions.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
speed a small amount by adjusting RFP A FLOW Observes RFPT A speed raises and lowers a small amount. CNTRL 06-84A manual control knob. 16. IF 34FCV-137 is in automatic May adjust RFP A FLOW CNTRL 06-84A manual control SAT I UNSAT INA (BAL), THEN adjust RFP A knob to raise RFP A discharge pressure.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
FLOW CNTRL 06-84A manual control knob to maintain RFP A discharge pressure EVALUATOR NOTE: RFP A discharge pressure will GREATER THAN RPV already be greater than Reactor pressure, therefore no pressure.
place keeping and three-point communication .
adjustment is required. 17. Close the following valves: Closes 41 MOV-1 04A by depressing close pushbutton.
VI. TASK CONDITIONS A. A plant startup is in progress.
B. Reactor pressure is approaching 500 psig.
C. Reactor water level is being controlled with 34FCV-137 in AUTO.
                                                      -3 of 9-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Start Feedwater pump A per OP-2A Section D.2. The procedure is in progress up to step D.2.18."
STEP                                       STANDARD                           EVALUATION I COMMENT
: 1.     Obtain a controlled copy of     Obtains a controlled copy of OP-2A.                                 SATIUNSAT OP-2A.
: 2.     Select the correct section to   Selects Section D.2 of OP-2A.                                       SAT I UNSAT perform the task.
Proceeds to Step D.2.18.
    *3. Test RFPT A trip as follows at   Depresses A MAN TRIP pushbutton.                                 CRITICAL STEP panel 09-6:
SAT I UNSAT
SAT I UNSAT
* RFPT A STOP VLV DRNS Closes 41 MOV-1 07 A by depressing close pushbutton.
* Depress A MAN TRIP pushbutton.
0 41MOV-104A 0 41MOV-107A Closes 41 MOV-1 08A by depressing close pushbutton.
: 4.      Verify the following :          Observes RFPT A LP Stop Valve green light on, red light            SAT I UNSAT off.
* RFPT A DRNS 0 41MOV-108A Closes 41MOV-112A2 by depressing close pushbutton.
* RFPT A LP AND HP Stop Valves are closed .
0 41 MOV-112A2 I -7 of 9-STEP STANDARD EVALUATION I COMMENT EVALUATOR CUE: 31MOV-103A is NOT required to be open for Main Turbine warming. 18. IF 31MOV-103A is not Observes annunciator 09-6-4-33 is clear. SAT I UNSAT required to be open for main turbine warming, THEN perform the following: Verify annunciator 09-6-4-33 RFPT A LP STM DRN POT LVL HI is clear. 19. Ensure closed RFPT A LP Closes 31 MOV-1 03A by depressing close pushbutton.
Observes RFPT A HP Stop Valve green light on, red light off.                                                                            I
SAT I UNSAT STM DRN 31MOV-103A.
* Annunciator 09-6-4-2 RFPT A TRIP is in alarm.
EVALUATOR CUE: Another operator will continue with this procedure as actions become necessary. EVALUATOR:
Observes annunciator 09-6-4-2 is in alarm.
Terminate the task at this point. Task Standard:
                                                                -4 of 9-
Feedwater pump A is running with discharge pressure greater than Reactor pressure.  
 
-8 of 9-HANDOUT
STEP                                        STANDARD                          EVALUATION I COMMENT
*5. Reset RFPT A trip as follows  Depresses A MAN TRIP RESET pushbutton.                            CRITICAL STEP at panel 09-6:                                                                                    SAT I UNSAT
* Depress AND hold A MAN    EVALUATOR NOTE: The candidate should hold the TRIP RESET pushbutton. pushbutton while observing conditions in the next step, but it is only critical that the pushbutton is depressed long enough to reset the trip signal.
: 6. Verify the following:          Observes RFPT A LP Stop Valve green light off, red light            SAT/UNSAT on.
* RFPT A LP AND HP Stop Valves are open.
Observes RFPT A HP Stop Valve green light off, red light
* Annunciator 09-6-4-2 on.
RFPT A TRIP is clear.
Observes annunciator 09-6-4-2 is clear.
*7. Release A MAN TRIP RESET      Releases A MAN TRIP RESET pushbutton.                              CRITICAL STEP pushbutton.                                                                                        SAT/UNSAT EVALUATOR CUE: Time compression is in effect. The RFPT A local trip test and reset have been completed SAT per OP-2A steps D.2.20 and D.2.21.
: 8. Perform RFPT A local trip test Determines RFPT A local trip test has been completed SAT,          SAT/UNSAT as follows ...                per evaluator cue.
: 9. Perform RFPT A local trip      Determines RFPT A local trip reset has been completed              SAT/UNSAT reset as follows ...          SAT, per evaluator cue.
                                                        -5 of 9-
 
STEP                                        STANDARD                            EVALUATION I COMMENT
: 10. Open 34FWS-16A (rx fdwtr      Dispatches operator to open 34FWS-16A.                            SAT I UNSAT pump A inlet to FCV-137 isol valve) .
EVALUATOR CUE: 34FWS-16A is open.
11 . WHILE performing the          Acknowledges procedure step.                                      SAT I UNSAT following steps, maintain RPV water level BETWEEN 197 and 203 inches on 06LI-94A,    EVALUATOR CUE: Another operator will monitor Reactor 8, and C.                      water level and operation of 34FCV-137.
*12. Place RFPT A MSC on high      Slowly raises RFPT A MTR SPEED CHANGER until RFPT                CRITICAL STEP speed stop as follows:        A speed begins to rise.                                            SAT I UNSAT IF 34FCV-137 is in automatic (BAL), THEN perform the following :
Slowly raise RFPT A MTR SPEED CHANGER to roll A RFPT.
*13. Slowly raise RFPT A MTR        Slowly raises RFPT A MTR SPEED CHANGER until high                CRITICAL STEP SPEED CHANGER to high          speed stop red light illuminates and green light                  SATIUNSAT speed stop.                    extinguishes.
: 14. Continue to raise MSC for at  Raises RFPT A MTR SPEED CHANGER for at least 5                    SAT I UNSAT least 5 seconds after reaching seconds after high speed stop red light first illuminates and high speed stop to ensure      green light extinguishes.
MSC is fully on high speed stop.
                                                      -6 of 9-
 
STEP                                    STANDARD                        EVALUATION I COMMENT
: 15. Take control of RFPT A speed Adjusts RFP A FLOW CNTRL 06-84A manual control knob            SAT IUNSAT with MGU as follows:        a small amount in both the clockwise and counterclockwise Raise and lower RFPT A      directions.
speed a small amount by adjusting RFP A FLOW        Observes RFPT A speed raises and lowers a small amount.
CNTRL 06-84A manual control knob.
: 16. IF 34FCV-137 is in automatic May adjust RFP A FLOW CNTRL 06-84A manual control            SAT I UNSAT INA (BAL), THEN adjust RFP A    knob to raise RFP A discharge pressure.
FLOW CNTRL 06-84A manual control knob to maintain RFP A discharge pressure        EVALUATOR NOTE: RFP A discharge pressure will GREATER THAN RPV            already be greater than Reactor pressure, therefore no pressure.                    adjustment is required .
: 17. Close the following valves:  Closes 41 MOV-1 04A by depressing close pushbutton.            SAT I UNSAT
* RFPT A STOP VLV DRNS     Closes 41 MOV-1 07A by depressing close pushbutton.
0   41MOV-104A 0   41MOV-107A Closes 41 MOV-1 08A by depressing close pushbutton.
* RFPT A DRNS Closes 41MOV-112A2 by depressing close pushbutton.
0   41MOV-108A 0  41 MOV-112A2 I
                                                  -7 of 9-
 
STEP                                     STANDARD                         EVALUATION I COMMENT EVALUATOR CUE: 31MOV-103A is NOT required to be open for Main Turbine warming.
: 18. IF 31MOV-103A is not           Observes annunciator 09-6-4-33 is clear.                     SAT I UNSAT required to be open for main turbine warming, THEN perform the following :
Verify annunciator 09-6-4-33 RFPT A LP STM DRN POT LVL HI is clear.
: 19. Ensure closed RFPT A LP       Closes 31 MOV-1 03A by depressing close pushbutton.           SAT I UNSAT STM DRN 31MOV-103A.
EVALUATOR CUE: Another operator will continue with this procedure as actions become necessary.
EVALUATOR: Terminate the task at this point.
Task Standard: Feedwater pump A is running with discharge pressure greater than Reactor pressure.
                                                          -8 of 9-
 
HANDOUT
* A plant startup is in progress.
* A plant startup is in progress.
* Reactor pressure is approaching 500 psig.
* Reactor pressure is approaching 500 psig.
* Reactor water level is being controlled with 34FCV-137 in AUTO. Start Feedwater pump A per OP-2A Section 0.2. The procedure is in progress up to step 0.2.18. -9 of 9-ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 D TASK TITLE: Start EDGs A and C Due to Hurricane Warning APPL. TO JPM NUMBER REV: DATE: NRC KJA SYSTEM NUMBER: 264000 A4.04 (3.7/3.7) JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 20 Minutes SUBMITTED: _::z:-'") 1c-OPERATIONS REVIEW: ... APPROVED:
* Reactor water level is being controlled with 34FCV-137 in AUTO.
_
Start Feedwater pump A per OP-2A Section 0.2. The procedure is in progress up to step 0.2.18.
________ _ CANDIDATE NAME: JPM Completion Location:
                          -9 of 9-
TE PERFORMED: D Simulated D Plant C8] Performed C8] Simulator TIME TO COMPLETE:
 
Minutes PERFORMANCE EVALUATION
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 D                         TASK TITLE:     Start EDGs A and C Due to Hurricane Warning APPL. TO       JPM NUMBER REV:               DATE:                                       NRC KJA SYSTEM NUMBER:         264000 A4 .04 (3.7/3.7)
: D Satisfactory D Unsatisfactory COMMENTS: (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)
JAF TASK NUMBER:                                                 JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:                           20   Minutes
                                              --~
SUBMITTED:     _::z:-~ '")                 1c-                   OPERATIONS REVIEW: ...   ~F::::e; ~
APPROVED:       _  __.~-'-"~...:::::;;.___.,~:;..___ _ _ _ _ _ _ __
CANDIDATE NAME:
JPM Completion     D         Simulated                 C8] Performed Location:          D        Plant                      C8] Simulator TE PERFORMED:                                      TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :                           D   Satisfactory         D Unsatisfactory COMMENTS: (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 D APPL. TO JPM NUMBER Current Update: Date Outstand i ng Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Start EDGs A and C Due to Hurricane Warning By: lnt D Additionallnformation D Validation D Procedural Change Required Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
[8J None Current Update: By: Date Int. Previous Revision Date: -2of12-S/RO NRC 14-2 D APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Start EDGs A and C Due to Hurricane Warning A. OP-22 , Diesel Generator Emergency Power Ill. TOOLS AND EQUIPMENT A. Synch Key IV. SET UP REQUIREMENTS A. Plant in a power operating with Bus 10500 supplied from T-3 (IC-68). EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.
SIGNATURE REVIEWED BY:                                                           DOC. COMPLETE :
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly *identified and not actually performed.
PROGRAM ADMINISTER
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication. VI. TASK CONDITIONS A. The National Weather Service has issued a Hurricane Warning for Oswego County. B. AOP-13 , High Winds , Hurricanes , and Tornadoes , has been entered. C. AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs. D. Pre-startup checks have been completed for all EDGs. E. EDGs have been declared inoperable. -3 of 12-  
 
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate , "Start EDGs A and C per OP-22 Section D.1. Load each EDG to approximately 2600 KW." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of OP-22. SATIUNSAT OP-22. 2. Select the correct section to Selects Section D.1 of OP-22. SAT I UNSAT perform the task. 3. Perform pre-startup checks for Determines pre-startup checks have been completed, per SATIUNSAT EDG A and C per Subsections initial conditions. G.25 and G.26. 4. IF pre-startup checks are Determines pre-startup checks have NOT been omitted, per SAT I UNSAT omitted ... initial conditions.  
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 D       TASK TITLE:    Start EDGs A and C Due to Hurricane Warning APPL. TO         JPM NUMBER Current Update:                           By:
*5. Simultaneously place the Simultaneously rotates EDG A CONTROL and EDG C CRITICAL STEP following control switches to CONTROL switches clockwise to START. SATIUNSAT START:
Date                         lnt Outstanding Items D   Technical Review                           D     Additionallnformation D    Questions and Answers                       D     Validation D   Procedural Change Required                 [8J  None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2of12-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 D             TASK TITLE:        Start EDGs A and C Due to Hurricane Warning APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-22, Diesel Generator Emergency Power Ill. TOOLS AND EQUIPMENT A. Synch Key IV. SET UP REQUIREMENTS A. Plant in a power operating with Bus 10500 supplied from T-3 (IC-68).
EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly *identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
place keeping and three-point communication .
VI. TASK CONDITIONS A. The National Weather Service has issued a Hurricane Warning for Oswego County.
B. AOP-13 , High Winds, Hurricanes, and Tornadoes, has been entered.
C. AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs.
D. Pre-startup checks have been completed for all EDGs.
E. EDGs have been declared inoperable.
                                                      -3 of 12-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Start EDGs A and C per OP-22 Section D.1. Load each EDG to approximately 2600 KW."
STEP                                           STANDARD                     EVALUATION I COMMENT
: 1.     Obtain a controlled copy of     Obtains a controlled copy of OP-22.                             SATIUNSAT OP-22.
: 2.     Select the correct section to   Selects Section D.1 of OP-22.                                   SAT I UNSAT perform the task.
: 3.     Perform pre-startup checks for Determines pre-startup checks have been completed, per         SATIUNSAT EDG A and C per Subsections     initial conditions .
G.25 and G.26.
: 4.     IF pre-startup checks are       Determines pre-startup checks have NOT been omitted, per       SAT I UNSAT omitted ...                     initial conditions.
    *5.     Simultaneously place the       Simultaneously rotates EDG A CONTROL and EDG C                 CRITICAL STEP following control switches to   CONTROL switches clockwise to START.                           SATIUNSAT START:
* EDGACNTRL
* EDGACNTRL
* EDG C CNTRL -4 of 12-STEP STANDARD EVALUATION I COMMENT 6. IF frequency of either EDG Observes EDG A and C frequency stabilize between 58 and SAT I UNSAT does not stabilize BETWEEN 62Hz. 58 and 62 Hz AFTER reaching normal voltage, THEN immediately place the affected EDG CNTRL switch in STOP. I 7. WHEN approximately 10 Observes EDG A speed is approximately 900 rpm. SAT I UNSAT seconds have elapsed , verify the following:
* EDG C CNTRL
                                                                  -4 of 12-
 
STEP                                   STANDARD                         EVALUATION I COMMENT
: 6. IF frequency of either EDG     Observes EDG A and C frequency stabilize between 58 and     SAT I UNSAT does not stabilize BETWEEN     62Hz.
58 and 62 Hz AFTER reaching normal voltage, THEN immediately place the affected EDG CNTRL switch in STOP.
I
: 7. WHEN approximately 10         Observes EDG A speed is approximately 900 rpm .             SAT I UNSAT seconds have elapsed , verify the following:
Observes EDG A frequency is approximately 60 Hz.
Observes EDG A frequency is approximately 60 Hz.
* EDG A speed is approximately 900 rpm.
* EDG A speed is approximately 900 rpm.
* EDG A frequency is Observes EDG A voltage is approximately 4.3 KV. I approximately 60 Hz.
* EDG A frequency is       Observes EDG A voltage is approximately 4.3 KV.                             I approximately 60 Hz.
* EDG A voltage is approximately 4.3 kV. Observes EDG C speed is approximately 900 rpm.
* EDG A voltage is Observes EDG C speed is approximately 900 rpm.
* EDG C speed is approximately 900 rpm. Observes EDG C frequency is approximately 60 Hz.
approximately 4.3 kV.
* EDG C speed is approximately 900 rpm . Observes EDG C frequency is approximately 60 Hz.
* EDG C frequency is approximately 60 Hz.
* EDG C frequency is approximately 60 Hz.
* EDG C voltage is Observes EDG C voltage is approximately 4.3 KV. approximately 4.3 kV.
* EDG C voltage is         Observes EDG C voltage is approximately 4 .3 KV.
* EDG A & C TIE BKR Observes EDG A & C TIE BKR 10504 green light off , red 1 0504 is closed.
approximately 4.3 kV.
* ESW Pump 46P-2A is light on. running. Observes ESW pump 46P-2A green light off, red light on. -------5 of 12-STEP STANDARD EVALUATION I COMMENT . 8. Verify the following at panel Dispatches operator to verify conditions at panel 92HV-9A. SAT I UNSAT 92HV-9A:
* EDG A & C TIE BKR Observes EDG A & C TIE BKR 10504 green light off, red 10504 is closed .
* The following fans indicate EVALUATOR CUE: All verifications for OP-22 step 0.1.6 running: have been completed SAT.
light on.
* ESW Pump 46P-2A is running .
Observes ESW pump 46P-2A green light off, red light on.
- - - -- -
                                                        -5 of 12-
 
STEP                                     STANDARD
                                                              .                                EVALUATION I COMMENT
: 8. Verify the following at panel   Dispatches operator to verify conditions at panel 92HV-9A.     SAT I UNSAT 92HV-9A:
* The following fans indicate EVALUATOR CUE: All verifications for OP-22 step 0 .1.6 running:                   have been completed SAT.
* 92FN-1A
* 92FN-1A
* 92FN-1 C
* 92FN-1 C
Line 576: Line 1,516:
* The following annunciators are clear:
* The following annunciators are clear:
* HV-9A-7 SUPPLY FAN FN-1A TROUBLE
* HV-9A-7 SUPPLY FAN FN-1A TROUBLE
* HV-9A-9 SUPPLY FAN FN-IC TROUBLE *9. Trip EDG A & C TIE BKR Trips EDG A & C TIE BKR 10504 by rotating control switch CRITICAL STEP 10504 , allow switch to spring counterclockwise to TRIP, then releasing switch. SAT I UNSAT return to AUTO. 10. Verify EPIC-D-730 alarmed Observes EPIC-D-730 alarmed and cleared on alarm typer. SAT I UNSAT and cleared on alarm typer. -6of12-
* HV-9A-9 SUPPLY FAN FN-IC TROUBLE
: 11. *12. *13. 14. *15. STEP STANDARD IF 10500 bus is being supplied I Rotates AUTO MANUAL T-3 LTC CONTROL switch by 71T-3 , THEN ensure AUTO clockwise to MAN. MANUAL T-3 LTC CONTROL switch is in MAN. EVALUATOR ROLE PLAY: If contacted as Power Control , acknowledge T-3 LTC will be taken to manual. Place the following switches in I Places EDG A GOV MODE switch in DROOP. DROOP:
*9 . Trip EDG A & C TIE BKR         Trips EDG A & C TIE BKR 10504 by rotating control switch       CRITICAL STEP 10504, allow switch to spring   counterclockwise to TRIP, then releasing switch .               SAT I UNSAT return to AUTO.
* EDG A GOV MODE
: 10. Verify EPIC-D-730 alarmed       Observes EPIC-D-730 alarmed and cleared on alarm typer.         SAT I UNSAT and cleared on alarm typer.
* EDG C GOV MODE Parallel EDG A with 10500 Bus as follows: Place EDG A LOAD BKR SYNCH SW in ON. Adjust EDG A VOLT REG to match INCOMING and RUNNING voltage. Adjust EDG A GOV to rotate SYNCHRO.SCOPE slowly in the FAST direction (clockwise).
                                                    -6of12-
Places EDG C GOV MODE switch in DROOP. Inserts synch key and rotates EDG A LOAD BKR SYNCH SW clockwise to ON. Adjusts EDG A VOLT REG to match INCOMING and RUNNING voltage , as necessary. Adjusts EDG A GOV to establish SYNCHROSCOPE rotation slowly in the FAST direction (clockwise). EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present, mark this step NA. The step is then NOT critical.  
 
-7 of 12-EVALUATION I COMMENT SAT I UNSAT CRITICAL STEP SAT I UNSAT CRITICAL STEP SAT I UNSAT SAT I UNSAT INA CRITICAL STEP SAT I UNSAT INA STEP STANDARD EVALUATION I COMMENT *16. WHEN EDG A and 10500 Bus When SYNCHROSCOPE is at approximately 12 o'clock, CRITICAL STEP are in phase closes EDG A LOAD BKR 1 0502 by rotating control switch SAT I UNSAT (SYNCHROSCOPE at 12 clockwise. o'clock), close EDG A LOAD BKR 10502. *17. Adjust EDG A GOV to raise Rotates EDG A GOV control switch clockwise to establish CRITICAL STEP EDG A load 100 to 300 kW. EDG A load 100 to 300 kW , as necessary. SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is initially present, mark this step NA. The step is then NOT critical.
STEP                                            STANDARD                          EVALUATION I COMMENT
: 18. Place EDG A LOAD BKR Rotates EDG A LOAD BKR SYNCH SW counterclockwise SAT I UNSAT SYNCH SW in OFF and to OFF and removes synch key. remove synch switch handle. 19. IF A EDG has operated at Determines EDG A has NOT operated less than 520 kW for SAT I UNSAT LESS THAN 520 kW for greater than 4.5 hours. GREATER THAN 4.5 hours , THEN perform the following
: 11. IF 10500 bus is being supplied I Rotates AUTO MANUAL T-3 LTC CONTROL switch                       SAT I UNSAT by 71T-3, THEN ensure AUTO       clockwise to MAN .
... EVALUATOR CUE: If asked , report that EDG A has NOT operated less than 520 kW for greater than 4.5 hours. -8 of 12-STEP STANDARD EVALUATION I COMMENT *20. Adjust EDG A GOV to raise Rotates EDG A GOV control switch clockwise to raise EDG CRITICAL STEP EDG A load to LESS THAN A load to approximately 2600 kW in approximately 800 kW SATIUNSAT OR EQUAL TO 2,600 kW over increments. 3 to 5 minutes in approximately 800 kW EVALUATOR CUE: If desired, prompt the candidate that increments.
MANUAL T-3 LTC CONTROL switch is in MAN .
time compression is in effect and one minute has passed. This cue can be repeated as necessary to complete loading of EDG A. *21. Parallel EDG C with 1 0500 Inserts synch key and rotates EDG C LOAD BKR SYNCH CRITICAL STEP Bus as follows: SW clockwise to ON. SATIUNSAT Place EDG C LOAD BKR SYNCH SW in ON. 22. Adjust EDG C VOLT REG to Adjusts EDG C VOLT REG to match INCOMING and SAT I UNSAT INA match INCOMING and RUNNING voltage, as necessary. RUNNING voltage. *23. Adjust EDG C GOV to rotate Adjusts EDG C GOV to establish SYNCHROSCOPE CRITICAL STEP SYNCHROSCOPE slowly in rotation slowly in the FAST direction (clockwise).
EVALUATOR ROLE PLAY: If contacted as Power Control, acknowledge T-3 LTC will be taken to manual.
SAT I UNSAT INA the FAST direction (clockwise). EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present , mark this step NA. The step is then NOT critical.
*12. Place the following switches in I Places EDG A GOV MODE switch in DROOP.                           CRITICAL STEP DROOP:                                                                                             SAT I UNSAT
-9 of 12-
* EDG A GOV MODE               Places EDG C GOV MODE switch in DROOP.
-STEP STANDARD EVALUATION I COMMENT *24. WHEN EDG C and 10500 Bus When SYNCHROSCOPE is at approximately 12 o'clock, CRITICAL STEP are in phase closes EDG C LOAD BKR 10512 by rotating control switch SATIUNSAT (SYNCHROSCOPE at 12 clockwise. o'clock), close EDG C LOAD BKR 10512. *25. Adjust EDG C GOV to raise Rotates EDG C GOV control switch clockwise to establish CRITICAL STEP EDG C load 100 to 300 kW. EDG C load 100 to 300 kW , as necessary. SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is init i ally present , mark this step NA. The step is then NOT critical.
* EDG C GOV MODE
: 26. Place EDG C LOAD BKR Rotates EDG C LOAD BKR SYNCH SW counterclockwise SATIUNSAT SYNCH SW in OFF and to OFF and removes synch key. remove synch switch handle. 27. IF C EDG has operated at Determines EDG C has NOT operated less than 520 kW for SATIUNSAT LESS THAN 520 kW for greater than 4.5 hours. GREATER THAN 4.5 hours , THEN perform the following  
*13. Parallel EDG A with 10500         Inserts synch key and rotates EDG A LOAD BKR SYNCH              CRITICAL STEP Bus as follows:                   SW clockwise to ON.                                              SAT I UNSAT Place EDG A LOAD BKR SYNCH SW in ON.
... EVALUATOR CUE: If asked , report that EDG C has NOT operated less than 520 kW for greater than 4.5 hours. -10 of 12-STEP STANDARD EVALUATION I COMMENT *28. Adjust EDG C GOV to raise Rotates EDG C GOV control switch clockwise to raise EDG CRITICAL STEP EDG C load to LESS THAN C load to approximately 2600 kW in approximately 800 kW SAT I UNSAT OR EQUAL TO 2,600 kW over increments.
: 14. Adjust EDG A VOLT REG to         Adjusts EDG A VOLT REG to match INCOMING and                    SAT I UNSAT INA match INCOMING and               RUNNING voltage, as necessary.
3 to 5 minutes in approximately 800 kW EVALUATOR CUE: If desired, prompt the candidate that increments.
RUNNING voltage.
time compression is in effect and one minute has passed. This cue can be repeated as necessary to complete loading of EDG C. EVALUATOR CUE: Another operator will complete the remaining portions of OP-22 for startup of EDGs A and C . . EVALUATOR:
*15. Adjust EDG A GOV to rotate       Adjusts EDG A GOV to establish SYNCHROSCOPE                      CRITICAL STEP SYNCHRO.SCOPE slowly in          rotation slowly in the FAST direction (clockwise).             SAT I UNSAT INA the FAST direction (clockwise).
Terminate the task at this point. Task Standard:
EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present, mark this step NA.
EDGs A and C are running and loaded to approximately 2600 KW. -11 of 12-  
The step is then NOT critical.
* *
                                                          -7 of 12-
* *
 
* HANDOUT The National Weather Service has issued a Hurricane Warning for Oswego County. AOP-13, High Winds, Hurricanes, and Tornadoes, has been entered. AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs. Pre-startup checks have been completed for all EDGs . EDGs have been declared inoperable . Start EDGs A and C per OP-22 Section 0.1. Load each EDG to approximately 2600 KW. -12 of 12-S/RO NRC 1 4-2 E APPL. T O JPM NUMBER REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK T I TLE: Restore Shutdown Cooling After I so l at i on , RHR Pump Trips NRC KIA SYSTEM NUMBER: 205000 A4.01 (3.7/3.7) JAF QUAL STANDARD NUMBER: 20 M i nutes ---OPERATIONS REV I EW: 7 JPM Complet i on 0 Simulated Performed Simulator Location: 0 Plant .TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION
STEP                                      STANDARD                          EVALUATION I COMMENT
: 0 Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
*16. WHEN EDG A and 10500 Bus      When SYNCHROSCOPE is at approximately 12 o'clock,               CRITICAL STEP are in phase                  closes EDG A LOAD BKR 10502 by rotating control switch          SAT I UNSAT (SYNCHROSCOPE at 12            clockwise.
o'clock), close EDG A LOAD BKR 10502.
*17. Adjust EDG A GOV to raise      Rotates EDG A GOV control switch clockwise to establish        CRITICAL STEP EDG A load 100 to 300 kW.      EDG A load 100 to 300 kW, as necessary.                        SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is initially present, mark this step NA.
The step is then NOT critical.
: 18. Place EDG A LOAD BKR          Rotates EDG A LOAD BKR SYNCH SW counterclockwise                SAT I UNSAT SYNCH SW in OFF and            to OFF and removes synch key.
remove synch switch handle.
: 19. IF A EDG has operated at      Determines EDG A has NOT operated less than 520 kW for          SAT I UNSAT LESS THAN 520 kW for          greater than 4.5 hours.
GREATER THAN 4.5 hours, THEN perform the following ...
EVALUATOR CUE: If asked, report that EDG A has NOT operated less than 520 kW for greater than 4.5 hours.
                                                    -8 of 12-
 
STEP                                    STANDARD                          EVALUATION I COMMENT
*20. Adjust EDG A GOV to raise  Rotates EDG A GOV control switch clockwise to raise EDG          CRITICAL STEP EDG A load to LESS THAN    A load to approximately 2600 kW in approximately 800 kW          SATIUNSAT OR EQUAL TO 2,600 kW over  increments.
3 to 5 minutes in approximately 800 kW increments.               EVALUATOR CUE: If desired, prompt the candidate that time compression is in effect and one minute has passed.
This cue can be repeated as necessary to complete loading of EDG A.
*21 . Parallel EDG C with 10500  Inserts synch key and rotates EDG C LOAD BKR SYNCH              CRITICAL STEP Bus as follows:            SW clockwise to ON .                                              SATIUNSAT Place EDG C LOAD BKR SYNCH SW in ON.
: 22. Adjust EDG C VOLT REG to  Adjusts EDG C VOLT REG to match INCOMING and                    SAT I UNSAT INA match INCOMING and        RUNNING voltage, as necessary.
RUNNING voltage.
*23. Adjust EDG C GOV to rotate Adjusts EDG C GOV to establish SYNCHROSCOPE                      CRITICAL STEP SYNCHROSCOPE slowly in    rotation slowly in the FAST direction (clockwise).             SAT I UNSAT INA the FAST direction (clockwise).
EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present, mark this step NA.
The step is then NOT critical.
                                                    -9 of 12-
 
-
STEP                                      STANDARD                          EVALUATION I COMMENT
  *24. WHEN EDG C and 10500 Bus      When SYNCHROSCOPE is at approximately 12 o'clock,              CRITICAL STEP are in phase                  closes EDG C LOAD BKR 10512 by rotating control switch          SATIUNSAT (SYNCHROSCOPE at 12            clockwise .
o'clock), close EDG C LOAD BKR 10512.
  *25. Adjust EDG C GOV to raise      Rotates EDG C GOV control switch clockwise to establish        CRITICAL STEP EDG C load 100 to 300 kW.     EDG C load 100 to 300 kW, as necessary.                       SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is initially present, mark this step NA.
The step is then NOT critical.
: 26. Place EDG C LOAD BKR           Rotates EDG C LOAD BKR SYNCH SW counterclockwise                 SATIUNSAT SYNCH SW in OFF and           to OFF and removes synch key.
remove synch switch handle.
: 27. IF C EDG has operated at       Determines EDG C has NOT operated less than 520 kW for           SATIUNSAT LESS THAN 520 kW for           greater than 4.5 hours.
GREATER THAN 4.5 hours, THEN perform the following ...
EVALUATOR CUE: If asked, report that EDG C has NOT operated less than 520 kW for greater than 4.5 hours.
                                                      -10 of 12-
 
STEP                                     STANDARD                         EVALUATION I COMMENT
  *28. Adjust EDG C GOV to raise     Rotates EDG C GOV control switch clockwise to raise EDG       CRITICAL STEP EDG C load to LESS THAN       C load to approximately 2600 kW in approximately 800 kW       SAT I UNSAT OR EQUAL TO 2,600 kW over     increments.
3 to 5 minutes in approximately 800 kW increments.                  EVALUATOR CUE: If desired, prompt the candidate that time compression is in effect and one minute has passed.
This cue can be repeated as necessary to complete loading of EDG C.
EVALUATOR CUE: Another operator will complete the remaining portions of OP-22 for startup of EDGs A and C .
                                                                                              .
EVALUATOR: Terminate the task at this point.
Task Standard: EDGs A and C are running and loaded to approximately 2600 KW.
                                                        -11 of 12-
 
HANDOUT
* The National Weather Service has issued a Hurricane Warning for Oswego County.
* AOP-13, High Winds, Hurricanes, and Tornadoes, has been entered.
* AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs.
* Pre-startup checks have been completed for all EDGs .
* EDGs have been declared inoperable .
Start EDGs A and C per OP-22 Section 0.1. Load each EDG to approximately 2600 KW.
                        -12 of 12-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 E       TASK TITLE :    Restore Shutdown Cooling After Isolation , RHR Pump Trips APPL . T O     JPM NUMBER REV:               DATE :                     NRC KIA SYSTEM NUMBER:         205000 A4 .01 (3.7/3 .7)
JAF TASK NUMBER:                                JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                              -  Minutes SUBMITTED :                                     OPERATIONS REVIEW:      -~    -~~c:d;>"' ,~
                                                                      ~                        7 APPROVED :
CANDIDATE NAME :
JPM Completion      0  Simulated      ~    Performed Location :         0  Plant          ~    Simulator
  .TE PERFORMED :                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :           0   Satisfactory       D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER  
SIGNATURE/PRINTED CANDIDATE REVIEW:
\
SIGNATURE REVIEWED BY:                                         DOC . COMPLETE :
S/RO NRC 14-2 E APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Restore Shutdown Cooling After Isolation, RHR Pump Trips By: lnt D Additionallnformation D Procedural Change Required D Validation 1:8:1 None Comments:
PROGRAM ADMINISTER
Current Update: By: Date Int. Previous Revision Date: -2 of 9-S/RO NRC 14-2 E APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Restore Shutdown Cooling After Isolation , RHR Pump Trips A. AOP-30 , Loss of Shutdown Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a low-power IC (IC-67). B. Ensure RHR B was initially in Shutdown Cooling lineup with RHR pump B running , but is now isolated by closing valves 25B , 17, and 18. C. Close 10MOV-12B.
\
D. Ensure Reactor coolant temperature is above 140&deg;F. E. Ensure Reactor water level is greater than 215". F. Ensure EPIC screen RHRB is on a screen near the JPM location.
 
G. Ensure RHRSW pump B is in service and RHRSW pump D is in standby. H. Ensure all actions of AOP-30 Attachment 1 are complete up to step 5.G. I. Ensure the following simulator programming
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 E       TASK TITLE:      Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO         JPM NUMBER Current Update:                           By:
:
Date                             lnt Outstanding Items D     Technical Review                               D    Additionallnformation D     Questions and Answers                         D     Validation D     Procedural Change Required                     1:8:1 None Comments:
* Malfunction RH01: B , RHR Pump B Trip (Trigger 1)
Current Update:                                 By:
* Trigger 1-Event Command: zlo10as35b(2)==1 (code for 10MOV-12B red light on), Action: None J. Ensure the following tags are hanging:
Date                                       Int.
* RHR KEEP-FULL PMP 1 OP-2B control switch -in STOP with red tag
Previous Revision Date:
* MIN FLOW VLV 10MOV-16B control switch-red tag
                                              -2 of 9-
* RHR TEST TORUS CLG & SPRAY 1 OMOV-39B -red tag V. EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.  
 
-3 of 9-S/RO NRC 14-2 E APPL. TO JPM NUMBER JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Restore Shutdown Cooling After Isolation , RHR Pump Trips B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication. VI. TASK CONDITIONS A. RHR B was in Shutdown Cooling. B. A spurious isolation signal caused Shutdown Cooling to isolate. C. The cause of the isolation signal has been determined and corrected.  
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 E           TASK TITLE:      Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. AOP-30, Loss of Shutdown Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a low-power IC (IC-67).
-4 of 9-  
B. Ensure RHR B was initially in Shutdown Cooling lineup with RHR pump B running , but is now isolated by closing valves 25B, 17, and 18.
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Restore Shutdown Cooling using RHR pump B per AOP-30 Attachment
C. Close 10MOV-12B.
: 1. The procedure has been complete up to step S.G." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of AOP-30 Attachment
D. Ensure Reactor coolant temperature is above 140&deg;F.
: 1. SAT I UNSAT AOP-30 Attachment
E. Ensure Reactor water level is greater than 215".
: 1. 2. IF white HI DW PRESS OR Observes white HI DW PRESS OR LO LVL CLOSE OF SATIUNSAT LO LVL CLOSE OF 1 OMOV-10MOV-25B IN SHUTDOWN CLG 10A-DS85A(B) light is 25A(B) IN SHUTDOWN CLG not lit. 1 OA-DS85A(B) light is on, THEN reset logic as follows: 3. Ensure open HX A( B) BYP Observes 1 OMOV-668 green light off, red light on. SAT I UNSAT VLV 10MOV-66A(B).  
F. Ensure EPIC screen RHRB is on a screen near the JPM location.
*4. Open SHUTDOWN CLG Opens 10MOV-18 by rotating control switch clockwise.
G. Ensure RHRSW pump B is in service and RHRSW pump D is in standby.
CRITICAL STEP SUCT 10MOV-18. SAT I UNSAT *5. Open SHUTDOWN CLG Opens 10MOV-17 by rotating control switch clockwise.
H. Ensure all actions of AOP-30 Attachment 1 are complete up to step 5.G.
CRITICAL STEP SUCT 10MOV-17.
I. Ensure the following simulator programming:
SAT I UNSAT 6. Ensure closed HX A( B) Observes 10MOV-12B green light on, red light off. SAT I UNSAT OUTLET VLV 10MOV-12A(B).  
* Malfunction RH01 :B, RHR Pump B Trip (Trigger 1)
-5 of 9-I STEP STANDARD EVALUATION I COMMENT 7. Ensure RPV water level is Observes Reactor water level is above 215 inches. SATIUNSAT GREATER THAN 215 inches. *8. Start RHR pump that was in Starts RHR pump B by rotating control switch clockwise. CRITICAL STEP service prior to isolation. SAT I UNSAT *9 Open LPCIINBD INJ VLV Opens 1 OMOV-258 by rotating control switch clockwise. CRITICAL STEP 1 OMOV-25A(B).
* Trigger 1- Event Command : zlo10as35b(2)==1 (code for 10MOV-12B red light on) , Action: None J. Ensure the following tags are hanging:
SAT I UNSAT EVALUATOR NOTE: RHR pump B amps will be just below the red line value. If the candidate identifies this and is looking for direction, report that RHR pump B operation is satisfactory as long current does not exceed red line amps. EVALUATOR CUE: Direct the candidate to establish Reactor coolant temperature control in a band of 120-140&deg;F using RHR heat exchanger inlet temperature.  
* RHR KEEP-FULL PMP 1OP-2B control switch - in STOP with red tag
*10. Establish normal temperature Throttles open 10MOV-12B by rotating control switch CRITICAL STEP control per Section E of OP-130. clockwise.
* MIN FLOW VLV 10MOV-16B control switch- red tag
SAT I UNSAT EVALUATOR NOTE: When 10MOV-12B red light illuminates , an automatic trigger trips RHR pump B. This initiates an alternate path for the candidate to start RHR pump D to re-establish Shutdown Cooling flow. -6 of 9-
* RHR TEST TORUS CLG & SPRAY 1OMOV-39B - red tag V. EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.
: 11. STEP Recognize trip of RHR pump B. STANDARD Recognizes trip of RHR pump B. EVALUATOR NOTE: This may include recognizing annunciator 09-3-2-5, RHR pump B indicating light , flow , and/or amps. EVALUATOR ROLE PLAY: If asked to determine cause of RHR pump B trip, report RHR pump B tripped on overcurrent.
                                                    -3 of 9-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 E             TASK TITLE :     Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO          JPM NUMBER B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .
VI. TASK CONDITIONS A. RHR B was in Shutdown Cooling .
B. A spurious isolation signal caused Shutdown Cooling to isolate.
C. The cause of the isolation signal has been determined and corrected.
                                                      -4 of 9-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Restore Shutdown Cooling using RHR pump B per AOP-30 Attachment 1. The procedure has been complete up to step S.G."
STEP                                       STANDARD                       EVALUATION I COMMENT
: 1.     Obtain a controlled copy of   Obtains a controlled copy of AOP-30 Attachment 1.             SAT I UNSAT AOP-30 Attachment 1.
: 2.     IF white HI DW PRESS OR       Observes white HI DW PRESS OR LO LVL CLOSE OF                 SATIUNSAT LO LVL CLOSE OF 1OMOV-         10MOV-25B IN SHUTDOWN CLG 10A-DS85A(B) light is 25A(B) IN SHUTDOWN CLG         not lit.
1OA-DS85A(B) light is on, THEN reset logic as follows:
: 3.     Ensure open HX A( B) BYP       Observes 1OMOV-668 green light off, red light on.             SAT I UNSAT VLV 10MOV-66A(B).
    *4.     Open SHUTDOWN CLG             Opens 10MOV-18 by rotating control switch clockwise.         CRITICAL STEP SUCT 10MOV-18.                                                                               SAT I UNSAT
    *5.     Open SHUTDOWN CLG             Opens 10MOV-17 by rotating control switch clockwise.         CRITICAL STEP SUCT 10MOV-17.                                                                               SAT I UNSAT I
: 6.     Ensure closed HX A( B)         Observes 10MOV-12B green light on, red light off.             SAT I UNSAT OUTLET VLV 10MOV-12A(B).
                                                              -5 of 9-
 
STEP                                       STANDARD                         EVALUATION I COMMENT
: 7. Ensure RPV water level is   Observes Reactor water level is above 215 inches.               SATIUNSAT GREATER THAN 215 inches.
*8. Start RHR pump that was in   Starts RHR pump B by rotating control switch clockwise .       CRITICAL STEP service prior to isolation.                                                                   SAT I UNSAT
*9 Open LPCIINBD INJ VLV       Opens 1OMOV-258 by rotating control switch clockwise.           CRITICAL STEP 1OMOV-25A(B).                                                                                 SAT I UNSAT EVALUATOR NOTE: RHR pump B amps will be just below the red line value. If the candidate identifies this and is looking for direction, report that RHR pump B operation is satisfactory as long current does not exceed red line amps.
EVALUATOR CUE: Direct the candidate to establish Reactor coolant temperature control in a band of 120-140&deg;F using RHR heat exchanger inlet temperature.
*10. Establish normal temperature Throttles open 10MOV-12B by rotating control switch             CRITICAL STEP control per Section E of OP- clockwise.                                                       SAT I UNSAT 130.
EVALUATOR NOTE: When 10MOV-12B red light illuminates, an automatic trigger trips RHR pump B. This initiates an alternate path for the candidate to start RHR pump D to re-establish Shutdown Cooling flow.
                                                      -6 of 9-
 
STEP                                    STANDARD                      EVALUATION I COMMENT
: 11. Recognize trip of RHR pump Recognizes trip of RHR pump B.                               SAT/UNSAT B.
EVALUATOR NOTE: This may include recognizing annunciator 09-3-2-5, RHR pump B indicating light, flow, and/or amps.
EVALUATOR ROLE PLAY: If asked to determine cause of RHR pump B trip, report RHR pump B tripped on overcurrent.
EVALUATOR CUE: If asked how to proceed, direct candidate to make a recommendation for restoring Shutdown Cooling and then carry out that recommendation.
EVALUATOR CUE: If asked how to proceed, direct candidate to make a recommendation for restoring Shutdown Cooling and then carry out that recommendation.
EVALUATOR NOTE: The candidate may use guidance in AOP-30 Attachment 1 or OP-13D section D for starting RHR pump D. Depending on the exact procedural path taken , additional steps may be taken (such as re-positioning 10MOV-12B and/or closing 10MOV-15B), but the following two steps are the only critical steps. -7 of 9-EVALUATION I COMMENT SAT/UNSAT STEP STANDARD EVALUATION I COMMENT *12. Open SHUTDOWN CLG Opens 10MOV-15D by rotating control switch clockwise to CRITICAL STEP SUCT VLV 10MOV-15D.
EVALUATOR NOTE: The candidate may use guidance in AOP-30 Attachment 1 or OP-13D section D for starting RHR pump D. Depending on the exact procedural path taken ,
open. SAT/UNSAT  
additional steps may be taken (such as re-positioning 10MOV-12B and/or closing 10MOV-15B), but the following two steps are the only critical steps.
*13. Start RHR pump D. Starts RHR pump D by rotating control switch clockwise to CRITICAL STEP START. SAT I UNSAT EVALUATOR CUE: Another operator will continue actions in the procedure. EVALUATOR:
                                                -7 of 9-
Terminate the task at this po i nt. Task Standard:
 
Shutdown Cooling is placed in service on RHR B. RHR pump D is started in response to the trip of RHR pump B. -8 of 9-HANDOUT
STEP                                         STANDARD                           EVALUATION I COMMENT
  *12. Open SHUTDOWN CLG             Opens 10MOV-15D by rotating control switch clockwise to             CRITICAL STEP SUCT VLV 10MOV-15D.           open.                                                               SAT/UNSAT
  *13. Start RHR pump D.             Starts RHR pump D by rotating control switch clockwise to           CRITICAL STEP START.                                                               SAT I UNSAT EVALUATOR CUE: Another operator will continue actions in the procedure.
EVALUATOR: Terminate the task at this point.
Task Standard: Shutdown Cooling is placed in service on RHR B. RHR pump D is started in response to the trip of RHR pump B.
                                                          -8 of 9-
 
HANDOUT
* RHR B was in Shutdown Cooling.
* RHR B was in Shutdown Cooling.
* A spurious isolation signal caused Shutdown Cooling to isolate.
* A spurious isolation signal caused Shutdown Cooling to isolate.
* The cause of the isolation signal has been determined and corrected.
* The cause of the isolation signal has been determined and corrected.
Restore Shutdown Cooling using RHR pump B per AOP-30 Attachment
Restore Shutdown Cooling using RHR pump B per AOP-30 . The procedure has been complete up to step 5.G.
: 1. The procedure has been complete up to step 5.G. -9 of 9-S/RO NRC 14-2 F APPL. TO JPM NUMBER REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED:
                            -9 of 9-
APPROVED: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path) NRC KIA SYSTEM NUMBER: 261000 A4.06 (3.3/3.6)
 
JAF QUAL STANDARD NUMBER: 15 Minutes __ __:__ OPERATIONS  
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 F         TASK TITLE :     Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path)
APPL. TO      JPM NUMBER REV:              DATE:                        NRC KIA SYSTEM NUMBER:           261000 A4 .06 (3.3/3.6)
JAF TASK NUMBER:                                  JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME :  __    15
__:__ Minutes SUBMITTED:                                       OPERATIONS   REVIEW~~
APPROVED :
-------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------
CANDIDATE NAME: JPM Completion Location: E PERFORMED:
CANDIDATE NAME:
0 Simulated 0 Plant C8J Performed C8J Simulator TIME TO COMPLETE:
JPM Completion     0  Simulated          C8J Performed Location :         0 Plant             C8J Simulator E PERFORMED:                    TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION:         0     Satisfactory       0   Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
Minutes PERFORMANCE EVALUATION:
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE:
SIGNATURE/PRINTED CANDIDATE REVIEW:
PROGRAM ADMINISTER S/RO NRC 14-2 F APPL. TO JPM NUMBER Current Update: Date Outstanding Items 0 Technical Review 0 Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path) By: lnt 0 Additionallnformation 0 Validation 0 Procedural Change Required 1:8] None Comments: Cur r ent Update: By: Date Int. Previous Revision Date: -2 of 11-S/RO NRC 14-2 F APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Manually Isolate Reactor Building Ventilation, Low Reactor Building D/P (Ait Path) A. OP-51A, Reactor Building Ventilation and Cooling System B. OP-20 , Standby Gas Treatment System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69). B. Ensure the following simulator programming:
SIGNATURE REVIEWED BY:                                         DOC. COMPLETE:
PROGRAM ADMINISTER
 
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 F       TASK TITLE:     Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path)
APPL. TO          JPM NUMBER Current Update:                          By:
Date                            lnt Outstanding Items 0   Technical Review                            0    Additionallnformation 0   Questions and Answers                        0    Validation 0   Procedural Change Required                   1:8] None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                            -2 of 11-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 F             TASK TITLE:       Manually Isolate Reactor Building Ventilation, Low Reactor Building D/P (Ait Path)
APPL. TO          JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-51A, Reactor Building Ventilation and Cooling System B. OP-20, Standby Gas Treatment System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69).
B. Ensure the following simulator programming:
* Malfunction HV03, Secondary Containment Leakage, 50%
* Malfunction HV03, Secondary Containment Leakage, 50%
* Event Trigger 1: Event-zdi11 sgta04(3)==1  
* Event Trigger 1: Event- zdi11 sgta04(3)==1 &zdi11 sgtb04(3)==1 , Command- imf hv03 10
&zdi11 sgtb04(3)==1 , Command-imf hv03 10
* Event Trigger 29: Event- zdi5as1 (1 )==1 , Command- set ypo:rp02:a=1
* Event Trigger 29: Event-zdi5as1 (1 )==1 , Command-set ypo:rp02:a=1
* Event Trigger 30: Event- zdi5as1 (1 )==1 , Command- set ypo:rp02 :b=1 C. Insert a Reactor scram .
* Event Trigger 30: Event-zdi5as1 (1 )==1 , Command-set ypo: rp02: b=1 C. Insert a Reactor scram. D. Restore Reactor water level above 177". V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
D. Restore Reactor water level above 177".
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication. VI. TASK CONDITIONS A. A radioactive steam leak has developed in the Reactor Building.  
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
-3 of 11-  
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Manually isolate the Reactor Building per OP-51A section G.1." STEP STANDARD 1. Obtain a controlled copy of Obtains a controlled copy of OP-51A. Refers to section OP-51A. G.1. 2. Ensure SBGT is running per Obtains a controlled copy of OP-20. Refers to section 0.1 OP-20. or 0.2 or Posted Attachment
VI. TASK CONDITIONS A. A radioactive steam leak has developed in the Reactor Building.
: 3. EVALUATOR ROLE PLAY: If asked which train of SBGT to start , tell the candidate that either train is fine. EVALUATOR NOTE: The subsequent JPM steps are written for use of OP-20 sections 0.1 or 0.2. If the Posted Attachment is used, slightly different verifications will be performed, but there will be no impact on Critical Steps. *3. Ensure open Opens ABOVE(BELOW)
                                                      -3 of 11-
EL 369' SUCT 01-125MOV-11(12)
 
ABOVE(BELOW)
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Manually isolate the Reactor Building per OP-51A section G.1."
EL 369' by rotating control switch clockwise to open. SUCT 01-125MOV-11 (12) *4. Ensure open TRAIN A(B) Opens TRAIN A(B) INLET 01-125MOV-14A(B) by rotating INLET 01-125MOV-14A(B) control switch clockwise to open. -4 of 11-EVALUATION I COMMENT SAT I UNSAT SATIUNSAT CRITICAL STEP SAT I UNSAT CRITICAL STEP SATIUNSAT STEP STANDARD EVALUATION I COMMENT 5. Verify the following: Observes white light for AIR HTR 01-125E-5A(B) is on. SAT I UNSAT
STEP                                             STANDARD                         EVALUATION I COMMENT
* White light for AIR HTR 01-125E-5A(B) is on 6.
: 1.     Obtain a controlled copy of       Obtains a controlled copy of OP-51A. Refers to section           SAT I UNSAT OP-51A.                           G.1.
* Red light for AIR HTR 01-Observes red light for AIR HTR 01-125E-5A(B) is on. SAT I UNSAT 125E-5A(B) is on 7.
: 2.     Ensure SBGT is running per       Obtains a controlled copy of OP-20. Refers to section 0 .1       SATIUNSAT OP-20.                           or 0 .2 or Posted Attachment 3.
* TRAIN A(B) CLG VLV 01-Observes TRAIN A(B) CLG VLV 01-125MOV-100A(B)
EVALUATOR ROLE PLAY: If asked which train of SBGT to start, tell the candidate that either train is fine.
SAT I UNSAT 125MOV-100A(B) is closed green light on, red light off. 8.
EVALUATOR NOTE: The subsequent JPM steps are written for use of OP-20 sections 0 .1 or 0.2. If the Posted Attachment is used, slightly different verifications will be performed, but there will be no impact on Critical Steps.
* FN DISCH 01-125MOV-Observes FN DISCH 01-125MOV-15A(B) green light is off, SATIUNSAT 15A(B) is open red light is on. 9.
    *3.     Ensure open                       Opens ABOVE(BELOW) EL 369' SUCT 01-125MOV-11(12)                 CRITICAL STEP ABOVE(BELOW) EL 369'               by rotating control switch clockwise to open.                     SAT I UNSAT SUCT 01-125MOV-11 (12)
* TRAIN A(B) FN 01-125FN-Observes TRAIN A(B) FN 01-125FN-1A(B) green light is off, SAT I UNSAT 1A(B) is running red light is on. 10. IF standby gas treatment is Determines step is NIA. SAT I UNSAT being placed in service to support any of the following  
    *4.     Ensure open TRAIN A(B)           Opens TRAIN A(B) INLET 01-125MOV-14A(B) by rotating             CRITICAL STEP INLET 01-125MOV-14A(B)           control switch clockwise to open.                                 SATIUNSAT
... -5 of 11-STEP STANDARD EVALUATION I COMMENT 11. IF SGT Train B(A) is Observes TRAIN B(A) CLG VLV 01-125MOV-100B(A)
                                                                    -4 of 11-
SAT I UNSAT shutdown, THEN perform the green light off, red light on. following:
 
* Verify open TRAIN B(A) CLG VLV 01-125MOV-100B(A). 12.
STEP                                         STANDARD                       EVALUATION I COMMENT
* Verify flow rate is 6000 to Observes SGT flow rate. SATIUNSAT 5800 scfm on SGT FLOW 01-125FI-106A.
: 5. Verify the following :           Observes white light for AIR HTR 01-125E-5A(B) is on.         SAT I UNSAT
: 13. IF RB DIFF PRESS 01-Observes Reactor Building DIP is more negative than -0.25 SAT I UNSAT 125DPI-100A orB indicates inches water. less negative than -0.25 inches water, THEN ensure SGT Train B is in service per EVALUATOR NOTE: Reactor Building DIP is SAT at this Subsection 0.2. point in the JPM because normal Reactor Building ventilation has not yet been isolated. Once the Reactor Building isolation is performed, Reactor Building DIP will be UNSAT. EVALUATOR NOTE: The candidate will proceed back to OP-51A step G.1.2. ----6 of 11-STEP STANDARD EVALUATION I COMMENT *14. Depress the following Depresses RB VENT I SOL A pushbutton.
* White light for AIR HTR 01-125E-5A(B) is on
CRITICAL STEP pushbuttons at panel 09-75: SAT I UNSAT
: 6.
* Red light for AIR HTR 01-   Observes red light for AIR HTR 01-125E-5A(B) is on.           SAT I UNSAT 125E-5A(B) is on
: 7.
* TRAIN A(B) CLG VLV 01-       Observes TRAIN A(B) CLG VLV 01-125MOV-100A(B)                 SAT I UNSAT 125MOV-100A(B) is closed     green light on, red light off.
: 8.
* FN DISCH 01-125MOV-         Observes FN DISCH 01-125MOV-15A(B) green light is off,         SATIUNSAT 15A(B) is open               red light is on .
: 9.
* TRAIN A(B) FN 01-125FN-     Observes TRAIN A(B) FN 01-125FN-1A(B) green light is off,     SAT I UNSAT 1A(B) is running             red light is on.
: 10. IF standby gas treatment is     Determines step is NIA.                                       SAT I UNSAT being placed in service to support any of the following ...
                                                      -5 of 11-
 
STEP                                         STANDARD                               EVALUATION I COMMENT 11 . IF SGT Train B(A) is           Observes TRAIN B(A) CLG VLV 01-125MOV-100B(A)                         SAT I UNSAT shutdown, THEN perform the     green light off, red light on.
following :
* Verify open TRAIN B(A)
CLG VLV 01-125MOV-100B(A).
: 12.
* Verify flow rate is 6000 to Observes SGT flow rate.                                               SATIUNSAT 5800 scfm on SGT FLOW 01-125FI-106A.
: 13. IF RB DIFF PRESS 01-           Observes Reactor Building DIP is more negative than -0.25             SAT I UNSAT 125DPI-100A orB indicates       inches water.
less negative than -0.25 inches water, THEN ensure SGT Train B is in service per   EVALUATOR NOTE: Reactor Building DIP is SAT at this Subsection 0.2.                 point in the JPM because normal Reactor Building ventilation has not yet been isolated. Once the Reactor Building isolation is performed, Reactor Building DIP will be UNSAT.
EVALUATOR NOTE: The candidate will proceed back to OP-51A step G.1 .2.
                                                                                                  ---
                                                        -6 of 11-
 
STEP                                     STANDARD                     EVALUATION I COMMENT
*14. Depress the following           Depresses RB VENT ISOL A pushbutton.                   CRITICAL STEP pushbuttons at panel 09-75:                                                             SAT I UNSAT
* RB VENT ISOLA
* RB VENT ISOLA
* RB VENT ISOL B Depresses RB VENT ISOL B pushbutton.
* RB VENT ISOL B Depresses RB VENT ISOL B pushbutton.                   CRITICAL STEP SATIUNSAT EVALUATOR NOTE: The verifications below may be done in any order.
CRITICAL STEP SATIUNSAT EVALUATOR NOTE: The verifications below may be done in any order. 15. Verify isolation per Subsection Proceeds to OP-51A section G.2. SATIUNSAT G.2. 16. Verify the following: Observes 66AOV-100A green light on , red light off. SATIUNSAT
: 15. Verify isolation per Subsection Proceeds to OP-51A section G.2.                         SATIUNSAT G.2.
* INBD SUPP ISOL 66AOV-1 OOA -Closed 17.
: 16. Verify the following :         Observes 66AOV-100A green light on, red light off.       SATIUNSAT
* OUTBD EXH ISOL Observes 66AOV-101A green light on , red light off. SAT I UNSAT 66AOV-101A-Closed 18.
* INBD SUPP ISOL 66AOV-1OOA - Closed
* BELOW EL 369' RECIRC Observes 66AOD-105 green light off , red light on. SAT I UNSAT 66AOD-1 05 -Open 19.
: 17.
* EL 369' RECIRC 66AOD-Observes 66AOD-108 green light off , red light on. SATIUNSAT 108-Open -7 of 11-STEP STANDARD EVALUATION I COMMENT 20.
* OUTBD EXH ISOL             Observes 66AOV-101A green light on, red light off.       SAT I UNSAT 66AOV-101A- Closed
* OUTBD SUPP ISOL Observes 66AOV-1008 green light on, red light off. SAT I UNSAT 66AOV-100B-Closed 21.
: 18.
* INBD EXH ISOL 66AOV-Observes 66AOV-101B green light on, red light off. SAT I UNSAT 101 B-Closed 22.
* BELOW EL 369' RECIRC       Observes 66AOD-105 green light off, red light on.       SAT I UNSAT 66AOD-1 05 - Open
* SUPP FN 66FN-5A, 58, Observes 2 of the following fans have green light off, red SAT I UNSAT SC (two of three)-On light on and 1 of the following fans has green light on, red light off:
: 19.
* EL 369' RECIRC 66AOD-       Observes 66AOD-108 green light off, red light on.       SATIUNSAT 108- Open
                                                    -7 of 11-
 
STEP                                       STANDARD                         EVALUATION I COMMENT
: 20.
* OUTBD SUPP ISOL         Observes 66AOV-1008 green light on, red light off.               SAT I UNSAT 66AOV-100B- Closed
: 21.
* INBD EXH ISOL 66AOV-   Observes 66AOV-101B green light on, red light off.               SAT I UNSAT 101 B- Closed
: 22.
* SUPP FN 66FN-5A, 58,   Observes 2 of the following fans have green light off, red       SAT I UNSAT SC (two of three)- On   light on and 1 of the following fans has green light on, red light off:
* 66FN-5A
* 66FN-5A
* 66FN-5B
* 66FN-5B
* 66FN-5C 23.
* 66FN-5C
* BELOW EL 369' EXH FN Observes 1 of the following fans have green light off, red SAT I UNSAT 66FN-12A OR 66FN-12B light on and 1 of the following fans has green light on, red -On light off:
: 23.
* BELOW EL 369' EXH FN   Observes 1 of the following fans have green light off, red       SAT I UNSAT 66FN-12A OR 66FN-12B   light on and 1 of the following fans has green light on, red
      -On                     light off:
* 66FN-12A
* 66FN-12A
* 66FN-12B 24.
* 66FN-12B
* EL 369' EXH FN 66FN-Observes 66FN-13A green light on, red light off. SAT I UNSAT 13A AND 66FN-13B-Off Observes 66FN-13B green light on, red light off. 25.
: 24.
* TK EXH FN 66FN-35 -Off Observes 66FN-35 green light on, red light off. SAT I UNSAT -8 of 11-STEP STANDARD EVALUATION I COMMENT 26.
* EL 369' EXH FN 66FN-   Observes 66FN-13A green light on, red light off.                 SAT I UNSAT 13A AND 66FN-13B- Off Observes 66FN-13B green light on, red light off.
* CRESC SUPP FN 66FN-Observes 1 of the following fans have green light off , red SAT I UNSAT 26A OR 66FN-26B -On light on and 1 of the following fans has green light on, red light off:
: 25.
* TK EXH FN 66FN Off Observes 66FN-35 green light on, red light off.                   SAT I UNSAT
                                                -8 of 11-
 
STEP                                     STANDARD                         EVALUATION I COMMENT
: 26.
* CRESC SUPP FN 66FN-     Observes 1 of the following fans have green light off, red       SAT I UNSAT 26A OR 66FN-26B - On   light on and 1 of the following fans has green light on, red light off:
* 66FN-26A
* 66FN-26A
* 66FN-26B 27.
* 66FN-26B
* Standby Gas Treatment-Determines SBGT is still running per OP-20. SAT I UNSAT Running per OP-20 28.
: 27.
* Reactor Building to Observes Reactor Building to atmosphere differential SAT I UNSAT atmosphere differential pressure is less negative than 0.25 in. water gauge. pressure-(-)0.25 to(-) 2.50 in. water gauge EVALUATOR NOTE: The candidate will now proceed to OP-20 section 0.1 or 0.2 to start the second train of SBGT. -9 of 11-STEP STANDARD EVALUATION I COMMENT *29. Ensure open Opens BELOW(ABOVE)
* Standby Gas Treatment- Determines SBGT is still running per OP-20.                       SAT I UNSAT Running per OP-20
EL 369' SUCT 01-125MOV-12(11)
: 28.
CRITICAL STEP BELOW(ABOVE)
* Reactor Building to     Observes Reactor Building to atmosphere differential             SAT I UNSAT atmosphere differential pressure is less negative than 0.25 in . water gauge.
EL 369' by rotating control switch clockwise to open. SAT I UNSAT SUCT 01-125MOV-12(11). *30. Ensure open TRAIN B(A) Opens TRAIN B(A) INLET 01-125MOV-14B(A) by rotating CRITICAL STEP INLET 01-125MOV-14B(A). control switch clockwise to open. SAT I UNSAT EVALUATOR CUE: Another operator has verified proper response of Standby Gas Treatment Train B(A). EVALUATOR:
pressure- (-)0.25 to(-)
Terminate the task at this point. Task Standard:
2.50 in . water gauge EVALUATOR NOTE: The candidate will now proceed to OP-20 section 0 .1 or 0.2 to start the second train of SBGT.
The Reactor Building is isolated and Reactor Building differential pressure is restored with two trains of Standby Gas Treatment in service. -10 of 11-HANDOUT
                                                -9 of 11-
 
STEP                                         STANDARD                               EVALUATION I COMMENT
  *29. Ensure open                       Opens BELOW(ABOVE) EL 369' SUCT 01-125MOV-12(11)                       CRITICAL STEP BELOW(ABOVE) EL 369'             by rotating control switch clockwise to open.                           SAT I UNSAT SUCT 01-125MOV-12(11).
  *30. Ensure open TRAIN B(A)           Opens TRAIN B(A) INLET 01-125MOV-14B(A) by rotating                   CRITICAL STEP INLET 01-125MOV-14B(A).           control switch clockwise to open.                                       SAT I UNSAT EVALUATOR CUE: Another operator has verified proper response of Standby Gas Treatment Train B(A) .
EVALUATOR: Terminate the task at this point.
Task Standard: The Reactor Building is isolated and Reactor Building differential pressure is restored with two trains of Standby Gas Treatment in service.
                                                            -10 of 11-
 
HANDOUT
* A radioactive steam leak has developed in the Reactor Building.
* A radioactive steam leak has developed in the Reactor Building.
Manually isolate the Reactor Building per OP-51 A section G.1. -11 of 11-  
Manually isolate the Reactor Building per OP-51 A section G.1.
. S/RO NRC 14-2 G APPL. TO JPM NUMBER REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Reset Group 2 Isolat i on , Restore RWCU NRC KIA SYSTEM NUMBER: 223002 A4.03 (3.6/3.5) JAF QUAL STANDARD NUMBER: 15 Minutes __ ....;__ OPERATIONS REVIEW: /"V JPM Completion Locat i on: D S i mulated D Plant [gj Performed
                          -11 of 11-
[gj Simulator if E PERFORMED: TIME TO COMPLETE: M i nutes PERFORMANCE EVALUATION
 
: D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE
. S/RO         NRC 14-2 G         TASK TITLE:        Reset Group 2 Isolation , Restore RWCU APPL . TO     JPM NUMBER REV:               DATE:                           NRC KIA SYSTEM NUMBER:           223002 A4 .03 (3.6/3.5)
JAF TASK NUMBER:                                    JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:      __  15
                                    ....;__ Minutes SUBMITTED:                                          OPERATIONS REVIEW:           ~~~ ~
rr -~7
                                                                              /"V APPROVED :
CANDIDATE NAME:
JPM Completion     D   Simulated          [gj Performed Location :          D  Plant              [gj Simulator ifE PERFORMED:                   TIME TO COMPLETE :                   Minutes PERFORMANCE EVALUATION :           D       Satisfactory       D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 G APPL. TO JPM NUMBER Current Update: Date Outstanding Items 0 Technical Review 0 Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Reset Group 2 Isolation, Restore RWCU By: lnt 0 Additional Information 0 Validation 0 Procedural Change Required Comments: [gl None Current Update: By: Date Int. Previous Revision Date: -2 of 11-JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 G TASK TITLE: Reset Group 2 Isolation , Restore RWCU APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. AOP-15 , Isolation Verification and Recovery B. OP-28, Reactor Water Clean-Up System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69). B. Insert a Reactor scram. C. Restore Reactor water level above 177". D. Trip both Recirculation pumps. V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
SIGNATURE/PRINTED CANDIDATE REVIEW:
SIGNATURE REVIEWED BY:                                             DOC . COMPLETE:
PROGRAM ADMINISTER
 
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO           NRC 14-2 G         TASK TITLE:      Reset Group 2 Isolation, Restore RWCU APPL. TO         JPM NUMBER Current Update:                           By:
Date                           lnt Outstanding Items 0   Technical Review                             0  Additional Information 0   Questions and Answers                         0   Validation 0   Procedural Change Required                   [gl None Comments:
Current Update:                                 By:
Date                                     Int.
Previous Revision Date:
                                              -2 of 11-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 G             TASK TITLE:       Reset Group 2 Isolation, Restore RWCU APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. AOP-15 , Isolation Verification and Recovery B. OP-28, Reactor Water Clean-Up System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69).
B. Insert a Reactor scram.
C. Restore Reactor water level above 177".
D. Trip both Recirculation pumps.
V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication.
VI. TASK CONDITIONS A. Both Recirculation pumps have tripped. B. A Reactor scram has been inserted.
VI. TASK CONDITIONS A. Both Recirculation pumps have tripped .
C. Reactor water level lowered to 140 inches. D. Reactor water level has been recovered above 177 inches. E. Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2. -3 of 11-  
B. A Reactor scram has been inserted.
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Reset the Group 2 isolation per AOP-15 section G.1. Then , restore RWCU per OP-28 section G.4. Establish gravity blowdown flow to the Main Condenser." --------STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of AOP-15. Refers to section SAT I UNSAT AOP-15. G.1. 2. WHEN it has been determined Continues with procedure. SAT I UNSAT that an undesired release will not occur when isolation is reset , continue with EVALUATOR CUE: If the candidate requests assistance procedure. determining an undesired release will not occur , then inform the candidate  
C. Reactor water level lowered to 140 inches.
" An undesired release will not occur when isolation is reset". 3. Place control switch for OW Rotates control switch for OW FLOOR ORN 20AOV-83 to SAT I UNSAT FLOOR ORN 20AOV-83 in CLOSE. CLOSE. 4. Place control switch for OW Rotates control switch for OW EQUIP ORN 20AOV-95 to SAT I UNSAT EQUIP ORN 20AOV-95 to CLOSE , then releases. CLOSE , spring return to AUTO. -4 of 11-
D. Reactor water level has been recovered above 177 inches.
: 5. 6. 7. 8. STEP Simultaneously rotate the following PCIS VLV RESET switches to both RESET positions, spring return to NORM:
E. Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2.
* 16A-S32
                                                      -3 of 11-
* 16A-S33 Restore RWCU System , if necessary, per Section G of OP-28. IF boron was injected per the EOPs , THEN Subsection G.4 cannot be performed.
 
Ensure Subsection G.1 is complete. STANDARD Simultaneously rotates PCIS VLV RESET switches S32 and 16A-S33 to clockwise positions.
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Reset the Group 2 isolation per AOP-15 section G.1 . Then , restore RWCU per OP-28 section G.4.
Simultaneously rotates PCIS VLV RESET switches S32 and 16A-S33 to counterclockwise positions. EVALUATOR NOTE: These switches may be rotated in either direction first. Obtains a controlled copy of OP-28. Refers to section G.4 per initiating cue. Determines no boron has been injected. EVALUATOR CUE: If asked about boron injection , report that no boron has been injected.
Establish gravity blowdown flow to the Main Condenser."
* Indicates need to ensure Subsection G.1 is complete. EVALUATOR CUE: OP-28 sections G.1 and G.2 have been completed by another operator.  
                                  - - - ---- -
-5 of 11-EVALUATION I COMMENT CRITICAL STEP SAT I UNSAT CRITICAL STEP SAT I UNSAT SATIUNSAT SAT I UNSAT SATIUNSAT STEP STANDARD EVALUATION I COMMENT 9. Ensure one of the following Determ i nes RWCU pump A is the preferred pump to isolate. SAT I UNSAT RWCU pumps is isolated by performing one of the following: EVALUATOR NOTE: A note in OP-28 identifies RWCU pump A as the preferred pump to isolate. EVALUATOR CUE: If asked about which pump to isolate , direct the candidate to isolate RWCU pump A. 10. IF RWCU Pump A will be the Directs operator to close valves to isolate RWCU pump A. SAT/UNSAT isolated pump , THEN ensure closed the following valves:
STEP                                             STANDARD                         EVALUATION I COMMENT
* 12RWC-19A (RWCU pump EVALUATOR CUE: OP-28 step G.4.3.a has been A suet inner isol valve) completed to i solate RWCU pump A.
: 1.     Obtain a controlled copy of       Obtains a controlled copy of AOP-15. Refers to section           SAT I UNSAT AOP-15 .                         G.1.
: 2.     WHEN it has been determined       Continues with procedure.                                         SAT I UNSAT that an undesired release will not occur when isolation is reset, continue with             EVALUATOR CUE: If the candidate requests assistance procedure.                       determining an undesired release will not occur, then inform the candidate "An undesired release will not occur when isolation is reset".
: 3.     Place control switch for OW       Rotates control switch for OW FLOOR ORN 20AOV-83 to               SAT I UNSAT FLOOR ORN 20AOV-83 in             CLOSE.
CLOSE.
: 4.     Place control switch for OW       Rotates control switch for OW EQUIP ORN 20AOV-95 to               SAT I UNSAT EQUIP ORN 20AOV-95 to             CLOSE, then releases .
CLOSE, spring return to AUTO.
                                                                  -4 of 11-
 
STEP                                        STANDARD                      EVALUATION I COMMENT
: 5. Simultaneously rotate the     Simultaneously rotates PCIS VLV RESET switches 16A-          CRITICAL STEP following PCIS VLV RESET     S32 and 16A-S33 to clockwise positions.                        SAT I UNSAT switches to both RESET positions, spring return to NORM :
* 16A-S32                 Simultaneously rotates PCIS VLV RESET switches 16A-          CRITICAL STEP
* 16A-S33                 S32 and 16A-S33 to counterclockwise positions .               SAT I UNSAT EVALUATOR NOTE: These switches may be rotated in either direction first.
: 6. Restore RWCU System , if      Obtains a controlled copy of OP-28. Refers to section G.4     SATIUNSAT necessary, per Section G of  per initiating cue.
OP-28.
: 7. IF boron was injected per the Determines no boron has been injected.                         SAT I UNSAT EOPs, THEN Subsection G.4 cannot be performed.
EVALUATOR CUE: If asked about boron injection, report that no boron has been injected. *
: 8. Ensure Subsection G.1 is      Indicates need to ensure Subsection G .1 is complete .         SATIUNSAT complete.
EVALUATOR CUE: OP-28 sections G .1 and G.2 have been completed by another operator.
                                                    -5 of 11-
 
STEP                                     STANDARD                       EVALUATION I COMMENT
: 9. Ensure one of the following   Determines RWCU pump A is the preferred pump to isolate.     SAT I UNSAT RWCU pumps is isolated by performing one of the following :                   EVALUATOR NOTE: A note in OP-28 identifies RWCU pump A as the preferred pump to isolate.
EVALUATOR CUE: If asked about which pump to isolate, direct the candidate to isolate RWCU pump A.
: 10. IF RWCU Pump A will be the     Directs operator to close valves to isolate RWCU pump A.     SAT/UNSAT isolated pump, THEN ensure closed the following valves:
* 12RWC-19A (RWCU pump     EVALUATOR CUE: OP-28 step G.4.3.a has been A suet inner isol valve) completed to isolate RWCU pump A.
* 12RWC-73A (RWCU pump A suet outer isol valve)
* 12RWC-73A (RWCU pump A suet outer isol valve)
* 12RWC-29A (RWCU pump A disch isol valve)
* 12RWC-29A (RWCU pump A disch isol valve)
* 12RWC-87A (outlet block valve 1 2FE-20A)
* 12RWC-87A (outlet block valve 12FE-20A)
* 12RWC-38A (RWCU pump A disch check valve RWC-28A bypass valve) 11. Reset isolation per AOP-15 , if necessary. Determines isolation has been reset per AOP-15. SAT/UNSAT  
* 12RWC-38A (RWCU pump A disch check valve RWC-28A bypass valve) 11 . Reset isolation per AOP-15, if Determines isolation has been reset per AOP-15 .             SAT/UNSAT necessary.
-6 of 11-STEP STANDARD EVALUATION I COMMENT 12. Ensure closed 12RWC-63 Directs operator to ensure closed 12RWC-63. SATIUNSAT (RWCU return line manual isol valve). EVALUATOR CUE: 12RWC-63 is closed. *13. Open CLN UP SUCT 12MOV-Opens 12MOV-15 by rotating control switch clockwise to CRITICAL STEP 15. OPEN. SATIUNSAT  
                                                      -6 of 11 -
*14. Open CLN UP SUCT 12MOV-Opens 12MOV-18 by rotating control switch clockwise to CRITICAL STEP 18. OPEN. SAT I UNSAT 15. Ensure seal purge flow rate as Directs operator to establish seal purge flow for RWCU SATIUNSAT follows: pump A. IF seal purge flow is for 12P-1 B only, THEN throttle EVALUATOR CUE: RWCU pump seal purge is 2 gpm. 12RWC-88B as necessary (bypass regulating valve 12P-1 B) to establish a flow rate BETWEEN 1.8 and 2.2 gpm as indicated on 12FI-20 (RWCU pumps mini purge flow indic). 16. Ensure ST-26J , Heatup and Acknowledges cue. SAT I UNSAT Cooldown Temperature Checks , is in progress prior to establishing blowdown flow. EVALUATOR CUE: Another operator is performing ST-26J. -7 of 11-STEP STANDARD EVALUATION I COMMENT 17. Slowly establish a gravity Proceeds to OP-28 section G.5. SAT I UNSAT blowdown flow rate of LESS THAN OR EQUAL TO 30 gpm per Subsection G.5. 18. Direct RP to ensure posting Directs RP to ensure posting requirements are met to SAT I UNSAT requirements are met to support the blowdown operation. support the blowdown operation.
 
