ML14119A393
| ML14119A393 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 04/04/2014 |
| From: | David Silk Operations Branch I |
| To: | FitzPatrick |
| Jackson D | |
| Shared Package | |
| ML13330B159 | List: |
| References | |
| TAC U01887 | |
| Download: ML14119A393 (2) | |
Text
FitzPatrick Op Test Comments JPM Format-Suggest closer alignment to Form ES-C-1 in Appendix C of NUREG-1 021. Need to specify a detailed task standard to assist in grading Admin JPMs RO-C002 :
No comment.
RO-EP:
JPM is not discriminating in that anyone (secretary, NPO) could make announcement. Too much cueing. Heplace with rad control JPM.
S/RO-C00-1: No comment.
SRO-C00-2: List "all" reports. Consider 1 OCFR50. 72(b )(2)(iv)(A) - ECCS should have actuated.
S/RO-EC:
No comment.
SRO-EP:
Provide info about earthquake for clarification.
SRO-RC:
No comment.
No comment.
JPM B:
No comment.
JMPC:
No comment.
JPM D:
No comment.
JPM E:
Modify JPM steps to better reflect presented conditions presented conditions.
JPM F:
No comment.
JPMG:
Needs to be modified to be an alternate path JPM.
JPM H:
No comment.
No comment.
JPM J:
No comment.
JPM K:
No comment.
Simulator Scenarios Scenario 1:
No comment. Will designate this scenario as the spare.
Scenario 2:
Modify electrical malfunction - lose higher level/voltage bus.
Scenario 3:
No comment.
Scenario 4:
No comment.