ML14119A393

From kanterella
Jump to navigation Jump to search

NRC Comments on Draft Licensee- Developed Exam (Operating) (Folder 2)
ML14119A393
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/04/2014
From: David Silk
Operations Branch I
To:
FitzPatrick
Jackson D
Shared Package
ML13330B159 List:
References
TAC U01887
Download: ML14119A393 (2)


Text

FitzPatrick Op Test Comments JPM Format-Suggest closer alignment to Form ES-C-1 in Appendix C of NUREG-1 021. Need to specify a detailed task standard to assist in grading Admin JPMs RO-C002 :

No comment.

RO-EP:

JPM is not discriminating in that anyone (secretary, NPO) could make announcement. Too much cueing. Heplace with rad control JPM.

S/RO-C00-1: No comment.

SRO-C00-2: List "all" reports. Consider 1 OCFR50. 72(b )(2)(iv)(A) - ECCS should have actuated.

S/RO-EC:

No comment.

SRO-EP:

Provide info about earthquake for clarification.

SRO-RC:

No comment.

Simulator JPMs JPM A:

No comment.

JPM B:

No comment.

JMPC:

No comment.

JPM D:

No comment.

JPM E:

Modify JPM steps to better reflect presented conditions presented conditions.

JPM F:

No comment.

JPMG:

Needs to be modified to be an alternate path JPM.

JPM H:

No comment.

In-Plant JPMs JPM 1:

No comment.

JPM J:

No comment.

JPM K:

No comment.

Simulator Scenarios Scenario 1:

No comment. Will designate this scenario as the spare.

Scenario 2:

Modify electrical malfunction - lose higher level/voltage bus.

Scenario 3:

No comment.

Scenario 4:

No comment.