EVALUATOR CUE: RP reports that posting requirements are met. 19. IF reactor coolant temperature Determines Reactor coolant temperature is greater than . SAT I UNSAT is LESS THAN 212&deg;F , THEN 212&deg;F. ensure RPV is vented to prevent drawing a vacuum inside RPV. 20. At the discretion of the Shift Acknowledges cue. SAT I UNSAT Manager , contact the Reactor Analyst prior to commencing blowdown to turn off core EVALUATOR CUE: The Shift Manager directs continuing thermal monitoring. with the procedure prior to contacting the Reactor Analyst. I 21. IF RPV pressure is GREATER Observes 12MOV-53 green light on , red light off. SAT I UNSAT THAN 50 psig , THEN ensure closed SLOWDOWN ORIFICE BYP 12MOV-53.  
STEP                                         STANDARD                     EVALUATION I COMMENT
-8 of 11-STEP STANDARD EVALUATION I COMMENT 22. IF RPV pressure is LESS Determines RPV pressure is greater than 50 psig. SAT I UNSAT THAN 50 psig, THEN open SLOWDOWN ORIFICE SYP 12MOV-53.  
: 12. Ensure closed 12RWC-63         Directs operator to ensure closed 12RWC-63.                 SATIUNSAT (RWCU return line manual isol valve) .
! 23. IF RWCU pumps trip during Acknowledges step. SATIUNSAT blowdown operation to the condenser, THEN perform the following  
EVALUATOR CUE: 12RWC-63 is closed.
... 24. IF initiating a blowdown Determines blowdown flow will be to the Main Condenser, SAT I UNSAT following a RWCU pump trip not the WCT, per initiating cue. and manual system isolation , THEN perform gravity blowdown to WCT starting at Step G.5.9 ... 25. IF blowdown is to be routed to Observes 12MOV-57 green light on , red light off. SAT I UNSAT the Main Condenser, THEN perform the following:
*13. Open CLN UP SUCT 12MOV-         Opens 12MOV-15 by rotating control switch clockwise to     CRITICAL STEP
Ensure closed SLOWDOWN TO RADW 12MOV-57.  
: 15.                             OPEN .                                                     SATIUNSAT
*26. Open SLOWDOWN Opens 12MOV-56 by rotating control switch clockwise to CRITICAL STEP TO MAIN CNDSR 12MOV-56.
*14. Open CLN UP SUCT 12MOV-         Opens 12MOV-18 by rotating control switch clockwise to     CRITICAL STEP
OPEN. SAT I UNSAT 27. IF blowdown is to be routed to Determines blowdown flow will be to the Main Condenser, SATIUNSAT the Waste Collector Tank, not the WCT, per initiating cue. THEN perform the following  
: 18.                             OPEN .                                                     SAT I UNSAT
... . -9 of 11-STEP STANDARD EVALUATION I COMMENT 28. Establish blowdown flow as Directs operator to ensure closed 12RWC-63 or determines SAT I UNSAT II follows: it is closed from earlier cue. IF gravity blowdown will be used, THEN perform the EVALUATOR CUE: If asked, report that 12RWC-63 is following:
: 15. Ensure seal purge flow rate as Directs operator to establish seal purge flow for RWCU     SATIUNSAT follows:                       pump A.
closed. Ensure closed 12RWC-63 (RWCU return line manual isol valve). *29. Throttle open FILTER DEMIN Throttles open 12MOV-74 by rotating control switch CRITICAL STEP BYP 12MOV-74 until red open clockwise to OPEN. SAT I UNSAT light comes on (dual position indication).  
IF seal purge flow is for 12P-1B only, THEN throttle         EVALUATOR CUE: RWCU pump seal purge is 2 gpm.
*30. Adjust CLN UP SLOWDOWN Throttles open 12FCV-55 by rotating potentiometer CRITICAL STEP FLOW CNTRL 12FCV-55 until clockwise. SAT I UNSAT desired blowdown flow rate is established. EVALUATOR:
12RWC-88B as necessary (bypass regulating valve 12P-1B) to establish a flow rate BETWEEN 1.8 and 2.2 gpm as indicated on 12FI-20 (RWCU pumps mini purge flow indic).
Terminate the task at this point. Task Standard:
: 16. Ensure ST-26J , Heatup and     Acknowledges cue.                                           SAT I UNSAT Cooldown Temperature Checks, is in progress prior to establishing blowdown flow. EVALUATOR CUE: Another operator is performing ST-26J .
PC IS Group 2 isolation is reset. RWCU gravity blowdown flow to the Main Condenser is established. -10 of 11-HANDOUT
                                                      -7 of 11 -
 
STEP                                     STANDARD                           EVALUATION I COMMENT
: 17. Slowly establish a gravity     Proceeds to OP-28 section G.5.                                   SAT I UNSAT blowdown flow rate of LESS THAN OR EQUAL TO 30 gpm per Subsection G.5.
: 18. Direct RP to ensure posting   Directs RP to ensure posting requirements are met to             SAT I UNSAT requirements are met to       support the blowdown operation.
support the blowdown operation.
EVALUATOR CUE: RP reports that posting requirements are met.
: 19. IF reactor coolant temperature Determines Reactor coolant temperature is greater than .         SAT I UNSAT is LESS THAN 212&deg;F, THEN       212&deg;F.
ensure RPV is vented to prevent drawing a vacuum inside RPV.
: 20. At the discretion of the Shift Acknowledges cue.                                               SAT I UNSAT Manager, contact the Reactor Analyst prior to commencing blowdown to turn off core     EVALUATOR CUE: The Shift Manager directs continuing thermal monitoring.           with the procedure prior to contacting the Reactor Analyst.
I 21 . IF RPV pressure is GREATER     Observes 12MOV-53 green light on, red light off.                 SAT I UNSAT THAN 50 psig, THEN ensure closed SLOWDOWN ORIFICE BYP 12MOV-53.
                                                      -8 of 11-
 
STEP                                     STANDARD                       EVALUATION I COMMENT
: 22. IF RPV pressure is LESS       Determines RPV pressure is greater than 50 psig.             SAT I UNSAT THAN 50 psig, THEN open SLOWDOWN ORIFICE SYP 12MOV-53.                                                                                                   !
: 23. IF RWCU pumps trip during     Acknowledges step.                                           SATIUNSAT blowdown operation to the condenser, THEN perform the following ...
: 24. IF initiating a blowdown       Determines blowdown flow will be to the Main Condenser,     SAT I UNSAT following a RWCU pump trip     not the WCT, per initiating cue.
and manual system isolation, THEN perform gravity blowdown to WCT starting at Step G.5.9 ...
: 25. IF blowdown is to be routed to Observes 12MOV-57 green light on, red light off.             SAT I UNSAT the Main Condenser, THEN perform the following:
Ensure closed SLOWDOWN TO RADW 12MOV-57.
*26. Open SLOWDOWN                 Opens 12MOV-56 by rotating control switch clockwise to     CRITICAL STEP TO MAIN CNDSR 12MOV-56.       OPEN.                                                       SAT I UNSAT
: 27. IF blowdown is to be routed to Determines blowdown flow will be to the Main Condenser,     SATIUNSAT the Waste Collector Tank,     not the WCT, per initiating cue.
THEN perform the following ...
                                                                                  .
                                                    -9 of 11-
 
STEP                                           STANDARD                       EVALUATION I COMMENT
: 28. Establish blowdown flow as       Directs operator to ensure closed 12RWC-63 or determines           SAT I UNSAT II follows:                         it is closed from earlier cue.
IF gravity blowdown will be used, THEN perform the           EVALUATOR CUE: If asked, report that 12RWC-63 is following:                       closed.
Ensure closed 12RWC-63 (RWCU return line manual isol valve) .
  *29. Throttle open FILTER DEMIN       Throttles open 12MOV-74 by rotating control switch               CRITICAL STEP BYP 12MOV-74 until red open       clockwise to OPEN .
light comes on (dual position                                                                       SAT I UNSAT indication).
  *30. Adjust CLN UP SLOWDOWN           Throttles open 12FCV-55 by rotating potentiometer               CRITICAL STEP FLOW CNTRL 12FCV-55 until         clockwise.                                                         SAT I UNSAT desired blowdown flow rate is established.
EVALUATOR: Terminate the task at this point.
Task Standard: PC IS Group 2 isolation is reset. RWCU gravity blowdown flow to the Main Condenser is established.
                                                              -10 of 11-
 
HANDOUT
* Both Recirculation pumps have tripped.
* Both Recirculation pumps have tripped.
* A Reactor scram has been inserted.
* A Reactor scram has been inserted.
* Reactor water level lowered to 140 inches.
* Reactor water level lowered to 140 inches.
* Reactor water level has been recovered above 177 inches.
* Reactor water level has been recovered above 177 inches.
* Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2. Reset the Group 2 isolation per AOP-15 section G.1. Then, restore RWCU per OP-28 section G.4. Establish gravity blowdown flow to the Main Condenser.  
* Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2.
-11 of 11-S/RO NRC 14-2 H APPL. TO JPM NUMBER REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Perform Rod Worth Minimize r On-Line Diagnostic Test NRC KIA SYSTEM NUMBER: 201006 A4.02 (2.9/2.9)
Reset the Group 2 isolation per AOP-15 section G.1. Then, restore RWCU per OP-28 section G.4. Establish gravity blowdown flow to the Main Condenser.
JAF QUAL STANDARD NUMBER: 10 Minutes ---OPERATIONS JPM Completion Location: D Simulated D Plant Performed Simulator TE PERFORMED: TIME TO COMPLETE:
                            -11 of 11-
Minutes PERFORMANCE EVALUATION
 
: D Satisfactory D Unsatisfactory  
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC 14-2 H         TASK TITLE:     Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO      JPM NUMBER REV:              DATE:                        NRC KIA SYSTEM NUMBER:         201006 A4 .02 (2.9/2.9)
------------------------------------------------------
JAF TASK NUMBER:                                JAF QUAL STANDARD NUMBER:
-------------------------------
ESTIMATED COMPLETION TIME :
COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
                              - -10  - Minutes SUBMITTED:                                      OPERATIONS   REVIEW:~~~~
7~1 APPROVED :
CANDIDATE NAME:
JPM Completion     D  Simulated        ~    Performed Location :         D   Plant           ~    Simulator TE PERFORMED:                     TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION :         D   Satisfactory       D Unsatisfactory
-------------------------------------------------------------------------------------
COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 H APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Perform Rod Worth Minimizer On-Line Diagnostic Test By: lnt D Additionallnformation D Validation D Procedural Change Required r8l None Comments: Current Update: By: Date Int. Previous Revision Date: -2 of 7-S/RO NRC 14-2 H APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Perform Rod Worth Minimizer On-Line Diagnostic Test A ST-20A , Rod Worth Minimizer Functional Test Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A Plant in cold shutdown condition (IC-70). B. Ensure the Rod Worth Minimizer is initialized. C. Insert malfunction RW01. D. Bypass the Rod Worth Minimizer E. Delete malfunction RW01. F. Prepare a copy of ST-20A marked up to step 8.2. V. EVALUATOR NOTES A The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.
SIGNATURE/PRINTED CANDIDATE REVIEW:
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking, place keeping and three-point communication.
SIGNATURE REVIEWED BY:                                         DOC. COMPLETE :
VI. TASK CONDITIONS A The plant is in cold shutdown.
PROGRAM ADMINISTER
B. Preparations are underway for a Reactor startup. C. ST-20A , Rod Worth Minimizer Functional Test , is in progress.
 
D. This is the first time initializing the Rod Worth Minimizer below the Low Power Alarm Point. -3 of 7-  
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 H       TASK TITLE:      Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO         JPM NUMBER Current Update:                           By:
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate , "Perform the Rod Worth Minimizer on-line diagnostic test per ST-20A section 8.2." STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of Obtains a controlled copy of ST-20A from evaluator.
Date                             lnt Outstanding Items D   Technical Review                               D   Additionallnformation D    Questions and Answers                         D   Validation D   Procedural Change Required                     r8l None Comments:
Refers SAT I UNSAT ST-20A. to section 8.2. EVALUATOR:
Current Update:                                 By:
Provide a working copy of ST -20A. *2. Ensure NORMAL BYPASS Rotates NORMAL BYPASS keylock switch clockwise to CRITICAL STEP keylock switch is in NORMAL. NORMAL. SAT I UNSAT 3. Verify MANUAL BYPASS light Observes MANUAL BYPASS light is off. SAT I UNSAT is off. 4. Perform Steps 8.2.4 through Acknowledges step. SAT I UNSAT 8.2.5A without delay. *5. Initialize RWM as follows: Depresses SYSTEM INITIALIZE PUSHBUTTON. CRITICAL STEP SAT I UNSAT Depress and hold SYSTEM EVALUATOR NOTE: This pushbutton is only required to INITIALIZE pushbutton.
Date                                       Int.
be held long enough to obtain successful system initialization for purposes of the critical step. -4 of 7-STEP STANDARD EVALUATION I COMMENT 6. Verify SYSTEM INITIALIZE Observes SYSTEM INITIALIZE light is on. SAT/UNSAT light is on. 7. IF RWM operator panel AUTO Acknowledges cue. SAT/UNSAT light is on, OR first time initializing RWM below Low EVALUATOR CUE: If asked , " RWM OPERABLE ON" has Power Alarm Point , RWM operator panel AUTO light Off , printed out on the alarm typer. THEN verify "RWM OPERABLE ON" prints out on alarm typer. *8. Release SYSTEM INITIALIZE Releases SYSTEM INITIALIZE pushbutton. CRITICAL STEP pushbutton. SAT/UNSAT
Previous Revision Date:
* 9. Verify SYSTEM INITIALIZE Observes SYSTEM INITIALIZE light is off. SAT/UNSAT light is off. *10. IF INOP/RESET light is on , Depresses INOP/RESET pushbutton CRITICAL STEP THEN perform the following:
                                              -2 of 7-
SAT/UNSAT
 
* Depress INOP/RESET pushbutton. 11.
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 H               TASK TITLE:      Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A   None II. REFERENCES A   ST-20A, Rod Worth Minimizer Functional Test Ill. TOOLS AND EQUIPMENT A   None IV. SET UP REQUIREMENTS A   Plant in cold shutdown condition (IC-70).
* Verify all associated lights Observes INOP/RESET light is off. SAT/UNSAT go off. -5 of 7-STEP STANDARD EVALUATION I COMMENT 12. IF AUTO light on RWM Observes AUTO light is off on RWM operator panel. SAT I UNSAT operator panel is off THEN Perform on-line diagnostic test as follows: *13. Depress SYSTEM Depresses SYSTEM DIAGNOSTIC pushbutton.
B. Ensure the Rod Worth Minimizer is initialized.
CRITICAL STEP DIAGNOSTIC pushbutton to SAT I UNSAT start diagnostic routine. I 14. Verify WITHDRAW BLOCK Observes WITHDRAW BLOCK and INSERT BLOCK lights SAT I UNSAT and INSERT BLOCK lights go go on and off sequentially multiple times. on and off sequentially at least five times. *15. Depress SYSTEM Depresses SYSTEM DIAGNOSTIC pushbutton.
C. Insert malfunction RW01 .
CRITICAL STEP DIAGNOSTIC pushbutton to SATIUNSAT stop diagnostic routine. EVALUATOR:
D. Bypass the Rod Worth Minimizer E. Delete malfunction RW01 .
Terminate the task at this point. Task Standard:
F. Prepare a copy of ST-20A marked up to step 8.2.
The Rod Worth Minimizer is un-bypassed, initialized , and the system diagnostic test is performed.  
V. EVALUATOR NOTES A   The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
-6 of 7-HANDOUT
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication.
VI. TASK CONDITIONS A   The plant is in cold shutdown.
B. Preparations are underway for a Reactor startup.
C. ST-20A, Rod Worth Minimizer Functional Test, is in progress.
D. This is the first time initializing the Rod Worth Minimizer below the Low Power Alarm Point.
                                                        -3 of 7-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform the Rod Worth Minimizer on-line diagnostic test per ST-20A section 8.2."
STEP                                           STANDARD                           EVALUATION I COMMENT
: 1.     Obtain a controlled copy of     Obtains a controlled copy of ST-20A from evaluator. Refers         SAT I UNSAT ST-20A.                         to section 8.2.
EVALUATOR: Provide a working copy of ST-20A.
    *2.     Ensure NORMAL BYPASS           Rotates NORMAL BYPASS keylock switch clockwise to                 CRITICAL STEP keylock switch is in NORMAL. NORMAL.                                                             SAT I UNSAT
: 3. Verify MANUAL BYPASS light       Observes MANUAL BYPASS light is off.                               SAT I UNSAT is off.
: 4.     Perform Steps 8.2.4 through     Acknowledges step.                                                 SAT I UNSAT 8.2.5A without delay.
    *5.     Initialize RWM as follows:     Depresses SYSTEM INITIALIZE PUSHBUTTON.                           CRITICAL STEP SAT I UNSAT Depress and hold SYSTEM         EVALUATOR NOTE: This pushbutton is only required to INITIALIZE pushbutton.         be held long enough to obtain successful system initialization for purposes of the critical step.
                                                                  -4 of 7-
 
STEP                                       STANDARD             EVALUATION I COMMENT
: 6. Verify SYSTEM INITIALIZE         Observes SYSTEM INITIALIZE light is on.             SAT/UNSAT light is on .
: 7. IF RWM operator panel AUTO       Acknowledges cue.                                   SAT/UNSAT light is on, OR first time initializing RWM below Low Power Alarm Point, RWM            EVALUATOR CUE: If asked, "RWM OPERABLE ON" has operator panel AUTO light Off,   printed out on the alarm typer.
THEN verify "RWM OPERABLE ON" prints out on alarm typer.
*8. Release SYSTEM INITIALIZE         Releases SYSTEM INITIALIZE pushbutton.             CRITICAL STEP pushbutton.                                                                           SAT/UNSAT
                                                                                                            *
: 9. Verify SYSTEM INITIALIZE         Observes SYSTEM INITIALIZE light is off.           SAT/UNSAT light is off.
*10. IF INOP/RESET light is on,       Depresses INOP/RESET pushbutton                   CRITICAL STEP THEN perform the following:                                                           SAT/UNSAT
* Depress INOP/RESET pushbutton.
11 .
* Verify all associated lights Observes INOP/RESET light is off.                   SAT/UNSAT go off.
                                                          -5 of 7-
 
STEP                                         STANDARD                               EVALUATION I COMMENT
: 12. IF AUTO light on RWM             Observes AUTO light is off on RWM operator panel.                     SAT I UNSAT operator panel is off THEN Perform on-line diagnostic test as follows:
  *13. Depress SYSTEM                   Depresses SYSTEM DIAGNOSTIC pushbutton.                             CRITICAL STEP DIAGNOSTIC pushbutton to                                                                               SAT I UNSAT start diagnostic routine.
I
: 14. Verify WITHDRAW BLOCK           Observes WITHDRAW BLOCK and INSERT BLOCK lights                       SAT I UNSAT and INSERT BLOCK lights go       go on and off sequentially multiple times.
on and off sequentially at least five times.
  *15. Depress SYSTEM                   Depresses SYSTEM DIAGNOSTIC pushbutton.                             CRITICAL STEP DIAGNOSTIC pushbutton to                                                                               SATIUNSAT stop diagnostic routine.
EVALUATOR: Terminate the task at this point.
Task Standard: The Rod Worth Minimizer is un-bypassed, initialized, and the system diagnostic test is performed.
                                                            -6 of 7-
 
HANDOUT
* The plant is in cold shutdown.
* The plant is in cold shutdown.
* Preparations are underway for a Reactor startup.
* Preparations are underway for a Reactor startup.
* ST -20A, Rod Worth Minimizer Functional Test, is in progress.
* ST -20A, Rod Worth Minimizer Functional Test, is in progress.
* This is the first time initializing the Rod Worth Minimizer below the Low Power Alarm Point. Perform the Rod Worth Minimizer on-line diagnostic test per ST -20A section 8.2. -7 of 7-S/RO 14-2 NRC I ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE . i APPL. TO JPM NUMBER TASK TITLE: Vent Torus to Lower Primary Containment Pressure REV: DATE: NRC KIA SYSTEM NUMBER: 295010 AA1.05 (3.1/3.4)
* This is the first time initializing the Rod Worth Minimizer below the Low Power Alarm Point.
JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 20 Minutes ---SUBMITTED: OPERATIONS APPROVED: CANDIDATE NAME: ------------------------------
Perform the Rod Worth Minimizer on-line diagnostic test per ST -20A section 8.2.
JPM Completion Location: DATE PERFORMED:
                            -7 of 7-
[8J Simulated
 
[8J Plant D Performed D Simulator TIME TO COMPLETE:
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE
Minutes PERFORMANCE EVALUATION
{~    S/RO           14-2 NRC I       TASK TITLE:     Vent Torus to Lower Primary Containment
: D Satisfactory D Unsatisfactory (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
. i APPL. TO        JPM NUMBER                          Pressure REV:               DATE:                     NRC KIA SYSTEM NUMBER:         295010 AA1 .05 (3.1/3.4)
JAF TASK NUMBER:                                 JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                                  - Minutes SUBMITTED:                                       OPERATIONS   REVIEW~>~
APPROVED :
CANDIDATE NAME :
                    ------------------------------
JPM Completion     [8J Simulated     D Performed Location :          [8J Plant         D Simulator DATE PERFORMED:                      TIME TO COMPLETE:               Minutes PERFORMANCE EVALUATION :           D   Satisfactory       D Unsatisfactory (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO 14-2 NRC I APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Vent Torus to Lower Primary Containment Pressure By: lnt D Additionallnformation D Validation D Procedural Change Required Comments: None Current Update By: Date lnt Previous Revision Date:
SIGNATURE/PRINTED CANDIDATE REVIEW:
S/RO 14-2 NRC I APPL. TO JPM NUMBER ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Vent Torus to Lower Primary Containment Pressure I. SAFETY CONSIDERATIONS A. Ensure proper safety equipment and safety procedures are observed. II. REFERENCES A. EP-6 , POST ACCIDENT CONTAINMENT VENTING AND GAS CONTROL Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Current copy of EP-6 including Attachment
SIGNATURE REVIEWED BY:                                         DOC. COMPLETE:
: 1. V. EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.
PROGRAM ADMINISTER
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO             14-2 NRC I     TASK TITLE:  Vent Torus to Lower Primary Containment APPL. TO         JPM NUMBER                     Pressure Current Update:                         By:
Date                       lnt Outstanding Items D Technical Review                             D  Additionallnformation D Questions and Answers                       D   Validation D Procedural Change Required                   ~  None Comments:
Current Update                                 By:
Date                                 lnt Previous Revision Date:
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO             14-2 NRC I             TASK TITLE:     Vent Torus to Lower Primary Containment APPL. TO        JPM NUMBER                                Pressure I.     SAFETY CONSIDERATIONS A. Ensure proper safety equipment and safety procedures are observed .
II. REFERENCES A. EP-6, POST ACCIDENT CONTAINMENT VENTING AND GAS CONTROL Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Current copy of EP-6 including Attachment 1.
V.     EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , placekeeping and three-point communication. VI. TASK CONDITIONS A. Conditions have occurred which require venting the containment.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .
B. The EOPs have been entered. C. Action to preclude the failure of containment must be completed.
VI . TASK CONDITIONS A. Conditions have occurred which require venting the containment.
D. One train of SGT is in service. The other train of SGT is secured. E. Containment purge is NOT in progress.
B. The EOPs have been entered.
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate , "Vent the Torus using EP-6, SectionS.?  
C. Action to preclude the failure of containment must be completed.
" Venting Containment". Start at step 5.7.6." NOTE: Unless otherwise noted, all controls are located on Panel 27PCP in the Relay Room. ------STEP STANDARD EVALUATION I COMMENT 1. Obtain a controlled copy of procedure Obtains a controlled copy of procedure and proceeds to SAT/UNSAT EP-6. the PCP panel in the Relay Room. EVALUATOR:
D. One train of SGT is in service. The other train of SGT is secured.
A controlled copy of the procedure is available at the PCP panel. Evaluator to provide working copy. 2. Reviews prerequisites , precautions and special instructions associated with the Reviews applicable portions of procedure.
E. Containment purge is NOT in progress.
SAT I UNSAT procedure.
 
: 3. Selects section 5. 7 , Venting Selects the correct section of the procedure to be SAT/UNSAT Containment.
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Vent the Torus using EP-6, SectionS.? "Venting Containment" . Start at step 5.7.6."
performed. 4. NOTE: Reviews Note and selects step 5.7.6 to perform as SAT/UNSAT Steps 5.7.6 and 5.7.7 may be directed.
NOTE: Unless otherwise noted, all controls are located on Panel 27PCP in the Relay Room .
performed and repeated in any order to alternate between torus and drywell venting. Torus venting is preferred. ---
- -       ----
STEP STANDARD EVALUATION I COMMENT 5. {Step 5.7.6) Verifies Torus pressure is less than PCPL and Torus SAT I UNSAT IF Torus will be vented THEN perform level is less than 29.5 ft. the following:
STEP                                         STANDARD                             EVALUATION I COMMENT
: 1.     Obtain a controlled copy of procedure     Obtains a controlled copy of procedure and proceeds to           SAT/UNSAT EP-6.                                     the PCP panel in the Relay Room.
EVALUATOR: A controlled copy of the procedure is available at the PCP panel. Evaluator to provide working copy.
: 2.     Reviews prerequisites, precautions and   Reviews applicable portions of procedure.                       SAT I UNSAT special instructions associated with the procedure.
: 3.     Selects section 5.7, Venting             Selects the correct section of the procedure to be               SAT/UNSAT Containment.                             performed.
: 4.       NOTE:                                     Reviews Note and selects step 5.7.6 to perform as               SAT/UNSAT Steps 5.7.6 and 5.7.7 may be             directed.
performed and repeated in any order to alternate between torus and drywell venting . Torus venting is preferred.
                                                                                                                                      -- -
 
STEP                                           STANDARD                         EVALUATION I COMMENT
: 5. {Step 5.7.6)                           Verifies Torus pressure is less than PCPL and Torus             SAT I UNSAT IF Torus will be vented THEN perform   level is less than 29.5 ft.
the following:
* Verify torus pressure is LESS THAN PCPL
* Verify torus pressure is LESS THAN PCPL
* Verify primary containment water EVALUATOR CUE: When candidate locates indication level is LESS THAN 29.5 feet. of pressure and level, inform the candidate that Torus
* Verify primary containment water   EVALUATOR CUE: When candidate locates indication level is LESS THAN 29.5 feet.       of pressure and level, inform the candidate that Torus Pressure is 50 psig and Primary Containment Water
* While venting torus , frequently Pressure is 50 psig and Primary Containment Water monitor torus pressure and primary Level is 29.0 ft. containment water level.
* While venting torus, frequently Level is 29.0 ft.
* IF primary containment water level reaches 29.5 feet while venting the torus, THEN vent drywell per Step 5.7.7. * {Step 5.7.6.D) Candidate places TORUS EXH INNER BYP VLV CRITICAL STEP
monitor torus pressure and primary containment water level.
* Open TORUS EXH INNER BYP 27MOV-117 control switch to the OPEN position.
* IF primary containment water level reaches 29.5 feet while venting the torus, THEN vent drywell per Step 5.7.7.
VLV 27MOV-117. SAT/UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off , red light is on. * {Step 5.7.6.E) Candidate places TORUS EXH OUTER BYP VLV CRITICAL STEP
* {Step 5.7.6.D)                         Candidate places TORUS EXH INNER BYP VLV                       CRITICAL STEP
* Open TORUS EXH OUTER BYP 27MOV-123 control switch to the OPEN position. VLV 27MOV-123. SAT/UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to open , inform the candidate that the green light is off, red light is on.
* Open TORUS EXH INNER BYP             27MOV-117 control switch to the OPEN position.
--------------STEP STANDARD EVALUATION I COMMENT 5. cont. (Step 5.7.6.F) For each valve, candidate locates its red/green position SAT I UNSAT
SAT/UNSAT VLV 27MOV-117.
* Ensure closed the following valves: lights and indicates it should be closed. 0 OW EXH OUTER BYP VLV 27MOV-113. EVALUATOR CUE: When candidate inquires about 0 OW EXH INNER BYPASS VLV light status, inform the candidate the green light is on, 27MOV-122.
EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.
red light is off. 0 OW EXH INNER ISOL VLV 27AOV-113.
*
0 OW EXH OUTER ISOL VLV 27AOV-114.
{Step 5.7.6.E)                         Candidate places TORUS EXH OUTER BYP VLV                       CRITICAL STEP
EVALUATOR CUE: After 27MOV-117  
* Open TORUS EXH OUTER BYP             27MOV-123 control switch to the OPEN position.
& 123 are open , inform the candidate that the control room has called to inform the candidate that Primary Containment Water Level is 30 ft. 6. (Step 5.7.6.C) IF primary containment water level Candidate refers to section 5.7.7 SAT I UNSAT reaches 29.5 feet while venting the torus , THEN vent drywell per Step EVALUATOR CUE: If candidate wants direction from 5.7.7. the control room , inform the candidate that for the purposes of this JPM, no further guidance can be given.
SAT/UNSAT VLV 27MOV-123.
STEP STANDARD EVALUATION I COMMENT 7. (Step 5. 7. 7) IF drywell will be vented , THEN perform Verifies Torus pressure is less than PCPL. SAT I UNSAT the following:
EVALUATOR CUE: When candidate indicates placing the control switch to open , inform the candidate that the green light is off, red light is on .
* Verify torus pressure is BELOW EVALUATOR CUE: When candidate locates indication PCPL of pressure and level , inform the candidate that Torus Pressure is 50 psig and Primary Containment Water . Level is 30.0 ft * (Step 5.7.7.8) Candidate places DW EXH OUTER BYP VLV 27MOV-CRITICAL STEP
 
* Open DW EXH OUTER BYP VLV 113 control switch to the OPEN position. 27MOV-113 SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off , red light is on. * (Step 5.7.7.C) Candidate places DW EXH INNER BYPASS VLV CRITICAL STEP
- - - -         -------     ---
* Open DW EXH INNER BYPASS 27MOV-122 control switch to the OPEN position. VLV 27MOV-122. SATIUNSAT EVALUATOR CUE: When cand i date indicates placing the control switch to open , inform the candidate that the green light is off, red light is on. L____ ___ -------
STEP                                           STANDARD                         EVALUATION I COMMENT
STEP STANDARD EVALUATION I COMMENT 7 cont. (Step 5.7.7.D)
: 5. cont. (Step 5.7.6.F)                         For each valve, candidate locates its red/green position       SAT I UNSAT
* Ensure closed the following valves: 0 TORUS EXH INNER Candidate places TORUS EXH INNER BYP VLV CRITICAL STEP
* Ensure closed the following valves: lights and indicates it should be closed .
* BYP VLV 27MOV-117 27MOV-117 control switch to the CLOSE position. SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on , red light is off. i 0 TORUS EXH OUTER Candidate places TORUS EXH OUTER BYP VLV CRITICAL STEP
0   OW EXH OUTER BYP VLV 27MOV-113.
* BYP VLV 27MOV-123 27MOV-123 control switch to the CLOSE position.
EVALUATOR CUE: When candidate inquires about 0   OW EXH INNER BYPASS VLV         light status, inform the candidate the green light is on, 27MOV-122.                     red light is off.
SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on , red light is off. 0 TORUS EXH INNER For each valve, candidate locates its red/green position SAT I UNSAT ISOL VLV 27AOV-117 lights and indicates it should be closed. 0 TORUS EXH OUTER ISOL VLV 27AOV-118 EVALUATOR CUE: When candidate inquires about light status, inform the candidate the green light is on, red light is off.
0   OW EXH INNER ISOL VLV 27AOV-113.
STEP STANDARD EVALUATION I COMMENT 8. (Step 5.7.7.E} Contacts control room and requests direction on vent SAT I UNSAT
0   OW EXH OUTER ISOL VLV 27AOV-114.
* IF it becomes necessary to raise rate . vent rate, AND torus pressure is LESS THAN PCPL, THEN attempt EVALUATOR CUE: When candidate requests direction to open the following valves: for vent rate, respond that current rate of pressure 0 OW EXH INNER ISOL VLV reduction is acceptable. 27AOV-113 0 OW EXH OUTER ISOL VLV 27AOV-114
EVALUATOR CUE: After 27MOV-117 & 123 are open ,
: 9. (Step 5.7.7.F} Contacts the control room on the status of containment SAT/UNSAT
inform the candidate that the control room has called to inform the candidate that Primary Containment Water Level is 30 ft.
* IF containment purge is not in purge . progress, THEN cycle one or more of the following valves as necessary to control drywell pressure. Verify EVALUATOR CUE: When candidate inquires as to the torus pressure is LESS THAN PCPL status of containment purge, inform the candidate that it before opening any valve: is NOT in progress. 0 OW EXH OUTER BYP VLV 27MOV-113 0 OW EXH INNER BYPASS VLV 27MOV-122 0 OW EXH INNER ISOL VLV 27AOV-113 0 OW EXH OUTER ISOL VLV 27AOV-114 EVALUATOR:
: 6.   (Step 5.7.6.C)                         Candidate refers to section 5.7.7                             SAT I UNSAT IF primary containment water level reaches 29.5 feet while venting the torus, THEN vent drywell per Step       EVALUATOR CUE: If candidate wants direction from 5.7.7.                                 the control room , inform the candidate that for the purposes of this JPM, no further guidance can be given.
Terminate the JPM at this point.
 
STEP                                             STANDARD                       EVALUATION I COMMENT
: 7.     (Step 5. 7. 7)                             Verifies Torus pressure is less than PCPL.                     SAT I UNSAT IF drywell will be vented , THEN perform the following :
* Verify torus pressure is BELOW           EVALUATOR CUE: When candidate locates indication PCPL                                   of pressure and level, inform the candidate that Torus Pressure is 50 psig and Primary Containment Water
                                                          . Level is 30.0 ft
            *     (Step 5.7.7.8)                             Candidate places DW EXH OUTER BYP VLV 27MOV-                 CRITICAL STEP
* Open DW EXH OUTER BYP VLV               113 control switch to the OPEN position.
SAT I UNSAT 27MOV-113 EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.
            *     (Step 5.7.7.C)                             Candidate places DW EXH INNER BYPASS VLV                     CRITICAL STEP
* Open DW EXH INNER BYPASS                 27MOV-122 control switch to the OPEN position.
SATIUNSAT VLV 27MOV-122.
EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.
L _ _ _ _ ___
              ---                                                                                     - ---
 
STEP                                           STANDARD                         EVALUATION I COMMENT 7 cont. (Step 5.7.7.D)
* Ensure closed the following valves :
0   TORUS EXH INNER         Candidate places TORUS EXH INNER BYP VLV                       CRITICAL STEP
* BYP VLV 27MOV-117       27MOV-117 control switch to the CLOSE position.
SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on , red light is off.
i 0   TORUS EXH OUTER         Candidate places TORUS EXH OUTER BYP VLV                       CRITICAL STEP
* BYP VLV 27MOV-123       27MOV-123 control switch to the CLOSE position.
SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on, red light is off.
0   TORUS EXH INNER         For each valve, candidate locates its red/green position       SAT I UNSAT ISOL VLV 27AOV-117     lights and indicates it should be closed.
0   TORUS EXH OUTER ISOL VLV 27AOV-118     EVALUATOR CUE: When candidate inquires about light status, inform the candidate the green light is on, red light is off.
 
STEP                                           STANDARD                           EVALUATION I COMMENT
: 8. (Step 5.7.7.E}                           Contacts control room and requests direction on vent           SAT I UNSAT
* IF it becomes necessary to raise       rate .
vent rate, AND torus pressure is LESS THAN PCPL, THEN attempt         EVALUATOR CUE: When candidate requests direction to open the following valves:         for vent rate, respond that current rate of pressure 0   OW EXH INNER ISOL VLV             reduction is acceptable.
27AOV-113 0   OW EXH OUTER ISOL VLV 27AOV-114
: 9. (Step 5.7.7.F}                           Contacts the control room on the status of containment         SAT/UNSAT
* IF containment purge is not in         purge .
progress, THEN cycle one or more of the following valves as necessary to control drywell pressure. Verify   EVALUATOR CUE: When candidate inquires as to the torus pressure is LESS THAN PCPL       status of containment purge, inform the candidate that it before opening any valve:             is NOT in progress.
0   OW EXH OUTER BYP VLV 27MOV-113 0   OW EXH INNER BYPASS VLV 27MOV-122 0   OW EXH INNER ISOL VLV 27AOV-113 0   OW EXH OUTER ISOL VLV 27AOV-114 EVALUATOR: Terminate the JPM at this point.
 
HANDOUT
HANDOUT
* Conditions have occurred which require venting the containment.
* Conditions have occurred which require venting the containment.
* The EOPs have been entered.
* The EOPs have been entered.
* Action to preclude the failure of containment must be completed.
* Action to preclude the failure of containment must be completed .
* One train of SGT is in service. The other train of SGT is secured.
* One train of SGT is in service. The other train of SGT is secured.
* Containment purge is NOT in progress. Vent the Torus using EP-6, Section 5. 7 " Venting Containment
* Containment purge is NOT in progress.
". Start at step 5.7.6.
Vent the Torus using EP-6, Section 5.7 "Venting Containment". Start at step 5.7.6.
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC14-2J TASK TITLE: Line-up SLC Test Tank for Injection APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 295031 EA1.08 (3.8/3.9) JAF TASK NUMBER: JAF QUAL STANDARD NUMBER: ESTIMATED COMPLETION TIME: 15 Minutes _ ____..;:.......
 
SUBMITTED: OPERATIONS REVIEW: . / CA"' 7 I APPROVED:
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         NRC14-2J               TASK TITLE :           Line-up SLC Test Tank for Injection APPL. TO     JPM NUMBER REV:             DATE:                                 NRC KIA SYSTEM NUMBER:         295031 EA1 .08 (3 .8/3 .9)
CANDIDATE NAME: JPM Completion Location: I TE PERFORMED: 1:8J Simulated 1:8J Plant 0 Performed 0 Simulator TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION
JAF TASK NUMBER:                                           JAF QUAL STANDARD NUMBER:
: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ESTIMATED COMPLETION TIME :     _      15
EVALUATOR: SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO NRC 14-2 J APPL. TO JPM NUMBER Current Update: Date Outstanding Items D Technical Review D Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Line-up SLC Test Tank for Injection By: lnt D Additionallnformation D Validation D Procedural Change Required Comments: 1Z1 None Current Update: By: Date Int. Previous Revision Date: -2 of 8-S/RO NRC 14-2 J JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Line-up SLC Test Tank for Injection APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EP-8, Alternate Injection Systems Ill. TOOLS AND EQUIPMENT A. Flashlight.
____..;:....... Minutes SUBMITTED:     ~    ~    ---~< ~                          OPERATIONS REVIEW: . ~~    /       ~      ~ 7~
IV. SET UP REQUIREMENTS A. Obtain Shift Managers/Control Room Supervisors permission prior to performing this task. B. Obtain a controlled copy of EP-8 prior to performing this task. V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
CA"'
                                                                                  ~                    I APPROVED :     -~db~~=-~-----------------
CANDIDATE NAME:
JPM Completion   1:8J Simulated                 0  Performed Location :        1:8J Plant                     0   Simulator ITE PERFORMED:                        TIME TO COMPLETE:                       Minutes PERFORMANCE EVALUATION :           0           Satisfactory         0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW:
SIGNATURE REVIEWED BY:                                                   DOC . COMPLETE :
PROGRAM ADMINISTER
 
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             NRC 14-2 J       TASK TITLE:      Line-up SLC Test Tank for Injection APPL. TO         JPM NUMBER Current Update:                           By:
Date                             lnt Outstanding Items D   Technical Review                               D    Additionallnformation D   Questions and Answers                         D   Validation D   Procedural Change Required                     1Z1  None Comments:
Current Update:                                 By:
Date                                       Int.
Previous Revision Date:
                                              -2 of 8-
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             NRC 14-2 J             TASK TITLE:       Line-up SLC Test Tank for Injection APPL. TO           JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EP-8, Alternate Injection Systems Ill. TOOLS AND EQUIPMENT A. Flashlight.
IV. SET UP REQUIREMENTS A. Obtain Shift Managers/Control Room Supervisors permission prior to performing this task.
B. Obtain a controlled copy of EP-8 prior to performing this task.
V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication. VI. TASK CONDITIONS A. Operation of Alternate Injection Systems is required due to a LOCA. B. The SLC system is to be utilized as an injection source. C. The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the source of injection water supply. -3 of 8-  
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12." STEP STANDARD EVALUATION I COMMENT 1. Obtains a controlled copy of The candidate determines where to obtain a controlled copy SAT I UNSAT the procedure EP-8 and of EP-8. (Control Room , Merlin , EOP cabinet) selects section 5.12. EVALUATOR:
VI. TASK CONDITIONS A. Operation of Alternate Injection Systems is required due to a LOCA.
Provide candidate a current copy of EP-8 section 5.12. 2. Proceeds to Reactor Building Proceeds to the Reactor Building 326' elevation to the SLC SAT I UNSAT 326' elevation to the SLC Skid. Skid. *3. (Step 5.12.1.A}
B. The SLC system is to be utilized as an injection source.
Simulates unlocking 11 SLC-11. CRITICAL STEP Close 11 SLC-11 (SLC tank SAT I UNSAT TK-1 outlet isol valve). EVALUATOR CUE: The indicated valve is unlocked. Simulates closing 11 SLC-11 by rotating valve operator clockwise until motion stops. EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction and come to a stop. -4 of 8-STEP STANDARD EVALUATION I COMMENT *4. (Step 5.12.1.8)
C. The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the source of injection water supply.
Simulates unlocking 11 SLC-41. CRITICAL STEP Open 11 SLC-41 (SLC test SAT/UNSAT tank TK-3 outlet isol valve). EVALUATOR CUE: The indicated valve is unlocked. Simulates opening 11 SLC-41 by rotating valve operator counterclockwise.
                                                        -3 of 8-
EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction.  
 
! -5 of 8-STEP STANDARD EVALUATION I COMMENT *5. (Step 5.12.1.C)
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12."
Simulates opening 11 SLC-29 by rotating valve operator CRITICAL STEP Station an operator at 11 TK-3 counterclockwise. SAT I UNSAT (standby liquid control test tank) to establish and maintain EVALUTOR CUE: If the candidate attempts to station 11TK-3 at least 112 full using another operator for this step, direct them to perform the one or both of the following required manipulation(s) themselves.
STEP                                           STANDARD                           EVALUATION I COMMENT
: 1.     Obtains a controlled copy of     The candidate determines where to obtain a controlled copy             SAT I UNSAT the procedure EP-8 and           of EP-8. (Control Room , Merlin , EOP cabinet) selects section 5.12.
EVALUATOR: Provide candidate a current copy of EP-8 section 5.12.
: 2.     Proceeds to Reactor Building     Proceeds to the Reactor Building 326' elevation to the SLC             SAT I UNSAT 326' elevation to the SLC         Skid.
Skid.
    *3.     (Step 5.12.1.A}                   Simulates unlocking 11 SLC-11 .                                     CRITICAL STEP Close 11 SLC-11 (SLC tank                                                                               SAT I UNSAT TK-1 outlet isol valve).
EVALUATOR CUE: The indicated valve is unlocked.
Simulates closing 11 SLC-11 by rotating valve operator clockwise until motion stops.
EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction and come to a stop.
                                                                  -4 of 8-
 
STEP                                         STANDARD                     EVALUATION I COMMENT
*4 . (Step 5.12.1.8)               Simulates unlocking 11 SLC-41 .                           CRITICAL STEP Open 11 SLC-41 (SLC test                                                                   SAT/UNSAT tank TK-3 outlet isol valve) . EVALUATOR CUE: The indicated valve is unlocked.
Simulates opening 11 SLC-41 by rotating valve operator counterclockwise.
EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction.
                                                                                                                !
                                                      -5 of 8-
 
STEP                                         STANDARD                           EVALUATION I COMMENT
*5. (Step 5.12.1.C)                 Simulates opening 11 SLC-29 by rotating valve operator             CRITICAL STEP Station an operator at 11 TK-3 counterclockwise.                                                   SAT I UNSAT (standby liquid control test tank) to establish and maintain     EVALUTOR CUE: If the candidate attempts to station 11TK-3 at least 112 full using     another operator for this step, direct them to perform the one or both of the following       required manipulation(s) themselves.
sources of makeup water:
sources of makeup water:
* Demin-water
EVALUATOR CUE: The indicated valve operator has
: By opening EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction. If lineup has been 11 SLC-29 (SLC test tank performed correctly, report that water is flowing into the TK-3 demin water addition test tank and the tank is filling slowly. isol valve)
* Demin-water: By opening        rotated in the indicated direction. If lineup has been 11 SLC-29 (SLC test tank       performed correctly, report that water is flowing into the TK-3 demin water addition       test tank and the tank is filling slowly.
* Fire system water: Using a Simulates uncoiling fire hose (located west of SLC tank) and CRITICAL STEP fire hose placing nozzle into the test tank. SAT I UNSAT EVALUATOR CUES: The hose is uncoiled.
isol valve)
The hose nozzle is in the test tank. Simulates opening hose rack isolation valve and using the bail handle to open the nozzle. EVALUATOR CUES: Water is flowing from the hose nozzle. The test tank is filling more rapidly. -6 of 8-STEP STANDARD EVALUATION I COMMENT *6. (Step 5.12.1.D)
Simulates uncoiling fire hose (located west of SLC tank) and       CRITICAL STEP
Observes test tank water level. CRITICAL STEP WHEN 11TK-3 is at least 112 SAT I UNSAT full , place SLC pump switch in EVALUATOR CUE: After the fire hose is filling the tank , START SYS-A OR START inform the candidate that the tank is more than % full. SYS-8. Simulates contacting the Control Room to start an SLC pump. EVALUATOR CUE: The Control Room has started SLC pump A 7. Monitors SLC test tank water Continues to observe SLC test tank water level. SAT I UNSAT level while injecting. EVALUATOR: Term i nate the task at this point. Task Standard:
* Fire system water: Using a placing nozzle into the test tank.                                 SAT I UNSAT fire hose EVALUATOR CUES: The hose is uncoiled. The hose nozzle is in the test tank.
An SLC pump is running with suction from the SLC test tank. The SLC test tank is aligned for injection of both Demineralized water and Fire water to the RPV. -7 of 8-HANDOUT
Simulates opening hose rack isolation valve and using the bail handle to open the nozzle.
EVALUATOR CUES: Water is flowing from the hose nozzle. The test tank is filling more rapidly.
                                                        -6 of 8-
 
STEP                                       STANDARD                           EVALUATION I COMMENT
  *6.     (Step 5.12.1.D)                 Observes test tank water level.                                   CRITICAL STEP WHEN 11TK-3 is at least 112                                                                           SAT I UNSAT full , place SLC pump switch in     EVALUATOR CUE: After the fire hose is filling the tank, START SYS-A OR START                 inform the candidate that the tank is more than % full.
SYS-8 .
Simulates contacting the Control Room to start an SLC pump.
EVALUATOR CUE: The Control Room has started SLC pump A
: 7. Monitors SLC test tank water     Continues to observe SLC test tank water level.                     SAT I UNSAT level while injecting.
EVALUATOR: Term inate the task at this point.
Task Standard: An SLC pump is running with suction from the SLC test tank. The SLC test tank is aligned for injection of both Demineralized water and Fire water to the RPV.
                                                              -7 of 8-
 
HANDOUT
* Operation of Alternate Injection Systems is required due to a LOCA.
* Operation of Alternate Injection Systems is required due to a LOCA.
* The SLC system is to be utilized as an injection source.
* The SLC system is to be utilized as an injection source.
* The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the sources of injection water supply. Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12. -8 of 8-S/RO 14-2 NRC K APPL. TO JPM NUMBER REV: DATE: JAF TASK NUMBER: ESTIMATED COMPLETION TIME: SUBMITTED: APPROVED: CANDIDATE NAME: ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE TASK TITLE: Electrically Disarm a CRD HCU NRC KIA SYSTEM NUMBER: 201003 A2.02 (3.7/3.8) JAF QUAL STANDARD NUMBER: 15 Minutes ---JPM Completion 0 Simulated 0 Performed 0 Simulator Location: 0 Plant .TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION
* The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the sources of injection water supply.
: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12.
                              -8 of 8-
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         14-2 NRC K         TASK TITLE :    Electrically Disarm a CRD HCU APPL . TO     JPM NUMBER REV:             DATE :                       NRC KIA SYSTEM NUMBER:           201003 A2 .02 (3.7/3.8)
JAF TASK NUMBER:                                JAF QUAL STANDARD NUMBER:
ESTIMATED COMPLETION TIME:
                              - -15  - Minutes SUBMITTED:
APPROVED :
CANDIDATE NAME:
JPM Completion     0   Simulated       0     Performed Location :         0   Plant           0    Simulator
  .TE PERFORMED:                     TIME TO COMPLETE:                   Minutes PERFORMANCE EVALUATION :         0   Satisfactory         0   Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED CANDIDATE REVIEW: SIGNATURE REVIEWED BY: DOC. COMPLETE: PROGRAM ADMINISTER S/RO 14-2 NRC K APPL. TO JPM NUMBER Current Update: Date Outstanding Items 0 Technical Review 0 Questions and Answers JOB PERFORMANCE MEASURE RECORD AND CHECKLIST TASK TITLE: Electrically Disarm a CRD HCU By: lnt 0 Additionallnformation 0 Validation 0 Procedural Change Required Comments:
SIGNATURE/PRINTED CANDIDATE REVIEW:
1:8:1 None urrent Update: By: Date Int. Previous Revision Date: -2 of 7-S/RO 14-2 NRC K APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE: Electrically Disarm a CRD HCU A. OP-25 , Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A. Flashlight IV. SET UP REQUIREMENTS A. Provide a working copy of OP-25. EVALUATOR NOTES A. The candidate should , at a minimum , observe the change in equipment status light indication when equipment is operated.
SIGNATURE REVIEWED BY:                                         DOC. COMPLETE :
B. If simulating this task , then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
PROGRAM ADMINISTER
C. The candidate should demonstrate proper use of HU tools such as procedure use , self checking , place keeping and three-point communication.
 
VI. TASK CONDITIONS A. The plant is operating at 1 00% power. B. Control rod 22-19 was fully withdrawn , but would not couple. C. The rod has been fully inserted and its HCU has been valved out. D. The rod must be electrically disarmed. -3 of 7-  
JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO             14-2 NRC K       TASK TITLE:      Electrically Disarm a CRD HCU APPL. TO         JPM NUMBER Current Update:                           By:
* -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Electrically disarm control rod 22-19 per OP-25 Section G.21." STEP STANDARD 1. Obtain a controlled copy of The candidate determines where to obtain a controlled copy OP-25. of OP-25. (Control Room, Merlin) EVALUATOR:
Date                             lnt Outstanding Items 0   Technical Review                               0     Additionallnformation 0    Questions and Answers                         0     Validation 0   Procedural Change Required                     1:8:1 None Comments:
Provide candidate a current copy of OP-25. 2. Review precautions and Reviews precautions and selects section G.21. selects correct section. 3. (Step G.21.1) Notifies Control Room that CRD 22-19 will be electrically Notify Control Room that CRD disarmed. 22-19 will be electrically disarmed. EVALUATOR CUE: Acknowledge communication.  
urrent Update:                                 By:
-4 of 7-EVALUATION I COMMENT SATIUNSAT SAT I UNSAT SAT I UNSAT STEP STANDARD EVALUATION I COMMENT *4. (Step G.21.2) . Simulates unplugging amphenol connector from 03SOV-120 CRITICAL STEP Unplug amphenol connector at HCU 22-19. SAT I UNSAT from each of the following solenoid operated valves at HCU 22-19 and control per EVALUATOR CUE: The indicated connector has been AP-12.06. unplugged.
Date                                         Int.
* 03SOV-120(*) (withdraw settle solenoid operated valve) *5. (Step G.21.2) Simulates unplugging amphenol connector from 03SOV-121 CRITICAL STEP
Previous Revision Date:
* 03SOV-121
                                              -2 of 7-
(*)(insert at HCU 22-19. SAT I UNSAT exhaust water solenoid operated valve) EVALUATOR CUE: The indicated connector has been unplugged. *6. (Step G.21.2) Simulates unplugging am phenol connector from 03SOV-122 CRITICAL STEP
 
* 03SOV-122(*) (withdraw at HCU 22-19. SAT I UNSAT drive water solenoid operated valve) EVALUATOR CUE: The indicated connector has been unplugged. *7. (Step G.21.2) Simulates unplugging amphenol connector from 03SOV-123 CRITICAL STEP
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             14-2 NRC K             TASK TITLE:      Electrically Disarm a CRD HCU APPL. TO         JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-25, Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A. Flashlight IV. SET UP REQUIREMENTS A. Provide a working copy of OP-25.
* 03SOV-123(*) (insert drive at HCU 22-19. SAT I UNSAT water solenoid operated valve) EVALUATOR CUE: The indicated connector has been I unplugged.
EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated.
i I I I -5 of 7-
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
: 8. STEP (Step G.21.3) Notify Control Room that CRD 22-19 has been electrically disarmed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,
STANDARD Notifies Control Room that CRD 22-19 has been electrically disarmed.
place keeping and three-point communication.
EVALUATOR CUE: Acknowledge communication. EVALUATOR:
VI. TASK CONDITIONS A. The plant is operating at 100% power.
Terminate the task at this point. Task Standard:
B. Control rod 22-19 was fully withdrawn , but would not couple.
Control rod 22-19 is electrically disarmed. -6 of 7-EVALUATION I COMMENT SAT/UNSAT HANDOUT
C. The rod has been fully inserted and its HCU has been valved out.
* The plant is operating at 1 00&deg;/o power.
D. The rod must be electrically disarmed.
                                                      -3 of 7-
 
* - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Electrically disarm control rod 22-19 per OP-25 Section G.21."
STEP                                           STANDARD                         EVALUATION I COMMENT
: 1.     Obtain a controlled copy of       The candidate determines where to obtain a controlled copy     SATIUNSAT OP-25.                             of OP-25. (Control Room, Merlin)
EVALUATOR: Provide candidate a current copy of OP-25.
: 2.     Review precautions and             Reviews precautions and selects section G.21.                   SAT I UNSAT selects correct section.
: 3.     (Step G.21.1)                     Notifies Control Room that CRD 22-19 will be electrically       SAT I UNSAT Notify Control Room that CRD       disarmed .
22-19 will be electrically disarmed.                         EVALUATOR CUE: Acknowledge communication.
                                                                  -4 of 7-
 
STEP                                     STANDARD                         EVALUATION I COMMENT
  *4. (Step G.21.2)       .         Simulates unplugging amphenol connector from 03SOV-120     CRITICAL STEP Unplug amphenol connector     at HCU 22-19.                                               SAT I UNSAT from each of the following solenoid operated valves at HCU 22-19 and control per     EVALUATOR CUE: The indicated connector has been AP-12 .06.                     unplugged.
* 03SOV-120(*) (withdraw settle solenoid operated valve)
  *5. (Step G.21.2)                 Simulates unplugging amphenol connector from 03SOV-121     CRITICAL STEP
* 03SOV-121 (*)(insert       at HCU 22-19.                                               SAT I UNSAT exhaust water solenoid operated valve)
EVALUATOR CUE: The indicated connector has been unplugged .
  *6. (Step G.21.2)                 Simulates unplugging am phenol connector from 03SOV-122     CRITICAL STEP
* 03SOV-122(*) (withdraw     at HCU 22-19.                                               SAT I UNSAT drive water solenoid operated valve)
EVALUATOR CUE: The indicated connector has been unplugged.
  *7. (Step G.21.2)                 Simulates unplugging amphenol connector from 03SOV-123     CRITICAL STEP at HCU 22-19.
* 03SOV-123(*) (insert drive                                                             SAT I UNSAT water solenoid operated valve)                     EVALUATOR CUE: The indicated connector has been I                                                                                                                 i I
I                                    unplugged.
I
                                                    -5 of 7-
 
STEP                                          STANDARD                          EVALUATION I COMMENT
: 8.   (Step G.21.3)                     Notifies Control Room that CRD 22-19 has been electrically     SAT/UNSAT disarmed.
Notify Control Room that CRD 22-19 has been electrically disarmed.                         EVALUATOR CUE: Acknowledge communication .
EVALUATOR: Terminate the task at this point.
Task Standard: Control rod 22-19 is electrically disarmed .
                                                              -6 of 7-
 
HANDOUT
* The plant is operating at 100&deg;/o power.
* Control rod 22-19 was fully withdrawn, but would not couple.
* Control rod 22-19 was fully withdrawn, but would not couple.
* The rod has been fully inserted and its HCU has been valved out.
* The rod has been fully inserted and its HCU has been valved out.
* The rod must be electrically disarmed.
* The rod must be electrically disarmed.
Electrically disarm control rod 22-19 per OP-25 Section G.21. -7 of 7-Appendix D Scenario Outline Form ES-D-1 Facility: James A Fitzpatrick Scenario No.: NRC-1 Op-Test No.: 14-2 Examiners: Operators: Initial Conditions
Electrically disarm control rod 22-19 per OP-25 Section G.21.
: The plant is operating at approximately 90% power. RCIC is out of service for maintenance. Torus cooling is in service on RHR loop A Turnover: Secure Torus cooling per OP-13B sections F.1 and F. 7. Event Malf. Event Event No. No. Type* Description N-Shutdown Torus Cooling 1 N/A BOP, SRO OP-13B 2 SW04: A C-SRO RHRSW Pump A Trip ARP 09-3-1-25, Technical Specifications 3 NM14: B 1-ATC, APRM B Fails Upscale SRO OP-16, ARP 09-5-1-4 I-BOP, HPCIInadvertent Initiation 4 HP05 SRO AOP-77, AOP-32, Technical Specifications FW05: A C-BOP Feedwater Pump A High Vibration and Pump Trip 5 R-ATC , FW01: A SRO ARP 09-6-4-11, AOP-41 RR15: A Loss of Coolant Accident 6 M-All MS02: A EOP-2 , EOP-4 FW01: B Feedwater Pump B Trip , HPCI Trip 7 C-All HP02 EOP-2 ED43: A Loss of Offsite Power 8 C-All ED43: B AOP-72 * (N)ormal, (R)eactivity, (l)nstrument , (C)omponent, (M)ajor Facility: James A. Fitzpatrick Scenario No.: NRC-1 Op-Test No.: 14-2 1. Total malfunctions (5-8) 7 Events 2, 3, 4, 5 , 6, 7, 8 2. Malfunctions after EOP entry (1-2) 2 Events 7 & 8 3. Abnormal events (2-4) 3 Events 3, 4, 5 4. Major transients (1-2) 1 Event 6 5. EOPs entered/requiring substantive actions (1-2) 2 EOP-2, EOP-4 6. EOP contingencies requiring substantive actions (0-2) 2 EOP-2 Alt Level Leg, EOP-2 Emergency Depress Leg 7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:
                              -7 of 7-
CT-1: Given a coolant leak inside the Containment, the crew will spray the Drywell, in accordance with EOP-4. CT-2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below -19", in accordance with EOP-2.
 
Appendix D                                     Scenario Outline                           Form ES-D-1 Facility: James A Fitzpatrick             Scenario No. : NRC-1                   Op-Test No.: 14-2 Examiners:                                             Operators:
Initial Conditions: The plant is operating at approximately 90% power. RCIC is out of service for maintenance. Torus cooling is in service on RHR loop A Turnover: Secure Torus cooling per OP-13B sections F.1 and F.7.
Event         Malf.     Event                                       Event No.         No.       Type*                                     Description N-       Shutdown Torus Cooling 1           N/A         BOP, SRO       OP-13B RHRSW Pump A Trip 2       SW04:A       C-SRO ARP 09-3-1-25, Technical Specifications 1-ATC,       APRM B Fails Upscale 3        NM14:B SRO       OP-16, ARP 09-5-1-4 I-BOP,       HPCIInadvertent Initiation 4         HP05 SRO       AOP-77, AOP-32, Technical Specifications C-BOP FW05:A                   Feedwater Pump A High Vibration and Pump Trip 5                     R-ATC ,
FW01 :A       SRO       ARP 09-6-4-11, AOP-41 RR15:A                   Loss of Coolant Accident 6                     M-All MS02:A                   EOP-2, EOP-4 FW01 :B                   Feedwater Pump B Trip, HPCI Trip 7                     C-All HP02                     EOP-2 ED43 :A                   Loss of Offsite Power 8                     C-All ED43 :B                 AOP-72
*         (N)ormal,   (R)eactivity, (l)nstrument, (C)omponent,   (M)ajor
 
Facility: James A. Fitzpatrick                 Scenario No. : NRC-1 Op-Test No.: 14-2
: 1. Total malfunctions (5-8)                                       7 Events 2, 3, 4, 5, 6, 7, 8
: 2. Malfunctions after EOP entry (1-2)                             2 Events 7 & 8
: 3. Abnormal events (2-4)                                         3 Events 3, 4, 5
: 4. Major transients (1-2)                                         1 Event 6
: 5. EOPs entered/requiring substantive actions (1-2)               2 EOP-2, EOP-4
: 6. EOP contingencies requiring substantive actions (0-2)         2 EOP-2 Alt Level Leg, EOP-2 Emergency Depress Leg
: 7. Critical tasks (2-3)                                           2 CRITICAL TASK DESCRIPTIONS:
CT-1 : Given a coolant leak inside the Containment, the crew will spray the Drywell, in accordance with EOP-4.
CT-2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below -19", in accordance with EOP-2.
 
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
* LOI14-2 NRC EXAMINATION SCENARIO 1 TITLE: SCENARIO NUMBER: PATH: Validation:  
~~
...:z:-n :'"3 /1..--' ,) CRS ATC BOP LOI14-2 NRC EXAMINATION SCENARIO 1 NRC 1 STAND ALONE Training:
* LOI14-2 NRC EXAMINATION SCENARIO 1
i&o/ r I CANDIDATES L OI 14-2 NRC Examination Scenar i o 1 Page 1 of 23 RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/1/14 LOI 14-2 NRC Exam New Scenario T. Hooper \. LOI 14-2 NRC Examination Scenario 1 Page 2 of 23 A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 1 B. SCENARIO SETUP: 1. IC-61 2. Special Instructions:
  ~------------------------------------------------------------~
: a. The Plant is operating at approximately 90% power. b. RCIC is out of service for maintenance.
TITLE:                                   LOI14-2 NRC EXAMINATION SCENARIO 1 SCENARIO NUMBER:                         NRC 1 PATH:                                     STAND ALONE Validation: ...:z:-n :'"3
: c. Torus cooling is in service on RHR loop A. 3. Preset Conditions:
                          '
: a. Preset, M: RC03, RCIC System Turbine Trip b. Trigger 1, M:SW04:A, RHR Service Water Pump A Trip c. Trigger 2, NM14:B, APRM Channel B Failure , 100% d. Trigger 3, M:HP05, HPCI Inadvertent Initiation
                            /1..-- Training: i&o/             Operations: ~~/
: e. Trigger 16, M:HP02, HPCI Turbine Trip f. Trigger 4, M: FW05:A, Rx Feedwtr Pmp A High Vibration
r I
: g. Trigger 17, M:FW01:A, Rx Feedwtr Pmp A Trip h. Trigger 5, M:RR15:A, Coolant (A) Leakage Inside Pr i mary Containment, ramp=3 minutes, initial=1.5%, final=5% i. Trigger 6, M:FW01 :B, Rx Feedwtr Pmp B Trip j. Trigger 6, M:ED43:A, LHH Line #3 Fault, delay=4 minutes k. Trigger 6, M:ED43:B, NMP Line #4 Fault, delay=5 minutes I. Trigger 6, M:MS02:A, (MSL A) Stm Leakage Inside Prim, ramp=3 minutes, 50% m. Preset, O:RC ZA013PI96, Pump Suction Pressure lndi, 0% n. Preset, O:RC ZA013PI94, Turbine Steam Inlet Pressu, 0% o. Preset, O:RC ZL01315(1), (Mimic) Inboard Stm Supply Is, Off p. Preset, O:RC ZL01316(1), (Mimic) Outbd Stm Supply lsol, Off q. Preset, O:RC ZL01339(1), (Mimic) Pump Suet From Supp C, Off r. Preset, O:RC ZL01341 (1 ), (Mimic) Pump Suet From Supp C, Off s. Preset, O:RC ZL013AS1(1), Inboard Steam Supply lsol, Off t. Preset, O:RC ZL013AS10(1), Pump Suction From Supp C, Off u. Preset, O: RC ZL013AS2(1), Outboard Steam Supply lso, Off v. Preset, O:RC ZL013AS22(1), Pmp Suction From Supp C, Off w. Preset, O:RC ZL013AS4(1), Pmp Suction From Cond Sto, Off x. Preset, O:AN941 : 34, RCIC Exh Press Hi (25 psig), Off y. Event Trigger 1, Action: zlo1 034a(2)==0, Command: None z. Event Trigger 6, Action: zdi5as1(1)==1, Command: imf rr15:a 22 20:00 5 aa. Event Trigger 16, Action: zdi23as19==1, Command: None bb. Event Trigger 17, Action: fwvrfpt(1)>8 , Command: None 4. Consumable Forms and Procedures
                                                                                  ~
: + AOP-1, AOP-8, AOP-41, AOP-72, AOP-77 LOI 14-2 NRC Examination Scenario 1 Page 3 of23 C. SCENARIO  
  ,)                                                        CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 1 Page 1 of 23
 
RECORD OF CHANGES SOURCE OF             BRIEF DESCRIPTION OF DATE         CHANGE                       CHANGE       INITIATOR REVIEWED 5/1/14   LOI 14-2 NRC Exam     New Scenario             T. Hooper
\.
LOI 14-2 NRC Examination Scenario 1 Page 2 of 23
 
A. TITLE:               LOI14-2 NRC EXAMINATION SCENARIO 1 B. SCENARIO SETUP:
: 1. IC-61
: 2. Special Instructions:
: a. The Plant is operating at approximately 90% power.
: b. RCIC is out of service for maintenance.
: c. Torus cooling is in service on RHR loop A.
: 3. Preset Conditions:
: a. Preset, M:RC03, RCIC System Turbine Trip
: b. Trigger 1, M:SW04:A, RHR Service Water Pump A Trip
: c. Trigger 2, NM14:B, APRM Channel B Failure, 100%
: d. Trigger 3, M:HP05, HPCI Inadvertent Initiation
: e. Trigger 16, M:HP02, HPCI Turbine Trip
: f. Trigger 4, M:FW05:A, Rx Feedwtr Pmp A High Vibration
: g. Trigger 17, M:FW01:A, Rx Feedwtr Pmp A Trip
: h. Trigger 5, M:RR15:A, Coolant (A) Leakage Inside Primary Containment, ramp=3 minutes, initial=1.5%, final=5%
: i. Trigger 6, M:FW01 :B, Rx Feedwtr Pmp B Trip
: j. Trigger 6, M:ED43:A, LHH Line #3 Fault, delay=4 minutes
: k. Trigger 6, M:ED43:B, NMP Line #4 Fault, delay=5 minutes I. Trigger 6, M:MS02:A, (MSL A) Stm Leakage Inside Prim, ramp=3 minutes, 50%
: m. Preset, O:RC ZA013PI96, Pump Suction Pressure lndi, 0%
: n. Preset, O:RC ZA013PI94, Turbine Steam Inlet Pressu, 0%
: o. Preset, O:RC ZL01315(1), (Mimic) Inboard Stm Supply Is, Off
: p. Preset, O:RC ZL01316(1), (Mimic) Outbd Stm Supply lsol, Off
: q. Preset, O:RC ZL01339(1), (Mimic) Pump Suet From Supp C, Off
: r. Preset, O:RC ZL01341 (1 ), (Mimic) Pump Suet From Supp C, Off
: s. Preset, O:RC ZL013AS1(1), Inboard Steam Supply lsol, Off
: t. Preset, O:RC ZL013AS10(1), Pump Suction From Supp C, Off
: u. Preset, O:RC ZL013AS2(1), Outboard Steam Supply lso, Off
: v. Preset, O:RC ZL013AS22(1), Pmp Suction From Supp C, Off
: w. Preset, O:RC ZL013AS4(1), Pmp Suction From Cond Sto, Off
: x. Preset, O:AN941 :34, RCIC Exh Press Hi (25 psig), Off
: y. Event Trigger 1, Action: zlo1 034a(2)==0, Command: None
: z. Event Trigger 6, Action: zdi5as1(1)==1, Command: imf rr15:a 22 20:00 5 aa. Event Trigger 16, Action: zdi23as19==1, Command: None bb. Event Trigger 17, Action: fwvrfpt(1)>8 , Command: None
: 4. Consumable Forms and Procedures:
              + AOP-1, AOP-8, AOP-41, AOP-72, AOP-77 LOI 14-2 NRC Examination Scenario 1 Page 3 of23
 
C.     SCENARIO  


==SUMMARY==
==SUMMARY==
: The scenario will begin at approximately 90% power with RCIC out of service for maintenance and Torus cooling in service on RHR loop A. The crew will begin the shift by securing the Torus cooling lineup. While the crew is securing Torus cooling , RHRSW pump A will trip. The SRO will determine the Technical Specification impact. The crew will continue with the remaining steps to secure Torus cooling APRM B will fail upscale and cause a half scram on RPS B. The SRO will determine that Technical Specifications are satisfied with APRM B bypassed.
:
The crew will bypass APRM Band reset the half scram. HPCI will inadvertently start. The SRO will enter AOP-77 and direct securing HPCI. The crew will secure HPCI and one train of Standby Gas Treatment.
The scenario will begin at approximately 90% power with RCIC out of service for maintenance and Torus cooling in service on RHR loop A. The crew will begin the shift by securing the Torus cooling lineup.
The SRO will determine the Technical Specification impact. With RCIC out of service , Technical Specifications will require a plant shutdown.
While the crew is securing Torus cooling , RHRSW pump A will trip. The SRO will determine the Technical Specification impact. The crew will continue with the remaining steps to secure Torus cooling APRM B will fail upscale and cause a half scram on RPS B. The SRO will determine that Technical Specifications are satisfied with APRM B bypassed. The crew will bypass APRM Band reset the half scram.
Feedwater pump A will develop a high vibration. The crew may lower Reactor power in anticipation of tripping the pump. When the vibration exceeds 6 mils, the crew will trip the pump. If the crew does not trip the pump by 8 mils, the pump will spuriously trip. A Recirculation run back is likely to occur following the pump trip. The crew will respond to stabilize the plant within the capacity of a single Feedwater pump. A coolant leak will develop in the Drywell. The crew will scram the Reactor in anticipation of an automatic scram. Following the scram, Feedwater pump B will trip. With no remaining high pressure Feedwater, the crew may attempt to restore HPCI to service , but HPCI will trip. The crew will attempt to maintain Reactor water level with CRD and SLC , and may lower Reactor pressure to inject with Condensate Booster pumps. Offsite power lines 3 and 4 will sequentially trip. The loss of offsite power will make all Condensate pumps unavailable. Only low pressure ECCS pumps will be available for high capacity injection to the Reactor. Additionally, all Circulating Water pumps will trip , requiring the crew to close MSIVs and control Reactor pressure using SRVs. The coolant leak will continue to get worse. The crew will place Torus spray in service. When Torus pressure exceeds 15 psig, the crew will also place Drywell spray in service. Drywell spray will lower Drywell pressure such that the Pressure Suppression Pressure curve is not challenged.
HPCI will inadvertently start. The SRO will enter AOP-77 and direct securing HPCI. The crew will secure HPCI and one train of Standby Gas Treatment. The SRO will determine the Technical Specification impact.
The coolant leak rate will exceed the capacity of available high pressure injection. Reactor water level will lower to the top of active fuel. The crew will execute an Emergency RPV Depressurization and then control low pressure injection systems to restore Reactor water level. The scenario will be terminated when all control rods are inserted, the Emergency RPV Depressurization is in progress, and Reactor water level is controlled above 0". LOI 14-2 NRC Examination Scenario 1 Page 4 of 23 Shift Turnover The Plant is operating at approximately 90% power during a power reduction.
With RCIC out of service, Technical Specifications will require a plant shutdown.
RCIC is out of service for maintenance. Torus cooling is in service on RHR loop A When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI 14-2 NRC Examination Scenario 1 Page 5 of 23 Critical Tasks/Standards Critical Task #1: Given a coolant leak inside the Containment , the crew will spray the Drywell, in accordance with EOP-4. Critical Task #2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below -19" , in accordance with EOP-2. LOI 14-2 NRC Examination Scenario 1 Page 6 of 23 EVENT NO. EVENT SEQUENCE 1. Shutdown Torus Cooling (Normal: BOP, SRO) 2. RHRSW Pump A Trip (Component:
Feedwater pump A will develop a high vibration . The crew may lower Reactor power in anticipation of tripping the pump. When the vibration exceeds 6 mils, the crew will trip the pump. If the crew does not trip the pump by 8 mils, the pump will spuriously trip. A Recirculation run back is likely to occur following the pump trip. The crew will respond to stabilize the plant within the capacity of a single Feedwater pump.
SRO) (Tech Spec: SRO) 3. APRM B Fails Upscale (Component:
A coolant leak will develop in the Drywell. The crew will scram the Reactor in anticipation of an automatic scram. Following the scram, Feedwater pump B will trip. With no remaining high pressure Feedwater, the crew may attempt to restore HPCI to service, but HPCI will trip. The crew will attempt to maintain Reactor water level with CRD and SLC, and may lower Reactor pressure to inject with Condensate Booster pumps.
ATC, SRO) 4. HPCI Inadvertent Initiation (Instrument:
Offsite power lines 3 and 4 will sequentially trip. The loss of offsite power will make all Condensate pumps unavailable. Only low pressure ECCS pumps will be available for high capacity injection to the Reactor.
BOP, SRO) (Tech Spec: SRO) 5. Feedwater Pump A High Vibration and Pump Trip (Component:
Additionally, all Circulating Water pumps will trip, requiring the crew to close MSIVs and control Reactor pressure using SRVs.
BOP) (Reactivity:
The coolant leak will continue to get worse. The crew will place Torus spray in service. When Torus pressure exceeds 15 psig, the crew will also place Drywell spray in service. Drywell spray will lower Drywell pressure such that the Pressure Suppression Pressure curve is not challenged. The coolant leak rate will exceed the capacity of available high pressure injection . Reactor water level will lower to the top of active fuel. The crew will execute an Emergency RPV Depressurization and then control low pressure injection systems to restore Reactor water level.
ATC, SRO) 6. Coolant Leak in Drywell (Major: All) 7. Feedwater Pump B Trip, HPCI Trip (Component:
The scenario will be terminated when all control rods are inserted, the Emergency RPV Depressurization is in progress, and Reactor water level is controlled above 0".
All) 8. Loss of Offsite Power (Component:
LOI 14-2 NRC Examination Scenario 1 Page 4 of 23
All) D. TERMINATION CUES:
 
Shift Turnover The Plant is operating at approximately 90% power during a power reduction.
RCIC is out of service for maintenance.
Torus cooling is in service on RHR loop A When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI 14-2 NRC Examination Scenario 1 Page 5 of 23
 
Critical Tasks/Standards Critical Task #1: Given a coolant leak inside the Containment, the crew will spray the Drywell, in accordance with EOP-4.
Critical Task #2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below
                  -19" , in accordance with EOP-2.
LOI 14-2 NRC Examination Scenario 1 Page 6 of 23
 
EVENT NO.                                       EVENT SEQUENCE
: 1.         Shutdown Torus Cooling                         (Normal: BOP, SRO)
RHRSW Pump A Trip                               (Component: SRO)
: 2.                                                        (Tech Spec: SRO)
: 3.         APRM B Fails Upscale                           (Component: ATC, SRO)
HPCI Inadvertent Initiation                     (Instrument: BOP, SRO) 4.
(Tech Spec: SRO)
Feedwater Pump A High Vibration and Pump Trip   (Component: BOP) 5.
(Reactivity: ATC, SRO)
: 6.         Coolant Leak in Drywell                         (Major: All)
: 7.         Feedwater Pump B Trip, HPCI Trip               (Component: All)
(~    8.         Loss of Offsite Power                           (Component: All)
D. TERMINATION CUES:
* All control rods are inserted
* All control rods are inserted
* Emergency RPV Depressurization is in progress
* Emergency RPV Depressurization is in progress
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 7 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1) After the shift turnover, allow All no more than five minutes for panel walkdown
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 7 of 23
* Walkdown the control panels and assume the watch I Events 1 & 2 SRO SAT I UNSAT INA Secure Torus Cooling,
 
* Perform Crew Brief RHRSW Pump A Trip
INSTRUCTOR ACTIVITY             POSITION             OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)
After the shift turnover, allow All no more than five minutes for panel walkdown
* Walkdown the control panels and assume the watch I
Events 1 & 2                   SRO                                                                     SAT I UNSAT INA Secure Torus Cooling, RHRSW Pump A Trip
* Perform Crew Brief
* Direct BOP to secure Torus cooling per OP-13B sections F.1 and F.7.
* Direct BOP to secure Torus cooling per OP-13B sections F.1 and F.7.
* Acknowledge trip of RHRSW pump A
* Acknowledge trip of RHRSW pump A
* Determine Technical Specification 3.7.1 Condition A must be entered (restore RHRSW pump A to operable within 30 days) BOP SAT I UNSAT INA Note:
* Determine Technical Specification 3.7.1 Condition A must be entered (restore RHRSW pump A to operable within 30 days)
* Close RHR TEST & TORUS CLG 1 OMOV-34A Ensure Trigger 1 automatically
BOP                                                                     SAT I UNSAT INA Note:
* Recognize I report trip of RHRSW pump A goes active and trips RHRSW pump A when 1 OMOV-34A red
* Close RHR TEST & TORUS CLG 1OMOV-34A Ensure Trigger 1 automatically
* IF RHR Loop A flow is LESS THAN 1500 gpm, THEN ensure light extinguishes.
* Recognize I report trip of RHRSW pump A goes active and trips RHRSW pump A when 1OMOV-34A red
open MIN FLOWVLV 10MOV-16A
* IF RHR Loop A flow is LESS THAN 1500 gpm, THEN ensure light extinguishes.                         open MIN FLOWVLV 10MOV-16A
* IF RHR Loop A operation is not required, THEN shut down RHR Loop A per Subsection F.7 -----LOI 14-2 NRC Examination Scenario 1 Page 8 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP cont. SAT I UNSAT INA
* IF RHR Loop A operation is not required, THEN shut down RHR Loop A per Subsection F.7
* Ensure one of the RHR Loop A keep-full systems is in service Role Play: as follows: If dispatched to investigate trip 0 RHR KEEP-FULL PMP 10P-2A is running, of RHRSW pump A , wait 2 minutes, then report that the OR pump breaker tripped on 0 10RHR-274 (RHR loop A containment spray keep-full cond overcurrent, but there is xfer connection valve) is throttled open nothing abnormal at the pump.
                                                                                                          - ----
* Ensure closed the following valves: 0 RHR TEST & TORUS CLG 1 OMOV-34A 0 TORUS SPRAY INBD VLV 10MOV-38A 0 OW SPRAY INBD VLV 10MOV-31A
LOI 14-2 NRC Examination Scenario 1 Page 8 of 23
* Ensure the following RHR pumps are stopped: 0 RHR PMP 1 OP-3A 0 RHR PMP 1 OP-3C
 
