ML14345A988: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14345A988
| number = ML14345A988
| issue date = 12/23/2014
| issue date = 12/23/2014
| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Station, Unit No. 2 (TAC No. MF5383)
| title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Station, Unit No. 2
| author name = Ennis R B
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000277
| docket = 05000277
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:MF5383
| project = TAC:MF5383
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 WASHINGTON, D.C. 20555-0001 December 23, 2014 SUBJECT: REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2 (TAC NO. MF5383) Dear Mr. Pacilio: By letter to the Nuclear Regulatory Commission (NRC) dated December 5, 2014, Exelon Generation Company, LLC (Exelon) submitted a Global Nuclear Fuel-Americas (GNF-A) affidavit dated November 6, 2014, executed by Mr. James F. Harrison (included in Attachment 4 to Exelon's letter). Exelon requested that the information contained in Attachment 4 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390. Specifically, Exelon requested that the following document be withheld: GNF report 001 N0184.3-P, dated November 6, 2014, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR [Safety Limit Minimum Critical Power Ratio], Peach Bottom Unit 2 Cycle 21" A non-proprietary copy of the document (Attachment 5 to Exelon's letter) has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the M. Pacilio -2 -submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1420. Docket No. 50-277 cc: Mr. James F. Harrison Vice President Fuel Licensing Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv M. Pacilio -2 -submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1420. Docket No. 50-277 cc: Mr. James F. Harrison Vice President Fuel Licensing Sincerely, IRA! Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDorllpl1-2 Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource ADAMS Accession No
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 23, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
* ML 14345A988 .. OFFICE LPL 1-2/PM LPL 1-2/LA NAME REnnis A Baxter DATE 12/12/14 12/22/14 OFFICIAL RECORD COPY RidsRgn1 MaiiCenter Resource RidsAcrsAcnw_MaiiCTR Resource LPL 1-2/BC MKhanna 12/23/14
 
}}
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2 (TAC NO. MF5383)
 
==Dear Mr. Pacilio:==
 
By letter to the Nuclear Regulatory Commission (NRC) dated December 5, 2014, Exelon Generation Company, LLC (Exelon) submitted a Global Nuclear Fuel- Americas (GNF-A) affidavit dated November 6, 2014, executed by Mr. James F. Harrison (included in Attachment 4 to Exelon's letter). Exelon requested that the information contained in Attachment 4 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390. Specifically, Exelon requested that the following document be withheld:
GNF report 001 N0184.3-P, dated November 6, 2014, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR [Safety Limit Minimum Critical Power Ratio], Peach Bottom Unit 2 Cycle 21" A non-proprietary copy of the document (Attachment 5 to Exelon's letter) has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the
 
M. Pacilio                                       submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1420.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-277 cc:     Mr. James F. Harrison Vice President Fuel Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
 
..* ML14345A988 OFFICE     LPL 1-2/PM         LPL 1-2/LA       LPL 1-2/BC NAME       REnnis             A Baxter         MKhanna DATE         12/12/14         12/22/14         12/23/14}}

Latest revision as of 18:37, 31 October 2019

Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Station, Unit No. 2
ML14345A988
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/23/2014
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Rick Ennis, NRR/DORL 415-1420
References
TAC MF5383
Download: ML14345A988 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 23, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2 (TAC NO. MF5383)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated December 5, 2014, Exelon Generation Company, LLC (Exelon) submitted a Global Nuclear Fuel- Americas (GNF-A) affidavit dated November 6, 2014, executed by Mr. James F. Harrison (included in Attachment 4 to Exelon's letter). Exelon requested that the information contained in Attachment 4 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390. Specifically, Exelon requested that the following document be withheld:

GNF report 001 N0184.3-P, dated November 6, 2014, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR [Safety Limit Minimum Critical Power Ratio], Peach Bottom Unit 2 Cycle 21" A non-proprietary copy of the document (Attachment 5 to Exelon's letter) has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the

M. Pacilio submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-277 cc: Mr. James F. Harrison Vice President Fuel Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv

..* ML14345A988 OFFICE LPL 1-2/PM LPL 1-2/LA LPL 1-2/BC NAME REnnis A Baxter MKhanna DATE 12/12/14 12/22/14 12/23/14