Letter Sequence Draft Other |
---|
|
Results
Other: ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318, ML20240A322, ML20254A128, ML20254A272, ML20268A322, ML20268B437, ML20268C197, ML20274A136, ML20279A331, ML20297A306, ML20300A556, ML20301A632, ML20302A234, ML20302A235, ML20303A011, ML20303A016, ML20307A010, ML20307A019, ML20321A279, ML20322A350, ML20323A018, ML20325A031, ML20328A162, ML20329A432, ML20329A442, ML20350B716, ML20350B723, ML20350B739, ML20350B785, ML21012A270, ML21025A073, ML21025A143, ML21025A403, ML21025A405, ML21025A414, ML21040A471, ML21040A483, ML21043A207, ML21050A084, ML21050A119, ML21050A227, ML21056A220... further results
|
MONTHYEARML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) Project stage: Draft Other ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test Project stage: Draft Other ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions Project stage: Other ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) Project stage: Other ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) Project stage: Other ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key Project stage: Other ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key Project stage: Draft Other ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) Project stage: Draft Other ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) Project stage: Other ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) Project stage: Draft Other ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other 2020-03-12
[Table View] |
|
---|
Category:License-Operator
MONTHYEARJAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1112022-03-14014 March 2022 Requalification Program Inspection IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18029A5822018-01-29029 January 2018 Requalification Program Inspection ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) 2024-07-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) ML16081A1592016-03-0303 March 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML16085A2472016-03-0303 March 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16085A2462016-03-0101 March 2016 Final Outlines (Folder 3) ML16085A2482016-03-0101 March 2016 Handouts to Applicants - Summary of References(Folder 3) ML16081A0772016-02-29029 February 2016 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML16085A2492016-02-25025 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) 2024-07-03
[Table view] |
Text
Facility:
James A. Fitzpatrick ExamDate:
Feb2020 1 2 3 4 5 6 ADMIN Attributes JobContent Admin JPMs LOD Topic U/E/S Explanation andK/A (1-5) l/C Critical Scope Perf.
Cues Overlap Job Key Minutia Link Focus Steps (N/B) Std.
ROC001 C0109 2 S ROCOO2 2 3 3 S ROEC 2.21 3 S RORC 2 34 3 S SROC001 COO E Rearranged onSROworksheet.
2.1.19 2 order ofquestions SROCOO2 2 8 3 S SROEC EC E Deleted ofJPMstep9.
2.2.41 3 extraneous part SRORC RC E Revised 2.3.4 3 staytime for wording clarity SROEP 2.4.40 3 S 1
Safety Simulator/In-Plant Function JPMs andK/A 9
A 290003 2 x E Madeadditional stepcritical.
A4.01 2
B 259001 3 S A4.01 4
C 209001 2 x E Changed initial tomakeadditional conditions step cmial.
A4.01 6
D 262001 3+ S A4.01
5 E 223002 4 S A4.03 F 3 x E Revised task Addedmore standard. detailed indicator 201001 descriptors.
A2.07 3
G 239001 2 S A4.01 7
H 215005 3 S A4.06 5
I 223002 2 S A2.09 6
J 295003 3+ S AA1.04 1
K 201001 2 S 2.1.20
ES301 3 FormES301-7 Instructions for Completing This Table:
Check ormarkany item(s) requiring a comment andexplain theissue inthe space provided using the guidebelow.
- 1. Check each JPM for appropriate administrative topic requirements (COO, EC,Rad,andEP) orsafetyfunction requirements K/A.
andcorresponding Markincolumn1.
(ES-301, D.3and D.4)
- 2. Determine thelevel of difficulty (LOD) using anestablished 1-5rating scale. Levels 1and5 represent (low aninappropriate orhigh) for level discriminatory thelicense thatisbeing tested. Mark in column 2 (Appendix D,C.1.f)
- 3. Incolumn 3,"Attributes," check the appropriate boxwhenanattribute isnotmet:
o Theinitial conditions and/or initiating cueis clear toensure theoperator understands thetaskandhowtobegin. C,B.4)
(Appendix o TheJPMcontains appropriate cues that clearly indicate whenthey should beprovided tothe examinee. andnotleading.
Cuesareobjective (AppendixC,D.1) o AII critical steps (elements) areproperly identified.
O Thescope ofthetask isnottoonarrow (N) ortoobroad (B).
O Excessive overlap does notoccur withother parts ofthe operating test orwritten examination. (ES-301, D.1.a, D.2.a) andES-301, o Thetask performance standard clearly describes the expected outcome ( i.e.,
end state).Each p erformance stepidentifies a standard for successful completion ofthestep.
o A valid marked upkeywasprovided (e.g., graph interpretation, initialed steps for handouts).