* Ensure closed the following valves: I 0 RHR TEST TORUS CLG & SPRAY 1 OMOV-39A I 0 DW SPRAY OUTBD VLV 1 OMOV-26A
INSTRUCTOR ACTIVITY                   POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION BOP cont.                                                                 SAT I UNSAT INA
* Ensure one of the RHR Loop A keep-full systems is in service Role Play:                                       as follows:
If dispatched to investigate trip               0   RHR KEEP-FULL PMP 10P-2A is running, of RHRSW pump A , wait 2 minutes, then report that the                               OR pump breaker tripped on                         0   10RHR-274 (RHR loop A containment spray keep-full cond overcurrent, but there is                           xfer connection valve) is throttled open nothing abnormal at the pump.
* Ensure closed the following valves:
0   RHR TEST & TORUS CLG 1OMOV-34A 0   TORUS SPRAY INBD VLV 10MOV-38A 0   OW SPRAY INBD VLV 10MOV-31A
* Ensure the following RHR pumps are stopped:
0   RHR PMP 1OP-3A 0   RHR PMP 1OP-3C
* Ensure closed the following valves :                                               I 0   RHR TEST TORUS CLG & SPRAY 1OMOV-39A                                           I 0   DW SPRAY OUTBD VLV 1OMOV-26A
* Ensure open MIN FLOWVLV 10MOV-16A
* Ensure open MIN FLOWVLV 10MOV-16A
* Ensure open HX A BYP VLV 1 OMOV-66A
* Ensure open HX A BYP VLV 1OMOV-66A
* IF RHRSW Loop A operation is not required, THEN shut down RHRSW Loop A as follows: 0 Close RHRSW DISCH VLV FROM HX A 10MOV-89A 0 Ensure the following RHRSW pumps are stopped: 0 RHRSW PMP 10P-1A 0 RHRSW PMP 10P-1C -------------------
* IF RHRSW Loop A operation is not required, THEN shut down RHRSW Loop A as follows:
---LOI 14-2 NRC Examination Scenario 1 Page 9 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event3 ATC SAT I UNSAT INA On Lead Examiner Cue:
0   Close RHRSW DISCH VLV FROM HX A 10MOV-89A 0   Ensure the following RHRSW pumps are stopped:
0   RHRSW PMP 10P-1A 0   RHRSW PMP 10P-1C
                  -               - - - ---- -                 ----------                                                     - - -
LOI 14-2 NRC Examination Scenario 1 Page 9 of 23
 
INSTRUCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION Event3                       ATC                                                                         SAT I UNSAT INA On Lead Examiner Cue:
* Recognize I report multiple annunciators, including:
* Recognize I report multiple annunciators, including:
ACTIVATE TRIGGER 2 0 09-5-2-44, APRM UPSCALE APRM B Fails Upscale 0 09-5-2-55, APRM TRIP SYS B INOP OR UPSCALE TRIP
ACTIVATE TRIGGER 2                         0   09-5-2-44, APRM UPSCALE APRM B Fails Upscale                       0   09-5-2-55, APRM TRIP SYS B INOP OR UPSCALE TRIP
* Recognize I report APRM B indicates upscale
* Recognize I report APRM B indicates upscale
* Recognize I report half scram SRO SATIUNSATINA
* Recognize I report half scram SRO                                                                         SATIUNSATINA
* Acknowledge report
* Acknowledge report
* Direct ARP response
* Direct ARP response
* Determine Technical Specification Table 3.3.1.1-1 Functions 2b, c, and d are met with APRM B out of service * .Determines TRM Table T3.3.B-1 Functions 1a, b, and care met with APRM B out of service
* Determine Technical Specification Table 3.3.1.1-1 Functions 2b, c, and d are met with APRM B out of service
                                          * .Determines TRM Table T3.3.B-1 Functions 1a, b, and care met with APRM B out of service
* Direct bypassing APRM B per OP-16
* Direct bypassing APRM B per OP-16
* Direct reset of half scram ATC SAT I UNSAT INA
* Direct reset of half scram ATC                                                                         SAT I UNSAT INA
* Bypass APRM B per OP-16 Section E.16: 0 Place APRM BYP switch in B 0 Verify APRM B is bypassed using one or both of the following:
* Bypass APRM B per OP-16 Section E.16:
0   Place APRM BYP switch in B 0   Verify APRM B is bypassed using one or both of the following:
* APRM B BYPASS indicating light is on
* APRM B BYPASS indicating light is on
* APRM B EPIC alarm indicates bypassed 0 Verify the other two APRM channels associated with the same APRM BYP switch are in service using one or both of the following:
* APRM B EPIC alarm indicates bypassed 0   Verify the other two APRM channels associated with the same APRM BYP switch are in service using one or both of the following:
* APRM BYPASS indicating lights are off for the other two APRMs
* APRM BYPASS indicating lights are off for the other two APRMs
* No EPIC bypassed alarms for the other two APRMs LOI 14-2 NRC Examination Scenario 1 Page 10 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC cont. SAT I UNSAT INA
* No EPIC bypassed alarms for the other two APRMs LOI 14-2 NRC Examination Scenario 1 Page 10 of 23
* Reset half scram per ARP: 0 Place RX SCRAM RESET switch to GROUP 2 & 3 , then to GROUP 1 & 4, spring return to NORM 0 Verify RPS 8 SCRAM GROUPS 1, 2 , 3, and 4 lights are on -LOI 14-2 NRC Examination Scenario 1 Page 11 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event4 BOP/ATC SAT/UNSAT/NA On Lead Examiner Cue: Recognize I report spurious HPCI initiation ACTIVATE TRIGGER 3
 
* HPCI Inadvertent Initiation
INSTRUCTOR ACTIVITY           POSITION             OPERATOR ACTIONS/STANDARD                     COMMENTS/EVALUATION ATC cont.                                                           SAT I UNSAT INA
* Recognize I report Reactor power rise , if applicable
* Reset half scram per ARP:
* Recognize I report Reactor water level rise , if applicable SRO SAT/UNSAT/NA
0   Place RX SCRAM RESET switch to GROUP 2 & 3, then to GROUP 1 & 4, spring return to NORM 0   Verify RPS 8 SCRAM GROUPS 1, 2, 3, and 4 lights are on
                                                                                                                      -
LOI 14-2 NRC Examination Scenario 1 Page 11 of 23
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION Event4                       BOP/ATC                                                                   SAT/UNSAT/NA On Lead Examiner Cue:
ACTIVATE TRIGGER 3
* Recognize I report spurious HPCI initiation HPCI Inadvertent Initiation
* Recognize I report Reactor power rise, if applicable
* Recognize I report Reactor water level rise, if applicable SRO                                                                       SAT/UNSAT/NA
* Acknowledge report
* Acknowledge report
* Enter AOP-77 (Inadvertent Initiation of ECCS or RCIC)
* Enter AOP-77 (Inadvertent Initiation of ECCS or RCIC)
Line 956: Line 2,460:
* Determine Technical Specification 3.5.1 Condition G requires being in Mode 3 within 12 hours and reducing Reactor pressure to :s; 150 psig within 36 hours
* Determine Technical Specification 3.5.1 Condition G requires being in Mode 3 within 12 hours and reducing Reactor pressure to :s; 150 psig within 36 hours
* Declare the secured train of Standby Gas Treatment inoperable
* Declare the secured train of Standby Gas Treatment inoperable
* Determine Technical Specification 3.6.4.3 Condition A requires restoring Standby Gas Treatment to operable within 7 days LOI 14-2 NRC Examination Scenario 1 Page 12 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT/UNSAT/NA Role Play:
* Determine Technical Specification 3.6.4.3 Condition A requires restoring Standby Gas Treatment to operable within 7 days LOI 14-2 NRC Examination Scenario 1 Page 12 of 23
 
INSTRUCTOR ACTIVITY             POSITION             OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION BOP                                                                     SAT/UNSAT/NA Role Play:
* Execute AOP-77 If dispatched to investigate HPCI, wait three minutes, then
* Execute AOP-77 If dispatched to investigate HPCI, wait three minutes, then
* Observe Reactor water level and Drywell pressure indications report there is no obvious to verify HPCI injection not required reason why HPCI started and
* Observe Reactor water level and Drywell pressure indications report there is no obvious                 to verify HPCI injection not required reason why HPCI started and
* Trip HPCI there is no observable damage to the system.
* Trip HPCI there is no observable damage to the system.
* AFTER turbine comes to a complete stop, place AUX OIL PMP 23P-150 control switch in PULL-TO-LOCK
* AFTER turbine comes to a complete stop, place AUX OIL PMP 23P-150 control switch in PULL-TO-LOCK
* Secure one train of Standby Gas
* Secure one train of Standby Gas
* For the running Standby Gas train, open 02-125MOV-11(12)
* For the running Standby Gas train, open 02-125MOV-11(12)
* May execute AOP-32 (Unexplained/Unanticipated Reactivity Change) 0 Determine HPCI initiation was only cause of reactivity change LOI 14-2 NRC Examination Scenario 1 Page 13 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event 5 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:
* May execute AOP-32 (Unexplained/Unanticipated Reactivity Change) 0   Determine HPCI initiation was only cause of reactivity change LOI 14-2 NRC Examination Scenario 1 Page 13 of 23
 
INSTRUCTOR ACTIVITY               POSITION               OPERATOR ACTIONS/STANDARD                           COMMENTS/EVALUATION Event 5                         BOP I ATC                                                                 SAT I UNSAT INA On Lead Examiner Cue:
* Recognize I report EPIC alarms ACTIVATE TRIGGER 4
* Recognize I report EPIC alarms ACTIVATE TRIGGER 4
* Recognize I report annunciator 09-6-4-11, RFPT A VIB HI Feedwater Pump A High Vibration and Pump Trip
* Recognize I report annunciator 09-6-4-11, RFPT A VIB HI Feedwater Pump A High Vibration and Pump Trip
* Recognize I report rising Feedwater pump A vibrations SRO SAT I UNSAT INA Note:
* Recognize I report rising Feedwater pump A vibrations SRO                                                                       SAT I UNSAT INA Note:
* Acknowledge report The ARP directs tripping
* Acknowledge report The ARP directs tripping
* Direct ARP response Feedwater pump A if vibration reaches 6 mils. There is no
* Direct ARP response Feedwater pump A if vibration reaches 6 mils. There is no
* May direct emergency power reduction with Recirculation flow automatic trip on vibration, and/or CRAM rods however the pump will
* May direct emergency power reduction with Recirculation flow automatic trip on vibration,                 and/or CRAM rods however the pump will
* Direct trip of Feedwater pump A spuriously trip in this scenario if vibration reaches -8 mils.
* Direct trip of Feedwater pump A spuriously trip in this scenario if vibration reaches -8 mils.
* Enter AOP-41 (Feedwater Malfunction)
* Enter AOP-41 (Feedwater Malfunction)
* May enter AOP-8 (Unexpected Change in Core Flow) BOP SAT I UNSAT INA Note:
* May enter AOP-8 (Unexpected Change in Core Flow)
* Execute ARP 09-6-4-11 Recirculation pumps will likely 0 Monitor vibration level and trend runback to the 44% limiter due to only one Feedwater pump 0 When vibration approaches/exceeds 6 mils, trip Feedwater operating and Reactor water pump A level lowering to 196.5".
BOP                                                                       SAT I UNSAT INA Note:
* Coordinate with A TC to lower Reactor power with Recirculation flow, as required I directed Role Play: If dispatched to investigate , wait 2 minutes, then report that Feedwater pump A is vibrating, but there is no obvious cause. LOI 14-2 NRC Examination Scenario 1 Page 14 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT I UNSAT INA Note:
* Execute ARP 09-6-4-11 Recirculation pumps will likely             0   Monitor vibration level and trend runback to the 44% limiter due to only one Feedwater pump                   0   When vibration approaches/exceeds 6 mils, trip Feedwater operating and Reactor water                     pump A level lowering to 196.5".
* Coordinate with BOP to lower Reactor power with CRAM rods, Following the trip of as required I directed
* Coordinate with A TC to lower Reactor power with Recirculation flow, as required I directed Role Play:
* Monitor for thermal-hydraulic instabilities (THI) Feedwater pump A, Reactor power will likely stabilize between 65-70% power. The crew may decide to lower Reactor power further by inserting CRAM rods, since during a startup the second Feedwater pump is started prior to exceeding 55% power. However, there is no hard requirement to continue the power reduction.
If dispatched to investigate, wait 2 minutes, then report that Feedwater pump A is vibrating, but there is no obvious cause .
Role Play: If the crew is not taking action to lower Reactor power by inserting CRAM rods, when crew informs management or Reactor Engineering of event, direct crew to lower Reactor power to 50% using RAP-7.3.16. LOI 14-2 NRC Examination Scenario 1 Page 15 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Events 6 1 7 1 & 8 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:
LOI 14-2 NRC Examination Scenario 1 Page 14 of 23
* Recognize I report degrading Primary Containment conditions ACTIVATE TRIGGER 5 (leakage, temperature, pressure)
 
Loss of Coolant Accident,
INSTRUCTOR ACTIVITY               POSITION             OPERATOR ACTIONS/STANDARD                       COMMENTS/EVALUATION ATC                                                                   SAT I UNSAT INA Note:
* Recognize I report trip of Feedwater pump 8 (after scram) Feedwater Pump 8 Trip, HPCI Trip, Loss of Offsite Power
* Coordinate with BOP to lower Reactor power with CRAM rods, as required I directed Following the trip of
* Monitor for thermal-hydraulic instabilities (THI)
Feedwater pump A, Reactor power will likely stabilize between 65-70% power. The crew may decide to lower Reactor power further by inserting CRAM rods, since during a startup the second Feedwater pump is started prior to exceeding 55% power.
However, there is no hard requirement to continue the power reduction.
Role Play:
If the crew is not taking action to lower Reactor power by inserting CRAM rods, when crew informs management or Reactor Engineering of event, direct crew to lower Reactor power to 50% using RAP-7.3.16.
LOI 14-2 NRC Examination Scenario 1 Page 15 of 23
 
INSTRUCTOR ACTIVITY               POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION Events 6 1 7 1 & 8               BOP I ATC                                                                 SAT I UNSAT INA On Lead Examiner Cue:
* Recognize I report degrading Primary Containment conditions ACTIVATE TRIGGER 5                             (leakage, temperature, pressure)
Loss of Coolant Accident, Feedwater Pump 8 Trip, HPCI
* Recognize I report trip of Feedwater pump 8 (after scram)
Trip, Loss of Offsite Power
* Recognize I report trip of HPCI (if re-start attempted)
* Recognize I report trip of HPCI (if re-start attempted)
Note:
* Recognize I report loss of Lines 3 and 4 (approximately 4 and Note:                                          5 minutes after scram, respectively)
* Recognize I report loss of Lines 3 and 4 (approximately 4 and 5 minutes after scram, respectively)
Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the Feedwater pump trip and delayed loss of offsite power.
Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the Feedwater pump trip and delayed loss of offsite power. This trigger also re-inserts the coolant leak malfunction and ramps it to a higher value. Critical Task #1 Given a coolant leak Inside the Containment, the crew will Pass/ Fail spray the Drywall, in accordance with EOP-4. Critical Task t1 Standard:
This trigger also re-inserts the coolant leak malfunction and ramps it to a higher value.
Drywall spray In service. Critical Task t2 . Given a coolant leak, a loss of high pi'8SSure Injection Pass/ Fall systems, and the Inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will Initiate actio* for an RPV Depressurization before RNctor wat.rlevellowtn below -1.8", In accordance wlthEOP..Z.
Critical Task #1                           Given a coolant leak Inside the Containment, the crew will       Pass/ Fail spray the Drywall, in accordance with EOP-4.
Drywall spray In service.
Critical Task t1 Standard:
Critical Task t2 .                         Given a coolant leak, a loss of high pi'8SSure Injection         Pass/ Fall systems, and the Inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will Initiate actio* for an Emerge~~ey RPV Depressurization before RNctor wat.rlevellowtn below -1.8 ", In accordance wlthEOP..Z.
7 ADS valves open.
Critical Task t2 Standard:
Critical Task t2 Standard:
7 ADS valves open. LOI14-2 NRC Examination Scenario 1 Page 16 of 23 IINSTRUCTORACTIVITY I POSITION I OPERATORACTIONS/STANDARD I COMMENTS/EVALUATION I SRO SAT/UNSAT/NA
LOI14-2 NRC Examination Scenario 1 Page 16 of 23
 
IINSTRUCTORACTIVITY               I POSITION I             OPERATORACTIONS/STANDARD                             I COMMENTS/EVALUATION I SRO                                                                           SAT/UNSAT/NA
* Acknowledge reports
* Acknowledge reports
* Direct Reactor scram
* Direct Reactor scram
Line 994: Line 2,520:
* Enter EOP-4 (Primary Containment Control) on high Drywell pressure and high Drywell temperature (as they occur)
* Enter EOP-4 (Primary Containment Control) on high Drywell pressure and high Drywell temperature (as they occur)
* Acknowledge trip of Feedwater pump B
* Acknowledge trip of Feedwater pump B
* Direct Reactor water level controlled 180-220" using HPCI , Condensate, SLC, and/or CRD
* Direct Reactor water level controlled 180-220" using HPCI ,
Condensate, SLC, and/or CRD
* Acknowledge trip of HPCI
* Acknowledge trip of HPCI
* Direct Reactor pressure controlled 800-1000#
* Direct Reactor pressure controlled 800-1000# using Turbine Note:                                         Bypass Valves A pressure band of 600-800#
using Turbine Note: Bypass Valves A pressure band of 600-800#
* May direct Reactor depressurization to inject with Condensate would allow injection with
* May direct Reactor depressurization to inject with Condensate would allow injection with
* Enter AOP-39 (Loss of Coolant) Condensate Booster pumps , however these will become
* Enter AOP-39 (Loss of Coolant)
* Direct Control Room and Relay Room Ventilation isolated per unavailable due to the OP-55B Section G within 30 minutes eventual loss of offsite power.
Condensate Booster pumps, however these will become
* Direct TSC filtered ventilation started per Section D of OP-59B within 60 minutes Role Play:
* Direct Control Room and Relay Room Ventilation isolated per unavailable due to the                         OP-55B Section G within 30 minutes eventual loss of offsite power.
* May direct Core Spray and RHR injection prevented per EP-5 When directed to place
* Direct TSC filtered ventilation started per Section D of OP-59B within 60 minutes
* When Primary Containment pressure exceeds 2.7 psig and Control Room , Relay Room , before Torus pressure exceeds 15 psig, direct initiation of and/or TSC filtered ventilation Torus Spray in service, acknowledge direction.
* May direct Core Spray and RHR injection prevented per EP-5 Role Play:
When directed to place
* When Primary Containment pressure exceeds 2.7 psig and Control Room , Relay Room ,                   before Torus pressure exceeds 15 psig, direct initiation of and/or TSC filtered ventilation               Torus Spray in service, acknowledge direction.
LOI 14-2 NRC Examination Scenario 1 Page 17 of 23
LOI 14-2 NRC Examination Scenario 1 Page 17 of 23
[INSTRUCTOR ACTIVI"TY ImPOSITION I OPERATOR ACTIONS/STANDARD I COMMENTS/EVALUATION I SRO cont. SAT/UNSAT/NA
 
[INSTRUCTOR ACTIVI"TY             ImPOSITION I               OPERATOR ACTIONS/STANDARD                       I COMMENTS/EVALUATION I SRO cont.                                                                   SAT/UNSAT/NA
* Acknowledge loss of Line 3
* Acknowledge loss of Line 3
* Acknowledge loss of Line 4
* Acknowledge loss of Line 4
* Enter AOP-72 (115 KV Grid Loss, Instability , or Degradation)
* Enter AOP-72 (115 KV Grid Loss, Instability, or Degradation)
Note:
Note:
* Acknowledge loss of all Condensate pumps and Circulating The MSIVs will be closed due Water pumps to loss of all Circulating Water
* Acknowledge loss of all Condensate pumps and Circulating The MSIVs will be closed due                     Water pumps to loss of all Circulating Water pumps after the loss of 115
* Direct closure of MSIVs pumps after the loss of 115 KV.
* Direct closure of MSIVs KV.
* Direct Reactor pressure control using SRVs
* Direct Reactor pressure control using SRVs
* When Torus pressure exceeds 15 psig: 0 Verify Recirculation pumps tripped 0 Verify trip of Drywell cooling fans 0 Direct initiation of Drywell Spray
* When Torus pressure exceeds 15 psig:
0   Verify Recirculation pumps tripped 0   Verify trip of Drywell cooling fans 0   Direct initiation of Drywell Spray
* Determine Reactor water level cannot be maintained above 0"
* Determine Reactor water level cannot be maintained above 0"
* Enter Alternate RPV Level Control leg of EOP-2
* Enter Alternate RPV Level Control leg of EOP-2
* Direct override of ADS
* Direct override of ADS
* Direct CRD maximized and SLC injection, if not done Note: previously As Reactor water level lowers ,
* Direct CRD maximized and SLC injection, if not done Note:                                           previously As Reactor water level lowers,
* When Reactor water level reaches 0", enter Emergency Critical Task #2 the crew will transition from RPV Depressurization leg of EOP-2 wide range to fuel zone level
* When Reactor water level reaches 0", enter Emergency         Critical Task #2 the crew will transition from                   RPV Depressurization leg of EOP-2 wide range to fuel zone level
* Direct opening 7 ADS valves indicators. The determination of when to initiate Emergency
* Direct opening 7 ADS valves indicators. The determination of when to initiate Emergency
* Direct Reactor water level restored and maintained 180-220" RPV Depressurization (CT-2) using Core Spray and/or LPCI will be made using Fuel Zone
* Direct Reactor water level restored and maintained 180-220" RPV Depressurization (CT-2)                     using Core Spray and/or LPCI will be made using Fuel Zone level indicators.
* As time allows, directs re-start of Drywell spray level indicators.
* As time allows, directs re-start of Drywell spray LOI 14-2 NRC Examination Scenario 1 Page 18 of 23
LOI 14-2 NRC Examination Scenario 1 Page 18 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION I ATC SAT I UNSAT INA
 
INSTRUCTOR ACTIVITY           POSITION             OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION I ATC                                                                     SAT I UNSAT INA
* Enter AOP-1
* Enter AOP-1
* Depress MANUAL SCRAM A and MANUAL SCRAM 8 pushbuttons
* Depress MANUAL SCRAM A and MANUAL SCRAM 8 pushbuttons
Line 1,031: Line 2,562:
* Ensure Main Turbine is tripped
* Ensure Main Turbine is tripped
* Verify 4KV loads transfer to reserve power
* Verify 4KV loads transfer to reserve power
* May begin Reactor depressurization BOP SAT/UNSAT/NA
* May begin Reactor depressurization BOP                                                                     SAT/UNSAT/NA
* Enter AOP-1
* Enter AOP-1
* Attempt to control Reactor water level 180-220" using HPCI, Condensate, SLC, and/or CRD
* Attempt to control Reactor water level 180-220" using HPCI, Condensate, SLC, and/or CRD
* May attempt to manually re-start HPCI: 0 Ensure open 23MOV-16 0 Ensure running 23P-140 0 Ensure open 23MOV-14 0 If 09-3-3-28 is in alarm, then depress 23A-S17 0 Ensure running 23P-150 0 Recognize I report failure of HPCI to start -------------
* May attempt to manually re-start HPCI :
LOI14-2 NRC Examination Scenario 1 Page 19 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC I BOP SAT I UNSAT INA
0   Ensure open 23MOV-16 0   Ensure running 23P-140 0   Ensure open 23MOV-14 0   If 09-3-3-28 is in alarm, then depress 23A-S17 0   Ensure running 23P-150 0   Recognize I report failure of HPCI to start
                                                                          -------------
LOI14-2 NRC Examination Scenario 1 Page 19 of 23
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION ATC I BOP                                                                   SAT I UNSAT INA
* Attempt to maintain Reactor water level with SLC and/or CRD
* Attempt to maintain Reactor water level with SLC and/or CRD
* Recognize I report leakage exceeds capacity of SLC and/or CRD
* Recognize I report leakage exceeds capacity of SLC and/or CRD
* May lower Reactor pressure using Turbine Bypass Valves
* May lower Reactor pressure using Turbine Bypass Valves
* May inject using Condensate Booster pumps
* May inject using Condensate Booster pumps
* Initiate Torus spray: I I Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL , ' 0 spring return to normal 0 Verify white SPRAY PERM 1 OA-DS67 A( B) light is on 0 Ensure available RHR pumps in RHR Loop A(B) are running (recognize/report failure to automatically start) 0 Open RHR TEST TORUS CLG & SPRAY 1 OMOV-39A(B) 0 Throttle TORUS SPRAY INBD VLV 10MOV-38A(B) to establish desired torus spray flow rate 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm , ensure closed MIN FLOW VLV 10MOV-16A(B) 0 Throttle RHR TEST & TORUS CLG 1 OMOV-34A(B) to divert excess flow to the torus to maintain > 6 , 500 gpm RHR Loop A(B) flow with one RHR pump operating or > 13 , 000 gpm RHR Loop A(B) flow with two RHR pumps operating  
* Initiate Torus spray:                                                               I I
------------LOI 14-2 NRC Examination Scenario 1 Page 20 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC I BOP SAT I UNSAT INA cont. Establish RHRSW flow and temperature control: 0 0 Start one of the RHRSW pumps 0 Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89A(B) to establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX A( B) 1 OMOV-89A(B) to establish 2500 to 4000 gpm per RHRSW pump 0 IF drywell or torus sprays are in service, THEN establish 4000 gpm per RHRSW pump 0 Close HX A( B) BYP VLV 1 OMOV-66A(B)
0    Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL,                               '
spring return to normal 0   Verify white SPRAY PERM 1OA-DS67A( B) light is on 0   Ensure available RHR pumps in RHR Loop A(B) are running (recognize/report failure to automatically start) 0   Open RHR TEST TORUS CLG & SPRAY 1OMOV-39A(B) 0   Throttle TORUS SPRAY INBD VLV 10MOV-38A(B) to establish desired torus spray flow rate 0   WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm, ensure closed MIN FLOW VLV 10MOV-16A(B) 0   Throttle RHR TEST & TORUS CLG 1OMOV-34A(B) to divert excess flow to the torus to maintain > 6,500 gpm RHR Loop A(B) flow with one RHR pump operating or >
13,000 gpm RHR Loop A(B) flow with two RHR pumps operating
                                                                                - - --                     ---- -- - -
LOI 14-2 NRC Examination Scenario 1 Page 20 of 23
 
INSTRUCTOR ACTIVITY             POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS/EVALUATION ATC I BOP                                                           SAT I UNSAT INA cont.
0    Establish RHRSW flow and temperature control:
0   Start one of the RHRSW pumps 0   Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89A(B) to establish 2500 to 4000 gpm 0   Start the second RHRSW pump if desired 0   Throttle RHRSW DISCH VLV FROM HX A( B) 1OMOV-89A(B) to establish 2500 to 4000 gpm per RHRSW pump 0   IF drywell or torus sprays are in service, THEN establish 4000 gpm per RHRSW pump 0   Close HX A( B) BYP VLV 1OMOV-66A(B)
* Close MSIVs
* Close MSIVs
* Control Reactor pressure using SRVs Note:
* Control Reactor pressure using SRVs Note:
* Ensure Recirc pumps tripped When RPV water level lowers
* Ensure Recirc pumps tripped When RPV water level lowers
* Ensure Drywell Cooling fans tripped below 59.5", Torus and
* Ensure Drywell Cooling fans tripped below 59.5", Torus and
* Initiate Drywell spray: Critical Task #1 Drywell Spray are automatically secured as LPCI 0 Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL, receives an initiation signal. spring return to normal The SRO will direct Torus and 0 Verify white SPRAY PERM 1 OA-DS67 A( B) light is on Drywell Spray re-established at a later time. 0 Ensure available RHR pumps in RHR Loop A(B) are running 0 Open OW SPRAY OUTBD VLV 1 OMOV-26A(B) 0 Throttle OW SPRAY INBD VLV 10MOV-31A(B) to establish desired drywell spray flow rate -------LOI 14-2 NRC Examination Scenario 1 Page 21 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION I ATC I BOP SAT I UNSAT INA cont.
* Initiate Drywell spray:                                 Critical Task #1 Drywell Spray are automatically secured as LPCI             0   Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL, receives an initiation signal.                 spring return to normal The SRO will direct Torus and             0   Verify white SPRAY PERM 1OA-DS67A( B) light is on Drywell Spray re-established at a later time.                           0   Ensure available RHR pumps in RHR Loop A(B) are running 0   Open OW SPRAY OUTBD VLV 1OMOV-26A(B) 0   Throttle OW SPRAY INBD VLV 10MOV-31A(B) to establish desired drywell spray flow rate
* Override ADS: 0 Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0 Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0 Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0 Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on
-- --- --
LOI 14-2 NRC Examination Scenario 1 Page 21 of 23
 
INSTRUCTOR ACTIVITY                 POSITION                   OPERATOR ACTIONS/STANDARD                   COMMENTS/EVALUATION I ATC I BOP                                                               SAT I UNSAT INA cont.
* Override ADS:
0   Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0   Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0   Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0   Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on
* Maximize CRD, if not done previously
* Maximize CRD, if not done previously
* Initiate SLC injection, if not done previously
* Initiate SLC injection, if not done previously
* Verify isolations per AOP-15
* Verify isolations per AOP-15 Critical Task #2
* Open 7 ADS valves Critical Task #2
* Open 7 ADS valves
* Restore and maintain Reactor water level 180-220" using available injection systems
* Restore and maintain Reactor water level 180-220" using available injection systems
* Control Core Spray injection:
* Control Core Spray injection:
0 Throttle 14MOV-12A(B)
0   Throttle 14MOV-12A(B)
* Control LPCI injection:
* Control LPCI injection:
0 Throttle 1 OMOV-27 A( B) 0 Secure RHR pumps if needed Termination Criteria:
0   Throttle 1OMOV-27A( B) 0   Secure RHR pumps if needed Termination Criteria:
* All control rods are inserted
* All control rods are inserted
* Emergency RPV Depressurization is in progress
* Emergency RPV Depressurization is in progress
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 22 of 23 ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 90% power during a power reduction. RCIC is out of service for maintenance.
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 22 of 23
Torus cooling is in service on RHR loop A. When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI14-2 NRC Examination Scenario 1 Page 23 of 23 Appendix D Scenario Outline Form ES-D-1 Facility: James A. Fitzpatrick Scenario No.: NRC-2 Op-Test No.: 14-2 Examiners: Operators: Initial Conditions:
 
The plant is operating at approximately 99% power. Air Compressor B is out of service for maintenance.
ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 90% power during a power reduction .
Core Spray pump A is ready for full flow testing. Main Generator reactive load is at minimum per Power Control request. Turnover:
RCIC is out of service for maintenance.
Perform Core Spray full flow testing per ST-3PA, starting at step 8.7.6. Event Malf. Event Event No. No. Type* Description N-Perform Core Spray Full Flow Test 1 N/A BOP, SRO ST-3PA C-Core Spray Pump Overload 2 Override BOP, SRO ARP 09-3-1-31, Technical Specifications RD06 C-Control Rod Drive Pump Trip , One Control Rod Drive Accumulator 3 ATC, Low Pressure RD09 SRO AOP-69, ARP-09-5-1-43, Technical Specifications TU04 R-ATC Main Turbine Bearing High Vibration; Loss of Main Condenser 4 C-ATC, Vacuum MC01 SRO AOP-66, AOP-31, AOP-1 RP01AB Failure of RPS and ARI to Actuate 5 RP01BB M-All RP09 EOP-2 , EOP-3 SL02 C-First SLC Squib Valve Fails to Fire , Second SLC Pump Trips, 6 SL01 ATC, Recirculation Pumps Fail to Automatically Trip RR13 SRO EOP-3 EG01 C-Main Generator Trip, Two Turbine Bypass Valves Fail Closed 7 BOP , TC04 SRO EOP-3 * (N)ormal, (R)eactivitv, (l)nstrument, (C)omponent (M)ajor Facility:
Torus cooling is in service on RHR loop A.
James A. Fitzpatrick Scenario No.: NRC-2 Op-Test No.: 14-2 1. Total malfunctions (5-8) 6 Events 2, 3, 4, 5, 6, 7 2. Malfunctions after EOP entry (1-2) 2 Events 6 & 7 3. Abnonnal events (2-4) 2 Events 3 &4 4. Major transients (1-2) 1 Event 5 5. EOPs entered/requiring substantive actions (1-2) 1 EOP-2 6. EOP contingencies requiring substantive actions (0-2) 1 EOP-3 7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:
When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI14-2 NRC Examination Scenario 1 Page 23 of 23
 
Appendix D                                       Scenario Outline                             Form ES-D-1 Facility: James A. Fitzpatrick             Scenario No.: NRC-2                     Op-Test No.: 14-2 Examiners:                                             Operators:
Initial Conditions: The plant is operating at approximately 99% power. Air Compressor B is out of service for maintenance. Core Spray pump A is ready for full flow testing. Main Generator reactive load is at minimum per Power Control request.
Turnover: Perform Core Spray full flow testing per ST-3PA, starting at step 8.7.6.
Event         Malf.       Event                                     Event No.         No.       Type*                                   Description N-       Perform Core Spray Full Flow Test 1           N/A         BOP, SRO       ST-3PA C-       Core Spray Pump Overload 2       Override       BOP, SRO       ARP 09-3-1-31, Technical Specifications C-       Control Rod Drive Pump Trip, One Control Rod Drive Accumulator RD06 3                       ATC,       Low Pressure RD09         SRO       AOP-69, ARP-09-5-1-43, Technical Specifications R-ATC         Main Turbine Bearing High Vibration; Loss of Main Condenser TU04 4                                   Vacuum C-ATC, MC01           SRO       AOP-66, AOP-31, AOP-1 RP01AB Failure of RPS and ARI to Actuate 5       RP01BB       M-All EOP-2, EOP-3 RP09 SL02                     First SLC Squib Valve Fails to Fire, Second SLC Pump Trips, C-6         SL01         ATC,       Recirculation Pumps Fail to Automatically Trip SRO       EOP-3 RR13 EG01           C-       Main Generator Trip, Two Turbine Bypass Valves Fail Closed 7                       BOP, TC04         SRO       EOP-3
*         (N)ormal,   (R)eactivitv, (l)nstrument,   (C)omponent   (M)ajor
 
Facility: James A. Fitzpatrick               Scenario No.: NRC-2 Op-Test No.: 14-2
: 1. Total malfunctions (5-8)                                   6 Events 2, 3, 4, 5, 6, 7
: 2. Malfunctions after EOP entry (1-2)                         2 Events 6 & 7
: 3. Abnonnal events (2-4)                                       2 Events 3 &4
: 4. Major transients (1-2)                                     1 Event 5
: 5. EOPs entered/requiring substantive actions (1-2)           1 EOP-2
: 6. EOP contingencies requiring substantive actions (0-2)       1 EOP-3
: 7. Critical tasks (2-3)                                       2 CRITICAL TASK DESCRIPTIONS:
CT -1: Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
CT -1: Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Tripping Recirculation pumps CT-2: Given a failure to scram, the crew will initiate Control Rod insertion, in accordance with EOP-3.
* Tripping Recirculation pumps CT-2: Given a failure to scram, the crew will initiate Control Rod insertion, in accordance with EOP-3.
TITLE: SCENARIO NUMBER: PATH: JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 2 LOI14-2 NRC EXAMINATION SCENARIO 2 NRC 2 STAND ALONE Validation:  
 
..-=:-""' '} Training: ) ' CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 2 Page 1 of 29 RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/3/12 New New Scenario T. Hooper 5/14/14 LOI14-2 NRC Exam Modified for LOI14-2 NRC Exam T. Hooper LOI14-2 NRC Examination Scenario 2 Page 2 of 28 A. TITLE: LOI 14-2 NRC EXAMINATION SCENARIO 2 B. SCENARIO SETUP: 1. IC-62 2. Special Instructions
JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 2 TITLE:                                  LOI14-2 NRC EXAMINATION SCENARIO 2 SCENARIO NUMBER:                        NRC 2 PATH:                                  STAND ALONE Validation: ..-=:-""' '} ~-    Training: ,Jl~
: a. The Plant is operating at approximately 99% power. b. Air Compressor B is out of service for maintenance.
)                     '
: c. Ensure Generator reactive load is at minimum per OP-11A. 3. Preset Conditions
CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 2 Page 1 of 29
 
RECORD OF CHANGES SOURCE OF             BRIEF DESCRIPTION OF DATE         CHANGE                         CHANGE       INITIATOR REVIEWED 5/3/12     New                 New Scenario                 T. Hooper 5/14/14   LOI14-2 NRC Exam   Modified for LOI14-2 NRC Exam T. Hooper LOI14-2 NRC Examination Scenario 2 Page 2 of 28
 
A. TITLE:               LOI 14-2 NRC EXAMINATION SCENARIO 2 B. SCENARIO SETUP:
: 1. IC-62
: 2. Special Instructions:
: a. The Plant is operating at approximately 99% power.
: b. Air Compressor B is out of service for maintenance.
: c. Ensure Generator reactive load is at minimum per OP-11A.
: 3. Preset Conditions:
: a. Preset, R:IA15:B, Air Camp 39AC-2B Supply Breaker, Open (will not show in Instructor Station Summary after snap/reset)
: a. Preset, R:IA15:B, Air Camp 39AC-2B Supply Breaker, Open (will not show in Instructor Station Summary after snap/reset)
: b. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off c. TRIGGER 1, O:CS ZA014P1A, Core Spray Pump A Current, Ramp=20 seconds, 170 d. TRIGGER 1 , O:AN931 :31, Core Spray Pmp 14P-1A Overload, Delay=15 seconds, ON e. TRIGGER 2, M: RD06:A, CRD Hydraulic Pump Trip (A) f. TRIGGER 2, M: RD09:22:31, Control Rod (22-31) Accumulator, Delay=30 seconds g. TRIGGER 3, M:TU04E, Main Turbine High Bearing #5 Vibration, lnitial=21  
: b. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off
%, Final=27%, Ramp=5:00
: c. TRIGGER 1, O:CS ZA014P1A, Core Spray Pump A Current, Ramp=20 seconds, 170
: h. TRIGGER 3, M: TU04F, Main Turbine High Bearing #6 Vibration, lnitial=21  
: d. TRIGGER 1, O:AN931 :31, Core Spray Pmp 14P-1A Overload, Delay=15 seconds, ON
%, Final=28%, Ramp=5: 00 i. TRIGGER 4 , M:MC01, Main Condenser Air In Leakage, lnitial=12%, Final=25%, Ramp=8 minutes j. Preset , M:RP01 :AB, RPS Automatic Scram Failure B Side Only k. Preset , M:RP01 :BB, RPS Manual Scram Failure B Side Only I. Preset, M:RP09 , ARI Fails to Actuate m. Preset, M: SL02:A, Standby Liquid Squib Valve Fails n. Preset, M:SL02:B , Standby Liquid Squib Valve Fails o. Preset, M:RR13:A, ATWS System Fails to Initiate p. Preset , M:RR13:B, ATWS System Fails to Initiate q. TRIGGER 5, M:EG01, Main Generator Trip r. TRIGGER 6, M:TC04:A Turbine Bypass Valve Failure, 0% s. TRIGGER 6, M: TC04: B Turbine Bypass Valve Failure , 0% t. TRIGGER 20, R:IA07, Scram Air Hdr Man lso Vlv, CLOSE u. TRIGGER 20, M:IA01 , Loss of Air Pressure to Scram Air Header, 100%, Ramp=30 seconds v. TRIGGER 19, R:RH40:A , Relay 1 OA-K45A Timer Grayboot, REMOVED w. TRIGGER 19, R:RH40:B, Relay 10A-K45B Timer Grayboot , REMOVED x. Event Trigger 1, Event: zdi14as4a(2)==1 , Command: None y. Event Trigger 4, Event: ycx07nmaprmaf<95 , Command: None z. Event Trigger 5, Event: ycx07nmaprmaf<42, Command: None aa. Event Trigger 6, Event: ycx07nmaprmaf<24, Command: None bb. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor zao14p1a LOI 14-2 NRC Examination Scenario 2 Page 3 of 28 cc. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor an931 :31 dd. Event Trigger 21, Event: ycx07nmaprmaf<95, Command: imf tu04:e 14 60 ee. Event Trigger 22, Event: ycx07nmaprmaf<95, Command: imf tu04:f 14 60 ff. Event Trigger 23, Event: ycx07nmaprmaf<85, Command: imf mc01 30 1:00 gg. Event Trigger 24, Event: ycx07nmaprmaf<60, Command: imf mc01 35 1:00 hh. Event Trigger 25, Event: zdi11 s1 (2)==1, Command: dmf sl02:b ii. Event Trigger 26, Event: zdi11 s1 (2)==1, Command: trgr 28 jj. EventTrigger27, Event: zdi11s1(2)==1, Command: imfsl01:b (30 5) kk. Event Trigger 28, Event: zdi11s1(1)==1, Command: dmf sl02:a II. Event Trigger 29, Event: zdi11s1(1)==1, Command: trgr 25 mm. Event Trigger 30, Event: zdi11s1(1)==1, Command: imf sl01 :a (27 5) 4. Consumable Forms and Procedures:  
: e. TRIGGER 2, M:RD06:A, CRD Hydraulic Pump Trip (A)
+ AOP-1, AOP-31, AOP-66, AOP-69, ST-3PA LOI 14-2 NRC Examination Scenario 2 Page 4 of 28 C. SCENARIO  
: f. TRIGGER 2, M:RD09:22:31, Control Rod (22-31) Accumulator, Delay=30 seconds
: g. TRIGGER 3, M:TU04E, Main Turbine High Bearing #5 Vibration, lnitial=21 %,
Final=27%, Ramp=5:00
: h. TRIGGER 3, M:TU04F, Main Turbine High Bearing #6 Vibration, lnitial=21 %,
Final=28%, Ramp=5:00
: i. TRIGGER 4, M:MC01, Main Condenser Air In Leakage, lnitial=12%, Final=25%,
Ramp=8 minutes
: j. Preset, M:RP01 :AB, RPS Automatic Scram Failure B Side Only
: k. Preset, M:RP01 :BB, RPS Manual Scram Failure B Side Only I. Preset, M:RP09, ARI Fails to Actuate
: m. Preset, M:SL02:A, Standby Liquid Squib Valve Fails
: n. Preset, M:SL02:B, Standby Liquid Squib Valve Fails
: o. Preset, M:RR13:A, ATWS System Fails to Initiate
: p. Preset, M:RR13:B, ATWS System Fails to Initiate
: q. TRIGGER 5, M:EG01, Main Generator Trip
: r. TRIGGER 6, M:TC04:A Turbine Bypass Valve Failure, 0%
: s. TRIGGER 6, M:TC04:B Turbine Bypass Valve Failure, 0%
: t. TRIGGER 20, R:IA07, Scram Air Hdr Man lso Vlv, CLOSE
: u. TRIGGER 20, M:IA01 , Loss of Air Pressure to Scram Air Header, 100%, Ramp=30 seconds
: v. TRIGGER 19, R:RH40:A, Relay 1OA-K45A Timer Grayboot, REMOVED
: w. TRIGGER 19, R:RH40:B, Relay 10A-K45B Timer Grayboot, REMOVED
: x. Event Trigger 1, Event: zdi14as4a(2)==1 , Command: None
: y. Event Trigger 4, Event: ycx07nmaprmaf<95, Command : None
: z. Event Trigger 5, Event: ycx07nmaprmaf<42, Command : None aa. Event Trigger 6, Event: ycx07nmaprmaf<24, Command: None bb. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor zao14p1a LOI 14-2 NRC Examination Scenario 2 Page 3 of 28
 
cc. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor an931 :31 dd. Event Trigger 21, Event: ycx07nmaprmaf<95, Command: imf tu04:e 14 60 ee. Event Trigger 22, Event: ycx07nmaprmaf<95, Command: imf tu04:f 14 60 ff. Event Trigger 23, Event: ycx07nmaprmaf<85, Command: imf mc01 30 1:00 gg. Event Trigger 24, Event: ycx07nmaprmaf<60, Command: imf mc01 35 1:00 hh. Event Trigger 25, Event: zdi11 s1 (2)==1, Command: dmf sl02:b ii. Event Trigger 26, Event: zdi11 s1 (2)==1, Command: trgr 28 jj. EventTrigger27, Event: zdi11s1(2)==1, Command: imfsl01:b (30 5) kk. Event Trigger 28, Event: zdi11s1(1)==1, Command: dmf sl02:a II. Event Trigger 29, Event: zdi11s1(1)==1, Command: trgr 25 mm. Event Trigger 30, Event: zdi11s1(1)==1, Command: imf sl01 :a (27 5)
: 4. Consumable Forms and Procedures:
              + AOP-1, AOP-31, AOP-66, AOP-69, ST-3PA LOI 14-2 NRC Examination Scenario 2 Page 4 of 28
 
C.       SCENARIO  


==SUMMARY==
==SUMMARY==
: The scenario will begin with the plant operating at approximately 99% power. The crew will begin by performing Core Spray pump testing per ST-3PA. When the Core Spray test valve is opened , an overload condition will develop on Core Spray pump A The crew will perform ARP actions to lower pump flow and then stop the pump. The SRO will determine the Technical Specification impact. The running Control Rod Drive pump will trip. The crew will enter AOP-69, start the standby pump, and restore normal Control Rod Drive parameters. During this evolution , one Control Rod Drive accumulator will develop a low pressure. The SRO will determine the Technical Specification impact. Main Turbine vibrations will develop. The crew will enter AOP-66 to address the vibrations.
:
The vibrations will subside as Reactor power is lowered, however the vibrations will have caused damage resulting in Main Condenser air in-leakage.
The scenario will begin with the plant operating at approximately 99% power. The crew will begin by performing Core Spray pump testing per ST-3PA. When the Core Spray test valve is opened , an overload condition will develop on Core Spray pump A The crew will perform ARP actions to lower pump flow and then stop the pump. The SRO will determine the Technical Specification impact.
Main Condenser vacuum will degrade. The crew will enter AOP-31 and eventually insert a manual Reactor scram. RPS B will fail to process the scram and ARI will also fail to insert control rods. The crew will enter EOP-2 and EOP-3. The A TWS system will fail to automatically trip the Recirculation pumps when required. The crew will lower Recirculation flow to minimum and then trip the Recirculation pumps. The crew will terminate and prevent injection except CRD, SLC, and RCIC. The crew will attempt to inject boron using SLC, however the squib valves will fail to fire when the first SLC pump is started. The second SLC pump will successfully start and inject, but then trip after a time delay. The Main Turbine will be available until power lowers to approximately 40%, when a spurious turbine trip occurs. As power lowers, two Turbine Bypass alves will fail closed, challenging Reactor pressure control and Primary Containment control. The crew will be able to manually insert control rods. Either pulling RPS fuses or venting the scram air header will result in all rods inserting. The scenario will be terminated when control rods are being inserted or are all inserted and Reactor water level is controlled above 0". LOI14-2 NRC Examination Scenario 2 Page 5 of 28 Shift Turnover The Plant is operating at approximately 99% power. Air Compressor B is out of service for maintenance.
The running Control Rod Drive pump will trip. The crew will enter AOP-69, start the standby pump, and restore normal Control Rod Drive parameters. During this evolution, one Control Rod Drive accumulator will develop a low pressure. The SRO will determine the Technical Specification impact.
Main Generator reactive load is at minimum per Power Control request. When you take the shift , perform Core Spray A pump testing per ST-3PA , starting at step 8.7.6. LOI 14-2 NRC Examination Scenario 2 Page 6 of 28 Critical Tasks/Standards Critical Task #1: Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
Main Turbine vibrations will develop. The crew will enter AOP-66 to address the vibrations. The vibrations will subside as Reactor power is lowered, however the vibrations will have caused damage resulting in Main Condenser air in-leakage. Main Condenser vacuum will degrade. The crew will enter AOP-31 and eventually insert a manual Reactor scram .
RPS B will fail to process the scram and ARI will also fail to insert control rods. The crew will enter EOP-2 and EOP-3. The ATWS system will fail to automatically trip the Recirculation pumps when required . The crew will lower Recirculation flow to minimum and then trip the Recirculation pumps. The crew will terminate and prevent injection except CRD, SLC, and RCIC. The crew will attempt to inject boron using SLC, however the squib valves will fail to fire when the first SLC pump is started. The second SLC pump will successfully start and inject, but then trip after a time delay. The Main Turbine will be available until power lowers to approximately 40%, when a spurious turbine trip occurs. As power lowers, two Turbine Bypass alves will fail closed, challenging Reactor pressure control and Primary Containment control. The crew will be able to manually insert control rods. Either pulling RPS fuses or venting the scram air header will result in all rods inserting .
The scenario will be terminated when control rods are being inserted or are all inserted and Reactor water level is controlled above 0".
LOI14-2 NRC Examination Scenario 2 Page 5 of 28
 
Shift Turnover The Plant is operating at approximately 99% power.
Air Compressor B is out of service for maintenance.
Main Generator reactive load is at minimum per Power Control request.
When you take the shift, perform Core Spray A pump testing per ST-3PA, starting at step 8.7.6 .
LOI 14-2 NRC Examination Scenario 2 Page 6 of 28
 
Critical Tasks/Standards Critical Task #1 : Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Tripping Recirculation pumps Critical Task #2: Given a failure to scram , the crew will initiate Control Rod insertion, in accordance with EOP-3. LOI14-2 NRC Examination Scenario 2 Page 7 of 28 EVENT NO. EVENT SEQUENCE 1. Perform Core Spray Full Flow Test (Normal: BOP, SRO} 2. Core Spray Pump Overload (Component:
* Tripping Recirculation pumps Critical Task #2: Given a failure to scram , the crew will initiate Control Rod insertion, in accordance with EOP-3.
BOP, SRO} 3. Control Rod Drive Pump Trip, One Control (Component:
LOI14-2 NRC Examination Scenario 2 Page 7 of 28
ATC, SRO} Rod Drive Accumulator Low Pressure 4. Main Turbine Bearing High Vibration, Loss of (Reactivity:
 
ATC} Main Condenser Vacuum (C: ATC, SRO} 5. Failure of RPS and ARI to Actuate (Major: All} First SLC Squib Valve Fails to Fire, Second SLC (Component:
EVENT NO.                                       EVENT SEQUENCE
ATC, SRO} 6. Pump Trips, Recirculation Pumps Fail to Automatically Trip 7. Main Generator Trip and Two Turbine (Component:
: 1.       Perform Core Spray Full Flow Test                 (Normal: BOP, SRO}
BOP, SRO} Bypass Valves Fails Closed D. TERMINATION CUES:
: 2.       Core Spray Pump Overload                         (Component: BOP, SRO}
Control Rod Drive Pump Trip, One Control         (Component: ATC, SRO}
3.
Rod Drive Accumulator Low Pressure Main Turbine Bearing High Vibration, Loss of     (Reactivity: ATC}
4.
Main Condenser Vacuum                             (C: ATC, SRO}
: 5.       Failure of RPS and ARI to Actuate                 (Major: All}
First SLC Squib Valve Fails to Fire, Second SLC   (Component: ATC, SRO}
: 6.       Pump Trips, Recirculation Pumps Fail to Automatically Trip Main Generator Trip and Two Turbine               (Component: BOP, SRO}
7.
Bypass Valves Fails Closed D. TERMINATION CUES:
* Control rods are being inserted or are all inserted.
* Control rods are being inserted or are all inserted.
* Reactor water level is being controlled above 0". LOI 14-2 NRC Examination Scenario 2 Page 8 of 28 INSTklJCTOR ACTIVITY POSITION OPERA fOR ACTIONS/STANDARD COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1) After the shift turnover , allow All no more than five minutes for panel walkdown
* Reactor water level is being controlled above 0".
* Walkdown the control panels and assume the watch Event 1 SRO SAT I UNSAT INA Perform Core Spray Full Flow
LOI 14-2 NRC Examination Scenario 2 Page 8 of 28
* Perform Crew Brief Test
 
* Direct BOP to perform Core Spray testing per ST-3PA BOP SAT I UNSAT INA
INSTklJCTOR ACTIVITY           POSITION               OPERA fOR ACTIONS/STANDARD                     COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)
After the shift turnover, allow All no more than five minutes for panel walkdown
* Walkdown the control panels and assume the watch Event 1                         SRO                                                                       SAT I UNSAT INA Perform Core Spray Full Flow Test
* Perform Crew Brief
* Direct BOP to perform Core Spray testing per ST-3PA BOP                                                                       SAT I UNSAT INA
* Start PMP 14P-1A
* Start PMP 14P-1A
* Throttle TEST VL V 14MOV-26A to momentarily establish Core Note: Spray Loop A flow rate at GREATER THAN OR EQUAL TO As 14MOV-26A is being 5150 gpm on EPIC display CS opened, ensure Trigger 1
* Throttle TEST VL V 14MOV-26A to momentarily establish Core Spray Loop A flow rate at GREATER THAN OR EQUAL TO Note:
* Throttle TEST VLV 14MOV-26A to establish GREATER THAN automatically activates.
5150 gpm on EPIC display CS As 14MOV-26A is being opened, ensure Trigger 1
This OR EQUAL TO 4610 LESS THAN OR EQUAL TO 4790 gpm will lead immediately into the on EPIC display TRCS (as time permits) next event.
* Throttle TEST VLV 14MOV-26A to establish GREATER THAN automatically activates. This                 OR EQUAL TO 4610 LESS THAN OR EQUAL TO 4790 gpm will lead immediately into the                 on EPIC display TRCS (as time permits) next event.
* Verify closed MIN FLOW VLV 14MOV-5A (as time permits) '-------LOI 14-2 NRC Examination Scenario 2 Page 9 of 28 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event2 BOP SAT I UNSAT INA Core Spray Pump Overload
* Verify closed MIN FLOW VLV 14MOV-5A (as time permits)
'-----                                                         --
LOI 14-2 NRC Examination Scenario 2 Page 9 of 28
 
INSTRUCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION Event2                         BOP                                                                       SAT I UNSAT INA Core Spray Pump Overload
* Recognize I report high current on Core Spray pump A
* Recognize I report high current on Core Spray pump A
* Recognize I report annunciator 09-3-1-31 , Core Spray Pmp 14P-1A Overload SRO SAT I UNSAT INA
* Recognize I report annunciator 09-3-1-31 , Core Spray Pmp 14P-1A Overload SRO                                                                       SAT I UNSAT INA
* Acknowledge report
* Acknowledge report
* Direct execution of ARP
* Direct execution of ARP
* Declare Core Spray pump A inoperable
* Declare Core Spray pump A inoperable
* Determine Technical Specification 3.5.1 Condition A requires restoring Core Spray pump to operable within 7 days BOP SAT I UNSAT INA Role Play:
* Determine Technical Specification 3.5.1 Condition A requires restoring Core Spray pump to operable within 7 days BOP                                                                       SAT I UNSAT INA Role Play:
* Executes ARP 09-3-1-31
* Executes ARP 09-3-1-31 :
: If contacted as NPO about Core Spray pump A wh i le it is
If contacted as NPO about Core Spray pump A while it is
* IF either of the following conditions exist: still running, immediately 0 Pump flow rate is > 4700 gpm, OR Pump amps are > 160 , report that the pump is running very loudly and there is some
* IF either of the following conditions exist:
* THEN reduce pump flow rate until: light smoke coming from the 0 Pump flow rate is s 4700 gpm , AND Pump amps are s 160 motor. If contacted as NPO about
still running, immediately                   0   Pump flow rate is > 4700 gpm, OR Pump amps are > 160, report that the pump is running very loudly and there is some
* IF the annunciator remains in alarm , AND core spray is not Core Spray pump A after it required to assure adequate core cooling , THEN perform the has been stopped , following: immediately report that it has
* THEN reduce pump flow rate until:
* Ensure closed INBD INJ VLV 14MOV-12A stopped and the smoke is dissipating.
light smoke coming from the                 0   Pump flow rate is s 4700 gpm, AND Pump amps are s 160 motor.
If contacted as NPO about
* IF the annunciator remains in alarm , AND core spray is not Core Spray pump A after it                   required to assure adequate core cooling , THEN perform the has been stopped,                           following :
immediately report that it has
* Ensure closed INBD INJ VLV 14MOV-12A stopped and the smoke is dissipating .
* Ensure closed TEST VLV 14MOV-26A
* Ensure closed TEST VLV 14MOV-26A
* Ensure open MIN FLOW VLV 14MOV-5A
* Ensure open MIN FLOW VLV 14MOV-5A
* Stop PMP 14P-1A LOI 14-2 NRC Examination Scenario 2 Page 10 of 28
* Stop PMP 14P-1A LOI 14-2 NRC Examination Scenario 2 Page 10 of 28
--INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 3 ATC SAT I UNSAT INA On Lead Examiner Cue:
 
              -                                                     -
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS I EVALUATION Event 3                         ATC                                                                       SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 2
* Recognize I report annunciators:
* Recognize I report annunciators:
ACTIVATE TRIGGER 2 Control Rod Drive Pump Trip, 0 09-5-1-9, CRD CHARGING WTR PRESS LO One Control Rod Drive 0 09-5-1-39, CRD PMP 3P-16A OVERLOAD Accumulator Low Pressure 0 09-5-1-49, CRD PMP 3P-16A TRIP 0 09-5-1-43, CRD ACCUM PRESS LO OR LVL HI (delayed)
Control Rod Drive Pump Trip,                 0   09-5-1-9, CRD CHARGING WTR PRESS LO One Control Rod Drive                       0   09-5-1-39, CRD PMP 3P-16A OVERLOAD Accumulator Low Pressure 0   09-5-1-49, CRD PMP 3P-16A TRIP 0   09-5-1-43, CRD ACCUM PRESS LO OR LVL HI (delayed)
* Recognize I report trip of CRD pump A
* Recognize I report trip of CRD pump A
* Recognize I report accumulator alarm on control rod 22-31 (delayed)
* Recognize I report accumulator alarm on control rod 22-31 (delayed)
Role Play: SRO SAT I UNSAT INA If contacted about control rod
Role Play:                     SRO                                                                       SAT I UNSAT INA If contacted about control rod scram times, report that all
* Acknowledge reports scram times, report that all control rod scram times were
* Acknowledge reports control rod scram times were
* Enter AOP-69 (Control Rod Drive Pump Trouble) within limits during last
* Enter AOP-69 (Control Rod Drive Pump Trouble) within limits during last surveillance.
* Direct start of CRD pump B surveillance.
* Direct start of CRD pump B
* Determine Technical Specification 3.1.5 Condition A requires declaring control rod 22-31 scram time "slow" or declaring control rod 22-31 inoperable within 8 hours Role Play: ATC SAT I UNSAT INA If dispatched to investigate
* Determine Technical Specification 3.1.5 Condition A requires declaring control rod 22-31 scram time "slow" or declaring control rod 22-31 inoperable within 8 hours Role Play:                     ATC                                                                       SAT I UNSAT INA If dispatched to investigate pump trip, wait 2 minutes, then
* Execute AOP-69 pump trip, wait 2 minutes, then report CRD pump A breaker is
* Execute AOP-69 report CRD pump A breaker is
* Note override conditions for RPV pressure above 900 psig and tripped and there are no required scram abnormal indications at the
* Note override conditions for RPV pressure above 900 psig and tripped and there are no                     required scram abnormal indications at the pump.
* Monitor ACCUM alarm lights on full core display pump.
* Monitor ACCUM alarm lights on full core display
* Ensure CRD FLOW CNTRL 03FIC-301 is in MAN
* Ensure CRD FLOW CNTRL 03FIC-301 is in MAN
* Rotate manual control knob on CRD FLOW CNTRL 03FIC-301 fully counterclockwise LOI 14-2 NRC Examination Scenario 2 Page 11 of 28
* Rotate manual control knob on CRD FLOW CNTRL 03FIC-301 fully counterclockwise LOI 14-2 NRC Examination Scenario 2 Page 11 of 28
. INSTRuCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC cont. SAT I UNSAT INA Role Play:
 
* Verify in-service CRD flow control valve (03FCV-19A or B) is If dispatched to investigate closed accumulator alarm, wait 2
INSTRuCTOR ACTIVITY         POSITION
* Start CRD PMP 03P-16B minutes, then report that the accumulator pressure for
                                              .        OPERATOR ACTIONS/STANDARD                       COMMENTS I EVALUATION ATC cont.                                                                 SAT I UNSAT INA Role Play:
* Slowly adjust manual control knob on CRD FLOW CNTRL control rod 22-31 is 850 psig 03FIC-301 to establish 59 to 61 gpm on 03-FI-310 or 03FIC-and slowly lowering.
* Verify in-service CRD flow control valve (03FCV-19A or B) is If dispatched to investigate               closed accumulator alarm, wait 2 minutes, then report that the
301
* Start CRD PMP 03P-16B accumulator pressure for
* Place CRD FLOW CNTRL 03FIC-301 in automatic as follows: 0 Balance controller by adjusting setpoint tape 0 Place controller in AUTO 0 Adjust setpoint to BETWEEN 59 and 61 gpm I I ! ----LOI14-2 NRC Examination Scenario 2 Page 12 of 28
* Slowly adjust manual control knob on CRD FLOW CNTRL control rod 22-31 is 850 psig             03FIC-301 to establish 59 to 61 gpm on 03-FI-310 or 03FIC-and slowly lowering.                       301
--INSTklJCTOR ACTIVITY POSITION OPERA lOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 ATC I BOP SAT I UNSAT INA On Lead Examiner Cue: Recognize I report high Turbine vibrations ACTIVATE TRIGGER 3
* Place CRD FLOW CNTRL 03FIC-301 in automatic as follows:
* Main Turbine Vibration
0   Balance controller by adjusting setpoint tape 0   Place controller in AUTO 0   Adjust setpoint to BETWEEN 59 and 61 gpm I
I
                                                                                                                              !
                                - -                 --
LOI14-2 NRC Examination Scenario 2 Page 12 of 28
 
        -                                                           -
INSTklJCTOR ACTIVITY         POSITION               OPERAlOR ACTIONS/STANDARD                         COMMENTS I EVALUATION Event 4                         ATC I BOP                                                                   SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 3
* Recognize I report high Turbine vibrations Main Turbine Vibration
* Monitor Turbine vibrations
* Monitor Turbine vibrations
* Report vibrations on bearing 5 & 6 are greater than 9 mils but less than 12 mils I Note: SRO SAT I UNSAT INA A Reactor scram is required if
* Report vibrations on bearing 5 & 6 are greater than 9 mils but less than 12 mils I
* Acknowledge report vibrations exceeded 12 mils or if vibrations exceeded 9 mils
Note:                           SRO                                                                         SAT I UNSAT INA A Reactor scram is required if vibrations exceeded 12 mils or
* Enter AOP-66 (Main Turbine High Vibration) for more than 15 minutes. Neither of these conditions are expected in this scenario. BOP SAT I UNSAT INA Role Play: Execute AOP-66
* Acknowledge report if vibrations exceeded 9 mils
* If dispatched to investigate vibrations
* Enter AOP-66 (Main Turbine High Vibration) for more than 15 minutes.
; wait 2 minutes,
Neither of these conditions are expected in this scenario.
BOP                                                                         SAT I UNSAT INA Role Play:
If dispatched to investigate
* Execute AOP-66 vibrations; wait 2 minutes,
* Notifiy crew of Reactor scram criteria then report you can feel vibrations on the Turbine Deck
* Notifiy crew of Reactor scram criteria then report you can feel vibrations on the Turbine Deck
* Ensure Main Turbine system engineer is notified but do not see any obvious
* Ensure Main Turbine system engineer is notified but do not see any obvious
* Determine MVARs already lowered to minimum cause.
* Determine MVARs already lowered to minimum cause.
* Coordinate with A TC to lower Recirc flow with RWR MG A(B) SPEED CNTRL
* Coordinate with A TC to lower Recirc flow with RWR MG A(B)
SPEED CNTRL
* Monitor Turbine vibrations
* Monitor Turbine vibrations
* Report Turbine vibrations are less than 9 mils LOI 14-2 NRC Examination Scenario 2 Page 13 of 28
* Report Turbine vibrations are less than 9 mils LOI 14-2 NRC Examination Scenario 2 Page 13 of 28
. . , INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Note: ATC SAT I UNSAT INA Once Reactor power is
 
* Lower Recirc flow with RWR MG A(B) SPEED CNTRL reduced to approximately 95%, Triggers 21 and 22
                                                                .                                               . ,
* Monitor APRMs , CTP , Recirc flow , Reactor water level activate to lower the Turbine vibrations.
INSTRUCTOR ACTIVITY           POSITION             OPERATOR ACTIONS/STANDARD                 COMMENTS I EVALUATION Note:                           ATC                                                               SAT I UNSAT INA Once Reactor power is reduced to approximately
Trigger 4 activates to initiate the next part of event 4. LOI 14-2 NRC Examination Scenario 2 Page 14 of 28 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 Continued BOP/ATC SAT I UNSAT INA Loss of Main Condenser
* Lower Recirc flow with RWR MG A(B) SPEED CNTRL 95% , Triggers 21 and 22
* Recognize I report annunciator 09-3-1-28 Offgas Recombiner vacuum Trouble Note:
* Monitor APRMs, CTP, Recirc flow, Reactor water level activate to lower the Turbine vibrations. Trigger 4 activates to initiate the next part of event 4.
* Recognize I report lowering Main Condenser vacuum This part of event 4 is automatically initiated when Reactor power is lowered < -95% in the previous part of the event. SRO SATIUNSAT/NA Note:
LOI 14-2 NRC Examination Scenario 2 Page 14 of 28
* Acknowledge reports A typical benchmark for
 
* Enter AOP-31 (Loss of Condenser Vacuum) directing a Reactor scram is a vacuum of 24.0" Hg.
INSTRUCTOR ACTIVITY         POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION Event 4 Continued             BOP/ATC                                                                 SAT I UNSAT INA Loss of Main Condenser vacuum
* Recognize I report annunciator 09-3-1-28 Offgas Recombiner Trouble Note:
* Recognize I report lowering Main Condenser vacuum This part of event 4 is automatically initiated when Reactor power is lowered <
-95% in the previous part of the event.
SRO                                                                     SATIUNSAT/NA Note:
* Acknowledge reports A typical benchmark for directing a Reactor scram is a
* Enter AOP-31 (Loss of Condenser Vacuum) vacuum of 24.0" Hg.
* Direct power reduction per RAP-7.3.16 to maintain Main Condenser vacuum within Normal Operating Region I
* Direct power reduction per RAP-7.3.16 to maintain Main Condenser vacuum within Normal Operating Region I
* Direct Reactor scram Note: BOP SAT I UNSAT INA If desired by lead examiner to
* Direct Reactor scram Note:                         BOP                                                                     SAT I UNSAT INA If desired by lead examiner to
* Execute AOP-31 expedite the vacuum loss in
* Execute AOP-31 expedite the vacuum loss in this event, Triggers 23 and/or
* Monitor Main Condenser vacuum this event, Triggers 23 and/or 24 may be manually inserted
* Monitor Main Condenser vacuum 24 may be manually inserted
* Trip Recombiner once the previous severity of malfunction MC01 is fully
* Trip Recombiner once the previous severity of malfunction MC01 is fully
* Trip H 2 addition ramped in.
* Trip H2 addition ramped in.
* Close 20LCV-958 Role Play:
* Close 20LCV-958
* Attempt to determine cause of vacuum degradation If dispatched to investigate
* Attempt to determine cause of vacuum degradation Role Play:
* Coordinate with ATC to lower Recirc flow with RWR MG A(B) Recombiner trouble alarm, SPEED CNTRL if Core Flow is >55% wait 2 minutes , then report that the alarm is caused by high Recombiner flow. LOI14-2 NRC Examination Scenario 2 Page 15 of 28
If dispatched to investigate
-INSTklJCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Note: ATC SAT/UNSAT/NA Once a Reactor scram is
* Coordinate with ATC to lower Recirc flow with RWR MG A(B)
* Lower Recirc flow with RWR MG A(B) SPEED CNTRL if Core attempted, a failure to scram Flow is >55%1nsert CRAM rods will occur. This is scripted in
Recombiner trouble alarm,                   SPEED CNTRL if Core Flow is >55%
* Depress manual Scram pushbuttons the next event.
wait 2 minutes, then report that the alarm is caused by high Recombiner flow.
* Place Mode Switch to Shutdown LOI 14-2 NRC Examination Scenario 2 Page 16 of 28 INSTklJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION I Events 6 1 7 1 & 8 ATC SAT I UNSAT INA Failure of RPS and ARI to
LOI14-2 NRC Examination Scenario 2 Page 15 of 28
* Recognize I report failure to scram Actuate, First SLC Squib Valve Fails to Fire, Second
 
* Manually initiate ARI SLC Pump Trips, Recirculation Pumps Fail to Automatically Trip, Main Generator Trip, Two Turbine Bypass Valves Fail Closed Critical Task #1 Given a failure to scram with Reactor power above 2.5%, the Pass I Fail crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
                                                                -
INSTklJCTOR ACTIVITY           POSITION             OPERATOR ACTIONS/STANDARD                   COMMENTS I EVALUATION Note:                           ATC                                                                 SAT/UNSAT/NA Once a Reactor scram is
* Lower Recirc flow with RWR MG A(B) SPEED CNTRL if Core attempted, a failure to scram               Flow is >55%1nsert CRAM rods will occur. This is scripted in the next event.
* Depress manual Scram pushbuttons
* Place Mode Switch to Shutdown LOI 14-2 NRC Examination Scenario 2 Page 16 of 28
 
INSTklJCTOR ACTIVITY                   POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION   I Events 61 71 & 8                       ATC                                                                     SAT I UNSAT INA Failure of RPS and ARI to Actuate, First SLC Squib
* Recognize I report failure to scram Valve Fails to Fire, Second
* Manually initiate ARI SLC Pump Trips, Recirculation Pumps Fail to Automatically Trip, Main Generator Trip, Two Turbine Bypass Valves Fail Closed Critical Task #1                                   Given a failure to scram with Reactor power above 2.5%, the   Pass I Fail crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Terminating and preventing all RPV injection except SLC, RCIC, and CRD
* Tripping Recirculation pumps Critical Task #1 Standard:
* Tripping Recirculation pumps Critical Task #1 Standard:                         Terminate and prevent all injection except SLC, RCIC and CRD per EP-5 And/or Trip Recirculation pumps
Terminate and prevent all injection except SLC, RCIC and CRD per EP-5 And/or Trip Recirculation pumps ----_, --
                      ---- _, -- -~-----                                                                                        .. ------
.. ------Critical Task #2 Given a failure to scram, the crew will initiate Control Rod Pass I Fail insertion, in accordance with EOP-3. Critical Task #2 Standard:
Critical Task #2                                   Given a failure to scram, the crew will initiate Control Rod Pass I Fail insertion, in accordance with EOP-3.
Perform EP-3 Backup Control Rod Insertion Actions to insert control rods. LOI 14-2 NRC Examination Scenario 2 Page 17 of 28 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT/UNSAT/NA Note:
Critical Task #2 Standard:                         Perform EP-3 Backup Control Rod Insertion Actions to insert control rods.
* Acknowledge report Malfunctions will:
LOI 14-2 NRC Examination Scenario 2 Page 17 of 28
* Enter EOP-2 (RPV Control) on Reactor power above 2.5% or 0 Trip the Main Generator unknown when a scram is required when Reactor power
 
* Determine the Reactor will NOT remain shutdown under all lowers to approximately conditions without boron I 42%
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS I EVALUATION SRO                                                                           SAT/UNSAT/NA
* Exit EOP-2 0 Fail closed two Turbine Bypass Valves when
* Acknowledge report Note:
* Enter EOP-3 (Failure to Scram) Reactor power lowers to
Malfunctions will:
* Direct EP-3 Failure to Scram Actions Critical Tasks #1 and #2 approximately 24%
* Enter EOP-2 (RPV Control) on Reactor power above 2.5% or unknown when a scram is required 0  Trip the Main Generator when Reactor power
* Direct bypassing MSIV low RPV water level isolation interlocks per EP-2
* Determine the Reactor will NOT remain shutdown under all lowers to approximately                 conditions without boron 42%                                                                                                                             I
* Direct terminate and prevent all injection except SLC, RCIC Critical Task #1 and CRD per EP-5
* Exit EOP-2 0   Fail closed two Turbine Bypass Valves when
* Enter EOP-3 (Failure to Scram)
Reactor power lowers to                                                                               Critical Tasks #1 and #2
* Direct EP-3 Failure to Scram Actions approximately 24%
* Direct bypassing MSIV low RPV water level isolation interlocks per EP-2 Critical Task #1
* Direct terminate and prevent all injection except SLC, RCIC and CRD per EP-5
* Direct RPV water level controlled between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI)
* Direct RPV water level controlled between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI)
* Direct Reactor pressure controlled 800-1000 psig with Turbine Bypass Valves and SRVs, as required LOI 14-2 NRC Examination Scenario 2 Page 18 of 28
* Direct Reactor pressure controlled 800-1000 psig with Turbine Bypass Valves and SRVs, as required LOI 14-2 NRC Examination Scenario 2 Page 18 of 28
" . . INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC SAT/UNSAT/NA
 
* Perform EP-3 Failure to Scram Actions 0 Ensure Rx Mode Switch in SHUTDOWN 0 Ensure ARI initiated 0 Run Recirc flow to minimum 0 Determine Rx power greater than 2.5% 0 Ensure Recirc pumps tripped Critical Task #1 0 Override ADS 0 Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0 Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0 Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0 Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on 0 Obtain CRS concurrence to inject SLC 0 Attempt to inject SLC Note: 0 Verify white SQUIB VLVS READY lights are on Due to failure of the SLC squib 0 Note level on TK LVL 11 Ll-66 valves to fire, pump discharge 0 Place SLC pup keylock switch in START SYS-A or pressure will be high (near START SYS-B 1500 psig) and tank level will Verify red SLC pump running light is on NOT lower. 0 0 Verify SLC pump discharge pressure on DISCH PRESS 11 Pl-65 is greater than or equal to RPV pressure --LOI 14-2 NRC Examination Scenario 2 Page 19 of 28 INSTRuCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC cont. SAT/UNSAT/NA 0 Verify the following: 0 CLN UP SUCT 12MOV-18 is closed 0 CLN UP RETURN ISOL VALVE 12MOV-69 is closed 0 Recognize I report failure of SLC pump to inject 0 Attempt to inject with other SLC pump 0 Recognize I report trip of second SLC pump
        "                                                                                                             . .
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                   COMMENTS I EVALUATION ATC                                                                   SAT/UNSAT/NA
* Perform EP-3 Failure to Scram Actions 0 Ensure Rx Mode Switch in SHUTDOWN 0 Ensure ARI initiated 0 Run Recirc flow to minimum 0 Determine Rx power greater than 2.5%
0 Ensure Recirc pumps tripped Critical Task #1 0 Override ADS 0   Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0   Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0   Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0   Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on 0 Obtain CRS concurrence to inject SLC 0 Attempt to inject SLC 0   Verify white SQUIB VLVS READY lights are on Note:
Due to failure of the SLC squib                 0   Note level on TK LVL 11 Ll-66 valves to fire, pump discharge                 0   Place SLC pup keylock switch in START SYS-A or pressure will be high (near                         START SYS-B 1500 psig) and tank level will NOT lower.                                      0  Verify red SLC pump running light is on 0   Verify SLC pump discharge pressure on DISCH PRESS 11 Pl-65 is greater than or equal to RPV pressure
                                                                -                                                     -
LOI 14-2 NRC Examination Scenario 2 Page 19 of 28
 
INSTRuCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD               COMMENTS I EVALUATION ATC cont.                                                             SAT/UNSAT/NA 0   Verify the following :
0   CLN UP SUCT 12MOV-18 is closed 0   CLN UP RETURN ISOL VALVE 12MOV-69 is closed 0   Recognize I report failure of SLC pump to inject 0 Attempt to inject with other SLC pump 0   Recognize I report trip of second SLC pump
* Insert IRMs and SRMs
* Insert IRMs and SRMs
* Range IRMs as necessary  
* Range IRMs as necessary
-LOI14-2 NRC Examination Scenario 2 Page 20 of 28 INSTkLICTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I EVALUATION Booth Operator:
                                          -
BOP SAT I UNSAT INA When directed to install MSIV Direct NPO to bypass MSIV low RPV water level isolation low water level jumpers, wait 2
LOI14-2 NRC Examination Scenario 2 Page 20 of 28
* minutes and run interlocks per EP-2 Section 5.1 MSIVLEVEL.cae.
 
