Requalification Program Inspection
ML22073A111
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/14/2022
From: Diane Jackson
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Jackson D
References
Download: ML22073A111 (3)


Text

D. Curtlan UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 March 14, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Rhoades:

In a telephone conversation on March 3, 2022, Mr. B. Fuller, Senior Operations Engineer, and Mr. J. Gessner, Requalification Program Lead, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at James A. FitzPatrick Nuclear Power Plant. The inspection is planned for the week of April 25, 2022, which coincides with your scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past 2 years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past 2 years on simulator performance problems; (3) an index or summary of simulator performance test results in the past 2 years; and 4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by April 11, 2022. Mr. Gessner has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

D. Rhoades 2 The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Fuller at (610) 741-9636.

Sincerely, Digitally signed by Donald E.

Donald E. Jackson Date: 2022.03.14 13:33:07 Jackson -04'00' Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety Docket No. 50-333 License No. DPR-59 cc: Distribution via ListServ

D. Rhoades 3

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - REQUALIFICATION PROGRAM INSPECTION DATED MARCH 14, 2022 DISTRIBUTION:

ECarfang, DORS JHawkins, DORS SHaney, DORS CDukehart, DORS EMiller, DORS, SRI CSwisher, DORS, RI ATrudell, DORS AA LHowell, RI OEDO RidsNrrPMFitzPatrick Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\DRS\Operations Branch\FULLER\Requal FY22 FitzPatrick\JAF 2021 LOR CorpNotifLtr.docx ADAMS ACCESSION NO. ML22073A111 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS/OB RI/DORS/OB NAME BFuller/BJF DEJackson/ DEJ DATE 3/14/22 3/8/22 OFFICIAL RECORD COPY