- 4. Forcolumn 4,"Job Content," check theappropriate boxif the job content flaw doesnotmeetthefollowing elements:
o Topics are linked tothe jobcontent (e.g.,nota disguised task, task required inreal job).
o TheJPMhasmeaningful performance requirements thatwill provide a legitimate basis forevaluating theapplicant's understanding andability tosafely operate theplant. (ES-301, D.2.c)
- 5. Based onthereviewer's judgment, isthe JPMaswritten (U)nacceptable (requiring repairor replacement),inneed (S)atisfactory?
of(E)nhancement, or Marktheanswer incolumn 5.
- 6. Incolumn 6,provide a brief description ofany(U)nacceptable or(E)nhancement rating from column 5.
Saveinitial reviewcomments anddetail subsequent comment resolution sothat eachexam-bound JPM ismarked resolution bya (S)atisfactory onthis form.
ES301 4 FormES301-7 Facilit
- James A. Fitz atrick Scenario:
1 ExamDate:
Feb2020 1 2 3 4 5 6 7 8 9 10 Event Realism/Cred. *@t*sdVge a e LOD TS CTs gSyc9en9.p U/E/S Explanation 1 s 2 X S 3 X X S 4 X S 5 S 6 X S 7 X X S 8 S 9 X X S 9 2 2 4
ES-301 5 FormES301-7 Facilit:James A. Fitz atrick Scenario:2 ExamDate:
Feb2020 1 2 3 4 5 6 7 8 9 10 Event Realism/Cred. *c9t oan n*sde;itLOD
- TS CTs O e*"a^p U/E/S Explanation 1 s 2 X S 3 S 4 X S 5 X X S 6 S 7 X S 8 X X S 8 2 2 5
ES301 6 FormES301-7 Facilit
- James A. Fitz atrick Scenario:
3 ExamDate: Feb2020 1 2 3 4 5 6 7 8 9 10 Event Realism/Cred. *c9t Va*
n*sd "n
- LOD TS CTs OSyce*"dp U/E/S Explanation 1 U Replaced tolimit event potential JPMF with overlap 2 X S 3 X S 4 X (*) X S *This eventreuires TSdeterminations tomaketwose arate a licant 5 S 6 X S 7 X X S 8 X S 9 X S 9 1 2 3
ES301 7 FormES3017 Facilit
- James A. Fitz atrick Scenario:
4 ExamDate:
Feb2020 1 2 3 4 5 6 7 8 9 10 Event Realism/Cred. Required Ve able LOD TS CTs O e*"a'p U/E/S Explanation 1 X S 2 X S 3 X S 4 S 5 X E Added TSent reardinotential detail 6 X S 7 X X S 8 X S 9 X X S 9 2 3 4
ES301 8 FormES3017 Facilit
- James A. Fitz atrick Scenario:5 S are ExamDate:Feb2020 1 2 3 4 5 6 7 8 9 10 Event Realism/Cred. V9e n*sd Sc9t an
- LOD TS CTs Ov I"a^p U/E/S Explanation 1 s 2 X S 3 X S 4 X S 5 S 6 X S 7 X X S 8 X S 8 2 2 5
ES301 9 FormES301-7 forCompleting This Instructions Table:
Usethis tablefor each scenario for evaluation.
2 Checkthis boxif theevents arenotrelated (e.g.,seismic event followed byapipe rupture) ORif the events donotobey thelaws andthermodynamics.
ofphysics 3,4 Incolumns 3and4,check the boxif there isnoverifiable orrequired asapplicable.
action, Examples ofrequired areasfollows:
actions (ES-301, D.5f)
. opening,closing, andthrottling valves
. starting andstopping equipment
. raising andlowering level, flow, and pressure
. making decisions andgiving directions
. acknowledging orverifying keyalarms and automatic actions (Uncomplicated events that require action nooperator this beyond should included not be on the o perating test unless they are necessary t he toset stage for subsequent events. D, (Appendix B.3).)
5 Check boxif this thelevel ofdifficulty isnotappropriate.
6 Checkthisboxif theevent hasa TS.
7 Check boxif this theevent hasacritical task (CT). Ifthe same CTcovers more than oneevent, check theevent wheretheCTstarted only.
8 Check boxif this theevent overlaps with another event onany ofthelast twoNRCexaminations. (Appendix D,C.1.f) 9 Basedonthereviewer's judgment, istheevent aswritten (U)nacceptable repair (requiring orreplacement), inneedof(E)nhancement, theanswer or(S)atisfactory?
Mark incolumn 9.
10 Record anyexplanations oftheevents here.
shaded Inthe boxes, sumthenumber ofcheck marks ineach column.
. Incolumnsumthenumber 1, ofevents.
. Incolumns 2-4, record the total number ofcheck marks for eachcolumn.
. Incolumn 5, based on the reviewer's judgement, place a checkmark only ifthe scenario's LODisnotappropriate.
. Incolumn 6,TSarerequired tobe2 2for eachscenario. (ES-301, D.5.d)
. Incolumn 7,preidentified CTsshould be2 2for eachscenario. (Appendix D;ES-301, D.5.d; ES-301-4)
. Incolumn 8,record thenumber ofevents notused onthetwoprevious NRCinitial licensing exams. A scenario isconsidered unsatisfactoryif there is< 2 newevents. (ES-301, D.5.b; Appendix D,C.1.f)
. Incolumn 9,record whether thescenario aswritten (U)nacceptable, inneedof(E)nhancement, or (S)atisfactory from column11ofthesimulator scenariotable.