* Terminate and prevent all injection except SLC, RCIC, and Critical Task #1 CRD per EP-5 0 Feedwater 0 If RFP A is running: 0 Ensure RFP A FLOW CNTRL 06-84A is in MAN 0 Lower RFP A FLOW CNTRL 06-84A to minimum 0 Ensure open RFP A MIN FLOW 34FCV-135A 0 If RFP B is running: 0 Ensure RFP B FLOW CNTRL 06-848 is in MAN 0 Lower RFP BFLOW CNTRL 06-848 to minimum 0 Ensure open RFP B MIN FLOW 34FCV-135B 0 Ensure closed: 0 RFP A DISCH 34MOV-100A 0 RFP B DISCH 34MOV-100B 0 Ensure FDWTR STARTUP VLV 34FCV-137 in MANUAL 0 Ensure closed FDWTR STARTUP VLV 34FCV-137 0 HPCI 0 Trip HPCI by depressing TURB TRIP 23A-S19 pushbutton LOI 14-2 NRC Examination Scenario 2 Page 21 of 28 INSTRUCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I BOP cont. 0 Core Spray Loop A SAT I UNSAT INA Note: 0 Place 14MOV-11A AUTO ACTUATION BYPASS SW 14A-S 16A switch in bypass RCIC is out of service as part Verify white 14MOV-11A AUTO ACTUATION BYPASS of the scenario setup, so RCIC 0 actions may not be taken. L T 14A-DS35A light is on 0 Ensure closed OUTBD INJ VLV 14MOV-11A 0 Ensure PMP 14P-1A is stopped 0 Core Spray Loop B 0 Place 14MOV-11 B AUTO ACTUATION BYPASS SW 14A-S16B switch in bypass 0 Verify white 14MOV-11B AUTO ACTUATION BYPASS L T 14A-DS35B light is on 0 Ensure closed OUTBD INJ VLV 14MOV-118 0 Ensure PMP 14P-1 B is stopped LOI 14-2 NRC Examination Scenario 2 Page 22 of 28 INSTRUCTOR ACTIVITY I POSITION I OPERA TOR ACTIONS/STANDARD I COMMENTS I EVALUATION BOP cont. SAT/UNSAT/NA 0 RHR Loop A Booth Operator:
INSTkLICTOR ACTIVITY I   POSITION I               OPERATOR ACTIONS/STANDARD                   I COMMENTS I EVALUATION Booth Operator:                   BOP                                                                       SAT I UNSAT INA When directed to install MSIV low water level jumpers, wait 2
Place 10MOV-27A AUTO CONTROL BYPASS 10A-0 If requested to disconnect S23A RHR timers, wait 2 minutes, then activate Trigger 19 and 0 Verify white light above 1 OMOV-27 A AUTO CONTROL report task completion. BYPASS 1 OA-S23A is on 0 Ensure closed LPCI OUTBD INJ VLV 10MOV-27A 0 Ensure RHR Loop A pumps which are not required to be running are stopped 0 RHR Loop B 0 Place 10MOV-27B AUTO CONTROL BYPASS 10A-S23B 0 Verify white light above 1 OMOV-27B AUTO CONTROL BYPASS 1 OA-S23B is on 0 Ensure closed LPCI OUTBD INJ VLV 10MOV-27B 0 Ensure RHR Loop B pumps which are not required to be running are stopped
* Direct NPO to bypass MSIV low RPV water level isolation minutes and run                                 interlocks per EP-2 Section 5.1 MSIVLEVEL.cae.
* Report RPV water level is less than 11 0" to CRS LOI 14-2 NRC Examination Scenario 2 Page 23 of 28 INSTklJCTOR ACTIVITY I POSITION I OPERA TOR ACTIONS/STANDARD I COMMENTS ,*EVALUATION BOP cont. SAT I UNSAT INA
* Terminate and prevent all injection except SLC, RCIC, and   Critical Task #1 CRD per EP-5 0   Feedwater 0   If RFP A is running:
* Control RPV water level between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI) 0 Feedwater 0 If any Reactor feed pump is running: 0 Ensure feedwater pump discharge pressure is less than RPV pressure by adjusting reactor feed pump speed 0 Lineup injection flow path by performing on or both of the following:
0   Ensure RFP A FLOW CNTRL 06-84A is in MAN 0   Lower RFP A FLOW CNTRL 06-84A to minimum 0   Ensure open RFP A MIN FLOW 34FCV-135A 0   If RFP B is running:
0 Adjusting FDWTR STARTUP VLV 34FCV-137 0 Ensure open or throttled open Reactor feed pump discharge valve for running pump (34MOV-100A or B) 0 Control feed flow to RPV by performing any of the _following:
0   Ensure RFP B FLOW CNTRL 06-848 is in MAN 0   Lower RFP BFLOW CNTRL 06-848 to minimum 0   Ensure open RFP B MIN FLOW 34FCV-135B 0   Ensure closed:
0 Adjust RFP speed 0 Adjust FDWTR STARTUP VLV 34FCV-137 0 Close feed pump discharge valves 0 If both Reactor feed pumps are shutdown, and feedwater discharge header pressure is greater than RPV pressure, then control feed flow to RPV by performing one or both of the following: 0 Throttling FDWTR STARTUP VLV 34FCV-137 0 Throttling one or both of the following valves, only if APRMs are on scale: 0 RFP A DISCH 34MOV-100A 0 RFP B DISCH 34MOV-100B LOI 14-2 NRC Examination Scenario 2 Page 24 of 28 INSTklJCTOR ACTIVITY I POSITION I ,. I COMMENTS ,*EVALUATION OPERATOR ACTIONS/STANDARD BOP cont. SAT I UNSAT INA 0 HPCI 0 Preparation for injection:
0   RFP A DISCH 34MOV-100A 0   RFP B DISCH 34MOV-100B 0   Ensure FDWTR STARTUP VLV 34FCV-137 in MANUAL 0   Ensure closed FDWTR STARTUP VLV 34FCV-137 0   HPCI 0   Trip HPCI by depressing TURB TRIP 23A-S19 pushbutton LOI 14-2 NRC Examination Scenario 2 Page 21 of 28
0 Ensure SGT is running per OP-20 0 Ensure open one of the following valves: 0 HPCI GLAND SEAL SUCT 01-125MOV-13A 0 HPCI GLAND SEAL SUCT 01-125MOV-13B 0 Ensure HPCI FLOW CNTRL 23FIC-108-1 setpoint is adjusted to minimum 0 Ensure HPCI FLOW CNTRL 23FIC-108-1 is in AUTO 0 Injection with initiation signal: 0 Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0 Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0 Verify HPCI auto-initiation 0 Control HPCI turbine speed in manual or automatic 0 Periodically verify HPCI turbine speed is greater than 21 00 rpm 0 Injection without initiation signal: 0 Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0 Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0 Ensure open OUTBD STM SUPP VLV 23MOV-16 0 Ensure GLAND SEAL CNDSR BLOWER 23P-140 is running -LOI14-2 NRC Examination Scenario 2 Page 25 of 28 INSTRUCTOR ACTIVITY I POSITION I OPERA TOR ACTIONS/STANDARD I COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA 0 HPCI cont. 0 Injection without initiation signal cont. 0 Ensure open TURB STM SUPP VLV 23MOV-14 0 Ensure AUX 01 L PMP 23P-150 is running 0 Open INJ VLV 23MOV-19 0 Ensure closed the following valves: o STM LINE DRAIN TO RADW 23AOV-42 o STM LINE DRAIN TO RADW 23AOV-43 o TEST VLV TO CST 23MOV-21 o HPCI & RCIC TEST VLV TO CST 23MOV-24 0 Control HPCI turbine speed in manual or automatic 0 Periodically verify HPCI turbine speed is greater than 21 00 rpm ! ATC SAT I UNSAT INA Booth Operator:
 
* Perform EP-3 Backup Control Rod Insertion Actions If requested to pull RPS fuses, Critical Task #2 wait 30 seconds and for lead 0 May de-energize scram solenoids per Subsection 5.2 examiner concurrence, then 0 Determine fuses to be pulled based on lit RPS Scram run SCRAMFUSEOUTB.cae Group lights and report task completion.
INSTRUCTOR ACTIVITY I   POSITION I           OPERATOR ACTIONS/STANDARD               I COMMENTS I EVA~UATION BOP cont.
0 Direct NPO to pull fuses 5A-F18B, 5A-F18F, 5A-F18D, If directed to vent Scram Air and 5A-F18H Header, wait 2 minutes and for 0 May direct NPO to vent scram air header per Subsection lead examiner concurrence, 5.3 then activate Trigger 20 and
0 Core Spray Loop A                               SAT I UNSAT INA 0 Place 14MOV-11A AUTO ACTUATION BYPASS SW Note:                                              14A-S 16A switch in bypass RCIC is out of service as part of the scenario setup, so RCIC                  0  Verify white 14MOV-11A AUTO ACTUATION BYPASS actions may not be taken.                         LT 14A-DS35A light is on 0 Ensure closed OUTBD INJ VLV 14MOV-11A 0 Ensure PMP 14P-1A is stopped 0 Core Spray Loop B 0 Place 14MOV-11 B AUTO ACTUATION BYPASS SW 14A-S16B switch in bypass 0 Verify white 14MOV-11B AUTO ACTUATION BYPASS LT 14A-DS35B light is on 0 Ensure closed OUTBD INJ VLV 14MOV-118 0 Ensure PMP 14P-1 B is stopped LOI 14-2 NRC Examination Scenario 2 Page 22 of 28
* Report all control rods are inserted report task completion. LOI 14-2 NRC Examination Scenario 2 Page 26 of 28
 
-INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT I UNSAT INA
INSTRUCTOR ACTIVITY I   POSITION I               OPERATOR ACTIONS/STANDARD                   I COMMENTS I EVALUATION BOP cont.                                                               SAT/UNSAT/NA 0 RHR Loop A Booth Operator:
Place 10MOV-27A AUTO CONTROL BYPASS 10A-If requested to disconnect                           S23A RHR timers, wait 2 minutes, then activate Trigger 19 and                     0   Verify white light above 1OMOV-27A AUTO CONTROL report task completion .                             BYPASS 1OA-S23A is on 0   Ensure closed LPCI OUTBD INJ VLV 10MOV-27A 0   Ensure RHR Loop A pumps which are not required to be running are stopped 0 RHR Loop B 0   Place 10MOV-27B AUTO CONTROL BYPASS 10A-S23B 0   Verify white light above 1OMOV-27B AUTO CONTROL BYPASS 1OA-S23B is on 0   Ensure closed LPCI OUTBD INJ VLV 10MOV-27B 0   Ensure RHR Loop B pumps which are not required to be running are stopped
* Report RPV water level is less than 11 0" to CRS LOI 14-2 NRC Examination Scenario 2 Page 23 of 28
 
INSTklJCTOR ACTIVITY I   POSITION I               OPERATOR ACTIONS/STANDARD                             I COMMENTS , *EVALUATION BOP cont.                                                                             SAT I UNSAT INA
* Control RPV water level between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI) 0 Feedwater 0   If any Reactor feed pump is running:
0   Ensure feedwater pump discharge pressure is less than RPV pressure by adjusting reactor feed pump speed 0   Lineup injection flow path by performing on or both of the following:
0   Adjusting FDWTR STARTUP VLV 34FCV-137 0   Ensure open or throttled open Reactor feed pump discharge valve for running pump (34MOV-100A or B) 0   Control feed flow to RPV by performing any of the
_following:
0   Adjust RFP speed 0   Adjust FDWTR STARTUP VLV 34FCV-137 0   Close feed pump discharge valves 0   If both Reactor feed pumps are shutdown, and feedwater discharge header pressure is greater than RPV pressure, then control feed flow to RPV by performing one or both of the following :
0   Throttling FDWTR STARTUP VLV 34FCV-137 0   Throttling one or both of the following valves, only if APRMs are on scale:
0   RFP A DISCH 34MOV-100A 0   RFP B DISCH 34MOV-100B LOI 14-2 NRC Examination Scenario 2 Page 24 of 28
 
                                                            ,.
INSTklJCTOR ACTIVITY I   POSITION I           OPERATOR ACTIONS/STANDARD                        I COMMENTS , *EVALUATION BOP cont.                                                                 SAT I UNSAT INA 0 HPCI 0 Preparation for injection:
0   Ensure SGT is running per OP-20 0   Ensure open one of the following valves:
0   HPCI GLAND SEAL SUCT 01-125MOV-13A 0   HPCI GLAND SEAL SUCT 01-125MOV-13B 0   Ensure HPCI FLOW CNTRL 23FIC-108-1 setpoint is adjusted to minimum 0   Ensure HPCI FLOW CNTRL 23FIC-108-1 is in AUTO 0 Injection with initiation signal:
0   Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0 Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0   Verify HPCI auto-initiation 0   Control HPCI turbine speed in manual or automatic 0   Periodically verify HPCI turbine speed is greater than 21 00 rpm 0 Injection without initiation signal:
0   Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0   Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0   Ensure open OUTBD STM SUPP VLV 23MOV-16 0   Ensure GLAND SEAL CNDSR BLOWER 23P-140 is running
                                                                        -
LOI14-2 NRC Examination Scenario 2 Page 25 of 28
 
INSTRUCTOR ACTIVITY I   POSITION I                 OPERATOR ACTIONS/STANDARD                       I COMMENTS I EVALUATION BOP cont.                                                                       SAT I UNSAT INA 0 HPCI cont.
0   Injection without initiation signal cont.
0   Ensure open TURB STM SUPP VLV 23MOV-14 0   Ensure AUX 01 L PMP 23P-150 is running 0   Open INJ VLV 23MOV-19 0   Ensure closed the following valves:
o STM LINE DRAIN TO RADW 23AOV-42 o STM LINE DRAIN TO RADW 23AOV-43 o TEST VLV TO CST 23MOV-21 o HPCI & RCIC TEST VLV TO CST 23MOV-24 0   Control HPCI turbine speed in manual or automatic 0   Periodically verify HPCI turbine speed is greater than 21 00 rpm
                                                                                                                                        !
ATC                                                                             SAT I UNSAT INA Booth Operator:
* Perform EP-3 Backup Control Rod Insertion Actions If requested to pull RPS fuses,                                                                                   Critical Task #2 wait 30 seconds and for lead                     0 May de-energize scram solenoids per Subsection 5.2 examiner concurrence, then                           0   Determine fuses to be pulled based on lit RPS Scram run SCRAMFUSEOUTB.cae                                   Group lights and report task completion.
0   Direct NPO to pull fuses 5A-F18B, 5A-F18F, 5A-F18D, and 5A-F18H If directed to vent Scram Air Header, wait 2 minutes and for                   0 May direct NPO to vent scram air header per Subsection lead examiner concurrence,                           5.3 then activate Trigger 20 and report task completion .
* Report all control rods are inserted LOI 14-2 NRC Examination Scenario 2 Page 26 of 28
 
          -
INSTRUCTOR ACTIVITY             POSITION                     OPERATOR ACTIONS/STANDARD                         COMMENTS I EVALUATION SRO                                                                               SAT I UNSAT INA
* Acknowledge report
* Acknowledge report
* Exit EOP-3
* Exit EOP-3
* Enter EOP-2
* Enter EOP-2
* Direct Reactor water level restored and maintained 177 -222.5" BOP SAT I UNSAT INA
* Direct Reactor water level restored and maintained 177-222 .5" BOP                                                                               SAT I UNSAT INA
* Begin restoring Reactor water level 177 -222.5" Termination Criteria:
* Begin restoring Reactor water level 177-222 .5" Termination Criteria:
* Control rods are being inserted or are all inserted.
* Control rods are being inserted or are all inserted.
* Reactor water level is being controlled above 0". LOI 14-2 NRC Examination Scenario 2 Page 27 of 28 IIVIENT 1 Shift Turnover The Plant is operating at approximately 1 00% power. Air Compressor B is out of service for maintenance.
* Reactor water level is being controlled above 0".
Main Generator reactive load is at minimum per Power Control request. When you take the shift, perform Core Spray A pump testing per ST-3PA, starting at step 8.7.6. LOI 14-2 NRC Examination Scenario 2 Page 28 of 28 Appendix D Scenario Outline Form ES-D-1 Facility:
LOI 14-2 NRC Examination Scenario 2 Page 27 of 28
James A. Fitzpatrick Scenario No.: NRC-3 Op-Test No.: 14-2 Examiners: Operators:
 
Initial Conditions:
IIVIENT 1 Shift Turnover The Plant is operating at approximately 100% power.
The plant is operating at approximately 100% power. Air Compressor B is out of service for maintenance. Turnover:
Air Compressor B is out of service for maintenance.
Swap RBCLC pumps per OP-40 section G.1. Then lower Reactor power to 95% using Recirculation flow. Event Malf. Event Event No. No. Type* Description N-Swap RBCLC Pumps 1 N/A BOP, SRO OP-40 R-Lower Reactor Power to 95% Using Recirculation Flow 2 N/A ATC, SRO OP-27 Recirc Flow Unit Failure 3 RR23: B I-AII OP-16 , Technical Specifications C-Electrical Fault on Bus L-15 4 ED21: A BOP, SRO AOP-18A , Technical Specifications C-SRV C Inadvertently Opens 5 AD06: C BOP , SRO AOP-36 AD06: C SRV C Re-Opens , SRV Tailpipe Break Into Torus Airspace 6 M-All MS16:G AOP-36 , AOP-1 I EOP-2 , EOP-4 7 TC11 1-ATC , Main Turbine Fails to Trip SRO AOP-1 RH01 C-RHR Pump Trip , RHR Pump Suction Valve Fails Closed, RHRSW 8 Remotes BOP, Crossties Fail Closed Overrides SRO EOP-4 , EOP-2 * (N)ormal, (R)eactivity , (l)nstrument , (C)omponent , (M)ajor Facility: James A. Fitzpatrick Scenario No.: NRC-3 Op-Test No.: 14-2 1. Total malfunctions (5-8) 6 Events 3, 4, 5, 6, 7, 8 2. Malfunctions after EOP entry (1-2) 2 Events 7 & 8 3. Abnormal events (2-4) 2 Events 4 & 5 4. Major transients (1-2) 1 EventS 5. EOPs entered/requiring substantive actions (1-2) 2 EOP-2, EOP-4 6. EOP contingencies requiring substantive actions (0-2) 1 EOP-2 Emergency Depress Leg 7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:
Main Generator reactive load is at minimum per Power Control request.
CT-1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4. CT-2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4.
When you take the shift, perform Core Spray A pump testing per ST-3PA, starting at step 8.7.6.
TITLE: SCENARIO NUMBER: PATH: JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 3 L0114-2 NRC EXAMINATION SCENARIO 3 NRC 3 STAND ALONE Validation: Training:
LOI 14-2 NRC Examination Scenario 2 Page 28 of 28
CANDIDATES CRS ATC BOP LOI 14-2 NRC Examinat i on Scenario 3 Page 1 of 25 RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/15/14 LOI 14-2 NRC Exam New Scenario T. Hooper () LOI 14-2 NRC Examination Scenario 3 Page 2 of 25 A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 3 B. SCENARIO SETUP: 1. IC-63 2. Special Instructions:
 
: a. The Plant is operating at approximately 1 00% power. b. Air Compressor B is out of service for maintenance.
Appendix D                                       Scenario Outline                           Form ES-D-1 Facility: James A. Fitzpatrick           Scenario No.: NRC-3                     Op-Test No.: 14-2 Examiners:                                             Operators:
: 3. Preset Conditions
Initial Conditions: The plant is operating at approximately 100% power. Air Compressor B is out of service for maintenance.
: a. Trigger 1, M:RR23:B, Recirculation Flow Unit B Fails, 0% b. Trigger 2, M:ED21 :A, 600VAC Emerg Bus 11500 Failure c. Trigger 3, M:AD06:C, Rx Press Relief Valve (C-Inadvertently Opens) d. Trigger 4, O:AN941 : 08, ADS CNTRL PWR FAIL, on e. Trigger 4, O:AD ZL0271C(1), SRV C Green Light, off f. Trigger 4, O:AD ZL0271 C(2), SRV C White Light, off g. Trigger 4, O:AD ZL0271 C(3), SRV C Red Light, off h. Preset, M:TC11, Main Turbine Auto Trip Failure i. Trigger 6, M:RH01 :B, RHR Pump B Trip, Delay=90 seconds j. Trigger 6, M:RH01 :D, RHR Pump D Trip, Delay=1 05 seconds k. Trigger 6, M:MS16:C, ADS Discharge Line (2E-RV2-71C), Delay=1 minute, Ramp=5 minutes, 100% I. Trigger 25, R:AD07: C, 'C' SRV Isolation Switch at Remote Panel, Local m. Trigger 26, R:AD02:C, 'C' SRV Fuse Pull Out, Out n. Trigger27, O:AN941:18, REMOTE SHUTDOWN PNL DOOR OPEN, on o. Trigger 22, R:SW46A, Manual Operation of 10MOV148A, 0% p. Trigger 23, R:SW46D, Manual Operation of 10MOV149B, 0% q. Trigger 22, O:SW ZL010AS49A(1), Service Wtr Crosstie Valve, Off r. Trigger 22, O:SW ZL01 OAS49A(2), Service Wtr Crosstie Valve, Off s. Trigger 23, O:SW ZL010AS50B(1), Service Wtr Crosstie Valve, Off t. Trigger 23, O:SW ZL010AS50B(2), Service Wtr Crosstie Valve, Off u. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off v. Event Trigger 4, Action: None, Command: mrf ad02:c in w. Event Trigger 6, Action: (zlo5ads8a  
Turnover: Swap RBCLC pumps per OP-40 section G.1. Then lower Reactor power to 95% using Recirculation flow.
== 0) && (zlo5ads8b  
Event         Malf.     Event                                         Event No.         No.       Type*                                     Description N-       Swap RBCLC Pumps 1           N/A         BOP, SRO       OP-40 R-       Lower Reactor Power to 95% Using Recirculation Flow 2           N/A         ATC, SRO       OP-27 Recirc Flow Unit Failure 3         RR23:B       I-AII OP-16, Technical Specifications C-         Electrical Fault on Bus L-15 4         ED21 :A       BOP, SRO       AOP-18A, Technical Specifications C-         SRV C Inadvertently Opens 5         AD06 :C       BOP, SRO       AOP-36 AD06 :C                   SRV C Re-Opens , SRV Tailpipe Break Into Torus Airspace 6                     M-All MS16:G                   AOP-36 , AOP-1 EOP-2 , EOP-4 I
== 0), Command: None x. Event Trigger 16, Action: zlo10as4b(2)==0, Command: dmf rh10:b y. Event Trigger 17, Action: zlo10as4d(2)==0, Command: dmf rh10:b z. Event Trigger 22, Action: zdi1 Oas49a==1, Command: None aa. Event Trigger 23, Action: zdi1 Oas50b==1, Command: None 4. Consumable Forms and Procedures
1-ATC,       Main Turbine Fails to Trip 7          TC11 SRO       AOP-1 RH01                     RHR Pump Trip, RHR Pump Suction Valve Fails Closed, RHRSW C-8       Remotes       BOP,       Crossties Fail Closed SRO         EOP-4, EOP-2 Overrides
: + AOP-1 + AOP-18A + AOP-36 LOI14-2 NRC Examination Scenario 3 Page 3 of 25 C. SCENARIO  
*         (N)ormal,   (R)eactivity, (l)nstrument,   (C)omponent,   (M)ajor
 
Facility: James A. Fitzpatrick               Scenario No.: NRC-3 Op-Test No.: 14-2
: 1. Total malfunctions (5-8)                                   6 Events 3, 4, 5, 6, 7, 8
: 2. Malfunctions after EOP entry (1-2)                         2 Events 7 & 8
: 3. Abnormal events (2-4)                                       2 Events 4 & 5
: 4. Major transients (1-2)                                     1 EventS
: 5. EOPs entered/requiring substantive actions (1-2)           2 EOP-2, EOP-4
: 6. EOP contingencies requiring substantive actions (0-2)       1 EOP-2 Emergency Depress Leg
: 7. Critical tasks (2-3)                                       2 CRITICAL TASK DESCRIPTIONS:
CT-1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4.
CT-2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4.
 
JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 3 TITLE:                                  L0114-2 NRC EXAMINATION SCENARIO 3 SCENARIO NUMBER:                        NRC 3 PATH:                                  STAND ALONE Validation: .--Z~,te ') ~      Training: tfl~            Operatlon~4~',z&#xa3;/
CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 3 Page 1 of 25
 
RECORD OF CHANGES SOURCE OF             BRIEF DESCRIPTION OF DATE           CHANGE                       CHANGE       INITIATOR REVIEWED 5/15/14     LOI 14-2 NRC Exam     New Scenario             T. Hooper
()
LOI 14-2 NRC Examination Scenario 3 Page 2 of 25
 
A. TITLE:               LOI14-2 NRC EXAMINATION SCENARIO 3 B. SCENARIO SETUP:
: 1. IC-63
: 2. Special Instructions:
: a. The Plant is operating at approximately 100% power.
: b. Air Compressor B is out of service for maintenance.
: 3. Preset Conditions:
: a. Trigger 1, M:RR23:B, Recirculation Flow Unit B Fails, 0%
: b. Trigger 2, M:ED21 :A, 600VAC Emerg Bus 11500 Failure
: c. Trigger 3, M:AD06:C, Rx Press Relief Valve (C- Inadvertently Opens)
: d. Trigger 4, O:AN941 :08, ADS CNTRL PWR FAIL, on
: e. Trigger 4, O:AD ZL0271C(1), SRV C Green Light, off
: f. Trigger 4, O:AD ZL0271 C(2), SRV C White Light, off
: g. Trigger 4, O:AD ZL0271 C(3), SRV C Red Light, off
: h. Preset, M:TC11, Main Turbine Auto Trip Failure
: i. Trigger 6, M:RH01 :B, RHR Pump B Trip, Delay=90 seconds
: j. Trigger 6, M:RH01 :D, RHR Pump D Trip, Delay=1 05 seconds
: k. Trigger 6, M:MS16:C, ADS Discharge Line (2E-RV2-71C), Delay=1 minute, Ramp=5 minutes, 100%
I. Trigger 25, R:AD07:C, 'C' SRV Isolation Switch at Remote Panel, Local
: m. Trigger 26, R:AD02:C, 'C' SRV Fuse Pull Out, Out
: n. Trigger27, O:AN941:18, REMOTE SHUTDOWN PNL DOOR OPEN, on
: o. Trigger 22, R:SW46A, Manual Operation of 10MOV148A, 0%
: p. Trigger 23, R:SW46D, Manual Operation of 10MOV149B, 0%
: q. Trigger 22, O:SW ZL010AS49A(1), Service Wtr Crosstie Valve, Off
: r. Trigger 22, O:SW ZL01 OAS49A(2), Service Wtr Crosstie Valve, Off
: s. Trigger 23, O:SW ZL010AS50B(1), Service Wtr Crosstie Valve, Off
: t. Trigger 23, O:SW ZL010AS50B(2), Service Wtr Crosstie Valve, Off
: u. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off
: v. Event Trigger 4, Action: None, Command: mrf ad02:c in
: w. Event Trigger 6, Action: (zlo5ads8a == 0) && (zlo5ads8b == 0), Command: None
: x. Event Trigger 16, Action: zlo10as4b(2)==0, Command: dmf rh10:b
: y. Event Trigger 17, Action: zlo10as4d(2)==0, Command: dmf rh10:b
: z. Event Trigger 22, Action: zdi1 Oas49a==1, Command: None aa. Event Trigger 23, Action: zdi1 Oas50b==1, Command: None
: 4. Consumable Forms and Procedures:
            + AOP-1
            + AOP-18A
            + AOP-36 LOI14-2 NRC Examination Scenario 3 Page 3 of 25
 
C.       SCENARIO  


==SUMMARY==
==SUMMARY==
: The scenario will begin at approximately 100% power with Air Compressor B out of service for maintenance. The crew will begin the shift by starting RBCLC pump A and securing RBCLC pump C for normal equipment rotation. Next the crew will lower Reactor power to approximately 95% using Recirculation flow. Recirculation flow unit B will fail downscale.
:
This will result in a rod block and half scram. The SRO will determine the Technical Specification impact. The crew will bypass Recirculation flow unit Band reset the half scram. An electrical fault will develop on Bus L-15. The crew will execute AOP-18A, Loss of Switchgear L 15. The crew will start Standby Gas Treatment train B and isolate normal Reactor Building Ventilation.
The scenario will begin at approximately 100% power with Air Compressor B out of service for maintenance.
Multiple important loads will be lost , including RHR A Containment spray/cooling valves , Core Spray A injection valves, and SLC pump A. The SRO will determine the Technical Specification impact. SRV C will inadvertently open. The crew will execute AOP-36, Stuck Open Relief Valve(s). The crew will take actions to close SRV C. The valve will close when the isolation switch in the field is manipulated.
The crew will begin the shift by starting RBCLC pump A and securing RBCLC pump C for normal equipment rotation . Next the crew will lower Reactor power to approximately 95% using Recirculation flow.
The crew will place Torus cooling in service on RHR loop B. RHR loop A will be unavailable from the earlier loss of Bus L 15. SRV C will re-open due to mechanical failure. The crew will execute AOP-36 , Stuck Open Relief Valve(s). The crew will take actions to close SRV C , but the valve will not close. The crew may lower Reactor power in anticipation of a Reactor scram. The crew will execute EOP-4 , Primary Containment Control, and EOP-2, RPV Control. The crew will manually scram the Reactor per AOP-1, Reactor Scram, before Torus water temperature reaches 11 0&deg;F. Following the scram , the Main Turbine will fail to automatically trip. The crew " will execute guidance in AOP-1 to manually trip the Main Turbine. The SRV C tailpipe will develop a break in the Torus airspace.
Recirculation flow unit B will fail downscale. This will result in a rod block and half scram. The SRO will determine the Technical Specification impact. The crew will bypass Recirculation flow unit Band reset the half scram.
This will result in rising Containment pressures and temperatures.
An electrical fault will develop on Bus L-15. The crew will execute AOP-18A, Loss of Switchgear L 15. The crew will start Standby Gas Treatment train B and isolate normal Reactor Building Ventilation. Multiple important loads will be lost, including RHR A Containment spray/cooling valves, Core Spray A injection valves, and SLC pump A. The SRO will determine the Technical Specification impact.
The crew will attempt to control Containment conditions by initiating Torus and Drywell spray. RHR loop A will be unavailable for sprays due to the earlier loss of L-15. RHR pumps B and D will trip , resulting in loss of the ability to spray with RHR. The crew will attempt to spray using RHR Service Water. Loop A will be unavailable due to the earlier loss of Bus L 15. Loop B will be unavailable due to failure of one of the crosstie valves to open. With no Torus and Drywell spray capability, Containment conditions will exceed the Pressure Suppression Pressure. The crew will execute and Emergency RPV Depressurization. The scenario will be terminated when all control rods are inserted , the Emergency RPV Depressurization is in progress , and Reactor water level is controlled above 0". LOI 14-2 NRC Examination Scenario 3 Page 4 of 25 Shift Turnover The Plant is operating at approximately 1 00% power. Air Compressor B is out of service for maintenance.
SRV C will inadvertently open. The crew will execute AOP-36, Stuck Open Relief Valve(s) . The crew will take actions to close SRV C. The valve will close when the isolation switch in the field is manipulated. The crew will place Torus cooling in service on RHR loop B. RHR loop A will be unavailable from the earlier loss of Bus L 15.
When you take the shift: 1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1. 2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.
SRV C will re-open due to mechanical failure . The crew will execute AOP-36, Stuck Open Relief Valve(s) .
LOI 14-2 NRC Examination Scenario 3 Page 5 of 25 Critical Tasks/Standards Critical Task #1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4. Critical Task #2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4. LOI 14-2 NRC Examination Scenario 3 Page 6 of 25 EVENT NO. EVENT SEQUENCE 1. Swap RBCLC Pumps (Normal: BOP, SRO) 2. Lower Reactor Power to 95% (Reactivity:
The crew will take actions to close SRV C, but the valve will not close . The crew may lower Reactor power in anticipation of a Reactor scram . The crew will execute EOP-4, Primary Containment Control, and EOP-2, RPV Control. The crew will manually scram the Reactor per AOP-1, Reactor Scram, before Torus water temperature reaches 11 0&deg;F. Following the scram, the Main Turbine will fail to automatically trip. The crew "will execute guidance in AOP-1 to manually trip the Main Turbine.
ATC, SRO) Using Recirculation Flow 3. Recirc Flow Unit Failure (Instrument:
The SRV C tailpipe will develop a break in the Torus airspace. This will result in rising Containment pressures and temperatures. The crew will attempt to control Containment conditions by initiating Torus and Drywell spray. RHR loop A will be unavailable for sprays due to the earlier loss of L-15. RHR pumps B and D will trip, resulting in loss of the ability to spray with RHR. The crew will attempt to spray using RHR Service Water. Loop A will be unavailable due to the earlier loss of Bus L 15. Loop B will be unavailable due to failure of one of the crosstie valves to open. With no Torus and Drywell spray capability, Containment conditions will exceed the Pressure Suppression Pressure. The crew will execute and Emergency RPV Depressurization .
All) (Tech Spec: SRO) 4. Electrical Fault on Bus L-15 (Component:
The scenario will be terminated when all control rods are inserted, the Emergency RPV Depressurization is in progress, and Reactor water level is controlled above 0".
BOP, SRO) (Tech Spec: SRO) 5. SRV C Inadvertently Opens (Component:
LOI 14-2 NRC Examination Scenario 3 Page 4 of 25
BOP, SRO) 6. SRV C Re-Opens, SRV Tailpipe (Major: All) Break Into Torus Airspace 7. Main Turbine Fails to Trip (Instrument:
 
ATC, SRO) ,) 8. RHR Pump Trip, RHR Pump Suction Valve (Component:
Shift Turnover The Plant is operating at approximately 100% power.
BOP, SRO) Fails Closed, RHRSW Crossties Fail Closed D. TERMINATION CUES:
Air Compressor B is out of service for maintenance.
When you take the shift:
: 1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1.
: 2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.
LOI 14-2 NRC Examination Scenario 3 Page 5 of 25
 
Critical Tasks/Standards Critical Task #1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4.
Critical Task #2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4.
LOI 14-2 NRC Examination Scenario 3 Page 6 of 25
 
EVENT NO.                                       EVENT SEQUENCE
: 1.         Swap RBCLC Pumps                               (Normal: BOP, SRO)
Lower Reactor Power to 95%                     (Reactivity: ATC, SRO)
: 2.        Using Recirculation Flow Recirc Flow Unit Failure                       (Instrument: All) 3.
(Tech Spec: SRO)
Electrical Fault on Bus L-15                   (Component: BOP, SRO) 4.
(Tech Spec: SRO)
: 5.         SRV C Inadvertently Opens                       (Component: BOP, SRO)
SRV C Re-Opens, SRV Tailpipe                   (Major: All) 6.
Break Into Torus Airspace
: 7.         Main Turbine Fails to Trip                     (Instrument: ATC, SRO)
,)     8.
RHR Pump Trip, RHR Pump Suction Valve           (Component: BOP, SRO)
Fails Closed, RHRSW Crossties Fail Closed D. TERMINATION CUES:
* All control rods are inserted
* All control rods are inserted
* Emergency RPV Depressurization is in progress
* Emergency RPV Depressurization is in progress
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 7 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1) After the shift turnover, allow All no more than five minutes for panel walkdown
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 7 of 25
* Walkdown the control panels and assume the watch Event1 SRO SAT/UNSATINA Swap RBCLC Pumps
 
INSTRUCTOR ACTIVITY             POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)
After the shift turnover, allow All no more than five minutes for panel walkdown
* Walkdown the control panels and assume the watch Event1                         SRO                                                                     SAT/UNSATINA Swap RBCLC Pumps
* Perform Crew Brief
* Perform Crew Brief
* Direct BOP to start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1 BOP SAT I UNSAT INA Role Play:
* Direct BOP to start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1 BOP                                                                     SAT I UNSAT INA Role Play:
* Start RBCLC pump A If dispatched to perform any
* Start RBCLC pump A If dispatched to perform any pump checks, immediately
* Verify RBCLC pump motor current is LESS THAN pump checks, immediately maximum normal amps report that the requested
* Verify RBCLC pump motor current is LESS THAN maximum normal amps report that the requested pump checks are SAT.
* Place and hold control switch for RBCLC pump C in pump checks are SAT. STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch
* Place and hold control switch for RBCLC pump C in STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch
* Verify RBCLC pump motor current for the running RBCLC pumps is LESS THAN maximum normal amps LOI 14-2 NRC Examination Scenario 3 Page 8 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event2 SRO SAT I UNSAT INA Lower Reactor Power to 95%
* Verify RBCLC pump motor current for the running RBCLC pumps is LESS THAN maximum normal amps LOI 14-2 NRC Examination Scenario 3 Page 8 of 25
* Direct ATC to lower power to 95% with Recirc flow Using Recirculation Flow
 
* Provide oversight for reactivity manipulation ATC SAT I UNSAT INA
INSTRUCTOR ACTIVITY           POSITION             OPERATOR ACTIONS/STANDARD                 COMMENTS/EVALUATION Event2                       SRO                                                               SAT I UNSAT INA Lower Reactor Power to 95%
* Lower Recirc flow alternately with RWR MG A(B) SPEED ' CNTRL
Using Recirculation Flow
* Monitor APRMs, CTP, Recirc flow, Reactor water level BOP SAT I UNSAT INA
* Direct ATC to lower power to 95% with Recirc flow
* Assist ATC with peer checks and plant monitoring LOI 14-2 NRC Examination Scenario 3 Page 9 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event3 ATC SAT I UNSAT INA On Lead Examiner Cue:
* Provide oversight for reactivity manipulation ATC                                                               SAT I UNSAT INA
* Recognize I report multiple annunciators, including 09-5-2-25, ACTIVATE TRIGGER 1 FLOW REF OFF NORM Recirc Flow Unit Failure
* Lower Recirc flow alternately with RWR MG A(B) SPEED CNTRL                                                  '
* Monitor APRMs, CTP, Recirc flow, Reactor water level BOP                                                               SAT I UNSAT INA
* Assist ATC with peer checks and plant monitoring LOI 14-2 NRC Examination Scenario 3 Page 9 of 25
 
INSTRUCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD                           COMMENTS/EVALUATION Event3                       ATC                                                                           SAT I UNSAT INA On Lead Examiner Cue:
* Recognize I report multiple annunciators, including 09-5-2-25, ACTIVATE TRIGGER 1                         FLOW REF OFF NORM Recirc Flow Unit Failure
* Recognize I report APRMs 8, D, and F indicate normally but have an upscale trip
* Recognize I report APRMs 8, D, and F indicate normally but have an upscale trip
* Recognize I report half scram SRO SAT I UNSAT INA
* Recognize I report half scram SRO                                                                           SAT I UNSAT INA
* Acknowledge report
* Acknowledge report
* Direct ARP response
* Direct ARP response
* Direct bypassing Recirc flow unit 8 per OP-16
* Direct bypassing Recirc flow unit 8 per OP-16
* Direct reset of half scram
* Direct reset of half scram
* Determine one of two required channels of Technical Specification Table 3.3.1.1-1 Function 2b is not operable with an inoperable Recirc flow unit
* Determine one of two required channels of Technical Specification Table 3.3.1 .1-1 Function 2b is not operable with an inoperable Recirc flow unit
* Determine Technical Specification 3.3.1.1 Condition A must be entered (place channel in trip or place associated trip system in trip within 12 hours)
* Determine Technical Specification 3.3.1 .1 Condition A must be entered (place channel in trip or place associated trip system in trip within 12 hours)
* Determine one of four required channels of TRM Table T3.3.8-1 Function 1 b is not operable with an inoperable Recirc flow unit
* Determine one of four required channels of TRM Table T3.3.8-1 Function 1b is not operable with an inoperable Recirc flow unit
* Determine TRM 3.3.8 Condition A must be entered (restore inoperable channel within 7 days) LOI 14-2 NRC Examination Scenario 3 Page 10 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT/UNSAT/NA
* Determine TRM 3.3.8 Condition A must be entered (restore inoperable channel within 7 days)
* Coordinate with BOP to bypass Recirc flow unit 8 per OP-16 Section E.21: 0 Place RWR FLOW UNIT BYP switch in 8 0 Verify the following FLOW UNIT indications:
LOI 14-2 NRC Examination Scenario 3 Page 10 of 25
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                           COMMENTS/EVALUATION ATC                                                                           SAT/UNSAT/NA
* Coordinate with BOP to bypass Recirc flow unit 8 per OP-16 Section E.21:
0   Place RWR FLOW UNIT BYP switch in 8 0   Verify the following FLOW UNIT indications:
* Associated BYPASS indicating light is on
* Associated BYPASS indicating light is on
* Associated UPSC OR INOP light is off
* Associated UPSC OR INOP light is off
* Associated COMPAR light is off SAT I UNSAT INA 0 Verify BYPASS light is off for other flow unit channel on same side 0 Verify white BYP light in on at top of panel 09-14 for FLOW UNITS 0 IF a flow unit is declared inoperable, THEN one of the two required APRM Neutron Flux-High (flow biased) Channels in the associated trip system must be considered inoperable 0 Coordinate with BOP to place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14
* Associated COMPAR light is off                           SAT I UNSAT INA 0   Verify BYPASS light is off for other flow unit channel on same side 0   Verify white BYP light in on at top of panel 09-14 for FLOW UNITS 0   IF a flow unit is declared inoperable, THEN one of the two required APRM Neutron Flux-High (flow biased) Channels in the associated trip system must be considered inoperable 0   Coordinate with BOP to place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14
* Reset half scram per ARP: ' 0 Place RX SCRAM RESET switch to GROUP 2 & 3, then to GROUP 1 & 4, spring return to NORM 0 Verify RPS 8 SCRAM GROUPS 1, 2, 3, and 4 lights are on BOP SAT I UNSAT INA
* Reset half scram per ARP:
                                  '             0   Place RX SCRAM RESET switch to GROUP 2 & 3, then to GROUP 1 & 4, spring return to NORM 0   Verify RPS 8 SCRAM GROUPS 1, 2, 3, and 4 lights are on BOP                                                                           SAT I UNSAT INA
* Assist ATC with actions and/or plant monitoring, as required
* Assist ATC with actions and/or plant monitoring, as required
* Place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14 LOI 14-2 NRC Examination Scenario 3 Page 11 of 25 INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event4 BOPIATC SAT I UNSAT INA On Lead Examiner Cue: Recognize I report multiple annunciators ACTIVATE TRIGGER 2
* Place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14 LOI 14-2 NRC Examination Scenario 3 Page 11 of 25
* Electrical Fault on Bus L-15
 
* Recognize I report loss of L-15 SRO SAT I UNSAT INA
INSTRUCTOR ACTIVITY             POSITION               OPERATOR ACTIONS/STANDARD                             COMMENTS/EVALUATION Event4                         BOPIATC                                                                     SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 2
* Recognize I report multiple annunciators Electrical Fault on Bus L-15
* Recognize I report loss of L-15 SRO                                                                         SAT I UNSAT INA
* Acknowledge reports
* Acknowledge reports
* Enter AOP-18A, Loss of Switchgear L 15
* Enter AOP-18A, Loss of Switchgear L 15
* Enters I exits EOP-5, Secondary Containment Control, due to Reactor Building DIP
* Enters I exits EOP-5, Secondary Containment Control, due to Reactor Building DIP
* Determine operability is affected for Core Spray, RHR, SLC, PCIS, MSLCS, LPCI MOV IPS, and SGT
* Determine operability is affected for Core Spray, RHR, SLC, PCIS, MSLCS, LPCI MOV IPS, and SGT
* Determine most limiting Technical Specification entry is LCO 3.8.7 Condition A, which requires restoring L-15 to operable status within 8 hours BOP SAT I UNSAT INA I Role Play: If dispatched to investigate,
* Determine most limiting Technical Specification entry is LCO 3.8.7 Condition A, which requires restoring L-15 to operable status within 8 hours BOP                                                                         SAT I UNSAT INA Role Play:                                                                                                                       I
* Execute AOP-18A, Loss of Switchgear L 15 wait 2 minutes, then report 0 Attempt to maintain drywell pressure by controlling drywell that the L-15 supply breaker temperature as follows: (11502) is tripped and appears
* Execute AOP-18A, Loss of Switchgear L 15 If dispatched to investigate, wait 2 minutes, then report                 0   Attempt to maintain drywell pressure by controlling drywell that the L-15 supply breaker                   temperature as follows:
* Ensure running Drywell Cooling Fans 68FN-2B, 2D, to be damaged. 4B, 4D
(11502) is tripped and appears
* Ensure running Drywell Cooling Fans 68FN-2B, 2D, to be damaged.                                     4B, 4D
* Consider initiating Torus Vent per OP-37
* Consider initiating Torus Vent per OP-37
* Consider lowering RBC temperature below normal ------LOI 14-2 NRC Examination Scenario 3 Page 12 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP cont. SAT/UNSAT/NA 0 Isolate Reactor Building Ventilation as follows: 0 Ensure running, Standby Treatment System "B" per OP-20
* Consider lowering RBC temperature below normal
-         --                                       ---
LOI 14-2 NRC Examination Scenario 3 Page 12 of 25
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                           COMMENTS/EVALUATION BOP cont.                                                                   SAT/UNSAT/NA 0   Isolate Reactor Building Ventilation as follows:
0   Ensure running, Standby Treatment System "B" per OP-20
* Open BELOW EL 369' SUCT 01-125MOV-12
* Open BELOW EL 369' SUCT 01-125MOV-12
* Open TRAIN B INLET 01-125MOV-14B 0 Depress RB VENT ISOL B pushbutton at 09-75 0 Verify Reactor Building Isolation per Section G of OP-51A, refer to Attachment 1 for de-energized valves 0 Refer to Attachment 1 for affected loads 0 Refer to Attachment 2 for multiple alarms associated with L151oads 0 Consider shutting down the following systems:
* Open TRAIN B INLET 01-125MOV-14B 0   Depress RB VENT ISOL B pushbutton at 09-75 0   Verify Reactor Building Isolation per Section G of OP-51A, refer to Attachment 1 for de-energized valves 0   Refer to Attachment 1 for affected loads 0   Refer to Attachment 2 for multiple alarms associated with L151oads 0   Consider shutting down the following systems:
* RWCU System
* RWCU System
* Fuel Pool Cooling System 0 Direct Electricians to measure "A" LPCI Inverter Battery 71 BAT-3a parameters every 4 hours -LOI 14-2 NRC Examination Scenario 3 Page 13 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Event 5 BOPIATC SAT I UNSAT INA On Lead Examiner Cue:
* Fuel Pool Cooling System 0   Direct Electricians to measure "A" LPCI Inverter Battery 71 BAT-3a parameters every 4 hours
* Recognize I report annunciators
                                                                                                                              -
: ACTIVATE TRIGGER 3 SRV C Inadvertently Opens 0 09-4-1-16, SRV Leaking 0 09-4-2-6, SRV Sonic Man Alarm Hi
LOI 14-2 NRC Examination Scenario 3 Page 13 of 25
* Recognize I report SRV C open Note: SRO SAT I UNSAT INA RHR loop A is unavailable for
 
INSTRUCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD                       COMMENTS/EVALUATION Event 5                       BOPIATC                                                                   SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 3
* Recognize I report annunciators:
SRV C Inadvertently Opens                 0   09-4-1-16, SRV Leaking 0   09-4-2-6, SRV Sonic Man Alarm Hi
* Recognize I report SRV C open Note:                         SRO                                                                       SAT I UNSAT INA RHR loop A is unavailable for
* Acknowledge report Torus Cooling due to loss of Bus L-15.
* Acknowledge report Torus Cooling due to loss of Bus L-15.
* Enter AOP-36, Stuck Open Relief Valve
* Enter AOP-36, Stuck Open Relief Valve
* If Torus water temperature exceeds 95&deg;F or Torus water level exceeds 14.0 feet, enter EOP-4 , Primary Containment Control
* If Torus water temperature exceeds 95&deg;F or Torus water level exceeds 14.0 feet, enter EOP-4, Primary Containment Control
* Direct initiation of Torus Cooling
* Direct initiation of Torus Cooling
* Determine SRV C is inoperable, but is not a required ADS valve per Technical Specification 3.5.1 BOP SAT I UNSAT INA
* Determine SRV C is inoperable, but is not a required ADS valve per Technical Specification 3.5.1 BOP                                                                       SAT I UNSAT INA
* Execute AOP-36 0 Identify open SRV 0 Determine annunciator 09-4-2-37 is NOT in alarm 0 Determine annunciator 09-4-3-3 is NOT in alarm 0 Cycle SRV C control switch at panel 09-4 0 Direct Operator to place SRV C isolation switch in LOCAL at panel 25ASP-5 0 Determine SRV C closed LOI 14-2 NRC Examination Scenario 3 Page 14 of 25 INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT I UNSAT INA Role Play: Direct Operator to remove the four control power fuses for 0 When directed to place SRV C SRV C at panel 09-45 isolation switch in LOCAL, wait 2 minutes, insert Trigger 0 Direct Operator to place SRV C isolation switch in 25, wait approximately 15 REMOTE at panel 25ASP-5 seconds, then report task 0 Monitor Torus water temperature completion.
* Execute AOP-36 0   Identify open SRV 0   Determine annunciator 09-4-2-37 is NOT in alarm 0   Determine annunciator 09-4-3-3 is NOT in alarm 0   Cycle SRV C control switch at panel 09-4 0   Direct Operator to place SRV C isolation switch in LOCAL at panel 25ASP-5 0   Determine SRV C closed LOI 14-2 NRC Examination Scenario 3 Page 14 of 25
 
INSTRUCTOR ACTIVITY             POSITION                 OPERATOR ACTIONS/STANDARD                           COMMENTS/EVALUATION BOP                                                                         SAT I UNSAT INA Role Play:
0    Direct Operator to remove the four control power fuses for When directed to place SRV C                     SRV C at panel 09-45 isolation switch in LOCAL, wait 2 minutes, insert Trigger               0   Direct Operator to place SRV C isolation switch in 25, wait approximately 15                         REMOTE at panel 25ASP-5 seconds, then report task                   0   Monitor Torus water temperature completion.
* Initiate Torus Cooling per OP-138 posted attachment:
* Initiate Torus Cooling per OP-138 posted attachment:
Role Play: 0 Ensure at least one of the RHR pumps is running When directed to remove SRV 0 Open RHR TEST TORUS CLG & SPRAY 1 OMOV-398 C fuses, wait 1 minute, insert Throttle RHR TEST & TORUS CLG 1 OMOV-348 to Trigger 26, then report task 0 completion.
Role Play:                                   0   Ensure at least one of the RHR pumps is running When directed to remove SRV                 0   Open RHR TEST TORUS CLG & SPRAY 1OMOV-398 C fuses, wait 1 minute, insert 0    Throttle RHR TEST & TORUS CLG 1OMOV-348 to Trigger 26, then report task completion.                                       establish desired/flow 0   WHEN RHR Loop A(B) flow is GREATER THAN 1500 Role Play:                                       gpm, ensure closed MIN FLOW VLV 10MOV-168 When directed to place SRV C                 0   Establish RHRSW flow and temperature control isolation switch in REMOTE,
establish desired/flow 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 Role Play: gpm, ensure closed MIN FLOW VLV 10MOV-168 When directed to place SRV C 0 Establish RHRSW flow and temperature control isolation switch in REMOTE,
* Initiate RHRSW per OP-13C posted attachment:
* Initiate RHRSW per OP-13C posted attachment:
wait 1 minute, re-insert remote AD07:C in remote, wait 0 Start one of the RHRSW pumps approximately 15 seconds, 0 Throttle RHRSW DISCH VLV FROM HX 8 10MOV-89B to then report task completion.
wait 1 minute, re-insert remote AD07:C in remote, wait                       0   Start one of the RHRSW pumps approximately 15 seconds,                   0   Throttle RHRSW DISCH VLV FROM HX 8 10MOV-89B to then report task completion.                     establish 2500 to 4000 gpm 0   Start the second RHRSW pump if desired 0   Throttle RHRSW DISCH VLV FROM HX 8 10MOV-898 to establish 2500 to 4000 gpm per RHRSW pump 0   Close HX 8 BYP VLV 1OMOV-668
establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX 8 10MOV-898 to establish 2500 to 4000 gpm per RHRSW pump 0 Close HX 8 BYP VLV 1 OMOV-668 ----LOI 14-2 NRC Examination Scenario 3 Page 15 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION Events 6 1 7 1 & 8 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:
                                                                                                        ----
* Recognize I report annunciator 09-4-2-6, SRV Sonic Mon ACTIVATE TRIGGER 4 Alarm Hi SRV C Re-Opens, SRV
LOI 14-2 NRC Examination Scenario 3 Page 15 of 25
* Recognize I report SRV C open Tailpipe Break Into Torus Airspace, Main Turbine Fails to Trip, RHR Pump Trip, RHR Pump Suction Valve Fails Closed, RHRSW Crossties Fail Closed Note: Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the SRV tailpipe break. Critical Task #1 Given a stuck open SRV, the crew will scram the Reactor Pass I Fail before Torus water temperature exceeds the Boron Injection Initiation Temperature, In accordance with AOP-36 and EOP* 4. Critical Tak ..W Standard:
 
The Reactor Ia scrammed.
INSTRUCTOR ACTIVITY             POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS/EVALUATION Events 6 1 7 1 & 8             BOP I ATC                                                             SAT I UNSAT INA On Lead Examiner Cue:
Critical Taka Given the Inability to maintain Primary Containment Pass/Fall c:ondllona Inside tile Pressure Suppreaalon Pressure, the crew Wfll Pllfon'b .,. Emergency RPV Depressurization, in accordanc.wlth EOP-4. Critical Tak t2 Standard:
* Recognize I report annunciator 09-4-2-6, SRV Sonic Mon ACTIVATE TRIGGER 4                           Alarm Hi SRV C Re-Opens, SRV Tailpipe Break Into Torus
* Recognize I report SRV C open Airspace, Main Turbine Fails to Trip, RHR Pump Trip, RHR Pump Suction Valve Fails Closed, RHRSW Crossties Fail Closed Note:
Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the SRV tailpipe break.
Critical Task #1                         Given a stuck open SRV, the crew will scram the Reactor     Pass I Fail before Torus water temperature exceeds the Boron Injection Initiation Temperature, In accordance with AOP-36 and EOP*
4.
Critical Tak ..W Standard:               The Reactor Ia scrammed.
Critical Taka                           Given the Inability to maintain Primary Containment         Pass/Fall c:ondllona Inside tile Pressure Suppreaalon Pressure, the crew Wfll Pllfon'b .,. Emergency RPV Depressurization, in accordanc.wlth EOP-4.
7SRVsareopen.
7SRVsareopen.
LOI 14-2 NRC Examination Scenario 3 Page 16 of 25 IINSTRUCTORACTIVITY  
Critical Tak t2 Standard:
--T POSITION I OPERATORACTIONS/STANDARD I COMMENTS/EVALUATION I SRO SAT I UNSAT INA
LOI 14-2 NRC Examination Scenario 3 Page 16 of 25
 
IINSTRUCTORACTIVITY       --T POSITION I             OPERATORACTIONS/STANDARD                         I COMMENTS/EVALUATION I SRO                                                                         SAT I UNSAT INA
* Acknowledge report
* Acknowledge report
* Enter AOP-36, Stuck Open Relief Valve
* Enter AOP-36, Stuck Open Relief Valve
Line 1,319: Line 3,147:
* Enters I re-enters EOP-4, Primary Containment Control on high Torus water temperature, if required
* Enters I re-enters EOP-4, Primary Containment Control on high Torus water temperature, if required
* May direct rapid Reactor power reduction with Recirculation flow and/or CRAM rods
* May direct rapid Reactor power reduction with Recirculation flow and/or CRAM rods
* Before Torus water temperature exceeds 110&deg;F, direct Reactor scram Critical Task #1
* Before Torus water temperature exceeds 110&deg;F, direct Reactor scram                                                 Critical Task #1
* Enter AOP-1 , Reactor Scram
* Enter AOP-1 , Reactor Scram
* Enter EOP-2, RPV Control, on low Reactor water level
* Enter EOP-2, RPV Control, on low Reactor water level
Line 1,328: Line 3,156:
* Acknowledge degrading Primary Containment conditions
* Acknowledge degrading Primary Containment conditions
* Re-enter EOP-2 on high Drywell pressure
* Re-enter EOP-2 on high Drywell pressure
* Re-enter EOP-4 on high Drywell pressure and temperature LOI 14-2 NRC Examination Scenario 3 Page 17 of 25 I INSTRUCTOR ACTIVITY I POSITION I OPERA TOR ACTIONS/STANDARD I COMMENTS/EVALUATION SRO cont. SAT I UNSAT INA
* Re-enter EOP-4 on high Drywell pressure and temperature LOI 14-2 NRC Examination Scenario 3 Page 17 of 25
 
I INSTRUCTOR ACTIVITY           I POSITION I             OPERATOR ACTIONS/STANDARD                       I COMMENTS/EVALUATION SRO cont.                                                                   SAT I UNSAT INA
* When Primary Containment pressure exceeds 2. 7 psig and before Torus pressure exceeds 15 psig, direct initiation of Torus Spray
* When Primary Containment pressure exceeds 2. 7 psig and before Torus pressure exceeds 15 psig, direct initiation of Torus Spray
* Acknowledge trip of RHR pump and inability to spray using RHR
* Acknowledge trip of RHR pump and inability to spray using RHR
Line 1,334: Line 3,164:
* Acknowledge inability to spray using RHRSW
* Acknowledge inability to spray using RHRSW
* When Torus pressure exceeds 15 psig, determine unable to spray Drywell Note:
* When Torus pressure exceeds 15 psig, determine unable to spray Drywell Note:
* Monitor Primary Containment conditions on Pressure The Pressure Suppression Suppression Pressure curve Pressure is approximately 26-* When Torus pressure cannot be maintained below the Critical Task #2 28 psig at the Torus water Pressure Suppression Pressure, direct opening 7 ADS level expected during this valves scenario.
* Monitor Primary Containment conditions on Pressure The Pressure Suppression                     Suppression Pressure curve Pressure is approximately 26-
* When Torus pressure cannot be maintained below the 28 psig at the Torus water                   Pressure Suppression Pressure, direct opening 7 ADS           Critical Task #2 level expected during this                   valves scenario.
* Acknowledge that less than 7 ADS valves are open
* Acknowledge that less than 7 ADS valves are open
* Direct opening additional SRVs until a total of 7 SRVs are open
* Direct opening additional SRVs until a total of 7 SRVs are open
* Acknowledge that 7 SRVs are open LOI 14-2 NRC Examination Scenario 3 Page 18 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT I UNSAT INA Role Play:
* Acknowledge that 7 SRVs are open LOI 14-2 NRC Examination Scenario 3 Page 18 of 25
* Execute AOP-36 When directed to place SRV C isolation switch in LOCAL, 0 Identify open SRV wait 2 minutes , then report 0 Determine annunciator 09-4-2-37 is NOT in alarm task completion. Use Trigger 27 and the associated 0 Determine annunciator 09-4-3-3 is NOT in alarm annunciator override as 0 Cycle SRV C control switch at panel 09-4 necessary to simulate Direct Operator to place SRV C isolation switch in LOCAL opening/closing the door to 0 25ASP-5 (but do NOT use at panel 25ASP-5 remotes to actually cycle 0 Determine SRV C is open isolation switch or pull SRV Direct Operator to place SRV C isolation switch in fuses). 0 REMOTE at panel 25ASP-5 0 Monitor Torus water temperature
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION BOP                                                                       SAT I UNSAT INA Role Play:
* Execute AOP-36 When directed to place SRV C isolation switch in LOCAL,                 0   Identify open SRV wait 2 minutes, then report               0   Determine annunciator 09-4-2-37 is NOT in alarm task completion . Use Trigger 27 and the associated                     0   Determine annunciator 09-4-3-3 is NOT in alarm annunciator override as                   0   Cycle SRV C control switch at panel 09-4 necessary to simulate opening/closing the door to                0  Direct Operator to place SRV C isolation switch in LOCAL 25ASP-5 (but do NOT use                       at panel 25ASP-5 remotes to actually cycle                 0   Determine SRV C is open isolation switch or pull SRV fuses).                                    0  Direct Operator to place SRV C isolation switch in REMOTE at panel 25ASP-5 0   Monitor Torus water temperature
* Enter AOP-1
* Enter AOP-1
* Control Reactor water level 180-220" using Feedwater LOI14-2 NRC Examination Scenario 3 Page 19 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT I UNSAT INA
* Control Reactor water level 180-220" using Feedwater LOI14-2 NRC Examination Scenario 3 Page 19 of 25
 
INSTRUCTOR ACTIVITY             POSITION               OPERATOR ACTIONS/STANDARD                             COMMENTS/EVALUATION ATC                                                                           SAT I UNSAT INA
* Enter AOP-1
* Enter AOP-1
* Depress MANUAL SCRAM A and MANUAL SCRAM 8 push buttons Critical Task #1
* Depress MANUAL SCRAM A and MANUAL SCRAM 8 push buttons                                                     Critical Task #1
* Place RX MODE switch in SHUTDOWN
* Place RX MODE switch in SHUTDOWN
* Fully insert IRMs and SRMs
* Fully insert IRMs and SRMs
Line 1,349: Line 3,184:
* Recognize I report failure of Main Turbine to automatically trip, if not manually tripped before automatic trip required
* Recognize I report failure of Main Turbine to automatically trip, if not manually tripped before automatic trip required
* Manually trip Main Turbine
* Manually trip Main Turbine
* Verify 4KV loads transfer to reserve power ATC I BOP SAT I UNSAT INA
* Verify 4KV loads transfer to reserve power ATC I BOP                                                                     SAT I UNSAT INA
* May attempt to initiate Torus spray: Note: 0 Place SPRAY CNTRL 10A-S17B switch to MANUAL, i RHR loop A is unavailable to spring return to normal spray due to loss of Bus L-15. 0 Verify white SPRAY PERM 1 OA-DS678 light is on RHR pumps B and D trip on a 0 May attempt to start RHR pump time delay after the scram. Therefore, RHR is unavailable 0 Recognize I report trip of RHR pumps 8 and D to spray either the Torus or 0 Recognize I report inability to spray using RHR the Drywell. -* ---LOI 14-2 NRC Examination Scenario 3 Page 20 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC/80P SAT I UNSAT INA *cont.
* May attempt to initiate Torus spray:
* Attempt to initiate Torus spray using RHRSW per EP-14: 0 Verify RHR pumps 8 and D are stopped 0 Ensure closed 1 OMOV-268 and/or 1 OMOV-31 8 0 Ensure closed 1 OMOV-398 and/or 1 OMOV-388 0 Ensure closed 1 OMOV-398 and/or 1 OMOV-348 0 Ensure closed 1 OMOV-258 and/or 1 OMOV-278 0 Ensure RHRSW pumps 8 and D are running 0 Ensure RHRSW DISCH VLV FROM HX 8 10MOV-898 is throttled to establish 2500 to 4000 gpm per RHRSW pump. 0 Attempt to open both of the following valves:
Note:                                       0   Place SPRAY CNTRL 10A-S17B switch to MANUAL,                                     i spring return to normal RHR loop A is unavailable to spray due to loss of Bus L-15.             0   Verify white SPRAY PERM 1OA-DS678 light is on RHR pumps B and D trip on a                 0   May attempt to start RHR pump time delay after the scram.
Therefore, RHR is unavailable               0   Recognize I report trip of RHR pumps 8 and D to spray either the Torus or               0   Recognize I report inability to spray using RHR the Drywell.
- *     ---
LOI 14-2 NRC Examination Scenario 3 Page 20 of 25
 
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS/EVALUATION ATC/80P                                                                 SAT I UNSAT INA
                              *cont.
* Attempt to initiate Torus spray using RHRSW per EP-14:
0   Verify RHR pumps 8 and D are stopped 0   Ensure closed 1OMOV-268 and/or 1OMOV-31 8 0   Ensure closed 1OMOV-398 and/or 1OMOV-388 0   Ensure closed 1OMOV-398 and/or 1OMOV-348 0   Ensure closed 1OMOV-258 and/or 1OMOV-278 0   Ensure RHRSW pumps 8 and D are running 0   Ensure RHRSW DISCH VLV FROM HX 8 10MOV-898 is throttled to establish 2500 to 4000 gpm per RHRSW pump.
0   Attempt to open both of the following valves:
* RHRSW TO RHR 10MOV-1488
* RHRSW TO RHR 10MOV-1488
* RHRSW TO RHR 10MOV-1498 0 Recognize I report 10MOV-1498 fails to open 0 Recognize I report inability to spray using RHRSW LOI 14-2 NRC Examination Scenario 3 Page 21 of 25 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS/EVALUATION. ATC/BOP SAT/UNSAT/NA cont.
* RHRSW TO RHR 10MOV-1498 0   Recognize I report 10MOV-1498 fails to open 0   Recognize I report inability to spray using RHRSW LOI 14-2 NRC Examination Scenario 3 Page 21 of 25
* May close MSIVs, as directed Note: Critical Task #2 SRV C is inoperable and
 
* Verify isolations per AOP-15, as time permits unable to be opened. SRV G
INSTRUCTOR ACTIVITY                   POSITION                   OPERATOR ACTIONS/STANDARD                         COMMENTS/EVALUATION .
ATC/BOP                                                                     SAT/UNSAT/NA cont.
* May close MSIVs, as directed Note:
* Verify isolations per AOP-15, as time permits               Critical Task #2 SRV C is inoperable and unable to be opened. SRV G
* Attempt to open 7 ADS valves is failed open, and therefore
* Attempt to open 7 ADS valves is failed open, and therefore
* Recognize I report less than 7 ADS valves open may not be counted by the crew as open for the purposes
* Recognize I report less than 7 ADS valves open may not be counted by the crew as open for the purposes
* Open additional SRVs until 7 SRVs are open of Emergency RPV
* Open additional SRVs until 7 SRVs are open of Emergency RPV Depressurization. Therefore,
* Restore and maintain Reactor water level 180-220" using Depressurization.
* Restore and maintain Reactor water level 180-220" using the crew may open either one                         available injection systems or two additional non-ADS
Therefore, the crew may open either one available injection systems or two additional non-ADS
* Control Core Spray injection:
* Control Core Spray injection:
SRVs. Throttle 14MOV-12B 0
SRVs.
Throttle 14MOV-12B
* Control LPCI injection:
* Control LPCI injection:
0 Throttle 10MOV-27A 0 Secure RHR pumps if needed -----------
0   Throttle 10MOV-27A 0   Secure RHR pumps if needed
                                                                                                              '~**      -----------
Termination Criteria:
Termination Criteria:
* All control rods are inserted
* All control rods are inserted
* Emergency RPV Depressurization is in progress
* Emergency RPV Depressurization is in progress
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 22 of 25 ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 1 00% power. Air Compressor 8 is out of service for maintenance.
* Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 22 of 25
When you take the shift: 1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1. 2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.
 
ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 100% power.
Air Compressor 8 is out of service for maintenance.
When you take the shift:
: 1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1.
: 2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.
LOI 14-2 NRC Examination Scenario 3 Page 23 of 25
LOI 14-2 NRC Examination Scenario 3 Page 23 of 25
(' ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps-(site specific control rod movement control sheet format is to be used) EN-RE-215 Attach 9.4 I nit Step Action 1 Lower power Prepared By: (RxEng) to 95% RTP Rod -Reviewed By: 'Bob-Tone.t (RxEng or SRO) Power Reduction Today From To Method Notch Notch --RWR Stamps Page 1 of 1 Cplg RSCS Notes Chk Grp NA -Target rate= 1% RTP per minute SM Approval: (Shift Manager) CONTROL ROOM OPERA TOR LOI14-2 NRC Examination Scenario 3 Page 24 of 25 0 ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps-(site specific control rod movement control sheet format is to be used) EN-RE-215 Attach 9.4 I nit Step Action 1 Lower power Prepared By: (RxEng) to 95% RTP Rod -Reviewed By: Bob-TO'rt.e4' (RxEng or SRO) Power Reduction Today From To Method Notch Notch
 
--RWR Stamps Page 1 of 1 Cplg RSCS Notes Chk Grp NA -Target rate= 1% RTP per minute SM Approval: (Shift Manager) INDEPENDENT VERIFIER LOI14-2 NRC Examination Scenario 3 Page 25 of25 Appendix D Scenario Outline Form ES-D-1 Facility: James A. Fitzpatrick Scenario No.: NRC-4 Op-Test No.: 14-2 Examiners: Operators: Initial Conditions
ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)
: The plant is operating at approximately 65% power. Circulating Water pump C is ready to be returned to service following maintenance. Turnover: Start Circulating Water pump C per OP-4 section 0.17. Then , raise Reactor power us i ng Recirculation flow per the provided reactivity instruction. Event Malf. Event Event No. No. Type* Description N-Start Circulating Water Pump C 1 N/A BOP , SRO OP-4 R-Raise Reactor Power with Recirculation Flow 2 N/A ATC , SRO OP-27 3 Override 1-ATC , Recirculation Pump B Runs High SRO OP-27 , Techn i cal Specif i cations C-Loss of Steam Packing Exhauster A 4 Override BOP , SRO ARP 09-7-3-43 , OP-240 C-Loss of RBCLC Flow to Recirculation Pump B 5 SW01:B BOP , SRO OP-27, AOP-8 , Technical Specificat i ons 6 MS05 M-All Main Steam Leak into Turbine Bu i lding AOP-40 , AOP-1 , EOP-2 7 RP12 1-ATC , All MSIVs Fail to Automatically Close SRO AOP-40 FW03/04 Loss of High Pressure Injection 8 RD06 M-All Overr i de EOP-2 Override I-BOP , HPCI Flow Controller Failure in Automatic , HPCI Trips 9 HP02 SRO OP-15 , EOP-2 RC02 RCIC Fails to Automatically Initiate , RCIC Trips , ADS Fails to 10 RC03 I-AII Automatically Initiate AD01 OP-19 , EOP-2 * (N)ormal , (R)eactivity , (l)nstrument , (C)omponent , (M)ajor Facility:
Power Reduction EN-RE-215 Attach 9.4                         Today                                        Page 1 of 1 From      To              Cplg    RSCS I nit Step       Action       Rod                      Method                              Notes Notch    Notch              Chk      Grp Lower power                                                           Target rate= 1% RTP per 1
James A. Fitzpatrick Scenario No.: NRC-4 Op-Test No.: 14-2 1. Total malfunctions (5-8) 8 7,8,9,10 2. Malfunctions after EOP entry (1-2) 3 7, 9, 10 3. Abnormal events (2-4) 3 3, 4, 5 4. Major transients (1-2) 2 6 & 8 5. EOPs entered/requiring substantive actions (1-2) 1 EOP-2 6. EOP contingencies requiring substantive actions (0-2) 0 7. Critical tasks (2-3) 3 CRITICAL TASK DESCRIPTIONS:
to 95% RTP
                                    -      -        -      RWR      NA        -              minute
('
Prepared By:                                                       SM Approval: VOIN~'&~
(RxEng)                                                           (Shift Manager)
Reviewed By:     'Bob- Tone.t (RxEng or SRO)
Stamps CONTROL ROOM OPERATOR LOI14-2 NRC Examination Scenario 3 Page 24 of 25
 
ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)
Power Reduction EN-RE-215 Attach 9.4                         Today                                        Page 1 of 1 From      To              Cplg    RSCS Init  Step       Action       Rod                    Method                              Notes Notch    Notch              Chk      Grp Lower power                                                         Target rate= 1% RTP per 1
to 95% RTP
                                    -    -        -      RWR      NA        -              minute 0
Prepared By:                                                             SM Approval:    Va.v~'RO"et (RxEng)                                                         (Shift Manager)
Reviewed By:     Bob- TO'rt.e4' (RxEng or SRO)
Stamps INDEPENDENT VERIFIER LOI14-2 NRC Examination Scenario 3 Page 25 of25
 
Appendix D                                       Scenario Outline                               Form ES-D-1 Facility: James A. Fitzpatrick           Scenario No.: NRC-4                       Op-Test No.: 14-2 Examiners:                                               Operators:
Initial Conditions: The plant is operating at approximately 65% power. Circulating Water pump C is ready to be returned to service following maintenance.
Turnover: Start Circulating Water pump C per OP-4 section 0 .17. Then , raise Reactor power using Recirculation flow per the provided reactivity instruction .
Event         Malf.     Event                                         Event No.         No.       Type*                                     Description N-         Start Circulating Water Pump C 1         N/A         BOP, SRO         OP-4 R-         Raise Reactor Power with Recirculation Flow 2           N/A         ATC, SRO         OP-27 1-ATC,       Recirculation Pump B Runs High 3      Override SRO         OP-27, Technical Specifications C-         Loss of Steam Packing Exhauster A 4       Override       BOP, SRO       ARP 09-7-3-43, OP-240 C-         Loss of RBCLC Flow to Recirculation Pump B 5       SW01:B         BOP, SRO         OP-27, AOP-8, Technical Specifications Main Steam Leak into Turbine Building 6         MS05       M-All AOP-40, AOP-1 , EOP-2 1-ATC,       All MSIVs Fail to Automatically Close 7        RP12 SRO         AOP-40 FW03/04 Loss of High Pressure Injection 8         RD06       M-All EOP-2 Override Override    I-BOP,       HPCI Flow Controller Failure in Automatic, HPCI Trips 9
HP02         SRO         OP-15, EOP-2 RC02                     RCIC Fails to Automatically Initiate, RCIC Trips, ADS Fails to 10         RC03         I-AII     Automatically Initiate AD01                     OP-19, EOP-2
*         (N)ormal , (R)eactivity, (l)nstrument,   (C)omponent,   (M)ajor
 
Facility: James A. Fitzpatrick               Scenario No.: NRC-4 Op-Test No.: 14-2
: 1. Total malfunctions (5-8)                                   8 Even~3,4,5,6, 7,8,9,10
: 2. Malfunctions after EOP entry (1-2)                         3 Even~ 7, 9, 10
: 3. Abnormal events (2-4)                                       3 Even~ 3, 4, 5
: 4. Major transients (1-2)                                     2 Even~ 6 & 8
: 5. EOPs entered/requiring substantive actions (1-2)           1 EOP-2
: 6. EOP contingencies requiring substantive actions (0-2)       0
: 7. Critical tasks (2-3)                                       3 CRITICAL TASK DESCRIPTIONS:
CT -1: Given a loss of all RBCLC flow to an operating Recirculation pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:
CT -1: Given a loss of all RBCLC flow to an operating Recirculation pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:
* Securing the Recirculation pump
* Securing the Recirculation pump
* Isolating the Recirculation pump CT-2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40. CT-3: Given the Reactor above the injection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.
* Isolating the Recirculation pump CT-2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40.
TITLE: SCENARIO NUMBER: PATH: JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 4 LOI14-2 NRC EXAMINATION SCENARIO 4 NRC4 STAND ALONE Validation:
CT-3: Given the Reactor above the injection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.
_;z;:-/"---;z _....._..--
 
Training: u CANDIDATES CRS ATC BOP LOI 1 4-2 NRC Exam i nation Scenar i o 4 Page 1 of 23 RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INinATOR REVIEWED 5/22/14 New New Scenario T. Hooper LOI 14-2 NRC Examination Scenario 4 Page 2 of 23 A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 4 B. SCENARIO SETUP: 1. IC-64 2. Speciallnstructions:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 4 TITLE:                                        LOI14-2 NRC EXAMINATION SCENARIO 4 SCENARIO NUMBER:                              NRC4 PATH:                                          STAND ALONE Validation: _;z;:-/"- --;z _.. . _. -- Training: J~              Operations~~z~
: a. The Plant is operating at approximately 65% power. b. Circulating Water pump C is ready to be returned to service. 3. Preset Conditions
u                                                               CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 4 Page 1 of 23
: a. TRIGGER 1, O:RR ZAID218416B, MG Set B Digital Speed Control, lnitial=14.3, Final=25, Ramp=4 minutes b. TRIGGER 2, O:MS ZDI11VACN05, SPE A, STOP c. TRIGGER 3, M:SW01 :B, Loss of RBCLC Flow to Recirculation Pump B d. TRIGGER 4, M:MS05 , Steam Leakage Outside Primary Containment, Final=15 , Ramp=3 minutes e. Preset , M:RP12:A, PCIS Group 1 Inboard MSIV Isolation Failiure f. Preset , M:RP12:B, PCIS Group 1 Outboard MSIV Isolation Failiure g. Preset , M:HP04, HPCI Flow Auto Flow Controller Failure , 0% h. TRIGGER 5, M:HP02, HPCI Turbine Trip , Delay=1 0 seconds i. Preset, M: RC02, RCIC System Failure to Auto Start j. TRIGGER 6, M:RC03, RCIC System Turbine Trip , Delay=1 minute k. Preset, M:AD01, ADS Timer Fails to Start I. TRIGGER 7, M:FW03:A , Rx Feedwater Pmp A Auto Controller Failure , Finai=O , Delay= 1 0 seconds m. TRIGGER 7, M:FW03: B , Rx Feedwater Pmp B Auto Controller Failure, Finai=O , Delay= 1 0 seconds n. TRIGGER 7, M:FW04: A, Rx Feedwater Pmp A Manual Controller Failure , Finai=O , Delay= 1 0 seconds o. TRIGGER 7, M:FW04: B, Rx Feedwater Pmp B Manual Controller Failure, Finai=O , Delay= 1 0 seconds p. TRIGGER 7, M:RD06:A, CRD Hydraulic Pump Trip A , Delay=1 0 seconds q. TRIGGER 7, M:RD06:B, CRD Hydraulic Pump Trip B , Delay=1 0 seconds r. Preset , OS:SL ZDI11S1, SBLC Selector Switch, STOP s. Preset , M:HP04, HPCI Flow Auto Controller Failure , 0% t. Event Trigger 1, Event: rrfpa(2)>3150 , Command: None u. Event Trigger 5, Event: hpfd>1 00 , Command: None v. Event Trigger 6, Event: rcfd>15, Command: None w. Event Trigger 7, Event: (zlo5ads8a  
 
== 0) && (zlo5ads8b  
RECORD OF CHANGES SOURCE OF           BRIEF DESCRIPTION OF DATE       CHANGE                     CHANGE       INinATOR REVIEWED 5/22/14   New                 New Scenario             T. Hooper LOI 14-2 NRC Examination Scenario 4 Page 2 of 23
== 0), Command: None 4. Consumable Forms and Procedures:  
 
+ AOP-1, AOP-8, AOP-40 LOI 14-2 NRC Examination Scenario 4 Page 3 of 23 C. SCENARIO  
A. TITLE:               LOI14-2 NRC EXAMINATION SCENARIO 4 B. SCENARIO SETUP:
: 1. IC-64
: 2. Speciallnstructions:
: a. The Plant is operating at approximately 65% power.
: b. Circulating Water pump C is ready to be returned to service.
: 3. Preset Conditions:
: a. TRIGGER 1, O:RR ZAID218416B, MG Set B Digital Speed Control, lnitial=14.3, Final=25, Ramp=4 minutes
: b. TRIGGER 2, O:MS ZDI11VACN05, SPE A, STOP
: c. TRIGGER 3, M:SW01 :B, Loss of RBCLC Flow to Recirculation Pump B
: d. TRIGGER 4, M:MS05, Steam Leakage Outside Primary Containment, Final=15, Ramp=3 minutes
: e. Preset, M:RP12:A, PCIS Group 1 Inboard MSIV Isolation Failiure
: f. Preset, M:RP12:B, PCIS Group 1 Outboard MSIV Isolation Failiure
: g. Preset, M:HP04, HPCI Flow Auto Flow Controller Failure, 0%
: h. TRIGGER 5, M:HP02, HPCI Turbine Trip, Delay=1 0 seconds
: i. Preset, M:RC02, RCIC System Failure to Auto Start
: j. TRIGGER 6, M:RC03, RCIC System Turbine Trip, Delay=1 minute
: k. Preset, M:AD01, ADS Timer Fails to Start I. TRIGGER 7, M:FW03:A, Rx Feedwater Pmp A Auto Controller Failure, Finai=O, Delay= 10 seconds
: m. TRIGGER 7, M:FW03:B, Rx Feedwater Pmp B Auto Controller Failure, Finai=O, Delay= 10 seconds
: n. TRIGGER 7, M:FW04:A, Rx Feedwater Pmp A Manual Controller Failure, Finai=O, Delay= 10 seconds
: o. TRIGGER 7, M:FW04:B, Rx Feedwater Pmp B Manual Controller Failure, Finai=O ,
Delay= 10 seconds
: p. TRIGGER 7, M:RD06:A, CRD Hydraulic Pump Trip A , Delay=1 0 seconds
: q. TRIGGER 7, M:RD06:B, CRD Hydraulic Pump Trip B, Delay=1 0 seconds
: r. Preset, OS:SL ZDI11S1, SBLC Selector Switch, STOP
: s. Preset, M:HP04, HPCI Flow Auto Controller Failure, 0%
: t. Event Trigger 1, Event: rrfpa(2)>3150, Command: None
: u. Event Trigger 5, Event: hpfd>1 00, Command : None
: v. Event Trigger 6, Event: rcfd>15, Command: None
: w. Event Trigger 7, Event: (zlo5ads8a == 0) && (zlo5ads8b == 0), Command: None
: 4. Consumable Forms and Procedures:
              + AOP-1, AOP-8, AOP-40 LOI 14-2 NRC Examination Scenario 4 Page 3 of 23
 
C.       SCENARIO  


==SUMMARY==
==SUMMARY==
: "'The scenario will begin with the plant operating at approximately 65% power. The crew will begin by starting Circulating Water pump C. The crew will then raise power with Recirculation flow. Recirculation pump B will run high. The crew will lock the Recirculation pump B scoop tube to stop the uncontrolled positive reactivity addition. This malfunction will result in a Recirculation flow mismatch. The SRO will determine the Technical Specification impact. The running Steam Packing Exhauster will tr i p. The crew will respond to the ARP to start the standby Steam Packing Exhauster, and re-establish adequate system parameters. All RBCLC flow to Recirculation pump B will isolate. This will cause multiple high temperature alarms. If left unmitigated , this will cause degradation of both Rec i rculation pump B seals and loss of coolant into the Drywell. The crew will secure Recirculation pump B. If damage has occurred to both pump seals , the crew will also isolate Recirculation pump B to stop the loss of coolant. The crew will execute AOP-8 due to the reduction in core flow. The SRO will determine the Technical Specification impact. A Ma i n Steam leak will develop in the Turbine Building. All automatic closures of the MSIVs will fail. The crew may lower Reactor power in anticipation of a Reactor scram. The crew will scram the Reactor and manually close the MSIVs to stop the leak. , Following the scram , the Feedwater pump controllers will fail low , resulting in a loss of the normal high pressure injection source. HPCI will be available for start, however the automatic flow controller will fail such that HPCI does not automatically inject. The crew will inject with HPCI by taking manual control of the flow controller. HPCI will trip soon after injection is started. RCIC will be available for start , but will fail to automatically start i f an automatic initiation signal is received.
:
The crew will manually start RCIC. The running CRD pump will trip and the standby pump will trip upon start. Both SLC pumps will fail to start. With MSIVs closed, the crew will control Reactor pressure with SRVs. With Reactor coolant inventory being lost through the SRVs and only RCIC available as a high pressure injection source , Reactor water level control will be challenged.
"'The scenario will begin with the plant operating at approximately 65% power. The crew will begin by starting Circulating Water pump C. The crew will then raise power with Recirculation flow.
RCIC will then trip. The crew will lower Reactor pressure using SRVs and inject with Condensate Booster pumps to restore Reactor water level. The scenario will be terminated when all control rods are inserted and Reactor water level is controlled above 0". LOI14-2 NRC Examination Scenario 4 Page 4 of 23 Shift Turnover 'T he Plant is operating at approximately 65% power. Circulation Water pump C is ready to be returned to service following maintenance. When you take the shift: 1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step D.17.3.e. 2. Then , raise Reactor power using Recirculation flow per the provided reactivity instruction.
Recirculation pump B will run high. The crew will lock the Recirculation pump B scoop tube to stop the uncontrolled positive reactivity addition. This malfunction will result in a Recirculation flow mismatch. The SRO will determine the Technical Specification impact.
The running Steam Packing Exhauster will trip. The crew will respond to the ARP to start the standby Steam Packing Exhauster, and re-establish adequate system parameters.
All RBCLC flow to Recirculation pump B will isolate. This will cause multiple high temperature alarms. If left unmitigated, this will cause degradation of both Recirculation pump B seals and loss of coolant into the Drywell. The crew will secure Recirculation pump B. If damage has occurred to both pump seals, the crew will also isolate Recirculation pump B to stop the loss of coolant. The crew will execute AOP-8 due to the reduction in core flow. The SRO will determine the Technical Specification impact.
A Main Steam leak will develop in the Turbine Building. All automatic closures of the MSIVs will fail. The crew may lower Reactor power in anticipation of a Reactor scram. The crew will scram the Reactor and manually close the MSIVs to stop the leak.
, Following the scram , the Feedwater pump controllers will fail low, resulting in a loss of the normal high pressure injection source. HPCI will be available for start, however the automatic flow controller will fail such that HPCI does not automatically inject. The crew will inject with HPCI by taking manual control of the flow controller. HPCI will trip soon after injection is started. RCIC will be available for start, but will fail to automatically start if an automatic initiation signal is received. The crew will manually start RCIC . The running CRD pump will trip and the standby pump will trip upon start. Both SLC pumps will fail to start. With MSIVs closed, the crew will control Reactor pressure with SRVs. With Reactor coolant inventory being lost through the SRVs and only RCIC available as a high pressure injection source, Reactor water level control will be challenged.
RCIC will then trip. The crew will lower Reactor pressure using SRVs and inject with Condensate Booster pumps to restore Reactor water level.
The scenario will be terminated when all control rods are inserted and Reactor water level is controlled above 0".
LOI14-2 NRC Examination Scenario 4 Page 4 of 23
 
Shift Turnover
' T he Plant is operating at approximately 65% power.
Circulation Water pump C is ready to be returned to service following maintenance.
When you take the shift:
: 1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step D.17.3.e.
: 2. Then , raise Reactor power using Recirculation flow per the provided reactivity instruction.
Stop at approximately 75% power for further Reactor Engineering instructions.
Stop at approximately 75% power for further Reactor Engineering instructions.
LOI14-2 NRC Examination Scenario 4 Page 5 of 23 Critical Tasks/Standards  
LOI14-2 NRC Examination Scenario 4 Page 5 of 23
'Critical Task #1: Given a loss of all RBCLC flow to an operating Recirculation pump , prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:
 
* Securing the Recirculat i on pump
Critical Tasks/Standards
* Isolating the Recirculation pump Critical Task #2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines , in accordance with AOP-40. Critical Task #3: Given the Reactor above the i njection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection , i n accordance with EOP-2. LOI 14-2 NRC Examination Scenario 4 Page 6 of 23 EVENT NO. EVENT SEQUENCE 1. Start Circulating Water Pump C (Normal: BOP, SRO) 2. Raise Reactor Power with Recirculation Flow (Reactivity:
' Critical Task #1: Given a loss of all RBCLC flow to an operating Recirculation pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:
ATC, SRO) 3. Recirculation Pump B Runs High (Instrument:
* Securing the Recirculation pump
ATC, SRO) 4. Loss of Steam Packing Exhauster A (Component:
* Isolating the Recirculation pump Critical Task #2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40 .
BOP, SRO) 5. Loss of RBCLC Flow to Recirculation Pump B (Component:
Critical Task #3: Given the Reactor above the injection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.
BOP, SRO) 6. Main Steam Leak into Turbine Building (Major: All) 7. All MSIVs Fail to Automatically Close (Instrument:
LOI 14-2 NRC Examination Scenario 4 Page 6 of 23
ATC, SRO) 8. Loss of High Pressure Injection (Major: All) 9. HPCI Flow Controller Failure in Automatic, (Instrument:
 
BOP, SRO) HPCI Trips 10. RCIC Fails to Automatically Initiate, RCIC Trips, (Instrument:
EVENT NO.                                     EVENT SEQUENCE
All) ADS Fails to Automatically Initiate D. TERMINATION CUES:
: 1.       Start Circulating Water Pump C                   (Normal: BOP, SRO)
* All control rods are inserted.
: 2.       Raise Reactor Power with Recirculation Flow       (Reactivity: ATC, SRO)
* Reactor water level is being controlled above 0". L0114-2 NRC Examination Scenario 4 Page 7 of 23
: 3.       Recirculation Pump B Runs High                   (Instrument: ATC, SRO)
.. INSTkuCTOR ACTIVITY POSITION OPERAI OR ACTIONS/STANDARD COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1) After the shift turnover, allow All no more than five minutes for panel walkdown
: 4.       Loss of Steam Packing Exhauster A                 (Component: BOP, SRO)
* Walkdown the control panels and assume the watch Event1 SRO I SAT/UNSAT/NA I Start Circulating Water Pump
: 5.       Loss of RBCLC Flow to Recirculation Pump B       (Component: BOP, SRO)
* Perform Crew Brief c
: 6.       Main Steam Leak into Turbine Building             (Major: All)
* Direct BOP to start Circulation Water pump C per OP-4 section D.17 BOP SAT I UNSAT INA
: 7.       All MSIVs Fail to Automatically Close             (Instrument: ATC, SRO)
: 8.       Loss of High Pressure Injection                   (Major: All)
HPCI Flow Controller Failure in Automatic,       (Instrument: BOP, SRO)
: 9.        HPCI Trips RCIC Fails to Automatically Initiate, RCIC Trips, (Instrument: All) 10.
ADS Fails to Automatically Initiate D. TERMINATION CUES:
* All control rods are inserted .
* Reactor water level is being controlled above 0".
L0114-2 NRC Examination Scenario 4 Page 7 of 23
 
            ..
INSTkuCTOR ACTIVITY             POSITION               OPERAI OR ACTIONS/STANDARD                       COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)
After the shift turnover, allow All no more than five minutes for panel walkdown
* Walkdown the control panels and assume the watch I
Event1                           SRO                                                                           SAT/UNSAT/NA         I Start Circulating Water Pump c
* Perform Crew Brief
* Direct BOP to start Circulation Water pump C per OP-4 section D.17 BOP                                                                           SAT I UNSAT INA
* Place and hold CIRC WTR PMP C 36P-1 C control switch in START Role Play:
* Place and hold CIRC WTR PMP C 36P-1 C control switch in START Role Play:
* WHEN Circulating Water Pump C 36P-1C starts, release CIRC If asked for pre-and post-start checks, immediate report WTR PMP C 36P-1 C control switch checks are SAT.
* WHEN Circulating Water Pump C 36P-1C starts, release CIRC If asked for pre- and post-start WTR PMP C 36P-1 C control switch checks, immediate report checks are SAT.
* Verify CIRC WTR PMP DISCH VLV 36MOV-100C is full open When asked about seal water
* Verify CIRC WTR PMP DISCH VLV 36MOV-100C is full open When asked about seal water
* Verify discharge valve for each running circulating water pump pressure, wait 1 minute, then is full open report Circulating Water pump C seal water pressure is 25
* Verify discharge valve for each running circulating water pump pressure, wait 1 minute, then                   is full open report Circulating Water pump C seal water pressure is 25
* Verify seal water pressure is GREATER THAN OR EQUAL TO psig and stable. 20 psig on 36PI-111 C (eire water pump C seal water press indic) at northwest corner of eire pump pit
* Verify seal water pressure is GREATER THAN OR EQUAL TO psig and stable.                               20 psig on 36PI-111 C (eire water pump C seal water press indic) at northwest corner of eire pump pit
* Verify all white lights for RPS A and RPS B power source selectors are on at panel 09-16 LOI14-2 NRC Examination Scenario 4 Page 8 of 23
* Verify all white lights for RPS A and RPS B power source selectors are on at panel 09-16 LOI14-2 NRC Examination Scenario 4 Page 8 of 23
-INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 2 SRO SAT I UNSAT INA Raise Reactor Power with
 
* Direct ATC to raise power to 75% with Recirc flow Recirculation Flow
              -
* Provide oversight for reactivity manipulation ATC SAT I UNSAT INA Booth Operator:
INSTRUCTOR ACTIVITY         POSITION             OPERATOR ACTIONS/STANDARD                 COMMENTS I EVALUATION Event 2                       SRO                                                               SAT I UNSAT INA Raise Reactor Power with Recirculation Flow
* Raise Recirc flow alternately with RWR MG A(B) SPEED Ensure Trigger 1 automatically CNTRL activates when Recirculation pump B flow exceeds
* Direct ATC to raise power to 75% with Recirc flow
* Monitor APRMs, CTP, Recirc flow, Reactor water level approximately 11.5 Mlbmlhr to initiate the next event. ! LOI 14-2 NRC Examination Scenario 4 Page 9 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event3 ATC SAT I UNSAT INA Recirculation Pump B Runs
* Provide oversight for reactivity manipulation ATC                                                               SAT I UNSAT INA Booth Operator:
* Recognize I report Recirculation pump B speed controller is High malfunctioning SRO SAT I UNSAT INA
* Raise Recirc flow alternately with RWR MG A(B) SPEED Ensure Trigger 1 automatically             CNTRL activates when Recirculation pump B flow exceeds
* Monitor APRMs, CTP, Recirc flow, Reactor water level approximately 11.5 Mlbmlhr to initiate the next event.
                                                                                                                        !
LOI 14-2 NRC Examination Scenario 4 Page 9 of 23
 
INSTRUCTOR ACTIVITY           POSITION                 OPERATOR ACTIONS/STANDARD                         COMMENTS I EVALUATION Event3                         ATC                                                                           SAT I UNSAT INA Recirculation Pump B Runs High
* Recognize I report Recirculation pump B speed controller is malfunctioning SRO                                                                           SAT I UNSAT INA
* Acknowledge report
* Acknowledge report
* Direct lock-up of Recirculation pump B scoop tube per OP-27 Section G.6 Note:
* Direct lock-up of Recirculation pump B scoop tube per OP-27 Section G.6 Note:
* Enter AOP-8 (Unexpected Change in Core Flow) Depending on the speed of
* Enter AOP-8 (Unexpected Change in Core Flow)
* Enter AOP-32 (Unexplained/Unanticipated Reactivity Change) the crew's actions to lock-up
Depending on the speed of
* Determine compliance with Technical Specification 3.4.1: Recirculation pump B scoop tube, the resulting 0 If core flow <70% (53.9 Mlb/hr), flow mismatch must be Recirculation loop flow (7.7 Mlb/hr) mismatch may vary. If core flow (53.9 Mlb/hr), flow mismatch must be 0 (3.85 Mlb/hr) 0 If these limits not met, enter Condition Band restore within 24 hours ATC SAT I UNSAT INA Role Play:
* Enter AOP-32 (Unexplained/Unanticipated Reactivity Change) the crew's actions to lock-up Recirculation pump B scoop
* Determine compliance with Technical Specification 3.4.1:
tube, the resulting                         0   If core flow <70% (53.9 Mlb/hr), flow mismatch must be Recirculation loop flow                         ~10% (7.7 Mlb/hr) mismatch may vary.
If core flow ~70% (53.9 Mlb/hr), flow mismatch must be
                                                  ~5%  (3.85 Mlb/hr) 0   If these limits not met, enter Condition Band restore within 24 hours ATC                                                                           SAT I UNSAT INA Role Play:
* Place RWR B SCOOP TUBE control switch to TRIP If asked as management or Reactor Engineering about
* Place RWR B SCOOP TUBE control switch to TRIP If asked as management or Reactor Engineering about
* Place SCOOP TUBE B AUTO UNLOCK control switch in ON how to restore Recirculation
* Place SCOOP TUBE B AUTO UNLOCK control switch in ON how to restore Recirculation
* Monitor for Thermal Hydraulic Instabilities flow mismatch to within limits, I direct the crew to maintain
* Monitor for Thermal Hydraulic Instabilities                                           I flow mismatch to within limits, direct the crew to maintain
* Monitor Feedwater response Recirculation flow at the current value until further investigation and analysis is completed.
* Monitor Feedwater response Recirculation flow at the current value until further investigation and analysis is completed.
LOI 14-2 NRC Examination Scenario 4 Page 10 of 23 INSTRuCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 ATC/BOP SAT I UNSAT INA On Lead Examiner Cue:
LOI 14-2 NRC Examination Scenario 4 Page 10 of 23
* Recognize I report annunciator 09-7-3-43, SPE VAC LO ACTIVATE TRIGGER 2 Loss of Steam Packing
 
* Recognize I report neither Steam Packing Exhauster is running Exhauster A SRO SATIUNSATINA
INSTRuCTOR ACTIVITY         POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS I EVALUATION Event 4                       ATC/BOP                                                                   SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 2
* Recognize I report annunciator 09-7-3-43, SPE VAC LO Loss of Steam Packing
* Recognize I report neither Steam Packing Exhauster is running Exhauster A SRO                                                                       SATIUNSATINA
* Acknowledge report
* Acknowledge report
* Direct ARP response
* Direct ARP response
* Direct starting standby Steam Packing Exhauster BOP SATIUNSATINA Role Play:
* Direct starting standby Steam Packing Exhauster BOP                                                                       SATIUNSATINA Role Play:
* Execute ARP 09-7-3-43 If dispatched to investigate Steam Packing Exhauster A,
* Execute ARP 09-7-3-43 If dispatched to investigate Steam Packing Exhauster A,
* Start Steam Packing Exhauster B per OP-24D section G.1: wait 2 minutes, then report 0 Start SPE B 38C-5B that the breaker for Steam Packing Exhauster A is tripped 0 Throttle open SPE B DISCH 38MOV-D2 until red open but there are no other indicating light comes on (dual position indication) abnormal conditions.
* Start Steam Packing Exhauster B per OP-24D section G.1:
0 Close SPE A DISCH 38MOV-D1, while throttling SPE B DISCH 38MOV-D2 to establish 10 to 20 inches of water vacuum on VAC 94PI-09 ------LOI 14-2 NRC Examination Scenario 4 Page 11 of 23
wait 2 minutes, then report                 0   Start SPE B 38C-5B that the breaker for Steam Packing Exhauster A is tripped             0   Throttle open SPE B DISCH 38MOV-D2 until red open but there are no other                         indicating light comes on (dual position indication) abnormal conditions.                       0   Close SPE A DISCH 38MOV-D1, while throttling SPE B DISCH 38MOV-D2 to establish 10 to 20 inches of water vacuum on VAC 94PI-09
* ' INSTkLJCTOR ACTIVITY POSITION OPERAl OR ACTIONS/STANDARD COMMENTS I EVALUATION Event 5 BOPIATC SAT I UNSAT INA On Lead Examiner Cue:
                                                                                                                      -----     -
* Recognize I report EPIC low flow alarm ACTIVATE TRIGGER 3 Loss of RBCLC Flow to
LOI 14-2 NRC Examination Scenario 4 Page 11 of 23
 
                                                                      *                                                   '
INSTkLJCTOR ACTIVITY         POSITION                 OPERAl OR ACTIONS/STANDARD                     COMMENTS I EVALUATION Event 5                     BOPIATC                                                                     SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 3
* Recognize I report EPIC low flow alarm Loss of RBCLC Flow to
* Recognize I report multiple annunciators, including:
* Recognize I report multiple annunciators, including:
Recirculation Pump B 0 09-4-3-16, RWR PMP B SEAL CLR FLOW LO 0 09-4-3-26, RWR PUMP B MTR WINDING CLR FLOW LO 0 09-4-3-33, RWR PMP A OR B TEMP HI Critical Task *1 Given a loss of all RBCLC flow to an operating Recirculation Pass/ Fall pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, In accordance with OP-27:
Recirculation Pump B                             09-4-3-16, RWR PMP B SEAL CLR FLOW LO 0
09-4-3-26, RWR PUMP B MTR WINDING CLR FLOW LO 0   09-4-3-33, RWR PMP A OR B TEMP HI Critical Task *1                         Given a loss of all RBCLC flow to an operating Recirculation   Pass/ Fall pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, In accordance with OP-27:
* Securing the Recirculation pump
* Securing the Recirculation pump
* Isolating the Recirculation pump Critical Task *1 Standard:
* Isolating the Recirculation pump Critical Task *1 Standard:               Stop Recirculation pump B.
Stop Recirculation pump B. And/or Isolate Recirculation pump B. SRO SATIUNSATINA
And/or Isolate Recirculation pump B.
SRO                                                                         SATIUNSATINA
* Acknowledge reports
* Acknowledge reports
* Direct ARP execution
* Direct ARP execution Critical Task #1
* Direction shutdown of Recirculation pump B per OP-27 Critical Task #1
* Direction shutdown of Recirculation pump B per OP-27
* Enter AOP-8 (Unexpected Change in Core Flow)
* Enter AOP-8 (Unexpected Change in Core Flow)
* Determine Technical Specification 3.3.1.1 Condition C and TRO 3.3.8 Condition C entry is required (1 hour to establish single loop limits for APRM flow biased scram and rod block)
* Determine Technical Specification 3.3.1.1 Condition C and TRO 3.3.8 Condition C entry is required (1 hour to establish single loop limits for APRM flow biased scram and rod block)
* Determine Technical Specification 3.4.1 Condition B entry is required (24 hours) LOI 14-2 NRC Examination Scenario 4 Page 12 of 23
* Determine Technical Specification 3.4.1 Condition B entry is required (24 hours)
---. INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP SAT I UNSAT INA
LOI 14-2 NRC Examination Scenario 4 Page 12 of 23
* Execute ARP 09-4-3-16, as time permits: 0 Monitor seal cavity temps on 02TR-031 (points 20 & 21) 0 If seal cavity temp increases to 250&deg;F, then shutdown B Note: RWR pump per Section G of OP-27 Some indication for 15FIS-0 Ensure open 15AOV-132B and 15AOV-133B 1 02B is available on EPIC Verify RBC flow rate >300 gpm on 15FIS-102B screen RWRB 1. 0 0 Monitor OW leakage for signs of seal leakage Role Play:
 
* Execute ARP 09-4-3-26, as time permits: If dispatched to check RBC 0 Monitor temps on 02-2TR-31 flow rate to RWR pump B, wait Verify RBC flow rate >300 gpm on 15FIS-102B 2 minutes, then report that 0 there is no RBC flow to RWR 0 If RBC flow cannot be restored and RWR pump and motor pump B. temps are rising, then shut down RWR loop B per OP-27 Section G 0 Monitor OW sump levels
        -   -                                                 -   .
* Execute ARP 09-4-3-33, as time permits: 0 Check 02-2TR-31 0 Check RBC temp 0 Check RBC lineup and verify at least 300 gpm on 15-FIS-102B 0 Monitor computer and annunciators for problem 0 Monitor OW leakage for possible leak in RBC system 0 If any RWR motor bearing exceeds 220&deg;F, then shut down RWR pump per Section G of OP-27 LOI 14-2 NRC Examination Scenario 4 Page 13 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA
INSTRUCTOR ACTIVITY         POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION BOP                                                                     SAT I UNSAT INA
* Secure Recirculation pump B per OP-27: 0 Close RWR PMP 8 DISCH 02MOV-538 Critical Task #1 Note: 0 Verify RWR PMP 02-2P-1 B is tripped If Recirculation pump B is 0 Place RWR PMP 02-2P-1 B control switch in PULL TO secured before damage to the LOCK seals results in coolant leakage into the Drywell, 0 Verify open RWR MG B GEN FIELD BKR isolation of the pump is not 0 IF loop 8 isolation is required, THEN ensure closed the required to meet the critical following valves: Critical Task #1 task.
* Execute ARP 09-4-3-16, as time permits:
* RWR PMP 8 DISCH 02MOV-538
0 Monitor seal cavity temps on 02TR-031 (points 20 & 21) 0 If seal cavity temp increases to 250&deg;F, then shutdown B Note:                                         RWR pump per Section G of OP-27 Some indication for 15FIS-                 0 Ensure open 15AOV-132B and 15AOV-133B 102B is available on EPIC                     Verify RBC flow rate >300 gpm on 15FIS-102B 0
* RWR PMP 8 SUCT 02MOV-438 Role Play: If dispatched to close 02-* 02-2RWR-39B (RWR pump B seal purge upstr isol 2RWR-39B, wait 2 minutes, valve) then report task completion.
screen RWRB 1.
* Coordinate with ATC to execute AOP-8, as time permits Note:
0 Monitor OW leakage for signs of seal leakage Role Play:
* Monitor for thermal-hydraulic instability It is expected to move to the
* Execute ARP 09-4-3-26, as time permits:
If dispatched to check RBC                 0 Monitor temps on 02-2TR-31 flow rate to RWR pump B, wait 2 minutes, then report that                0  Verify RBC flow rate >300 gpm on 15FIS-102B there is no RBC flow to RWR                 0 If RBC flow cannot be restored and RWR pump and motor pump B.                                       temps are rising, then shut down RWR loop B per OP-27 Section G 0 Monitor OW sump levels
* Execute ARP 09-4-3-33, as time permits:
0 Check 02-2TR-31 0 Check RBC temp 0 Check RBC lineup and verify at least 300 gpm on 15-FIS-102B 0 Monitor computer and annunciators for problem 0 Monitor OW leakage for possible leak in RBC system 0 If any RWR motor bearing exceeds 220&deg;F, then shut down RWR pump per Section G of OP-27 LOI 14-2 NRC Examination Scenario 4 Page 13 of 23
 
INSTRUCTOR ACTIVITY         POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS I EVALUATION BOP cont.                                                                 SAT I UNSAT INA
* Secure Recirculation pump B per OP-27:
0   Close RWR PMP 8 DISCH 02MOV-538                         Critical Task #1 Note:                                     0   Verify RWR PMP 02-2P-1 B is tripped If Recirculation pump B is                 0   Place RWR PMP 02-2P-1 B control switch in PULL TO secured before damage to the                   LOCK seals results in coolant                   0   Verify open RWR MG B GEN FIELD BKR leakage into the Drywell, isolation of the pump is not               0   IF loop 8 isolation is required, THEN ensure closed the required to meet the critical                 following valves:                                       Critical Task #1 task.
* RWR PMP 8 DISCH 02MOV-538 Role Play:
* RWR PMP 8 SUCT 02MOV-438 If dispatched to close 02-
* 02-2RWR-39B (RWR pump B seal purge upstr isol 2RWR-39B, wait 2 minutes,                         valve) then report task completion.
* Coordinate with ATC to execute AOP-8, as time permits
* Monitor for thermal-hydraulic instability Note:
It is expected to move to the
* Ensure RPV water level returns to normal and stabilizes next event before the crew
* Ensure RPV water level returns to normal and stabilizes next event before the crew
* Determine operating point on Power-Flow Map addresses Recirculation loop
* Determine operating point on Power-Flow Map addresses Recirculation loop temperature and SLO
* Demand a 3D Monicore Official Program and review margin to temperature and SLO scram/rod block setpoint thermal limits issues. ATC SAT I UNSAT INA
* Demand a 3D Monicore Official Program and review margin to scram/rod block setpoint                   thermal limits issues.
ATC                                                                       SAT I UNSAT INA
* Monitor Reactor power
* Monitor Reactor power
* Monitor for thermal-hydraulic instability
* Monitor for thermal-hydraulic instability
* Monitor Feedwater response -LOI14-2 NRC Examination Scenario 4 Page 14 of 23 INSTklJCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION Events 6 1 7 1 8 1 & 9 ATCIBOP SAT I UNSAT INA On Lead Examiner Cue:
* Monitor Feedwater response
* Recognize I report annunciator 09-3-1-39 , TURB BLDG ARM ACTIVATE TRIGGER 4 Main Steam Leak into Turbine RADHI Building , All MSIVs Fail to
                                                                                                    ~~ -
* Recognize I report rising radiation levels in Turbine Building Automatically Close Loss of High Pressure Injection HPCI Flow Controller Failure in Automatic , HPCI Trips RCIC Fails to Automatically Initiate, RCIC Trips , ADS Fails to Automatically Initiate r Critical Task #2 Given a Main Steam leak into the Turbine Building and a Pass I Fail failure of the MSIVs to automatically close, isolate the Main I Steam lines, in accordance with AOP-40. Critical Task #2 Standard:
LOI14-2 NRC Examination Scenario 4 Page 14 of 23
Close at least one MSIV in each Main Steam line. Critical Task #3 Given the Reactor above the injection pressure of adequate Pass I Fail injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2. Critical Task #3 Standard:
 
Lower Reactor pressure using SRVs to below the discharge pressure of the Condensate Booster pumps. LOI14-2 NRC Examination Scenario 4 Page 15 of 23 INSTkLJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT I UNSAT INA
INSTklJCTOR ACTIVITY         POSITION                 OPERATOR ACTIONS/STANDARD                         COMMENTS I EVALUATION Events 61 71 81 & 9             ATCIBOP                                                                     SAT I UNSAT INA On Lead Examiner Cue:
ACTIVATE TRIGGER 4
* Recognize I report annunciator 09-3-1-39, TURB BLDG ARM RADHI Main Steam Leak into Turbine Building , All MSIVs Fail to
* Recognize I report rising radiation levels in Turbine Building Automatically Close Loss of High Pressure Injection HPCI Flow Controller Failure in Automatic, HPCI Trips RCIC Fails to Automatically Initiate, RCIC Trips, ADS Fails to Automatically Initiate r Critical Task #2                         Given a Main Steam leak into the Turbine Building and a           Pass I Fail failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40.
I Critical Task #2 Standard:                 Close at least one MSIV in each Main Steam line.
Critical Task #3                           Given the Reactor above the injection pressure of adequate       Pass I Fail injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.
Critical Task #3 Standard:                 Lower Reactor pressure using SRVs to below the discharge pressure of the Condensate Booster pumps.
LOI14-2 NRC Examination Scenario 4 Page 15 of 23
 
INSTkLJCTOR ACTIVITY         POSITION               OPERATOR ACTIONS/STANDARD                       COMMENTS I EVALUATION SRO                                                                       SAT I UNSAT INA
* Acknowledge reports
* Acknowledge reports
* Direct ARP execution
* Direct ARP execution
* May direct Reactor power reduction with CRAM rods, as time Note: permits The crew will monitor Main
* May direct Reactor power reduction with CRAM rods, as time Note:                                       permits The crew will monitor Main
* Enter AOP-40 (Main Steam Line Break) Steam Tunnel temperatures Direct a manual Reactor scram and likely set a benchmark of
* Enter AOP-40 (Main Steam Line Break)
* 185&deg;F for inserting a scram.
Steam Tunnel temperatures and likely set a benchmark of
* Direct a manual Reactor scram 185&deg;F for inserting a scram.
* Enter AOP-1 (Reactor Scram)
* Enter AOP-1 (Reactor Scram)
* Direct closure of MSIVs Critical Task #2
* Direct closure of MSIVs                                     Critical Task #2
* Enter EOP-2 (RPV Control) on low Reactor water level
* Enter EOP-2 (RPV Control) on low Reactor water level
* Direct Reactor water level controlled 180 to 220" (expands band as necessary due to injection failures)
* Direct Reactor water level controlled 180 to 220" (expands band as necessary due to injection failures)
* Direct Reactor pressure controlled 800-1000 psig using SRVs Note:
* Direct Reactor pressure controlled 800-1000 psig using SRVs Note:
* Acknowledge failure of Feedwater controllers Depending on the pre-scram Direct manual start of HPCI power level , Reactor water
* Acknowledge failure of Feedwater controllers Depending on the pre-scram power level, Reactor water
* level may not reach the HPCI
* Direct manual start of HPCI level may not reach the HPCI
* Acknowledge failure of HPCI to inject in automatic and RCIC automatic initiation setpoint of 126.5" on the
* Acknowledge failure of HPCI to inject in automatic and RCIC automatic initiation setpoint of 126.5" on the
* Direct manual control of HPCI flow scram.
* Direct manual control of HPCI flow scram.
Line 1,490: Line 3,478:
* Acknowledge trip of RCIC (after one minute of injection)
* Acknowledge trip of RCIC (after one minute of injection)
* May direct maximizing CRD injection
* May direct maximizing CRD injection
* May direct injection with SLC
* May direct injection with SLC Critical Task #3
* Direct reducing Reactor pressure using SRVs Critical Task #3 LOI 14-2 NRC Examination Scenario 4 Page 16 of 23
* Direct reducing Reactor pressure using SRVs LOI 14-2 NRC Examination Scenario 4 Page 16 of 23
. INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO cont. SATIUNSATINA
 
                                                                    .
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                           COMMENTS I EVALUATION SRO cont.                                                                       SATIUNSATINA
* Direct Reactor water level controlled 180 to 220" using Condensate Booster pumps
* Direct Reactor water level controlled 180 to 220" using Condensate Booster pumps
* As time permits, direct Turbine Building evacuation, verification of isolations, and alignment of Control Room, Relay Room, and TSC ventilation
* As time permits, direct Turbine Building evacuation, verification of isolations, and alignment of Control Room, Relay Room, and TSC ventilation
* As time permits, direct initiation of Torus Cooling ATC SAT I UNSAT INA
* As time permits, direct initiation of Torus Cooling ATC                                                                             SAT I UNSAT INA
* May insert CRAM rods, as time permits
* May insert CRAM rods, as time permits
* Enter AOP-1
* Enter AOP-1
Line 1,505: Line 3,495:
* Ensure Main Turbine is tripped
* Ensure Main Turbine is tripped
* Verify 4KV loads transfer to reserve power
* Verify 4KV loads transfer to reserve power
* Close MSIVs Critical Task #2
* Close MSIVs                                                       Critical Task #2
* Control Reactor pressure 800-1 000 psig using SRVs
* Control Reactor pressure 800-1 000 psig using SRVs Critical Task #3
* Reduce Reactor pressure using SRVs Critical Task #3 LOI 14-2 NRC Examination Scenario 4 Page 17 of 23 INSTRUCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP SAT I UNSAT INA Role Play:
* Reduce Reactor pressure using SRVs LOI 14-2 NRC Examination Scenario 4 Page 17 of 23
* Execute ARP 09-3-1-39, as time permits: If dispatched to investigate in Turbine Building, wait 2 0 Determine which ARM is in alarm minutes , then report there is a 0 Evacuate personnel at location of ARM in alarm lot of steam coming from the Turbine Deck and very high 0 Attempt to reset ARM temperatures. 0 Direct RP to survey area Role Play:
 
* Enter AOP-1 If dispatched as RP to survey
INSTRUCTOR ACTIVITY           POSITION               OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION BOP                                                                     SAT I UNSAT INA Role Play:
* Attempt to control Reactor water level 180-220" using Turbine Building, wait 2 Feedwater minutes, then report radiation
* Execute ARP 09-3-1-39, as time permits:
* Recognize I report inability to inject with high pressure levels matching current status Feedwater pumps of ARMs.
If dispatched to investigate in Turbine Building, wait 2                     0   Determine which ARM is in alarm minutes, then report there is a             0   Evacuate personnel at location of ARM in alarm lot of steam coming from the Turbine Deck and very high                   0   Attempt to reset ARM temperatures.                               0   Direct RP to survey area
* Enter AOP-1 Role Play:
If dispatched as RP to survey
* Attempt to control Reactor water level 180-220" using Turbine Building, wait 2                     Feedwater minutes, then report radiation
* Recognize I report inability to inject with high pressure levels matching current status               Feedwater pumps of ARMs.
* Recognize I report failure of HPCI to inject Role Play:
* Recognize I report failure of HPCI to inject Role Play:
* Take manual control of HPCI flow controller and raise flow If dispatched to investigate
* Take manual control of HPCI flow controller and raise flow If dispatched to investigate
* Recognize I report HPCI trip Feedwater pump control , wait
* Recognize I report HPCI trip Feedwater pump control , wait 2 minutes, then report that you
* Recognize I report failure of RCIC to automatically start 2 minutes , then report that you have found no indications why
* Recognize I report failure of RCIC to automatically start have found no indications why
* Start RCIC per OP-19 posted attachment:
* Start RCIC per OP-19 posted attachment:
Feedwater pump control has failed. 0 Verify Annunciator 09-4-0-32 RCIC LOGIC RX LVL HI is clear Role Play: 0 Verify RCIC is lined up to one of the following suction If dispatched to investigate paths: HPCI trip, wait 2 minutes , then
Feedwater pump control has failed .                                     0   Verify Annunciator 09-4-0-32 RCIC LOGIC RX LVL HI is clear Role Play:                                   0   Verify RCIC is lined up to one of the following suction If dispatched to investigate                     paths:
* CST SUCT VLV 13MOV-18 open for suction from CSTs report that there appears to be
HPCI trip, wait 2 minutes, then
* The following valves open for suction from torus: damage to the HPCI Turbine Stop Valve, 23HOV-1.
* CST SUCT VLV 13MOV-18 open for suction from CSTs report that there appears to be damage to the HPCI Turbine
* The following valves open for suction from torus :
Stop Valve, 23HOV-1 .
* INBD TORUS SUCT 13MOV-41
* INBD TORUS SUCT 13MOV-41
* OUTBD TORUS SUCT 13MOV-39 0 Start VAC PMP 13P-3 --LOI 14-2 NRC Examination Scenario 4 Page 18 of 23
* OUTBD TORUS SUCT 13MOV-39 0   Start VAC PMP 13P-3
. . . ' . INSTFn.JCTOR ACTIVITY POSITION OPERA TOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA
                                                                                                                              - -
* Start RCIC per OP-19 posted attachment (cont.): 0 Open OIL CLR WTR SUPP 13MOV-132 Note: 0 Perform the following without unnecessary delay: -RCIC will trip approximately
LOI 14-2 NRC Examination Scenario 4 Page 18 of 23
 
        . .                                                   .     '
                                                                                                                      .
INSTFn.JCTOR ACTIVITY         POSITION             OPERATOR ACTIONS/STANDARD                     COMMENTS I EVALUATION BOP cont.                                                             SAT I UNSAT INA
* Start RCIC per OP-19 posted attachment (cont.):
0 Open OIL CLR WTR SUPP 13MOV-132 Note:                                       0 Perform the following without unnecessary delay:
                          -
RCIC will trip approximately
* Open TURB STM SUPP VLV 13MOV-131 one minute after start.
* Open TURB STM SUPP VLV 13MOV-131 one minute after start.
* Open INJ VLV 13MOV-21 Role Play:
* Open INJ VLV 13MOV-21
* Recognize I report trip of RCIC If dispatched to investigate
* Recognize I report trip of RCIC Role Play:
If dispatched to investigate
* Recognize I report trip of CRD pump RCIC trip, wait 2 minutes, then
* Recognize I report trip of CRD pump RCIC trip, wait 2 minutes, then
* May attempt to start standby CRD pump I report that there appears to be damage to the RCIC 0 Recognize I report trip of 2"d CRD pump trip/throttle valve, 13HOV-1.
* May attempt to start standby CRD pump report that there appears to be                                                                                             I damage to the RCIC                           0 Recognize I report trip of 2"d CRD pump trip/throttle valve, 13HOV-1.
* May attempt to initiate SLC Note: 0 Recognize I report failure of SLC pumps to start Condensate Booster pumps
* May attempt to initiate SLC 0 Recognize I report failure of SLC pumps to start Note:
* Control Reactor water level 180 to 200" using Condensate will be capable of injection to Booster pumps the Reactor once Reactor pressure is reduced to approximately 700 psig. LOI 14-2 NRC Examination Scenario 4 Page 19 of 23 INSTkUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC I BOP SAT I UNSAT INA
Condensate Booster pumps
* As time permits , verify isolations per AOP-15
* Control Reactor water level 180 to 200" using Condensate will be capable of injection to             Booster pumps the Reactor once Reactor pressure is reduced to approximately 700 psig.
LOI 14-2 NRC Examination Scenario 4 Page 19 of 23
 
INSTkUCTOR ACTIVITY               POSITION                   OPERATOR ACTIONS/STANDARD                 COMMENTS I EVALUATION ATC I BOP                                                               SAT I UNSAT INA
* As time permits, verify isolations per AOP-15
* May initiate Torus Cooling per OP-138 posted attachment:
* May initiate Torus Cooling per OP-138 posted attachment:
0 Ensure at least one of the RHR pumps is running 0 Open RHR TEST TORUS CLG & SPRAY 1 OMOV-39A(B) 0 Throttle RHR TEST & TORUS CLG 1 OMOV-34A(B) to establish desired/flow 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm, ensure closed MIN FLOWVLV 10MOV-16B 0 Establish RHRSW flow and temperature control
0   Ensure at least one of the RHR pumps is running 0   Open RHR TEST TORUS CLG & SPRAY 1OMOV-39A(B) 0   Throttle RHR TEST & TORUS CLG 1OMOV-34A(B) to establish desired/flow 0   WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm, ensure closed MIN FLOWVLV 10MOV-16B 0   Establish RHRSW flow and temperature control
* May initiate RHRSW per OP-13C posted attachment:
* May initiate RHRSW per OP-13C posted attachment:
0 Start one of the RHRSW pumps 0 Throttle RHRSW DISCH VLV FROM HX A(B) 1 OMOV-89 A(B) to establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89 A(B) to establish 2500 to 4000 gpm per RHRSWpump 0 Close HX A( B) BYP VLV 1 OMOV-66 A( B) Termination Criteria:
0   Start one of the RHRSW pumps 0   Throttle RHRSW DISCH VLV FROM HX A(B) 1OMOV-89 A(B) to establish 2500 to 4000 gpm 0   Start the second RHRSW pump if desired 0   Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89 A(B) to establish 2500 to 4000 gpm per RHRSWpump 0   Close HX A( B) BYP VLV 1OMOV-66 A( B)
Termination Criteria:
* All control rods are inserted.
* All control rods are inserted.
* Reactor water level is being controlled above 0". LOI 14-2 NRC Examination Scenario 4 Page 20 of 23 ,
* Reactor water level is being controlled above 0".
Shift Turnover The Plant is operating at approximately 65% power. Circulation Water pump C is ready to be returned to service following maintenance.
LOI 14-2 NRC Examination Scenario 4 Page 20 of 23
When you take the shift: 1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step 0.17.3.e.
            ,
: 2. Then, raise Reactor power using Recirculation flow per the provided reactivity instruction. Stop at approximately 75% power for further Reactor Engineering instructions.
 
LOI 14-2 NRC Examination Scenario 4 Page 21 of 23 c ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps-(site specific control rod movement control sheet format is to be used) EN-RE-215 Attach 9.4 I nit Step Action 1 Raise power to 75% RTP WaitS minutes , then 2 Prepared By: (RxEng) demand 3D Monicore case Rod --Reviewed By: Bob-TO!'\AW (RxEng or SRO) Power Ascension Today From To Method Notch Notch --RWR ---Stamps Page 1 of 1 Cplg RSCS Notes Chk Grp NA -Target rate= 1% per minute --SM Approval: (Shift Manager) CONTROL ROOM OPERA TOR LOI14-2 NRC Examination Scenario 4 Page 22 of 23 0 ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps-(site specific control rod movement control sheet format is to be used) EN-RE-215 Attach 9.4 I nit Step Action 1 Raise power to 75% RTP WaitS minutes, then 2 Prepared By: (RxEng) demand 3D Monicore case Rod --Reviewed By: Bob-Tc?t'\.e4:, (RxEng or SRO) Power Ascension Today From To Method Notch Notch --RWR ---Stamps Page 1 of 1 Cplg RSCS Notes Chk Grp NA -Target rate= 1% per minute --SM Approval:
Shift Turnover The Plant is operating at approximately 65% power.
Vcwet'RO"et (Shift Manager) INDEPENDENT VERIFIER LOI 14-2 NRC Examination Scenario 4 Page 23 of 23}}
Circulation Water pump C is ready to be returned to service following maintenance.
When you take the shift:
: 1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step 0.17.3.e.
: 2. Then, raise Reactor power using Recirculation flow per the provided reactivity instruction . Stop at approximately 75%
power for further Reactor Engineering instructions.
LOI 14-2 NRC Examination Scenario 4 Page 21 of 23
 
ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)
Power Ascension EN-RE-215 Attach 9.4                         Today                                        Page 1 of 1 From      To              Cplg    RSCS Init  Step       Action       Rod                    Method                              Notes Notch    Notch              Chk      Grp Raise power 1
to 75% RTP       -      -        -      RWR      NA        -    Target rate= 1% per minute WaitS minutes, then 2     demand 3D        -      -        -        -      -        -
Monicore case c
Prepared By:                                                               SM Approval:  VCVtler'R~
(RxEng)                                                           (Shift Manager)
Reviewed By:     Bob- TO!'\AW (RxEng or SRO)
Stamps CONTROL ROOM OPERATOR LOI14-2 NRC Examination Scenario 4 Page 22 of 23
 
ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)
Power Ascension EN-RE-215 Attach 9.4                           Today                                        Page 1 of 1 From      To              Cplg    RSCS Init  Step       Action           Rod                  Method                              Notes Notch    Notch              Chk      Grp Raise power 1
to 75% RTP
                                      -    -        -    RWR      NA        -    Target rate= 1% per minute WaitS minutes, then 2     demand 3D            -    -        -        -      -        -
Monicore case 0
Prepared By:                                                                 SM Approval:  Vcwet'RO"et (RxEng)                                                             (Shift Manager)
Reviewed By:     Bob- Tc?t'\.e4:,
(RxEng or SRO)
Stamps INDEPENDENT VERIFIER LOI 14-2 NRC Examination Scenario 4 Page 23 of 23}}

Revision as of 19:24, 31 October 2019

Final Operating Exam (Sections a, B, and C) (Folder 3)
ML14318A510
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/15/2014
From:
Operations Branch I
To:
FitzPatrick
Shared Package
ML14101A125 List:
References
TAC U01887
Download: ML14318A510 (290)


Text

ENT~RGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO 14-2 NRC RO TASK TITLE: Perform RHR Lineup Verification Per ST -2AN C001 APPL . TO JPM NUMBER REV : DATE: NRC KJA SYSTEM NUMBER: _.2:......1_.:.....31--'(._4_

.6i.-)- - - - -

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME :

- Minutes SUBMITTED:

APPROVED:

CANDIDATE NAME: LOGIN ID:

JPM Completion Perform Location : Simulator DATE PERFORMED: TIME TO COMPLETE : Minutes

---

")ERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE:

PROGRAM ADMINISTER

-1 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO 14-2 NRC RO TASK TITLE: Perform RHR Lineup Verification Per ST-2AN C001 APPL. TO JPM NUMBER Current Update: By:.

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required C8] None Comments:

Current Update By:

Date lnt Previous Revision Date:

-2 of 8-

ENTERGY NU LEAR NORTHEAST JOB PERFO MANCE MEASURE RO 14-2 NRC RO TASK TliTLE: Perform RHR Lineup Verification Per ST-2AN C001 APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-2AN, RHR Loop A Monthly Operability Test Ill. TOOLS AND EQUIPMENT

  • None IV. SET UP REQUIREMENTS A. Provide a copy of ST-2AN complete up to step 8.1.

B. Reset the simulator to an IC (IC-66) ith RHR in a normal standby lineup, except for the following :

a. 10MOV-16A, MIN FLOWVLV, is closed .
b. 1OMOV-66A, HX A BYP VLV, is losed.
c. 10MOV-57, RHR DISCH TO RA W , is open.
d. 10MOV-18, SHUTDOWN CLG S CT, is open.

V. EVALUATOR NOTES A. The candidate should, at a minimum observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform th candidate that the conditions of each step need only be properly identified and not actually p rformed .

C. The candidate should demonstrate p oper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .

D. Should Candidate inform CRS that ST cannot be continued due to the out of position valve or out of spec readings, etc .. . , inform Candidate the deviation has been noted and for them to continue with the ST.

VI. TASK CONDITIONS A. ST-2AN, RHR Loop A Monthly Oper bility Test, is in progress.

B. Other operators have prepared ST-2 N up to Section 8.1.

C. RHR Loop A level switches are operr ble.

D. RHR Loop A is in the standby LPCI I neup.

VII . INITIATING CUE t form the candidate, "Complete ST-2AN Sections e. 1 and 8.2. "

-3 of 8-

RO 14-2 NRC RO C001 TASK TITLE: Perform RHR Lineup Verific tion

-

C -CRITICAL STEP STEP STANDARD EVALUATION I COMMENT

1. IF 10LS-100 (RHR loop A Co tacts Operator in Relay Room to SAT/UNSAT containment spray line level switch) ver fy lights for 10LS-100 and 10LS-and 10LS-101 (RHR loop' A LPCI 10 are OFF on alarm module 10-keep-full level switch) are operable, 74 1-44 inside panel AR-8 THEN perform the following:

EV ALUTOR ROLE PLAY:

~

Verify RHR Loop A keep-full level lnd rm the Candidate that the lights switch alarms are clear by one of the for 10LS-100 and 10LS-101 are following methods: OPF.

  • Verify lights for 1OLS-1 00 and -OR-10LS-101 are off on alarm module 10-7 4-1-44 inside panel AR-8 in relay room Uti izes any EPIC station and verifies poi pts EPIC-D-129 and EPIC-D-130
  • Verify associated EPIC points indicate NORMAL (EPIC-D-129 and EPIC-D-130) indicate NORMAL

, 2. Mark Steps 8.1 .2 through 8.1.10 N/A M rks Steps 8.1 .2 through 8.1.1 0 SAT/UNSAT N/

  • 3. IF RHR Loop A is in standby LPCI Ve ifies the following lineup at panel CRITICAL STEP lineup per OP-13, Section E, THEN 09 3 and documents in ST-2AN: (bolded items only) perform the following: SAT I UNSAT Verify the following lineup at panel 09-3:

-4 of 8-

RO 14-2 NRC RO C001 TASK TITLE: Perform RHR Lineup Verific~tion EVALUATION I STEP J STANDARD COMMENT

3. Verify the following lineup at panel ve~ifies the following lineup at panel CRITICAL STEP (cont.) 09-3 (cont.): 09 Ia and documents in ST-2AN (bolded items only)

(co t.): SAT I UNSAT I

-Closed

-Closed

  • MIN FLOWVLV 10MOV-16A-Open * *MIN FLOW VLV 10MOV-16A-Closed EV~LUATOR NOTE: The bolded iterps in this step are improperly ali ~ ned. Should the Candidate inform the CRS that the ST cannot be lbontinued due to the improperly ali~ ned item, inform the Candidate th~ deviation has been noted, continue with the ST, and the deyiation will be corrected by another Operator later.
  • OW SPRAY OUTBO VLV
  • OW SPRAY INBO VLV 10MOV-

-Open

-Open

  • RHR TEST TORUS CLG &
  • RHR TEST TORUS CLG &

SPRAY 1OMOV-39A- Closed SPRAY 1OMOV-39A- Closed

  • TORUS SPRAY INBO VLV

!I

-5 of 8-

RO 14-2 NRC RO C001 TASK TITLE p e rform RHRL"me up ven"fiIC~ fIIOn II EVALUATION I STEP I STANDARD f COMMENT

3. Verify the following lineup at panel Ve ifies the following lineup at panel CRITICAL STEP (cont. ) 09-3 (cont.): 09J3 and documents in ST-2AN (bolded items only)

(co t.): SAT I UNSAT

-Closed

-Closed

-Open

-Open

-Open

-Open

-Closed

-Closed II

  • RHR DISCH TO RADW 1OMOV Closed
  • RHR DISCH TO RADW 1OMOV Closed
  • SHUTDOWN CLG SUCT 10MOV Closed
  • SHUTDOWN CLG SUCT I, 10MOV Closed I

-6 of 8-

RO 14-2 NRC RO C001 TASK TITLE Perform RHR Lineup Verification EVALUATION I STEP STANDARD COMMENT

  • 4. Verify the following lineup at panel Ve ifies the following lineup at panel CRITICAL STEP 09-4: 09i 4 and documents in ST-2AN (balded items only)

(CO!lt. ): SAT/UNSAT

  • RHR DISCH TO RADW 1OMOV Closed * *RHR DISCH TO RADW 10MOV Open
  • SHUTDOWN CLG SUCT 10MOV Closed * *SHUTDOWN CLG SUCT 10MOV-18.:.... Open I

EVt LUATOR NOTE: The bolded ite I s above are improperly aligned.

Sh uld the Candidate inform the C~S that the ST cannot be co1tinued due to the improperly aligned item, inform the Candidate thel deviation has been noted, continue with the ST, and the deyiation will be corrected by

, anqther Operator later.

EVALUATOR: Terr ~ inate the task at this point.

Task Standard: RHR lineup verification performed Improper lineup of minimum flow valve, heat exchanger bypass valve, discharge valve to Radwaste, and sh utdown cooling isolation valve identified.

-7 of 8-

HA DOUT

  • ST-2AN, RHR Loop A Monthly Operability Test, is in progress.
  • Other operators have prepared ST -2AN up to Section 8.1.
  • RHR Loop A is in the tandby LPCI lineup.

Complete ST-2AN Sections 8.1 a d 8.2.

I 8 of 8-

ENTERGY NUC EAR NORTHEAST I

JOB PERFOR ~ ANCE MEASURE RO NRC 14-2 RO TASK TIT~E: Re-activation of RO License C002 APPL . TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: .....:2:..:..

. 1.:...:...4..:.._(l.::.3:..::..3~..-)_ _ _ __

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME :

- Minute I

-z:;- ~ ----z_, _ .~ff)/,L_;;

SUBMITTED: .-

_,. r OPERATIONS REVIEW:

~~ (

APPROVED :

~ I CANDIDATE NAME:

JPM Completion Perform Classroom TE PERFORMED: Minutes PERFORMANCE EVALUATION : D Satisfact ry D Unsatisfactory


-------------------------------------------

COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER I

JOB PERFOR ANCE MEASURE RECORD ~NO CHECKLIST RO NRC 14-2 RO TASK TIT E: Re-activation of RO License C002 APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1Z1 None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

- of 8-

JOB PERFORMANCE MEASURE REQUIRED T iSK INFORMATION RO NRC 14-2 RO TASK Tl E: Re-activation of RO License C002 APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ODS0-30, Maintenance of NRC Licenses ~ nd STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the cand~date that the conditions of each step need only be properly identified and not actually perform d.

C. The candidate should demonstrate proper se of HU tools such as procedure use, self checking, place keeping and three-point communicat on.

VI. TASK CONDITIONS A. You are a Reactor Operator (RO) and your RO license became inactive on July 1, 2014.

B. You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4, 2014.

-3 of 8-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:

Yes- This IS required for license re-activation and it meets the standard.

No- This IS required for license re-activation, but it does NOT meet the standard.

N/R- This is NOT required for license re-activation."

EVALUATOR: Provide the candidate with the attached handout and worksheet. Provide ODS0-30 if requested .

STEP STANDARD EVALUATION I COMMENT

  • 1. Evaluates worksheet step 1 Circles Yes for worksheet step 1. CRITICAL STEP regarding requalification SAT I UNSAT training .

EVALUATOR NOTE: This step meets the required standard of being current in requal, which includes passing all exams with at least an 80%.

  • 2. Evaluates worksheet step 2 Circles No for worksheet step 2. CRITICAL STEP regarding a plant tour. SAT I UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO.
  • 3. Evaluates worksheet step 3 Circles No for worksheet step 3 Schedule A. CRITICAL STEP regarding proposed under- SAT I UNSAT instruction watch Schedule A.

EVALUATOR NOTE: The RB NPO position does not count towards the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-shift, leaving only 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

-4 of 8-

STEP STANDARD EVALUATION I COMMENT

  • 4. Evaluates worksheet step 3 Circles No for worksheet step 3 Schedule B. CRITICAL STEP regarding proposed under- SAT/UNSAT instruction watch Schedule B.

EVALUATOR NOTE: This step does not meet the required standard of the 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of on-shift time being performed in the same calendar quarter.

  • 5. Evaluates worksheet step 3 Circles Yes for worksheet step 3 Schedule C. CRITICAL STEP regarding proposed under- SAT/UNSAT instruction watch Schedule C.

EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter.

EVALUATOR: Terminate the task at this point.

-5 of 8-

EVALUATOR'S KEY

1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
  • Does The Above Meet Re-activation Standard? N/R
2. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
  • Does The Above Meet Re-activation Standard? Yes N/R
3. Below are three proposed schedules for you to stand the watch under instruction.

Date Position Hours Attend All Turnovers?

Sept 12 SNO 12 Yes Schedule Sept 13 SNO 12 Yes A Sept 20 RBNPO 12 Yes Sept 21 SNO 12 Yes

  • Does The Above Meet Re-activation Standard? Yes G N/R Date Position Hours Attend All Turnovers?

Sept 28 SN02 12 Yes Schedule Sept 29 SNO 12 Yes B Sept 30 SNO 12 Yes Oct 01 SNO 12 Yes Oct02 SNO 12 Yes

  • Does The.Above Meet Re-activation Standard? Yes N/R Date Position Hours Attend All Turnovers?

Sept22 SNO 12 Yes Schedule Sept 23 SNO 12 Yes c Sept 24 RBNPO 8 No (last 4 hrs of shift in Work Control)

Sept 25 SNO 12 Yes Sept27 SNO 12 Yes

  • Does The Above Meet Re-activation Standard? G No N/R EVALUATOR'S KEY

-6 of 8-

HANDOUT

  • You are a Reactor Operator (RO) and your RO license became inactive on July 1, 2014 .
  • You have been directed to re-activate your license during the 3rd quarter to stand an RO watch on October 4, 2014.

Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:

Yes - This IS required for license re-activation and it meets the standard.

No- This IS required for license re-activation, but it does NOT meet the standard.

N/R- This is NOT required for license re-activation.

-7 of 8-

WORKSHEET I. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.

  • Does The Above Meet Re-activation Standard? Yes No N/R
2. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
  • Does The Above Meet Re-activation Standard? Yes No N/R
3. Below are three proposed schedules for you to stand the watch under instruction.

Date Position Hours Attend All Turnovers?

Sept 12 SNO 12 Yes Schedule Sept 13 SNO 12 Yes A Sept 20 RBNPO 12 Yes Sept 21 SNO 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No N/R Date Position Hours Attend All Turnovers?

Sept 28 SN02 12 Yes Schedule Sept 29 SNO 12 Yes B Sept 30 SNO 12 Yes Oct 01 SNO 12 Yes Oct02 SNO 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No N/R Date Position Hours Attend All Turnovers?

Sept 22 SNO 12 Yes Schedule Sept 23 SNO 12 Yes c Sept 24 RBNPO 8 No (last 4 hrs of shift in Work Control)

Sept 25 SNO 12 Yes Sept 27 SNO 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No N/R

-8 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO NRC 14-2 RO TASK TITLE : Perform ST-23C , Jet Pump Operability- Two Loop EC APPL . TO JPM NUMBER REV: DATE : NRC KJA SYSTEM NUMBER: _2_.2_._12_(,_3_

.7-'-)_ _ _ __

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME :

- Minutes SUBMITTED: OPERATIONS REVIEW: ~d z~

~ .s-;

APPROVED :

CANDIDATE NAME :

JPM Completion Perform Classroom ATE PERFORMED: TIME TO COMPLETE : Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory


COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE:

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST RO NRC 14-2 RO TASK TITLE: Perform ST-23C, Jet Pump Operability- Two Loop EC APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1Z1 None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 15-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION RO NRC 14-2 RO TASK TITLE: Perform ST-23C, Jet Pump Operability- Two Loop EC APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-23C, Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Prepare a copy of ST-23C filled out up to step 8.1.

EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking,

. place keeping and three-point communication .

VI. TASK CONDITIONS A. ST-23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.

B. The required data for completing ST-23C is included on the provided handout.

C. Baseline data collection is complete and an "established pattern" exists.

-3 of 15-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform ST-23C steps 8.1 through 8.4. Then assess the results against the Level 1 Acceptance Criteria of section 10.1 .1 and 10.1 .2 by completing the provided worksheet. "

EVALUATOR: Provide the candidate with the attached handout, worksheet, and the prepared copy of ST-23C.

STEP STANDARD EVALUATION I COMMENT

1. Record data for ST-23C step Records data for ST-23C section 8.1 per the provided key. SAT I UNSAT 8.1.

EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.

2. Calculate the value for ST- Calculates and records a value of 6.5 Mlbmlhr per the SAT I UNSAT 23C step 8.2. provided key.
3. Record data for ST-23C step Records data for ST-23C step 8.3 on Attachment 5 per the SAT I UNSAT 8.3 on Attachment 5. provided key.

EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.

4. Record data for ST-23C step Record data for ST-23C step 8.4 on Attachment 2 per the SAT I UNSAT 8.4 on Attachment 2. provided key.

EVALUATOR NOTE: It is acceptable for all values to be rounded to the nearest whole number.

-4 of 15-

STEP STANDARD EVALUATION I COMMENT

  • 5. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.1 is UNSAT CRITICAL STEP Criteria 10.1.1 . and provides brief description of why (see provided key). SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1 .1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr (5%).
  • 6. Assess Level 1 Acceptance Determines Level1 Acceptance Criteria 10.1.2 is UNSAT CRITICAL STEP Criteria 10.1.2. and provides brief description of why (see provided key) . SAT I UNSAT EVALUATOR NOTE: Level 1 Acceptance Criteria 10.1.2 is NOT met because both:
  • Loop A flows are greater than 5% from predicted on Attachments 3 and 4 AND
  • Jet Pump 3 and 4 dPs are greater than 20% below established values .

EVALUATOR: Terminate the task at this point.

-5 of 15-

EVALUATOR'S KEY JET PUMP OPERABILITY TEST FOR TWO LOOP OPERATION (EPIC ST-23C AVAILABLE)

Init 8.0 PROCZD'URB 8.1 Record the following:

8.1.1 Total Core Flow 93.5 (% rated)

EPIC - A-3330 TH 8 .1. 2 Loop A Jet Pump Flow 32.5 Mlbm/hr 02-3FI-92A TH 8.1.3 Loop B Jet Pump Flow 39.0 Mlbm/hr 02-3FI-92B TH 8 .1. 4 A Pump Speed = 60 x 3 ~pump power - 1.3 =

60 3~ 2.63

- 1 .3 = 81.5

'

X A- 399 TH 8 .1.5 B Pump Speed = 58.5 x 3~pump power + 1.9 =

58. 5 X 3 .J 2. 61 + 1.9 :; 82.4 A-400 ' TH 8.1.6 17.422 A Recirc Loop Flow Mlbm/hr EPIC-A-3317 TH 8.1. 7 B Recirc Loop Flow 16.602 Mlbm/hr EPIC-A-3318 TH 8.2 Calculate the absolute value of:

I <8.1.2> - (8.1.3) 1 = _ _6_*5_ _ _ _-J'-.lbm/hr TH EVALUATOR'S KEY

-6 of 15-

EVALUATOR'S KEY JET PUMP OPERABILITY TEST FOR TWO LOOP OPERATION (EPIC ST- 23C AVAILABLE}

ATTACHMENT 2 Page 1 of 1 ST 23C DATA FOR REACTOR ENGINEERING SUPPQRT Tod*y/0730 Date/Time A. Recirc Loop A flow (EPIC-A- 3317 ) __1_7._.4_22___ Ml bm/hr B. Recirc Loop B flow (EPIC-A- 3318) ---=1c..::.6.:..::60.=.:2=--- Mlbm/hr

c. Rx Total core Flow (EPIC- A- 04141 ___;.7...:.1*:....:4_ _ _ Mlbm/hr D. EPI C-A-6254 , ~"SUB __7_2._9___ Ml bm/hr E. Recirc Pump A Speed (02-184SI-16Al 82.46

'

_____

at panel 09-4)

F. Recirc Pump B Speed (02-184SI -16Bl ,

at panel 09 - 4) 82.50 Q.

G. Recirc ~ A Speed A-399 Calc. ----"'8..;.;;

1*.5.;;._- - %

H. Recirc Pump B Speed A- 400 Calc

---82.4- - '

I. RWR Loop A Jet Pump Flow (02 - 3FI-92A at panel 09- 4 ) _3_2._5_ _ lbs/hr x 10' J. RWR Loop B Jet Pump Flow (02 - 3FI-92B at panel 09-4) _3_9._0_ _ lbs/hr x 10' K. Double Tapped JP 1 Fl ow (02-3FI-87A at panel 09-4) 3.45 lbs/hr x 10' L. Double Tapped JP 6 Flow (02-3FI -87C at panel 09-4) _ 3_.3_ _ lbs/hr x 10' M. Double Tapped JP l l Fl ow (02-3FI-87B at panel 09-4) _4_.o_ _ lbs/hr x 10' N. Double Tapped JP 16 Flow (02-3FI -87D at panel 09-4) 4.1 lbs/hr x 10'

0. EPIC-A- 3382 RECIRC LOOP A AVE JET PMP \PSID 31.01 %paid P. EPIC-A- 3381 RECI RC LOOP B AVE JET PMP %PSID 48.71 Q. EPIC- A- 405 RX CORE DIFF PRES 17.6 psid R. EPIC- A-3390 P6 10 MIN AVG CORE THERMAL POWER 2437.8 mwth EVALUATOR'S KEY

-7 of 15-

EVALUATOR'S KEY ATTACHMENT S Page 1 of 4 LOOP AVERAGE dP V" JET PUMP dP LOOI'AAYG JPI JPI

~1'110 -20% +211%

s 4.0 7.3 8 5.8 8.7 7 &.1 8.2 5.6 &A 5.1 7.7 s..a ... 8.7 10.1 I 7.8 11.5 9 7.8 11.7 7.2 10.1 u 9.11 7.3 11 .0 a.a 1u 10 e.1 13.o a.o 12.0 7A 11.0 a.1 12.2 9.!; 14.2 II 0.5 14.3 u 13.2 8.1 12.2 8.11 13.4 10.4 15.8 12 10.3 15.5 11.11 14.4 1.s 13.3 11.1 14.5 11,3 17.0 13 11.2 18.8 10.4 15.8 9.6 14.4 10.5 15.7 12.2 11A 14 12.0 18.0 11 .2 111.1 10.4 15.5 11.2 16.9 13.:Z 111.7 15 12.9 ID.3 12.0 1&0 11.1 18.7 12.0 18.0 14.1 21.1 16 13.7 20.5 12..8 11.2 11.0 17.1 12.8 18.2 15.0 22.5 17 14.5 21.8 13.8 2M 12.1 1U IU 20.3 18 15.3 23.0 14.4 21.0 13.4 20.0 14.3 21 .5 18.8 25.2 Ill 1e.2 24.3 15.2 22.1 14.1 21.2 15..1 22.8 17,7 28.5 20 17.0 26.15 18.0 24.0 14.8 22.3 15.8 2U 21 17.8 21.7 18.& 26.2 15.8 23.4 18.8 24.0 1'-5 28.2 22 18.6 21.0 17.8 21.4 18.4 24.6 17.4 2&1 20.4 30.8 23 19.5 28.2 18.4 27.8 17.1 25.7 11.1 27.2 21.3 31.9 24 20.3 30.4 111.2 2&7 17.9 28.8 1&11 28.S 22.2 33.3 25 21.1 31 .7 20.0 a-9 18.6 21.0 10.1 29.5 23.1 34.&

28 21.9 32.1 20-' 31.1 19.4 28.1 20.4 30.6 24.0 38.1 27 22.8 34.1 2U 32.3 20.1 30.2 21.2 31 .7 24.11 37.3 21 2U 35.4 22.S 83.5 20.9 31.4 2UI 3U 25.1 36.8 24.4 su 23.1 34.7 21.7 32.15 22.7 34.0 28.8 ~.0 30 25.2 37A 23.11 3U 22.4 3U 23.4 35.1 27.5 41.3 Sl 28.0 311.0 24.7 37,I 23.2 34.1 24.2 38.3 28,4 42.6 32 21.8 ~.3 25.5 38.3 23.11 3U 24.11 37.A 28.S 44.0 33 21.1 41.5 a .s au 24.7 ¥ .0 21. se.s 30.2 415.

34 28.5 42.7 27.1 40.8 25.5 su 2M 38.8 31.1 48.1 35 211.3 43.9 21.0 41.1 21.2 39.3 27.2 ~.* 32.0 47.11 S8 31).1 45.1 2&7 43.0 21.0 40.5 27.9 41 .0 32.9 4D.3 37 30.!1 48.4 20.5 44.2 27.7 41.8 21.7 43.0 ~..7 I 31.7 47.1 30.S 45,4 28.5 42.7 29.4 44.1 32.5 41.& 31.1 4U 28.2 43.0 30.2 45.2

~ 33.3 80.0 su 47.1 30.0 45.0 311.9 48.4 41 34.1 51.2 32.8 411.0 30.8 .4f.2 :11 .1 47.s 37.3 SIUI 42 35.0 52.4 33.4 50.1 31 .5 47.3 32.4 4a.& 38.1  !;7.2 35.8 5U 34.2 51.3 32.S 41.4 33.1 o48.7 39.0 ~5 44 3U ISU 35.0 52.5 33.1 49.8 33.8 30.8 38.11 .541.9 45 37.4 sa..1 au 53.7 33.8 so.1 34.8 51 .11 40.8 81.2 31.2 57,3 31.8 5U 34.6 51.11 35.4 53. I 41.7 62.5 47 311.0 51.5 37.A 58.1 38.3 53.0 38.1 114.2 311.8 511.7 38.2 57.3 31.1 54.1 su 56.3 t;l.4 11&.1 40.8 1!0.11 39.0 58..5 38.9 85.3 37.8 58.4 44.3 1111.4 50 <11 .4 e:l.l 311.1 511.8 S7.8 58.A 38.3 57.5 45..2 87.7 51 42.2 63.3 <<1.8 1!0.6 38.A 57.8 311.1 58.8 o4e.O 89.1 52 43.0 8U 41.3 82.0 39.1 -58.7 38.8 11e.1 41.11 71).4 43.8 85.7 42. I 83.2 39.0 511.9 40.5 1!0.1 47.8 71.7 54 44.8 au 42.9 64.4 40.7 no 41.3 81.0 48.7 73.0 45.4 81.1 43.7 85.0 41 .4 82.2 -42.0 83.0 58 48.2 811.3 44.5 68.8 42.2 83.3 42.7 114.1 50.4 75.8

--.......... _ __

57 47.0 70.6 45.3 67.11 43.0 64.4 43.5 68.2 51.3 7U 47.8 71.1 48. I N .l 43.7 85.6 44.2 1111.3

.... 73.0 *** "1'0 .3 44.5 88.7 o66.0 87.4 53.0 7U 1!0 49.4

,._., ......

74.2

~

47.1

... 1u 45.3 au 45.7

.......... !MMI

1312AYG -.IN 31.01 32.0 33.2 16.4 24.0 353 I ni t TH EVALUATOR'S KEY

-8 of 15-

EVALUATOR'S KEY ATTACHMENT S

. Par;re 2 of 4

  • - - - :: ::

LOOP AVERAG!!: dP vs JBT PUMP dP L~.,::vo JPI

~

"!:..'

-+81% ~

JP7 JP7 JPI JPI

-+81%  ::

u JPt

.u

!1..0 11.0

  • -e 5.11 7.0 8.3 4.1 4.9 u

7.4

1.8 4.5 5.7 8.8 4.4 u

u .u. 1.0 7.0 8.0 8.5 7.4 11.7 11~

5.7 8-6 a.e 11.8

&.3 8.0 ._,

7.9 !l.t u

7.7 u

lU u

8.1 11..3 9.0 8.3 12.4 7.3 11 .0 8.8 10.2 6.11 9.9 7.0 10.&

10.0 9.2 13.7 8.1 12.2 7.8 11.3 7.4 11.0 7.8 11 .7 13.4 u 11.0 12.0 13..0 10.1 10.11 11.8 16.1 us.*

17.8 8.8 9.7 10.5 14.8 15.7

'-3 9.1 8.8 12.5 13.8 14.7

....u 8.1 12.2 1S.3 14.4 8.-4 10.2 1U._

14.1 15.3 14.0 12.7 18.1 11.3 18.9 10.8 15.8 10.3 15.5 11-0 18.5 15.0 13.8 20.4 12.1 111.1 11.3 17.0 11.1 1!1.8 11.8 17.7 18.0 14.5 21.7 1U 19.3 12.0 1CI.1 1U 17.8 IU .!.U_

17.0 1!1..4 23.1 13..8 20.5 12.8 111.2 12.8 1U 1a.4 20.1 18.0 18..3 24.4 14.4 21.6 13.5 20.3 13.3 20-0 14.2 21.

UI.O 17.2 25.7 15.2 22.8 14.3 21 .4 14.1 21.2 15.0 22.5 20.0 18.0 27.1 18.0 24.0 15.0 22.8 14.9 22.3 15.8 23.8 21.0 18.8 28.4 1U 25.2 15.8 23.7 15.8 23.4 18.1 2!1.0 22-0 1U 28.7 17.8 28.3 18.5 24.8 18.4 2..5 17.5 28.2 23.0 20.7 31 .0 18.3 27.5 17.3 25.8 17.1 2$.7 11.3 27.4 24.0 21.8 32.3 19.1 28.7 1CI.O 27.1 17-11 28.8 19.1 28.11 25.0 22.4 33..7 18.11 28.1 18.8 2U 1U 27.9 1U 28-"

28.0 23.3 35..0 20.7 31.0 111.11 28.3 111.4 28.1 20.7 31.0 27.0 24.2 38.3 21~5 32.2 20.3 30.4 20.1 30,2 2u; 32.3 28.0 25.1 37.8 22.2 3U 21.0 31.5 20.0 31.3 22.3 33.5 28.0 25.8 3U 23.0 34.5 21.1 32.7 21.8 32.5 23.1 K7 30.0 28.8 40.2 23.8 36.7 22.5 33..8 22.4 33.8 23.8 3U 31 .0 27.7 41.5 24.8 38.8 23.3 34.1 zu au 24.8 37.1 32-0 28.t 42.8 2$,3 38.0 24.0 38.0 23.11 36.9 ~ 38.4 33.0 28.4 44.1 2t.1 38.2 24. 8 37.1 ~.7 37.0 28.4 311.8 34.0 30.3 45.5 2U -40.3 2U ae.:s 25A 311.1 27.2 40.8 35.0 31 .2 48.8 27.7 41.5 28.2 38.4 28.2 3U 21.0 42.0 36.0 32-0 48.1 2U 42.8 27.0 -40.5 2t.D 40.4 21.8 ~u 37.0 32.8 49.4 29.2 43.a 27.7 41 .8 27.7 4t-l! 29.7 44.5 38.0 33.8 50.7 30.0 45.0 285 42.7 28.5 42.7 30-6 48.7 38.0 34.7 152.0 30.7 46.1 211.2 43.8 211.2 43.8 31.3 4.U..

40.0 35.5 53..3 31.5 47.3 30.0 48.0 30.0 45.0 32.1 4'-2 41..0 3'-4 54.1 32.3 48.4 30.7 o441.1 30.7 48>1 ,4 42.0 37.a 5U a:J-1 4U 31 .5 4U au 47.2 33.1 1111.8 43.0 38.1 57.2 33.8 50.7 32.2 48.3 32.3 44 34.8 su 44.0 ae.o 58..5 34.11 51.11 33.0 48.4 33.0 48,5 36.4 53.1 48.0 3U 118.1 35.4 53.0 33.7 1!0.8 33.1 50.7 38.2  !IC.:I 48.0 -40.7 t1.1 36.1 54.2 34.4 51.7 34.~ _11 .8 S?.O ~55. ~

47.0 41 .1 82.4 ~. 8 55.3 38.2 152.8 35.3 52-!L 011.e 111.8 48.0 42.5 83..7 37.7 58..5 _:!!1,11 53.8 _35.1 54.1 36.7 sa.o 48.0 43. ee..o 3'-4 57.7 ~-1 55.0 36.8 55.2 3'-5 511.2 1!0.0 44.2 eu 31.2 58.11 97.4 e&.1 37.1 111.4 -40.3 eo.s 51.0 45.1 67.1 40.0 80.0 38.2 57.3 38.3 57.5 41.1 81.7 52.0 45.9 1!8.11 40.7 61.1 38.8 118.4 aD. I 42-0 70,2 JiU ~-'

53.0 45.8 41.5 82.3 3'1.7 511.5 aD.ll 511.8 428 84.2 54.0 47.e 71.5 42.3 63.4 40.4 50.8 40.8 80.8 43.8 1&.4 56.0 45 72.8 43.0  !IC.S 41 .1 61.7 41.4 82.1 44.4 88.7 se.o 57.0 58.0

50.2 51 .1

  • 74,1 75.3 7a.8 43.8 44.8 48.3 815.7 ee.e 68.0 41.11

. 42.8 43.4 82.8

!IC.O 1&.1 42.1 42.8 43.7

....