ES301 10 FormES301-7 Facility: ExamDate: FEB2020 1 2 3 4 5 6 7 8 11 Scenario % Unsat Explanation Event Events TS TS CT CT
- "8"0 Totals Unsat. Total Unsat.TotalUnsat.
Elements 1 9 2 2 0 S 2 8 2 2 0 S 3 9 1 2 2 11 S Seescenario #3Table,above 4 9 2 3 0 S 5 (Spare) 8 2 2 0 S for Instructions Completing This Table:
Check ormarkanyitem(s)requiring comment andexplainthe issue inthe space provided.
1,3,5 Foreach scenario, simulator enter the totalnumber of events (column 1), TSentries/actions (column 3), andCTs(column 5).
Thisnumber should match the scenario respective from the event-based scenario tables (thesum from c olumns 1, 6,and 7, respectively).
2,4,6 Foreach simulatorscenario, evaluateeach TS,andCT as (S)atisfactory, (E)nhance, event, or(U)nsatisfactory based onthe following criteria:
- a. Events. Each eventisdescribedona FormES-D-2, including allswitch manipulations,pertinent andverifiable alarms, Event actions. arebalanced actions between at-the-controls andbalance-of-plant applicants during thescenario. All event-related onFormES-301-4 attributes aremet.Enter number thetotal of unsatisfactory eventsincolumn 2.
- b. TS.A scenario includes twoTSentries/actions atleast across atleast twodifferentevents. TSentriesandactions onFormES-D-2.
aredetailed Enter thetotal number TSentries/actions ofunsatisfactory incolumn 4.(ES-301, D.5d)
- c. CL Check that a scenarioincludes atleasttwopreidentified CTs.Thiscriterion isa target attribute, quantitative notanabsoluteminimum Check requirement.
thateach CTisexplicitly bounded onFormES-D-2 with measurable performance standards (see AppendixD). Enter thetotal numberofunsatisfactory CTsin column 6.
7 8
Incolumn If 7,calculate thevalueincolumn thepercentage ofunsatisfactory 7 is> 20%,markthescenario scenario elements:
as(U)nsatisfactory (2
incolumn
+ 4 + 6) 1 + 3+ 5/
8.If column 7 is 5 20%, annotate with or(S)atisfactory.
(E)nhancement 9 incolumn 9,explaineachunsatisfactory TS,andCT.Editorial event, comments canalso beadded here.
Saveinitial reviewcomments anddetail subsequentcomment resolution sothat eachexam-bound scenario ismarked bya (S)atisfactory resolution form.
onthis
ES301 11 FormES3017 Sitename: James A.Fitzpatrick ExamDate: February 2020 OPERATING TESTTOTALS Total Total Total %
Total Explanation Unsat. Edits Sat. Unsat.
Admin. 9 0 3 6 JPMs Sim./In-Plant 11 0 3 8 JPMs Scenarios 5 0 0 5 Op.Test 25 0 6 19 0 Totals:
Instructions forCompleting This Table:
Updatedatafor thistable from qualityreviews andtotals intheprevioustables and then calculate the percentage of total items areunsatisfactory that andgive anexplanation inthespace provided.
- 1. Enter the total number ofitems submitted fortheoperating test inthe "Total" column.For example, if nine administrative JPMswere submitted,enter"9"inthe "Total" items column for administrative JPMs.
Forscenarios, enter the totalnumber ofsimulator scenarios.
2' Enter thetotal number of(U)nsatisfactoryJPMsandscenarios from the twoJPMs column 5and simulator scenarios column 8 intheprevious tables.Provide anexplanation inthe space provided.
3' Enter totalsfor (E)nhancements needed and(S)atisfactoryJPMsandscenarios from the previous tables. Thistask isfortrackingonly.
- 4. Total each column andenter the amounts inthe"Op.Test Totals" row.
5' Calculate thepercentage ofthe operatingtestthatis(U)nsatisfactory (Op. Test Total Unsat.)/(Op. Test Total) andplace this value inthebolded "%Unsat." cell.
Refer toES-501, E.3.a,torate theoveralloperatingtestasfollows:
satisfactory,ifthe "Op. TestTotal" "%Unsat." s is 20%
unsatisfactory, "Op.
if TestTotal""%Unsat." is> 20%
6 Update this table andthe tables above with post-examchanges ifthe"as-administered" operating test required content changes, including thefollowing:
. TheJPMperformance standardswere incorrect.
. Theadministrative JPMtasks/keys wereincorrect.
CTswereincorrect inthe scenarios (notincludingpostscenario criticaltasks defined in Appendix D).
. TheEOPstrategy wasincorrect ina scenario(s).
. TSentries/actions were determined tobeincorrect ina scenario s .
i