83..2 85.5 4U_

48.\

48 eu 111.1 70.4

--

1!11.0 52.0 77.9 48..1 88.1 ... I 1111.2 44.4 1111.7 47,7 71 .8 eo.o 45.2.... _ 87.8

_..,.. 711.2 52.1 o441.8 70.3 44.8 87.3 IPIG-A 48.8 72.1 Aeoanl ciD lar ~A--8IMI . . . I I l - - l IISIIAVO 114JI'-7 IIIIJP.. -JI'-10 31.01 30.3 35.1 :u.a 34.0 35.0 Ini t TH EVALUATOR'S KEY

-9 of 15-

EVALUATOR'S KEY AT'l'ACHMENT 5 Page 3 of 4 I.OOP AVERAGE dP VB I JF.T PUMP dP

..,,.

av'o5.0o:'..:.0 ,

~

4.0 11 .11"_11

  • ~

&.0 oil' It

.4ft 4.1

"!'_12 41!1.

8.1 JI011

.4ft 3.1 41!1.

5 .8

"!'_14

~

l!l.8

"!'_14

~

u

-:.:!

4,2

.!!.~

8.0 4.8 7.l!l 4.1 7.3 4.5 u 4.11 11.8 5.1 7.8 7.0 5.0 8 .5 5.7 8 .5 5.3 7.8 u 8.0 5.11 u

&.0 u 9.7 8,5 11.7 &.1 0-.1 8.1 8.2 8.8 10.2 11.0 7.2 10.1 7.3 10.1 u lo.3 8.11 10.3 7.8 11.4 10.0 . 8-1 12.1 8.1 12.1 7.8 I 1.4 7.8 11.6 u 12.7 11 .0 u &.II 13.3 8.4 12.8 &.4 12.8 ~3 14.0 12.0 t.7 '"'"

14.5 !U 14~ 1.2 1~7 11.1 t;u 10.2 !J,:J 13.0 14.0 10.5 11.3 15.7 18.11 10.5 11.2 15.7 IU u

10.7 14.11 1&,1 ***

10.7 14.11 18.0 1U 11 .1 1&.8 17.11 1$.0 12.1 18.1 12.0 18.1 11.5 17.2 11 .4 17.1 12.1 11.2 18.0 17.0 18.0 12.11 13.7 14.5 111.3 20.5 21 .7 12.8 13.8 14.4 18.2 20..4 21 .8 IU 13.1 13.1 18.4 1t.L 20.8 12-2 12.11 1:U

,,,.

1&.3 20.5 13.7 1U 1$.4 2o.5 21.1 23.1 UI.O 15-3 22.11 15.2 22.8 14.8 2U 14.4 21 .7 18.2 24.4 20.0 18.1 24.1 18.0 24.0 1$.4 23.1 15.2 22.1 17.1 25.7 21.0 1U 25.3 18.1 25.2 18.2 _2Y_ 15.11 .AI 111.0 .ll7.0 22.0 17.7 211.1 17.8 2&.4 17.0 25.6 1&.7 25.0 1&.8 2&.l!l 23.0 24.~

25.0 28.0 27.0 11.5 UI.S 20.1 20.8 21.7 27.1 28.0

~

31.4 az.a 11.4 111.1 111.0 20.7 21.5 27.5 28-7 211.8 31.1 32.3 17.8 18.5 18.3 20.1 20.8 28.8 27.8 211.0

. 3o.2 31.4 17.5 18.2 18.0 1t.7 20-5

...

28.2 27.3

nJ,IJ 30.7 18.7 20.6 21 .4 22..3 23.2 211.8 30.11 32.2 a;Mi 34.8 28.0 2U 33.8 22.3 33.4 21.7 32.5 21.2 3U 24.1 38.1 211.0 23.3 35.0 23.1 34.8 22.5 33.7 22.0 3
1.0 24.9 37,4 30.0 24.1 _.2 23.11 35.8 23.3 34.9 22.7 34. 2U 311.7 31.0 24.11 37.4 24.8 37.0 24.1 35.1 23.5 3!1.2 28.7 o!O.O 32.0 25.7 38.1 ~4 3!1.1 24.8 37.3 24.2 38.3 27.5 1.

33.0 28.5 1111-8 28.2 ;jll.3 ..2!1,1_ 38.5 _AO :Jt,S :i~J,4 42.1 a-4.0 27.4 41,0 27.0 -40.~ 28.4 _ae.* 25.7 ae.a 21~ 43-t 36.0 28.2 42.2 27.8 4U 27.2 <<1.8 2&.5 :118.7 30.1 45.2 38.0 211.0 48.4 2U 42.1 28.0 42.0 27.2 40.8 31 .0 411.5 37.0 21.8 44.8 21.3 44.0 2&.8 43.2 28.0 42.0 su 47.1 3!1.0 30.11 45.8 30.1 45.2 21.1 44.4 21-7 43.1 32.8 48.1 3t.O 31.4 47.1 30.11 411,4 304 4&,8 21.5 44.2 au 110.5

~*

_;J1.7 47.5 30.2 ~ 34.5 40.0 41.0 42.0 32.2 33.0 S8JI 48.3

~

30.7 32.5 33.2 48.7 4U 31.2 32.0 32.8 48.Q_

411.1 31.0 31.7

  • s 47.8 38.4 311.3

_o1 .t 53.1 54.4 au 43.0 44.0 45.0 34.8 311.4 38.2 51.11

_53,_1 54.3 34.0 34.8

...a 51 .0

!12.2 53.4 34.4 35.1 50.3 51.5

_12,7 32.5 33.2

M.J!.

.....

411.7 51 -0

Jt.l 38.0

'l!IJ 55,7 51-~-

51.3 411.0 47.0 37.0 37,1 55.5 58.7 311.4 37.2 54.11 55.7 36.11 38.7 11:1.111 55.1 34.7 35.8 x .1 113.2

~~.a

<<<A ***

80.11 48.0 38.8 57.11 £1_ 5U 37.5 58.3 38.2 54.3 41.5 812.3 4t.O <IIJ,4 .!i!!,l l!l8.7 _H. I 3U 57.5 37.0 55.5 42.4 83.1 50.0 40.:;z 80.3 ;jll. ~ Ji!t.Z 38.1 _H.7 'J'].7 JU ..§.3 84.9 51.0 41 .0 81.5 -40.3 80.4 3U _H,'I! 38.5 ~7 . 7 44.1 M -2 x.o 41 .8 82.7 41.0 11.& 40.7 61.1 311.2 55.8 45.0 81.5 53.0 42.6 83-11 41.8 82.7 41.5 82.3 40.0 80.0 45.1 eu 54.0 43..4 85.1 42.6 IIi).II 42.: 53.5 40.7 81.1 4&.8 70.1 85.0 44.2_

...

ee.s 43.4 115.1 43.1 84.7 41.5 82.2 47.8 71.4

_

58.0 45.0 a7.5 44.2 tltl.2 43.8 85.8 42.2 83-3 411.5 72.8 57.0 45.1 44.8 a7..4 44.7 a7.1 43.0 84.4 411.4 74.1

.....

55.0 411,8 70.0 45.7 45.5 1111.2 43.7 55.1 50.3 _Th_4 118.0 47.4 71 .2 411.5 8111.7 45.3 1111..4 44.5 118.7 51 .1 7&.7 eo.o

-1AV~_

48.71 48.2

~---.....,

51.2 72.4 47.3

....~12 43.7 70.11 47.1 11111-aiiM I M7.1f1.1ll 50.1 70.8 45.2

....~,.

aT.I 52.0

., .. ~**

7ti.G 4t.Z 4t. 7 Init TH EVALUATOR'S KEY

-10 of 15-

EVALUATOR'S KEY ATTACHMENT 5 Page 4 of 4 LOOP AVERAGE dP vs JET PUMP dP

.~~,.:., ~-11

~

JP11 JP17 JP11 JP11 JP1t

-~

JP!7 JP:IO

-~ ~ -~ -2011. .an, 5-0 4.2 1.3 4.2 *~

11.3 3 .8

+~

5.1 u

~

5 .8 4.3 8.4 11.0 5.0 7.11 5.0 7.5 4.6 7.0 4.7 7.0 5.1 7.1 7.0 5.9 8.1 u 8.7 5.4 8.1 5.5 8.2 u u 8.0 8.7 f0.1 8.11 u 8.2 11.3 l .:l u 8.7 10.1 11.0 10.0 11.D 7.5 8.4 9.2 11 .3 12.8

\3.8 7.4 8.2 9 .0

!U 12.3 13.5 u

7.7 8.5 lOA u.e 12.7 7.0 7.8 y_

1().8 11..8 13.0

.

7.5

~

11.1 11.3 12.5 13.7 12.0 10.0 15.1 u 14.7 u 13.9 11.4 loU_ 10.0 14.11 1:to 10.11 18.3 10.8 15.11 10.0 15-0 1~ 15.4 10.8 18.1 14.0 15.0 18.0 11.1 12.8 13.4 17.11 1U 20.1 11 .4 12.2 12.11 17.0 18.2 19.4 10.8 11 .5 1U 111.2 17.3 18.4 U .O 11.9 12.7

*'

17A 111.0 11.11 12.4 13.2 17.3 IU 18.7 17.0 14.2 21.3 13.'7 20.11 13.1 18.8 13.5 20.2 1~ 20.0 18.0 15.1 22.8 ~~ au 13.8 20.7 14.3 21.4 14.1 22.1 18.0 15.9 23.8 1U 2U 14.1 21.9 15.1 22.11 1&.5 23.3 20.0 111.7 211.1 111.1 24.1 15.4 23.0 15.8 23.8 18.3 ~~~

21.0 17.8 211.3 18.8 25.3 18.1 24.2 18.7 -~1 17, \ 25.7 22.0 18.4 27.8 17.8 28.4 18.8 25.3 ns 2U 1U au 23.0 1U 211.8  !.tc4 27.15 17,7 28.5 18.3 27.5 11.7 .211.1 24.0 20.1 30.1 1U 21.8 11.4 2i .II 111.1 28.7 111,5 28.2 25.0 20.11 31.3 20.0 28.8 19.2 211.8 20.0 au 20.3 30.4 28.0 21.7 32.11 20.7 31.1 18.9 au 20.8 31.2 21.1 31.11 27.0 au 33.8 21.5 32.2 20.7 31 .1 21 .1 32.4 21.11 32A 211.0 23.4 35.1 22.3 3a-4 21.5 32-2 2U 33.1 22.6 . 34.0 28.0 24.2. 31.3 23.0 34.8 22.2 33.3 23.2

~-*

23.4 35.1 30.0 25.1 37.8 23.8 :18.7 23.0 34.5 24.0 311.0 24.2 311.3 31.0 25.11 38.1 2U 38.11 23.8 315.1 248 37.3 28.0 ..£!.

32.0 21-7 40.1 25.4 38.0 24.5 3U 25.7 38..5 25.1 38.7 33.0 27.5 4U 211.1 3U 25.3 37.8 211.5 39.7 _p.8 ..i!f,8 34.0 2.1.4 . 42.8 28.11 4().3 28.0 311.1 27.3 41.0 27.3 41.0 35.0 211.2 43.8 27.7 41.5 au 40.2 28.1 42.2 28.1 42.2 38.0 30.0 45.1 28.4 42.15 27.11 41.4 28.11 43.4 28.11 43.3 37.0 30-8 48.3 21l2 43.8 211.3 42.5 28.8 44.8 28.7 44.5 38.0 31.7 47A 30.D 44.8 28.1 43.8 30.8 ...... 30.4 45.7 311.0 40.0 41.0 42.0 43.0 32.5 93.4 34.2 35.0 35.11 48.8

!0.1 51.3 112.5 53A 30.7 31.5 32.2 33.0 33.1

...

48.1 47.2 411.5 50.7 21U 3CI.8 31.4 32.1 32.11 44.8 45.8 47.1 48.2 441.3 31.4 32.2 33.0 33.11 34.7 47.1 48.3 48.1 IK:.I 52.0 31.2

_;Jl.U

-***

33.8 34.3 48.8 48.0 48.2 eo.s 51.5 44.0 38.7 !1!1,0 34.5 51 .8 33.1 50.5 JI.IIA 6U 35.1 jt7 4.0 37.6 58.3 aG.3 5U 3U 51.8 38.3 54~ ;JC~,II 5M1

-46.0 38.4 57.5 31.1 54-1 35.2 52.8 37.2 1115.7 3U 58.0 47.0 38.2 58.8 llll.8 1115.2 35.8 53.8 38.0 57.0 37.4 511.1 48.D 40.0 eo.o 37.1 1115.4 38.7 116.1 38.8 58.2 311.2 57.3 81, 3U

-~

441.0 <10.11 38.3 57.5 37.5 58.2 5U 511.4 50.0 41.7 82.5 3t.1 5U 38.2 S7.3 40.5 80.7 311.7 .8,8 S1.0 42.5 83.1 3t.8 511.1 39.0 ea.s 41 .3 au ~ eG-8 52.0 43.3 15.0 40.1 80.9 39.7 __.B,I 42.1 ..J!i!,2 41.3 ~-

5:!.0 44.2 IIU 41 .4 82.1 4D.5 80.8 42.8 84.<1 _42.0 83.1 54.0 45.0 87.5 42.1 83.2 41 .3 111.11 43.8 15.11 42.8 114.2 55.0 45.8 Ill.I 42.8 84.3 42.0 83.U 44.8 15.11 43.11 05.4

!511.0 48.7 10.0 43.8 815.5 42.1 84.2 45.4 1111.1 44.4 1111.5 157.0 58.D 611.0 47.6 48.3 411.2 71.2 72.5 73.7 44.4 4.2 46.9 88.1 87.7 au 43.8 44.3 45.1 815.3 111.5 87.t 4&.2 47.1 47.11 1111.4 70.11 71.1

...._,

45.1 4&.7

.....

117.7 70.0 15.0 48..8

......,.

80.0 50.0 48.7 70.0 18.7 48.7 73.1 47.4 71.1

---lip I r U . B _ I M _ 1 1 t _ _ IPIC-A4Itla-3311 AVQ 4tl.71 51.1 llloll'-17 48.1 I

_...7.11'-11 51.1 l 41.2

_l_ _W..!_.I~

41.4 Ini t _TH _ __

EVALUATOR'S KEY

-11 of 15-

EVALUATOR'S KEY Level 1 Status (circle one) If UNSAT, describe why below Acceptance Criteria Recirculation loop jet pump flow mismatch 10.1.1 SAT 8 exceeds 5% of rated core flow (3.85 Mlbm/hr).

(or similar)

Loop A and B flows are greater than 5% from predicted (Att. 3).

Loop A and B jet pump flows are greater than 5%

10. 1.2 SAT s from predicted (Att. 4).

Jet pump 3 and 4 dPs are greater than 20% below established values (Att 5).

(or similar, such as " Loop A does not meet any of the required criteria in 10.1.2.")

EVALUATOR'S KEY

-12 of 15-

  • HANDOUT
  • ST -23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available), is in progress.
  • The required data for completing ST -23C is included on the provided handout.
  • Baseline data collection is complete and an "established pattern" exists.

Perform ST -23C section 8.0. Then assess the results against the Level 1 Acceptance Criteria of section 10.1.1 and 10.1.2 by completing the provided worksheet.

-13 of 15-

HANDOUT Parameter Instrument I EPIC Point Value Total Core Flow EPIC-A-3330 93.5% rated Loop A Jet Pump Flow 02-3FI-92A 32.5 Mlbm/hr Loop B Jet Pump Flow 02-3FI-92B 39.0 Mlbm/hr A Pump Power EPIC-A-399 2.63 MW B Pump Power EPIC-A-400 2.61 MW A Recirc Loop Flow EPIC-A-3317 17.422 Mlbm/hr B Recirc Loop Flow EPIC-A-3318 16.602 Mlbm/hr Rx Total Core Flow EPIC-A-0414 71.4 Mlbm/hr WTSUB EPIC-A-6254 72.9 Mlbm/hr Recirc Pump A Speed 02-184SI-16A1 82.46%

Recirc Pump B Speed 02-184SI-16B1 82 .50%

6 Double Tapped JP 1 Flow 02-3FI-87A 3.45 lbs/hr x 10 6

Double Tapped JP 6 Flow 02-3FI-87C 3.3 lbs/hr x 10 6

Double Tapped JP 11 Flow 02-3FI-87B 4.0 lbs/hr x 10 6

Double Tapped JP 16 Flow 02-3FI-87D 4.11bs/hr x 10 Recirc Loop A Ave Jet Pmp %PSID EPIC-A-3382 31.01% psid Recirc Loop B Ave Jet Pmp %PSID EPIC-A-3381 48.71% psid Rx Core Diff Press EPIC-A-405 17.6 psid P6 10 Min Avg Core Thermal Power EPIC-A-3390 2437.8 MWth Jet Pump 1 dP EPIC-A-942 32.0% psid Jet Pump 2 dP EPIC-A-944 33.2% psid Jet Pump 3 dP EPIC-A-946 16.4% psid Jet Pump 4 dP EPIC-A-948 24.0% psid Jet Pump 5 dP EPIC-A-950 35.3% psid Jet Pump 6 dP EPIC-A-952 30.3% psid Jet Pump 7 dP EPIC-A-954 35.1% psid Jet Pump 8 dP EPIC-A-956 34.8% psid Jet Pump 9 dP EPIC-A-958 34.0% psid Jet Pump 10 dP EPIC-A-960 35.0% psid Jet Pump 11 dP EPIC-A-943 51.2% psid Jet Pump 12 dP EPIC-A-945 43.7% psid Jet Pump 13 dP EPIC-A-947 50.1% psid Jet Pump 14 dP EPIC-A-949 49.2% psid Jet Pump 15 dP EPIC-A-951 49.7% psid Jet Pump 16 dP EPIC-A-953 51.1% psid Jet Pump 17 dP EPIC-A-955 46.1% psid Jet Pump 18 dP EPIC-A-957 51.8% psid Jet Pump 19 dP EPIC-A-959 48.2% psid Jet Pump 20 dP EPIC-A-961 46.4% psid

-14 of 15-

WORKSHEET Level 1 Status (circle one) If UNSAT, describe why below Acceptance Criteria 10.1 .1 SAT UNSAT 10.1 .2 SAT UNSAT

-15 of 15-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE

~....,_ ______

RO APPL. TO 14-2 NRC RO RC JPM NUMBER TASK TITLE : Determine Worker Exposure for Emergent Work REV: DATE : NRC KIA SYSTEM NUMBER: 2.3.4 (3 .2/3.7)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : _ 20

____:..;_:__ Minutes SUBMITTED:

APPROVED:

CANDIDATE NAME: LOGIN ID:

JPM Completion Perform Location : Classroom DATE PERFORMED: TIME TO COMPLETE: Minutes

---

n ERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

-1 of 10-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required 1:8] None Comments:

Current Update By:

Date lnt Previous Revision Date:

-2 of 10-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EN-RP-201 , Dosimetry Administration Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure adequate copies of the procedures referenced above are available.

V. EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication.

VI. TASK CONDITIONS A. The plant is operating at 100% power.

B. Two operators are required to enter a locked high radiation area to support an emergent job.

C. The job is expected to take 45 minutes D. The job site dose rate is 1500 mRem/hr.

E. Operator #1 has received 1147 mRem of dose so far this year.

F. Operator #2 has received 450 mRem of dose so far this year.

G. Neither operator has received any dose extensions so far this year.

H. Neither operator has any undocumented quarters for this year.

-3 of 10-

RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work

. - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Determine the expected dose that each operator will receive while performing this job.

Determine if each operator will need a dose extension in order to receive this dose. Report your results on the provided worksheet. "

EXAMINER: Provide the candidate with the first handout and worksheet.

EVALUATION STEP STANDARD

/COMMENT

1. Obtain required references. Obtains and utilizes required SAT I UNSAT references, which may include:
  • EN-RP-201 EXAMINER NOTE: See provided key for remaining steps.
  • 2. Determine the expected dose that each Calculates that each operator will CRITICAL operator will receive while performing receive 1125 mRem while performing STEP this job this job. SAT I UNSAT (45 minutesl60 minutes per hour) x (1500 mRemlhour) = 1125 mRem
  • 3. Determine if Operator #1 will need a Determines that Operator #1 will need CRITICAL dose extension in order to receive this dose extension in order to receive this STEP dose. dose. SAT I UNSAT 1147 mRem + 1125 mRem = 2272 mRem > 2000 mRem normal dose limit
  • 4. Determine if Operator #2 will need a Determines that Operator #2 will NOT CRITICAL dose extension in order to receive this need dose extension in order to receive STEP dose. this dose. SAT I UNSAT 450 mRem + 1125 mRem = 1575 mRem < 2000 mRem normal dose limit c

-4 of 10-

RO 14-2 NRC RO RC TASK TITLE: Determine Worker Exposure for Emergent Work EVALUATION STEP STANDARD

/COMMENT EXAMINER: If the candidate correctly complete JPM steps 2-4, provide them with the extra handout, with the following information:

"Operator #1 has been granted a dose extension to 2500 mRem . Operator #2 has NOT been granted a dose extension.

Determine the maximum stay time allowed for both Operator #1 and for Operator #2, such that they do NOT exceed their dose limits. Document your results in the worksheet below."

  • 5. Determine the maximum stay time Calculates the maximum stay time for CRITICAL allowed for Operator #1 such that dose Operator #1 is approximately 54 STEP limit is NOT exceeded . minutes. SAT I UNSAT (2500 mRem- 1147 mRem) 11500 mRemlhr =0.902 hours0.0104 days <br />0.251 hours <br />0.00149 weeks <br />3.43211e-4 months <br /> x (60 minutes

=

per hour) 54 .12 minutes

/ *6. Determine the maximum stay time Calculates the maximum stay time for CRITICAL allowed for Operator #2 such that dose Operator #2 is approximately 62 STEP limit is NOT exceeded . minutes. SAT I UNSAT (2000 mRem- 450 mRem) 11500

=

mRemlhr 1.033 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> (60 minutes per hour) = 62 minutes EVALUATOR: Terminate the task at this point.

-5 of 10-

EVALUATOR'S KEY

1. Expected dose that each operator will receive while performing this job:

1125 mRem

2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one) e No
3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one)

Yes G

-6 of 10-

EVALUATOR'S KEY

1. Maximum stay time allowed for Operator #1 (record final answer in minutes):

54 minutes

2. Maximum stay time allowed for Operator #2 (record final answer in minutes):

62 minutes EVALUATOR'S KEY

-7 of 10-

HANDOUT

  • The plant is operating at 100% power.
  • The job is expected to take 45 minutes.
  • The job site dose rate is 1500 mRem/hr.
  • Operator #1 has received 1147 mRem of dose so far this year.
  • Operator #2 has received 450 mRem of dose so far this year.
  • Neither operator has received any dose extensions so far this year.
  • Neither operator has any undocumented quarters for this year.

Determine the expected dose that each operator will receive while performing this job.

Determine if each operator will need a dose extension in order to receive this dose.

Report your results on the provided worksheet.

-8 of 10-

WORKSHEET

1. Expected dose that each operator will receive while performing this job:
2. Will Operator #1 need a dose extension in order to receive the dose calculated above? (circle one)

Yes No

3. Will Operator #2 need a dose extension in order to receive the dose calculated above? (circle one)

Yes No

-9 of 10-

EXTRA HANDOUT Operator #1 has been granted a dose extension to 2500 mRem.

Operator #2 has NOT been granted a dose extension.

Determine the maximum stay time allowed for both Operator #1 and for Operator #2, such that they do NOT exceed their dose limits.

Document your results in the worksheet below.

EXTRA WORKSHEET

1. Maximum stay time allowed for Operator #1 (record final answer in minutes):
2. Maximum stay time allowed for Operator #2 (record final answer in minutes):

-10 of 10-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO NRC 14-2 SRO TASK TITLE : Verify Fuel Movement Sheets C001 APPL . TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: _2_.1_.3_5___.(3_.-'9)_ _ _ __

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : 20 Minutes

  1. - c:b-;zr=::::::->

--'--

SUBMITTED: OPERATIONS REVIEW: .~

/

APPROVED:

CANDIDATE NAME :

JPM Completion Perform Classroom ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO NRC 14-2 SRO TASK TITLE: Verify Fuel Movement Sheets C001 APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required 1Zl None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2of12-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO NRC 14-2 SRO TASK TITLE: Verify Fuel Movement Sheets C001 APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES A OSP-66.001 , Management of Refueling Activities Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A None EVALUATOR NOTES A The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A Today is October 2, 2014.

B. A refueling outage is underway.

C. A refueling error occurred last shift.

D. You are the oncoming Refuel Bridge SRO.

E. The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO.

-3 of 12-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Verify the previous shift's in-core placement of components (steps 1, 2, 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, and 17 from the provided ICA Transfer Forms)."

EVALUATOR: Provide the candidate with the attached handouts (fuel movement-sheets and pictures of core cells). Provide OSP-66.001 if requested.

STEP STANDARD EVALUATION I COMMENT

1. Verify correct loading of Determines four Control Cell 38-35 bundles are in the SAT I UNSAT Control Cell 38-35. correct location and orientation (ICA Transfer Form steps 1-4):
  • JLV675
  • JLV682
  • JLK804
  • JLK817
  • 2 . Determine the INCORRECT Determines two Control Cell 14-35 bundles are the correct CRITICAL STEP loading of Control Cell14-35. bundles but in the INCORRECT orientation (ICA Transfer SATIUNSAT Form steps 6 & 7):
  • JLV678
  • JLV670
3. Verify the correct loading of Determines two Control Cell 14-35 bundles are the correct SAT I UNSAT Control Cell 14-35. bundles and in the correct orientation (ICA Transfer Form steps 9 & 10) :
  • JLK805
  • JLK812

-4of12-


STEP STANDARD EVALUATION I COMMENT

  • 4. Determine the INCORRECT Determines one Control Cell 38-15 bundle is in the correct CRITICAL STEP loading of Control Cell 38-15. orientation but is the INCORRECT bundle (ICA Transfer SAT/UNSAT Form step 11 ):
  • JLV668 (vs. JLV 698)
5. Verify the correct loading of Determines three Control Cell 38-15 bundles are the correct SAT/UNSAT Control Cell 38-15. bundles and in the correct orientation (ICA Transfer Form steps 12, 14, & 15):
  • JLV674
  • JLK807
  • JLK820
  • 6. Determine the INCORRECT Determines that the two single blade guides in Control Cell CRITICAL STEP loading of Control Cell 14-15. 14-15 are in the wrong orientation (ICA Transfer Form steps SAT/UNSAT 16 & 17).

EVALUATOR: Terminate the task at this point.

-5 of 12-

HANDOUT

  • Today is October 2, 2014.
  • A refueling outage is underway.
  • A refueling error occurred last shift .
  • You are the oncoming Refuel Bridge SRO .
  • The prior shift's fuel moves into the Spent Fuel Pool have been verified correct by another SRO.

Verify the previous shift's in-core placement of components (steps 1, 2, 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, and 17 from the provided ICA Transfer Forms).

-6of12-

HANDOUT ATTACHMENT 9.1 ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)

(1) Number: R21-0001 (2) Issued (Date): Oct I 2014 (3) Reason for Transfer: Cycle 21 Refueling Ouage (4) Prepared By: S. Carol in/ S. emw.fUt (4a) Reviewed By: B. Drews/ fJJ. 9)'1.(!(W (4b) Additional Approvals By: _N/A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(10) SNMC Approval: S. Carol in/ I S. emw.fUt Lines __l.:lL thru Date Oct 1, 2014 Line Description Serial No. I From To Performed Dateffime Verified No. of Material Equipment ID ICA Coord. ICA Coord. by Executed by (5) (5) (6) (7) (8) (9) (II) (12) (13)

I FUEL BUNDLE JLV675 SFP 26-BB-2 CORE 39-34 a9J 10/02/14 0300 e!J) 2 FUEL BUNDLE JLV682 SFP 26-CC-2 CORE 37-36 a9J 10/02/14 0310 e!J) 3 DOUBLE BLADE GUIDE N/A CORE 39-36 SFP 26-EE-2 a9J 10/02/14 0320 e!J) 37-34 26-DD-1 4 FUEL BUNDLE JLK804 SFP 26-DD-2 CORE 37-34 a9J 10/02/14 0330 e!J) 5 FUEL BUNDLE JLK817 SFP 26-EE-2 CORE 39-36 a9J 10/02/14 0340 e!J) 6 FUEL BUNDLE JLV678 SFP 26-FF-2 CORE 15-34 a9J 10/02/14 0350 e!J) 7 FUEL BUNDLE JLV670 SFP 26-W-3 CORE 13-36 a9J 10/02/14 0400 e!J) 8 DOUBLE BLADE GUIDE N/A CORE 15-36 SFP 26-DD-2 a9J 10/02/14 0410 e!J) 13-34 26-CC-1 c):o II FUEL BUNDLE FUEL BUNDLE FUEL BUNDLE JLK805 JLK812 JLV698 SFP SFP SFP 26-X-3 26-Y-3 26-Z-3 CORE CORE CORE 13-34 15-36 39-14 a9J a9J a9J 10/02/14 0420 10f02f14 0430 10/02/14 0440 e!J) e!J) e!J) 12 FUEL BUNDLE JLV674 SFP 26-AA-3 CORE 37-16 a9J 10/02/14 0450 e!J)

NOTES/COMMENTS Line#:

Line#:

Line#:

Line#:

(14) SNM Records Updated by: _ _ _ _ _ _ _ _ _ __ Lines Thru Date (15) Verified by: _ _ _ _ _ _ _ _ _ _ _ _ Lines Thru Date

-7 of 12-

HANDOUT ATTACHMENT 9.1 ITEM CONTROL AREA (ICA) TRANSFER FORM (TYPICAL)

(1) Number: R21-0001 (2) Issued (Date): Oct 1 2014 (3) Reason for Transfer: Cycle 21 Refueling Ouage (4) Prepared By: S. Carol in/ S. &mllin (4a) Reviewed By: B. Drews/ 91. ~

(4b) Additional Approvals By: _N/A._ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _

(10) SNMC Approval: S. Carol in/ I S. &mllin Lines 13-19 thru __Date Oct 1, 2014 Line Description Serial No. I From To Performed Date/Time Verified No. of Material Equipment ID ICA Coord. ICA Coord. by Executed by (5) (5) (6) (7) (8) (9) (II) (12) (13) 13 DOUBLE BLADE GUIDE N/A CORE 39-16 SFP 26-CC-2 a9J 10/02/14 0500 e:J) 37-14 26-BB-1 14 FUEL BUNDLE JLK807 SFP 26-BB-1 CORE 37-14 a9J 10/02/14 0510 e:J) 15 FUEL BUNDLE JLK820 SFP 26-CC-1 CORE 39-16 a9J 10J02J14 0520 e:J) 16 SINGLE BLADE GUIDE N/A SFP 25-FF- CORE 13-16 a9J 10/02/14 0530 e:J)

II 17 SINGLE BLADE GUIDE N/A SFP 25-FF-1 CORE 15-14 a9J 10/02/14 0540 e:J) 18 FUEL BUNDLE JLV720 CORE 13-14 SFP 35-N-7 a9J 10/02/14 0550 e:J) 19 FUEL BUNDLE JLV725 CORE 15-16 SFP 35-N-6 a9J 10/02/14 0600 e:J)

NIA c

20 NIA 21 N/A

, 22 23 N/A 24 N/A NOTES/COMMENTS Line#:

Line#:

Line#:

Line#:

(14) SNM Records Updated by: _ _ _ _ _ _ _ _ _ __ Lines Thru Date (15) Verified by: _ __ _ __ _ _ _ _ _ _ Lines Thru Date

-8 of 12-

HANDOUT SOUTH NORTH Control Cell 38-35

-9 of 12-

HANDOUT SOUTH NORTH Control Cell 14-35

-10of12-

HANDOUT SOUTH NORTH Control Cell 38-15

-11of12-

HANDOUT SOUTH NORTH Control Cell14-15

-12 of 12-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO NRC 14-2 SRO TASK TITLE : Re-activation of SRO License C002 APPL. TO JPM NUMBER REV: DATE : NRC KIA SYSTEM NUMBER: _2_.1_.4__;(...._3._8).___ _ __


JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- Minutes SUBMITTED: OPERATIONS REVIEW~~?';*~

APPROVED :


CANDIDATE NAME :

JPM Completion Perform Classroom

'ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO NRC 14-2 SRO TASK TITLE: Re-activation of SRO License C002 APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required ~ None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 8-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO NRC 14-2 SRO TASK TITLE: Re-activation of SRO License C002 APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ODS0-30, Maintenance of NRC Licenses and STA Qualifications Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. None EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A. You are a Shift Manager and your SRO license became inactive on July 1, 2014.

B. You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4, 2014.

-3 of 8-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:

Yes- This IS required for license re-activation and it meets the standard.

No- This IS required for license re-activation , but it does NOT meet the standard.

N/R- This is NOT required for license re-activation ."

EVALUATOR: Provide the candidate with the attached handout and worksheet. Provide ODS0-30 if requested.

STEP STANDARD EVALUATION I COMMENT

  • 1. Evaluates worksheet step 1 Circles Yes for worksheet step 1. CRITICAL STEP regarding requalification SAT I UNSAT training .

EVALUATOR NOTE: This step meets the required standard of being current in requal , which includes passing all exams with at least and 80%.

  • 2. Evaluates worksheet step 2 Circles No for worksheet step 2. CRITICAL STEP regarding Emergency Director SAT I UNSAT qualification.

EVALUATOR NOTE: This step does not meet the required standard of being currently qualified Emergency Director.

3. Evaluates worksheet step 3 Circles NIR for worksheet step 3. SAT I UNSAT regarding Fire Brigade member qualification.

EVALUATOR NOTE: Fire Brigade qualification is not required for a Shift Manager.

-4 of 8-


- -

STEP STANDARD EVALUATION I COMMENT

  • 4. Evaluates worksheet step 4 Circles No for worksheet step 4. CRITICAL STEP regarding a plant tour. SAT/UNSAT EVALUATOR NOTE: This step does not meet the required standard of the plant tour being supervised by an SRO.
  • 5. Evaluates worksheet step 5 Circles No for worksheet step 5 Schedule A. CRITICAL STEP regarding proposed under- SAT/UNSAT instruction watch Schedule A.

EVALUATOR NOTE: The FSS position does not count towards the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-shift, leaving only 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

  • 6. Evaluates worksheet step 5 Circles No for worksheet step 5 Schedule B. CRITICAL STEP regarding proposed under- SAT I UNSAT instruction watch Schedule B.

EVALUATOR NOTE: This step does not meet the required standard of the 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of on-shift time being performed in the same calendar quarter.

  • 7. Evaluates worksheet step 5 Circles Yes for worksheet step 5 Schedule C. CRITICAL STEP regarding proposed under- SAT/UNSAT instruction watch Schedule C.

EVALUATOR NOTE: This step meets the required standard of 4 12-hour shifts during the same calendar quarter.

EVALUATOR: Terminate the task at this point.

-5 of 8-

EVALUATOR'S KEY

1. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
  • Does The Above Meet Re-activation Standard? <9 No NIR
2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
  • Does The Above Meet Re-activation Standard? Yes G NIR
3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
  • Does The Above Meet Re-activation Standard? Yes No
4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
  • Does The Above Meet Re-activation Standard? Yes NIR
5. Below are three proposed schedules for you to stand the watch under instruction.

Date Position Hours Attend All Turnovers?

Sept 12 SM 12 Yes Schedule Sept 13 SM 12 Yes A Sept 20 FSS 12 Yes Sept 21 CRS 12 Yes

  • Does The Above Meet Re-activation Standard? Yes G NIR Date Position Hours Attend All Turnovers?

Sept 28 CRS 12 Yes Schedule Sept 29 SM 12 Yes B Sept 30 SM 12 Yes Oct 01 SM 12 Yes Oct02 SM 12 Yes

  • Does The Above Meet Re-activation Standard? Yes NIR Date Position Hours Attend All Turnovers?

Sept 22 SM 12 Yes Schedule Sept 23 SM 12 Yes c Sept 24 STA 8 No (last 4 hrs of shift in Work Control)

Sept 25 SM 12 Yes Sept 27 SM 12 Yes

  • Does The Above Meet Re-activation Standard? e No NIR EVALUATOR'S KEY

-6 of 8-

HANDOUT

  • You are a Shift Manager and your SRO license became inactive on July 1, 2014 .
  • You have been directed to re-activate your license during the 3rd quarter to stand the Shift Manager watch on October 4, 2014.

Complete the following worksheet regarding re-activation of your license. Consider each item separately and circle the correct response for each item as follows:

Yes- This IS required for license re-activation and it meets the standard.

No- This IS required for license re-activation, but it does NOT meet the standard.

N/R- This is NOT required for license re-activation.

-7 of 8-

WORKSHEET

l. You have attended all requal training and passed all quizzes/exams. However your written grade average is 84% and you are on a PIP until it is greater than 85%. This is not expected until after Oct 4.
  • Does The Above Meet Re-activation Standard? Yes No NIR
2. You are no longer qualified as Emergency Director and you will notre-qualify until after Oct 4.
  • Does The Above Meet Re-activation Standard? Yes No NIR
3. You are no longer qualified as a Fire Brigade member and you will notre-qualify until after Oct 4.
  • Does The Above Meet Re-activation Standard? Yes No NIR
4. On your own time, you and a friend (who has an active RO license) came in and took a complete tour of the plant. Neither the Shift Manager nor the Control Room Supervisor were aware of this.
  • Does The Above Meet Re-activation Standard? Yes No NIR
5. Below are three proposed schedules for you to stand the watch under instruction.

Date Position Hours Attend All Turnovers?

Sept 12 SM 12 Yes Schedule Sept 13 SM 12 Yes A Sept 20 FSS 12 Yes Sept 21 CRS 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No NIR Date Position Hours Attend All Turnovers?

Sept 28 CRS 12 Yes Schedule Sept 29 SM 12 Yes B Sept 30 SM 12 Yes Oct 01 SM 12 Yes Oct02 SM 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No NIR Date Position Hours Attend All Turnovers?

Sept22 SM 12 Yes Schedule Sept 23 SM 12 Yes c Sept 24 STA 8 No (last 4 hrs of shift in Work Control)

Sept 25 SM 12 Yes Sept 27 SM 12 Yes

  • Does The Above Meet Re-activation Standard? Yes No NIR

-8 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO NRC 14-2 SRO TASK TITLE: Review ST-23C , Jet Pump Operability- Two Loop EC APPL . TO JPM NUMBER REV: DATE: NRC KJA SYSTEM NUMBER: -=2:..:..:.2=-:....1.;. : 2:. . .J.(. .:. :..4. .;_{,)1_ _ _ __

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : 20 Minutes

---=-.:......

SUBMITTED: OPERATIONS REVIEW: ~~cd')'~

APPROVED :

/

CANDIDATE NAME:

JPM Completion Perform Location : Classroom ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO NRC 14-2 SRO TASK TITLE: Review ST-23C, Jet Pump Operability- Two Loop EC APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items 0 Technical Review 0 Additional Information 0 Questions and Answers 0 Validation 0 Procedural Change Required ['8] None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 6-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO NRC 14-2 SRO TASK TITLE: Review ST-23C, Jet Pump Operability- Two Loop EC APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-23C, Jet Pump Operability Test for Two Loop Operation Ill. TOOLS AND EQUIPMENT A. Calculator IV. SET UP REQUIREMENTS A. Ensure a copy of the associated JPM handout is available for each candidate (ST-23C completed up to Management SRO Review- numbers based on failure of JP 4 at 100% power).

EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A. ST-23C, Jet Pump Operability Test for Two Loop Operation (EPIC Available) , has been performed and is ready for the Management SRO Review.

-3 of 6-

  • -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform the Management SRO Review of ST-23C per section 11 .2. Report your findings in the space below, including any required actions or restrictions (Tech Spec, TRM, ODCM , etc.), if applicable."

EVALUATOR: Provide the candidate with the attached handout and the prepared copy of ST-23C.

STEP STANDARD EVALUATION I COMMENT

1. Review data recorded in ST- Reviews data recorded in ST-23C . SAT I UNSAT 23C.
  • 2. Identify calculation error in Identifies the calculation in step 8.2 should be recorded as CRITICAL STEP step 8.2. 6.5 Mlbmlhr. SAT I UNSAT
  • 3. Identify Level 1 Acceptance Identifies Level 1 Acceptance Criteria 10.1.1 is NOT met CRITICAL STEP Criteria 10.1.1 is NOT met. due to Recirculation loop jet pump flow mismatch. SAT I UNSAT

.

EVALATOR NOTE: Level1 Acceptance Criteria 10.1.1 is NOT met because total core flow is greater than 70% and Recirculation loop jet pump flow mismatch is greater than 3.85 Mlbmlhr.

-- -

-4 of 6-


- - -

STEP STANDARD EVALUATION I COMMENT

  • 4. Identify Level1 Acceptance Identifies Level 1 Acceptance Criteria 10.1.2 is NOT met. CRITICAL STEP Criteria 10.1.2 is NOT met. SAT I UNSAT EVALUATOR NOTE: Level1 Acceptance Criteria 10.1.2 is NOT met because both:
  • Loop flow is greater than 5% from predicted on Attachments 3 and 4 AND
  • Jet pump 3 and 4 dPs are greater than 20% below established values .
5. Identify required notification. Identifies immediate notification of the Operations Manager SAT I UNSAT or alternate is required .
  • 6. Identify required corrective Identifies Technical Specification LCO 3.4.1 Condition B CRITICAL STEP and compensatory actions. must be entered (restore mismatch within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). SAT I UNSAT Identifies Technical Specification LCO 3.4.2 Condition A must be entered (be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />).

EVALUATOR: Terminate the task at this point.

-5 of 6-

HANDOUT

  • ST -23C, Jet Pump Operability Test for Two Loop Operation {EPIC Available), has been performed and is ready for the Management SRO Review.

Perform the Management SRO Review of ST -23C per section 11.2. Report your findings in the space below, including any required actions or restrictions {Tech Spec, TRM, ODCM, etc.), if applicable.

-6 of 6-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO NRC 14-2 SRO TASK TITLE : Determine Visitor RCA Access Requirements RC APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: _2_.3_.4---'(.._3._7).___ _ __

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER :

ESTIMATED COMPLETION TIME :

- Minutes SUBMITTED:

APPROVED :


CANDIDATE NAME :

JPM Completion Perform Location : Classroom ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST SRO NRC 14-2 SRO TASK TITLE: Determine Visitor RCA Access Requirements RC APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required [2J None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 8-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SRO NRC 14-2 SRO TASK TITLE : Determine Visitor RCA Access Requirements RC APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EN-RP-201 , Dosimetry Administration B. EN-RP-202, Personnel Monitoring Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Ensure sufficient copies of EN-RP-201 and EN-RP-202.

V. EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed .

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A. A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System .

B. Dose rates in the associated work area range from 0 - 5 mr/hr.

C. The evaluation is expected to take approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

D. The Operations Manager has designated you as the visitor sponsor and visitor escort.

E. Security arrangements have already been completed for visitor access.

F. The individual has never been exposed to or monitored for Occupational Radiation Exposure.

G. The individual will NOT be trained as a Radworker and will NOT perform any work.

-3 of 8-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public. Identify the individual's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline. Document your results on the provided worksheet."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of the Obtains a copy of EN-RP-201 and/or EN-RP-202, as SAT I UNSAT correct procedure. required.
  • 2. Identify procedural Identifies requirements of EN-RP-202 section 5.3.[1] must CRITICAL STEP requirements for allowing the be met: SAT I UNSAT individual to enter the RCA as a visitor.
  • Perform an indoctrination briefing of Attachment 9.2 .
  • Escort briefed per page 2 of Attachment 9.1 .
  • Visitor and escort complete Attachment 9.9 when the briefing is completed.
  • Assign individual a DLR.

EVALUATOR NOTE: See attached key to assist in grading the candidate's completed worksheet. Each of these requirements may be written out or the appropriate procedure steps may be referenced.

-4 of 8-

STEP STANDARD EVALUATION I COMMENT

  • 3. Identify the individual's annual Identifies the individual's routine annual administrative dose CRITICAL STEP regulatory dose limit. guideline as 100 mrem/year. SAT/UNSAT
  • 4. Identify the individual's Identifies the individual's maximum annual administrative CRITICAL STEP maximum annual dose guideline as 100 mrem/year. SAT/UNSAT administrative dose guideline.
  • 5. Identify the individual's routine Identifies the individual's routine annual administrative dose CRITICAL STEP annual administrative dose guideline as 50 mrem/year. SAT/UNSAT guideline.

EVALUATOR: Terminate the task at this point.

-5 of 8-

EVALUATOR'S KEY

1. Identify the procedural requirements for allowing the individual to enter the RCA as a visitor:

Requirements of EN-RP-202 section 5.3.[1] must be met:

  • Perform an indoctrination briefing of Attachment 9.2.
  • Escort briefed per page 2 of Attachment 9.1.
  • Visitor and escort complete Attachment 9.9 when the briefing is completed.
  • Assign individual a DLR.

EVALUATOR NOTE: Each of these requirements may be written out or the appropriate procedure steps may be referenced .

2. Identify the individual's annual regulatory dose limit:

100 mrem/year

3. Identify the individual's maximum annual administrative dose guideline:

100 mrem/year

4. Identify the individual's routine annual administrative dose guideline:

50 mrem/year EVALUATOR'S KEY

-6 of 8-

HANDOUT

  • A Technical Representative from the Viking Valve Corporation Engineering Department is arriving tomorrow to evaluate replacing the Main Condenser Pit Foam Fire Suppression System.
  • Dose rates in the associated work area range from 0 -

5 mr/hr.

  • The evaluation is expected to take approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
  • The Operations Manager has designated you as the visitor sponsor and visitor escort .
  • Security arrangements have already been completed for visitor access.
  • The individual has never been exposed to or monitored for Occupational Radiation Exposure.
  • The individual will NOT be trained as a Radworker and will NOT perform any work.

Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor/member of the public.

Identify the individual's annual regulatory dose limit, maximum annual administrative dose guideline, and routine annual administrative dose guideline. Document your results on the provided worksheet.

-7 of 8-

WORKSHEET

1. Identify the in-processing requirements for allowing the individual to enter the RCA as a visitor:
2. Identify the individual's annual regulatory dose limit:
3. Identify the individual's maximum annual administrative dose guideline:
4. Identify the individual's routine annual administrative dose guideline:

-8 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate APPL. TO JPM NUMBER Event Notification REV: DATE: NRC KIA SYSTEM NUMBER: ....:2:..:..4..:..:.*_;_44.:_(~4.:_.4..t_)- - - - -

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : --'--

30 Minutes SUBMITTED:

APPROVED:

CANDIDATE NAME: LOGIN ID:

JPM Completion Perform Location : Classroom DATE PERFORMED: TIME TO COMPLETE: Minutes

---

ERFORMANCE EVALUATION : 0 Satisfactory 0 Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

-1 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO 14-2 NRC SRO EP TASK TITLE : Determine Emergency Classification and Initiate APPL. TO JPM NUMBER Event Notification Current Update: By:

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required [8:1 None Comments:

Current Update By:

Date lnt Previous Revision Date:

-2 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate APPL. TO JPM NUMBER Event Notification I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. IAP-1 B. IAP-2 C. EAP-1 .1 D. EAP-4 Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Ensure sufficient copies of the referenced documents are available, including extra copies of the Part 1 notification form .

V. EVALUATOR NOTES A. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .

-3 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SRO 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate APPL. TO JPM NUMBER Event Notification VI. TASK CONDITIONS A. The plant was initially operatin9 at 100% power with no equipment out of service.

B. An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.

C. The Reactor was manually scrammed five minutes ago.

E. The following conditions exist now:

  • Reactor pressure is 200 psig and lowering.
  • Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.
  • Drywell pressure is 15 psig and slowly rising .
  • A team is being assembled to close 12MOV-18 in the field . Expected completion time for the team is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> from now.
  • Reactor Building differential pressure is -0.25" H2 0 .
  • No change has been seen in Stack or Reactor Building exhaust radiation levels.
  • 200' elevation wind speed is 10 mph from 190°.
  • 30' elevation wind speed is 5 mph from 190°.
  • Stability class is E.

-4 of 9-

SRO '-"" 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification VII. INITIATING CUE Inform the candidate of the following :

"1. Classify the event and inform the examiner of the classification. 2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.

This is a time critical JPM. Your time clock starts once you acknowledge this task."

  • - CRITICAL STEP STEP STANDARD EVALUATION I COMMENT
1. Obtain applicable reference documents Obtains a copy of applicable reference documents, as SAT I UNSAT needed:
  • EAP-1.1 EVALUATOR: Ensure sufficient copies of these documents are available.
  • 2. Classify the event Classifies the event as General Emergency FG1.1 CRITICAL STEP based on loss of RCS and Primary Containment barriers SAT I UNSAT and potential loss of Fuel Clad Barrier within 15 minutes of JPM start time.

JPM start time:

Time of classification :

Time difference:

-5 of 9-

SRO " 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP STANDARD EVALUATION I COMMENT

  • 3. Implement EAP-1 .1, Offsite Completes EAP-1 .1 Attachment 1, Part 1 notification CRITICAL STEP Notifications, in order to notify offsite form per attached key within 15 minutes of classification SAT I UNSAT agencies. time.

Time of classification :

Time of offsite notification:

Time difference:

EVALUATOR NOTE: Only item 3, 4 , 5, 6, 7, 9, and 10 of EAP-1 .1 Attachment 1 are deemed critical for this JPM. These items are individually graded in the JPM steps below. All other items are non-critical. See attached key.

  • 4. Completes Part 1 Notification step 3. Indicates "GENERAL EMERGENCY" in Part 1 CRITICAL STEP Notification step 3 (see attached key) . SAT I UNSAT
  • 5. Completes Part 1 Notification step 4. Records today's date and time of declaration in Part 1 CRITICAL STEP Notification step 4 (see attached key). SAT I UNSAT
  • 6. Completes Part 1 Notification step 5. Indicates "No Release" in Part 1 Notification step 5 (see CRITICAL STEP attached key). SAT I UNSAT

-6 of 9-

SRO ....,.. 14-2 NRC SRO EP TASK TITLE: Determine Emergency Classification and Initiate Event Notification STEP STANDARD EVALUATION I COMMENT

  • 6. Completes Part 1 Notification step 6. Indicates "EVACUATE and IMPLEMENT the Kl PLAN CRITICAL STEP for the following ERPA. .. : 1, 2, 3, 26, 27" in Part 1 SAT/UNSAT Notification step 6 (see attached key).
  • 7. Completes Part 1 Notification step 7. Indicates EAL # "FG1.1 " in Part 1 Notification step 7 CRITICAL STEP (see attached key) . SAT/UNSAT
  • 8. Completes Part 1 Notification step 9. Indicates elevated wind speed of 10 mph in Part 1 CRITICAL STEP Notification step 9 (see attached key) . SAT/UNSAT Indicates ground wind speed of 5 mph in Part 1 Notification step 9 (see attached key) .
  • 9. Completes Part 1 Notification step 10. Indicates elevated wind direction of 190° in Part 1 CRITICAL STEP Notification step 10 (see attached key) . SAT/UNSAT Indicates ground wind direction of 190° in Part 1 Notification step 10 (see attached key).

EVALUATOR: Terminate the task at this point.

- - - --- - -

-7 of 9-

EVALUATOR'S KEY PART ONE GLNERAL INfORMATION Paqe 1 of 1 NEW YORK STATE UPSTAIR RADIOLOGICAL EMERGENCY DA.TA FORM PART l NOii(JCIIian II

'TillS iii tl) rlplli an inek!ent* 11e J*- A. Fllz.f'Ridl ~ Plri S.lllldbrlur ~.* (c-Ml rdll:lll to lndudlllllldloltolng t!Mienttl D ~~ewvor~~ ..... CJ o.w.go COUIIIIJ 0 t.IIN Mllil l'vlnt Ulllt ft 0 NIM llllllle f>tOinlt Unit n FIIOII: (Z.!&..I2£.. OTHER) ED Appi'OYilll: (Sifln~ture]

GE;Jti~ERAL tNFORMATION tNote: 0 When chldc.ed ll'dl'*- c:hiMe In statue, NOT for D1ace

      • u.u.ge1ranamllild an: (Oilflt lllltnm.t 24 HcNr Clodf v*: A. RECI ..~

[] o.-*

[] NY ..... ; 51848W2GO r;V201 Co.: $11.0150 QtJ111

[] . .,

  • i : 34N20t II[.Canlrllil *Roam HcllinB a NMP II 2: ~2&COrllrGI~ H~
02. lllis is : A. An AcNal Ema~ (a.) AD!:IIcn:ilo Ol. The Eme~ CLmir~e~tian il:

A. UNUSUAL EVE.'ff ~~E AREA EMERGI:NcY & il.MEROHNcY TERMINATED B. ALERT ENERAL EMERGENCY f . Otha-

04. Thi1 EmciJmqo ClusifiCIIiall de~:IIIRCran; trCNJan wreJ IJimel (daW) *' f1iml:>-24 br clock~

OS. I ~: of RadiD.:ti>-c Mftriai&!Nc wlbc diiNIIIicd even!;

Noltdease Rdaue BELOW £oderl.llimilll Ted111K.I Spel'ific.-.tion D Tb Aln>Oiiph~~~e g Ta W11et C. Ret-e ABO... £ ~rat limilt T<<blli~ll Specif.eati011 c To~ cToWIIer D. ~rel-ftlCIIIiriuewlllllillll

06. The fiJlllnwioll'rof<<<iYe ACdQDJ ate~ to be impletnetMd BICM:II upmctkla'ble:

A. NO NEED,_. Pll0Tt:C11VE ACTJOI'I"'S OII!Side 1he sile ~

lS o lS

{!)EVACtiATI! llld IMPLEMENT tM ICJ PUN for 1M follCPAing ERPAs and

~ rema.iJliq EIU'As MONITOR lbt EMERGENCY AURTSYSTIM 1 2 ~ S 6 7 I 9 10 II l:Z 13 14 IS 16 17 I I 19 ;zo

~*

2:z Zl 24 :z9 1'o'fl]L* Qff1lrE. d rJI((OIIITlfS.SHOuL/l. 'JH1.5J.llU ~EL T£R.JN.PY.'-£ + TM,j.lfJJ.f.&J'A'-f.!Al(QN IS.I:K!I.ad.~M C. SHI!LTER-I:N.rLACE N!CliMPUMIINT lllle Kl PLAN fGr the tollowlna EltPAs llld All mr.inio,a ell'~ )f()NJTOR till £MIJlG£NC'W AL£RT SYSTJtM I 2 l . ' s 7 ll 9 10 11 11 tl 14 IS 16 17 II l!l 20 21 l2 23 24 1S 2:6 27 za 29

07. tALl FGU Brief En:nc {~fiCHU/ desr:~fton henl* NOT Clftlr:lfj Dciaiption I; Oilier SiFi6CIIII lnf~icm Oil Jb!lol;tlot Sr.tlll8: A. OperatiOIIIII ~hllldown ffoa'llf'l Dire at tsllrlt me * ~ mmula)

(dille) (tilllC l4 t. dock) 10 100 I

09. W111d$pced: A. MiJWHour at dcv~on fM(EkYIII:IIl) 010.

Wind Di.ftu:tion: A. (Fnlm) 5 Jill Miletlllour ar el~

~-ll'~iQD 30 ZCJQ Feet: !Cii'OIIIIdl

  • : : (Eie\oaed)

B. (from) 1SD * ~- 111 ele~'MiCft .112 I_iOI'OWIIdl ou. SUblldy C11W Ele\IIIC!d: I.!DilllliSi - A B c ~ - D ~ *( E l F G t ekP"booe II Iilli Oil.

.INtmt! .dAnl!!;v), DQ kparud By- Ccmnnanicalol's nunc:;

~...,.. any quetliOIII&?"

--

0 N.wYorll.... D ~Coun11 D Nine ... Point Unllltt [] lllrw Mile Point Unttt:l

  • J.,..A. FbP8Itlck NUcle*POWifPianlcut81 ~

EVALUATOR'S KEY

-8 of 9-

HANDOUT

  • The plant was initially operating at 100% power with no equipment out of service.
  • An earthquake was felt in the Control Room and confirmed with both JAF and Nine Mile Point Unit 2 seismic instrumentation.
  • The Reactor was manually scrammed five minutes ago.
  • The following conditions exist now:

o Reactor pressure is 200 psig and lowering.

o Reactor water level is -5 inches and slowly lowering with all available injection sources maximized.

o Drywell pressure is 15 psig and slowly rising.

o A steam leak in the Reactor Building coming from the Reactor Water Cleanup system has been reported.

o Reactor Water Cleanup isolation valves 12MOV-15 and 12MOV-18 have failed to close.

o A team is being assembled to close 12MOV-18 in the field.

Expected completion time for the team is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> from now.

o Reactor Building differential pressure is -0.25" H20.

o No change has been seen in Stack or Reactor Building exhaust radiation levels.

o 200' elevation wind speed is 10 mph from 190°.

o 30' elevation wind speed is 5 mph from 190°.

o Stability class is E.

1. Classify the event and inform the examiner of the classification.
2. Then, complete the Part 1 Notification per EAP-1.1, Offsite Notifications.

This is a time critical JPM. Your time clock starts once you acknowledge this task.

-9 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 A TASK TITLE : Restore CRD to Normal Al ignment Following A TWS (Ait Path)

APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 201001 A2 .07 (3.2/3.1)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- -15 - Minutes

. ?/')~*

SUBMITIED: OPERATIONS REVIEW: , -;<? ~L---~

/ ' (

APPROVED :


CANDIDATE NAME :

JPM Completion D Simulated C8J Performed Location : D Plant cgj Simulator TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE:

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 A TASK TITLE: Restore CRD to Normal Alignment Following ATWS (Ait Path)

APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1:8J None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 7-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 A TASK TITLE: Restore CRD to Normal Alignment Following ATWS (Ait Path)

APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES A EP-3, Backup Control Rod Insertion B. OP-25, Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A Reset to an appropriate IC (IC-66).

B. Ensure the Reactor is scrammed, but RPS is reset.

C. Ensure both CRD pumps are running .

D. Ensure full open CRD Drive Water Pressure Control Valve 03MOV-20.

E. Ensure full closed CRD Cooling Water Pressure Control Valve 03MOV-22.

F. Ensure CRD Flow Control tapeset is run to maximum.

G. Ensure override RD ZAI3FC301 (2), CRD FLOW CONTROLLER- AUTO, is preset at a high value

(>95).

V. EVALUATOR NOTES A The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A An ATWS has occurred.

B. Control rods were inserted by raising CRD drive water and cooling water differential pressure.

C. Another operator is assigned Reactor water level control.

-3 of 7-

  • -CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform EP-3 Section 5.15, CRD Hydraulic System Restoration. The procedure has been completed up to step 5.15.4. Secure CRD pump 8 and leave CRD pump A running ."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of EP-3. SAT I UNSAT EP-3.
2. Select the correct section to Selects Section 5.15. SAT I UNSAT perform the task.

Starts at step 5.15.4.

  • 3. IF both CRD pumps are Stops CRD pump 8 by rotating control switch CRITICAL STEP running , THEN shut down one counterclockwise. SAT I UNSAT of the CRD pumps.
4. Establish normal CRD Obtains a controlled copy of OP-25 Section E. SAT I UNSAT Hydraulic System operating values per Section E of OP-25.

EVALUATOR NOTE: JPM steps 8-13 may be performed in any order, but each has the potential to affect CRD parameters established in other steps. JPM steps 11 and 12 should only be graded SAT if the associated parameter is ensured in band at the completion of the JPM. This may require the candidate to re-adjust the associated controls.

-4 of 7-

STEP STANDARD EVALUATION I COMMENT

  • 5. Establish normal CRD system Attempts to adjust tapeset on CRD FLOW CNTRL 03FIC- CRITICAL STEP flow. 301 to lower CRD system flow. SATIUNSAT EVALUATOR NOTE: The tapeset on 03FIC-301 is failed ,

such that the controller will not respond to the operator's adjustments while in AUTO. EN-OP-115 provides guidance for the operator to take manual control of a controller that has failed in automatic.

6. Recognize I report CRD Flow Reports CRD Flow Control Valve failure. SATIUNSAT Control Valve failure.

EVALUATOR NOTE: If candidate asks how to proceed, direct them to make a recommendation and then carry out that recommendation.

  • 8. Establish normal CRD system Adjusts knob on CRD FLOW CNTRL 03FIC-301 to establish CRITICAL STEP flow. between 59 and 61 gpm . SAT I UNSAT
  • 9. Establish normal CRD drive Throttles closed CRD Drive Water Motor Operated Pressure CRITICAL STEP water differential pressure. Control Valve 03MOV-20 by rotating control switch SATIUNSAT counterclockwise.

Adjusts 03MOV-20 as required to establish 260 to 270 psid drive water differential pressure.

-5 of 7-

- - - - --

STEP STANDARD EVALUATION I COMMENT

10. Establish normal CRD cooling Fully opens CRD Cooling Water Motor Operated Pressure SAT I UNSAT water valve alignment. Control Valve 03MOV-22 by rotating control switch clockwise.

EVALUATOR CUE: If necessary, report CRD stabilizing valve flow is 6 gpm.

EVALUATOR NOTE: The step below is the last step in EP-3 Section 5.15.

11 . Ensure reference leg backfill is Dispatches operator to ensure reference leg backfill is SAT I UNSAT restored by performing one of restored .

the following :

  • Slowly open 03CRD-300 EVALUATOR CUE: Report that backfill has been restored (reactor vessel wtr lvl as requested .

backfill sys CRD charging header tie in valve)

  • Place all Reference Leg Backfill Systems in service per Section D of OP-27A EVALUATOR: Terminate the task at this point.

Task Standard: The CRD system is restored to a normal alignment. The CRD flow controller is operated in manual due to failure of the automatic setpoint tape to respond to changes in operator demand.

-6 of 7-

HANDOUT

  • An ATWS has occurred.
  • Control rods were inserted by raising CRD drive water and cooling water differential pressure.
  • Another operator is assigned Reactor water level control.

Perform EP-3 Section 5.15, CRD Hydraulic System Restoration. The procedure has been completed up to step 5.15.4. Secure CRD pump B and leave CRD pump A running.

-7 of 7-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 B TASK TITLE: Restore ESW after injection into RBCLC APPL . TO JPM NUMBER REV: DATE : NRC KIA SYSTEM NUMBER: 400000 A4.01 (3 .1/3.0)


JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- Minutes SUBMITTED: _;::z- /L 2 ~ OPERATIONS REVIEW: . ~ <~d::~~

~ 7 APPROVED: ~--"'-"-=----+-----------

_ ......

CANDIDATE NAME :

JPM Completion 0 Simulated 1:8] Performed Location : 0 Plant 1:8] Simulator ATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : 0 Satisfactory 0 Unsatisfactory COMMENTS : (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 B TASK TITLE: Restore ESW after injection into RBCLC APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1Zl None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 8-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 B TASK TITLE: Restore ESW after injection into RBCLC APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-21, Emergency Service Water B. OP-40, Reactor Building Closed Loop Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to IC-67.

B. Place RBCLC pump control switches in PTL.

C. Ensure remote SW22, LIFT LEADS LB-4/LA-6 PER OP-21, is inserted as LIFT.

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , place keeping and three-point communication.

VI. TASK CONDITIONS

1. The plant is shutdown.
2. All RBCLC pumps were placed in Pull to Lock.
3. ESW auto aligned to RBCLC .
4. RBCLC pumps are ready to be returned to service.
5. The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed.

-3 of 8-

  • - CRITICAL STEP

'NITIATING CUE Inform the candidate, "Restore the ESW system to normal per OP-21 Section F.3."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of OP-21 , Obtains a controlled copy of OP-21 . SAT I UNSAT ESW. Reviews Precautions.

Selects section F.3.

2. Perform Implementation section of Determines implementation section SAT I UNSAT Attachment 3. of Attachment 3 has been completed , per initial conditions.
  • 3. Reset ESW Logic A by depressing Depresses ESW SYS A INJ SIG CRITICAL STEP ESW SYS A INJ SIG RESET RESET pushbutton. SAT I UNSAT pushbutton.
4. Verify white ESW SYS A INJ SIG Observes white ESW SYS A INJ SAT I UNSAT light is off. SIG light is off.

'

I *5. Reset ESW Logic 8 by depressing ESW SYS 8 INJ SIG RESET Depresses ESW SYS 8 INJ SIG RESET pushbutton.

CRITICAL STEP SAT I UNSAT pushbutton.

6. Verify white ESW SYS 8 INJ SIG Observes white ESW SYS 8 INJ SATIUNSAT light is off. SIG light is off.

-4 of 8-

STEP STANDARD EVALUATION I COMMENT EVALUATOR NOTE: The next 6 valves are throttleable, therefore the control switches must be held in the desired position while the valves re-position. Stroke times are each approximately 30-45 seconds.

  • 7. Close ESW RETURN TO SERV Closes ESW RETURN TO SERV CRITICAL STEP WTR 15MOV-1758. WTR 15MOV-1758 by taking control SATIUNSAT switch CCW to Close.
  • 9. Close ESW SYS 8 INJ VLV 46MOV- Closes ESW SYS 8 INJ VLV CRITICAL STEP 1018. 46MOV-1018 by taking control SAT I UNSAT switch CCW to Close.

/ *10. Close ESW RETURN TO SERV Closes ESW RETURN TO SERV CRITICAL STEP WTR 15MOV-175A. WTR 15MOV-175A by taking control SATIUNSAT switch CCW to Close.

  • 12. Close ESW SYS A INJ VLV 46MOV- Closes ESW SYS A INJ VLV CRITICAL STEP 101A. 46MOV-1 01A by taking control SAT I UNSAT switch CCW to Close.
13. Ensure open 15R8C-41 R8CLC Dispatches operator to ensure open SAT I UNSAT Makeup Tank TK-4 Outlet 15R8C-41 R8CLC Makeup Tank TK-4 Outlet.

EVALUATOR CUE: 15R8C-41 R8CLC Makeup Tank TK-4 Outlet is open.

()

-5 of 8-

STEP STANDARD EVALUATION I COMMENT

14. Start up RBCLC System per Section EVALUATOR CUE: Time SAT I UNSAT D of OP-40. compression will be invoked and another Operator will restore RBCLC.

SIMULATOR OPERATOR ACTION:

Start RBCLC pumps A & B.

Green flag RBCLC pump C.

Inform Candidate RBCLC discharge pressure is stable and > 80 psig.

15. Candidate reads OP-21 Steps EVALUATOR CUE: Inform SAT I UNSAT F.3.14, 15, & 16. Candidate no ESW valves were re-positioned during AOP-11 .

If asked about the position of Breaker 71MCC-152-0D4, report open .

16. WHEN RBCLC discharge header EVALUATOR CUE: OP-21 SAT I UNSAT pressure is stable at GREATER Attachment 3 Restoration section is THAN OR EQUAL TO 80 psig, complete.

perform Restoration section of Attachment 3.

17. Shut down ESW per Subsections Obtains Subsections F.1 and F.2. SAT I UNSAT F.1 and F.2.
18. Verify RBCLC System is in normal Determines RBCLC system is in SAT I UNSAT operation. normal operation.

EVALUATOR CUE: If needed , state that the RBCLC system is in normal operation .

19. Verify EDG A and C are shutdown. Determines EDG A and C are SATIUNSAT shutdown .

~

-6 of 8-

STEP STANDARD EVALUATION I COMMENT I 20. Verify ventilation loads downstream EVALUATOR CUE: Ventilation SAT/UNSAT of 46MOV-101A do not require loads downstream of 46MOV-101A ESW. do not require ESW.

21 . Ensure open ESW SYS A TEST Observes ESW SYS A TEST VLV SAT/UNSAT VLV 46MOV-102A. 46MOV-102A is open .

  • Red light on, Green light off
22. Ensure closed ESW SYS A INJ VL V Observes ESW SYS A INJ VLV SAT I UNSAT 46MOV-101A 46MOV-101A is closed.
  • Red light off, Green light on
  • 23. Stop ESW PMP A 46P-2A. Stops ESW PMP A 46P-2A by taking CRITICAL STEP control switch CCW to Stop. SAT I UNSAT EVALUATOR CUE: Another operator will shutdown ESW loop B.

EVALUATOR: Terminate the task at this point.

Task Standard: The ESW logic is reset, ESW valves are aligned in a normal configuration , and ESW pump A is shutdown.

-7 of 8-

HANDOUT

  • The plant is shutdown.
  • All RBCLC pumps were placed in Pull to Lock.
  • RBCLC pumps are ready to be returned to service.
  • The implementation section of OP-21 Attachment 3, STATUS CONTROL FORM FOR ESW RESET FOLLOWING INJECTION TO RBCLC, has been performed.

Restore the ESW system to normal per OP-21 Section F.3.

-8 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 C TASK TITLE : Start First Feedwater Pump APPL . TO JPM NUMBER REV: DATE : NRC KIA-SYSTEM NUMBER: 259001 A4 .02 (3.9/3.7)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME :

- -20 - Minutes SUBMITTED : __;;:;c: /L ==:z OPERATIONS REVIEW: ~~:-L /'~

APPROVED : -~JL~~~~---------

CANDIDATE NAME :

JPM Completion D Simulated C8J Performed Location : D Plant C8J Simulator TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 C TASK TITLE: Start First Feedwater Pump APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additional Information D Questions and Answers D Validation D Procedural Change Required [8J None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 9-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 C TASK TITLE: Start First Feedwater Pump APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-2A, Feedwater System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Plant in a startup condition near 500 psig (IC-68) .

B. Ensure both Feedwater pumps are secured.

C. Ensure 34MOV-100A and 34MOV-100B are closed .

D. Ensure Reactor water level is being maintained in the green band and controlled with 34FCV-137 in AUTO.

E. Place FDWTR screen on EPIC slave 1 monitor.

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication .

VI. TASK CONDITIONS A. A plant startup is in progress.

B. Reactor pressure is approaching 500 psig.

C. Reactor water level is being controlled with 34FCV-137 in AUTO.

-3 of 9-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Start Feedwater pump A per OP-2A Section D.2. The procedure is in progress up to step D.2.18."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of OP-2A. SATIUNSAT OP-2A.
2. Select the correct section to Selects Section D.2 of OP-2A. SAT I UNSAT perform the task.

Proceeds to Step D.2.18.

  • 3. Test RFPT A trip as follows at Depresses A MAN TRIP pushbutton. CRITICAL STEP panel 09-6:

SAT I UNSAT

  • Depress A MAN TRIP pushbutton.
4. Verify the following : Observes RFPT A LP Stop Valve green light on, red light SAT I UNSAT off.
  • RFPT A LP AND HP Stop Valves are closed .

Observes RFPT A HP Stop Valve green light on, red light off. I

Observes annunciator 09-6-4-2 is in alarm.

-4 of 9-

STEP STANDARD EVALUATION I COMMENT

  • 5. Reset RFPT A trip as follows Depresses A MAN TRIP RESET pushbutton. CRITICAL STEP at panel 09-6: SAT I UNSAT
  • Depress AND hold A MAN EVALUATOR NOTE: The candidate should hold the TRIP RESET pushbutton. pushbutton while observing conditions in the next step, but it is only critical that the pushbutton is depressed long enough to reset the trip signal.
6. Verify the following: Observes RFPT A LP Stop Valve green light off, red light SAT/UNSAT on.

Observes RFPT A HP Stop Valve green light off, red light

RFPT A TRIP is clear.

Observes annunciator 09-6-4-2 is clear.

  • 7. Release A MAN TRIP RESET Releases A MAN TRIP RESET pushbutton. CRITICAL STEP pushbutton. SAT/UNSAT EVALUATOR CUE: Time compression is in effect. The RFPT A local trip test and reset have been completed SAT per OP-2A steps D.2.20 and D.2.21.
8. Perform RFPT A local trip test Determines RFPT A local trip test has been completed SAT, SAT/UNSAT as follows ... per evaluator cue.
9. Perform RFPT A local trip Determines RFPT A local trip reset has been completed SAT/UNSAT reset as follows ... SAT, per evaluator cue.

-5 of 9-

STEP STANDARD EVALUATION I COMMENT

10. Open 34FWS-16A (rx fdwtr Dispatches operator to open 34FWS-16A. SAT I UNSAT pump A inlet to FCV-137 isol valve) .

EVALUATOR CUE: 34FWS-16A is open.

11 . WHILE performing the Acknowledges procedure step. SAT I UNSAT following steps, maintain RPV water level BETWEEN 197 and 203 inches on 06LI-94A, EVALUATOR CUE: Another operator will monitor Reactor 8, and C. water level and operation of 34FCV-137.

  • 12. Place RFPT A MSC on high Slowly raises RFPT A MTR SPEED CHANGER until RFPT CRITICAL STEP speed stop as follows: A speed begins to rise. SAT I UNSAT IF 34FCV-137 is in automatic (BAL), THEN perform the following :

Slowly raise RFPT A MTR SPEED CHANGER to roll A RFPT.

  • 13. Slowly raise RFPT A MTR Slowly raises RFPT A MTR SPEED CHANGER until high CRITICAL STEP SPEED CHANGER to high speed stop red light illuminates and green light SATIUNSAT speed stop. extinguishes.
14. Continue to raise MSC for at Raises RFPT A MTR SPEED CHANGER for at least 5 SAT I UNSAT least 5 seconds after reaching seconds after high speed stop red light first illuminates and high speed stop to ensure green light extinguishes.

MSC is fully on high speed stop.

-6 of 9-

STEP STANDARD EVALUATION I COMMENT

15. Take control of RFPT A speed Adjusts RFP A FLOW CNTRL 06-84A manual control knob SAT IUNSAT with MGU as follows: a small amount in both the clockwise and counterclockwise Raise and lower RFPT A directions.

speed a small amount by adjusting RFP A FLOW Observes RFPT A speed raises and lowers a small amount.

CNTRL 06-84A manual control knob.

16. IF 34FCV-137 is in automatic May adjust RFP A FLOW CNTRL 06-84A manual control SAT I UNSAT INA (BAL), THEN adjust RFP A knob to raise RFP A discharge pressure.

FLOW CNTRL 06-84A manual control knob to maintain RFP A discharge pressure EVALUATOR NOTE: RFP A discharge pressure will GREATER THAN RPV already be greater than Reactor pressure, therefore no pressure. adjustment is required .

17. Close the following valves: Closes 41 MOV-1 04A by depressing close pushbutton. SAT I UNSAT
  • RFPT A STOP VLV DRNS Closes 41 MOV-1 07A by depressing close pushbutton.

0 41MOV-104A 0 41MOV-107A Closes 41 MOV-1 08A by depressing close pushbutton.

0 41MOV-108A 0 41 MOV-112A2 I

-7 of 9-

STEP STANDARD EVALUATION I COMMENT EVALUATOR CUE: 31MOV-103A is NOT required to be open for Main Turbine warming.

18. IF 31MOV-103A is not Observes annunciator 09-6-4-33 is clear. SAT I UNSAT required to be open for main turbine warming, THEN perform the following :

Verify annunciator 09-6-4-33 RFPT A LP STM DRN POT LVL HI is clear.

19. Ensure closed RFPT A LP Closes 31 MOV-1 03A by depressing close pushbutton. SAT I UNSAT STM DRN 31MOV-103A.

EVALUATOR CUE: Another operator will continue with this procedure as actions become necessary.

EVALUATOR: Terminate the task at this point.

Task Standard: Feedwater pump A is running with discharge pressure greater than Reactor pressure.

-8 of 9-

HANDOUT

  • A plant startup is in progress.
  • Reactor pressure is approaching 500 psig.
  • Reactor water level is being controlled with 34FCV-137 in AUTO.

Start Feedwater pump A per OP-2A Section 0.2. The procedure is in progress up to step 0.2.18.

-9 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 D TASK TITLE: Start EDGs A and C Due to Hurricane Warning APPL. TO JPM NUMBER REV: DATE: NRC KJA SYSTEM NUMBER: 264000 A4 .04 (3.7/3.7)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME: 20 Minutes

--~

SUBMITTED: _::z:-~ '") 1c- OPERATIONS REVIEW: ... ~F::::e; ~

APPROVED: _ __.~-'-"~...:::::;;.___.,~:;..___ _ _ _ _ _ _ __

CANDIDATE NAME:

JPM Completion D Simulated C8] Performed Location: D Plant C8] Simulator TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS: (MANDA TORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 D TASK TITLE: Start EDGs A and C Due to Hurricane Warning APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required [8J None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2of12-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 D TASK TITLE: Start EDGs A and C Due to Hurricane Warning APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-22, Diesel Generator Emergency Power Ill. TOOLS AND EQUIPMENT A. Synch Key IV. SET UP REQUIREMENTS A. Plant in a power operating with Bus 10500 supplied from T-3 (IC-68).

EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly *identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication .

VI. TASK CONDITIONS A. The National Weather Service has issued a Hurricane Warning for Oswego County.

B. AOP-13 , High Winds, Hurricanes, and Tornadoes, has been entered.

C. AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs.

D. Pre-startup checks have been completed for all EDGs.

E. EDGs have been declared inoperable.

-3 of 12-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Start EDGs A and C per OP-22 Section D.1. Load each EDG to approximately 2600 KW."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of OP-22. SATIUNSAT OP-22.
2. Select the correct section to Selects Section D.1 of OP-22. SAT I UNSAT perform the task.
3. Perform pre-startup checks for Determines pre-startup checks have been completed, per SATIUNSAT EDG A and C per Subsections initial conditions .

G.25 and G.26.

4. IF pre-startup checks are Determines pre-startup checks have NOT been omitted, per SAT I UNSAT omitted ... initial conditions.
  • 5. Simultaneously place the Simultaneously rotates EDG A CONTROL and EDG C CRITICAL STEP following control switches to CONTROL switches clockwise to START. SATIUNSAT START:
  • EDGACNTRL

-4 of 12-

STEP STANDARD EVALUATION I COMMENT

6. IF frequency of either EDG Observes EDG A and C frequency stabilize between 58 and SAT I UNSAT does not stabilize BETWEEN 62Hz.

58 and 62 Hz AFTER reaching normal voltage, THEN immediately place the affected EDG CNTRL switch in STOP.

I

7. WHEN approximately 10 Observes EDG A speed is approximately 900 rpm . SAT I UNSAT seconds have elapsed , verify the following:

Observes EDG A frequency is approximately 60 Hz.

  • EDG A speed is approximately 900 rpm.
  • EDG A frequency is Observes EDG A voltage is approximately 4.3 KV. I approximately 60 Hz.
  • EDG A voltage is Observes EDG C speed is approximately 900 rpm.

approximately 4.3 kV.

  • EDG C speed is approximately 900 rpm . Observes EDG C frequency is approximately 60 Hz.
  • EDG C frequency is approximately 60 Hz.
  • EDG C voltage is Observes EDG C voltage is approximately 4 .3 KV.

approximately 4.3 kV.

  • EDG A & C TIE BKR Observes EDG A & C TIE BKR 10504 green light off, red 10504 is closed .

light on.

Observes ESW pump 46P-2A green light off, red light on.

- - - -- -

-5 of 12-

STEP STANDARD

. EVALUATION I COMMENT

8. Verify the following at panel Dispatches operator to verify conditions at panel 92HV-9A. SAT I UNSAT 92HV-9A:
  • The following fans indicate EVALUATOR CUE: All verifications for OP-22 step 0 .1.6 running: have been completed SAT.
  • The following fans indicate stopped:
  • HV-9A-7 SUPPLY FAN FN-1A TROUBLE
  • HV-9A-9 SUPPLY FAN FN-IC TROUBLE
  • 9 . Trip EDG A & C TIE BKR Trips EDG A & C TIE BKR 10504 by rotating control switch CRITICAL STEP 10504, allow switch to spring counterclockwise to TRIP, then releasing switch . SAT I UNSAT return to AUTO.
10. Verify EPIC-D-730 alarmed Observes EPIC-D-730 alarmed and cleared on alarm typer. SAT I UNSAT and cleared on alarm typer.

-6of12-

STEP STANDARD EVALUATION I COMMENT

11. IF 10500 bus is being supplied I Rotates AUTO MANUAL T-3 LTC CONTROL switch SAT I UNSAT by 71T-3, THEN ensure AUTO clockwise to MAN .

MANUAL T-3 LTC CONTROL switch is in MAN .

EVALUATOR ROLE PLAY: If contacted as Power Control, acknowledge T-3 LTC will be taken to manual.

  • 12. Place the following switches in I Places EDG A GOV MODE switch in DROOP. CRITICAL STEP DROOP: SAT I UNSAT
  • EDG A GOV MODE Places EDG C GOV MODE switch in DROOP.
  • 13. Parallel EDG A with 10500 Inserts synch key and rotates EDG A LOAD BKR SYNCH CRITICAL STEP Bus as follows: SW clockwise to ON. SAT I UNSAT Place EDG A LOAD BKR SYNCH SW in ON.
14. Adjust EDG A VOLT REG to Adjusts EDG A VOLT REG to match INCOMING and SAT I UNSAT INA match INCOMING and RUNNING voltage, as necessary.

RUNNING voltage.

  • 15. Adjust EDG A GOV to rotate Adjusts EDG A GOV to establish SYNCHROSCOPE CRITICAL STEP SYNCHRO.SCOPE slowly in rotation slowly in the FAST direction (clockwise). SAT I UNSAT INA the FAST direction (clockwise).

EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present, mark this step NA.

The step is then NOT critical.

-7 of 12-

STEP STANDARD EVALUATION I COMMENT

  • 16. WHEN EDG A and 10500 Bus When SYNCHROSCOPE is at approximately 12 o'clock, CRITICAL STEP are in phase closes EDG A LOAD BKR 10502 by rotating control switch SAT I UNSAT (SYNCHROSCOPE at 12 clockwise.

o'clock), close EDG A LOAD BKR 10502.

  • 17. Adjust EDG A GOV to raise Rotates EDG A GOV control switch clockwise to establish CRITICAL STEP EDG A load 100 to 300 kW. EDG A load 100 to 300 kW, as necessary. SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is initially present, mark this step NA.

The step is then NOT critical.

18. Place EDG A LOAD BKR Rotates EDG A LOAD BKR SYNCH SW counterclockwise SAT I UNSAT SYNCH SW in OFF and to OFF and removes synch key.

remove synch switch handle.

19. IF A EDG has operated at Determines EDG A has NOT operated less than 520 kW for SAT I UNSAT LESS THAN 520 kW for greater than 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

GREATER THAN 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, THEN perform the following ...

EVALUATOR CUE: If asked, report that EDG A has NOT operated less than 520 kW for greater than 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

-8 of 12-

STEP STANDARD EVALUATION I COMMENT

  • 20. Adjust EDG A GOV to raise Rotates EDG A GOV control switch clockwise to raise EDG CRITICAL STEP EDG A load to LESS THAN A load to approximately 2600 kW in approximately 800 kW SATIUNSAT OR EQUAL TO 2,600 kW over increments.

3 to 5 minutes in approximately 800 kW increments. EVALUATOR CUE: If desired, prompt the candidate that time compression is in effect and one minute has passed.

This cue can be repeated as necessary to complete loading of EDG A.

  • 21 . Parallel EDG C with 10500 Inserts synch key and rotates EDG C LOAD BKR SYNCH CRITICAL STEP Bus as follows: SW clockwise to ON . SATIUNSAT Place EDG C LOAD BKR SYNCH SW in ON.
22. Adjust EDG C VOLT REG to Adjusts EDG C VOLT REG to match INCOMING and SAT I UNSAT INA match INCOMING and RUNNING voltage, as necessary.

RUNNING voltage.

  • 23. Adjust EDG C GOV to rotate Adjusts EDG C GOV to establish SYNCHROSCOPE CRITICAL STEP SYNCHROSCOPE slowly in rotation slowly in the FAST direction (clockwise). SAT I UNSAT INA the FAST direction (clockwise).

EVALUATOR NOTE: If initial conditions are such that an acceptable rotation is initially present, mark this step NA.

The step is then NOT critical.

-9 of 12-

-

STEP STANDARD EVALUATION I COMMENT

  • 24. WHEN EDG C and 10500 Bus When SYNCHROSCOPE is at approximately 12 o'clock, CRITICAL STEP are in phase closes EDG C LOAD BKR 10512 by rotating control switch SATIUNSAT (SYNCHROSCOPE at 12 clockwise .

o'clock), close EDG C LOAD BKR 10512.

  • 25. Adjust EDG C GOV to raise Rotates EDG C GOV control switch clockwise to establish CRITICAL STEP EDG C load 100 to 300 kW. EDG C load 100 to 300 kW, as necessary. SAT I UNSAT INA EVALUATOR NOTE: If initial conditions are such that an acceptable loading is initially present, mark this step NA.

The step is then NOT critical.

26. Place EDG C LOAD BKR Rotates EDG C LOAD BKR SYNCH SW counterclockwise SATIUNSAT SYNCH SW in OFF and to OFF and removes synch key.

remove synch switch handle.

27. IF C EDG has operated at Determines EDG C has NOT operated less than 520 kW for SATIUNSAT LESS THAN 520 kW for greater than 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

GREATER THAN 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, THEN perform the following ...

EVALUATOR CUE: If asked, report that EDG C has NOT operated less than 520 kW for greater than 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

-10 of 12-

STEP STANDARD EVALUATION I COMMENT

  • 28. Adjust EDG C GOV to raise Rotates EDG C GOV control switch clockwise to raise EDG CRITICAL STEP EDG C load to LESS THAN C load to approximately 2600 kW in approximately 800 kW SAT I UNSAT OR EQUAL TO 2,600 kW over increments.

3 to 5 minutes in approximately 800 kW increments. EVALUATOR CUE: If desired, prompt the candidate that time compression is in effect and one minute has passed.

This cue can be repeated as necessary to complete loading of EDG C.

EVALUATOR CUE: Another operator will complete the remaining portions of OP-22 for startup of EDGs A and C .

.

EVALUATOR: Terminate the task at this point.

Task Standard: EDGs A and C are running and loaded to approximately 2600 KW.

-11 of 12-

HANDOUT

  • The National Weather Service has issued a Hurricane Warning for Oswego County.
  • AOP-13 Step E.3.9.a requires starting and loading each pair of EDGs.
  • Pre-startup checks have been completed for all EDGs .

Start EDGs A and C per OP-22 Section 0.1. Load each EDG to approximately 2600 KW.

-12 of 12-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 E TASK TITLE : Restore Shutdown Cooling After Isolation , RHR Pump Trips APPL . T O JPM NUMBER REV: DATE : NRC KIA SYSTEM NUMBER: 205000 A4 .01 (3.7/3 .7)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- Minutes SUBMITTED : OPERATIONS REVIEW: -~ -~~c:d;>"' ,~

~ 7 APPROVED :

CANDIDATE NAME :

JPM Completion 0 Simulated ~ Performed Location : 0 Plant ~ Simulator

.TE PERFORMED : TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : 0 Satisfactory D Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

\

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 E TASK TITLE: Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1:8:1 None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 9-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 E TASK TITLE: Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. AOP-30, Loss of Shutdown Cooling Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a low-power IC (IC-67).

B. Ensure RHR B was initially in Shutdown Cooling lineup with RHR pump B running , but is now isolated by closing valves 25B, 17, and 18.

C. Close 10MOV-12B.

D. Ensure Reactor coolant temperature is above 140°F.

E. Ensure Reactor water level is greater than 215".

F. Ensure EPIC screen RHRB is on a screen near the JPM location.

G. Ensure RHRSW pump B is in service and RHRSW pump D is in standby.

H. Ensure all actions of AOP-30 Attachment 1 are complete up to step 5.G.

I. Ensure the following simulator programming:

  • Malfunction RH01 :B, RHR Pump B Trip (Trigger 1)
  • Trigger 1- Event Command : zlo10as35b(2)==1 (code for 10MOV-12B red light on) , Action: None J. Ensure the following tags are hanging:
  • RHR KEEP-FULL PMP 1OP-2B control switch - in STOP with red tag
  • RHR TEST TORUS CLG & SPRAY 1OMOV-39B - red tag V. EVALUATOR NOTES A. The candidate should , at a minimum, observe the change in equipment status light indication when equipment is operated.

-3 of 9-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 E TASK TITLE : Restore Shutdown Cooling After Isolation, RHR Pump Trips APPL. TO JPM NUMBER B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .

VI. TASK CONDITIONS A. RHR B was in Shutdown Cooling .

B. A spurious isolation signal caused Shutdown Cooling to isolate.

C. The cause of the isolation signal has been determined and corrected.

-4 of 9-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Restore Shutdown Cooling using RHR pump B per AOP-30 Attachment 1. The procedure has been complete up to step S.G."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of AOP-30 Attachment 1. SAT I UNSAT AOP-30 Attachment 1.
2. IF white HI DW PRESS OR Observes white HI DW PRESS OR LO LVL CLOSE OF SATIUNSAT LO LVL CLOSE OF 1OMOV- 10MOV-25B IN SHUTDOWN CLG 10A-DS85A(B) light is 25A(B) IN SHUTDOWN CLG not lit.

1OA-DS85A(B) light is on, THEN reset logic as follows:

3. Ensure open HX A( B) BYP Observes 1OMOV-668 green light off, red light on. SAT I UNSAT VLV 10MOV-66A(B).
  • 4. Open SHUTDOWN CLG Opens 10MOV-18 by rotating control switch clockwise. CRITICAL STEP SUCT 10MOV-18. SAT I UNSAT
  • 5. Open SHUTDOWN CLG Opens 10MOV-17 by rotating control switch clockwise. CRITICAL STEP SUCT 10MOV-17. SAT I UNSAT I
6. Ensure closed HX A( B) Observes 10MOV-12B green light on, red light off. SAT I UNSAT OUTLET VLV 10MOV-12A(B).

-5 of 9-

STEP STANDARD EVALUATION I COMMENT

7. Ensure RPV water level is Observes Reactor water level is above 215 inches. SATIUNSAT GREATER THAN 215 inches.
  • 8. Start RHR pump that was in Starts RHR pump B by rotating control switch clockwise . CRITICAL STEP service prior to isolation. SAT I UNSAT
  • 9 Open LPCIINBD INJ VLV Opens 1OMOV-258 by rotating control switch clockwise. CRITICAL STEP 1OMOV-25A(B). SAT I UNSAT EVALUATOR NOTE: RHR pump B amps will be just below the red line value. If the candidate identifies this and is looking for direction, report that RHR pump B operation is satisfactory as long current does not exceed red line amps.

EVALUATOR CUE: Direct the candidate to establish Reactor coolant temperature control in a band of 120-140°F using RHR heat exchanger inlet temperature.

  • 10. Establish normal temperature Throttles open 10MOV-12B by rotating control switch CRITICAL STEP control per Section E of OP- clockwise. SAT I UNSAT 130.

EVALUATOR NOTE: When 10MOV-12B red light illuminates, an automatic trigger trips RHR pump B. This initiates an alternate path for the candidate to start RHR pump D to re-establish Shutdown Cooling flow.

-6 of 9-

STEP STANDARD EVALUATION I COMMENT

11. Recognize trip of RHR pump Recognizes trip of RHR pump B. SAT/UNSAT B.

EVALUATOR NOTE: This may include recognizing annunciator 09-3-2-5, RHR pump B indicating light, flow, and/or amps.

EVALUATOR ROLE PLAY: If asked to determine cause of RHR pump B trip, report RHR pump B tripped on overcurrent.

EVALUATOR CUE: If asked how to proceed, direct candidate to make a recommendation for restoring Shutdown Cooling and then carry out that recommendation.

EVALUATOR NOTE: The candidate may use guidance in AOP-30 Attachment 1 or OP-13D section D for starting RHR pump D. Depending on the exact procedural path taken ,

additional steps may be taken (such as re-positioning 10MOV-12B and/or closing 10MOV-15B), but the following two steps are the only critical steps.

-7 of 9-

STEP STANDARD EVALUATION I COMMENT

  • 12. Open SHUTDOWN CLG Opens 10MOV-15D by rotating control switch clockwise to CRITICAL STEP SUCT VLV 10MOV-15D. open. SAT/UNSAT
  • 13. Start RHR pump D. Starts RHR pump D by rotating control switch clockwise to CRITICAL STEP START. SAT I UNSAT EVALUATOR CUE: Another operator will continue actions in the procedure.

EVALUATOR: Terminate the task at this point.

Task Standard: Shutdown Cooling is placed in service on RHR B. RHR pump D is started in response to the trip of RHR pump B.

-8 of 9-

HANDOUT

  • The cause of the isolation signal has been determined and corrected.

Restore Shutdown Cooling using RHR pump B per AOP-30 . The procedure has been complete up to step 5.G.

-9 of 9-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 F TASK TITLE : Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path)

APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 261000 A4 .06 (3.3/3.6)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : __ 15

__:__ Minutes SUBMITTED: OPERATIONS REVIEW~~

APPROVED :


CANDIDATE NAME:

JPM Completion 0 Simulated C8J Performed Location : 0 Plant C8J Simulator E PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE:

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 F TASK TITLE: Manually Isolate Reactor Building Ventilation , Low Reactor Building D/P (Ait Path)

APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items 0 Technical Review 0 Additionallnformation 0 Questions and Answers 0 Validation 0 Procedural Change Required 1:8] None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 11-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 F TASK TITLE: Manually Isolate Reactor Building Ventilation, Low Reactor Building D/P (Ait Path)

APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-51A, Reactor Building Ventilation and Cooling System B. OP-20, Standby Gas Treatment System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69).

B. Ensure the following simulator programming:

  • Event Trigger 1: Event- zdi11 sgta04(3)==1 &zdi11 sgtb04(3)==1 , Command- imf hv03 10
  • Event Trigger 29: Event- zdi5as1 (1 )==1 , Command- set ypo:rp02:a=1
  • Event Trigger 30: Event- zdi5as1 (1 )==1 , Command- set ypo:rp02 :b=1 C. Insert a Reactor scram .

D. Restore Reactor water level above 177".

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .

VI. TASK CONDITIONS A. A radioactive steam leak has developed in the Reactor Building.

-3 of 11-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Manually isolate the Reactor Building per OP-51A section G.1."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of OP-51A. Refers to section SAT I UNSAT OP-51A. G.1.
2. Ensure SBGT is running per Obtains a controlled copy of OP-20. Refers to section 0 .1 SATIUNSAT OP-20. or 0 .2 or Posted Attachment 3.

EVALUATOR ROLE PLAY: If asked which train of SBGT to start, tell the candidate that either train is fine.

EVALUATOR NOTE: The subsequent JPM steps are written for use of OP-20 sections 0 .1 or 0.2. If the Posted Attachment is used, slightly different verifications will be performed, but there will be no impact on Critical Steps.

  • 3. Ensure open Opens ABOVE(BELOW) EL 369' SUCT 01-125MOV-11(12) CRITICAL STEP ABOVE(BELOW) EL 369' by rotating control switch clockwise to open. SAT I UNSAT SUCT 01-125MOV-11 (12)

-4 of 11-

STEP STANDARD EVALUATION I COMMENT

5. Verify the following : Observes white light for AIR HTR 01-125E-5A(B) is on. SAT I UNSAT
6.
7.
8.
  • FN DISCH 01-125MOV- Observes FN DISCH 01-125MOV-15A(B) green light is off, SATIUNSAT 15A(B) is open red light is on .
9.
  • TRAIN A(B) FN 01-125FN- Observes TRAIN A(B) FN 01-125FN-1A(B) green light is off, SAT I UNSAT 1A(B) is running red light is on.
10. IF standby gas treatment is Determines step is NIA. SAT I UNSAT being placed in service to support any of the following ...

-5 of 11-

STEP STANDARD EVALUATION I COMMENT 11 . IF SGT Train B(A) is Observes TRAIN B(A) CLG VLV 01-125MOV-100B(A) SAT I UNSAT shutdown, THEN perform the green light off, red light on.

following :

  • Verify open TRAIN B(A)

CLG VLV 01-125MOV-100B(A).

12.
13. IF RB DIFF PRESS 01- Observes Reactor Building DIP is more negative than -0.25 SAT I UNSAT 125DPI-100A orB indicates inches water.

less negative than -0.25 inches water, THEN ensure SGT Train B is in service per EVALUATOR NOTE: Reactor Building DIP is SAT at this Subsection 0.2. point in the JPM because normal Reactor Building ventilation has not yet been isolated. Once the Reactor Building isolation is performed, Reactor Building DIP will be UNSAT.

EVALUATOR NOTE: The candidate will proceed back to OP-51A step G.1 .2.

---

-6 of 11-

STEP STANDARD EVALUATION I COMMENT

  • 14. Depress the following Depresses RB VENT ISOL A pushbutton. CRITICAL STEP pushbuttons at panel 09-75: SAT I UNSAT
  • RB VENT ISOLA
  • RB VENT ISOL B Depresses RB VENT ISOL B pushbutton. CRITICAL STEP SATIUNSAT EVALUATOR NOTE: The verifications below may be done in any order.
15. Verify isolation per Subsection Proceeds to OP-51A section G.2. SATIUNSAT G.2.
16. Verify the following : Observes 66AOV-100A green light on, red light off. SATIUNSAT
17.
18.
  • BELOW EL 369' RECIRC Observes 66AOD-105 green light off, red light on. SAT I UNSAT 66AOD-1 05 - Open
19.
  • EL 369' RECIRC 66AOD- Observes 66AOD-108 green light off, red light on. SATIUNSAT 108- Open

-7 of 11-

STEP STANDARD EVALUATION I COMMENT

20.
21.
22.
  • SUPP FN 66FN-5A, 58, Observes 2 of the following fans have green light off, red SAT I UNSAT SC (two of three)- On light on and 1 of the following fans has green light on, red light off:
23.
  • BELOW EL 369' EXH FN Observes 1 of the following fans have green light off, red SAT I UNSAT 66FN-12A OR 66FN-12B light on and 1 of the following fans has green light on, red

-On light off:

24.
  • EL 369' EXH FN 66FN- Observes 66FN-13A green light on, red light off. SAT I UNSAT 13A AND 66FN-13B- Off Observes 66FN-13B green light on, red light off.
25.
  • TK EXH FN 66FN Off Observes 66FN-35 green light on, red light off. SAT I UNSAT

-8 of 11-

STEP STANDARD EVALUATION I COMMENT

26.
  • CRESC SUPP FN 66FN- Observes 1 of the following fans have green light off, red SAT I UNSAT 26A OR 66FN-26B - On light on and 1 of the following fans has green light on, red light off:
27.
  • Standby Gas Treatment- Determines SBGT is still running per OP-20. SAT I UNSAT Running per OP-20
28.
  • Reactor Building to Observes Reactor Building to atmosphere differential SAT I UNSAT atmosphere differential pressure is less negative than 0.25 in . water gauge.

pressure- (-)0.25 to(-)

2.50 in . water gauge EVALUATOR NOTE: The candidate will now proceed to OP-20 section 0 .1 or 0.2 to start the second train of SBGT.

-9 of 11-

STEP STANDARD EVALUATION I COMMENT

  • 29. Ensure open Opens BELOW(ABOVE) EL 369' SUCT 01-125MOV-12(11) CRITICAL STEP BELOW(ABOVE) EL 369' by rotating control switch clockwise to open. SAT I UNSAT SUCT 01-125MOV-12(11).
  • 30. Ensure open TRAIN B(A) Opens TRAIN B(A) INLET 01-125MOV-14B(A) by rotating CRITICAL STEP INLET 01-125MOV-14B(A). control switch clockwise to open. SAT I UNSAT EVALUATOR CUE: Another operator has verified proper response of Standby Gas Treatment Train B(A) .

EVALUATOR: Terminate the task at this point.

Task Standard: The Reactor Building is isolated and Reactor Building differential pressure is restored with two trains of Standby Gas Treatment in service.

-10 of 11-

HANDOUT

  • A radioactive steam leak has developed in the Reactor Building.

Manually isolate the Reactor Building per OP-51 A section G.1.

-11 of 11-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE

. S/RO NRC 14-2 G TASK TITLE: Reset Group 2 Isolation , Restore RWCU APPL . TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 223002 A4 .03 (3.6/3.5)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME: __ 15

....;__ Minutes SUBMITTED: OPERATIONS REVIEW: ~~~ ~

rr -~7

/"V APPROVED :

CANDIDATE NAME:

JPM Completion D Simulated [gj Performed Location : D Plant [gj Simulator ifE PERFORMED: TIME TO COMPLETE : Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE:

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 G TASK TITLE: Reset Group 2 Isolation, Restore RWCU APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items 0 Technical Review 0 Additional Information 0 Questions and Answers 0 Validation 0 Procedural Change Required [gl None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 11-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 G TASK TITLE: Reset Group 2 Isolation, Restore RWCU APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. AOP-15 , Isolation Verification and Recovery B. OP-28, Reactor Water Clean-Up System Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset to a power operating IC (IC-69).

B. Insert a Reactor scram.

C. Restore Reactor water level above 177".

D. Trip both Recirculation pumps.

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication.

VI. TASK CONDITIONS A. Both Recirculation pumps have tripped .

B. A Reactor scram has been inserted.

C. Reactor water level lowered to 140 inches.

D. Reactor water level has been recovered above 177 inches.

E. Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2.

-3 of 11-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Reset the Group 2 isolation per AOP-15 section G.1 . Then , restore RWCU per OP-28 section G.4.

Establish gravity blowdown flow to the Main Condenser."

- - - ---- -

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of AOP-15. Refers to section SAT I UNSAT AOP-15 . G.1.
2. WHEN it has been determined Continues with procedure. SAT I UNSAT that an undesired release will not occur when isolation is reset, continue with EVALUATOR CUE: If the candidate requests assistance procedure. determining an undesired release will not occur, then inform the candidate "An undesired release will not occur when isolation is reset".
3. Place control switch for OW Rotates control switch for OW FLOOR ORN 20AOV-83 to SAT I UNSAT FLOOR ORN 20AOV-83 in CLOSE.

CLOSE.

4. Place control switch for OW Rotates control switch for OW EQUIP ORN 20AOV-95 to SAT I UNSAT EQUIP ORN 20AOV-95 to CLOSE, then releases .

CLOSE, spring return to AUTO.

-4 of 11-

STEP STANDARD EVALUATION I COMMENT

5. Simultaneously rotate the Simultaneously rotates PCIS VLV RESET switches 16A- CRITICAL STEP following PCIS VLV RESET S32 and 16A-S33 to clockwise positions. SAT I UNSAT switches to both RESET positions, spring return to NORM :
  • 16A-S32 Simultaneously rotates PCIS VLV RESET switches 16A- CRITICAL STEP
  • 16A-S33 S32 and 16A-S33 to counterclockwise positions . SAT I UNSAT EVALUATOR NOTE: These switches may be rotated in either direction first.
6. Restore RWCU System , if Obtains a controlled copy of OP-28. Refers to section G.4 SATIUNSAT necessary, per Section G of per initiating cue.

OP-28.

7. IF boron was injected per the Determines no boron has been injected. SAT I UNSAT EOPs, THEN Subsection G.4 cannot be performed.

EVALUATOR CUE: If asked about boron injection, report that no boron has been injected. *

8. Ensure Subsection G.1 is Indicates need to ensure Subsection G .1 is complete . SATIUNSAT complete.

EVALUATOR CUE: OP-28 sections G .1 and G.2 have been completed by another operator.

-5 of 11-

STEP STANDARD EVALUATION I COMMENT

9. Ensure one of the following Determines RWCU pump A is the preferred pump to isolate. SAT I UNSAT RWCU pumps is isolated by performing one of the following : EVALUATOR NOTE: A note in OP-28 identifies RWCU pump A as the preferred pump to isolate.

EVALUATOR CUE: If asked about which pump to isolate, direct the candidate to isolate RWCU pump A.

10. IF RWCU Pump A will be the Directs operator to close valves to isolate RWCU pump A. SAT/UNSAT isolated pump, THEN ensure closed the following valves:
  • 12RWC-19A (RWCU pump EVALUATOR CUE: OP-28 step G.4.3.a has been A suet inner isol valve) completed to isolate RWCU pump A.

-6 of 11 -

STEP STANDARD EVALUATION I COMMENT

12. Ensure closed 12RWC-63 Directs operator to ensure closed 12RWC-63. SATIUNSAT (RWCU return line manual isol valve) .

EVALUATOR CUE: 12RWC-63 is closed.

  • 13. Open CLN UP SUCT 12MOV- Opens 12MOV-15 by rotating control switch clockwise to CRITICAL STEP
15. OPEN . SATIUNSAT
  • 14. Open CLN UP SUCT 12MOV- Opens 12MOV-18 by rotating control switch clockwise to CRITICAL STEP
18. OPEN . SAT I UNSAT
15. Ensure seal purge flow rate as Directs operator to establish seal purge flow for RWCU SATIUNSAT follows: pump A.

IF seal purge flow is for 12P-1B only, THEN throttle EVALUATOR CUE: RWCU pump seal purge is 2 gpm.

12RWC-88B as necessary (bypass regulating valve 12P-1B) to establish a flow rate BETWEEN 1.8 and 2.2 gpm as indicated on 12FI-20 (RWCU pumps mini purge flow indic).

16. Ensure ST-26J , Heatup and Acknowledges cue. SAT I UNSAT Cooldown Temperature Checks, is in progress prior to establishing blowdown flow. EVALUATOR CUE: Another operator is performing ST-26J .

-7 of 11 -

STEP STANDARD EVALUATION I COMMENT

17. Slowly establish a gravity Proceeds to OP-28 section G.5. SAT I UNSAT blowdown flow rate of LESS THAN OR EQUAL TO 30 gpm per Subsection G.5.
18. Direct RP to ensure posting Directs RP to ensure posting requirements are met to SAT I UNSAT requirements are met to support the blowdown operation.

support the blowdown operation.

EVALUATOR CUE: RP reports that posting requirements are met.

19. IF reactor coolant temperature Determines Reactor coolant temperature is greater than . SAT I UNSAT is LESS THAN 212°F, THEN 212°F.

ensure RPV is vented to prevent drawing a vacuum inside RPV.

20. At the discretion of the Shift Acknowledges cue. SAT I UNSAT Manager, contact the Reactor Analyst prior to commencing blowdown to turn off core EVALUATOR CUE: The Shift Manager directs continuing thermal monitoring. with the procedure prior to contacting the Reactor Analyst.

I 21 . IF RPV pressure is GREATER Observes 12MOV-53 green light on, red light off. SAT I UNSAT THAN 50 psig, THEN ensure closed SLOWDOWN ORIFICE BYP 12MOV-53.

-8 of 11-

STEP STANDARD EVALUATION I COMMENT

22. IF RPV pressure is LESS Determines RPV pressure is greater than 50 psig. SAT I UNSAT THAN 50 psig, THEN open SLOWDOWN ORIFICE SYP 12MOV-53.  !
23. IF RWCU pumps trip during Acknowledges step. SATIUNSAT blowdown operation to the condenser, THEN perform the following ...
24. IF initiating a blowdown Determines blowdown flow will be to the Main Condenser, SAT I UNSAT following a RWCU pump trip not the WCT, per initiating cue.

and manual system isolation, THEN perform gravity blowdown to WCT starting at Step G.5.9 ...

25. IF blowdown is to be routed to Observes 12MOV-57 green light on, red light off. SAT I UNSAT the Main Condenser, THEN perform the following:

Ensure closed SLOWDOWN TO RADW 12MOV-57.

  • 26. Open SLOWDOWN Opens 12MOV-56 by rotating control switch clockwise to CRITICAL STEP TO MAIN CNDSR 12MOV-56. OPEN. SAT I UNSAT
27. IF blowdown is to be routed to Determines blowdown flow will be to the Main Condenser, SATIUNSAT the Waste Collector Tank, not the WCT, per initiating cue.

THEN perform the following ...

.

-9 of 11-

STEP STANDARD EVALUATION I COMMENT

28. Establish blowdown flow as Directs operator to ensure closed 12RWC-63 or determines SAT I UNSAT II follows: it is closed from earlier cue.

IF gravity blowdown will be used, THEN perform the EVALUATOR CUE: If asked, report that 12RWC-63 is following: closed.

Ensure closed 12RWC-63 (RWCU return line manual isol valve) .

  • 29. Throttle open FILTER DEMIN Throttles open 12MOV-74 by rotating control switch CRITICAL STEP BYP 12MOV-74 until red open clockwise to OPEN .

light comes on (dual position SAT I UNSAT indication).

  • 30. Adjust CLN UP SLOWDOWN Throttles open 12FCV-55 by rotating potentiometer CRITICAL STEP FLOW CNTRL 12FCV-55 until clockwise. SAT I UNSAT desired blowdown flow rate is established.

EVALUATOR: Terminate the task at this point.

Task Standard: PC IS Group 2 isolation is reset. RWCU gravity blowdown flow to the Main Condenser is established.

-10 of 11-

HANDOUT

  • Both Recirculation pumps have tripped.
  • A Reactor scram has been inserted.
  • Reactor water level lowered to 140 inches.
  • Reactor water level has been recovered above 177 inches.
  • Other operators have completed isolation verifications per AOP-15 Attachments 1 & 2.

Reset the Group 2 isolation per AOP-15 section G.1. Then, restore RWCU per OP-28 section G.4. Establish gravity blowdown flow to the Main Condenser.

-11 of 11-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC 14-2 H TASK TITLE: Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 201006 A4 .02 (2.9/2.9)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME :

- -10 - Minutes SUBMITTED: OPERATIONS REVIEW:~~~~

7~1 APPROVED :

CANDIDATE NAME:

JPM Completion D Simulated ~ Performed Location : D Plant ~ Simulator TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory


COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 H TASK TITLE: Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required r8l None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 7-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 H TASK TITLE: Perform Rod Worth Minimizer On-Line Diagnostic Test APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A None II. REFERENCES A ST-20A, Rod Worth Minimizer Functional Test Ill. TOOLS AND EQUIPMENT A None IV. SET UP REQUIREMENTS A Plant in cold shutdown condition (IC-70).

B. Ensure the Rod Worth Minimizer is initialized.

C. Insert malfunction RW01 .

D. Bypass the Rod Worth Minimizer E. Delete malfunction RW01 .

F. Prepare a copy of ST-20A marked up to step 8.2.

V. EVALUATOR NOTES A The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication.

VI. TASK CONDITIONS A The plant is in cold shutdown.

B. Preparations are underway for a Reactor startup.

C. ST-20A, Rod Worth Minimizer Functional Test, is in progress.

D. This is the first time initializing the Rod Worth Minimizer below the Low Power Alarm Point.

-3 of 7-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Perform the Rod Worth Minimizer on-line diagnostic test per ST-20A section 8.2."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of Obtains a controlled copy of ST-20A from evaluator. Refers SAT I UNSAT ST-20A. to section 8.2.

EVALUATOR: Provide a working copy of ST-20A.

  • 2. Ensure NORMAL BYPASS Rotates NORMAL BYPASS keylock switch clockwise to CRITICAL STEP keylock switch is in NORMAL. NORMAL. SAT I UNSAT
3. Verify MANUAL BYPASS light Observes MANUAL BYPASS light is off. SAT I UNSAT is off.
4. Perform Steps 8.2.4 through Acknowledges step. SAT I UNSAT 8.2.5A without delay.
  • 5. Initialize RWM as follows: Depresses SYSTEM INITIALIZE PUSHBUTTON. CRITICAL STEP SAT I UNSAT Depress and hold SYSTEM EVALUATOR NOTE: This pushbutton is only required to INITIALIZE pushbutton. be held long enough to obtain successful system initialization for purposes of the critical step.

-4 of 7-

STEP STANDARD EVALUATION I COMMENT

6. Verify SYSTEM INITIALIZE Observes SYSTEM INITIALIZE light is on. SAT/UNSAT light is on .
7. IF RWM operator panel AUTO Acknowledges cue. SAT/UNSAT light is on, OR first time initializing RWM below Low Power Alarm Point, RWM EVALUATOR CUE: If asked, "RWM OPERABLE ON" has operator panel AUTO light Off, printed out on the alarm typer.

THEN verify "RWM OPERABLE ON" prints out on alarm typer.

  • 8. Release SYSTEM INITIALIZE Releases SYSTEM INITIALIZE pushbutton. CRITICAL STEP pushbutton. SAT/UNSAT
9. Verify SYSTEM INITIALIZE Observes SYSTEM INITIALIZE light is off. SAT/UNSAT light is off.
  • 10. IF INOP/RESET light is on, Depresses INOP/RESET pushbutton CRITICAL STEP THEN perform the following: SAT/UNSAT
  • Depress INOP/RESET pushbutton.

11 .

  • Verify all associated lights Observes INOP/RESET light is off. SAT/UNSAT go off.

-5 of 7-

STEP STANDARD EVALUATION I COMMENT

12. IF AUTO light on RWM Observes AUTO light is off on RWM operator panel. SAT I UNSAT operator panel is off THEN Perform on-line diagnostic test as follows:
  • 13. Depress SYSTEM Depresses SYSTEM DIAGNOSTIC pushbutton. CRITICAL STEP DIAGNOSTIC pushbutton to SAT I UNSAT start diagnostic routine.

I

14. Verify WITHDRAW BLOCK Observes WITHDRAW BLOCK and INSERT BLOCK lights SAT I UNSAT and INSERT BLOCK lights go go on and off sequentially multiple times.

on and off sequentially at least five times.

  • 15. Depress SYSTEM Depresses SYSTEM DIAGNOSTIC pushbutton. CRITICAL STEP DIAGNOSTIC pushbutton to SATIUNSAT stop diagnostic routine.

EVALUATOR: Terminate the task at this point.

Task Standard: The Rod Worth Minimizer is un-bypassed, initialized, and the system diagnostic test is performed.

-6 of 7-

HANDOUT

  • The plant is in cold shutdown.
  • Preparations are underway for a Reactor startup.

Perform the Rod Worth Minimizer on-line diagnostic test per ST -20A section 8.2.

-7 of 7-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE

{~ S/RO 14-2 NRC I TASK TITLE: Vent Torus to Lower Primary Containment

. i APPL. TO JPM NUMBER Pressure REV: DATE: NRC KIA SYSTEM NUMBER: 295010 AA1 .05 (3.1/3.4)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- Minutes SUBMITTED: OPERATIONS REVIEW~>~

APPROVED :

CANDIDATE NAME :


JPM Completion [8J Simulated D Performed Location : [8J Plant D Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : D Satisfactory D Unsatisfactory (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE:

PROGRAM ADMINISTER

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO 14-2 NRC I TASK TITLE: Vent Torus to Lower Primary Containment APPL. TO JPM NUMBER Pressure Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required ~ None Comments:

Current Update By:

Date lnt Previous Revision Date:

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO 14-2 NRC I TASK TITLE: Vent Torus to Lower Primary Containment APPL. TO JPM NUMBER Pressure I. SAFETY CONSIDERATIONS A. Ensure proper safety equipment and safety procedures are observed .

II. REFERENCES A. EP-6, POST ACCIDENT CONTAINMENT VENTING AND GAS CONTROL Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Current copy of EP-6 including Attachment 1.

V. EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking , placekeeping and three-point communication .

VI . TASK CONDITIONS A. Conditions have occurred which require venting the containment.

B. The EOPs have been entered.

C. Action to preclude the failure of containment must be completed.

D. One train of SGT is in service. The other train of SGT is secured.

E. Containment purge is NOT in progress.

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Vent the Torus using EP-6, SectionS.? "Venting Containment" . Start at step 5.7.6."

NOTE: Unless otherwise noted, all controls are located on Panel 27PCP in the Relay Room .

- - ----

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of procedure Obtains a controlled copy of procedure and proceeds to SAT/UNSAT EP-6. the PCP panel in the Relay Room.

EVALUATOR: A controlled copy of the procedure is available at the PCP panel. Evaluator to provide working copy.

2. Reviews prerequisites, precautions and Reviews applicable portions of procedure. SAT I UNSAT special instructions associated with the procedure.
3. Selects section 5.7, Venting Selects the correct section of the procedure to be SAT/UNSAT Containment. performed.
4. NOTE: Reviews Note and selects step 5.7.6 to perform as SAT/UNSAT Steps 5.7.6 and 5.7.7 may be directed.

performed and repeated in any order to alternate between torus and drywell venting . Torus venting is preferred.

-- -

STEP STANDARD EVALUATION I COMMENT

5. {Step 5.7.6) Verifies Torus pressure is less than PCPL and Torus SAT I UNSAT IF Torus will be vented THEN perform level is less than 29.5 ft.

the following:

  • Verify torus pressure is LESS THAN PCPL
  • Verify primary containment water EVALUATOR CUE: When candidate locates indication level is LESS THAN 29.5 feet. of pressure and level, inform the candidate that Torus Pressure is 50 psig and Primary Containment Water
  • While venting torus, frequently Level is 29.0 ft.

monitor torus pressure and primary containment water level.

  • IF primary containment water level reaches 29.5 feet while venting the torus, THEN vent drywell per Step 5.7.7.
  • {Step 5.7.6.D) Candidate places TORUS EXH INNER BYP VLV CRITICAL STEP

SAT/UNSAT VLV 27MOV-117.

EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.

{Step 5.7.6.E) Candidate places TORUS EXH OUTER BYP VLV CRITICAL STEP

SAT/UNSAT VLV 27MOV-123.

EVALUATOR CUE: When candidate indicates placing the control switch to open , inform the candidate that the green light is off, red light is on .

- - - - ------- ---

STEP STANDARD EVALUATION I COMMENT

5. cont. (Step 5.7.6.F) For each valve, candidate locates its red/green position SAT I UNSAT
  • Ensure closed the following valves: lights and indicates it should be closed .

0 OW EXH OUTER BYP VLV 27MOV-113.

EVALUATOR CUE: When candidate inquires about 0 OW EXH INNER BYPASS VLV light status, inform the candidate the green light is on, 27MOV-122. red light is off.

0 OW EXH INNER ISOL VLV 27AOV-113.

0 OW EXH OUTER ISOL VLV 27AOV-114.

EVALUATOR CUE: After 27MOV-117 & 123 are open ,

inform the candidate that the control room has called to inform the candidate that Primary Containment Water Level is 30 ft.

6. (Step 5.7.6.C) Candidate refers to section 5.7.7 SAT I UNSAT IF primary containment water level reaches 29.5 feet while venting the torus, THEN vent drywell per Step EVALUATOR CUE: If candidate wants direction from 5.7.7. the control room , inform the candidate that for the purposes of this JPM, no further guidance can be given.

STEP STANDARD EVALUATION I COMMENT

7. (Step 5. 7. 7) Verifies Torus pressure is less than PCPL. SAT I UNSAT IF drywell will be vented , THEN perform the following :
  • Verify torus pressure is BELOW EVALUATOR CUE: When candidate locates indication PCPL of pressure and level, inform the candidate that Torus Pressure is 50 psig and Primary Containment Water

. Level is 30.0 ft

  • (Step 5.7.7.8) Candidate places DW EXH OUTER BYP VLV 27MOV- CRITICAL STEP
  • Open DW EXH OUTER BYP VLV 113 control switch to the OPEN position.

SAT I UNSAT 27MOV-113 EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.

  • (Step 5.7.7.C) Candidate places DW EXH INNER BYPASS VLV CRITICAL STEP
  • Open DW EXH INNER BYPASS 27MOV-122 control switch to the OPEN position.

SATIUNSAT VLV 27MOV-122.

EVALUATOR CUE: When candidate indicates placing the control switch to open, inform the candidate that the green light is off, red light is on.

L _ _ _ _ ___

--- - ---

STEP STANDARD EVALUATION I COMMENT 7 cont. (Step 5.7.7.D)

  • Ensure closed the following valves :

0 TORUS EXH INNER Candidate places TORUS EXH INNER BYP VLV CRITICAL STEP

SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on , red light is off.

i 0 TORUS EXH OUTER Candidate places TORUS EXH OUTER BYP VLV CRITICAL STEP

SAT I UNSAT EVALUATOR CUE: When candidate indicates placing the control switch to close, inform the candidate that the green light is on, red light is off.

0 TORUS EXH INNER For each valve, candidate locates its red/green position SAT I UNSAT ISOL VLV 27AOV-117 lights and indicates it should be closed.

0 TORUS EXH OUTER ISOL VLV 27AOV-118 EVALUATOR CUE: When candidate inquires about light status, inform the candidate the green light is on, red light is off.

STEP STANDARD EVALUATION I COMMENT

8. (Step 5.7.7.E} Contacts control room and requests direction on vent SAT I UNSAT
  • IF it becomes necessary to raise rate .

vent rate, AND torus pressure is LESS THAN PCPL, THEN attempt EVALUATOR CUE: When candidate requests direction to open the following valves: for vent rate, respond that current rate of pressure 0 OW EXH INNER ISOL VLV reduction is acceptable.

27AOV-113 0 OW EXH OUTER ISOL VLV 27AOV-114

9. (Step 5.7.7.F} Contacts the control room on the status of containment SAT/UNSAT
  • IF containment purge is not in purge .

progress, THEN cycle one or more of the following valves as necessary to control drywell pressure. Verify EVALUATOR CUE: When candidate inquires as to the torus pressure is LESS THAN PCPL status of containment purge, inform the candidate that it before opening any valve: is NOT in progress.

0 OW EXH OUTER BYP VLV 27MOV-113 0 OW EXH INNER BYPASS VLV 27MOV-122 0 OW EXH INNER ISOL VLV 27AOV-113 0 OW EXH OUTER ISOL VLV 27AOV-114 EVALUATOR: Terminate the JPM at this point.

HANDOUT

  • Conditions have occurred which require venting the containment.
  • The EOPs have been entered.
  • Action to preclude the failure of containment must be completed .
  • One train of SGT is in service. The other train of SGT is secured.
  • Containment purge is NOT in progress.

Vent the Torus using EP-6, Section 5.7 "Venting Containment". Start at step 5.7.6.

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO NRC14-2J TASK TITLE : Line-up SLC Test Tank for Injection APPL. TO JPM NUMBER REV: DATE: NRC KIA SYSTEM NUMBER: 295031 EA1 .08 (3 .8/3 .9)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME : _ 15

____..;:....... Minutes SUBMITTED: ~ ~ ---~< ~ OPERATIONS REVIEW: . ~~ / ~ ~ 7~

CA"'

~ I APPROVED : -~db~~=-~-----------------

CANDIDATE NAME:

JPM Completion 1:8J Simulated 0 Performed Location : 1:8J Plant 0 Simulator ITE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC . COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO NRC 14-2 J TASK TITLE: Line-up SLC Test Tank for Injection APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items D Technical Review D Additionallnformation D Questions and Answers D Validation D Procedural Change Required 1Z1 None Comments:

Current Update: By:

Date Int.

Previous Revision Date:

-2 of 8-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO NRC 14-2 J TASK TITLE: Line-up SLC Test Tank for Injection APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. EP-8, Alternate Injection Systems Ill. TOOLS AND EQUIPMENT A. Flashlight.

IV. SET UP REQUIREMENTS A. Obtain Shift Managers/Control Room Supervisors permission prior to performing this task.

B. Obtain a controlled copy of EP-8 prior to performing this task.

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking, place keeping and three-point communication .

VI. TASK CONDITIONS A. Operation of Alternate Injection Systems is required due to a LOCA.

B. The SLC system is to be utilized as an injection source.

C. The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the source of injection water supply.

-3 of 8-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12."

STEP STANDARD EVALUATION I COMMENT

1. Obtains a controlled copy of The candidate determines where to obtain a controlled copy SAT I UNSAT the procedure EP-8 and of EP-8. (Control Room , Merlin , EOP cabinet) selects section 5.12.

EVALUATOR: Provide candidate a current copy of EP-8 section 5.12.

2. Proceeds to Reactor Building Proceeds to the Reactor Building 326' elevation to the SLC SAT I UNSAT 326' elevation to the SLC Skid.

Skid.

  • 3. (Step 5.12.1.A} Simulates unlocking 11 SLC-11 . CRITICAL STEP Close 11 SLC-11 (SLC tank SAT I UNSAT TK-1 outlet isol valve).

EVALUATOR CUE: The indicated valve is unlocked.

Simulates closing 11 SLC-11 by rotating valve operator clockwise until motion stops.

EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction and come to a stop.

-4 of 8-

STEP STANDARD EVALUATION I COMMENT

  • 4 . (Step 5.12.1.8) Simulates unlocking 11 SLC-41 . CRITICAL STEP Open 11 SLC-41 (SLC test SAT/UNSAT tank TK-3 outlet isol valve) . EVALUATOR CUE: The indicated valve is unlocked.

Simulates opening 11 SLC-41 by rotating valve operator counterclockwise.

EVALUATOR CUE: The indicated valve operator has rotated in the indicated direction.

!

-5 of 8-

STEP STANDARD EVALUATION I COMMENT

  • 5. (Step 5.12.1.C) Simulates opening 11 SLC-29 by rotating valve operator CRITICAL STEP Station an operator at 11 TK-3 counterclockwise. SAT I UNSAT (standby liquid control test tank) to establish and maintain EVALUTOR CUE: If the candidate attempts to station 11TK-3 at least 112 full using another operator for this step, direct them to perform the one or both of the following required manipulation(s) themselves.

sources of makeup water:

EVALUATOR CUE: The indicated valve operator has

  • Demin-water: By opening rotated in the indicated direction. If lineup has been 11 SLC-29 (SLC test tank performed correctly, report that water is flowing into the TK-3 demin water addition test tank and the tank is filling slowly.

isol valve)

Simulates uncoiling fire hose (located west of SLC tank) and CRITICAL STEP

  • Fire system water: Using a placing nozzle into the test tank. SAT I UNSAT fire hose EVALUATOR CUES: The hose is uncoiled. The hose nozzle is in the test tank.

Simulates opening hose rack isolation valve and using the bail handle to open the nozzle.

EVALUATOR CUES: Water is flowing from the hose nozzle. The test tank is filling more rapidly.

-6 of 8-

STEP STANDARD EVALUATION I COMMENT

  • 6. (Step 5.12.1.D) Observes test tank water level. CRITICAL STEP WHEN 11TK-3 is at least 112 SAT I UNSAT full , place SLC pump switch in EVALUATOR CUE: After the fire hose is filling the tank, START SYS-A OR START inform the candidate that the tank is more than % full.

SYS-8 .

Simulates contacting the Control Room to start an SLC pump.

EVALUATOR CUE: The Control Room has started SLC pump A

7. Monitors SLC test tank water Continues to observe SLC test tank water level. SAT I UNSAT level while injecting.

EVALUATOR: Term inate the task at this point.

Task Standard: An SLC pump is running with suction from the SLC test tank. The SLC test tank is aligned for injection of both Demineralized water and Fire water to the RPV.

-7 of 8-

HANDOUT

  • Operation of Alternate Injection Systems is required due to a LOCA.
  • The SLC system is to be utilized as an injection source.
  • The SLC system is to be aligned to use the test tank with the Demineralized Water System and the Fire System as the sources of injection water supply.

Align the SLC test tank for injection into the RPV using both the Demineralized Water and Fire Protection Systems as water sources per EP-8 Section 5.12.

-8 of 8-

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO 14-2 NRC K TASK TITLE : Electrically Disarm a CRD HCU APPL . TO JPM NUMBER REV: DATE : NRC KIA SYSTEM NUMBER: 201003 A2 .02 (3.7/3.8)

JAF TASK NUMBER: JAF QUAL STANDARD NUMBER:

ESTIMATED COMPLETION TIME:

- -15 - Minutes SUBMITTED:

APPROVED :

CANDIDATE NAME:

JPM Completion 0 Simulated 0 Performed Location : 0 Plant 0 Simulator

.TE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION : 0 Satisfactory 0 Unsatisfactory COMMENTS : (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED CANDIDATE REVIEW:

SIGNATURE REVIEWED BY: DOC. COMPLETE :

PROGRAM ADMINISTER

JOB PERFORMANCE MEASURE RECORD AND CHECKLIST S/RO 14-2 NRC K TASK TITLE: Electrically Disarm a CRD HCU APPL. TO JPM NUMBER Current Update: By:

Date lnt Outstanding Items 0 Technical Review 0 Additionallnformation 0 Questions and Answers 0 Validation 0 Procedural Change Required 1:8:1 None Comments:

urrent Update: By:

Date Int.

Previous Revision Date:

-2 of 7-

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 14-2 NRC K TASK TITLE: Electrically Disarm a CRD HCU APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-25, Control Rod Drive Hydraulic System Ill. TOOLS AND EQUIPMENT A. Flashlight IV. SET UP REQUIREMENTS A. Provide a working copy of OP-25.

EVALUATOR NOTES A. The candidate should, at a minimum , observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking ,

place keeping and three-point communication.

VI. TASK CONDITIONS A. The plant is operating at 100% power.

B. Control rod 22-19 was fully withdrawn , but would not couple.

C. The rod has been fully inserted and its HCU has been valved out.

D. The rod must be electrically disarmed.

-3 of 7-

  • - CRITICAL STEP VII. INITIATING CUE Inform the candidate, "Electrically disarm control rod 22-19 per OP-25 Section G.21."

STEP STANDARD EVALUATION I COMMENT

1. Obtain a controlled copy of The candidate determines where to obtain a controlled copy SATIUNSAT OP-25. of OP-25. (Control Room, Merlin)

EVALUATOR: Provide candidate a current copy of OP-25.

2. Review precautions and Reviews precautions and selects section G.21. SAT I UNSAT selects correct section.
3. (Step G.21.1) Notifies Control Room that CRD 22-19 will be electrically SAT I UNSAT Notify Control Room that CRD disarmed .

22-19 will be electrically disarmed. EVALUATOR CUE: Acknowledge communication.

-4 of 7-

STEP STANDARD EVALUATION I COMMENT

  • 4. (Step G.21.2) . Simulates unplugging amphenol connector from 03SOV-120 CRITICAL STEP Unplug amphenol connector at HCU 22-19. SAT I UNSAT from each of the following solenoid operated valves at HCU 22-19 and control per EVALUATOR CUE: The indicated connector has been AP-12 .06. unplugged.
  • 03SOV-120(*) (withdraw settle solenoid operated valve)
  • 03SOV-121 (*)(insert at HCU 22-19. SAT I UNSAT exhaust water solenoid operated valve)

EVALUATOR CUE: The indicated connector has been unplugged .

  • 6. (Step G.21.2) Simulates unplugging am phenol connector from 03SOV-122 CRITICAL STEP
  • 03SOV-122(*) (withdraw at HCU 22-19. SAT I UNSAT drive water solenoid operated valve)

EVALUATOR CUE: The indicated connector has been unplugged.

  • 03SOV-123(*) (insert drive SAT I UNSAT water solenoid operated valve) EVALUATOR CUE: The indicated connector has been I i I

I unplugged.

I

-5 of 7-

STEP STANDARD EVALUATION I COMMENT

8. (Step G.21.3) Notifies Control Room that CRD 22-19 has been electrically SAT/UNSAT disarmed.

Notify Control Room that CRD 22-19 has been electrically disarmed. EVALUATOR CUE: Acknowledge communication .

EVALUATOR: Terminate the task at this point.

Task Standard: Control rod 22-19 is electrically disarmed .

-6 of 7-

HANDOUT

  • The plant is operating at 100°/o power.
  • The rod has been fully inserted and its HCU has been valved out.
  • The rod must be electrically disarmed.

Electrically disarm control rod 22-19 per OP-25 Section G.21.

-7 of 7-

Appendix D Scenario Outline Form ES-D-1 Facility: James A Fitzpatrick Scenario No. : NRC-1 Op-Test No.: 14-2 Examiners: Operators:

Initial Conditions: The plant is operating at approximately 90% power. RCIC is out of service for maintenance. Torus cooling is in service on RHR loop A Turnover: Secure Torus cooling per OP-13B sections F.1 and F.7.

Event Malf. Event Event No. No. Type* Description N- Shutdown Torus Cooling 1 N/A BOP, SRO OP-13B RHRSW Pump A Trip 2 SW04:A C-SRO ARP 09-3-1-25, Technical Specifications 1-ATC, APRM B Fails Upscale 3 NM14:B SRO OP-16, ARP 09-5-1-4 I-BOP, HPCIInadvertent Initiation 4 HP05 SRO AOP-77, AOP-32, Technical Specifications C-BOP FW05:A Feedwater Pump A High Vibration and Pump Trip 5 R-ATC ,

FW01 :A SRO ARP 09-6-4-11, AOP-41 RR15:A Loss of Coolant Accident 6 M-All MS02:A EOP-2, EOP-4 FW01 :B Feedwater Pump B Trip, HPCI Trip 7 C-All HP02 EOP-2 ED43 :A Loss of Offsite Power 8 C-All ED43 :B AOP-72

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Facility: James A. Fitzpatrick Scenario No. : NRC-1 Op-Test No.: 14-2

1. Total malfunctions (5-8) 7 Events 2, 3, 4, 5, 6, 7, 8
2. Malfunctions after EOP entry (1-2) 2 Events 7 & 8
3. Abnormal events (2-4) 3 Events 3, 4, 5
4. Major transients (1-2) 1 Event 6
5. EOPs entered/requiring substantive actions (1-2) 2 EOP-2, EOP-4
6. EOP contingencies requiring substantive actions (0-2) 2 EOP-2 Alt Level Leg, EOP-2 Emergency Depress Leg
7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:

CT-1 : Given a coolant leak inside the Containment, the crew will spray the Drywell, in accordance with EOP-4.

CT-2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below -19", in accordance with EOP-2.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT

~~

  • LOI14-2 NRC EXAMINATION SCENARIO 1

~------------------------------------------------------------~

TITLE: LOI14-2 NRC EXAMINATION SCENARIO 1 SCENARIO NUMBER: NRC 1 PATH: STAND ALONE Validation: ...:z:-n :'"3

'

/1..-- Training: i&o/ Operations: ~~/

r I

~

,) CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 1 Page 1 of 23

RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/1/14 LOI 14-2 NRC Exam New Scenario T. Hooper

\.

LOI 14-2 NRC Examination Scenario 1 Page 2 of 23

A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 1 B. SCENARIO SETUP:

1. IC-61
2. Special Instructions:
a. The Plant is operating at approximately 90% power.
b. RCIC is out of service for maintenance.
c. Torus cooling is in service on RHR loop A.
3. Preset Conditions:
a. Preset, M:RC03, RCIC System Turbine Trip
b. Trigger 1, M:SW04:A, RHR Service Water Pump A Trip
c. Trigger 2, NM14:B, APRM Channel B Failure, 100%
d. Trigger 3, M:HP05, HPCI Inadvertent Initiation
e. Trigger 16, M:HP02, HPCI Turbine Trip
f. Trigger 4, M:FW05:A, Rx Feedwtr Pmp A High Vibration
g. Trigger 17, M:FW01:A, Rx Feedwtr Pmp A Trip
h. Trigger 5, M:RR15:A, Coolant (A) Leakage Inside Primary Containment, ramp=3 minutes, initial=1.5%, final=5%
i. Trigger 6, M:FW01 :B, Rx Feedwtr Pmp B Trip
j. Trigger 6, M:ED43:A, LHH Line #3 Fault, delay=4 minutes
k. Trigger 6, M:ED43:B, NMP Line #4 Fault, delay=5 minutes I. Trigger 6, M:MS02:A, (MSL A) Stm Leakage Inside Prim, ramp=3 minutes, 50%
m. Preset, O:RC ZA013PI96, Pump Suction Pressure lndi, 0%
n. Preset, O:RC ZA013PI94, Turbine Steam Inlet Pressu, 0%
o. Preset, O:RC ZL01315(1), (Mimic) Inboard Stm Supply Is, Off
p. Preset, O:RC ZL01316(1), (Mimic) Outbd Stm Supply lsol, Off
q. Preset, O:RC ZL01339(1), (Mimic) Pump Suet From Supp C, Off
r. Preset, O:RC ZL01341 (1 ), (Mimic) Pump Suet From Supp C, Off
s. Preset, O:RC ZL013AS1(1), Inboard Steam Supply lsol, Off
t. Preset, O:RC ZL013AS10(1), Pump Suction From Supp C, Off
u. Preset, O:RC ZL013AS2(1), Outboard Steam Supply lso, Off
v. Preset, O:RC ZL013AS22(1), Pmp Suction From Supp C, Off
w. Preset, O:RC ZL013AS4(1), Pmp Suction From Cond Sto, Off
x. Preset, O:AN941 :34, RCIC Exh Press Hi (25 psig), Off
y. Event Trigger 1, Action: zlo1 034a(2)==0, Command: None
z. Event Trigger 6, Action: zdi5as1(1)==1, Command: imf rr15:a 22 20:00 5 aa. Event Trigger 16, Action: zdi23as19==1, Command: None bb. Event Trigger 17, Action: fwvrfpt(1)>8 , Command: None
4. Consumable Forms and Procedures:

+ AOP-1, AOP-8, AOP-41, AOP-72, AOP-77 LOI 14-2 NRC Examination Scenario 1 Page 3 of23

C. SCENARIO

SUMMARY

The scenario will begin at approximately 90% power with RCIC out of service for maintenance and Torus cooling in service on RHR loop A. The crew will begin the shift by securing the Torus cooling lineup.

While the crew is securing Torus cooling , RHRSW pump A will trip. The SRO will determine the Technical Specification impact. The crew will continue with the remaining steps to secure Torus cooling APRM B will fail upscale and cause a half scram on RPS B. The SRO will determine that Technical Specifications are satisfied with APRM B bypassed. The crew will bypass APRM Band reset the half scram.

HPCI will inadvertently start. The SRO will enter AOP-77 and direct securing HPCI. The crew will secure HPCI and one train of Standby Gas Treatment. The SRO will determine the Technical Specification impact.

With RCIC out of service, Technical Specifications will require a plant shutdown.

Feedwater pump A will develop a high vibration . The crew may lower Reactor power in anticipation of tripping the pump. When the vibration exceeds 6 mils, the crew will trip the pump. If the crew does not trip the pump by 8 mils, the pump will spuriously trip. A Recirculation run back is likely to occur following the pump trip. The crew will respond to stabilize the plant within the capacity of a single Feedwater pump.

A coolant leak will develop in the Drywell. The crew will scram the Reactor in anticipation of an automatic scram. Following the scram, Feedwater pump B will trip. With no remaining high pressure Feedwater, the crew may attempt to restore HPCI to service, but HPCI will trip. The crew will attempt to maintain Reactor water level with CRD and SLC, and may lower Reactor pressure to inject with Condensate Booster pumps.

Offsite power lines 3 and 4 will sequentially trip. The loss of offsite power will make all Condensate pumps unavailable. Only low pressure ECCS pumps will be available for high capacity injection to the Reactor.

Additionally, all Circulating Water pumps will trip, requiring the crew to close MSIVs and control Reactor pressure using SRVs.

The coolant leak will continue to get worse. The crew will place Torus spray in service. When Torus pressure exceeds 15 psig, the crew will also place Drywell spray in service. Drywell spray will lower Drywell pressure such that the Pressure Suppression Pressure curve is not challenged. The coolant leak rate will exceed the capacity of available high pressure injection . Reactor water level will lower to the top of active fuel. The crew will execute an Emergency RPV Depressurization and then control low pressure injection systems to restore Reactor water level.

The scenario will be terminated when all control rods are inserted, the Emergency RPV Depressurization is in progress, and Reactor water level is controlled above 0".

LOI 14-2 NRC Examination Scenario 1 Page 4 of 23

Shift Turnover The Plant is operating at approximately 90% power during a power reduction.

RCIC is out of service for maintenance.

Torus cooling is in service on RHR loop A When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI 14-2 NRC Examination Scenario 1 Page 5 of 23

Critical Tasks/Standards Critical Task #1: Given a coolant leak inside the Containment, the crew will spray the Drywell, in accordance with EOP-4.

Critical Task #2: Given a coolant leak, a loss of high pressure injection systems, and the inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will initiate actions for an Emergency RPV Depressurization before Reactor water level lowers below

-19" , in accordance with EOP-2.

LOI 14-2 NRC Examination Scenario 1 Page 6 of 23

EVENT NO. EVENT SEQUENCE

1. Shutdown Torus Cooling (Normal: BOP, SRO)

RHRSW Pump A Trip (Component: SRO)

2. (Tech Spec: SRO)
3. APRM B Fails Upscale (Component: ATC, SRO)

HPCI Inadvertent Initiation (Instrument: BOP, SRO) 4.

(Tech Spec: SRO)

Feedwater Pump A High Vibration and Pump Trip (Component: BOP) 5.

(Reactivity: ATC, SRO)

6. Coolant Leak in Drywell (Major: All)
7. Feedwater Pump B Trip, HPCI Trip (Component: All)

(~ 8. Loss of Offsite Power (Component: All)

D. TERMINATION CUES:

  • Emergency RPV Depressurization is in progress
  • Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 7 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)

After the shift turnover, allow All no more than five minutes for panel walkdown

  • Walkdown the control panels and assume the watch I

Events 1 & 2 SRO SAT I UNSAT INA Secure Torus Cooling, RHRSW Pump A Trip

  • Perform Crew Brief
  • Direct BOP to secure Torus cooling per OP-13B sections F.1 and F.7.
  • Acknowledge trip of RHRSW pump A

BOP SAT I UNSAT INA Note:

  • Close RHR TEST & TORUS CLG 1OMOV-34A Ensure Trigger 1 automatically
  • IF RHR Loop A flow is LESS THAN 1500 gpm, THEN ensure light extinguishes. open MIN FLOWVLV 10MOV-16A
  • IF RHR Loop A operation is not required, THEN shut down RHR Loop A per Subsection F.7

- ----

LOI 14-2 NRC Examination Scenario 1 Page 8 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP cont. SAT I UNSAT INA

  • Ensure one of the RHR Loop A keep-full systems is in service Role Play: as follows:

If dispatched to investigate trip 0 RHR KEEP-FULL PMP 10P-2A is running, of RHRSW pump A , wait 2 minutes, then report that the OR pump breaker tripped on 0 10RHR-274 (RHR loop A containment spray keep-full cond overcurrent, but there is xfer connection valve) is throttled open nothing abnormal at the pump.

  • Ensure closed the following valves:

0 RHR TEST & TORUS CLG 1OMOV-34A 0 TORUS SPRAY INBD VLV 10MOV-38A 0 OW SPRAY INBD VLV 10MOV-31A

  • Ensure the following RHR pumps are stopped:

0 RHR PMP 1OP-3A 0 RHR PMP 1OP-3C

  • IF RHRSW Loop A operation is not required, THEN shut down RHRSW Loop A as follows:

0 Close RHRSW DISCH VLV FROM HX A 10MOV-89A 0 Ensure the following RHRSW pumps are stopped:

0 RHRSW PMP 10P-1A 0 RHRSW PMP 10P-1C

- - - - ---- - ---------- - - -

LOI 14-2 NRC Examination Scenario 1 Page 9 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event3 ATC SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 2 0 09-5-2-44, APRM UPSCALE APRM B Fails Upscale 0 09-5-2-55, APRM TRIP SYS B INOP OR UPSCALE TRIP

  • Recognize I report APRM B indicates upscale
  • Acknowledge report
  • Direct ARP response
  • Determine Technical Specification Table 3.3.1.1-1 Functions 2b, c, and d are met with APRM B out of service
  • .Determines TRM Table T3.3.B-1 Functions 1a, b, and care met with APRM B out of service

0 Place APRM BYP switch in B 0 Verify APRM B is bypassed using one or both of the following:

  • APRM B BYPASS indicating light is on
  • APRM B EPIC alarm indicates bypassed 0 Verify the other two APRM channels associated with the same APRM BYP switch are in service using one or both of the following:
  • APRM BYPASS indicating lights are off for the other two APRMs
  • No EPIC bypassed alarms for the other two APRMs LOI 14-2 NRC Examination Scenario 1 Page 10 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC cont. SAT I UNSAT INA

0 Place RX SCRAM RESET switch to GROUP 2 & 3, then to GROUP 1 & 4, spring return to NORM 0 Verify RPS 8 SCRAM GROUPS 1, 2, 3, and 4 lights are on

-

LOI 14-2 NRC Examination Scenario 1 Page 11 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event4 BOP/ATC SAT/UNSAT/NA On Lead Examiner Cue:

ACTIVATE TRIGGER 3

  • Recognize I report spurious HPCI initiation HPCI Inadvertent Initiation
  • Recognize I report Reactor power rise, if applicable
  • Recognize I report Reactor water level rise, if applicable SRO SAT/UNSAT/NA
  • Acknowledge report
  • Verify HPCI injection not required
  • Direct trip of HPCI I
  • May enter AOP-32 (Unexplained/Unanticipated Reactivity Change)
  • Determine Technical Specification 3.5.1 Condition G requires being in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reducing Reactor pressure to :s; 150 psig within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
  • Declare the secured train of Standby Gas Treatment inoperable

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT/UNSAT/NA Role Play:

  • Execute AOP-77 If dispatched to investigate HPCI, wait three minutes, then
  • Observe Reactor water level and Drywell pressure indications report there is no obvious to verify HPCI injection not required reason why HPCI started and
  • Trip HPCI there is no observable damage to the system.
  • AFTER turbine comes to a complete stop, place AUX OIL PMP 23P-150 control switch in PULL-TO-LOCK
  • Secure one train of Standby Gas
  • May execute AOP-32 (Unexplained/Unanticipated Reactivity Change) 0 Determine HPCI initiation was only cause of reactivity change LOI 14-2 NRC Examination Scenario 1 Page 13 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event 5 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:

  • Recognize I report EPIC alarms ACTIVATE TRIGGER 4
  • Recognize I report rising Feedwater pump A vibrations SRO SAT I UNSAT INA Note:
  • Acknowledge report The ARP directs tripping
  • Direct ARP response Feedwater pump A if vibration reaches 6 mils. There is no
  • May direct emergency power reduction with Recirculation flow automatic trip on vibration, and/or CRAM rods however the pump will
  • Direct trip of Feedwater pump A spuriously trip in this scenario if vibration reaches -8 mils.
  • May enter AOP-8 (Unexpected Change in Core Flow)

BOP SAT I UNSAT INA Note:

  • Execute ARP 09-6-4-11 Recirculation pumps will likely 0 Monitor vibration level and trend runback to the 44% limiter due to only one Feedwater pump 0 When vibration approaches/exceeds 6 mils, trip Feedwater operating and Reactor water pump A level lowering to 196.5".
  • Coordinate with A TC to lower Reactor power with Recirculation flow, as required I directed Role Play:

If dispatched to investigate, wait 2 minutes, then report that Feedwater pump A is vibrating, but there is no obvious cause .

LOI 14-2 NRC Examination Scenario 1 Page 14 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT I UNSAT INA Note:

  • Coordinate with BOP to lower Reactor power with CRAM rods, as required I directed Following the trip of
  • Monitor for thermal-hydraulic instabilities (THI)

Feedwater pump A, Reactor power will likely stabilize between 65-70% power. The crew may decide to lower Reactor power further by inserting CRAM rods, since during a startup the second Feedwater pump is started prior to exceeding 55% power.

However, there is no hard requirement to continue the power reduction.

Role Play:

If the crew is not taking action to lower Reactor power by inserting CRAM rods, when crew informs management or Reactor Engineering of event, direct crew to lower Reactor power to 50% using RAP-7.3.16.

LOI 14-2 NRC Examination Scenario 1 Page 15 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Events 6 1 7 1 & 8 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:

  • Recognize I report degrading Primary Containment conditions ACTIVATE TRIGGER 5 (leakage, temperature, pressure)

Loss of Coolant Accident, Feedwater Pump 8 Trip, HPCI

Trip, Loss of Offsite Power

  • Recognize I report trip of HPCI (if re-start attempted)
  • Recognize I report loss of Lines 3 and 4 (approximately 4 and Note: 5 minutes after scram, respectively)

Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the Feedwater pump trip and delayed loss of offsite power.

This trigger also re-inserts the coolant leak malfunction and ramps it to a higher value.

Critical Task #1 Given a coolant leak Inside the Containment, the crew will Pass/ Fail spray the Drywall, in accordance with EOP-4.

Drywall spray In service.

Critical Task t1 Standard:

Critical Task t2 . Given a coolant leak, a loss of high pi'8SSure Injection Pass/ Fall systems, and the Inability to restore and maintain Reactor water level above the Top of Active Fuel (TAF), the crew will Initiate actio* for an Emerge~~ey RPV Depressurization before RNctor wat.rlevellowtn below -1.8 ", In accordance wlthEOP..Z.

7 ADS valves open.

Critical Task t2 Standard:

LOI14-2 NRC Examination Scenario 1 Page 16 of 23

IINSTRUCTORACTIVITY I POSITION I OPERATORACTIONS/STANDARD I COMMENTS/EVALUATION I SRO SAT/UNSAT/NA

  • Acknowledge reports
  • Enter EOP-2 (RPV Control) on low Reactor water level, high Drywell pressure, and high Drywell temperature (as they occur)
  • Direct Reactor water level controlled 180-220" using HPCI ,

Condensate, SLC, and/or CRD

  • Acknowledge trip of HPCI
  • Direct Reactor pressure controlled 800-1000# using Turbine Note: Bypass Valves A pressure band of 600-800#
  • May direct Reactor depressurization to inject with Condensate would allow injection with
  • Enter AOP-39 (Loss of Coolant)

Condensate Booster pumps, however these will become

  • Direct Control Room and Relay Room Ventilation isolated per unavailable due to the OP-55B Section G within 30 minutes eventual loss of offsite power.
  • Direct TSC filtered ventilation started per Section D of OP-59B within 60 minutes

When directed to place

  • When Primary Containment pressure exceeds 2.7 psig and Control Room , Relay Room , before Torus pressure exceeds 15 psig, direct initiation of and/or TSC filtered ventilation Torus Spray in service, acknowledge direction.

LOI 14-2 NRC Examination Scenario 1 Page 17 of 23

[INSTRUCTOR ACTIVI"TY ImPOSITION I OPERATOR ACTIONS/STANDARD I COMMENTS/EVALUATION I SRO cont. SAT/UNSAT/NA

  • Acknowledge loss of Line 3
  • Acknowledge loss of Line 4
  • Enter AOP-72 (115 KV Grid Loss, Instability, or Degradation)

Note:

  • Acknowledge loss of all Condensate pumps and Circulating The MSIVs will be closed due Water pumps to loss of all Circulating Water pumps after the loss of 115
  • Direct closure of MSIVs KV.
  • Direct Reactor pressure control using SRVs
  • When Torus pressure exceeds 15 psig:

0 Verify Recirculation pumps tripped 0 Verify trip of Drywell cooling fans 0 Direct initiation of Drywell Spray

  • Determine Reactor water level cannot be maintained above 0"
  • Enter Alternate RPV Level Control leg of EOP-2
  • Direct override of ADS
  • Direct CRD maximized and SLC injection, if not done Note: previously As Reactor water level lowers,
  • When Reactor water level reaches 0", enter Emergency Critical Task #2 the crew will transition from RPV Depressurization leg of EOP-2 wide range to fuel zone level
  • Direct opening 7 ADS valves indicators. The determination of when to initiate Emergency
  • Direct Reactor water level restored and maintained 180-220" RPV Depressurization (CT-2) using Core Spray and/or LPCI will be made using Fuel Zone level indicators.
  • As time allows, directs re-start of Drywell spray LOI 14-2 NRC Examination Scenario 1 Page 18 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION I ATC SAT I UNSAT INA

  • Place RX MODE switch in SHUTDOWN
  • Observe Reactor power lowering
  • Ensure closed SDIV vent and drain valves
  • Verify 4KV loads transfer to reserve power
  • May begin Reactor depressurization BOP SAT/UNSAT/NA
  • Attempt to control Reactor water level 180-220" using HPCI, Condensate, SLC, and/or CRD
  • May attempt to manually re-start HPCI :

0 Ensure open 23MOV-16 0 Ensure running 23P-140 0 Ensure open 23MOV-14 0 If 09-3-3-28 is in alarm, then depress 23A-S17 0 Ensure running 23P-150 0 Recognize I report failure of HPCI to start


LOI14-2 NRC Examination Scenario 1 Page 19 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC I BOP SAT I UNSAT INA

  • Attempt to maintain Reactor water level with SLC and/or CRD
  • Recognize I report leakage exceeds capacity of SLC and/or CRD
  • May inject using Condensate Booster pumps
  • Initiate Torus spray: I I

0 Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL, '

spring return to normal 0 Verify white SPRAY PERM 1OA-DS67A( B) light is on 0 Ensure available RHR pumps in RHR Loop A(B) are running (recognize/report failure to automatically start) 0 Open RHR TEST TORUS CLG & SPRAY 1OMOV-39A(B) 0 Throttle TORUS SPRAY INBD VLV 10MOV-38A(B) to establish desired torus spray flow rate 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm, ensure closed MIN FLOW VLV 10MOV-16A(B) 0 Throttle RHR TEST & TORUS CLG 1OMOV-34A(B) to divert excess flow to the torus to maintain > 6,500 gpm RHR Loop A(B) flow with one RHR pump operating or >

13,000 gpm RHR Loop A(B) flow with two RHR pumps operating

- - -- ---- -- - -

LOI 14-2 NRC Examination Scenario 1 Page 20 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC I BOP SAT I UNSAT INA cont.

0 Establish RHRSW flow and temperature control:

0 Start one of the RHRSW pumps 0 Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89A(B) to establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX A( B) 1OMOV-89A(B) to establish 2500 to 4000 gpm per RHRSW pump 0 IF drywell or torus sprays are in service, THEN establish 4000 gpm per RHRSW pump 0 Close HX A( B) BYP VLV 1OMOV-66A(B)

  • Control Reactor pressure using SRVs Note:
  • Ensure Recirc pumps tripped When RPV water level lowers
  • Ensure Drywell Cooling fans tripped below 59.5", Torus and
  • Initiate Drywell spray: Critical Task #1 Drywell Spray are automatically secured as LPCI 0 Place SPRAY CNTRL 10A-S17A(B) switch to MANUAL, receives an initiation signal. spring return to normal The SRO will direct Torus and 0 Verify white SPRAY PERM 1OA-DS67A( B) light is on Drywell Spray re-established at a later time. 0 Ensure available RHR pumps in RHR Loop A(B) are running 0 Open OW SPRAY OUTBD VLV 1OMOV-26A(B) 0 Throttle OW SPRAY INBD VLV 10MOV-31A(B) to establish desired drywell spray flow rate

-- --- --

LOI 14-2 NRC Examination Scenario 1 Page 21 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION I ATC I BOP SAT I UNSAT INA cont.

  • Override ADS:

0 Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0 Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0 Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0 Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on

  • Maximize CRD, if not done previously
  • Initiate SLC injection, if not done previously
  • Verify isolations per AOP-15 Critical Task #2
  • Open 7 ADS valves
  • Restore and maintain Reactor water level 180-220" using available injection systems

0 Throttle 14MOV-12A(B)

  • Control LPCI injection:

0 Throttle 1OMOV-27A( B) 0 Secure RHR pumps if needed Termination Criteria:

  • Emergency RPV Depressurization is in progress
  • Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 1 Page 22 of 23

ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 90% power during a power reduction .

RCIC is out of service for maintenance.

Torus cooling is in service on RHR loop A.

When you take the shift, secure Torus cooling per OP-138 sections F.1 and F.7 LOI14-2 NRC Examination Scenario 1 Page 23 of 23

Appendix D Scenario Outline Form ES-D-1 Facility: James A. Fitzpatrick Scenario No.: NRC-2 Op-Test No.: 14-2 Examiners: Operators:

Initial Conditions: The plant is operating at approximately 99% power. Air Compressor B is out of service for maintenance. Core Spray pump A is ready for full flow testing. Main Generator reactive load is at minimum per Power Control request.

Turnover: Perform Core Spray full flow testing per ST-3PA, starting at step 8.7.6.

Event Malf. Event Event No. No. Type* Description N- Perform Core Spray Full Flow Test 1 N/A BOP, SRO ST-3PA C- Core Spray Pump Overload 2 Override BOP, SRO ARP 09-3-1-31, Technical Specifications C- Control Rod Drive Pump Trip, One Control Rod Drive Accumulator RD06 3 ATC, Low Pressure RD09 SRO AOP-69, ARP-09-5-1-43, Technical Specifications R-ATC Main Turbine Bearing High Vibration; Loss of Main Condenser TU04 4 Vacuum C-ATC, MC01 SRO AOP-66, AOP-31, AOP-1 RP01AB Failure of RPS and ARI to Actuate 5 RP01BB M-All EOP-2, EOP-3 RP09 SL02 First SLC Squib Valve Fails to Fire, Second SLC Pump Trips, C-6 SL01 ATC, Recirculation Pumps Fail to Automatically Trip SRO EOP-3 RR13 EG01 C- Main Generator Trip, Two Turbine Bypass Valves Fail Closed 7 BOP, TC04 SRO EOP-3

  • (N)ormal, (R)eactivitv, (l)nstrument, (C)omponent (M)ajor

Facility: James A. Fitzpatrick Scenario No.: NRC-2 Op-Test No.: 14-2

1. Total malfunctions (5-8) 6 Events 2, 3, 4, 5, 6, 7
2. Malfunctions after EOP entry (1-2) 2 Events 6 & 7
3. Abnonnal events (2-4) 2 Events 3 &4
4. Major transients (1-2) 1 Event 5
5. EOPs entered/requiring substantive actions (1-2) 1 EOP-2
6. EOP contingencies requiring substantive actions (0-2) 1 EOP-3
7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:

CT -1: Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:

  • Terminating and preventing all RPV injection except SLC, RCIC, and CRD

JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 2 TITLE: LOI14-2 NRC EXAMINATION SCENARIO 2 SCENARIO NUMBER: NRC 2 PATH: STAND ALONE Validation: ..-=:-""' '} ~- Training: ,Jl~

) '

CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 2 Page 1 of 29

RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/3/12 New New Scenario T. Hooper 5/14/14 LOI14-2 NRC Exam Modified for LOI14-2 NRC Exam T. Hooper LOI14-2 NRC Examination Scenario 2 Page 2 of 28

A. TITLE: LOI 14-2 NRC EXAMINATION SCENARIO 2 B. SCENARIO SETUP:

1. IC-62
2. Special Instructions:
a. The Plant is operating at approximately 99% power.
b. Air Compressor B is out of service for maintenance.
c. Ensure Generator reactive load is at minimum per OP-11A.
3. Preset Conditions:
a. Preset, R:IA15:B, Air Camp 39AC-2B Supply Breaker, Open (will not show in Instructor Station Summary after snap/reset)
b. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off
c. TRIGGER 1, O:CS ZA014P1A, Core Spray Pump A Current, Ramp=20 seconds, 170
d. TRIGGER 1, O:AN931 :31, Core Spray Pmp 14P-1A Overload, Delay=15 seconds, ON
e. TRIGGER 2, M:RD06:A, CRD Hydraulic Pump Trip (A)
f. TRIGGER 2, M:RD09:22:31, Control Rod (22-31) Accumulator, Delay=30 seconds
g. TRIGGER 3, M:TU04E, Main Turbine High Bearing #5 Vibration, lnitial=21 %,

Final=27%, Ramp=5:00

h. TRIGGER 3, M:TU04F, Main Turbine High Bearing #6 Vibration, lnitial=21 %,

Final=28%, Ramp=5:00

i. TRIGGER 4, M:MC01, Main Condenser Air In Leakage, lnitial=12%, Final=25%,

Ramp=8 minutes

j. Preset, M:RP01 :AB, RPS Automatic Scram Failure B Side Only
k. Preset, M:RP01 :BB, RPS Manual Scram Failure B Side Only I. Preset, M:RP09, ARI Fails to Actuate
m. Preset, M:SL02:A, Standby Liquid Squib Valve Fails
n. Preset, M:SL02:B, Standby Liquid Squib Valve Fails
o. Preset, M:RR13:A, ATWS System Fails to Initiate
p. Preset, M:RR13:B, ATWS System Fails to Initiate
q. TRIGGER 5, M:EG01, Main Generator Trip
r. TRIGGER 6, M:TC04:A Turbine Bypass Valve Failure, 0%
s. TRIGGER 6, M:TC04:B Turbine Bypass Valve Failure, 0%
t. TRIGGER 20, R:IA07, Scram Air Hdr Man lso Vlv, CLOSE
u. TRIGGER 20, M:IA01 , Loss of Air Pressure to Scram Air Header, 100%, Ramp=30 seconds
v. TRIGGER 19, R:RH40:A, Relay 1OA-K45A Timer Grayboot, REMOVED
w. TRIGGER 19, R:RH40:B, Relay 10A-K45B Timer Grayboot, REMOVED
x. Event Trigger 1, Event: zdi14as4a(2)==1 , Command: None
y. Event Trigger 4, Event: ycx07nmaprmaf<95, Command : None
z. Event Trigger 5, Event: ycx07nmaprmaf<42, Command : None aa. Event Trigger 6, Event: ycx07nmaprmaf<24, Command: None bb. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor zao14p1a LOI 14-2 NRC Examination Scenario 2 Page 3 of 28

cc. Event Trigger 16, Event: csipump(1)>50&&zdi14as5a(1)==1, Command: dor an931 :31 dd. Event Trigger 21, Event: ycx07nmaprmaf<95, Command: imf tu04:e 14 60 ee. Event Trigger 22, Event: ycx07nmaprmaf<95, Command: imf tu04:f 14 60 ff. Event Trigger 23, Event: ycx07nmaprmaf<85, Command: imf mc01 30 1:00 gg. Event Trigger 24, Event: ycx07nmaprmaf<60, Command: imf mc01 35 1:00 hh. Event Trigger 25, Event: zdi11 s1 (2)==1, Command: dmf sl02:b ii. Event Trigger 26, Event: zdi11 s1 (2)==1, Command: trgr 28 jj. EventTrigger27, Event: zdi11s1(2)==1, Command: imfsl01:b (30 5) kk. Event Trigger 28, Event: zdi11s1(1)==1, Command: dmf sl02:a II. Event Trigger 29, Event: zdi11s1(1)==1, Command: trgr 25 mm. Event Trigger 30, Event: zdi11s1(1)==1, Command: imf sl01 :a (27 5)

4. Consumable Forms and Procedures:

+ AOP-1, AOP-31, AOP-66, AOP-69, ST-3PA LOI 14-2 NRC Examination Scenario 2 Page 4 of 28

C. SCENARIO

SUMMARY

The scenario will begin with the plant operating at approximately 99% power. The crew will begin by performing Core Spray pump testing per ST-3PA. When the Core Spray test valve is opened , an overload condition will develop on Core Spray pump A The crew will perform ARP actions to lower pump flow and then stop the pump. The SRO will determine the Technical Specification impact.

The running Control Rod Drive pump will trip. The crew will enter AOP-69, start the standby pump, and restore normal Control Rod Drive parameters. During this evolution, one Control Rod Drive accumulator will develop a low pressure. The SRO will determine the Technical Specification impact.

Main Turbine vibrations will develop. The crew will enter AOP-66 to address the vibrations. The vibrations will subside as Reactor power is lowered, however the vibrations will have caused damage resulting in Main Condenser air in-leakage. Main Condenser vacuum will degrade. The crew will enter AOP-31 and eventually insert a manual Reactor scram .

RPS B will fail to process the scram and ARI will also fail to insert control rods. The crew will enter EOP-2 and EOP-3. The ATWS system will fail to automatically trip the Recirculation pumps when required . The crew will lower Recirculation flow to minimum and then trip the Recirculation pumps. The crew will terminate and prevent injection except CRD, SLC, and RCIC. The crew will attempt to inject boron using SLC, however the squib valves will fail to fire when the first SLC pump is started. The second SLC pump will successfully start and inject, but then trip after a time delay. The Main Turbine will be available until power lowers to approximately 40%, when a spurious turbine trip occurs. As power lowers, two Turbine Bypass alves will fail closed, challenging Reactor pressure control and Primary Containment control. The crew will be able to manually insert control rods. Either pulling RPS fuses or venting the scram air header will result in all rods inserting .

The scenario will be terminated when control rods are being inserted or are all inserted and Reactor water level is controlled above 0".

LOI14-2 NRC Examination Scenario 2 Page 5 of 28

Shift Turnover The Plant is operating at approximately 99% power.

Air Compressor B is out of service for maintenance.

Main Generator reactive load is at minimum per Power Control request.

When you take the shift, perform Core Spray A pump testing per ST-3PA, starting at step 8.7.6 .

LOI 14-2 NRC Examination Scenario 2 Page 6 of 28

Critical Tasks/Standards Critical Task #1 : Given a failure to scram with Reactor power above 2.5%, the crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:

  • Terminating and preventing all RPV injection except SLC, RCIC, and CRD

LOI14-2 NRC Examination Scenario 2 Page 7 of 28

EVENT NO. EVENT SEQUENCE

1. Perform Core Spray Full Flow Test (Normal: BOP, SRO}
2. Core Spray Pump Overload (Component: BOP, SRO}

Control Rod Drive Pump Trip, One Control (Component: ATC, SRO}

3.

Rod Drive Accumulator Low Pressure Main Turbine Bearing High Vibration, Loss of (Reactivity: ATC}

4.

Main Condenser Vacuum (C: ATC, SRO}

5. Failure of RPS and ARI to Actuate (Major: All}

First SLC Squib Valve Fails to Fire, Second SLC (Component: ATC, SRO}

6. Pump Trips, Recirculation Pumps Fail to Automatically Trip Main Generator Trip and Two Turbine (Component: BOP, SRO}

7.

Bypass Valves Fails Closed D. TERMINATION CUES:

  • Reactor water level is being controlled above 0".

LOI 14-2 NRC Examination Scenario 2 Page 8 of 28

INSTklJCTOR ACTIVITY POSITION OPERA fOR ACTIONS/STANDARD COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)

After the shift turnover, allow All no more than five minutes for panel walkdown

  • Walkdown the control panels and assume the watch Event 1 SRO SAT I UNSAT INA Perform Core Spray Full Flow Test
  • Perform Crew Brief
  • Throttle TEST VL V 14MOV-26A to momentarily establish Core Spray Loop A flow rate at GREATER THAN OR EQUAL TO Note:

5150 gpm on EPIC display CS As 14MOV-26A is being opened, ensure Trigger 1

  • Throttle TEST VLV 14MOV-26A to establish GREATER THAN automatically activates. This OR EQUAL TO 4610 LESS THAN OR EQUAL TO 4790 gpm will lead immediately into the on EPIC display TRCS (as time permits) next event.

'----- --

LOI 14-2 NRC Examination Scenario 2 Page 9 of 28

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event2 BOP SAT I UNSAT INA Core Spray Pump Overload

  • Recognize I report high current on Core Spray pump A
  • Acknowledge report
  • Direct execution of ARP

If contacted as NPO about Core Spray pump A while it is

  • IF either of the following conditions exist:

still running, immediately 0 Pump flow rate is > 4700 gpm, OR Pump amps are > 160, report that the pump is running very loudly and there is some

  • THEN reduce pump flow rate until:

light smoke coming from the 0 Pump flow rate is s 4700 gpm, AND Pump amps are s 160 motor.

If contacted as NPO about

  • IF the annunciator remains in alarm , AND core spray is not Core Spray pump A after it required to assure adequate core cooling , THEN perform the has been stopped, following :

immediately report that it has

  • Stop PMP 14P-1A LOI 14-2 NRC Examination Scenario 2 Page 10 of 28

- -

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 3 ATC SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 2

Control Rod Drive Pump Trip, 0 09-5-1-9, CRD CHARGING WTR PRESS LO One Control Rod Drive 0 09-5-1-39, CRD PMP 3P-16A OVERLOAD Accumulator Low Pressure 0 09-5-1-49, CRD PMP 3P-16A TRIP 0 09-5-1-43, CRD ACCUM PRESS LO OR LVL HI (delayed)

  • Recognize I report trip of CRD pump A

Role Play: SRO SAT I UNSAT INA If contacted about control rod scram times, report that all

  • Enter AOP-69 (Control Rod Drive Pump Trouble) within limits during last surveillance.
  • Direct start of CRD pump B
  • Note override conditions for RPV pressure above 900 psig and tripped and there are no required scram abnormal indications at the pump.
  • Monitor ACCUM alarm lights on full core display
  • Rotate manual control knob on CRD FLOW CNTRL 03FIC-301 fully counterclockwise LOI 14-2 NRC Examination Scenario 2 Page 11 of 28

INSTRuCTOR ACTIVITY POSITION

. OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC cont. SAT I UNSAT INA Role Play:

  • Verify in-service CRD flow control valve (03FCV-19A or B) is If dispatched to investigate closed accumulator alarm, wait 2 minutes, then report that the

0 Balance controller by adjusting setpoint tape 0 Place controller in AUTO 0 Adjust setpoint to BETWEEN 59 and 61 gpm I

I

!

- - --

LOI14-2 NRC Examination Scenario 2 Page 12 of 28

- -

INSTklJCTOR ACTIVITY POSITION OPERAlOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 ATC I BOP SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 3

  • Recognize I report high Turbine vibrations Main Turbine Vibration
  • Monitor Turbine vibrations
  • Report vibrations on bearing 5 & 6 are greater than 9 mils but less than 12 mils I

Note: SRO SAT I UNSAT INA A Reactor scram is required if vibrations exceeded 12 mils or

  • Acknowledge report if vibrations exceeded 9 mils

Neither of these conditions are expected in this scenario.

BOP SAT I UNSAT INA Role Play:

If dispatched to investigate

  • Execute AOP-66 vibrations; wait 2 minutes,
  • Notifiy crew of Reactor scram criteria then report you can feel vibrations on the Turbine Deck
  • Ensure Main Turbine system engineer is notified but do not see any obvious
  • Determine MVARs already lowered to minimum cause.
  • Coordinate with A TC to lower Recirc flow with RWR MG A(B)

SPEED CNTRL

  • Monitor Turbine vibrations
  • Report Turbine vibrations are less than 9 mils LOI 14-2 NRC Examination Scenario 2 Page 13 of 28

. . ,

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Note: ATC SAT I UNSAT INA Once Reactor power is reduced to approximately

  • Lower Recirc flow with RWR MG A(B) SPEED CNTRL 95% , Triggers 21 and 22
  • Monitor APRMs, CTP, Recirc flow, Reactor water level activate to lower the Turbine vibrations. Trigger 4 activates to initiate the next part of event 4.

LOI 14-2 NRC Examination Scenario 2 Page 14 of 28

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 Continued BOP/ATC SAT I UNSAT INA Loss of Main Condenser vacuum

  • Recognize I report lowering Main Condenser vacuum This part of event 4 is automatically initiated when Reactor power is lowered <

-95% in the previous part of the event.

SRO SATIUNSAT/NA Note:

  • Acknowledge reports A typical benchmark for directing a Reactor scram is a
  • Direct Reactor scram Note: BOP SAT I UNSAT INA If desired by lead examiner to
  • Execute AOP-31 expedite the vacuum loss in this event, Triggers 23 and/or
  • Trip Recombiner once the previous severity of malfunction MC01 is fully
  • Trip H2 addition ramped in.
  • Attempt to determine cause of vacuum degradation Role Play:

If dispatched to investigate

  • Coordinate with ATC to lower Recirc flow with RWR MG A(B)

Recombiner trouble alarm, SPEED CNTRL if Core Flow is >55%

wait 2 minutes, then report that the alarm is caused by high Recombiner flow.

LOI14-2 NRC Examination Scenario 2 Page 15 of 28

-

INSTklJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Note: ATC SAT/UNSAT/NA Once a Reactor scram is

  • Lower Recirc flow with RWR MG A(B) SPEED CNTRL if Core attempted, a failure to scram Flow is >55%1nsert CRAM rods will occur. This is scripted in the next event.
  • Place Mode Switch to Shutdown LOI 14-2 NRC Examination Scenario 2 Page 16 of 28

INSTklJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION I Events 61 71 & 8 ATC SAT I UNSAT INA Failure of RPS and ARI to Actuate, First SLC Squib

  • Manually initiate ARI SLC Pump Trips, Recirculation Pumps Fail to Automatically Trip, Main Generator Trip, Two Turbine Bypass Valves Fail Closed Critical Task #1 Given a failure to scram with Reactor power above 2.5%, the Pass I Fail crew will lower Reactor power by one or more of the following methods, in accordance with EOP-3:
  • Terminating and preventing all RPV injection except SLC, RCIC, and CRD
  • Tripping Recirculation pumps Critical Task #1 Standard: Terminate and prevent all injection except SLC, RCIC and CRD per EP-5 And/or Trip Recirculation pumps

_, -- -~----- .. ------

Critical Task #2 Given a failure to scram, the crew will initiate Control Rod Pass I Fail insertion, in accordance with EOP-3.

Critical Task #2 Standard: Perform EP-3 Backup Control Rod Insertion Actions to insert control rods.

LOI 14-2 NRC Examination Scenario 2 Page 17 of 28

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT/UNSAT/NA

  • Acknowledge report Note:

Malfunctions will:

  • Enter EOP-2 (RPV Control) on Reactor power above 2.5% or unknown when a scram is required 0 Trip the Main Generator when Reactor power
  • Determine the Reactor will NOT remain shutdown under all lowers to approximately conditions without boron 42% I

Reactor power lowers to Critical Tasks #1 and #2

  • Direct bypassing MSIV low RPV water level isolation interlocks per EP-2 Critical Task #1
  • Direct terminate and prevent all injection except SLC, RCIC and CRD per EP-5
  • Direct RPV water level controlled between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI)
  • Direct Reactor pressure controlled 800-1000 psig with Turbine Bypass Valves and SRVs, as required LOI 14-2 NRC Examination Scenario 2 Page 18 of 28

" . .

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC SAT/UNSAT/NA

  • Perform EP-3 Failure to Scram Actions 0 Ensure Rx Mode Switch in SHUTDOWN 0 Ensure ARI initiated 0 Run Recirc flow to minimum 0 Determine Rx power greater than 2.5%

0 Ensure Recirc pumps tripped Critical Task #1 0 Override ADS 0 Place ADS LOGIC OVERRIDE & RESET LOGIC A 2E-S2A in OVERRIDE 0 Place ADS LOGIC OVERRIDE & RESET LOGIC B 2E-S2B in OVERRIDE 0 Verify annunciator 09-4-1-27 ADS OVERRIDE SW IN OVERRIDE is in alarm 0 Verify white ADS LOGIC OVERRIDDEN 2E-DS10 light is on 0 Obtain CRS concurrence to inject SLC 0 Attempt to inject SLC 0 Verify white SQUIB VLVS READY lights are on Note:

Due to failure of the SLC squib 0 Note level on TK LVL 11 Ll-66 valves to fire, pump discharge 0 Place SLC pup keylock switch in START SYS-A or pressure will be high (near START SYS-B 1500 psig) and tank level will NOT lower. 0 Verify red SLC pump running light is on 0 Verify SLC pump discharge pressure on DISCH PRESS 11 Pl-65 is greater than or equal to RPV pressure

- -

LOI 14-2 NRC Examination Scenario 2 Page 19 of 28

INSTRuCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC cont. SAT/UNSAT/NA 0 Verify the following :

0 CLN UP SUCT 12MOV-18 is closed 0 CLN UP RETURN ISOL VALVE 12MOV-69 is closed 0 Recognize I report failure of SLC pump to inject 0 Attempt to inject with other SLC pump 0 Recognize I report trip of second SLC pump

  • Range IRMs as necessary

-

LOI14-2 NRC Examination Scenario 2 Page 20 of 28

INSTkLICTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I EVALUATION Booth Operator: BOP SAT I UNSAT INA When directed to install MSIV low water level jumpers, wait 2

  • Direct NPO to bypass MSIV low RPV water level isolation minutes and run interlocks per EP-2 Section 5.1 MSIVLEVEL.cae.

0 Ensure RFP A FLOW CNTRL 06-84A is in MAN 0 Lower RFP A FLOW CNTRL 06-84A to minimum 0 Ensure open RFP A MIN FLOW 34FCV-135A 0 If RFP B is running:

0 Ensure RFP B FLOW CNTRL 06-848 is in MAN 0 Lower RFP BFLOW CNTRL 06-848 to minimum 0 Ensure open RFP B MIN FLOW 34FCV-135B 0 Ensure closed:

0 RFP A DISCH 34MOV-100A 0 RFP B DISCH 34MOV-100B 0 Ensure FDWTR STARTUP VLV 34FCV-137 in MANUAL 0 Ensure closed FDWTR STARTUP VLV 34FCV-137 0 HPCI 0 Trip HPCI by depressing TURB TRIP 23A-S19 pushbutton LOI 14-2 NRC Examination Scenario 2 Page 21 of 28

INSTRUCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I EVA~UATION BOP cont.

0 Core Spray Loop A SAT I UNSAT INA 0 Place 14MOV-11A AUTO ACTUATION BYPASS SW Note: 14A-S 16A switch in bypass RCIC is out of service as part of the scenario setup, so RCIC 0 Verify white 14MOV-11A AUTO ACTUATION BYPASS actions may not be taken. LT 14A-DS35A light is on 0 Ensure closed OUTBD INJ VLV 14MOV-11A 0 Ensure PMP 14P-1A is stopped 0 Core Spray Loop B 0 Place 14MOV-11 B AUTO ACTUATION BYPASS SW 14A-S16B switch in bypass 0 Verify white 14MOV-11B AUTO ACTUATION BYPASS LT 14A-DS35B light is on 0 Ensure closed OUTBD INJ VLV 14MOV-118 0 Ensure PMP 14P-1 B is stopped LOI 14-2 NRC Examination Scenario 2 Page 22 of 28

INSTRUCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I EVALUATION BOP cont. SAT/UNSAT/NA 0 RHR Loop A Booth Operator:

0 Place 10MOV-27A AUTO CONTROL BYPASS 10A-If requested to disconnect S23A RHR timers, wait 2 minutes, then activate Trigger 19 and 0 Verify white light above 1OMOV-27A AUTO CONTROL report task completion . BYPASS 1OA-S23A is on 0 Ensure closed LPCI OUTBD INJ VLV 10MOV-27A 0 Ensure RHR Loop A pumps which are not required to be running are stopped 0 RHR Loop B 0 Place 10MOV-27B AUTO CONTROL BYPASS 10A-S23B 0 Verify white light above 1OMOV-27B AUTO CONTROL BYPASS 1OA-S23B is on 0 Ensure closed LPCI OUTBD INJ VLV 10MOV-27B 0 Ensure RHR Loop B pumps which are not required to be running are stopped

  • Report RPV water level is less than 11 0" to CRS LOI 14-2 NRC Examination Scenario 2 Page 23 of 28

INSTklJCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS , *EVALUATION BOP cont. SAT I UNSAT INA

  • Control RPV water level between -19" and 11 0" with only Group 1 Water Level Control Systems (Condensate/Feedwater, CRD, HPCI, RCIC, LPCI) 0 Feedwater 0 If any Reactor feed pump is running:

0 Ensure feedwater pump discharge pressure is less than RPV pressure by adjusting reactor feed pump speed 0 Lineup injection flow path by performing on or both of the following:

0 Adjusting FDWTR STARTUP VLV 34FCV-137 0 Ensure open or throttled open Reactor feed pump discharge valve for running pump (34MOV-100A or B) 0 Control feed flow to RPV by performing any of the

_following:

0 Adjust RFP speed 0 Adjust FDWTR STARTUP VLV 34FCV-137 0 Close feed pump discharge valves 0 If both Reactor feed pumps are shutdown, and feedwater discharge header pressure is greater than RPV pressure, then control feed flow to RPV by performing one or both of the following :

0 Throttling FDWTR STARTUP VLV 34FCV-137 0 Throttling one or both of the following valves, only if APRMs are on scale:

0 RFP A DISCH 34MOV-100A 0 RFP B DISCH 34MOV-100B LOI 14-2 NRC Examination Scenario 2 Page 24 of 28

,.

INSTklJCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS , *EVALUATION BOP cont. SAT I UNSAT INA 0 HPCI 0 Preparation for injection:

0 Ensure SGT is running per OP-20 0 Ensure open one of the following valves:

0 HPCI GLAND SEAL SUCT 01-125MOV-13A 0 HPCI GLAND SEAL SUCT 01-125MOV-13B 0 Ensure HPCI FLOW CNTRL 23FIC-108-1 setpoint is adjusted to minimum 0 Ensure HPCI FLOW CNTRL 23FIC-108-1 is in AUTO 0 Injection with initiation signal:

0 Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0 Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0 Verify HPCI auto-initiation 0 Control HPCI turbine speed in manual or automatic 0 Periodically verify HPCI turbine speed is greater than 21 00 rpm 0 Injection without initiation signal:

0 Depress INITIATION SIG/MAN TURB TRIP RESET 23A-S 17 pushbutton 0 Verify annunciator 09-3-3-28 HPCI TURB TRIP SOLENOID ENERGIZED is clear 0 Ensure open OUTBD STM SUPP VLV 23MOV-16 0 Ensure GLAND SEAL CNDSR BLOWER 23P-140 is running

-

LOI14-2 NRC Examination Scenario 2 Page 25 of 28

INSTRUCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA 0 HPCI cont.

0 Injection without initiation signal cont.

0 Ensure open TURB STM SUPP VLV 23MOV-14 0 Ensure AUX 01 L PMP 23P-150 is running 0 Open INJ VLV 23MOV-19 0 Ensure closed the following valves:

o STM LINE DRAIN TO RADW 23AOV-42 o STM LINE DRAIN TO RADW 23AOV-43 o TEST VLV TO CST 23MOV-21 o HPCI & RCIC TEST VLV TO CST 23MOV-24 0 Control HPCI turbine speed in manual or automatic 0 Periodically verify HPCI turbine speed is greater than 21 00 rpm

!

ATC SAT I UNSAT INA Booth Operator:

  • Perform EP-3 Backup Control Rod Insertion Actions If requested to pull RPS fuses, Critical Task #2 wait 30 seconds and for lead 0 May de-energize scram solenoids per Subsection 5.2 examiner concurrence, then 0 Determine fuses to be pulled based on lit RPS Scram run SCRAMFUSEOUTB.cae Group lights and report task completion.

0 Direct NPO to pull fuses 5A-F18B, 5A-F18F, 5A-F18D, and 5A-F18H If directed to vent Scram Air Header, wait 2 minutes and for 0 May direct NPO to vent scram air header per Subsection lead examiner concurrence, 5.3 then activate Trigger 20 and report task completion .

  • Report all control rods are inserted LOI 14-2 NRC Examination Scenario 2 Page 26 of 28

-

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT I UNSAT INA

  • Acknowledge report
  • Direct Reactor water level restored and maintained 177-222 .5" BOP SAT I UNSAT INA
  • Begin restoring Reactor water level 177-222 .5" Termination Criteria:
  • Reactor water level is being controlled above 0".

LOI 14-2 NRC Examination Scenario 2 Page 27 of 28

IIVIENT 1 Shift Turnover The Plant is operating at approximately 100% power.

Air Compressor B is out of service for maintenance.

Main Generator reactive load is at minimum per Power Control request.

When you take the shift, perform Core Spray A pump testing per ST-3PA, starting at step 8.7.6.

LOI 14-2 NRC Examination Scenario 2 Page 28 of 28

Appendix D Scenario Outline Form ES-D-1 Facility: James A. Fitzpatrick Scenario No.: NRC-3 Op-Test No.: 14-2 Examiners: Operators:

Initial Conditions: The plant is operating at approximately 100% power. Air Compressor B is out of service for maintenance.

Turnover: Swap RBCLC pumps per OP-40 section G.1. Then lower Reactor power to 95% using Recirculation flow.

Event Malf. Event Event No. No. Type* Description N- Swap RBCLC Pumps 1 N/A BOP, SRO OP-40 R- Lower Reactor Power to 95% Using Recirculation Flow 2 N/A ATC, SRO OP-27 Recirc Flow Unit Failure 3 RR23:B I-AII OP-16, Technical Specifications C- Electrical Fault on Bus L-15 4 ED21 :A BOP, SRO AOP-18A, Technical Specifications C- SRV C Inadvertently Opens 5 AD06 :C BOP, SRO AOP-36 AD06 :C SRV C Re-Opens , SRV Tailpipe Break Into Torus Airspace 6 M-All MS16:G AOP-36 , AOP-1 EOP-2 , EOP-4 I

1-ATC, Main Turbine Fails to Trip 7 TC11 SRO AOP-1 RH01 RHR Pump Trip, RHR Pump Suction Valve Fails Closed, RHRSW C-8 Remotes BOP, Crossties Fail Closed SRO EOP-4, EOP-2 Overrides

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Facility: James A. Fitzpatrick Scenario No.: NRC-3 Op-Test No.: 14-2

1. Total malfunctions (5-8) 6 Events 3, 4, 5, 6, 7, 8
2. Malfunctions after EOP entry (1-2) 2 Events 7 & 8
3. Abnormal events (2-4) 2 Events 4 & 5
4. Major transients (1-2) 1 EventS
5. EOPs entered/requiring substantive actions (1-2) 2 EOP-2, EOP-4
6. EOP contingencies requiring substantive actions (0-2) 1 EOP-2 Emergency Depress Leg
7. Critical tasks (2-3) 2 CRITICAL TASK DESCRIPTIONS:

CT-1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4.

CT-2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 3 TITLE: L0114-2 NRC EXAMINATION SCENARIO 3 SCENARIO NUMBER: NRC 3 PATH: STAND ALONE Validation: .--Z~,te ') ~ Training: tfl~ Operatlon~4~',z£/

CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 3 Page 1 of 25

RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 5/15/14 LOI 14-2 NRC Exam New Scenario T. Hooper

()

LOI 14-2 NRC Examination Scenario 3 Page 2 of 25

A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 3 B. SCENARIO SETUP:

1. IC-63
2. Special Instructions:
a. The Plant is operating at approximately 100% power.
b. Air Compressor B is out of service for maintenance.
3. Preset Conditions:
a. Trigger 1, M:RR23:B, Recirculation Flow Unit B Fails, 0%
b. Trigger 2, M:ED21 :A, 600VAC Emerg Bus 11500 Failure
c. Trigger 3, M:AD06:C, Rx Press Relief Valve (C- Inadvertently Opens)
d. Trigger 4, O:AN941 :08, ADS CNTRL PWR FAIL, on
e. Trigger 4, O:AD ZL0271C(1), SRV C Green Light, off
f. Trigger 4, O:AD ZL0271 C(2), SRV C White Light, off
g. Trigger 4, O:AD ZL0271 C(3), SRV C Red Light, off
h. Preset, M:TC11, Main Turbine Auto Trip Failure
i. Trigger 6, M:RH01 :B, RHR Pump B Trip, Delay=90 seconds
j. Trigger 6, M:RH01 :D, RHR Pump D Trip, Delay=1 05 seconds
k. Trigger 6, M:MS16:C, ADS Discharge Line (2E-RV2-71C), Delay=1 minute, Ramp=5 minutes, 100%

I. Trigger 25, R:AD07:C, 'C' SRV Isolation Switch at Remote Panel, Local

m. Trigger 26, R:AD02:C, 'C' SRV Fuse Pull Out, Out
n. Trigger27, O:AN941:18, REMOTE SHUTDOWN PNL DOOR OPEN, on
o. Trigger 22, R:SW46A, Manual Operation of 10MOV148A, 0%
p. Trigger 23, R:SW46D, Manual Operation of 10MOV149B, 0%
q. Trigger 22, O:SW ZL010AS49A(1), Service Wtr Crosstie Valve, Off
r. Trigger 22, O:SW ZL01 OAS49A(2), Service Wtr Crosstie Valve, Off
s. Trigger 23, O:SW ZL010AS50B(1), Service Wtr Crosstie Valve, Off
t. Trigger 23, O:SW ZL010AS50B(2), Service Wtr Crosstie Valve, Off
u. Preset, O:AN962: 18, Air Compr 39AC-2B Trip, Off
v. Event Trigger 4, Action: None, Command: mrf ad02:c in
w. Event Trigger 6, Action: (zlo5ads8a == 0) && (zlo5ads8b == 0), Command: None
x. Event Trigger 16, Action: zlo10as4b(2)==0, Command: dmf rh10:b
y. Event Trigger 17, Action: zlo10as4d(2)==0, Command: dmf rh10:b
z. Event Trigger 22, Action: zdi1 Oas49a==1, Command: None aa. Event Trigger 23, Action: zdi1 Oas50b==1, Command: None
4. Consumable Forms and Procedures:

+ AOP-1

+ AOP-18A

+ AOP-36 LOI14-2 NRC Examination Scenario 3 Page 3 of 25

C. SCENARIO

SUMMARY

The scenario will begin at approximately 100% power with Air Compressor B out of service for maintenance.

The crew will begin the shift by starting RBCLC pump A and securing RBCLC pump C for normal equipment rotation . Next the crew will lower Reactor power to approximately 95% using Recirculation flow.

Recirculation flow unit B will fail downscale. This will result in a rod block and half scram. The SRO will determine the Technical Specification impact. The crew will bypass Recirculation flow unit Band reset the half scram.

An electrical fault will develop on Bus L-15. The crew will execute AOP-18A, Loss of Switchgear L 15. The crew will start Standby Gas Treatment train B and isolate normal Reactor Building Ventilation. Multiple important loads will be lost, including RHR A Containment spray/cooling valves, Core Spray A injection valves, and SLC pump A. The SRO will determine the Technical Specification impact.

SRV C will inadvertently open. The crew will execute AOP-36, Stuck Open Relief Valve(s) . The crew will take actions to close SRV C. The valve will close when the isolation switch in the field is manipulated. The crew will place Torus cooling in service on RHR loop B. RHR loop A will be unavailable from the earlier loss of Bus L 15.

SRV C will re-open due to mechanical failure . The crew will execute AOP-36, Stuck Open Relief Valve(s) .

The crew will take actions to close SRV C, but the valve will not close . The crew may lower Reactor power in anticipation of a Reactor scram . The crew will execute EOP-4, Primary Containment Control, and EOP-2, RPV Control. The crew will manually scram the Reactor per AOP-1, Reactor Scram, before Torus water temperature reaches 11 0°F. Following the scram, the Main Turbine will fail to automatically trip. The crew "will execute guidance in AOP-1 to manually trip the Main Turbine.

The SRV C tailpipe will develop a break in the Torus airspace. This will result in rising Containment pressures and temperatures. The crew will attempt to control Containment conditions by initiating Torus and Drywell spray. RHR loop A will be unavailable for sprays due to the earlier loss of L-15. RHR pumps B and D will trip, resulting in loss of the ability to spray with RHR. The crew will attempt to spray using RHR Service Water. Loop A will be unavailable due to the earlier loss of Bus L 15. Loop B will be unavailable due to failure of one of the crosstie valves to open. With no Torus and Drywell spray capability, Containment conditions will exceed the Pressure Suppression Pressure. The crew will execute and Emergency RPV Depressurization .

The scenario will be terminated when all control rods are inserted, the Emergency RPV Depressurization is in progress, and Reactor water level is controlled above 0".

LOI 14-2 NRC Examination Scenario 3 Page 4 of 25

Shift Turnover The Plant is operating at approximately 100% power.

Air Compressor B is out of service for maintenance.

When you take the shift:

1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1.
2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.

LOI 14-2 NRC Examination Scenario 3 Page 5 of 25

Critical Tasks/Standards Critical Task #1: Given a stuck open SRV, the crew will scram the Reactor before Torus water temperature exceeds the Boron Injection Initiation Temperature, in accordance with AOP-36 and EOP-4.

Critical Task #2: Given the inability to maintain Primary Containment conditions inside the Pressure Suppression Pressure, the crew will perform an Emergency RPV Depressurization, in accordance with EOP-4.

LOI 14-2 NRC Examination Scenario 3 Page 6 of 25

EVENT NO. EVENT SEQUENCE

1. Swap RBCLC Pumps (Normal: BOP, SRO)

Lower Reactor Power to 95% (Reactivity: ATC, SRO)

2. Using Recirculation Flow Recirc Flow Unit Failure (Instrument: All) 3.

(Tech Spec: SRO)

Electrical Fault on Bus L-15 (Component: BOP, SRO) 4.

(Tech Spec: SRO)

5. SRV C Inadvertently Opens (Component: BOP, SRO)

SRV C Re-Opens, SRV Tailpipe (Major: All) 6.

Break Into Torus Airspace

7. Main Turbine Fails to Trip (Instrument: ATC, SRO)

,) 8.

RHR Pump Trip, RHR Pump Suction Valve (Component: BOP, SRO)

Fails Closed, RHRSW Crossties Fail Closed D. TERMINATION CUES:

  • Emergency RPV Depressurization is in progress
  • Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 7 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)

After the shift turnover, allow All no more than five minutes for panel walkdown

  • Walkdown the control panels and assume the watch Event1 SRO SAT/UNSATINA Swap RBCLC Pumps
  • Perform Crew Brief
  • Start RBCLC pump A If dispatched to perform any pump checks, immediately
  • Verify RBCLC pump motor current is LESS THAN maximum normal amps report that the requested pump checks are SAT.
  • Place and hold control switch for RBCLC pump C in STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch
  • Verify RBCLC pump motor current for the running RBCLC pumps is LESS THAN maximum normal amps LOI 14-2 NRC Examination Scenario 3 Page 8 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event2 SRO SAT I UNSAT INA Lower Reactor Power to 95%

Using Recirculation Flow

  • Direct ATC to lower power to 95% with Recirc flow
  • Provide oversight for reactivity manipulation ATC SAT I UNSAT INA
  • Lower Recirc flow alternately with RWR MG A(B) SPEED CNTRL '
  • Monitor APRMs, CTP, Recirc flow, Reactor water level BOP SAT I UNSAT INA
  • Assist ATC with peer checks and plant monitoring LOI 14-2 NRC Examination Scenario 3 Page 9 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event3 ATC SAT I UNSAT INA On Lead Examiner Cue:

  • Recognize I report multiple annunciators, including 09-5-2-25, ACTIVATE TRIGGER 1 FLOW REF OFF NORM Recirc Flow Unit Failure
  • Recognize I report APRMs 8, D, and F indicate normally but have an upscale trip
  • Acknowledge report
  • Direct ARP response
  • Direct bypassing Recirc flow unit 8 per OP-16
  • Determine one of two required channels of Technical Specification Table 3.3.1 .1-1 Function 2b is not operable with an inoperable Recirc flow unit
  • Determine Technical Specification 3.3.1 .1 Condition A must be entered (place channel in trip or place associated trip system in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />)
  • Determine one of four required channels of TRM Table T3.3.8-1 Function 1b is not operable with an inoperable Recirc flow unit
  • Determine TRM 3.3.8 Condition A must be entered (restore inoperable channel within 7 days)

LOI 14-2 NRC Examination Scenario 3 Page 10 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT/UNSAT/NA

  • Coordinate with BOP to bypass Recirc flow unit 8 per OP-16 Section E.21:

0 Place RWR FLOW UNIT BYP switch in 8 0 Verify the following FLOW UNIT indications:

  • Associated BYPASS indicating light is on
  • Associated UPSC OR INOP light is off
  • Associated COMPAR light is off SAT I UNSAT INA 0 Verify BYPASS light is off for other flow unit channel on same side 0 Verify white BYP light in on at top of panel 09-14 for FLOW UNITS 0 IF a flow unit is declared inoperable, THEN one of the two required APRM Neutron Flux-High (flow biased) Channels in the associated trip system must be considered inoperable 0 Coordinate with BOP to place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14

' 0 Place RX SCRAM RESET switch to GROUP 2 & 3, then to GROUP 1 & 4, spring return to NORM 0 Verify RPS 8 SCRAM GROUPS 1, 2, 3, and 4 lights are on BOP SAT I UNSAT INA

  • Assist ATC with actions and/or plant monitoring, as required
  • Place switch S-1 on FLOW UNIT 8 to INT TEST at panel 09-14 LOI 14-2 NRC Examination Scenario 3 Page 11 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event4 BOPIATC SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 2

  • Recognize I report loss of L-15 SRO SAT I UNSAT INA
  • Acknowledge reports
  • Determine most limiting Technical Specification entry is LCO 3.8.7 Condition A, which requires restoring L-15 to operable status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> BOP SAT I UNSAT INA Role Play: I
  • Execute AOP-18A, Loss of Switchgear L 15 If dispatched to investigate, wait 2 minutes, then report 0 Attempt to maintain drywell pressure by controlling drywell that the L-15 supply breaker temperature as follows:

(11502) is tripped and appears

  • Ensure running Drywell Cooling Fans 68FN-2B, 2D, to be damaged. 4B, 4D
  • Consider initiating Torus Vent per OP-37
  • Consider lowering RBC temperature below normal

- -- ---

LOI 14-2 NRC Examination Scenario 3 Page 12 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP cont. SAT/UNSAT/NA 0 Isolate Reactor Building Ventilation as follows:

0 Ensure running, Standby Treatment System "B" per OP-20

  • Open TRAIN B INLET 01-125MOV-14B 0 Depress RB VENT ISOL B pushbutton at 09-75 0 Verify Reactor Building Isolation per Section G of OP-51A, refer to Attachment 1 for de-energized valves 0 Refer to Attachment 1 for affected loads 0 Refer to Attachment 2 for multiple alarms associated with L151oads 0 Consider shutting down the following systems:
  • Fuel Pool Cooling System 0 Direct Electricians to measure "A" LPCI Inverter Battery 71 BAT-3a parameters every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

-

LOI 14-2 NRC Examination Scenario 3 Page 13 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Event 5 BOPIATC SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 3

SRV C Inadvertently Opens 0 09-4-1-16, SRV Leaking 0 09-4-2-6, SRV Sonic Man Alarm Hi

  • Recognize I report SRV C open Note: SRO SAT I UNSAT INA RHR loop A is unavailable for
  • Acknowledge report Torus Cooling due to loss of Bus L-15.
  • Enter AOP-36, Stuck Open Relief Valve
  • If Torus water temperature exceeds 95°F or Torus water level exceeds 14.0 feet, enter EOP-4, Primary Containment Control
  • Direct initiation of Torus Cooling

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT I UNSAT INA Role Play:

0 Direct Operator to remove the four control power fuses for When directed to place SRV C SRV C at panel 09-45 isolation switch in LOCAL, wait 2 minutes, insert Trigger 0 Direct Operator to place SRV C isolation switch in 25, wait approximately 15 REMOTE at panel 25ASP-5 seconds, then report task 0 Monitor Torus water temperature completion.

  • Initiate Torus Cooling per OP-138 posted attachment:

Role Play: 0 Ensure at least one of the RHR pumps is running When directed to remove SRV 0 Open RHR TEST TORUS CLG & SPRAY 1OMOV-398 C fuses, wait 1 minute, insert 0 Throttle RHR TEST & TORUS CLG 1OMOV-348 to Trigger 26, then report task completion. establish desired/flow 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 Role Play: gpm, ensure closed MIN FLOW VLV 10MOV-168 When directed to place SRV C 0 Establish RHRSW flow and temperature control isolation switch in REMOTE,

wait 1 minute, re-insert remote AD07:C in remote, wait 0 Start one of the RHRSW pumps approximately 15 seconds, 0 Throttle RHRSW DISCH VLV FROM HX 8 10MOV-89B to then report task completion. establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX 8 10MOV-898 to establish 2500 to 4000 gpm per RHRSW pump 0 Close HX 8 BYP VLV 1OMOV-668


LOI 14-2 NRC Examination Scenario 3 Page 15 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Events 6 1 7 1 & 8 BOP I ATC SAT I UNSAT INA On Lead Examiner Cue:

  • Recognize I report SRV C open Airspace, Main Turbine Fails to Trip, RHR Pump Trip, RHR Pump Suction Valve Fails Closed, RHRSW Crossties Fail Closed Note:

Ensure Trigger 6 automatically goes active when the Reactor scrams to cause the SRV tailpipe break.

Critical Task #1 Given a stuck open SRV, the crew will scram the Reactor Pass I Fail before Torus water temperature exceeds the Boron Injection Initiation Temperature, In accordance with AOP-36 and EOP*

4.

Critical Tak ..W Standard: The Reactor Ia scrammed.

Critical Taka Given the Inability to maintain Primary Containment Pass/Fall c:ondllona Inside tile Pressure Suppreaalon Pressure, the crew Wfll Pllfon'b .,. Emergency RPV Depressurization, in accordanc.wlth EOP-4.

7SRVsareopen.

Critical Tak t2 Standard:

LOI 14-2 NRC Examination Scenario 3 Page 16 of 25

IINSTRUCTORACTIVITY --T POSITION I OPERATORACTIONS/STANDARD I COMMENTS/EVALUATION I SRO SAT I UNSAT INA

  • Acknowledge report
  • Enter AOP-36, Stuck Open Relief Valve
  • Acknowledges SRV C will NOT close
  • May direct rapid Reactor power reduction with Recirculation flow and/or CRAM rods
  • Before Torus water temperature exceeds 110°F, direct Reactor scram Critical Task #1
  • Enter EOP-2, RPV Control, on low Reactor water level
  • Direct Reactor water level controlled 180-220" using Feedwater
  • Direct preventing injection from Core Spray and RHR as Reactor pressure lowers
  • Re-enter EOP-2 on high Drywell pressure
  • Re-enter EOP-4 on high Drywell pressure and temperature LOI 14-2 NRC Examination Scenario 3 Page 17 of 25

I INSTRUCTOR ACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS/EVALUATION SRO cont. SAT I UNSAT INA

  • When Primary Containment pressure exceeds 2. 7 psig and before Torus pressure exceeds 15 psig, direct initiation of Torus Spray
  • Acknowledge trip of RHR pump and inability to spray using RHR
  • Acknowledge inability to spray using RHRSW
  • When Torus pressure exceeds 15 psig, determine unable to spray Drywell Note:
  • Monitor Primary Containment conditions on Pressure The Pressure Suppression Suppression Pressure curve Pressure is approximately 26-
  • When Torus pressure cannot be maintained below the 28 psig at the Torus water Pressure Suppression Pressure, direct opening 7 ADS Critical Task #2 level expected during this valves scenario.
  • Acknowledge that less than 7 ADS valves are open
  • Direct opening additional SRVs until a total of 7 SRVs are open
  • Acknowledge that 7 SRVs are open LOI 14-2 NRC Examination Scenario 3 Page 18 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION BOP SAT I UNSAT INA Role Play:

  • Execute AOP-36 When directed to place SRV C isolation switch in LOCAL, 0 Identify open SRV wait 2 minutes, then report 0 Determine annunciator 09-4-2-37 is NOT in alarm task completion . Use Trigger 27 and the associated 0 Determine annunciator 09-4-3-3 is NOT in alarm annunciator override as 0 Cycle SRV C control switch at panel 09-4 necessary to simulate opening/closing the door to 0 Direct Operator to place SRV C isolation switch in LOCAL 25ASP-5 (but do NOT use at panel 25ASP-5 remotes to actually cycle 0 Determine SRV C is open isolation switch or pull SRV fuses). 0 Direct Operator to place SRV C isolation switch in REMOTE at panel 25ASP-5 0 Monitor Torus water temperature
  • Control Reactor water level 180-220" using Feedwater LOI14-2 NRC Examination Scenario 3 Page 19 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC SAT I UNSAT INA

  • Place RX MODE switch in SHUTDOWN
  • Observe Reactor power lowering
  • Ensure closed SDIV vent and drain valves
  • Verify 4KV loads transfer to reserve power ATC I BOP SAT I UNSAT INA
  • May attempt to initiate Torus spray:

Note: 0 Place SPRAY CNTRL 10A-S17B switch to MANUAL, i spring return to normal RHR loop A is unavailable to spray due to loss of Bus L-15. 0 Verify white SPRAY PERM 1OA-DS678 light is on RHR pumps B and D trip on a 0 May attempt to start RHR pump time delay after the scram.

Therefore, RHR is unavailable 0 Recognize I report trip of RHR pumps 8 and D to spray either the Torus or 0 Recognize I report inability to spray using RHR the Drywell.

- * ---

LOI 14-2 NRC Examination Scenario 3 Page 20 of 25

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ATC/80P SAT I UNSAT INA

  • cont.
  • Attempt to initiate Torus spray using RHRSW per EP-14:

0 Verify RHR pumps 8 and D are stopped 0 Ensure closed 1OMOV-268 and/or 1OMOV-31 8 0 Ensure closed 1OMOV-398 and/or 1OMOV-388 0 Ensure closed 1OMOV-398 and/or 1OMOV-348 0 Ensure closed 1OMOV-258 and/or 1OMOV-278 0 Ensure RHRSW pumps 8 and D are running 0 Ensure RHRSW DISCH VLV FROM HX 8 10MOV-898 is throttled to establish 2500 to 4000 gpm per RHRSW pump.

0 Attempt to open both of the following valves:

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION .

ATC/BOP SAT/UNSAT/NA cont.

  • May close MSIVs, as directed Note:
  • Verify isolations per AOP-15, as time permits Critical Task #2 SRV C is inoperable and unable to be opened. SRV G
  • Attempt to open 7 ADS valves is failed open, and therefore
  • Recognize I report less than 7 ADS valves open may not be counted by the crew as open for the purposes
  • Open additional SRVs until 7 SRVs are open of Emergency RPV Depressurization. Therefore,
  • Restore and maintain Reactor water level 180-220" using the crew may open either one available injection systems or two additional non-ADS

SRVs.

0 Throttle 14MOV-12B

  • Control LPCI injection:

0 Throttle 10MOV-27A 0 Secure RHR pumps if needed

'~** -----------

Termination Criteria:

  • Emergency RPV Depressurization is in progress
  • Reactor water level is controlled above 0" LOI 14-2 NRC Examination Scenario 3 Page 22 of 25

ATTACHMENT 1 Shift Turnover The Plant is operating at approximately 100% power.

Air Compressor 8 is out of service for maintenance.

When you take the shift:

1. Start RBCLC pump A and secure RBCLC pump C per OP-40 section G.1.
2. Lower Reactor power using Recirculation flow per the provided Reactivity Maneuver Instructions.

LOI 14-2 NRC Examination Scenario 3 Page 23 of 25

ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)

Power Reduction EN-RE-215 Attach 9.4 Today Page 1 of 1 From To Cplg RSCS I nit Step Action Rod Method Notes Notch Notch Chk Grp Lower power Target rate= 1% RTP per 1

to 95% RTP

- - - RWR NA - minute

('

Prepared By: SM Approval: VOIN~'&~

(RxEng) (Shift Manager)

Reviewed By: 'Bob- Tone.t (RxEng or SRO)

Stamps CONTROL ROOM OPERATOR LOI14-2 NRC Examination Scenario 3 Page 24 of 25

ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)

Power Reduction EN-RE-215 Attach 9.4 Today Page 1 of 1 From To Cplg RSCS Init Step Action Rod Method Notes Notch Notch Chk Grp Lower power Target rate= 1% RTP per 1

to 95% RTP

- - - RWR NA - minute 0

Prepared By: SM Approval: Va.v~'RO"et (RxEng) (Shift Manager)

Reviewed By: Bob- TO'rt.e4' (RxEng or SRO)

Stamps INDEPENDENT VERIFIER LOI14-2 NRC Examination Scenario 3 Page 25 of25

Appendix D Scenario Outline Form ES-D-1 Facility: James A. Fitzpatrick Scenario No.: NRC-4 Op-Test No.: 14-2 Examiners: Operators:

Initial Conditions: The plant is operating at approximately 65% power. Circulating Water pump C is ready to be returned to service following maintenance.

Turnover: Start Circulating Water pump C per OP-4 section 0 .17. Then , raise Reactor power using Recirculation flow per the provided reactivity instruction .

Event Malf. Event Event No. No. Type* Description N- Start Circulating Water Pump C 1 N/A BOP, SRO OP-4 R- Raise Reactor Power with Recirculation Flow 2 N/A ATC, SRO OP-27 1-ATC, Recirculation Pump B Runs High 3 Override SRO OP-27, Technical Specifications C- Loss of Steam Packing Exhauster A 4 Override BOP, SRO ARP 09-7-3-43, OP-240 C- Loss of RBCLC Flow to Recirculation Pump B 5 SW01:B BOP, SRO OP-27, AOP-8, Technical Specifications Main Steam Leak into Turbine Building 6 MS05 M-All AOP-40, AOP-1 , EOP-2 1-ATC, All MSIVs Fail to Automatically Close 7 RP12 SRO AOP-40 FW03/04 Loss of High Pressure Injection 8 RD06 M-All EOP-2 Override Override I-BOP, HPCI Flow Controller Failure in Automatic, HPCI Trips 9

HP02 SRO OP-15, EOP-2 RC02 RCIC Fails to Automatically Initiate, RCIC Trips, ADS Fails to 10 RC03 I-AII Automatically Initiate AD01 OP-19, EOP-2

  • (N)ormal , (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Facility: James A. Fitzpatrick Scenario No.: NRC-4 Op-Test No.: 14-2

1. Total malfunctions (5-8) 8 Even~3,4,5,6, 7,8,9,10
2. Malfunctions after EOP entry (1-2) 3 Even~ 7, 9, 10
3. Abnormal events (2-4) 3 Even~ 3, 4, 5
4. Major transients (1-2) 2 Even~ 6 & 8
5. EOPs entered/requiring substantive actions (1-2) 1 EOP-2
6. EOP contingencies requiring substantive actions (0-2) 0
7. Critical tasks (2-3) 3 CRITICAL TASK DESCRIPTIONS:

CT -1: Given a loss of all RBCLC flow to an operating Recirculation pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:

  • Securing the Recirculation pump
  • Isolating the Recirculation pump CT-2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40.

CT-3: Given the Reactor above the injection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT LOI14-2 NRC EXAMINATION SCENARIO 4 TITLE: LOI14-2 NRC EXAMINATION SCENARIO 4 SCENARIO NUMBER: NRC4 PATH: STAND ALONE Validation: _;z;:-/"- --;z _.. . _. -- Training: J~ Operations~~z~

u CANDIDATES CRS ATC BOP LOI 14-2 NRC Examination Scenario 4 Page 1 of 23

RECORD OF CHANGES SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INinATOR REVIEWED 5/22/14 New New Scenario T. Hooper LOI 14-2 NRC Examination Scenario 4 Page 2 of 23

A. TITLE: LOI14-2 NRC EXAMINATION SCENARIO 4 B. SCENARIO SETUP:

1. IC-64
2. Speciallnstructions:
a. The Plant is operating at approximately 65% power.
b. Circulating Water pump C is ready to be returned to service.
3. Preset Conditions:
a. TRIGGER 1, O:RR ZAID218416B, MG Set B Digital Speed Control, lnitial=14.3, Final=25, Ramp=4 minutes
b. TRIGGER 2, O:MS ZDI11VACN05, SPE A, STOP
c. TRIGGER 3, M:SW01 :B, Loss of RBCLC Flow to Recirculation Pump B
d. TRIGGER 4, M:MS05, Steam Leakage Outside Primary Containment, Final=15, Ramp=3 minutes
e. Preset, M:RP12:A, PCIS Group 1 Inboard MSIV Isolation Failiure
f. Preset, M:RP12:B, PCIS Group 1 Outboard MSIV Isolation Failiure
g. Preset, M:HP04, HPCI Flow Auto Flow Controller Failure, 0%
h. TRIGGER 5, M:HP02, HPCI Turbine Trip, Delay=1 0 seconds
i. Preset, M:RC02, RCIC System Failure to Auto Start
j. TRIGGER 6, M:RC03, RCIC System Turbine Trip, Delay=1 minute
k. Preset, M:AD01, ADS Timer Fails to Start I. TRIGGER 7, M:FW03:A, Rx Feedwater Pmp A Auto Controller Failure, Finai=O, Delay= 10 seconds
m. TRIGGER 7, M:FW03:B, Rx Feedwater Pmp B Auto Controller Failure, Finai=O, Delay= 10 seconds
n. TRIGGER 7, M:FW04:A, Rx Feedwater Pmp A Manual Controller Failure, Finai=O, Delay= 10 seconds
o. TRIGGER 7, M:FW04:B, Rx Feedwater Pmp B Manual Controller Failure, Finai=O ,

Delay= 10 seconds

p. TRIGGER 7, M:RD06:A, CRD Hydraulic Pump Trip A , Delay=1 0 seconds
q. TRIGGER 7, M:RD06:B, CRD Hydraulic Pump Trip B, Delay=1 0 seconds
r. Preset, OS:SL ZDI11S1, SBLC Selector Switch, STOP
s. Preset, M:HP04, HPCI Flow Auto Controller Failure, 0%
t. Event Trigger 1, Event: rrfpa(2)>3150, Command: None
u. Event Trigger 5, Event: hpfd>1 00, Command : None
v. Event Trigger 6, Event: rcfd>15, Command: None
w. Event Trigger 7, Event: (zlo5ads8a == 0) && (zlo5ads8b == 0), Command: None
4. Consumable Forms and Procedures:

+ AOP-1, AOP-8, AOP-40 LOI 14-2 NRC Examination Scenario 4 Page 3 of 23

C. SCENARIO

SUMMARY

"'The scenario will begin with the plant operating at approximately 65% power. The crew will begin by starting Circulating Water pump C. The crew will then raise power with Recirculation flow.

Recirculation pump B will run high. The crew will lock the Recirculation pump B scoop tube to stop the uncontrolled positive reactivity addition. This malfunction will result in a Recirculation flow mismatch. The SRO will determine the Technical Specification impact.

The running Steam Packing Exhauster will trip. The crew will respond to the ARP to start the standby Steam Packing Exhauster, and re-establish adequate system parameters.

All RBCLC flow to Recirculation pump B will isolate. This will cause multiple high temperature alarms. If left unmitigated, this will cause degradation of both Recirculation pump B seals and loss of coolant into the Drywell. The crew will secure Recirculation pump B. If damage has occurred to both pump seals, the crew will also isolate Recirculation pump B to stop the loss of coolant. The crew will execute AOP-8 due to the reduction in core flow. The SRO will determine the Technical Specification impact.

A Main Steam leak will develop in the Turbine Building. All automatic closures of the MSIVs will fail. The crew may lower Reactor power in anticipation of a Reactor scram. The crew will scram the Reactor and manually close the MSIVs to stop the leak.

, Following the scram , the Feedwater pump controllers will fail low, resulting in a loss of the normal high pressure injection source. HPCI will be available for start, however the automatic flow controller will fail such that HPCI does not automatically inject. The crew will inject with HPCI by taking manual control of the flow controller. HPCI will trip soon after injection is started. RCIC will be available for start, but will fail to automatically start if an automatic initiation signal is received. The crew will manually start RCIC . The running CRD pump will trip and the standby pump will trip upon start. Both SLC pumps will fail to start. With MSIVs closed, the crew will control Reactor pressure with SRVs. With Reactor coolant inventory being lost through the SRVs and only RCIC available as a high pressure injection source, Reactor water level control will be challenged.

RCIC will then trip. The crew will lower Reactor pressure using SRVs and inject with Condensate Booster pumps to restore Reactor water level.

The scenario will be terminated when all control rods are inserted and Reactor water level is controlled above 0".

LOI14-2 NRC Examination Scenario 4 Page 4 of 23

Shift Turnover

' T he Plant is operating at approximately 65% power.

Circulation Water pump C is ready to be returned to service following maintenance.

When you take the shift:

1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step D.17.3.e.
2. Then , raise Reactor power using Recirculation flow per the provided reactivity instruction.

Stop at approximately 75% power for further Reactor Engineering instructions.

LOI14-2 NRC Examination Scenario 4 Page 5 of 23

Critical Tasks/Standards

' Critical Task #1: Given a loss of all RBCLC flow to an operating Recirculation pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, in accordance with OP-27:

  • Securing the Recirculation pump
  • Isolating the Recirculation pump Critical Task #2: Given a Main Steam leak into the Turbine Building and a failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40 .

Critical Task #3: Given the Reactor above the injection pressure of adequate injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.

LOI 14-2 NRC Examination Scenario 4 Page 6 of 23

EVENT NO. EVENT SEQUENCE

1. Start Circulating Water Pump C (Normal: BOP, SRO)
2. Raise Reactor Power with Recirculation Flow (Reactivity: ATC, SRO)
3. Recirculation Pump B Runs High (Instrument: ATC, SRO)
4. Loss of Steam Packing Exhauster A (Component: BOP, SRO)
5. Loss of RBCLC Flow to Recirculation Pump B (Component: BOP, SRO)
6. Main Steam Leak into Turbine Building (Major: All)
7. All MSIVs Fail to Automatically Close (Instrument: ATC, SRO)
8. Loss of High Pressure Injection (Major: All)

HPCI Flow Controller Failure in Automatic, (Instrument: BOP, SRO)

9. HPCI Trips RCIC Fails to Automatically Initiate, RCIC Trips, (Instrument: All) 10.

ADS Fails to Automatically Initiate D. TERMINATION CUES:

  • Reactor water level is being controlled above 0".

L0114-2 NRC Examination Scenario 4 Page 7 of 23

..

INSTkuCTOR ACTIVITY POSITION OPERAI OR ACTIONS/STANDARD COMMENTS I EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Turnover (Attach. 1)

After the shift turnover, allow All no more than five minutes for panel walkdown

  • Walkdown the control panels and assume the watch I

Event1 SRO SAT/UNSAT/NA I Start Circulating Water Pump c

  • Perform Crew Brief
  • Direct BOP to start Circulation Water pump C per OP-4 section D.17 BOP SAT I UNSAT INA
  • Place and hold CIRC WTR PMP C 36P-1 C control switch in START Role Play:
  • WHEN Circulating Water Pump C 36P-1C starts, release CIRC If asked for pre- and post-start WTR PMP C 36P-1 C control switch checks, immediate report checks are SAT.
  • Verify discharge valve for each running circulating water pump pressure, wait 1 minute, then is full open report Circulating Water pump C seal water pressure is 25
  • Verify seal water pressure is GREATER THAN OR EQUAL TO psig and stable. 20 psig on 36PI-111 C (eire water pump C seal water press indic) at northwest corner of eire pump pit
  • Verify all white lights for RPS A and RPS B power source selectors are on at panel 09-16 LOI14-2 NRC Examination Scenario 4 Page 8 of 23

-

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 2 SRO SAT I UNSAT INA Raise Reactor Power with Recirculation Flow

  • Direct ATC to raise power to 75% with Recirc flow
  • Provide oversight for reactivity manipulation ATC SAT I UNSAT INA Booth Operator:
  • Raise Recirc flow alternately with RWR MG A(B) SPEED Ensure Trigger 1 automatically CNTRL activates when Recirculation pump B flow exceeds
  • Monitor APRMs, CTP, Recirc flow, Reactor water level approximately 11.5 Mlbmlhr to initiate the next event.

!

LOI 14-2 NRC Examination Scenario 4 Page 9 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event3 ATC SAT I UNSAT INA Recirculation Pump B Runs High

  • Recognize I report Recirculation pump B speed controller is malfunctioning SRO SAT I UNSAT INA
  • Acknowledge report
  • Direct lock-up of Recirculation pump B scoop tube per OP-27 Section G.6 Note:
  • Enter AOP-8 (Unexpected Change in Core Flow)

Depending on the speed of

  • Enter AOP-32 (Unexplained/Unanticipated Reactivity Change) the crew's actions to lock-up Recirculation pump B scoop

tube, the resulting 0 If core flow <70% (53.9 Mlb/hr), flow mismatch must be Recirculation loop flow ~10% (7.7 Mlb/hr) mismatch may vary.

0 If core flow ~70% (53.9 Mlb/hr), flow mismatch must be

~5% (3.85 Mlb/hr) 0 If these limits not met, enter Condition Band restore within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ATC SAT I UNSAT INA Role Play:

  • Place RWR B SCOOP TUBE control switch to TRIP If asked as management or Reactor Engineering about
  • Place SCOOP TUBE B AUTO UNLOCK control switch in ON how to restore Recirculation
  • Monitor for Thermal Hydraulic Instabilities I flow mismatch to within limits, direct the crew to maintain
  • Monitor Feedwater response Recirculation flow at the current value until further investigation and analysis is completed.

LOI 14-2 NRC Examination Scenario 4 Page 10 of 23

INSTRuCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Event 4 ATC/BOP SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 2

  • Recognize I report neither Steam Packing Exhauster is running Exhauster A SRO SATIUNSATINA
  • Acknowledge report
  • Direct ARP response
  • Direct starting standby Steam Packing Exhauster BOP SATIUNSATINA Role Play:
  • Execute ARP 09-7-3-43 If dispatched to investigate Steam Packing Exhauster A,
  • Start Steam Packing Exhauster B per OP-24D section G.1:

wait 2 minutes, then report 0 Start SPE B 38C-5B that the breaker for Steam Packing Exhauster A is tripped 0 Throttle open SPE B DISCH 38MOV-D2 until red open but there are no other indicating light comes on (dual position indication) abnormal conditions. 0 Close SPE A DISCH 38MOV-D1, while throttling SPE B DISCH 38MOV-D2 to establish 10 to 20 inches of water vacuum on VAC 94PI-09


-

LOI 14-2 NRC Examination Scenario 4 Page 11 of 23

  • '

INSTkLJCTOR ACTIVITY POSITION OPERAl OR ACTIONS/STANDARD COMMENTS I EVALUATION Event 5 BOPIATC SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 3

  • Recognize I report EPIC low flow alarm Loss of RBCLC Flow to

Recirculation Pump B 09-4-3-16, RWR PMP B SEAL CLR FLOW LO 0

0 09-4-3-26, RWR PUMP B MTR WINDING CLR FLOW LO 0 09-4-3-33, RWR PMP A OR B TEMP HI Critical Task *1 Given a loss of all RBCLC flow to an operating Recirculation Pass/ Fall pump, prevent a prolonged Recirculation seal loss of coolant accident by one or more of the following, In accordance with OP-27:

  • Securing the Recirculation pump
  • Isolating the Recirculation pump Critical Task *1 Standard: Stop Recirculation pump B.

And/or Isolate Recirculation pump B.

SRO SATIUNSATINA

  • Acknowledge reports
  • Direct ARP execution Critical Task #1
  • Direction shutdown of Recirculation pump B per OP-27
  • Enter AOP-8 (Unexpected Change in Core Flow)
  • Determine Technical Specification 3.3.1.1 Condition C and TRO 3.3.8 Condition C entry is required (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to establish single loop limits for APRM flow biased scram and rod block)
  • Determine Technical Specification 3.4.1 Condition B entry is required (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

LOI 14-2 NRC Examination Scenario 4 Page 12 of 23

- - - .

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP SAT I UNSAT INA

0 Monitor seal cavity temps on 02TR-031 (points 20 & 21) 0 If seal cavity temp increases to 250°F, then shutdown B Note: RWR pump per Section G of OP-27 Some indication for 15FIS- 0 Ensure open 15AOV-132B and 15AOV-133B 102B is available on EPIC Verify RBC flow rate >300 gpm on 15FIS-102B 0

screen RWRB 1.

0 Monitor OW leakage for signs of seal leakage Role Play:

If dispatched to check RBC 0 Monitor temps on 02-2TR-31 flow rate to RWR pump B, wait 2 minutes, then report that 0 Verify RBC flow rate >300 gpm on 15FIS-102B there is no RBC flow to RWR 0 If RBC flow cannot be restored and RWR pump and motor pump B. temps are rising, then shut down RWR loop B per OP-27 Section G 0 Monitor OW sump levels

0 Check 02-2TR-31 0 Check RBC temp 0 Check RBC lineup and verify at least 300 gpm on 15-FIS-102B 0 Monitor computer and annunciators for problem 0 Monitor OW leakage for possible leak in RBC system 0 If any RWR motor bearing exceeds 220°F, then shut down RWR pump per Section G of OP-27 LOI 14-2 NRC Examination Scenario 4 Page 13 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA

  • Secure Recirculation pump B per OP-27:

0 Close RWR PMP 8 DISCH 02MOV-538 Critical Task #1 Note: 0 Verify RWR PMP 02-2P-1 B is tripped If Recirculation pump B is 0 Place RWR PMP 02-2P-1 B control switch in PULL TO secured before damage to the LOCK seals results in coolant 0 Verify open RWR MG B GEN FIELD BKR leakage into the Drywell, isolation of the pump is not 0 IF loop 8 isolation is required, THEN ensure closed the required to meet the critical following valves: Critical Task #1 task.

  • Coordinate with ATC to execute AOP-8, as time permits
  • Monitor for thermal-hydraulic instability Note:

It is expected to move to the

  • Ensure RPV water level returns to normal and stabilizes next event before the crew
  • Determine operating point on Power-Flow Map addresses Recirculation loop temperature and SLO
  • Demand a 3D Monicore Official Program and review margin to scram/rod block setpoint thermal limits issues.

ATC SAT I UNSAT INA

  • Monitor Reactor power
  • Monitor for thermal-hydraulic instability

~~ -

LOI14-2 NRC Examination Scenario 4 Page 14 of 23

INSTklJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION Events 61 71 81 & 9 ATCIBOP SAT I UNSAT INA On Lead Examiner Cue:

ACTIVATE TRIGGER 4

  • Recognize I report rising radiation levels in Turbine Building Automatically Close Loss of High Pressure Injection HPCI Flow Controller Failure in Automatic, HPCI Trips RCIC Fails to Automatically Initiate, RCIC Trips, ADS Fails to Automatically Initiate r Critical Task #2 Given a Main Steam leak into the Turbine Building and a Pass I Fail failure of the MSIVs to automatically close, isolate the Main Steam lines, in accordance with AOP-40.

I Critical Task #2 Standard: Close at least one MSIV in each Main Steam line.

Critical Task #3 Given the Reactor above the injection pressure of adequate Pass I Fail injection sources, lower Reactor pressure to allow adequate Reactor injection, in accordance with EOP-2.

Critical Task #3 Standard: Lower Reactor pressure using SRVs to below the discharge pressure of the Condensate Booster pumps.

LOI14-2 NRC Examination Scenario 4 Page 15 of 23

INSTkLJCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO SAT I UNSAT INA

  • Acknowledge reports
  • Direct ARP execution
  • May direct Reactor power reduction with CRAM rods, as time Note: permits The crew will monitor Main

Steam Tunnel temperatures and likely set a benchmark of

  • Direct closure of MSIVs Critical Task #2
  • Enter EOP-2 (RPV Control) on low Reactor water level
  • Direct Reactor water level controlled 180 to 220" (expands band as necessary due to injection failures)
  • Direct Reactor pressure controlled 800-1000 psig using SRVs Note:
  • Acknowledge failure of Feedwater controllers Depending on the pre-scram power level, Reactor water
  • Direct manual start of HPCI level may not reach the HPCI
  • Acknowledge failure of HPCI to inject in automatic and RCIC automatic initiation setpoint of 126.5" on the
  • Acknowledge trip of HPCI
  • Acknowledge failure of RCIC to automatically start
  • Direct manual start of RCIC
  • Acknowledge trip of RCIC (after one minute of injection)
  • May direct maximizing CRD injection
  • May direct injection with SLC Critical Task #3
  • Direct reducing Reactor pressure using SRVs LOI 14-2 NRC Examination Scenario 4 Page 16 of 23

.

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION SRO cont. SATIUNSATINA

  • Direct Reactor water level controlled 180 to 220" using Condensate Booster pumps
  • As time permits, direct Turbine Building evacuation, verification of isolations, and alignment of Control Room, Relay Room, and TSC ventilation
  • As time permits, direct initiation of Torus Cooling ATC SAT I UNSAT INA
  • May insert CRAM rods, as time permits
  • Place RX MODE switch in SHUTDOWN
  • Observe Reactor power lowering
  • Ensure closed SDIV vent and drain valves
  • Verify 4KV loads transfer to reserve power
  • Close MSIVs Critical Task #2
  • Control Reactor pressure 800-1 000 psig using SRVs Critical Task #3
  • Reduce Reactor pressure using SRVs LOI 14-2 NRC Examination Scenario 4 Page 17 of 23

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP SAT I UNSAT INA Role Play:

If dispatched to investigate in Turbine Building, wait 2 0 Determine which ARM is in alarm minutes, then report there is a 0 Evacuate personnel at location of ARM in alarm lot of steam coming from the Turbine Deck and very high 0 Attempt to reset ARM temperatures. 0 Direct RP to survey area

If dispatched as RP to survey

  • Attempt to control Reactor water level 180-220" using Turbine Building, wait 2 Feedwater minutes, then report radiation
  • Recognize I report inability to inject with high pressure levels matching current status Feedwater pumps of ARMs.
  • Recognize I report failure of HPCI to inject Role Play:
  • Take manual control of HPCI flow controller and raise flow If dispatched to investigate
  • Recognize I report HPCI trip Feedwater pump control , wait 2 minutes, then report that you
  • Recognize I report failure of RCIC to automatically start have found no indications why

Feedwater pump control has failed . 0 Verify Annunciator 09-4-0-32 RCIC LOGIC RX LVL HI is clear Role Play: 0 Verify RCIC is lined up to one of the following suction If dispatched to investigate paths:

HPCI trip, wait 2 minutes, then

  • The following valves open for suction from torus :

Stop Valve, 23HOV-1 .

- -

LOI 14-2 NRC Examination Scenario 4 Page 18 of 23

. . . '

.

INSTFn.JCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION BOP cont. SAT I UNSAT INA

  • Start RCIC per OP-19 posted attachment (cont.):

0 Open OIL CLR WTR SUPP 13MOV-132 Note: 0 Perform the following without unnecessary delay:

-

RCIC will trip approximately

  • Recognize I report trip of RCIC Role Play:

If dispatched to investigate

  • Recognize I report trip of CRD pump RCIC trip, wait 2 minutes, then
  • May attempt to start standby CRD pump report that there appears to be I damage to the RCIC 0 Recognize I report trip of 2"d CRD pump trip/throttle valve, 13HOV-1.
  • May attempt to initiate SLC 0 Recognize I report failure of SLC pumps to start Note:

Condensate Booster pumps

  • Control Reactor water level 180 to 200" using Condensate will be capable of injection to Booster pumps the Reactor once Reactor pressure is reduced to approximately 700 psig.

LOI 14-2 NRC Examination Scenario 4 Page 19 of 23

INSTkUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS I EVALUATION ATC I BOP SAT I UNSAT INA

  • As time permits, verify isolations per AOP-15
  • May initiate Torus Cooling per OP-138 posted attachment:

0 Ensure at least one of the RHR pumps is running 0 Open RHR TEST TORUS CLG & SPRAY 1OMOV-39A(B) 0 Throttle RHR TEST & TORUS CLG 1OMOV-34A(B) to establish desired/flow 0 WHEN RHR Loop A(B) flow is GREATER THAN 1500 gpm, ensure closed MIN FLOWVLV 10MOV-16B 0 Establish RHRSW flow and temperature control

0 Start one of the RHRSW pumps 0 Throttle RHRSW DISCH VLV FROM HX A(B) 1OMOV-89 A(B) to establish 2500 to 4000 gpm 0 Start the second RHRSW pump if desired 0 Throttle RHRSW DISCH VLV FROM HX A(B) 10MOV-89 A(B) to establish 2500 to 4000 gpm per RHRSWpump 0 Close HX A( B) BYP VLV 1OMOV-66 A( B)

Termination Criteria:

  • Reactor water level is being controlled above 0".

LOI 14-2 NRC Examination Scenario 4 Page 20 of 23

,

Shift Turnover The Plant is operating at approximately 65% power.

Circulation Water pump C is ready to be returned to service following maintenance.

When you take the shift:

1. Start Circulating Water pump C per OP-4 section 0.17. The procedure is in progress up to step 0.17.3.e.
2. Then, raise Reactor power using Recirculation flow per the provided reactivity instruction . Stop at approximately 75%

power for further Reactor Engineering instructions.

LOI 14-2 NRC Examination Scenario 4 Page 21 of 23

ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)

Power Ascension EN-RE-215 Attach 9.4 Today Page 1 of 1 From To Cplg RSCS Init Step Action Rod Method Notes Notch Notch Chk Grp Raise power 1

to 75% RTP - - - RWR NA - Target rate= 1% per minute WaitS minutes, then 2 demand 3D - - - - - -

Monicore case c

Prepared By: SM Approval: VCVtler'R~

(RxEng) (Shift Manager)

Reviewed By: Bob- TO!'\AW (RxEng or SRO)

Stamps CONTROL ROOM OPERATOR LOI14-2 NRC Examination Scenario 4 Page 22 of 23

ATTACHMENT 9.4 REACTIVITY MANEUVER INSTRUCTION FORMS Sheet 1 of 1 Reactivity/monitoring Steps- (site specific control rod movement control sheet format is to be used)

Power Ascension EN-RE-215 Attach 9.4 Today Page 1 of 1 From To Cplg RSCS Init Step Action Rod Method Notes Notch Notch Chk Grp Raise power 1

to 75% RTP

- - - RWR NA - Target rate= 1% per minute WaitS minutes, then 2 demand 3D - - - - - -

Monicore case 0

Prepared By: SM Approval: Vcwet'RO"et (RxEng) (Shift Manager)

Reviewed By: Bob- Tc?t'\.e4:,

(RxEng or SRO)

Stamps INDEPENDENT VERIFIER LOI 14-2 NRC Examination Scenario 4 Page 23 of 23